Consaul v. City of San Diego
Consaul v. City of San Diego
Opinion of the Court
Opinion
The issue presented in this appeal of the superior court’s order denying a petition for writ of mandate brought by appellants Robert and Eva Consaul and Thomas Ahrens is whether certain dwelling unit allocations made by the City of San Diego (the city) to Ahrens’s development project, under the terms of an interim development ordinance (IDO), created a vested right in Ahrens to proceed with the development of the project, even though no building permits were applied for or obtained as contemplated by the IDO procedure. We conclude the trial court correctly denied Ahrens’s petition for writ of mandate which would have required the city to set aside its rezoning decision which placed the subject property in single-family residential zoning, some time after a preliminary dwelling unit allocation of 26 units had been made under the IDO. The record demonstrates the city’s action was neither arbitrary, capricious, nor totally lacking in evidentiary support. (Code Civ. Proc.,
Factual and Procedural Background
According to the petition for writ of mandate, petitioners and appellants Robert and Eva Consaul are the owners of the subject property, a 1.06-acre
This undeveloped 1.06-acre parcel is part of a larger 1.5-acre property owned by the Consauls. The undeveloped area is a remnant canyon with some degree of slope on a majority of the property, and is located downhill from the remainder of the Consauls’ land. The uphill area of the Consauls’ land (not the subject of this action) is now developed with a single-family residence and two apartments (in one of which Thomas Ahrens resides).
According to Ahrens’s declaration submitted in support of the petition for writ of mandate, there are a number of single-family homes in the area at the bottom of the canyon where the subject property is located. Also nearby, within 500 feet of the property, is a 250-unit apartment building, and other multifamily units are located to the north, south, and going uphill toward the east. According to Ahrens, at the top of that bank, the “traditional single family neighborhood of Point Loma begins,” but that neighborhood lies far above the subject property.
The declarations submitted by the city in opposition to the petition give a different view of the property’s surroundings. City planner William Levin, the supervisor of city planner Chris Jacobs who was directly involved with the project, states that the area surrounding the property on three sides is “clearly low density, single-family residential in character. The fourth side (north) has a multi-family character but was topographically separated from the subject property at a much higher elevation.”
In 1986, Ahrens retained engineers and surveyors to process a subdivision map, splitting the property into two parcels, the one at the top of the hill with the existing structures on it, and the subject property, parcel 2. At that time, the existing zoning on the property was R-1000 (multifamily), which, combined with the physical constraints on the development of the site relating to slopes, hillsides, and grading for ingress and egress, resulted in a maximum
We now undertake to summarize the complex land use planning regulations applicable to this property since the time the subdivision map was approved. First, the record shows the trial court was supplied with the text of municipal ordinances setting forth the city’s general power to create a general plan and to zone property. (San Diego Mun. Code (S.D.M.C.), § 101.0201 et seq.) Pursuant to that general plan, community plans are required to be prepared.
On July 14, 1987, the city adopted a comprehensive community plan for the peninsula area where the property is located. This plan was prepared with the assistance and input of local residents, acting as a planning group which made recommendations to city staff for changes in both land uses and zoning in this area. The subject property is designated on the plan (which supersedes the Coastal Plan of 1981) as multifamily. Although no changes were suggested for Ahrens’s parcel at that time, Ann Jackson, the chairperson of the community planning group, and city planner Levin later characterized that omission as a mistake in the plan.
On July 21, 1987, a week after the local community plan was adopted by city, the city council adopted an IDO placing a limitation of 8,000 on the number of dwelling units allowed to be authorized citywide, supplemental to the provisions of local plans and zoning. The effective period of the IDO was to be 18 months. Each area of the city was allocated a “fair share” of these 8,000 annual dwelling unit allocations; the subject area (the Peninsula Community) was allocated 96 units per year. Applicants for these allocations were required to submit specific information required by the IDO administrator (defined as the planning director, city manager, and city engineer or their designees), and ¿locations were made on a quarterly basis.
Shortly after the IDO was adopted, the city council enacted another growth management ordinance, an interim single family protection ordinance (INSFPO) in August 1988, the purpose of which was to prevent accelerated multifamily residential development in single-family neighborhoods where multifamily zoning was in effect. The parties agree this ordinance by its terms was not directly applicable to the subject property, which
Pursuant to the procedure set forth in the IDO, Ahrens submitted by May 1987 an application for dwelling unit allocations that included detailed site and grading plans, elevations and locations of all improvements. Meetings with city staff resulted in the development proposal being reduced from 44 to 26 units. Ahrens presented the proposal to the community planning group, which initially took no action.
By the city’s letter of November 4, 1988, Ahrens received a dwelling unit allocation for 18 units of the 26 requested. An additional allocation was made by letter of March 2, 1989, for the additional eight units. The first letter stated that Ahrens could proceed within one year of the date of the letter (Nov. 4,1988) “to file for a building permit application and plan check with the Building Inspection Department.” The second letter contained no such deadline language, but did state that Ahrens could proceed “immediately” to apply for the building permit and plan check, and that the IDO was scheduled to expire May 21, 1989.
The declarations submitted to the trial court contain conflicting accounts about the matter of building permit applications. Ahrens states he was told by “the Planning Department” after he received his initial allocation that he could not apply for any building permits until the entire 26-unit IDO allocation was received for the project. He also states that when he inquired about applying for building permits in July 1989, when he received notice the property might be rezoned to single-family status, he was told there was not enough time for those permits to be approved before the planning commission or city council hearings on the proposed rezone were held.
After the city planning department began working with community planning groups on the single-family neighborhood classification project, the chairperson of the peninsula planning group wrote a letter to city staff dated April 27, 1989, under the subject heading: “Protected Single-Family Neighborhood Maps.” She stated the group had voted to suggest that Ahrens’s property (along with three others) be investigated for single-family residential zoning, due to concerns about traffic and other noise levels, the slope of the land and congestion in the area. In response, the city planning department investigated the site and recommended it be included on the neighborhood classification map and rezoned to single-family residential status.
In July 1989, the city planning commission conducted a noticed public hearing on an agenda item listed as: “Classification of Single-Family Neighborhoods and Related Rezonings and Plan Amendments in Peninsula.” Ahrens appeared personally and through counsel to oppose the rezoning. The planning commission voted six to zero to recommend adoption of the maps identifying the protected single-family neighborhoods, and enactment of the related rezonings and amendments to the community plan, including the subject property as single-family.
Thereafter, the city council noticed a public hearing for August 8, 1989, on an agenda item titled the same as that of the planning commission, which included the subject property rezone. The matter was continued until September 11 to allow Ahrens to present his project to the community planning group in August. Although the planning group had previously voted on the matter, it heard the presentation in compliance with the city council’s request. However, it made no change in its vote recommending single-family classification for the property.
At the city council’s continued hearing on the classification of single-family neighborhoods, Ron Roberts, the city council representative for the
“[T]his piece of property is exactly what we were concerned about in the older areas of the community, where prior community plans really had not taken into account topography, the neighborhoods, the sort of detailed physical setting. This is very much a piece of a single-family neighborhood.”
Councilman Roberts further noted that access to the property would be through a single-family area surrounding the proposed development. He referred to the steep slopes on the property and the high retaining wall that would be required to build an access road, and commented, “[I]t just seems to me this is exactly, exactly, the type of property that we aimed these various programs at.”
After presentations by those in favor of and in opposition to the proposed rezoning, the city council on September 11, 1989, voted unanimously to (1) adopt a resolution approving the protected single-family neighborhood maps and releasing those areas not mapped for classification; and (2) adopt a resolution approving related amendments to the community plan as well as rezoning of Ahrens’s property to single-family status.
On December 26, 1989, Ahrens filed a petition for writ of mandate (ordinary mandamus, § 1085) in the superior court. Several theories were pled to support the contention the rezoning was invalid: (a) it was done in violation of previously vested rights, which the city was estopped to deny; (b) it violated the city’s promise under the IDO allocation to allow the applicant one year to develop the twenty-six proposed units, and the city was estopped from denying such a right; (c) the rezoning constituted an arbitrary and capricious act of downzoning of a single parcel, without adequate weighing of conflicting interests; and (d) it constituted a taking of property without just compensation resulting in no economically viable use of the property. The relief sought was invalidation of the rezoning ordinance and mandated rezoning to multifamily use for a prescribed period.
The city’s response to the petition included its answer and a demurrer on the procedural ground that it was not timely filed. Ahrens replied. City filed supplemental documents with the court, including a request for judicial notice of the city charter, municipal code, ordinances and resolutions, and other general planning material. At the hearing on the matter, the superior court explained its approach had been to examine the basis for the city’s action to decide if it was reasonably related to the public welfare. After hearing argument, the court agreed to take judicial notice of particular
Ahrens timely appealed.
Discussion
I
Standard of Review
Ahrens’s petition for writ of mandate sought relief in ordinary mandamus under section 1085 which would have declared that the city’s actions were invalid as applied to the subject property and would have ordered the city to rezone the property to multifamily status to permit Ahrens to pursue the development project. Ahrens’s characterization of this action as sounding in ordinary mandamus was correct under Arnel Development Co. v. City of Costa Mesa (1980) 28 Cal.3d 511, 514-521 [169 Cal.Rptr. 904, 620 P.2d 565], where the Supreme Court held: “California precedent has settled the principle that zoning ordinances, whatever the size of parcel affected, are legislative acts.” (Id. at p. 514.) “[R]ezoning of property, even a single parcel, is generally considered to be a quasi-legislative act [citations], subject to review under ordinary mandamus. The standard for review of a quasi-legislative act is whether the action was arbitrary or capricious or totally lacking in evidentiary support, or whether the agency has failed to follow the procedure and give the notices required by law. [Citation.]” (City of Carmel-by-the-Sea v. Board of Supervisors (1986) 183 Cal.App.3d 229, 238-239 [227 Cal.Rptr. 899].)
Complicating our application of these basic rules, however, is the peculiar nature of the rezoning decision made here. Arguably, at least, it was made as “a determination of specific rights in regard to a particular factual situation rather than the formulation of broad policy applicable to future situations. [Citation.]” (City of Carmel-by-the-Sea v. Board of Supervisors, supra, 183 Cal.App.3d at p. 239.) Such quasi-judicial administrative decisions are reviewed at the trial level by proceedings in administrative mandamus under section 1094.5. (Ibid.) In an abundance of caution, therefore, we find it necessary to construe this petition for writ of mandate as raising issues sounding both in ordinary mandamus and administrative mandamus. Under section 1094.5, subdivision (b), “The inquiry in such a case shall extend to the questions whether the respondent has proceeded without, or in excess of jurisdiction; whether there was a fair trial; and whether there was any prejudicial abuse of discretion. Abuse of discretion is established if the respondent has not proceeded in the manner required by law, the order or
Our review of the trial court’s ruling denying the petition for writ of mandate is conducted in two stages: we first consider whether the City’s actions, according to the standards of ordinary mandamus, were arbitrary, capricious, totally lacking in evidentiary support, or conducted without the proper notice and procedure. (City of Carmel-by-the-Sea v. Board of Supervisors, supra, 183 Cal.App.3d at pp. 238-239.) Regarding the administrative mandamus issues we deem to be raised by the pleading, “our duties are identical to those of the trial court in that we are required to conduct our own independent review of the entire administrative record. [Citations.]” (Id. at p. 239.) This latter review is conducted under the substantial evidence test. (Ibid.; § 1094.5, subd. (b).)
II
Vested Rights Doctrine
A
Development of the Doctrine
The leading case in the development of the vested rights doctrine as applied to land use law is Avco Community Developers, Inc. v. South Coast Regional Com. (Avco) (1976) 17 Cal.3d 785, 791-799 [132 Cal.Rptr. 386, 553 P.2d 546].
The Supreme Court in Avco established several rules for the application of the vested rights doctrine: First, “neither the existence of a particular zoning nor work undertaken pursuant to governmental approvals preparatory to construction of buildings can form the basis of a vested right to build a structure which does not comply with the laws applicable at the time a building permit is issued. By zoning the property or issuing approvals for work preliminary to construction the government makes no representation to a landowner that he will be exempt from the zoning laws in effect at the subsequent time he applies for a building permit or that he may construct particular structures on the property, and thus the government cannot be estopped to enforce the laws in effect when the permit is issued.” (Avco, supra, 17 Cal.3d at p. 793.)
Second, the Supreme Court in Avco reiterated that a landowner has no vested right in existing or anticipated zoning. (Avco, supra, 17 Cal.3d at p. 796.) Preliminary approvals received from the government for development, such as zoning of land for a particular purpose, are not sufficient to allow a developer a vested right to build on the land in accordance with former law. Allowing such preliminary approvals to determine the permissible use of land could seriously impair “the government’s right to control land use policy.” (Id. at p. 797.) Moreover, “it is settled that the government may not contract away its right to exercise the police power in the future. [Citations.]” (Id. at p. 800.)
In Avco, the Supreme Court was presented with the question of whether another type of land use permit, such as a conditional use permit, might create in a developer vested rights similar to those created by a building permit. Arguably, if such a form of governmental approval afforded “substantially the same specificity and definition to a project as a building permit,” it might place the government on adequate notice as to what approvals it had supposedly granted. (Avco, supra, 17 Cal.3d at p. 794.) The Supreme Court did not decide that question, however, since the record in that case showed that none of the permits obtained related to an identifiable building.
Here, Ahrens argues that the IDO dwelling unit allocations which he received in the two letters from the city were based on specific information he provided the planning department about the proposed project, and
B
Structure of the IDO
First, we note that by its own terms the IDO is an interim measure enacted for an 18-month period to allow for land-use planning controls upon residential development to be enacted pending the completion of a general reevaluation and adoption of a general plan update. These interim regulations enacted by the ordinance provide that no residential building permits shall be granted unless the application for building permits has been processed in accordance with the IDO procedures for dwelling unit allocations.
Section 6 of the IDO, “Procedure for Development Approval During Interim Period,” provides that the city shall develop an interim development allotment application form to contain such information on the form as deemed appropriate by the administrator of the ordinance. That administrator was directed to take into account certain enumerated factors in formulating standards and criteria for the review of applications under the IDO. The administrator was further directed to conduct a quarterly “dwelling unit allocation” for each community plan area, taking into account any development approvals granted prior to the effective date of the IDO, such as vesting tentative maps, development agreements, “or other entitlement which may create a legally vested right to development of the . . . project under California law.” The procedure set out in section 6J of the IDO provides for an applicant who received a dwelling unit allocation to have one year to submit to the building inspection department a building permit application form “to exercise the entitlement to the units represented by the allocation.” If building permits issued pursuant to the IDO procedure were allowed to expire or if entitlement to use of such permits were waived, the ordinance provided that a replacement allocation could be made in the applicable community plan area.
In section 9A of the IDO, language is set forth providing that the ordinance shall not affect in any manner any provisions of the municipal code
“No [IDO] variance request, appeal or released project is to be brought forth for public hearing for potential allocation unless full zoning code compliance is present and any required discretionary permits approved and recorded.”
Turning to the letters sent to Ahrens by the city setting forth his IDO dwelling unit allocations, the first of those letters, dated November 4, 1988, provides that an allocation of 18 units was made, and Ahrens was allowed to proceed as the applicant within 1 year of the date of the letter “to file for a building permit application and plan check with the Building Inspection Department of [the city].” In the next letter, dated March 2, 1989, Ahrens was notified of an allocation of eight additional units, and was told that he could proceed as the applicant “immediately to file for a building permit application and plan check with the Building Inspection Department of the City of San Diego.” The letter further stated that the IDO was scheduled to expire May 21, 1989.
Under Ahrens’s interpretation of the IDO, he was irrevocably granted one year from the date of the November 4, 1988, letter to file for and receive a building permit and plan check; alternatively, he claims that a new year begin to run with the sending of the March 2, 1989, letter, even though that letter did not refer to any additional one-year period. In the interim, however, before Ahrens’s building permit application and request for a plan check were ever made, the city had completed rezoning of the property in September 1989.
C
Application of the Doctrine
It is evident that the IDO dwelling unit allocation process created a separate layer of regulation between the subdivision map stage of the proceeding and the ultimate grant of a building permit application. To analyze the rights created by this type of regulation, we apply the established rule that “the rights which may ‘vest’ through reliance on a government
In this case, we conclude that even though a dwelling unit allocation was made, no vested right to proceed with the development project was created thereby. The language of the IDO and the letters notifying Ahrens of the dwelling unit allocation only created in Ahrens the right to apply for a building permit and a plan check. This procedure in the IDO is consistent with the language in Avco, supra, 17 Cal.3d at page 795: “[T]he general rule [is] that a builder must comply with the laws which are in effect at the time a building permit is issued, including the laws which were enacted after application for the permit. [Citations.]” Such laws may include zoning laws, and as the Supreme Court in Avco stated, “It is beyond question that a landowner has no vested right in existing or anticipated zoning. [Citations.]” (Id. at p. 796.) Predevelopment expenditures alone do not create such a right. (Raley v. California Tahoe Regional Planning Agency (1977) 68 Cal.App.3d 965, 985-986 [137 Cal.Rptr. 699].) A government’s right to control land-use policy cannot be impaired by the “freezing” of zoning law applicable to a particular development as of the time particular preliminary decisions are made concerning the project. (Avco, supra, 17 Cal.3d at p. 797.)
Moreover, we do not find the use in the IDO of the term “entitlement” in several specific contexts to be determinative of the vested rights issue. For example, section 6D, subdivision (2) of the IDO, setting forth the procedure for development approval during the interim period, states that in reviewing applications for dwelling unit allocations, the administrator shall take into account certain factors, including the existence of “[development approvals granted prior to the effective date of this ordinance pursuant to a vesting tentative map, development agreement, or other entitlement which may create a legally vested right to development of the whole or part of the project under California law.” (Italics added.) By this language, the city evidently sought to recognize and exempt from the operation of the IDO certain previously established vested rights, such as a vesting tentative map (Gov. Code, § 66498.1 et seq.), or a development agreement (Gov. Code, § 65864 et seq.), not to create a special exemption for rights actually established by the IDO itself. Instead, priority is established pursuant to the IDO for already existing vested rights.
Similarly, section 6J of the IDO states that an applicant who received a dwelling unit allocation had one year to apply for a building permit “to exercise the entitlement to the units represented by the allocation.” This
We are also unpersuaded by the reference in section 11 of the IDO
Ahrens’s argument that he had obtained all necessary discretionary approvals for his project (Youngblood v. Board of Supervisors, supra, 22 Cal.3d
Here, in contrast, the IDO expressly provides that further action, i.e., application for a building permit, is required even after the dwelling unit allocation is made. The scope of the right created by the IDO is to make further application. It makes no difference that building permit approval is normally considered a ministerial process where appropriate land use regulation compliance is present (Elysian Heights Residents Assn., Inc. v. City of Los Angeles (1986) 182 Cal.App.3d 21, 31 [227 Cal.Rptr. 226]), since the IDO by its terms required such an application to be timely made in order to exercise and perfect the entitlement to the dwelling unit allocation, under the current zoning of the property.
Moreover, even though city planner Jacobs’s supplemental declaration stated his belief as of the summer of 1989 that the planning department retained no further discretionary approval authority over the project, the fact remains that Ahrens did not completely comply with the IDO procedures by applying for and obtaining building permits. Evidently, the trial court was not persuaded that no such compliance was required in accordance with Ahrens’s claim he was told by “the planning department” he could not make such application unless all 26 units were preapproved; we are required to defer to this factual determination. (Committee for Responsible Planning v. City of Indian Wells, supra, 209 Cal.App.3d at pp. 1010-1011; City and County of San Francisco v. Grant Co. (1986) 181 Cal.App.3d 1085, 1091 [227 Cal.Rptr. 154].)
Even if the city’s letters to Ahrens concerning the IDO allocations created a good faith subjective belief on his part that he had a vested right to proceed with the particular development plans, such a belief is not enough to create a vested right which is otherwise unsupported by the land use regulations and facts of the particular situation. (Russ Bldg. Partnership v. City and County of San Francisco (1988) 44 Cal.3d 839, 853 [244 Cal.Rptr. 682, 750 P.2d 324].)
Moreover, “ ‘[a]n equitable estoppel requiring the government to exempt a land use from a subsequently imposed regulation must include (1)
As suggested above, we disagree with Ahrens’s argument that the nature of the IDO application he submitted, specifically identifying the type of project in contemplation, including its elevations and site plans, was adequate to create a vested right because it placed the city on some degree of notice of the type of structure sought to be developed. (See Avco, supra, 17 Cal.3d at p. 794.) Instead, we find the type of specificity required in the IDO application represents an effort by the city to create a rational and fair means of distributing a limited resource, i.e., the dwelling unit allocations under the IDO. Because the IDO imposed a cap of 8,000 units per year for all the various neighborhoods of the city, and included a designation of the number of units per neighborhood that were to be allocated, the city also properly included in the IDO an attempt to create a rational and fair mechanism for
The city’s efforts to make the IDO a fair and objective procedure may not result in the imposition of vested rights upon compliance with such an interim procedure.
As Ahrens correctly notes, land use planning law has evolved greatly since Avco was decided in 1976. However, the vested rights doctrine enunciated by Avco has stood the test of time, and may properly be applied even to modem land use planning devices such as a dwelling unit allocation procedure like the IDO.
m
Abuse of Discretion Claim
Having concluded that the IDO dwelling unit allocation did not create a vested right in Ahrens to proceed with his development, it remains for us to address his related claim that the rezoning of the property to single-family residential use was invalid under the theory that it was an arbitrary and capricious spot-zoning procedure. (Viso v. State of California (1979) 92 Cal.App.3d 15, 22 [154 Cal.Rptr. 580].) Zoning may be judicially invalidated if it is arbitrary and unreasonable, if it bears no reasonable relationship to the regional welfare, or if it deprives the landowner of substantially all use of the land. (Arnel Development Co. v. City of Costa Mesa, supra, 28 Cal.3d at p. 521.)
“One permissible basis for an attack upon the validity of a zoning ordinance is that the zoning ordinance is ‘spot zoning.’ [Citation.] Spot zoning occurs where a small parcel is restricted and given lesser rights than the surrounding property, as where a lot in the center of a business or commercial district is limited to uses for residential purposes thereby creating an ‘island’ in the middle of a larger area devoted to other uses. [Citation.] Usually spot zoning involves a small parcel of land, the larger the property the more difficult it is to sustain an allegation of spot zoning. [Citations.] Likewise, where the ‘spot’ is not an island but is connected on some sides to
In making his claim that his property was “spot zoned,” Ahrens contends that the city failed to adequately weigh the competing interests of himself as landowner and the neighboring landowners. (Raley v. California Tahoe Regional Planning Agency, supra, 68 Cal.App.3d at pp. 975-976.) The trial court disagreed, denying Ahrens’s petition for writ of mandate to compel the city council to vacate the rezoning decision and permit Ahrens the opportunity to pursue his development plan. In so doing, the trial court made factual findings concerning the extent to which the city council weighed the competing interests, and whether its conduct constituted an abuse of discretion. (City of Carmel-by-the-Sea v. Board of Supervisors, supra, 183 Cal.App.3d at pp. 238-239.) The record contains declarations on personal knowledge by Ahrens and by city planners Jacobs and Levin concerning the topographical and usage characteristics of the land and the surrounding area. As succinctly noted by the court in Viso v. State of California, supra, 92 Cal.App.3d at page 22, lines in zoning must be drawn at some point. The trial court evaluated the evidence and we will not disturb its evaluation on these factual issues concerning the existence of a valid basis for the city’s action.
Disposition
The order is affirmed.
Froehlich, J., concurred.
All statutory references are to the Code of Civil Procedure unless otherwise specified.
In supplemental briefing, the city points out that Levin must have misread the maps where he characterized the fourth, multifamily side of the property as being to the north; it is actually to the northeast.
Originally, the neighborhood classification project was to be contained in a growth management element of the general plan, submitted to the electorate in November 1988. The voters turned down that element, but the city council continued to pursue the single-family neighborhood protection project through planning department action and city council resolutions, rezonings, and public hearings on the neighborhood classification project.
Although the EDO is no longer in force, the issues presented by this appeal concerning the development allotment method of growth control (see Pacifica Corp. v. City of Camarillo (1983) 149 Cal.App.3d 168, 176 [196 Cal.Rptr. 670]) are of continuing public interest and warrant the publication of this opinion. (Cal. Rules of Court, rule 976(b)(3).)
following publication of the original opinion in this case, filed June 13, 1991, this court granted the city’s petition for rehearing to consider its arguments that the opinion (1) mistakenly concluded the city inappropriately used the INSFPO to rezone the property; (2) incorrectly described the property and its surroundings; (3) improperly concluded no more discretionary permits remained to be obtained for the project; (4) applied an incorrect standard of review; and (5) did not clearly set out directions on remand.
After granting rehearing, this court requested and considered supplemental briefing from the parties, and reviewed correspondence in the nature of amicus curiae briefing from the following: the Cities of West Hollywood and Malibu, the League of California Cities, the City of Lompoc, the City of Roseville, the City of Walnut Creek, the City of Anaheim, the City of Alameda, the City of Napa, the City of Pleasant Hill, the City and County of San Francisco, the City of Pacifica, the City of Tustin and the City of Livermore. We have also reviewed for the second time this 773-page record, and are satisfied despite the somewhat different version of facts presented in the dissenting opinion that our factual statement accurately reflects the record and clarifications made thereof in the rehearing materials and the supplemental briefing.
The order denying the petition for writ of mandate and overruling the city’s demurrer was a final determination of the entire action. As such we construe the order to be an appealable final judgment. (§ 1064; Cody v. Justice Court (1965) 238 Cal.App.2d 275, 277, fn. 1 [47 Cal.Rptr. 716]; see Avila v. Standard Oil Co. (1985) 167 Cal.App.3d 441, 445 [213 Cal.Rptr. 314].)
Section 1094.5, subdivision (c) prescribes two different standards of review for the trial court to apply as appropriate in administrative mandamus: substantial evidence or independent judgment. “The independent judgment test is reserved for those situations where the administrative decision substantially affects a fundamental, vested right acquired by the petitioner [citations]. The question of what constitutes a fundamental, vested right must be answered on a case-by-case basis and considers not only the economic aspects involved but also ‘the effect ... in human terms and the importance of it to the individual in the life situation.’ [Citation.] Even so, it is necessary to allege a deprivation of the right to property or to a livelihood [citation].” (Mountain Defense League v. Board of Supervisors (1977) 65 Cal.App.3d 723, 728 [135 Cal.Rptr. 588].) In San Marcos Mobilehome Park Owners’ Assn. v. City of San Marcos (1987) 192 Cal.App.3d 1492, 1499-1502 [238 Cal.Rptr. 290], this court noted that when particular rights are analyzed to determine whether they possess a fundamental nature, “the court manifests slighter sensitivity to the preservation of purely economic privileges.” (Id. at p. 1499.) In this case, Ahrens’s claim of a vested right to develop the property in accordance with the dwelling unit allocations made under the IDO falls short of an alleged entitlement to a right that is important to his life situation, the deprivation of which constitutes impairment to his right to pursue a livelihood or property essential thereto. (Bixby v. Pierno (1971) 4 Cal.3d 130, 144 [93 Cal.Rptr. 234, 481 P.2d 242].) Substantial evidence review in the administrative mandamus context is therefore appropriate. (§ 1094.5, subd. (c).)
Section 11 of the IDO, entitled Code Compliance, states: “All [IDO] variance applications, quarterly allocations, appeals of the Administrator decision and released projects are to receive a full zoning plan check by the Building Inspection Department. No [IDO] variance request, appeal or released project is to be brought forth for public hearing for potential allocation unless full zoning code compliance is present and any required discretionary permits approved and recorded.”
A similar “development allotment application” procedure (Pacifica Corp. v. City of Camarillo, supra, 149 Cal.App.3d 168, 176) was characterized as a land-use decision affecting the community at large as well as the individual applicant, made by the application of specific standards to existing facts. (Id. at p. 176.) In that case, the Court of Appeal noted that since developers were required to obtain a development allotment before a building permit could be issued, under that growth control law, a developer who had no development allocation had not yet acquired any vested rights in the planned development of its property. (Id. at p. 178.) The opinion does not suggest that a developer who did receive development allotments was entitled to a vested right either.
At the hearing before the trial court, the city made a general request for judicial notice of the city charter, the municipal code, all city ordinances and resolutions, and planning commission resolutions, as well as decisional law and public records provided with the points and authorities on file. At the hearing, the trial court agreed to take judicial notice of particular city ordinances, San Diego Municipal Code section 62.0401 et seq., the land development permit provisions concerning grading approvals. At oral argument before the trial court, and on rehearing application before this court (supported by a request for judicial notice), the city has argued that the land development ordinance and CEQA requirements (Cal. Environmental Quality Act, Pub. Resources Code, § 21000 et seq.) create additional discretionary approvals which were required before Ahrens could exercise his right to the IDO dwelling unit allocations made. Although we, like the trial court, have taken judicial notice of the land development ordinance (denying the balance of the city’s request; Evid. Code, § 459, subd. (a)), we need not base our decision on this argument. The structure of the IDO itself and the language of the letters sent to Ahrens by the city clearly provide that compliance with the IDO process was not the only compliance with city planning procedures (such as the building permit process) that was required under the city’s code. (IDO, § 9A, providing that the IDO is supplementary to existing planning procedures; also see City of West Hollywood v. Beverly Towers, Inc., supra, 52 Cal.3d at p. 1192.)
Because the petition for writ of mandate pleads no separate cause of action for inverse condemnation, and does not adequately present the issue to the trial court of whether any viable economic use of the property was denied by the rezoning decision here (see Agins v. City of Tiburon (1979) 24 Cal.3d 266 [157 Cal.Rptr. 372, 598 P.2d 25], affd. (1980) 447 U.S. 255 [65 L.Ed.2d 106, 100 S.Ct. 2138]; Nollan v. Cal. Coastal Commission (1987) 483 U.S. 825 [97 L.Ed.2d 677, 107 S.Ct. 3141]), we do not find it necessary to address the arguments presented on appeal concerning the “taking” issues. (Twain Harte Associates, Ltd. v. County of Tuolumne (1990) 217 Cal.App.3d 71, 81 [265 Cal.Rptr. 737].)
Dissenting Opinion
I respectfully dissent. I disagree with the majority as to the
facts of this matter, the applicable standard of review, and the controlling precedent as set forth by our Supreme Court in various cases. I would, for the reasons set forth below, reverse.
Appellants Robert and Eva Consaul and Thomas Ahrens (collectively, Ahrens) own a 1.06-acre of undeveloped land in a highly urbanized area of
The primary issue presented is whether Ahrens acquired a vested right to develop the property by spending 22 months and $60,000 obtaining all discretionary approvals for their project, including allocations of permits in compliance with City’s Interim Development Ordinance (IDO). The administrative record undisputedly supports Ahrens’s contention they had received all discretionary approvals, but City urges us to limit the vested rights doctrine to cases where the owner had obtained vested tentative subdivision maps, development agreements or building permits.
I would reject City’s suggested limitations. In my view, Ahrens acquired a vested right to develop their property when they received their final allocations under the IDO. (City of West Hollywood v. Beverly Towers, Inc. (1991) 52 Cal.3d 1184, 1190 [278 Cal.Rptr. 375, 805 P.2d 329].) City’s subsequent action in downzoning the property affected this vested right. Thus, the trial court was required to apply its independent judgment to the evidence presented to it, including the relevant administrative record. Because the record does not reflect the trial court applied its independent judgment, I would reverse.
Facts
In 1976, Robert and Eva Consaul purchased a 1.5-acre parcel in a highly urbanized area of City. At that time, the property was developed with a single-family residence and two apartments. These structures remain and are located at the top of a hill at the end of a cul-de-sac. Thomas Ahrens has lived in one of the apartments since 1976, acting as the apartment manager for the Consauls. Until the challenged action, the property has been zoned R-1000, permitting development of up to 65 units.
In 1986, Ahrens and the Consauls entered into an agreement to develop the property, with Ahrens purchasing an interest in the land. By this time, most of the surrounding area had been developed. The parties dispute whether the surrounding development is multifamily or single-family, but there is a 250-unit apartment building within 500 feet of the property and very high density to the north, south and west. Directly east is a steep canyon. At the base of the property, there is an area of single-family homes
Ahrens retained engineers and surveyors in 1986, and processed a map (in compliance with the Subdivision Map Act) to split the parcel in two. Parcel 1 is at the top of the hill, and contains the existing structures. It remains zoned multifamily (R-1000) and is not involved in this action. Parcel 2 is 1.06 acres, L-shaped, and under the R-1000 designation could have been developed with 54 units. However, there are additional constraints on the development of the site relating to slopes, hillsides, and grading which decrease the total number of units which can be constructed to 44. When the map was processed, City required that access be taken from the top of the hill through the developed high density multifamily area adjacent to parcel 1. This access road serves only this one parcel and will cost in excess of $134,000 to construct. It took City six months to process the map which was recorded in February 1987. Ahrens spent $7,200 processing the map, as well as hundreds of hours to prepare it and meet with City. After the map was recorded, Ahrens began plans for developing the property by hiring an architect, a project planner and a civil engineer. Ahrens’s initial plans were for development of 44 units, consistent with both the adopted land use and existing zoning.
On July 14, 1987, City adopted an amended, revised, comprehensive and very detailed community plan (the Plan) for the area “designed to guide development [] for the next fifteen to twenty years.” The Plan’s stated objective is to promote multifamily infill and to accommodate increased development without significant impact to adjacent land uses or traffic. The subject property is designated on the Plan (which supersedes the Coastal Plan of 1981)) as multifamily. The Plan notes this area of the City has maintained a stable population since 1965, with 70 percent of the area zoned for single-family use and 15 percent zoned for multifamily use. The Plan recognizes this is a highly urbanized community. The Plan was prepared with the assistance of local residents acting as a planning group, who made recommendations to City for changes in both land uses and zoning in this area. Ahrens’s parcel was not one suggested for any changes.
One week after City adopted the Plan (on July 21, 1987), the city council adopted an IDO for the entire City, placing a limitation of 8,000 units, i.e., building permits, allowed to be issued citywide regardless of local plans or
There have been two amendments to the IDO, including one in 1988. Each of the three IDO ordinances contains detailed procedures, as well as standards and criteria which must be considered in reviewing applications for IDO allocations.
In urbanized areas, the first priority is to be given to “development approvals” granted before the effective date of the ordinance. These “development approvals” include “vesting tentative map, development agreement, or other entitlement which may create a legally vested right to development of the whole or part of the project under California law.” (Italics added.) Even if a developer possessed building permits when the IDO was adopted, no residential development could proceed under those permits unless it met the IDO provisions including the community allocation.
Ahrens learned of the IDO and immediately met with City, who informed them they could not apply for any building permits until they received their IDO allocation. Ahrens complied with the IDO by submitting detailed site plans, grading plans, elevations and locations of all improvements such as buildings, units within the buildings, parking, landscaping and access road. Meetings with City resulted in the development being decreased from 44 to 26 units. When final plans were submitted, City directed Ahrens meet with the local planning group for its input. Ahrens did so, presenting the 26-unit project for the 1.06 acres. The planning group issued no objection to the project, and the plans were returned to City for final processing of the IDO allocation application.
Finally, on November 4, 1988, Ahrens were granted 18 of the 26 unit allocations. They were told they could not process any building permits until they received the final eight-unit allocation, which might be possible during the next quarterly period. On March 2, 1989, Ahrens received the final eight-unit allocation and prepared to obtain financing for their project. The IDO states an applicant who receives a dwelling unit allocation shall have one year to submit to the building inspection department a building permit application form to exercise “the entitlement to the units represented by the allocation.” (Italics added.) This one-year period was also set forth in the November letter to Ahrens.
Notwithstanding the inapplicability of the INSFPO to Ahrens’s property, the San Diego City Planning Commission conducted a noticed public hearing on an item listed as: “Classification of Single-Family Neighborhoods and Related Rezonings and Plan Amendments in Peninsula.” This notice, dated June 30,1989, for a hearing on July 13,1989, was the first time Ahrens were informed of any proposed action on their property. City’s report notes Ahrens’s parcel as vacant, but does not mention the IDO allocations. Ahrens appeared and opposed the rezoning. The planning commission voted, six to zero, to recommend adoption of the item before it—the classification of single-family neighborhoods and related rezonings and amendments to the community plan.
Thereafter, the city council noticed a public hearing for August 8, 1989. The agenda item is the same as the planning commission’s and includes the subject property rezone. The matter was continued until September 11 to allow Ahrens to present their project to the new planning group. The planning group met on August 17. Ahrens presented their project after counsel asked the board if it had already voted on the rezoning. The response was the group had already voted, despite one member’s admission he had never been advised Ahrens had plans for the vacant parcel, nor had he been advised what stage these plans were in when the group voted to recommend downzoning. According to the chair who had requested Ahrens’s vacant parcel be rezoned, despite the fact the vacant parcel is not subject to the INSFPO, the only purpose for allowing Ahrens to present their project was to comply with the city council’s request. Thus, the group allowed Ahrens to make their presentation but took no action.
On December 26, Ahrens filed a petition for writ of mandate in the superior court. They contended the rezoning was invalid on four separate grounds: (a) they had obtained a vested right to develop their property under the theory of promissory estoppel; (b) the rezoning violated City’s promise under the IDO allocation to allow them one year to develop their twenty-six units, and City was estopped from denying them such right; (c) the rezoning constituted an arbitrary and capricious act of “spot-zoning”; and (d) it constituted a taking of their property without just compensation because it rendered their property economically valueless. Additionally, Ahrens alleged the INSFPO did not apply to their vacant parcel, attaching the relevant IDO and INSFPO as adopted and subsequently amended.
City answered the petition and filed a demurrer on the ground that it was not timely filed.
Discussion
I. Judicial Notice and Related Preliminary Matters
The foundation for my review of the merits of this petition begins with a single sheet of paper in this 768-page record. City requested the trial court
I assume City is requesting that the court take judicial notice under Evidence Code section 459. However, this section requires this court to “take judicial notice of (1) each matter properly noticed by the trial court and (2) each matter that the trial court was required to notice under Section 451 or 453.” The record does not reflect what documents the trial court judicially noticed. The only ruling on any request for judicial notice by City was when the City Attorney discussed hearsay statements regarding two potential discretionary approvals which might remain for this project. When the court noted these hearsay statements were unsupported anywhere in the 597 papers filed with the court, City requested the court “to judicially notice 62.0401 et. seq. today.” The court responded, “I can do that.”
If the court had ruled on City’s request for judicial notice, it would have eliminated most of the record before it, allowing it to focus its attention on the merits of Ahrens’s petition based on the admissible relevant evidence before it. First, City’s admission that the INSFPO never applied to Ahrens’s parcel would have eliminated this portion of the record. Instead, however, the city attorney orally argued the INSFPO supported the rezoning. It attempted initially to do so before this court as well. Because the INSFPO did not apply to Ahrens’s property, this argument is plainly unpersuasive.
Second, City cited the superior court no authority, and I have found none, for judicially noticing (1) planning department reports relating to a draft ordinance which was never adopted, (2) a draft ordinance which was never adopted, (3) a planning department classification and methodology attached to the draft ordinance which was never adopted, and (4) an IDO information booklet prepared by staff.
This court denied City’s request to judicially notice ordinances which were not before us and records which do not reflect official action. Instead, the focus and crux of this case is the IDO and its provisions as adopted by City.
Finally, for purposes of my decision, I would disregard City’s references throughout its brief to comments made by the City Attorney to the superior
The undisputed admissible and competent evidence before us is that Ahrens had obtained all discretionary approvals for their 26-unit condominium project at the time City took its action to rezone their property. (See exhibit B.) I now turn to the merits of Ahrens’s petition.
II. Standard of Review
Ahrens complied with section 101.0210 of City’s code which requires a party challenging a zoning or rezoning decision by City to file a petition for a writ of mandate under section 1085 of the California Code of Civil Procedure.
A petition for writ of mandate under section 1085 (ordinary or traditional mandamus) is the proper format for challenging a legislative action, whereas section 1094.5 (administrative mandamus) is used when the action being attacked is adjudicatory. “A legislative or quasi-legislative action is the formulation, without regard to a specific set of facts, of a general rule applicable to future situations. An adjudicatory action is the determination of specific rights in regard to a specific fact situation.” (Cal. Administrative Mandamus (Cont.Ed.Bar 1989) § 1.7, p. 7, citing Wulzen v. Board of Supervisors (1894) 101 Cal. 15, 24 [35 P. 353].) Legislative actions create broad, general rules of public policy; adjudicatory actions affect specific individuals. Whether an action is legislative, adjudicatory or a combination of both must be determined by the facts of each individual case. (Horn v. County of Ventura (1979) 24 Cal.3d 605, 613 [156 Cal.Rptr. 718, 596 P.2d 1134].)
Although I agree with City that Ahrens should have set forth the nature of the writ being sought as well as the applicable standard of review before the superior court, I disagree Ahrens should be penalized for this failure by
Here, in contrast to the typical rezoning which is often characterized as “legislative” because it serves broad, general public policy
The IDO established a process with stringent requirements. Before permits can be allocated under the IDO, “the Administrator”—actually the city manager, city planning director and the city engineer—must all sign the letter allocating permits, affirming they have approved the development plans forming the basis for the application. Additionally, the IDO required Ahrens to present their scaled-down detailed plans to the local community planning group for its input before “the Administrator” would take final action on the IDO application.
Development allotment permit programs, such as this IDO, are not new to this state, and the process involved in such allotments has uniformly been held to be adjudicatory. (Pacifica Corp. v. City of Camarillo (1983) 149 Cal.App.3d 168 [196 Cal.Rptr. 670].)
Although Ahrens labelled their petition for writ of mandate as one under section 1085, they were challenging a rezoning after having received their 26-unit allocations and were given 1 year “to submit to the Building Inspection Department a building permit application form to exercise the entitlement to the units represented by the allocation.” (Italics added.) More importantly, regardless of its caption, the petition clearly alleged Ahrens had
III. The Vested Rights Doctrine
The vested rights doctrine is based on the theory of equitable estoppel. It requires two elements be present before it applies. First, there must be a promise; second, the promisee must show reasonable detrimental reliance on that promise. Citing, among others, Avco Community Developers, Inc. v. South Coast Regional Com. (1976) 17 Cal.3d 785 [132 Cal.Rptr. 386, 553 P.2d 546],
City disagrees, arguing as it did before the superior court that equitable estoppel in land use cases “requires a promise implied by a building permit.” (Italics in original.) In support of this argument, City relies on Russ Bldg. Partnership v. City and County of San Francisco (1988) 44 Cal.3d 839 [244 Cal.Rptr. 682, 750 P.2d 324], It is this argument and this case which the trial court found persuasive when it rejected Ahrens’s claim to a vested right.
However, in my view, Russ is neither dispositive, much less apposite, here. The question in Russ was the interpretation of a traffic mitigation condition contained in building permits which had already been obtained by the developers and under which construction was in progress. Russ does not hold, as City contends, that the possession of building permits is the sole criteria for applying the vested rights doctrine.
Indeed, the vested rights doctrine is not limited to the possession of building permits. In Youngblood v. Board of Supervisors, supra, 22 Cal.3d 644, our Supreme Court held a developer which had received approval of a tentative map, in compliance with the then-existing land-use plan for the area, could not be denied the right to develop consistent with that approved tentative map, despite a change in the land-use plan prior to the approval of a final subdivision map. The dispositive question was whether the developer had obtained all necessary discretionary approvals, making the issuance of the final subdivision map a ministerial function.
City obfuscates the effect of the IDO allocation, arguing its power to zone or rezone land and to regulate density of development remained unchanged by the IDO and remained in full force and effect. Although adopting the IDO did not affect City’s power, allocating the permits under the IDO did. The IDO exempted from its provisions, “Development approvals granted prior to the effective date of this ordinance pursuant to a vesting tentative map, development agreement, or other entitlement which may create a legally vested right to development of the whole or part of the project under California law.” (Italics added.) Further, no project could be granted an allocation “unless full zoning code compliance is present and any required discretionary permits approved.” I have already noted paragraph J of the IDO refers to the units represented by the allocation as “the entitlement.” Finally, when City adopted the urgency INSFPO, it exempted from its provisions “any lot or premises with a valid [IDO] allocation granted prior to August 9, 1988.” These references to the units as an entitlement and the treatment afforded a valid IDO, even in an ordinance adopted as urgency legislation, hardly comport with City’s contention the IDO allocation “was an invitation to submit a building permit application and plan check with the Building Inspection Department.”
I conclude, therefore, the allocation was in fact an entitlement, a vested right to proceed with the project in compliance with the discretionary approvals received by Ahrens and upon which they reasonably relied to their detriment.
Where, as here, the only admissible, competent evidence is undisputed that a party has acquired all discretionary approvals and the issuance of building permits remained as a ministerial act, the ultimate conclusion to be drawn from such facts is a question of law. Thus, the conclusion of the trial court is not controlling on appellate review. (Halaco Engineering Co. v. South Central Coast Regional Com. (1986) 42 Cal.3d 52, 74-75 [227
Respondent’s petition for review by the Supreme Court was denied August 20, 1992.
In light of my conclusion on the vested rights issue, I would not reach Ahrens’s remaining contentions.
City’s concession is never explained in light of the action it took under the provisions of the inapplicable INSFPO.
Ahrens, in a supplemental declaration, stated they sought to apply for building permits after receiving notice of the intended rezoning but were informed none would be processed. No competent, admissible evidence was presented which refuted Ahrens’s declaration.
City urges this court to carefully consider the comments of a representative of those persons supporting the rezone. I have done so, even though the comments are not material or relevant to the official action taken by City.
The ruling on the demurrer is not part of this appeal.
Although not file stamped, I assume for purposes of discussion that the request was, in fact, filed with the superior court.
It does, however, raise questions regarding the validity of the ordinance purportedly rezoning Ahrens’s property “Into R1-5000 Zone ... In Order To Implement The Single-Family Protection Ordinance.”
A11 statutory references are to the Code of Civil Procedure unless otherwise specified.
(Such as overall amendments to general or local plans followed by related rezonings.)
Youngblood v. Board of Supervisors (1978) 22 Cal.3d 644 [150 Cal.Rptr. 242, 586 P.2d 556], Pardee Construction Co. v. California Coastal Com. (1979) 95 Cal.App.3d 471 [157 Cal.Rptr. 184], and Elysian Heights Residents Assn., Inc. v. City of Los Angeles (1986) 182 Cal.App.3d 21 [227 Cal.Rptr. 226].
At no time did City come forth with any competent relevant evidence that any discretionary permits remained before Ahrens could obtain building permits.
Following publication of our opinion in this case, this court granted City’s petition for rehearing to consider City’s arguments that the court’s opinion: (1) mistakenly concluded the City inappropriately used the INSFPO to rezone the property; (2) incorrectly described the property and its surroundings; (3) improperly concluded no more discretionary permits remained to be obtained for the project; (4) applied an incorrect standard of review; (5) did not clearly set out directions on remand; or (6) in the alternative, if this court did not desire to correct “several analytical and factual errors,” we should depublish the opinion which “would negate any necessity to modify the Opinion.”
Reference
- Full Case Name
- ROBERT CONSAUL Et Al., Plaintiffs and Appellants, v. CITY OF SAN DIEGO, Defendant and Respondent
- Cited By
- 18 cases
- Status
- Published