Jacks v. City of Santa Barbara
Jacks v. City of Santa Barbara
Opinion
*254 Pursuant to an agreement between Southern California Edison (SCE) and defendant City of Santa Barbara (the City), SCE includes on its electricity bills to customers within the City a separate charge equal to 1 percent of SCE's gross receipts from the sale of electricity within the City, and transfers the revenues to the City. The City contends this separate charge, together with another charge equal to 1 percent of SCE's gross receipts that SCE includes in its electricity rates, is the fee paid by SCE for the privilege of using City property in connection with the delivery of electricity. Plaintiffs Rolland **213 Jacks and Rove Enterprises, Inc., contend the 1 percent charge that is separately stated on electricity bills is not compensation for the privilege of using City property, but is instead a tax imposed without voter approval, in violation of Proposition 218. (Cal. Const., art. XIII C, § 2, added by Prop. 218.)
As we explain below, the right to use public streets or rights-of-way is a property interest, and Proposition 218 does not limit the authority of government to sell or lease its property and spend the compensation it receives for whatever purposes it chooses. Therefore, charges that constitute compensation for the use of government property are not subject to Proposition 218's voter approval requirements. To constitute compensation for a property interest, however, the amount of the charge must bear a reasonable relationship to the value of the property interest; to the extent the charge exceeds any reasonable value of the interest, it is a tax and therefore requires voter approval.
The litigation below did not address whether the charges bear a reasonable relationship to the value of the property interests. Therefore, we affirm the judgment of the Court of Appeal to the extent it reversed the trial court's grant of the City's motion for judgment on the pleadings, but we reverse the Court of Appeal's order that the trial court grant summary adjudication to plaintiffs.
*863 I. FACTS
The parties stipulated to the following facts in the trial court. Beginning in 1959, the City and SCE entered into a series of franchise agreements granting SCE the privilege to construct and use equipment along, over, and under the City's streets to distribute electricity. 1 At issue in this case is an agreement *255 the City and SCE began negotiating in 1994, when their 1984 agreement was about to expire. The 1984 agreement required SCE to pay to the City a fee equal to 1 percent of the gross annual receipts from SCE's sale of electricity within the City in exchange for the franchise granted by the City. During the course of extended negotiations regarding a new agreement, the City and SCE extended the terms of the 1984 agreement five times, from September 1995 to December 1999.
In the negotiations for a long-term agreement, the City pursued a fee equal to 2 percent of SCE's gross annual receipts from the sale of electricity within the City. At some point in the negotiations, SCE proposed that it would remit to the City as a franchise fee 2 percent of its gross receipts if the Public Utilities Commission (PUC) consented to SCE's inclusion of the additional 1 percent as a surcharge on its bills to customers. Based on SCE's proposal, the City and SCE tentatively agreed to a 30-year agreement that included the provisions for payment of 2 percent of gross receipts. Following notice and a hearing, the City Council of Santa Barbara adopted the agreement as City Ordinance No. 5135 on December 7, 1999, with a term beginning on January 1, 2000 (the 1999 agreement). The ordinance was not submitted to the voters for their approval.
The 1999 agreement divides its 30-year period into two terms. The first two years were the "initial term," during which SCE was required to pay the City an "initial term fee" equal to 1 percent of its gross receipts from the sale of electricity within the City. The subsequent 28 years are the "extension term," during which SCE is to pay the additional 1 percent charge on its gross receipts, denominated the "recovery portion," for a total "extension term fee" of 2 percent of SCE's gross receipts from the sale of electricity within the City. At issue in this case is the recovery portion, which we, like the parties, refer to as the surcharge.
**214 The agreement required SCE to apply to the PUC by April 1, 2001, for approval to include the surcharge on its bills to ratepayers within the City, and to use its best efforts to obtain PUC approval by April 1, 2002. Approval was to be sought in accordance with the PUC's "Re Guidelines for the Equitable Treatment of Revenue-Producing Mechanisms Imposed by Local Government Entities on Public Utilities." ( Investigation on the Commission's Own Motion to Establish Guidelines for the Equitable Treatment of Revenue-Producing Mechanisms Imposed by Local Government Entities on Public Utilities (1989) 32 Cal.P.U.C.2d 60, 63 [Cal. P.U.C. Dec. No. 89-05-063] ( PUC Investigation ).) The agreement further provided that, in *864 the event the PUC did not give its approval by the end of the initial term, either party could terminate the agreement. Thereafter, *256 the City agreed to delay the time within which SCE was required to seek approval from the PUC, but SCE eventually obtained PUC approval, and began billing its customers within the City for the full extension term fee in November 2005.
The agreement provided that half of the revenues generated by the surcharge were to be allocated to the City's general fund and half to a City undergrounding projects fund. In November 2009, however, the City Council decided to reallocate the revenues from the surcharge, directing that all of the funds be placed in the City's general fund without any limitation on the use of these funds.
In 2011, plaintiffs filed a class action complaint challenging the surcharge. In their first amended complaint, they alleged the surcharge was an illegal tax under Proposition 218, which requires voter approval for all local taxes. (Cal. Const., art. XIII C.) Plaintiffs sought refunds of the charges collected, as well as declaratory relief and injunctive relief requiring the City to discontinue collection of the surcharge.
On cross-motions for summary adjudication and the City's motion for summary judgment, the trial court ruled that a franchise fee is not a tax under Proposition 218. Its ruling was based largely on
Santa Barbara County Taxpayer Assn., supra
,
Thereafter, the City moved for judgment on the pleadings, contending that Proposition 26 does not apply retroactively to the surcharge. The trial court agreed, citing
Brooktrails Township Community Services Dist. v. Board of Supervisors of Mendocino County
(2013)
*257
The Court of Appeal reversed the judgment. It looked to our opinion in
Sinclair Paint Co. v. State Bd. of Equalization
(1997)
We granted review to address whether the surcharge is a tax subject to Proposition 218's voter approval requirement, or a fee that may be imposed by the City without voter consent.
II. DISCUSSION
Over the past four decades, California voters have repeatedly expanded voter approval requirements for the imposition of taxes and assessments. These voter initiatives have not, however, required voter approval of certain charges related to a special benefit received by the payor or certain costs associated with an activity of the payor. Whether the surcharge required voter approval hinges on whether it is a valid charge under the principles that exclude certain charges from voter approval requirements. Our evaluation of this issue begins with a review of four voter initiatives that require voter approval of taxes, and the legal principles underlying the exclusion of certain charges from the initiatives' requirements. We then describe the historical characteristics of franchise fees, the Legislature's history of regulating the calculation of franchise fees, and the PUC's requirements concerning the imposition of franchise fees that exceed the average charges imposed by other local governments in the utility's service area. Finally, we analyze whether the surcharge is a valid franchise fee or a tax, and we hold that a charge imposed in exchange for franchise rights is a valid fee rather than a tax only if the amount of the charge is reasonably related to the value of the franchise.
*258 A. Restrictions on Taxes and Other Charges
1. Voter Initiatives
Beginning in 1978, state voters have imposed various limitations upon the authority of state and local governments to impose taxes and fees. Proposition 13, which was adopted that year, set the assessed value of real property as the "full cash value" on the owner's 1975-1976 tax bill, limited increases in the assessed value to 2 percent per year unless there was a change in ownership, and limited the rate of taxation on real property to 1 percent of its assessed value. (Cal. Const., art. XIII A, §§ 1, 2.) In addition, to prevent tax savings related to real property from being offset by increases in state and local taxes, Proposition 13 required approval by two-thirds of the members of the Legislature in order to increase state taxes, and required approval by two-thirds of the local electors of a city, county, or special district in order for such a local entity to impose special taxes. (Cal. Const., art. XIII A, §§ 3, 4 ;
Sinclair Paint, supra
, 15 Cal.4th at p. 872,
Proposition 13 did not define "special taxes," but this court addressed the initiative's
*866
restrictions on such taxes in two early cases. In
Los Angeles County Transportation Commission v. Richmond
(1982)
Thereafter, in 1986, the voters approved Proposition 62, which "added a new article to the Government Code (§§ 53720 -53730 ) requiring
**216
that all new local taxes be approved by a vote of the local electorate." (
Santa Clara County Local Transportation Authority v. Guardino
(1995)
Next, in 1996, state voters approved Proposition 218, known as the "Right to Vote on Taxes Act." (
Apartment Assn. of Los Angeles County, Inc. v. City of Los Angeles
(2001)
Second, Proposition 13 was "not intended to limit 'traditional' benefit assessments." (
Knox v. City of Orland
(1992)
2. Characteristics of Valid Fees
As noted above, following the enactment of Proposition 13, the Legislature and courts viewed various fees as outside the
*868
scope of the initiative. (Gov. Code, § 50076 ;
Evans v. City of San Jose
(1992)
The commonality among these categories of charges is the relationship between the charge imposed and a benefit or cost related to the payor. With respect to charges for benefits received, we explained in
Knox, supra
,
In sum, restricting allowable fees to the reasonable cost or value of the activity with which the charges are associated serves
**218
Proposition 13's purpose of limiting taxes. (See
Amador Valley, supra
, 22 Cal.3d at p. 231,
Although
Sinclair Paint, supra
,
To determine how franchise fees fit within these principles, we next consider the nature of franchise fees. We also describe the regulatory framework related to their calculation and imposition.
B. Franchise Fees
1. Nature of Franchise Fees
A franchise to use public streets or rights-of-way is a form of property (
Stockton Gas etc. Co. v. San Joaquin Co.
(1905)
This understanding that restrictions on taxation do not encompass amounts paid in exchange for property interests is confirmed by Proposition 26, the *263 purpose of which was to reinforce the voter approval requirements set forth in Propositions 13 and 218. (Prop. 26, § 1, subd. (f), Historical Notes, reprinted at 2B West's Ann. Cal. Const., supra , foll. art. XIII A, § 3, p. 297 ["to ensure the effectiveness of these constitutional limitations, [Proposition 26] defines a 'tax' ... so that neither the Legislature nor local governments can circumvent these restrictions on **219 increasing taxes by simply defining new or expanded taxes as 'fees' "].) Although Proposition 26 *870 strengthened restrictions on taxation by expansively defining "tax" as "any levy, charge, or exaction of any kind imposed by a local government" (Cal. Const., art. XIII C, § 1, subd. (e)), it provided an exception for "[a] charge imposed for entrance to or use of local government property, or the purchase, rental, or lease of local government property." ( Id ., subd. (e)(4).) 6
2. Laws Governing the Calculation of Franchise Fees
The Legislature has taken several approaches to the issue of the amount of compensation to be paid to local jurisdictions in exchange for rights-of-way over the jurisdictions' land relating to the provision of services such as electricity. As described more fully below, it initially barred the imposition of franchise fees due to perceived abuses by local governments. Thereafter, it authorized local agencies to grant franchises, and established two formulas with which to calculate franchise fees. These formulas do not bind charter jurisdictions, such as the City, but they provide helpful background to the PUC's regulation of charges imposed on ratepayers.
The California Constitution as adopted in 1879 provided that "[i]n any city where there are no public works owned and controlled by the municipality for the supplying the same with water or artificial light, any individual, or any company duly incorporated for such purpose ..., shall ... have the privilege of using the public streets and thoroughfares thereof, and of laying down pipes and conduits therein, and connections therewith, so far as may be necessary for introducing into and supplying such city and its inhabitants either with gaslight or other illuminating light, or with fresh water for domestic and all other purposes, upon the condition that the municipal government shall have the right to regulate the charges thereof." (Cal. Const., former art. XI, § 19.) The provision was intended to prevent a municipality from creating a monopoly within its jurisdiction by imposing burdens on parties who wanted to compete with an existing private utility. Although cities could not impose franchise fees on these "constitutional franchises," they were authorized to tax a franchise on the basis that a franchise constitutes real property within the city.
*264
(
Stockton etc. Co. v. San Joaquin Co., supra
, 148 Cal. at pp. 315-321,
In the meantime, in 1905, the Legislature enacted the Broughton Act, which authorized cities and counties to enter franchise agreements for the provision of electricity and various other services not encompassed by the constitutional restrictions
*871
on franchise fees. (Stats. 1905, ch. 578, p. 777;
County of Alameda v. Pacific Gas & Electric Co
. (1997)
The Broughton Act's provision that the fee be based on the receipts from the use, operation or possession of the franchise results in a complicated calculation of franchise
**220
fees. Usually, some portion of a utility's rights-of-way are on private property or property outside the jurisdiction of the city or county granting the franchise, and the utility's gross receipts attributable to a particular franchise must be reduced in proportion to the utility's rights-of-way that are not within the franchise agreement. (
Tulare County v. City of Dinuba, supra
, 188 Cal. at pp. 673-676,
As noted above, these statutory provisions do not bind jurisdictions governed by a charter, such as the City, but charter jurisdictions are free to follow the procedures set forth in the 1937 Act. (Pub. Util. Code, § 6205.) 9 However, the 1937 Act's provisions "relating to the payment of a percentage of gross receipts shall not be construed as a declaration of legislative judgment as to the proper compensation to be paid a chartered municipality for the right to exercise franchise privileges therein." (Pub. Util. Code, § 6205.) We explain below that although a charter jurisdiction's franchise fees are not limited by these statutory formulas, the PUC has concluded that it is not fair or reasonable to allow a utility to recoup from all of its utility customers charges imposed by a jurisdiction whose charges exceed the average amount of charges imposed by other local governments. Therefore, the PUC has established a procedure by which a utility may **221 obtain approval *266 to impose a surcharge on the bills of only those customers within the particular jurisdiction that imposes higher-than-average charges.
3. PUC Scrutiny of Utility Charges
The PUC sets the rates of a publicly regulated utility to permit the utility to recover its costs and expenses in providing its service, and to receive a fair return on the value of the property it uses in providing its service. (
Southern California
Gas Company v. Public Utilities Co
m
. (1979)
*267 ( PUC Investigation , supra , 32 Cal.P.U.C.2d at p. 63.) As voters restricted the taxing authority of local governments, however, some local jurisdictions increased the charges they imposed in connection with the provision of utility services. "As the number and increasing amounts of these local revenue-producing mechanisms began to multiply, the [PUC] became concerned that averaging these costs among all ratepayers would create inequities among ratepayers." ( Ibid . )
In response to this concern, the PUC established a procedure by which utilities may obtain approval to impose disproportionate charges on ratepayers within the jurisdiction that imposed the charges.
*873 ( PUC Investigation , supra , 32 Cal.P.U.C.2d at pp. 62, 69.) When a local government imposes taxes or fees "which in the aggregate significantly exceed the average aggregate of taxes or fees imposed by the other local governmental entities within the public utility's service territory," a utility may file an advice letter seeking approval to charge "local government fee surcharges." ( Id . at p. 73.) Such surcharges "shall be included as a separate item or items to bills rendered to applicable customers. Each surcharge shall be identified as being derived from the local governmental entity responsible for it." ( Ibid . )
The purpose of the PUC's procedure concerning local government fee surcharges is to ensure that utility rates are just, reasonable, and nondiscriminatory. ( PUC Investigation , supra , 32 Cal.P.U.C.2d at p. 69 ; see Pub. Util. Code, §§ 451 [all public utility charges shall be just and reasonable], 453 [no public utility shall discriminate], 728 [if PUC finds rates are unreasonable or discriminatory, it shall order just and reasonable rates].) "Basic rates ... are those designed to recoup a utility's costs incurred to serve all its customers. ( PUC Investigation, supra , 32 Cal.P.U.C.2d at p. 69.) If disproportionate taxes and fees are incorporated into all customers' basic rates, "some of these ratepayers would be subsidizing others but are not themselves benefiting from such increased taxes or fees." ( Ibid . )
The PUC's decision does not concern the validity of any charges imposed by local government. The PUC explained that it "[did] not dispute or seek to dispute the authority or right of any local governmental entity to impose or levy any form of tax or fee upon utility customers or the utility itself, which that local entity, as a matter of general or judicial decision, has jurisdiction to impose, levy, or increase. Any issue relating to such local authority is a matter for the Superior Court, not this Commission." ( PUC Investigation , supra , 32 Cal.P.U.C.2d at p. 69.)
C. Validity of the Surcharge
1. Relationship Between Franchise Rights and Franchise Fees
Plaintiffs contend the surcharge is a tax rather than a fee under Proposition 218, and therefore requires voter approval. Whether a charge is a tax or a fee "is a question of law for the appellate courts to decide on independent review of the facts." (
Sinclair Paint, supra
, 15 Cal.4th at p. 874,
As explained earlier, a franchise is a form of property, and a franchise fee is the price paid for the franchise. Moreover, historically, franchise fees have not been considered taxes, and nothing in Proposition 218 reflects an intention to treat amounts paid in exchange for property interests as taxes. Finally, like the receipt by a discrete group of a special benefit from the government, the receipt of an *874 interest in public property justifies the imposition of a charge on the recipient to compensate the public for the value received. Therefore, sums paid for the right to use a jurisdiction's rights-of-way are fees rather than taxes. But as explained below, to constitute compensation for the value received, the fees must reflect a reasonable estimate of the value of the franchise.
Each of the categories of valid fees we recognized in
Sinclair Paint, supra
,
In the course of our analysis, we observed that, "[i]n general, taxes are imposed for revenue purposes, rather than in return for a specific benefit conferred or privilege granted," and we looked to whether the primary purpose of a charge was to generate revenue. (
Sinclair Paint, supra
, 15 Cal.4th at p. 874,
In contrast, a fee paid for an interest in government property is compensation for the use or purchase of a government
asset
rather than compensation for a cost. Consequently, the revenue generated by the fee is available for whatever purposes the government chooses rather than tied to a public cost. The aspect of the transaction that distinguishes the charge from a tax is the receipt of value in exchange for the payment. (See
Sinclair Paint
, 15 Cal.4th at p. 874,
Plaintiffs observe, however, that SCE customers pay the surcharge, but SCE receives the franchise rights; therefore, they contend, the ratepayers do not receive any value in exchange for their *875 payment of the **223 charge. As noted above, publicly regulated utilities are allowed to recover their costs and expenses by passing them on to their ratepayers. Among the charges included in the rates charged to customers within the City is the initial 1 percent of *269 gross receipts paid in exchange for franchise rights, yet plaintiffs do not contend that this initial 1 percent is a tax because ratepayers do not receive the franchise rights. The fact that the surcharge is placed on customers' bills pursuant to the franchise agreement rather than a unilateral decision by SCE does not alter the substance of the surcharge; like the initial 1 percent charge, it is a payment made in exchange for a property interest that is needed to provide electricity to City residents. 10 Because a publicly regulated utility is a conduit through which government charges are ultimately imposed on ratepayers, we would be placing form over substance if we precluded the City from establishing that the surcharge bears a reasonable relationship to the value of the property interest it conveyed to SCE because the City expressed in its ordinance what was implicit-that once the PUC gave its approval, SCE would place the surcharge on the bills of customers within the City.
Although Sinclair Paint 's consideration of the purposes to which revenues will be put is not relevant in the context of transfers of public property interests, its broader focus on the relationship between a charge and the rationale underlying the charge provides guidance in evaluating whether the surcharge is a tax. Just as the amount of fees imposed to compensate for the expense of providing government services or the cost to the public associated with a payer's activities must bear a reasonable relationship to the costs and benefits that justify their imposition, fees imposed in exchange for a property interest must bear a reasonable relationship to the value received from the government. To the extent a franchise fee exceeds any reasonable value of the franchise, the excessive portion of the fee does not come within the rationale that justifies the imposition of fees without voter approval. Therefore, the excessive portion is a tax. If this were not the rule, franchise fees would become a vehicle for generating revenue independent of the purpose of the fees. In light of the PUC's investigation of local governments' attempts to produce revenue through charges imposed on public utilities, this concern is more than merely speculative. (See PUC Investigation, supra , 32 Cal.P.U.C.2d 60.)
We recognize that determining the value of a franchise may present difficulties. Unlike the cost of providing a government improvement or program, which may be calculated based on the expense of the personnel and materials used to perform the service or regulation, the value of property may vary greatly, depending on market forces and negotiations. Where a utility has an incentive to negotiate a lower fee, the negotiated fee may reflect the *270 value of the franchise rights, just as the negotiated rent paid by the lessor of a publicly owned building reflects its market value, despite the fact that a different lessor might have negotiated a different rental rate. In the absence of bona fide negotiations, *876 however, or in addition to such negotiations, an agency may look to other indicia of value to establish a reasonable value of franchise rights. 11
In sum, a franchise fee must be based on the value of the franchise conveyed in order to come within the rationale for its imposition without approval of the voters. Its value may be based on bona fide negotiations concerning the property's value, as well as other indicia of worth. Consistent with the principles that govern other fees, we hold that to constitute a valid franchise fee under Proposition 218, the amount of the franchise fee must bear a reasonable relationship to the value of the property interests transferred.
**224
(See
Sinclair Paint, supra
, 15 Cal.4th at pp. 874-876,
2. The City's Alternative Theories to Support the Surcharge
We find the City's remaining arguments in defense of the surcharge to be without merit.
The City contends that the surcharge is not a tax imposed on ratepayers because it is a burden SCE voluntarily assumed. The terms of the 1999 agreement belie the contention that SCE assumed a burden to pay the surcharge. The 1999 agreement states that SCE "shall collect" the surcharge from all SCE customers within the City, and the collection shall be based on electricity consumption. Arguably, these provisions are ambiguous as to whether the mandatory language imposes a duty to collect the surcharge, or imposes a duty, if it collects the surcharge, to apply it to all customers within the City based on consumption. However, the next paragraph of the 1999 agreement refers to "[t]he conditions precedent to the obligation of [ SCE ] under this Section 5 to levy, collect, and deliver to City the [surcharge]." In addition, the parties stipulated that "[t]he SCE assessments, collections and remittance of the [surcharge] were required by Santa Barbara Ordinance 5135." Finally, as noted above, public utilities are allowed to pass along to their customers expenses the utilities incur in producing their services, and SCE could terminate the 1999 agreement if the PUC did not agree to the inclusion of the surcharge on customers' bills. Thus, it does not appear that SCE assumed any burden to pay the surcharge from its assets.
We also reject the City's contention that imposition of the surcharge on customers is the result of a decision by SCE and the PUC. As discussed *271 above, the purpose of the PUC's involvement in the process was to ensure that higher-than-average fees were not imposed on customers who reside outside the City. The fact that the 1999 agreement required SCE to seek the approval of the PUC to include the charge on customers' bills, and allowed either party to terminate the agreement if the PUC's approval was not obtained, reflects that SCE was not willing to assume the burden of paying the surcharge, and that both parties to the agreement understood that the charge would be collected from ratepayers. These conclusions are confirmed by the parties' negotiations, which reflect that SCE was willing only to collect the charge from its customers and remit the revenue to the City. Finally, the City stipulated that the parties reached their *877 agreement on the condition that the surcharge would become payable only if SCE obtained the PUC's consent to include the surcharge as a customer surcharge. In sum, the City and SCE agreed that SCE would impose the surcharge on customers and remit the revenues to the City.
In a similar vein, the City contends we should look to a revenue measure's legal incidence-who is required to pay the revenues-rather than its economic incidence-who bears the economic burden of the measure. The City's contention is based on its view that SCE bears the legal incidence of the charges and, therefore, the charges are not a tax on the ratepayers. In support of its theory, the City cites case law holding that nonresidents do not have taxpayer standing under Code of Civil Procedure section 526a to challenge a jurisdiction's actions based on their payment of taxes within the jurisdiction. (See
Cornelius v. Los Angeles County etc. Authority
(1996)
In any event, all that the City ultimately contends in this regard is that the **225 economic incidence of a charge does not determine whether it is a tax. We agree. Valid fees do not become taxes simply because their cost is passed on to the ratepayers. As our discussion above reflects, the determination of whether a charge that is nominally a franchise fee constitutes a tax depends on whether it is reasonably related to the value of the franchise rights. *272 Finally, the City asserts that the negotiated value of the franchise is entitled to deference because the City's adoption of the 1999 agreement was a legislative act and because charter jurisdictions have broad discretion to enter franchise agreements. (See Gov. Code, § 50335 [the legislative body of a local agency may grant utility easements "upon such terms and conditions as the parties thereto may agree"].) The record does not adequately disclose the negotiations that occurred with respect to the value of the franchise, and we are therefore unable to evaluate what deference, if any, might be due.
III. THE JUDGMENT OF THE COURT OF APPEAL
As noted above, the Court of Appeal concluded that the surcharge's primary purpose was to raise revenue for general spending purposes rather than to compensate the City for the rights-of-way. Therefore, it held, the surcharge is a tax, and requires voter approval under Proposition 218. Based on these conclusions, it reversed the trial court's grant of the City's motion for judgment on the pleadings, and "directed the trial court to grant [plaintiffs'] motion for summary adjudication because the City imposed the 1% surcharge without complying with Proposition 218." As explained below, we agree that the judgment on the pleadings must be reversed, *878 but we conclude that plaintiffs did not establish a right to summary adjudication.
A motion for judgment on the pleadings presents the question of whether "the plaintiff's complaint state[s] facts sufficient to constitute a cause of action against the defendant." (
Smiley v. Citibank
(1995)
The first amended complaint alleges that the surcharge is not a franchise fee, but is instead a tax that requires voter approval under Proposition 218. In addition, with the parties' consent, the trial court took judicial notice of the written stipulation of facts submitted in connection with the motions for summary adjudication and summary judgment, and a second stipulation of facts submitted in connection with the City's motion for judgment on the pleadings. As described above, the stipulated facts reflect that the City and SCE agreed to double the amount to be paid for the privilege of using the rights-of-way and to pass these charges on to the *273 ratepayers, but they do not address the relationship, if any, between the surcharge and the value of the franchise. Liberally construed, the first amended complaint and the stipulated facts adequately allege the basis for a claim that the surcharge bears no reasonable relationship to the value of the franchise, and is therefore a tax requiring voter approval under Proposition 218. Accordingly, the trial court erred in granting judgment on the pleadings to the City.
Next we consider the Court of Appeal's direction to the trial court to grant plaintiffs' motion for summary adjudication. A plaintiff moving for summary adjudication with respect to a claim must establish each element of the claim. The burden then shifts to the defendant to demonstrate a triable issue of fact exists as to the claim. (Code Civ. Proc., § 437c, subd. (p)(1).) Like a ruling on a motion for judgment on the pleadings, a ruling on a motion for summary adjudication is reviewed de novo.
**226
(
Kendall v. Walker
(2009)
Plaintiffs sought summary adjudication of the allegation that the surcharge is a tax. (Code Civ. Proc., § 437c, subd. (f).) They asserted that the tests set forth in
Sinclair Paint, supra
,
Although plaintiffs' allegations and the stipulated facts adequately allege the basis for a contention that the surcharge bears no reasonable relationship to the value of the franchise, plaintiffs' motion for summary adjudication did not establish this contention. As explained in our discussion of franchise fees, cities are free to sell or lease their property, and the fact that a franchise fee is collected for the purpose of generating revenue does not establish that the compensation paid for the property interests is a tax. In addition, in contrast to fees imposed for the purpose of recouping the costs of government services or programs, which are limited to the reasonable costs of the services or programs, franchise fees are not based on the costs incurred in affording a *274 utility access to rights-of-way. Therefore, the facts on which plaintiffs relied in seeking summary adjudication did not establish their claim that the surcharge is a tax.
IV. DISPOSITION
We affirm the judgment of the Court of Appeal to the extent it reversed the trial court's judgment, and we reverse the judgment to the extent it directed the trial court to grant plaintiffs' motion for summary adjudication. The case is remanded to the Court of Appeal with directions to remand the matter to the trial court for further proceedings consistent with this opinion.
We Concur:
Werdegar, J.
Corrigan, J.
Liu, J.
Cuéllar, J.
Kruger, J.
DISSENTING OPINION BY CHIN, J.
Chin, J.
Since 1970, the City of Santa Barbara (the City) has imposed "a tax" on those using electricity in the City. Since 1977, the amount of the tax has been "six percent (6%) of the charges made for" energy use. (Santa Barbara Mun. Code, § 4.24.030 . ) In 1999, the City, in order to raise revenues for general governmental purposes, passed an ordinance-City Ordinance No. 5135 (the Ordinance)-separately requiring those receiving electricity within the City from Southern California Edison (SCE) to pay an additional 1 percent of the amount of their electrical bill. I conclude that this additional charge constitutes a tax that the City imposed in violation of the voter approval requirements of article XIII C of the California Constitution, as adopted by the voters at the November 5 General Election through passage of Proposition 218 (Proposition 218). The City's arguments to the contrary are unpersuasive.
The majority agrees that most of the City's arguments fail, but it largely agrees *880 with the City that the charge is a "valid franchise fee ... rather than a tax." (Maj. **227 opn., ante , 219 Cal.Rptr.3d at p. 865, 397 P.3d at p. 215.) Putting its own gloss on the City's argument-a gloss the City expressly rejects-the majority concludes that the charge is a valid franchise fee to the extent it "bear[s] a reasonable relationship to," as alternatively phrased, "the value of the property interests transferred" (maj. opn., ante , at p. 876, 397 P.3d at pp. 223-224), "the value of the franchise conveyed" ( ibid .), or "the value of the franchise rights" ( id . at p. 877, 397 P.3d at p. 225).
There is a fundamental problem with this approach: The electricity users upon whom the City imposes the charge, and who actually pay it, do not receive the franchise, any franchise rights, or any property interests. The Ordinance grants those valuable rights and interests
only to SCE
, the electricity supplier. Because the Ordinance requires SCE's customers to pay for rights and interests the City has granted to SCE, the charge does not
*275
constitute a "franchise fee" for purposes of the rule that "franchise fees [are not] considered taxes." (Maj. opn.,
ante
, 219 Cal.Rptr.3d at p. 869, 397 P.3d at p. 218.) In reality, it is just an increase in the City's user tax, which the City
calls
a franchise fee. It thus constitutes
precisely
what the voters adopted article XIII C to preclude: a "tax increase[ ] disguised via euphemistic relabeling as 'fees,' 'charges,' or 'assessments.' " (
Apartment Assn. of Los Angeles County, Inc. v. City of Los Angeles
(2001)
The majority cites no support for its conclusion that a charge imposed on and paid by someone who is granted nothing in return is not tax as to that person so long as someone else receives franchise rights for the payment. Indeed, as I explain below, the majority's analysis is inconsistent with our case law. And the line the majority draws between a valid franchise fee and a tax-whether the amount of the charge to a utility's customers bears a reasonable relationship to the value the entity receives-is problematic in many ways and renders long-standing statutory provisions regarding utility franchises vulnerable to constitutional challenge. For all of these reasons, I dissent.
I. FACTUAL AND LEGAL BACKGROUND
In 1887, SCE's predecessor, the Santa Barbara Electric Company, began supplying electricity in the City. In 1959, the City, pursuant to an agreement with SCE, adopted Ordinance No. 2728 granting SCE a 25-year franchise to use public property to transmit and distribute electricity. The ordinance required SCE to pay the City 2 percent of its "gross annual receipts ... arising from the use, operation or possession of [the] franchise," with a minimum payment of one-half percent of SCE's "gross annual receipts derived ... from the sale of electricity within the [City's] limits ... under both" the franchise being granted by the ordinance and SCE's separate and preexisting "constitutional franchise." The ordinance specified that the City was granting the franchise "under and in accordance with the provisions of *881 [the] Franchise Act of 1937." 1
In 1985, after the 1959 franchise expired, the City, pursuant to another agreement with SCE, adopted Ordinance No. 4312 granting SCE a 10-year *276 franchise to use public property to transmit and distribute electricity. "[A]s compensation," the ordinance required SCE to pay to the City 2 percent of its "annual gross receipts ... arising from the use, operation or possession of th[e] franchise," with a minimum payment of 1 percent of SCE's "annual gross receipts derived ... from the sale of electricity within the limits of [the] City under both" the franchise being granted by the ordinance and SCE's separate and preexisting "constitutional franchise." **228 The 1985 ordinance also required SCE to "collect for [the] City any utility users tax imposed by [the] City." This provision reflected the City's imposition in 1970 of "a tax" on "every person in" the City using electricity in the City. (Santa Barbara Ord. No. 3436.) The amount of the tax was initially three percent "of the charges made for" use of electricity. ( Ibid .) In 1977, the City doubled the tax to 6 percent. (Santa Barbara Ord. No. 3927, amending Santa Barbara Mun. Code, § 4.24.030; see Santa Barbara Ord. No. 4289 (1984), amending Santa Barbara Mun. Code, tit. 4.)
The year after the City doubled its electricity users tax, California voters passed Proposition 13. As the majority notes, Proposition 13 amended our Constitution to limit increases in the assessed value of real property to 2 percent per year (absent a change in ownership) and to limit the rate of taxation on real property to 1 percent of its assessed value. (Maj. opn., ante , 219 Cal.Rptr.3d at pp. 865-866, 397 P.3d at p. 215.) In order to prevent these tax savings from being offset by increases in state and local taxes, Proposition 13 also amended our Constitution to require approval by two-thirds of the local electors of a city, county, or special district in order for such a local entity to impose or raise special taxes. (Maj. opn., ante , at pp. 865-866, 397 P.3d at p. 215.) Since the voters enacted these limits on the City's taxing powers, the City has not formally increased the percentage of its electricity users tax.
However, in 1999, the City informally and effectively increased this tax by passing the Ordinance, which codified a new franchise agreement with SCE and required users of electricity within the City to pay an additional 1 percent of their electrical bill. According to the parties' stipulated facts, this charge began as a proposal from "City staff," "[d]uring the negotiations for the new franchise agreement," to "increase[ ] [the] annual 'franchise fee' " from 1 percent of SCE's gross receipts for electricity sold within the City-the amount under the expiring agreement-to 2 percent. "City staff" proposed the increase in order "to raise additional revenues for the City for general City governmental purposes." "After a period of negotiations," SCE said it would agree "to remit to the City a two percent ... franchise fee provided that the City agreed that the increase in the franchise fee would be payable to the City only if the California Public Utilities Commission ... consented to SCE's request that it be allowed to include the additional 1% amount as a customer surcharge on the bills of SCE to its customers in the City." City *882 staff and SCE *277 reached agreement "[o]n that basis" and the City Council later adopted the tentative agreement as Ordinance No. 5135 (Dec. 7, 1999).
The Ordinance granted SCE a franchise to use public property to construct and operate an electric transmission system. It provided for an : " 'Initial Term' " of three years-January 1, 2000, through December 31, 2002-and set the payment for that term at 1 percent of SCE's "Gross Annual Receipts." (Ord. No. 5135, §§ 3.A, 5.) The Ordinance also provided for an " 'Extension Term' " beginning 60 days after the California Public Utilities Commission (PUC) approved an "Extension Term Fee" and ending December 31, 2029. (Ord., § 3.B.) The total Extension Term Fee was 2 percent of SCE's Gross Annual Receipts, and comprised two elements: (1) the 1 percent Initial Term Fee; and (2) a 1 percent "Recovery Portion." (Ord., § 5.B.) Like the City's electricity users tax, the Recovery Portion was to be collected from "all electric utility customers served by [SCE] within the boundaries of the City" and was "based on consumption or use of electricity." ( Ibid .) SCE's "obligation" was "to levy" the Recovery Portion on its customers, "collect" this payment from its customers, and "deliver" the collected amount "to [the] City." (Ord., § 5.C.) In other words, according to the parties' stipulated facts, Ordinance No. 5135 "obligate[d]" all persons in the City receiving electricity from SCE "to pay" the Recovery Portion, and "require[d] [SCE] to collect" the Recovery Portion "from" its City customers "and remit [it] to" the City. The Ordinance made PUC approval of the Extension Term Fee a "condition [ ] precedent to" SCE's "obligation ... to levy, collect, and deliver to [the] City the Recovery Portion." 2
**229 If that approval was not obtained by the end of the Initial Term-December 31, 2002-the franchise would "continue on a year to year basis at the Initial Term Fee"-1 percent of gross revenues-until terminated by either party upon written notice.
In April 2001, the City and SCE agreed to delay for up to two years the filing with the PUC of a request for approval of the Extension Term Fee. In December 2004, almost three years later, the City directed SCE to submit the request. During that period, the only compensation SCE paid the City for the franchise was the Initial Term Fee. SCE eventually submitted the request on March 30, 2005, asking for approval "to bill and collect from its customers within the City ... a 1.0% electric franchise surcharge to be remitted to the City by SCE as a pass-through fee, pursuant to SCE's new franchise agreement with the City." The request explained that the new franchise *278 agreement "expressly provides for the additional amount to be surcharged to SCE's customers within the City," and requires PUC approval "in order for SCE to bill and collect the additional franchise surcharge for the City." The request also explained that, upon the PUC's approval, SCE would "bill and collect the surcharge revenues and pass through the revenues directly to the City." *883 On April 20, 2005, the PUC granted SCE's request.
In November 2005, SCE began billing the Recovery Portion to, and collecting it from, customers in the City, and remitting those revenues in their entirety to the City. At first, the City apportioned the revenues in accordance with the Ordinance, i.e., half to the City's general fund and half to a City undergrounding projects fund. In November 2009, the City directed that all revenues from the Recovery Portion be placed in its general fund without any limitation on use.
DISCUSSION
Plaintiffs Rolland Jacks and Rove Enterprises, Inc., claim that the City, by imposing the Recovery Portion through adoption of Ordinance No. 5135, violated article XIII C of the California Constitution. As here relevant, article XIII C provides that "local government[s]" may not "impose ... any general tax ... until that tax is submitted to the electorate and approved by a majority vote" (Cal. Const., art. XIII C, § 2, subd. (b)), and may not "impose ... any special tax ... until that tax is submitted to the electorate and approved by a two-thirds vote" ( id ., § 2, subd. (d)). Plaintiffs argue that the Recovery Portion is a tax within the meaning of these provisions and that the City violated article XIII C by imposing it without voter approval.
In opposition to this argument, the City focuses heavily on the word "impose" in article XIII C's provisions, asserting that the Recovery Portion was not "imposed" by the City on anyone. According to the City, the Recovery Portion is, as to SCE, a "voluntary" payment to which SCE, a "sophisticated, commercial entit[y] with substantial market power," "willingly agreed" in order "to obtain use of valuable public rights of way in its for-profit business." As to SCE's customers, SCE and/or the PUC "imposed" the Recovery Portion, and the City "played no part in" the decisions of those entities.
The majority correctly rejects these arguments, explaining that the terms of the agreement and the Ordinance require that the Recovery Portion "be collected from" SCE's customers and impose on SCE only an obligation "to collect the charge from its customers and remit the revenue to the City." (Maj. opn., ante , 219 Cal.Rptr.3d at p. 876, 397 P.3d at p. 224.) Indeed, the City's arguments necessarily fail in light of its stipulation that "[p]ursuant to City Ordinance [No.] 5135, all *279 persons in the City receiving electricity from SCE are obligated to pay the 1% Recovery Portion." (Italics added.)
In a related argument, the City asserts that the Recovery Portion is not "imposed"
**230 on SCE's customers because its "legal incidence"-i.e., the "legal duty to pay it"-"is on SCE." According to the City, that SCE's customers in fact "ultimately bear[ ]" the Recovery Portion's "economic burden" is irrelevant because, under the law, "whether a charge is a tax is determined by its legal incidence."
The City is correct to focus on the Recovery Portion's legal incidence, but its argument fails because, under the Ordinance, both the legal incidence and the economic burden of the Recovery Portion fall on SCE's customers, not on SCE. The rule in California is that where the government
mandates
payment of a charge by one party, and imposes a duty on some other party to collect the payment and remit it to the government, the legal incidence of the charge falls, not on the party
*884
collecting the payment-who acts merely as the government's collection agent or conduit-but on the party from whom the payment is, by law, collected. (
Western States Bankcard Assn. v. City and County of San Francisco
(1977)
Under these principles, the legal incidence of the Recovery Portion falls on SCE's customers, not, as the City asserts, on SCE. As noted above, the City has stipulated that SCE's customers "are obligated to pay" the Recovery Portion "[p]ursuant to City Ordinance [No.] 5135," and that SCE's duty under the Ordinance is "to collect" the Recovery Portion "from all SCE electricity users in the City and remit those funds to the City." The terms of the Ordinance and the representations in SCE's application for PUC approval, *280 as set forth above, fully support this stipulation. On this record, it is clear that the Ordinance mandates payment of the Recovery Portion by SCE's customers and makes SCE the City's collection agent and conduit regarding this payment. Accordingly, the legal incidence of the Recovery Portion is on SCE's customers.
The City's final argument is that the Recovery Portion is a "franchise fee"-i.e., "a bargained-for price for use of the City's rights of way in SCE's search for profits"-and that under California case law, a franchise fee "is not a tax." The majority essentially agrees with the City. "Historically," the majority begins, "franchise fees have not been considered" by California courts to be "taxes," and "[n]othing in Proposition 218 reflects an intent to change" this rule. (Maj. opn., ante , 219 Cal.Rptr.3d at pp. 869-870, 397 P.3d at pp. 218-219.) Putting its own gloss on the City's argument, the majority then concludes that the Recovery Portion is a "franchise fee" and not a tax insofar as its amount "is reasonably related to the value of the franchise." (Maj. opn., ante , at p. 865, 397 P.3d at p. 215.) "To the extent [it] exceeds any reasonable value of the franchise," it "is a tax" rather than a "franchise fee," because "the excessive portion ... does not come within the rationale that justifies the imposition of fees without voter approval." ( Id. at p. 875, 397 P.3d at p. 223.)
Whether a charge constitutes a "tax" for purposes of the Constitution "is a question of law for the appellate courts to decide on independent review of the facts." (
*885
Sinclair Paint Co. v. State Bd. of Equalization
(1997)
Tulare
makes clear that the Recovery Portion, irrespective of its relationship to the value of the franchise SCE received, is not a franchise fee for purposes of the rule that a franchise fee is not a tax. As explained above, the Recovery Portion is not a charge that "the holder of the franchise"-SCE-"undert[ook] to pay." (
Tulare
,
supra
, 188 Cal. at p. 670,
Although the majority recognizes the principles underlying the rule that franchise fees are not taxes, it fails to apply them. The majority observes that "a franchise fee is the purchase price of the franchise" (maj. opn., ante , 219 Cal.Rptr.3d at p. 869, 397 P.3d at p. 218), but it does not explain how the Recovery Portion, which the City has imposed on **232 someone other than the purchaser of the franchise, meets this test. The majority explains that "sums paid for the right to use a jurisdiction's rights-of-way are fees rather than taxes" because "the receipt of an interest in public property justifies the imposition of a charge on the recipient to compensate the public for the value received." (Maj. opn., ante , at pp. 873-874, 397 P.3d at p. 222, italics added.) *282 But the Recovery Portion is not imposed "on the recipient" of the interest in public property. ( Ibid .) The majority explains that "restrictions on taxation do not encompass amounts paid in exchange for property interests" (maj. opn., ante , at p. 869, 397 P.3d at p. 218, italics added), and that what "distinguishes" a valid charge "from a tax is the receipt of value in exchange for the payment " ( id . at p. 874, 397 P.3d at p. 222, italics added). But SCE's customers do not receive any property interest or value "in exchange for" paying the Recovery Portion. ( Ibid .) In short, the Recovery Portion lacks the "historical characteristics of franchise fees" that the majority identifies from our decisions. ( Id . at p. 865, 397 P.3d at p. 215.) It therefore does not, to use the majority's own words, "come within the rationale that justifies" ( id . at p. 875, 397 P.3d at p. 223) the rule that franchise fees are not taxes.
According to the majority, in determining whether the Recovery Portion is a franchise fee rather than a tax, it is irrelevant that SCE's customers "pay the surcharge" while "SCE receives the franchise rights," that SCE's customers "do not receive any value in exchange for their payment," and that the City is requiring SCE's customers "to compensate the City for the utility's use of public property." (Maj. opn., ante , 219 Cal.Rptr.3d at pp. 874-875, 397 P.3d at pp. 222-223, italics added.) The stated basis for this view is that "publicly regulated utilities are allowed to recover their costs and expenses by passing them on to their ratepayers," and are therefore merely "conduit[s] through which government charges are ultimately imposed on ratepayers." ( Id . at p. 875, 397 P.3d at p. 223.) Given this circumstance, the majority reasons, it makes no difference that the Recovery Portion is an obligation the City imposes directly on SCE's customers, instead of a contractual obligation of SCE that SCE "unilateral[ly]" decides to pass on to its customers. ( Ibid. ) The City, the majority asserts, should not be "precluded" from showing that the Recovery Portion bears a reasonable relationship to the value of the property interest it conveyed to SCE merely because the Ordinance expressly mandates what would have been "implicit" had SCE agreed to pay the Recovery Portion itself-"that once the PUC gave its approval, *887 SCE would place the surcharge on the bills of customers within the City." ( Ibid .)
For a number of reasons, I disagree. First, the majority's view is inconsistent with our case law, which, as explained above, establishes that a franchise fee-as distinguished from a tax-is a "charge [that]
the holder of the franchise undertakes to pay
," i.e., an "obligation to pay" that is "purely a matter of contract" and that is "imposed" on the payor "not ... by law but by
his
acceptance of the franchise." (
Tulare
,
supra
, 188 Cal. at p. 670,
Indeed, the majority's conclusion in this regard is inconsistent with its own discussion of the very case law on which it principally relies. As the majority explains, our prior decisions identify "categories of charges" that constitute valid "fees rather *888 than taxes" for purposes of applying Proposition 13. (Maj. opn., ante , 219 Cal.Rptr.3d at p. 868, 397 P.3d at p. 217.) "The commonality among these categories," the majority states, "is the relationship between the charge imposed and a benefit ... to the payor ." ( Ibid .) For example, the majority observes, "we [have] explained ... that 'if an assessment for ... improvements provides a special benefit to the assessed properties, then the assessed property owners should pay for the benefit they receive .' " ( Ibid ., italics added.) Under these cases, the majority states, a purported fee is a tax for *284 purposes of Proposition 13 to the extent it exceeds "the special benefit received by the payor ." (Maj. opn., ante , at p. 868, 397 P.3d at p. 218, italics added.)
A closer look at our assessment decisions reveals that a nexus between the benefit conferred and the person
paying the charge
is a prerequisite to concluding that the charge is not a tax. As we explained over 100 years ago, "the compensating benefit to the property owner" on whom the government imposes a charge for an improvement "is the warrant, and the sole warrant, for" finding that the charge is a valid assessment rather than a tax. (
Spring Street Co. v. City of Los Angeles
(1915)
The charge the majority here says is a valid fee differs in another significant respect
**234
from the charges we have previously held to be permissible fees instead of taxes: the measure of what is permissible. As the majority observes, as to all of the charges for benefits we have dealt with in prior cases, we have held that they are "taxes" to the extent they "exceed the reasonable
cost
of the activity on which they are based." (Maj. opn.,
ante
, --- Cal.Rptr.3d at p. ----, --- P.3d at p. ----, italics added.) This is true even of property assessments; although a given property may be assessed based on the proportionate share of the benefit it receives from a government improvement, the assessment is a valid fee rather than a tax only to the extent it does not exceed the proportionate
cost
of the improvement to the government. (
Knox v. City of Orland
(1992)
The majority here affords different treatment to the general revenue-raising measure at issue. It holds that cost is irrelevant, and that a charge labeled a "franchise fee" becomes a tax as to a utility's customers only to the extent the charge exceeds "the value" to the utility of "the property interests transferred" (maj. opn., ante, 219 Cal.Rptr.3d at p. 876, 397 P.3d at pp. 223-224), "the value of the franchise conveyed" ( ibid .), or "the value of the franchise rights" ( id . at p. 877, 397 P.3d at p. 225). Contrary to the majority's analysis, our prior decisions clearly do not provide support for the line the majority draws between a valid fee and a tax, or for its conclusion that the method the City used here to raise money for general purposes is, uniquely, not a tax. And because there is no existing authority for the majority's newly minted approach, the majority is incorrect that focusing on the fact the Recovery Portion is directly imposed by the City on SCE's customers "preclude[s]" the City from doing something it otherwise could, i.e., proving the charge is a fee rather than a tax by "establishing that [it] bears a reasonable relationship to the value of the property interest it conveyed to SCE." (Maj. opn., ante , at p. 875, 397 P.3d at p. 223.)
Third, there is no factual or legal basis for the majority's assumption that a utility, through price increases,
necessarily
can and will pass on to its customers charges it is legally required to pay. With respect to the sales tax, we have observed that a retailer "may choose simply to absorb the sales tax" imposed by statute instead of passing it on to its customers. (
Loeffler v. Target Corp.
(2014)
Moreover, in order to pass charges on to customers through a price increase, a utility would have to apply for and obtain approval from the PUC. Under our Constitution, the PUC has both the power and the duty to "fix rates" for California public utilities (Cal. Const. art. XII, § 6 ), such that the
*286
charges they demand for service are "just and reasonable" (§ 451 ; see
Southern California Edison Co. v. Peevey
(2003)
In one especially relevant example of its exercise of this power, the PUC disallowed, for purposes of a requested rate increase, contractual payments a utility made to its controlling parent company for various services. (
Pac. Tel.
,
supra
, 34 Cal.2d at p. 825,
Nothing would preclude the PUC from finding, for similar reasons, that it would not be just and reasonable for a utility, having agreed to pay a city double what it had paid for many years as compensation for using public property, to raise its rates in order to recoup from customers the doubled cost to which it agreed. Nor would anything preclude the PUC from finding that where the utility's duty to pay the increase was expressly made contingent on the utility's ability to recoup the expense from its customers, the increase was not "based on bona fide negotiations." (Maj. opn.,
ante
, 219 Cal.Rptr.3d at p. 876, 397 P.3d at p. 223.) Indeed, the majority rightly questions whether "the negotiations" here, which placed responsibility for paying the Recovery Portion on SCE's ratepayers and imposed no financial responsibility for that charge on SCE, reasonably reflect "the value" of what SCE received from the City. (Maj. opn.,
ante
, at p. 877, 397 P.3d at p. 225.) And where the payment is set as a percentage of a utility's gross annual receipts, the PUC could also find that the formula is "a false measuring rod," i.e., it "bears
*287
no rational relationship to" the value of what the utility is receiving. (Dec. No. 42529,
supra
, 48 Cal.P.U.C. at p. 472.) In short, had SCE agreed to pay the Recovery Portion and then applied for a rate increase to pass on the charge to its customers, the PUC could have "disallow[ed] expenditures that it [found] unreasonable, thus insuring that any excessive costs [would] be met from [SCE's] profits. The effect of the payments on rates and services [would have been] no greater than in any other case where the [PUC] and management disagree on the reasonableness of an expenditure, and the management concludes that it is good business judgment to make such payments from its profits despite the fact that it cannot recoup them from its rate payers." (
*891
Pac. Tel.
,
supra
, 34 Cal.2d, at p. 832,
Indeed, the facts in the record indicate that SCE and the City did not share the majority's assumption. As the majority explains, the record shows "that SCE was not willing to assume the burden of paying" the additional 1 percent the City demanded, and "was willing only to collect the charge from its customers and remit the revenue to the City." (Maj. opn., ante , 219 Cal.Rptr.3d at p. 876, 397 P.3d at p. 224.) It is for this reason that the agreement and the Ordinance provided that "the charge would be collected from ratepayers" and "would become payable only if SCE obtained the PUC's consent to include the surcharge as a customer surcharge." ( Ibid .) Moreover, as explained **236 above, although the agreement required SCE to obtain PUC approval by December 31, 2002, SCE and the City agreed not even to apply for PUC approval until over two years later, in March 2005. According to a letter from the City to SCE, the delay was "[b]ased" in part "upon the tremendous uncertainty associated with the end of the [California] deregulation transition period ... and the volatility and uncertainty of rates." Were it true, as the majority assumes, that SCE necessarily could have passed on the Recovery Portion to its customers, there would have been no reason for SCE to have refused legal responsibility for the proposed charge, for SCE and the City to have made the Recovery Portion contingent on "the PUC's consent to include the surcharge as a customer surcharge" (maj. opn., ante , at p. 877, 397 P.3d at p. 224), or for SCE and the City to have delayed submission of the application for PUC approval. In other words, as plaintiffs assert, the facts in the record indicate that, unlike the majority, SCE and the City did not consider the PUC to be "a mere rubber stamp of financial burdens" SCE and the City "might try to impose upon utility users."
Fourth, the majority's approach, in addition to being inconsistent with our case law, is fundamentally inconsistent with Proposition 218's purpose. The majority, partially quoting the first two sentences of Proposition 218's findings and declarations, suggests that the voters were "concern[ed] with excessive fees, not fees in general." (Maj. opn., ante , 219 Cal.Rptr.3d at p. 869, 397 P.3d at p. 218.) But the *288 majority ignores the very next sentence of the findings and declarations: "This measure protects taxpayers by limiting the methods by which local governments exact revenue from taxpayers without their consent." (Prop. 218, § 2, reprinted at 1 Stats. 1996, p. A-295.) Proposition 218 expressly provided that article XIII C "shall be liberally construed to effectuate" this goal, i.e., "limiting local government revenue and enhancing taxpayer consent." (Prop. 218, § 5, reprinted at Historical Notes, 2B West's Ann. Cal. Const. (2013), foll. Art. XIII C, § 1, at p. 363.) The majority also ignores the ballot arguments in favor of Proposition 218, which (1) warned that "politicians [had] created a loophole in the law that allows them to raise taxes without voter approval by calling taxes 'assessments' and 'fees,' " and (2) stated that "Proposition 218 guarantees your right to vote on local tax increases-even when they are called something else, like 'assessments' or 'fees' and imposed on homeowners." (Ballot Pamp., Gen. Elec. (Nov. 5, 1996) argument in favor of Prop. 218, p. 76.) The record here shows that the City imposed the Recovery Portion on SCE's customers in order to raise revenue for *892 general governmental purposes. The charge clearly constitutes one of the " 'revenue-producing mechanisms' " that, as the majority explains, local governments adopted because "voters restricted [their] taxing authority." (Maj. opn., ante , at p. 872, 397 P.3d at p. 221.) By holding that the City may raise revenue from SCE's consumers by calling the charge a franchise fee, even though those paying the fee receive no franchise, the majority sanctions this obvious evasion of Proposition 218 and allows the City to use the utility as a middleman for what is a tax disguised as a fee, in derogation of Proposition 218's express purpose and liberal construction clause.
Fifth, the majority's concern about the possible treatment of charges passed on to ratepayers by a utility's "unilateral decision" does not justify its refusal to recognize the significance under our case law of the fact that SCE's customers do not receive franchise rights in exchange for paying the Recovery Portion, and its focus instead on the value of those rights to an entity that is not paying for them. (Maj. opn., ante , 219 Cal.Rptr.3d at p. 875, 397 P.3d at p. 223.) Initially, the facts of this case do not present that scenario, and holding here that the Recovery Portion is a tax rather than a franchise fee because SCE's customers receive no franchise rights in return for their payment would not preclude ratepayers from arguing in a future case that we should expand article XIII C's reach to franchise charges that a utility, having contractually agreed to pay, unilaterally decides to pass on to its customers. The majority's concern about this scenario does not justify its contraction of article XIII C so as to make it inapplicable where it clearly does and should apply: direct **237 government imposition of a charge on those who receive nothing in return.
In any event, the majority's analysis is contrary to decades of California case law establishing that, for purposes of determining whether a charge is a tax or a fee as to the payor, charges passed on to the payor by the unilateral
*289
and discretionary decision of some third party are, in fact, different from charges legally imposed on the payor by the government. (E.g.
Western States
,
supra
, 19 Cal.3d at pp. 217-218,
Indeed, the effect of the majority's approach is to allow claims that this long-standing and unbroken line of precedent precludes. Under that precedent, a charge that is not imposed by the government on the payor-either directly or by inclusion of a
mandatory
pass-on provision-and that is passed on to the payor by the unilateral and discretionary decision of some third party, is not a tax, even if it is "implicit" (maj. opn.,
ante
, 219 Cal.Rptr.3d at p. 875, 397 P.3d at p. 223) that the third party on whom the charge is imposed will pass it on to the payor. Notably, in
Howard Jarvis Taxpayers Assn. v. City of Fresno
(2005)
Courts applying the federal Constitution's prohibition on state taxation of the federal government have used the same analysis specifically with respect to so-called utility franchise fees. In
U.S. v. City of Leavenworth, Kan.
(D.Kan. 1977)
Following this decision, in
U.S. v. State of Md.
(D.Md. 1979)
This long-standing and consistent precedent from both California and elsewhere no doubt explains why, as the majority notes, "plaintiffs do not contend" in this case that the Initial Term Fee "is a tax" that was imposed in violation of the state Constitution. (Maj. opn., ante , 219 Cal.Rptr.3d at p. 875, 397 P.3d at p. 223.) However, under the majority's holding that charges passed on by utilities are the same, for tax purposes, as charges imposed directly on ratepayers, plaintiffs now can, and surely will, make this argument. Indeed, the majority expressly states that the differences between the Initial Term Fee and the Recovery *291 Portion are "unrelated to the character or validity" of these charges. (Maj. opn., ante , at p. 875, fn. 10, 397 P.3d at p. 223, fn. 10.) Thus, plaintiffs may now allege that even the Initial Term Fee is a tax because it is passed on to them through SCE's rates and it exceeds the value of the franchise rights SCE received. 6
In the same way, the majority's holding renders both the Broughton Act and the 1937 Act vulnerable to constitutional challenge. Notwithstanding our holding almost 100 years ago that the fees utilities must pay under the Broughton Act are
not
taxes under the state Constitution (
Tulare
,
supra
, 188 Cal. at p. 670,
Finally, as a practical matter, the majority's approach is problematic in a number of ways. The majority mentions one: the inherent "difficulties" in "determining the value of a franchise." (Maj. opn.,
ante
, 219 Cal.Rptr.3d at p. 875, 397 P.3d at p. 223.) The majority references several factors it says may bear on value: "market forces" and
**239
"bona fide negotiations." (
Ibid
.) It suggests there may be "other indicia of value" (
ibid.
), but it declines to offer any guidance as to what those other indicia might be, instead "leav[ing] th[e] issue to be addressed
*895
by expert opinion and subsequent case law" (
id
. at p. 876, fn. 11, 397 P.3d at p. 223, fn. 11). But as we noted over 100 years ago, "[t]here are few subjects on which witnesses are more likely to differ than that of the value of property, and few are more difficult of satisfactory determination." (
O'Hara v. Wattson
(1915)
Perhaps to justify its failure to offer any real guidance on this admittedly "difficult[ ]" issue (maj. opn., ante , 219 Cal.Rptr.3d at p. 875, 397 P.3d at p. 223), the majority notes that "[t]he parties' briefs do not consider the means by which franchise rights might be valued." ( Id. at p. 876, fn. 11, 397 P.3d at p. 223, fn. 11). But there is a simple explanation for this silence: Neither party has suggested that the value of the franchise should even be a consideration in determining whether the Recovery Portion is a tax or a fee. On the contrary, upon the court's inquiry at oral argument, the City expressly disclaimed this approach. It asserted that, as to fees voluntarily negotiated for the use of government property, courts should not be concerned about whether the fee is reasonably related to the benefits, and should not second-guess what a utility is willing to pay for its use of public property. Nor, the City argued, are courts well positioned to second-guess the economic decisions of other branches of government. The City also noted, like the majority, the inherent difficulties of making this kind of determination, asking rhetorically, "what's the fair and rational rate of a parking meter," or "to rent a duck boat on the lake at the county fairgrounds," or "to rent a meeting room at the community center?" Bringing the question back to the facts of this case, the City rightly asked, "What are the limits of [a municipality's] ability to monetize its rights of way?" Instead, the City urges us to follow "well settled" law by focusing on the "legal incidence" of the Recovery Portion, "i.e., who has a legal duty to pay it." This test, the City asserts, is "logical"
*896 and "predictable," is "within the competence of courts to distinguish fees from taxes," and "better serves the needs of courts and the society they serve."
*293
I agree with the City. Indeed, regarding the City's comment about monetizing its rights of way, we have explained, as noted above, that a municipality's power to permit utilities to use public property "on such terms as are satisfactory to it" includes the power to " 'require the payment of such compensation as seems proper,' " and that courts therefore do not "question whether or not the amount charged is a reasonable charge." (
Sunset
,
supra
, 161 Cal. at p. 285,
There are myriad other ways in which the majority's approach-determining whether the amount of the charge bears a reasonable relationship to the value of the franchise conveyed-is problematic. It essentially requires courts to determine the adequacy of consideration, in contravention of the well-established " 'general contract principle that courts should
not
inquire into the adequacy of consideration.' " (
Foley v. Interactive Data Corp.
(1988)
Given these difficulties and the lack of authority for the majority's approach, I disagree with the majority's conclusion that the Recovery Portion is not a tax unless it exceeds the reasonable value of the franchise. Instead, based on long-standing precedent, the purpose of Proposition 218 to limit local government revenue and enhance taxpayer consent, and the command *294 that we liberally construe article XIII C to effectuate this purpose, I conclude that the Recovery Portion is a tax that the City may not impose without voter approval. I therefore dissent.
A franchise is a privilege granted by the government to a particular individual or entity rather than to all as a common right. A utility franchise is a privilege to use public streets or rights-of-way in connection with the utility's provision of services to residents within the governmental entity's jurisdiction. (
Spring Valley W.W. v. Schottler
(1882)
"For its own government, a county or city may adopt a charter by majority vote of its electors voting on the question." (Cal. Const., art. XI, § 3, subd. (a).) County charters "supersede ... all laws inconsistent therewith" (
ibid
.), and city charters supersede all inconsistent laws "with respect to municipal affairs." (
Id
., § 5, subd. (a); see
Johnson v. Bradley
(1992)
Proposition 218 also imposed restrictions on the imposition of fees and charges for property-related services, such as sewer and water services, but provided that "fees for the provision of electrical or gas service shall not be deemed charges or fees imposed as an incident of property ownership." (Cal. Const., art. XIII D, § 3, subd. (b);
ibr.US_Case_Law.Schema.Case_Body:v1">id
Plaintiffs and the City both view Proposition 26 as confirming their view of the law before Proposition 26 was enacted, but no party contends that it applies to the charges in this case, which were imposed prior to the enactment of Proposition 26.
Proposition 26's description of valid charges based on regulatory costs does not mirror our discussion of such costs in
Sinclair Paint, supra
,
We are concerned only with the validity of the surcharge under Proposition 218. Proposition 26's exception from its definition of "tax" with respect to local government property is not before us. (See Cal. Const., art. XIII C, § 1, subd. (e)(4).)
In 1971, the Legislature amended the act to provide that "municipality includes counties." (Pub. Util. Code, § 6201.5.) In addition, the Act has been extended to franchises for the transmission of oil and oil products, and the transmission of water. (Pub. Util. Code, § 6202.)
The 1937 Act includes a second alternative formula if the franchise is "complementary to a franchise derived under" the California Constitution. In that circumstance, the alternative payment is "one-half of 1 percent of the applicant's gross annual receipts from the sale of electricity within the limits of the municipality under both the electric franchises." (Pub. Util. Code, § 6231, subd. (c).)
The trial court ruled that as a charter jurisdiction, the City is not subject to general laws concerning franchises. (See
Southern Pacific Pipe Lines, Inc. v. City of Long Beach
(1988)
As explained above, the division of the charge into two parts, with one included in the rates paid by customers and the other separately stated on the bill, was driven by the PUC's effort to ensure that a local government's higher-than-average charges are not unfairly imposed on ratepayers outside of the local government's jurisdiction; this division of the charges is unrelated to the character or validity of the charges.
The parties' briefs do not consider the means by which franchise rights might be valued. We leave this issue to be addressed by expert opinion and subsequent case law.
Charter cities are not required to apply the Franchise Act of 1937 (the 1937 Act) (Pub. Util. Code, § 6201 et seq. ), but may voluntarily follow its provisions. (Pub. Util. Code, § 6205 ; all further unlabeled statutory references are to the Public Utilities Code.)
A utility may, "at its discretion," request permission from the PUC to set forth separate charges on certain of their customers' bills when a local governmental entity imposes upon the utility "[f]ranchise, general business license, or special taxes and/or fees ... [that] in the aggregate significantly exceed the average aggregate of taxes or fees imposed by other local government entities within the public utility's service territory." ( Re Guidelines for the Equitable Treatment of Revenue-Producing Mechanisms Imposed by Local Government Entities on Public Utilities (1989) 32 Cal.P.U.C.2d 60, 73.)
According to the majority, by adding a definition of "tax" to article XIII C and excepting from that definition " '[a] charge imposed for entrance to or use of local government property, or the purchase, rental, or lease of local government property,' " Proposition 26, approved by voters at the November 2, 2010 General Election, "confirmed" that "restrictions on taxation do not encompass amounts paid in exchange for property interests." (Maj. opn., ante , 219 Cal.Rptr.3d at p. 869, 397 P.3d at p. 218.) As the majority elsewhere acknowledges, Proposition 26 is not at issue here because "no party contends that it applies to the charges in this case." (Maj. opn., ante , at p. 867, fn. 4, 397 P.3d at p. 217, fn. 4.) Moreover, nothing in Proposition 26 indicates that a charge imposed on one party for someone else's use of government property comes within the exception the majority quotes. To the extent the majority's analysis suggests otherwise, it is dictum. Nor does anything in Proposition 26 support the majority's rule that payments for the privilege to use public property are taxes to the extent they exceed "the value of the franchise conveyed." (Maj. opn., ante , at p. 877, 397 P.3d at p. 225.)
The majority's analysis is likewise out of step with decisions from other jurisdictions holding that, to constitute a valid fee instead of a tax, a charge must be "based on a special benefit conferred
on the person paying the fee
." (
Home Builders Ass'n v. West Des Moines
(Iowa 2002)
See
Western States
,
supra
, 19 Cal.3d at page 217,
According to the majority, the Ordinance's treatment of the Recovery Portion "was driven by the PUC's effort to ensure that a local government's higher-than-average charges are not unfairly imposed on ratepayers outside of the local government's jurisdiction." (Maj. opn., ante , 219 Cal.Rptr.3d at p. 875, fn. 10, 397 P.3d at p. 223, fn. 10.) As far as the record discloses, this is true only in the sense that the separate billing procedure the PUC permits, but does not require, utilities to employ enabled the City to use SCE to collect the additional 1%-which is a disguised tax-only from the City's taxpayers, and not from those who do not pay taxes to the City.
Reference
- Full Case Name
- Rolland JACKS Et Al., Plaintiffs and Appellants, v. CITY OF SANTA BARBARA, Defendant and Respondent.
- Cited By
- 97 cases
- Status
- Published