*473 After winter storms damaged the seawall protecting their blufftop properties, homeowners sought a permit from the California Coastal Commission (Commission) to build a new seawall and repair their beach access stairway. The Commission granted the permit subject to several mitigation conditions. The owners filed an administrative mandate petition objecting to two conditions but then proceeded with construction. We hold that the owners forfeited their challenge because they accepted the benefits the permit conferred.
I. BACKGROUND
Plaintiffs Barbara Lynch and Thomas Frick own adjacent oceanfront properties in Encinitas. Their homes sit on a coastal bluff that cascades *474 steeply down to the beach and Pacific Ocean. The Encinitas shoreline is especially susceptible to landslides. Since 1986, the properties have been protected by a shared seawall at the base of the bluff and a midbluff erosion control structure. The original seawall contained 20-foot wooden poles embedded in the sandy beach and cabled to the bluff. In the midbluff structure, railroad ties and supporting wooden poles were tied into the bluff with steel cables. A shared stairway provided the only access from the blufftop to the beach below. In 1989, the Commission retroactively approved a coastal development permit for the seawall, midbluff structure, and stairway. Plaintiffs later added concrete footings at the base of the poles.
When the wooden poles showed significant decay, plaintiffs applied to the City of Encinitas (City) for authorization to replace the wooden seawall and midbluff structure with an integrated concrete wall. They also sought to rebuild the lower portion of the stairway, which would be attached to the new wall. The City approved the project in 2009, finding it consistent with the general plan and municipal code. Final approval required a coastal development permit from the Commission. While plaintiffs' application for this permit was pending, unusually heavy winter storms caused the bluff below Lynch's home to collapse, destroying part of the seawall, most of the midbluff structure, and the lower portion of the stairway.
Plaintiffs sought a new permit to demolish the old structure, construct a new tied-back seawall across both properties, and rebuild the lower stairway. Commission staff recommended approving the proposed seawall, even though the existing support under Frick's property was adequate, because the new wall would provide greater stability and visual appeal. The proposed seawall would be located eight feet inland from its current location, providing additional beach area for **1088 recreation. But staff recommended disapproving the stairway, finding it inconsistent with local coastal plan requirements discouraging private access stairways on the bluff.
Ultimately, the Commission approved a *757 coastal development permit 1 allowing seawall demolition and reconstruction, with the addition of midbluff geogrid protection below Lynch's home. The permit was subject to several conditions, three of which are at issue here. Special condition No. 1(a) prohibits reconstruction of the lower stairway. Special condition No. 2 provides that the seawall permit will expire in 20 years and prohibits future blufftop redevelopment from relying on the seawall as a source of geologic stability or protection. Special condition No. 3 requires that, before expiration of the 20-year period, plaintiffs must apply for a new permit to remove the seawall, change its size or configuration, or extend the authorization period. *475 Before the permit could issue, plaintiffs had to record deed restrictions stating that special conditions of the permit were covenants, conditions and restrictions on the use and enjoyment of their properties. They did so. Around the same time, plaintiffs filed a petition for writ of administrative mandate challenging the 20-year expiration conditions and the condition prohibiting reconstruction of the lower stairway. (Code Civ. Proc., § 1094.5.) While this litigation proceeded, plaintiffs satisfied all other permit conditions, obtained the permit, and built the seawall.
About a year later, the Commission moved for judgment on the mandate petition, arguing plaintiffs had waived their objections by accepting the permit conditions and constructing the project. The trial court denied the motion. Plaintiffs then moved for judgment, arguing the permit's 20-year expiration date was unconstitutional and beyond the Commission's authority because it did not mitigate impacts of this particular project. In addition, plaintiffs maintained the Commission could not prohibit reconstruction of the lower stairway because that activity did not require a permit. The trial court agreed with plaintiffs and issued a writ directing the Commission to remove the challenged conditions. The Court of Appeal reversed in a split decision. The majority determined that plaintiffs had waived their claims and, in any event, both conditions were valid. The dissenting justice disagreed with all of these conclusions.
We granted review. Because we determine plaintiffs' claims have been forfeited, we do not decide the legality of the challenged conditions.
II. DISCUSSION
As we have explained in various contexts, " 'waiver' means the intentional relinquishment or abandonment of a known right." (
Bickel v. City of Piedmont
(1997)
*758
Waiver differs from estoppel, which generally requires a showing that a party's words or acts have induced detrimental reliance by the opposing
*476
party. (See, e.g.,
Feduniak v. California Coastal Com.
(2007)
Whether a waiver or forfeiture has occurred is often a factual question, typically reviewed for substantial evidence. (
Bickel v. City of Piedmont
,
supra
, 16 Cal.4th at pp. 1052-1053,
The relevant facts are not in dispute. During the review process, plaintiffs submitted written objections to the conditions they now challenge. After the Commission voted to approve a coastal development permit subject to the challenged conditions, plaintiffs timely filed for a writ of mandate. While the mandate action was pending, however, they satisfied all other conditions, obtained the permit, and built the seawall. The trial court concluded plaintiffs' actions did not bar their petition. It explained that, "by proceeding with the repairs," plaintiffs "have not necessarily accepted the conditions in question. No action has been taken as to the twenty year condition[,] which can be removed after review of the instant petition." In addition, plaintiffs had "not undertaken any action as to the staircase." Contrary to the trial court, we conclude plaintiffs forfeited their right to challenge the permit's conditions by complying with all pre-issuance requirements, accepting the permit, and building the seawall.
In the land use context, a landowner may not challenge a permit condition if he has acquiesced to it either by specific agreement, or by failure to challenge the condition while accepting the benefits afforded by the permit.
*477
(
County of Imperial v. McDougal
(1977)
In
*759
County of Imperial
,
supra
, 19 Cal.3d at page 507,
Pfeiffer v. City of La Mesa
(1977)
Plaintiffs' position is analogous to that of the landowners in
Edmonds v. County of
Los Angeles
(1953)
Plaintiffs urge that because the objectionable permit conditions did not affect the design or construction of the seawall, it was possible to challenge the conditions while the project was being built. Noting the instability of the coastal bluffs, plaintiffs argue they should not have had to await the outcome **1091 of litigation before taking action to protect their homes. They essentially ask *479 us to create a new exception to the forfeiture rule, allowing landowners to accept the benefits of a permit under protest if the challenged restrictions can be severed from the project's construction. We decline to do so for a number of reasons.
When the Legislature addressed this subject, it authorized a narrow exception for challenges to permit conditions imposing a fee or similar exaction. The Mitigation Fee Act (Gov. Code, § 66000 et seq. ) establishes a procedure by which developers may proceed with a project and still protest the imposition of fees or a possessory interest in property. (See
Sterling Park, L.P. v. City of Palo Alto
(2013)
Before the Mitigation Fee Act, developers that wished to challenge the legality of a fee had to delay construction until mandamus proceedings ended. (See
McLain Western #1 v. County of San Diego
(1983)
Creating an under protest exception would also potentially swallow the general rule that landowners must take the burdens along with the benefits of a permit. Permit applicants frequently accept conditions they dislike in order to obtain a permit. "If every owner who disagrees with the conditions of a permit could unilaterally decide to comply with them under protest, do the work, and file an action in inverse condemnation on the theory of economic coercion, complete chaos would result in the administration of this important aspect of municipal affairs." (
Pfeiffer
,
supra
, 69 Cal.App.3d at p. 78,
*480 Although plaintiffs argue their exception would be limited to conditions that can be challenged without disrupting a project's construction, it could be difficult to determine whether a particular condition is truly severable. For example, here plaintiffs contend the 20-year expiration condition has no bearing on the seawall's construction. If the condition is valid, the seawall's permit will expire in 20 years; if it is not valid, the permit will continue beyond 20 years. The example illustrates the problem. The Commission imposed the expiration condition as a means of mitigating the seawall's adverse effects on the coastal environment. If a court invalidated the condition before the wall's construction, the Commission could have adjusted by directing that the seawall be located farther inland, for example, to account for additional sand loss beyond 20 years. Or, it might have required alterations in the wall's size or design. But if the condition is invalidated after the seawall has been built, alternative mitigation measures related to the design or placement of the wall, which might follow such a ruling, would be rendered unrealistic or impossible. Plaintiffs complain that whether the Commission would have required alternative mitigation measures rests on speculation. As a matter of equity, however, plaintiffs bear the **1092 weight of this uncertainty because their actions created it.
Requiring that parties seek to invalidate permit conditions in administrative mandate proceedings before proceeding with a project "serves the salutary purpose of promptly alerting the [agency] that its decision is being questioned" and allows the government to mitigate potential damages. (
California Coastal Com. v. Superior Court
(1989)
One might argue the Commission could have avoided this problem by declining to issue the permit after plaintiffs filed their administrative mandate action. Plaintiffs do not stress this point, presumably because they would prefer a rule allowing projects to proceed under protest over one encouraging permits to be withheld if they have challenged conditions. Denial of the permit may not have been possible here. According to the Commission, once a landowner satisfies all pre-issuance conditions, including recording deed restrictions that expressly promise all permit conditions will be honored, issuance of the permit is a purely ministerial act that Commission staff are powerless to interrupt. Even assuming the Commission's authority could be broadened in this regard, however, we believe the better rule puts the onus on landowners to resolve their challenges before accepting the benefits of a permit. The landowner is in the best position to know how strongly he objects *481 to a particular condition, and to weigh the chance a challenge will succeed against the costs of delaying the project.
Plaintiffs protest that imposing a forfeiture under these circumstances could put homeowners in a serious bind. The Commission approved the seawall because Lynch's blufftop home was in danger of collapsing into the sea. 4 Postponing construction until mandate proceedings had concluded would have left plaintiffs' homes at significant risk. If proceeding with a project constitutes a forfeiture, plaintiffs argue property owners under similar duress could be coerced to accept unlawful permit conditions, simply because they cannot wait months or years for litigation to conclude.
However, when safety is an issue, property owners can address imminent dangers by obtaining an emergency permit. (Pub. Resources Code, § 30624.)
5
Emergency permits generally authorize temporary improvements, needed for immediate relief when loss or damage is threatened. (
Barrie v. California Coastal Com.
(1987)
Temporary erosion protection under an emergency permit would have preserved the status quo pending the outcome of litigation. Because administrative mandate proceedings are often streamlined and subject to local fast track requirements (see Smith-Chavez et al., 2 Cal. Civil Practice: Real Property Litigation (1st ed. 2005) Land Use and Zoning Litigation, § 14:42, p. 14-52 et seq.), delay of **1093 a project's construction may be minimized. 6 *763 Moreover, although it was likely impossible here, in some cases the parties may be able to reach an agreement allowing construction to proceed while a challenge to permit conditions is resolved in court. A clear agreement of this sort could prevent a finding of equitable forfeiture. *482 In conclusion, although plaintiffs filed an administrative mandate petition, they forfeited their objections by constructing the project. 7 Without an express agreement with the agency providing otherwise, landowners who object to permit conditions not covered by the Mitigation Fee Act must litigate their objections in an administrative mandate proceeding before constructing the permitted project. Landowners who proceed with a project before the merits of their claims have been decided risk a finding that their objections were forfeited.
III. DISPOSITION
The judgment of the Court of Appeal is affirmed.
We Concur:
Cantil-Sakauye, C.J.
Werdegar, J.
Chin, J.
Liu, J.
Cuéllar, J.
Kruger, J.
We refer to this authorization as a permit, but technically it was an amendment to the coastal development permit the Commission issued for the original seawall in 1989.
Although the court used waiver terminology, the facts are more consistent with forfeiture. The Pfeiffers objected to the permit's conditions and complained throughout that they were complying " 'under protest.' " (
Pfeiffer
,
supra
, 69 Cal.App.3d at p. 76,
Our holding in
Edmonds
was phrased in terms of estoppel because the zoning authorities had "relied to their detriment" on the plaintiffs' promise to end their nonconforming use. (
Edmonds v. County of Los Angeles
,
supra
, 40 Cal.2d at p. 653,
Although the bluff supporting Frick's home was more stable, the Commission allowed the seawall to extend across his property because continuing erosion would likely threaten it in the near future.
In truly dire circumstances, immediate repairs can be made without an emergency permit. (See Pub. Resources Code, § 30611 ; Cal. Code Regs., tit. 14, § 13144.)
Although some amici curiae protest that an agency's notice of intent to issue a permit could expire before mandate litigation has concluded, courts can presumably address such problems by issuing appropriate stay orders. (See Code Civ. Proc., § 1094.5, subd. (g).)
The Commission also contends plaintiffs expressly agreed to accept the challenged permit conditions when they recorded deed restrictions referencing the permit. Because we conclude plaintiffs forfeited their claims by constructing the seawall project, we need not address this alternative argument.