Link-Belt Co. v. Star Iron & Steel Co.
Link-Belt Co. v. Star Iron & Steel Co.
Opinion of the Court
Opinion
This is an action by Link-Belt Company, a division of FMC Corporation (hereinafter Link-Belt) against Star Iron and Steel Com
The action for personal injuries and wrongful death (hereinafter the Green-Harris case) arose out of the collapse of a crane owned by the City of Los Angeles and used at Los Angeles Harbor. In 1959 Link-Belt acquired the crane, used, for the purpose of modifying and reselling it to the city. Link-Belt entered into a written contract with Star, whereby Star, for a price of $22,000, agreed to remodel and repair the crane in certain respects, replace certain parts and restore the crane “to good running condition.” After Star completed its work at Tacoma, Washington, the crane was shipped to Los Angeles, where Link-Belt made further modifications and repairs before the crane was accepted by the city. The Green-Harris accident occurred on March 30, 1968, while the crane was being used in loading a ship at Los Angeles Harbor.
The Green-Harris action was tried to the court, sitting without a jury. With respect to the liability of Link-Belt the trial court found the following among other things: following the work done by Star under its 1959 contract the crane was delivered to Los Angeles Harbor in an unassembled condition. During the course of reassembly of the crane Link-Belt made modifications in the luffing drum assembly and introduced a “Link Belt gear reduction system.” Link-Belt replaced the original 50-foot boom with a 70-foot boom and installed new electrical controls, motors and gear drives. Link-Belt also attempted to increase the load capacity of the crane by adding approximately 3000 additional pounds to the counterweight; and, after a series of tipping tests, rated the capacity of the crane at 7.5 tons at a 51-foot load radius. Although it was proper practice to conduct visual and scientific tests of the critical components, including the luffing drum shaft, Link-Belt failed to make any such tests during that period.
The trial court’s conclusion of law declared: “City is entitled to be indemnified by Link Belt by reason of City’s relation to the plaintiffs as an owner of said waterfront facility and appurtenances thereto making City secondarily and passively liable for the active and primary wrongdoing and negligence of Link Belt.”
The court awarded judgments totalling $251,213.93 against Link-Belt and the owner of the ship. The shipowner was given judgment against Link-Belt, the city and two other parties for indemnification in whatever amount the shipowner was required to pay to plaintiffs. The city and the other defendants were given judgment of indemnification against Link-Belt in whatever amount they were required to pay plaintiffs.
An appeal was taken by Link-Belt and the judgment was affirmed. (Green v. City of Los Angeles (1974) 40 Cal.App.3d 819 [115 Cal.Rptr. 685].)
Star was not a party to the Green-Harris case. Link-Belt’s motion to join Star as a cross-defendant in that case was denied as untimely. Link-Belt thereupon commenced this action against Star by filing its “complaint for indemnification.” This complaint, which was filed before the Green-Harris case was tried, alleged that if Link-Belt was held liable in the Green-Harris action, “the basis of such liability is and will be [Link-Belt’s] passive, indirect or secondary negligence as distinguished from the active, direct or primary negligence” of Star.
After the Green-Harris judgment had become final, Star made a motion for summary judgment in this action, based upon the findings of fact and conclusions of law and the appellate court opinion in the Green-Harris case. Copies of those documents were attached to the notice of motion.
In opposition to the motion Link-Belt submitted a copy of Star’s 1959 repair proposal and some excerpts from deposition testimony.
Link-Belt does not dispute that some species of active negligence on its part was adjudicated in the Green-Harris case. (See Burlingame Motor Co. v. Peninsula Activities, Inc., supra, 15 Cal.App.3d 656, 662.) Rather, it contends that, upon each of two theories, this finding does not bar a recovery against Star. One is that the action is based upon a breach of warranty. The other theory is that the law of implied indemnity should be reexamined in the light of the new comparative negligence rule established in Li v. Yellow Cab Co. (1975) 13 Cal.3d 804 [119 Cal.Rptr. 858, 532 P.2d 1226, 78 A.L.R. 3d 393].
The contention that this action is not one for indemnification confuses the source of the underlying right with the nature of the remedy.
Indemnification, as a form of relief, may be based upon a contractual obligation (see Civ. Code, § 2772) or it may be based upon equitable considerations without a contractual relationship between the parties. Thus, in Rossmoor Sanitation, Inc. v. Pylon, Inc. (1975) 13 Cal.3d 622, at page 628 [119 Cal.Rptr. 449, 532 P.2d 97], the court said: “Indemnity may be defined as the obligation resting on one party to make good a loss or damage another party has incurred. [Citation.] This obligation may be expressly provided for by contract [citation], it may be implied from a contract not specifically mentioning indemnity [citation], or it may arise from the equities of particular circumstances . .. .”
In the present case there is no contention that Star ever promised expressly to indemnify Link-Belt against loss or liability. If Star is under any duty to indemnify, it must arise by implication from the contract, or from the equities of the situation. Link-Belt’s theory appears to be in essence, that Star warranted the crane to be free from defects, that this warranty was breached in that the crane contained a defective part, and that by reason of that breach Link-Belt was damaged to the extent that it was required to pay the Green-Harris judgment. The relief sought is that Star make good the loss which Link-Belt incurred by reason of the
A contention similar to that made by Link-Belt here was rejected by the Supreme Court in County of Alameda v. Southern Pac. Co. (1961) 55 Cal.2d 479 [11 Cal.Rptr. 751, 360 P.2d 327]. In that case a rock company had made an agreement with the railroad which included a promise by the rock company to maintain a grade crossing. The railroad was under a common law duty to maintain it. The crossing was not properly maintained. A truck attempting to use the crossing was damaged, and its owner recovered a judgment against the railroad, which then sought to recover from the rock company. The Supreme Court said (at p. 487): “It is Southern Pacific’s theory, which was adopted by the trial court, that the breach of this contractual duty by Rock proximately and foreseeably led to the accident to the Cali truck and the necessity of Southern Pacific’s responding in damages therefor. Southern Pacific therefore argues that it is not an action for indemnification but rather a simple contract action for the damages proximately resulting to it from Rock’s breach of the contract to maintain. But the cases in California upon which Southern Pacific relies have treated such an action based upon the violation of a contract duty to the plaintiff by the defendant which resulted in a tort judgment against the plaintiff by a third person as being upon a cause of action on an implied promise to indemnify. (De La Forest v. Yandle, 171 Cal.App.2d 59, 61-62 [340 P.2d 52]; San Francisco Unified Sch. Dist. v. California Bldg. etc. Co., 162 Cal.App.2d 434, 440, 449 [328 P.2d 785]) and the cases cited and discussed in the latter case (162 Cal.App.2d at pp. 444-448) indicate that courts generally, where they allow such an action, treat it as one for recovery on an implied promise to indemnify the promisee for damages which the promisee is compelled to pay because of the breach by the promisor of his express promise.”
The trial court judgment in favor of the railroad against the rock company was reversed upon the ground that the contract between those parties contained no language expressly calling for indemnification of the railroad against its own negligence.
In the present case, since the recovery sought is indemnification, Link-Belt cannot escape the consequences of its own negligence by characterizing the action as one for breach of warranty.
Whatever the Burlingame court meant by this remark in a case which antedated the Li decision, it is not authority for a post-Zi change in the law of indemnity. There is nothing in the Li opinion to suggest that the Supreme Court intended any change in the long-established case law governing indemnification as between tortfeasors.
In Gardner v. Murphy (1975) 54 Cal.App.3d 164 [126 Cal.Rptr. 302] the court pointed out that the transfer of loss through indemnification rests upon a determination unlike that which is the basis of the sharing of liability under comparative negligence. The court said at page 168: “This difference in the character or kind of wrong which each joint tortfeasor has done to the injured third person is thus the essential foundation for the shift in liability between them accomplished by means of indemnification. This transfer in liability is not done simply because the two tortfeasors are not in pari delicto (see Herrero v. Atkinson, 227 Cal.App.2d 69, 74 [38 Cal.Rptr. 490, 8 A.L.R.3d 629]) or because the negligence or wrong of one is greater than that of the other as in pure comparative negligence. (See Li v. Yellow Cab Co., 13 Cal.3d 804, 829 [119 Cal.Rptr. 858, 532 P.2d 1226]; American Can Co. v. City & County of San Francisco, 202 Cal.App.2d 520, 525-526 [21 Cal.Rptr. 33.]) Equitable indemnity is not a sharing in liability in proportion to fault as pure comparative negligence is. It is instead a total and complete transfer of liability that is equitably justified by the difference in character or kind of the wrongs of the two tortfeasors. (See Alisal Sanitary Dist. v. Kennedy, 180 Cal.App.2d 69, 75 [4 Cal.Rptr. 379].)”
The long line of cases establishing the rules under which an entire loss may be shifted from one tortfeasor to another is binding upon this court, and may not be disregarded upon the basis of any asserted analogy with the Li case.
The judgment is affirmed.
Dunn, J., concurred.
For pertinent discussion of this principle, see Morgan v. Stubblefield (1972) 6 Cal.3d 606, 625 [100 Cal.Rptr. 1, 493 P.2d 465]; Gardner v. Murphy (1975) 54 Cal.App.3d 164 [126 Cal.Rptr. 302]; Burlingame Motor Co. v. Peninsula Activities, Inc. (1971) 15 Cal.App.3d 656 [93 Cal.Rptr. 376]; King v. Timber Structures, Inc. (1966) 240 Cal.App.2d 178 [49 Cal.Rptr. 414]; Cahill Bros., Inc. v. Clementina Co. (1962) 208 Cal.App.2d 367, 375 [25 Cal.Rptr. 301]; 4 Witkin, Summary of California Law (8th ed. 1974) Torts, sections 50-52.
“MR. WELLS [attorney for Link-Belt]: .... Now, if we were going on the negligence theory, I would certainly agree with the Court because one who is actively negligent cannot proceed against another for indemnity. There has been a case that’s just come down, I think the last few days, the Rossmoor case from the Supreme Court, that points that out. But here we are going on a warranty theory where the negligence of the party seeking indemnity is not a defense.”
Dissenting Opinion
I dissent. I believe there are triable issues of fact in the case at bench.
The majority upholds the summary judgment in favor of defendant Star on the theory that plaintiff Link-Belt’s cause of action against Star is necessarily an action for indemnification, and that Link-Belt cannot recover because of the law of implied indemnity which precludes recovery by a plaintiff found to be actively negligent.
The majority’s views are based upon dicta. The major premise of the majority is that there can be no cause of action for breach of an implied contract, such as an implied warranty of merchantability or fitness, without the application of the indemnity doctrine of active-passive negligence, if the plaintiff’s cause of action is predicated on shifting a tort liability of plaintiff to defendant. I do not consider this premise to be well founded.
The second premise of the majority, which follows from acceptance of the first premise, is that some species of active negligence on the part of Link-Belt was adjudicated in the Green-Harris litigation, and that this determination precludes any triable issue on this matter between Link-Belt and Star in the case before us. This second premise has a fatal flaw. The prior adjudication related to factual and legal issues between Link-Belt and the City of Los Angeles as to liability to the Green-Harris plaintiffs. Defendant Star was not a party to the Green-Harris action. Hence, there has been no determination or adjudication of any negligence on the part of Link-Belt—active or passive—with respect to the factual and legal issues involved in Link-Belt’s relationship with Star.
There is no doubt that the concept of “indemnity” is a broad one, and the term is used to cover many situations. Thus, sections 2772 to 2784.5 of the Civil Code constitute title 12 of said code, which is labelled “Indemnity.” Civil Code section 2772 defines indemnity as “a contract by which one engages to save another from a legal consequence of the conduct of one of the parties, or of some other person.” Similarly, Civil Code section 2527, in defining “insurance,” uses the following language: “Insurance is a contract whereby one undertakes to indemnify another against loss, damage, or liability, .arising from an unknown or contingent event.” We find the same definition of “insurance” set forth in section 22 of the Insurance Code.
However, the fact that the term, “indemnity,” is used in such a broad fashion does not lead to the conclusion that the determination of rights
In contending that the trial court erred in granting defendant Star’s motion for summary judgment, plaintiff argues that said defendant’s contract with plaintiff included an implied warranty of merchantability by defendant, and that plaintiff’s complaint, while entitled an action for indemnity, alleges such a warranty and the breach thereof in addition to the normal indemnity allegations. Plaintiff asserts that it is entitled to go to trial against defendant on the warranty cause of action without regard to the law of implied equitable indemnity. Clearly, plaintiff’s complaint contained the allegations necessary to state a cause of action for breach of implied warranty, including allegations that defendant Star had been given notice of such breach. (Faucette v. Lucky Stores, Inc. (1963) 219 Cal.App.2d 196 [33 Cal.Rptr. 215].)
The majority relies on County of Alameda v. Southern Pac. Co. (1961) 55 Cal.2d 479 [11 Cal.Rptr. 751, 360 P.2d 327], as holding that any action based upon a violation of a contract duty to the plaintiff by the defendant which resulted in a tort judgment against the plaintiff by a third person is construed as being upon a cause of action on an implied promise to indemnify. This concept is stated in County of Alameda, but this is not the actual holding of the case. In County of Alameda, Southern Pacific had set forth in its contract with California Rock express provisions for indemnity in two specific particulars. County of Alameda held, therefore, that Southern Pacific would have likewise made express provision for indemnity against its liability based on Southern Pacific’s negligent failure to maintain the track in proper condition “if it had intended to bind Rock to such an obligation. ” (County of Alameda, supra, 55 Cal.2d 479, at p. 488.) (Italics added.)
The contract between Link-Belt and Star is not at all similar to the contract between Southern Pacific and California Rock. In 1959, plaintiff acquired the used crane, involved in the Green-Harris accident, from the Isaacson Iron Works. The crane had originally been built by defendant Star in 1931. In 1959, plaintiff contracted with defendant Star for the “remodeling- and repair” of the disassembled, used crane at Tacoma, Washington. Defendant Star undertook in this contract to furnish certain enumerated parts that needed replacement, to “junk all equipment not
Although the instant case does not involve a sale, the law of implied warranties with respect to sales provides a compelling analogy to the situation involved in the case at bench. Thus, California Uniform Commercial Code section 2314 provides for the implied warranty of merchantability and section 2315 of the same code provides for the implied warranty of fitness for a particular purpose.
The California Uniform Commercial Code provisions relating to the damages which a buyer is entitled to recover for a seller’s breach of the implied warranties set forth in sections 2314 and 2315, establishes a legislative policy which appears to me to be equally applicable to the case at bench in terms of a reasonable and sound decisional-law policy. In addition, California Uniform Commercial Code section 2715 provides that a buyer may recover incidental and consequential damages resulting from a seller’s breach of warranty. Specifically, California Uniform Commercial Code section 2715, subdivision (2)(b), sets forth that consequential damages resulting from a seller’s breach include “[i]njuiy to person or property proximately resulting from any breach of warranty.” This consequential-damage provision, enacted in 1963 as part of California’s adoption of the Uniform Commercial Code, is consistent, however, with the same law of damages found in former Civil Code sections 1789 and 1790. (See Cal. Code Comment to U. Com. Code, § 2714.)
It is significant that California Uniform Commercial Code section 2715 does not, through its express language, limit its application to injuiy to the buyer’s person or property. Nor does section 2715 require any application of the active-passive negligence dichotomy to a buyer’s action against a seller for breach of warranty for consequential damages of injuiy to person or property.
It is to be noted that the majority upholds the granting of summary judgment to defendant Star—thus denying to plaintiff a trial on the merits. The summary judgment process has been described in numerous reported cases. “ ‘The matter to be determined by the trial court in considering such a motion [for summary judgment] is whether the defendant (or the plaintiff) has presented any facts which give rise to a triable issue. The court may not pass upon the issue itself.... The aim of the procedure is to discover, through the media of affidavits, whether the
And in the recent case of Buehler v. Oregon-Washington Plywood Corp. (1976) 17 Cal.3d 520, 526 [131 Cal.Rptr. 394, 551 P.2d 1226], we were reminded that “[sjummary judgment may only be granted if no material fact issue remains in the case. Where affidavits have been submitted by the opposing parties, any doubts as to whether summary judgment is proper should be resolved against the moving party. [Citation.]”
My initial concern, therefore, centers upon the question of whether plaintiff’s cause of action for warranty presents triable factual issues, even though the majority’s analysis considers, erroneously in my opinion, that such a cause of action cannot be distinguished from the law of implied indemnity.
Defendant Star argues that, under California law, apart from the question of implied indemnity, implied warranty of merchantability has no application to a contract for services such as that under which ; defendant undertook the reconditioning of the crane, and that, in any event, plaintiff’s cause of action for warranty is barred by the applicable statute of limitations, although this defense had not been pleaded by defendant.
It has long been established in sales transactions that there is implicit in the contract the seller’s warranty of merchantability, i.e., that the subject goods are fit for their intended purpose. The elements of this implied warranty were originally contained in section 1735 of the Civil Code, but now may be found in the California Uniform Commercial Code, sections 2314-2316. The warranty is in the nature of an obligation imposed by law, although founded on contract. Much of the decisional law in this area of implied warranty concerns sales transactions, but the statutory guidelines contained in the Commercial Code sections mentioned above (and their predecessors) have been applied to other types of transactions as well. (Holmes Packaging Mach. Corp. v. Bingham (1967) 252 Cal.App.2d 862 [60 Cal.Rptr. 769] (implied warranty applicable to bailment contracts).)
In the case at bench, the contract between the plaintiff Link-Belt and defendant Star was not a sale. Defendant Star contends that implied warranty of merchantability is not applicable to a contract of reconditioning and repair of a chattel, as the essential item offered plaintiff by defendant was the latter’s services, rather than a tangible piece of property.
Plaintiff, however, in asserting that warranty principles apply to the contractual transaction between plaintiff and defendant, relies on the California Supreme Court case of Aced v. Hobbs-Sesack Plumbing Co. (1961) 55 Cal.2d 573 [12 Cal.Rptr. 257, 360 P.2d 897], which held that a construction contract calling for labor and materials, while not a sale, was a contractual transaction giving rise to an implied warranty of merchantability. Aced was a suit by a general contractor (in a cross-complaint) against a subcontractor, seeking damages for loss sustained from the installation by the subcontractor of defective tubing in a cement floor. The tubing was part of a radiant heating system and eventually corroded, causing leakage. The general contractor attempted to invoke the warranty provisions set forth in the then Uniform Sales Act (Civ. Code, §§ 1734-1736). The Supreme Court rejected the contract-of-sale approach, characterizing the installation contract as one for labor and materials rather than a sale, but held that, despite the absence of statutory law, “[t]here may nevertheless be an implied warranty [of merchantability]. . . . similar warranties may be implied in other contracts not governed by such statutory provisions when the contracts are of such a nature that the implication is justified{Aced, supra, 55 Cal.2d 573, at p. 582.) (Italics added.)
Thus did Aced enlarge upon the principle contained in Gagne v. Bertran (1954) 43 Cal.2d 481, 486 [275 P.2d 15]. Aced stated that it was
Defendant Star seeks to avoid the application of Aced to the instant case by asserting that Aced applies the doctrine of warranty of merchantability to a nonsale contract only when a defendant has supplied some part of a product or an article which was defective and such defectiveness caused the damage. That Aced cannot be construed so narrowly is seen in the language of Aced giving approval to the principle found in Gagne that contracts for labor and material give rise to an implied warranty that the product will be fit for its intended use “both as to workmanship and materials.” (Aced, supra, 55 Cal.2d 573, at p. 582.) (Italics added.)
In addition, Aced has been the basis for a recent decision of the California Supreme Court. In Pollard v. Saxe & Yolles Dev. Co. (1974) 12 Cal.3d 374 [115 Cal.Rptr. 648, 525 P.2d 88], the court applied the doctrine of implied warranty of merchantability to a contract for the construction of a new building. Pollard interprets Aced as rejecting the view that implied warranties are limited to contracts within the sales act and as holding “that an implied warranty of merchantability arises from a contract to build a portion of a building because the contract is one for material and labor.” (Pollard, supra, 12 Cal.3d 374, at p. 378.) (Italics added.)
But in extending the doctrine of implied warranties to a contract to build an entire building, Pollard emphasizes the nature of the contract as essentially one for material and labor and interprets the implied warranty as “an implied warranty protecting the owner from defective construction.” (Pollard, supra, 12 Cal.3d 374, at p. 378.) (Italics added.) The Gagne, Aced and Pollard cases make it clear that the implied warranty of merchantability or suitability imposed in contracts for labor and material protect against defective workmanship and defective construction as well as against defectiveness of an article, material or goods.
The Allied Properties case involved the services of a marine engineer in designing a structually sound pier. A denial of implied warranty liability has been upheld for various types of professional service contracts. (See Roberts v. Karr (1960) 178 Cal.App.2d 535 [3 Cal.Rptr. 98] (surveyor); Gautier v. General Telephone Co. (1965) 234 Cal.App.2d 302 [44 Cal.Rptr. 404] (communication services); Stuart v. Crestview Mut. Water Co. (1973) 34 Cal.App.3d 802 [110 Cal.Rptr. 543] (engineer); Shepard v. Alexian Brothers Hosp. (1973) 33 Cal.App.3d 606 [109 Cal.Rptr. 132] (blood transfusion).)
It is defendant Star’s contention that the repair and reconditioning of plaintiff’s crane constitutes a service rather than a contract for goods and labor, and that, consequently, no warranty should be implied. In considering this contention, I turn to the language of the contract itself—primarily the language of defendant Star’s bid—and interpret it, an appellate function that must be exercised independently of the trial court. (Parsons v. Bristol Development Co. (1965) 62 Cal.2d 861 [44 Cal.Rptr. 767, 402 P.2d 839].) The contract contemplated the replacement by defendant of the crane’s component parts, as needed, and the checking, cleaning and repair of the crane. Defendant promised to restore the crane to “good running condition.” The subject matter appears to me to be far closer to supplying labor and materials than it does to the performance of a service. I conclude, therefore, that the contract is one for material and labor where the imposition of warranty liability is justified under the principles enunciated in Aced and Pollard.
The Aced court did not expand upon the meaning to be given to its statement that warranties similar to those found in the Uniform Sales-Act (Civ. Code, §§ 1734-1736) may be implied in other contracts not
Defendant Star also makes the contention that summary judgment was properly granted by the trial court because the plaintiff’s alleged breach of warranty cause of action was barred by the statute of limitations; defendant argues that the appropriate statute is the two-year limitation set forth in Code of Civil Procedure, section 339, subdivision 1, for oral contracts. Plaintiff Link-Belt claims that, pursuant to Aced, the four-year limitation on actions based on written contracts applies.
It has been said that the general rule is that “[t]he cause of action for breach of contract ordinarily accrues at the" time of breach, and the statute begins to run at that time regardless of whether any damage is apparent or whether the injured party is aware of his right to sue. [Citations.]” (2 Witkin, Cal. Procedure (2d ed. 1970) § 284, p. 1133.) (Italics in original.) Terming this rule harsh, Witkin also discusses the substantial departure from the rule which has been expressed in warranty cases involving sales: “Under the doctrine of prospective warranty, if the seller promises that something shall or shall not happen within a future time, the cause of action does not accrue during that time unless and until the harm occurs.” (Id, § 294, at p. 1141.) (Italics in original.)
The California decisional law has adopted the prospective warranty approach. “We are satisfied, however, that this is a case which could properly be found to come within the operation of the principle that, if a warranty relates to a future event before which the defect cannot be discovered by the exercise of reasonable diligence, the warranty, though accompanied by a representation as to present condition, is prospective in character and the statute of limitations begins to run as of the time of that event. This principle, while not always stated in identical language,
In Aced, the general contractor was not barred by the statute of limitations from pursuing its remedy even though its cross-complaint was filed more than four years after the defective tubing had been installed in the radiant heating system. A ced construed the implied warranty of the subcontractor to endure for a reasonable length of time after installation, and found the “future event” to be the leaking of the defective tubing, not discovered by the general contractor until several years after the installation was complete; the cause of action was found to have been filed in timely fashion, although more than four years after delivery, but within four years of discovery.
However, this does not resolve the preliminary underlying question in the case at bench of what length of time was reasonable in terms of applicability of the warranty. Obviously there could be no breach, and resultant accrual date from which the four-year statute commenced running, if the reasonable time envisaged by Aced for the existence of the warranty had expired more than four years prior to the crane’s collapse in 1968, an event which occurred more than eight years after the reconditioning of the crane by the defendant had been concluded.
There has been little discussion in the case law of what factors determine the length of time to be applied to a prospective implied warranty of merchantability. It seems reasonable to conclude, however, that the length of time any chattel, whether new or used, can reasonably be expected to last is of necessity determinable only on a case-by-case basis, according to proof. What might be reasonable with respect to tubing installed in cement would not necessarily apply to a gantry crane. The record before us does not tell us what the reasonable life expectancy of the reconditioned crane was; only expert testimony could shed light on this essential factual determination through trial. (See Balido v. Improved Machinery, Inc. (1972) 29 Cal.App.3d 633, 641-644 [105 Cal.Rptr. 890] for a discussion of the problem of limitation and causation which arises from passage of time in products liability cases.)
If it is assumed, arguendo, that plaintiff in the case at bench were to introduce evidence that the crane in question, after defendant’s reconditioning work, could reasonably have been expected to operate “in good running condition” for more than eight years, the “future event” described in Aced would be the crane’s collapse in 1968. If the trier of
Defendant also contends that, even if the Aced principle of prospective warranty is applicable to the instant case, plaintiff is barred from recovery because of its failure to test and inspect the crane prior to selling and delivering it to the city in 1961. The Aced principle of prospective warranty seems to apply to a “future event” only if the defect “cannot be discovered by the exercise of reasonable diligence” at some prior time by the person in whose favor the warranty runs.
Defendant seeks to invoke the doctrine of collateral estoppel as support for its assertion that the time for reasonable discovery by plaintiff has already been determined in the Green-Harris litigation, and that plaintiff is bound thereby. If defendant is correct, the statute of limitations ran out in 1965, at the latest.
It may be recalled that the Green-Harris court found that plaintiff Link-Belt herein had breached a duty owed to the Green-Harris plaintiffs by its failure to inspect the crane prior to delivery to the city in 1961, and that the defect was one which plaintiff Link-Belt herein would have discovered had it employed inspection and testing procedures which were part of “the state of the art” during the time period in question.
The doctrine of collateral estoppel was recently discussed in Chern in the following terms: “In the present case, however, estoppel is asserted on the basis of representations made by a different defendant in a different transaction than that complained of in the prior suit. While we find no cases on point, the authorities suggest that ‘where the subsequent action involves parallel facts, but a different historical transaction, the application of the law to the facts is not subject to collateral estoppel.’ [Citations.] In general it may be said that rulings of law, divorced from the specific facts to which they were applied, are not binding under principles of res judicata. [Citations.]” (Chern, supra, 15 Cal.3d 866, at pp. 871-872.) It is significant that Chern cites, with apparent approval, cases in which collateral estoppel was held inapplicable to subsequent litigation between the same parties: Commissioner v. Sunnen (1948) 333 U.S. 591, 597-599 [92 L.Ed. 898, 905-907, 68 S.Ct. 715] (collateral estoppel effect denied as to suit for income tax between same parties raising same legal issue but in different years); Grandview Dairy v. Jones
In my view, the instant case is not one in which the doctrine of collateral estoppel may be invoked. The instant case does not involve the same parties that were involved in the prior Green-Harris litigation. Although plaintiff Link-Belt herein was a defendant in the Green-Harris litigation, defendant Star herein was not a party to the Green-Harris litigation.
In addition, the issues between Link-Belt and Star in the case before us are different from the issues litigated in Green-Harris. The crucial issues concerned the duties of inspection owed by Link-Belt to the City of Los Angeles, which bought the crane from Link-Belt, to Green, killed in the accident, and to Harris, injured in the accident, under principles of negligence and strict liability in tort. Here, however, the concern relates to duties and rights between plaintiff Link-Belt and defendant Star arising out of a contract between these two parties for Star to supply labor and materials to recondition the crane. The duty to inspect the crane before delivery by Link-Belt to the city, placed upon Link-Belt by the Green-Harris court in favor of decedent Green and the injured Harris, does not lead to the inexorable conclusion that, without presentation of evidence, that same duty to inspect existed between plaintiff Link-Belt and defendant Star—arising out of the contract between these parties—not an issue at all decided in the Green-Harris litigation.
It is true that the Statutory law of warranty in a sales transaction does not govern the law of warranty as applied to products liability cases resulting in injury to the users of the product, or as applied to nonsales contracts such as contracts for labor and material. “Accordingly, rules defining and governing warranties that were developed to meet the needs of commercial transactions cannot properly be invoked to govern the manufacturer’s liability to those injured by its defective products unless those rules also serve the purposes for which such liability is imposed.” (Greenman, supra, 59 Cal.2d 57, at p. 63.) In similar vein we find our Supreme Court stating in Seely v. White Motor Co. (1965) 63 Cal.2d 9, 15 [45 Cal.Rptr. 17, 403 P.2d 145]: “The law of sales has been carefully articulated to govern the economic relations between suppliers and consumers of goods. The history of the doctrine of strict liability in tort indicates that it was designed, not to undermine the warranty provisions
In the case at bench we are dealing with a contract to supply labor and materials to recondition and repair a piece of complicated equipment so that it will be placed in “good running condition.” Whether, in such a situation, plaintiff Link-Belt would be expected to rely upon Star’s total inspection or whether there would be a duty upon plaintiff to dismantle the crane upon its delivery to plaintiff could well depend on factors such as the intent of the parties and practices and expectations within the industiy. These are matters for the trier of fact to determine from the presentation of evidence.
Hence, I reject the defendant’s contention that the doctrine of collateral estoppel applies to preclude a trial on the merits. The matters which might affect plaintiff’s right of recovery on warranty and which present triable issues of fact include, but are not necessarily limited to, the following: (I) the passage of time; (2) the failure of either party to this lawsuit to inspect; (3) an attempt by plaintiff to change the load capacity of the crane; and (4) a pre-1961 breakdown of the crane which may or may not have had an impact upon the ultimate collapse of the crane.
Link-Belt seeks to have this court reexamine the law of implied indemnity in light of the law of comparative negligence established by Li v. Yellow Cab Co. (1975) 13 Cal.3d 804 [119 Cal.Rptr. 858, 532 P.2d 1226, 78 A.L.R.3d 393]. I do not consider that any such reexamination is necessary under the circumstances presented in the case at bench, since it is my view that the active-passive negligence doctrine that is usually applied in indemnification actions is not applicable in the case at bench, and, even if it were applicable, it is not the proper subject of summary judgment under the facts involved here.
Even if the doctrine of implied indemnity were to be considered applicable to an action based on implied warranty to preclude recoveiy by one whose conduct amounts to active negligence, plaintiff Link-Belt is still entitled to its day in court with defendant Star regarding this issue of active-passive negligence. In this respect, the case of Rossmoor Sanitation, Inc. v. Pylon, Inc. (1975) 13 Cal.3d 622 [119 Cal.Rptr. 449, 532 P.2d 97], cited by the majority, is analogous to the instant case. In Rossmoor, one workman was injured and one workman was killed by a cave-in of a trench being dug by their employer, Pylon, which had contracted with
Rossmoor’s suit against Pylon was based upon express indemnity provisions in the contract between Rossmoor and Pylon. The original lawsuit against Rossmoor brought by the injured workman and the heirs of the deceased workman was entitled Widman v. Rossmoor Sanitation, Inc. (1971) 19 Cal.App.3d 734 [97 Cal.Rptr. 52]. In the Widman case the jury answered a special interrogatory which stated that “Rossmoor Sanitation was negligent in proximately causing the accident.” (Widman, supra, 19 Cal.App.3d 734 at p. 739.) In upholding the judgment in Widman, the court concluded that Rossmoor was vicariously liable under section 416 of the Restatement Second of Torts, for Pylon’s negligence in failing to shore trench No. 2. But the Widman court also held that, entirely independent of the vicarious liability imposed upon Rossmoor, there was substantial evidence that Rossmoor, as owner of the land, retained considerable measure of control over Pylon’s activities; that Rossmoor’s engineering firm had at least two employees—engineers or inspectors—on the job and that these men were directed to correct any dangerous condition and had the authority to demand that all underground work conformed to safety requirements.
The Widman court stated that “[i]t necessarily follows that the jury could also have found that Rossmoor Sanitation retained sufficient control over the premises to bring it within the rule that an owner of land who reserves control of the premises is an employer within the meaning of section 6304 of the Labor Code and subject to the duty to provide a safe place of employment [citations], and that having assumed such control, it had the responsibility for the enforcement of the safety order requiring the shoring of trench No. 2. [Citation.]” (Widman, supra, 19 Cal.App.3d 734 at p. 748.)
In the subsequent action of Rossmoor against Pylon, the issue of whether Rossmoor was actively negligent so as to preclude recovery on its contract of indemnity with Pylon was litigated, without reference to the jury’s finding in the Widman lawsuit, and without reference to the basis upon which the Widman court sustained the liability of Rossmoor
Assuming that Link-Belt in the case at bench would be barred from recovery against Star if Link-Belt was actively negligent, the issue is one that Link-Belt is entitled to litigate on the merits against Star, irrespective of the litigation of such an issue between Link-Belt and the City of Los Angeles in the Green-Harris litigation. Link-Belt is entitled to an independent determination of this issue as between it and Star just as Rossmoor was entitled to an independent determination of the issue of active versus passive negligence in Rossmoor’s suit against Pylon, even though there had been a contrary determination of the issue as between the Widman plaintiffs and Rossmoor in the initial lawsuit brought by the Widman plaintiffs.
If the jury’s .verdict and the appellate court’s decision sustaining the Widman judgment was not res judicata of the issue in the subsequent action by Rossmoor against Pylon, neither should the determination by the trial judge of the active or passive character of Link-Belt’s negligence with regard to the respective liability of the City of Los Angeles and Link-Belt to the Green-Harris plaintiffs preclude an independent determination of the issue of Link-Belt’s active or passive negligence with respect to Link-Belt’s action to recover against Star the loss suffered by Link-Belt in the Green-Harris litigation.
I do not interpret the findings of fact and conclusions of law made in the Green-Harris litigation to be definitive, conclusive, or binding for
The view set forth in Rossmoor Sanitation, Inc. v. Pylon, Inc., supra, appears to mandate that the active-passive negligence issue be litigated between Link-Belt and Star in a full-scale trial because of the concept that each situation involving application of the active-passive negligence doctrine depends upon an analysis of the particular circumstances involved. Thus, the Rossmoor court stated: “In actuality, however, we do not employ the active-passive dichotomy as wholly dispositive of this or any other case. We are ever mindful of the pragmatic approach taken by this court in Harvey Mach. Co. v. Hatzel & Buehler, Inc. (1960) 54 Cal.2d 445 [6 Cal.Rptr. 284, 353 P.2d 924]. There we viewed the issue as whether the indemnity clause in question operated to exculpate Harvey from the consequences of its own alleged breach of duty: ‘The question is one of interpretation of contracts. If it can be determined that the parties intended by their agreement to protect the indemnitee against claims of damage by any or even all types of negligent conduct on its part, such an agreement would effectively accomplish that purpose.’ (Id. at p. 447.).... [II] Thus, while adhering to the underlying distinction between active and passive negligence which has long been accepted by the bench, the bar, and the insurance industry, we hold that, as declared in Harvey, the question whether an indemnity agreement covers a given case turns primarily on contractual interpretation, and it is the intent of the parties as expressed in the agreement that should control. When the parties knowingly bargain for the protection at issue, the protection should be afforded. This requires an inquiry into the circumstances of the damage or injury and the language of the contract; of necessity, each case will turn on its own facts.” (Rossmoor, supra, 13 Cal.3d 622, at pp. 632-633.)
I would reverse the judgment from which the appeal has been taken.
A petition for a rehearing was denied January 7, 1977. Jefferson, J., was of the opinion that the petition should be granted. Appellant’s petition for a hearing by the Supreme Court was denied February 17, 1977.
Case-law data current through December 31, 2025. Source: CourtListener bulk data.