Cottage Grove's proposal, as originally submitted, included the following regulated activities: "removal or deposition of material, construction, alteration, clearing and grubbing, grading, paving, and discharging of storm water within the wetlands, watercourses, flood plains, channel encroachment lines, FEMA 100-year flood hazard zones and upland review areas 100 feet from wetlands and 200 feet from watercourses." As noted, the CIGNA campus contains a total of 165 acres of wetlands and watercourses and the proposed activities included the filling of 6.33 acres of wetlands and vegetation control on 6.20 acres. The proposal also included, however, the creation of 8 acres of new wetlands and the enhancement of 15 acres of existing wetlands.
The proposed master plan of development for the CIGNA campus, as submitted, contained a variety of project components: an 18-hole golf course, a 275 room hotel and conference center with golf clubhouse, a combination of four single-family neighborhoods and one garden-style apartment residential complex, approximately 1.3 million square feet of replacement office space among eight buildings, and retail development of approximately 44,000 square feet.
On January 10, 2000, the commission held the first public hearing on the application. Speaking in behalf of defendant Cottage Grove, Dennis Lowry, a wetland scientist, gave an overview of the project and described the impacts of the various developments and the proposed wetland mitigation and restoration. Also speaking in behalf of Cottage Grove, Richard Moore, an engineer, described the storm water management plan for the project. Peter Castaldi, the wetlands agent for the town of Bloomfield, reviewed his staff report and discussed some of the alternatives in the report. In the staff report, Castaldi set forth specific possible alternatives that would reduce the impacts on the wetlands; in particular, in the area of the golf course. Castaldi recommended that the board withhold approval of the plan until the CT Page 9296 alternatives were considered, discussed and implemented if necessary. Following the reports, the public was allowed to question Cottage Grove and to make comments. After comments and questions were received from the public, the hearing was continued to February 8, 2000.
The continued public hearing was conducted on February 8, 2000. It was noted that Cottage Grove made some changes to the master plan in the application following the January 10, 2000, hearing. Harrison Minchew, the vice-president and senior golf course architect for Palmer Course Design Company, described the different considerations in designing a "championship" golf course, including accommodating the needs of the developer and the environment. Minchew stated that the design of the course was changed several times based on comments from the Environmental Protection Agency, the department of environmental protection, and the Army Corps of Engineers. Peter Clark, vice-president of CIGNA, described the various factors that were considered in developing the master plan and how CIGNA determined what was feasible and prudent based on the various alternatives it determined were available. Lowry presented some of the changes that had been made to the master plan since the last hearing. Castaldi presented his revised staff report and described what was discussed during a meeting with the town planner and Cottage Grove's attorney, engineer and environmental professional. Castaldi also made recommendations to the commission concerning approval of the master plan.
Following Castaldi's report, the hearing was opened for questions and comments from the public. Harvey Luce, a soil scientist, gave a presentation in behalf of the plaintiff According to Luce, there were feasible and prudent alternatives to this plan of development. Luce stated that "CIGNA doesn't have to build those buildings. They don't have to build those parking lots. They could build less buildings and they could build less . . . and subsequently less parking lots." Luce also stated that "some of the filling for the golf course I think is totally unnecessary and totally unwananted." Luce also commented on the mitigation plan. He contended that CIGNA could have a smaller development that would have less impact on the wetlands. The hearing was continued to February 29, 2000.
At the public hearing on February 29, 2000, Cottage Grove submitted revised plans to the commission. Specifically, Cottage Grove agreed to eliminate the filling of wetlands in parcel nine and to reduce the scope of the project by eliminating the construction of seven homes in parcel three. Cottage Grove also agreed to make minor changes to Hole #6 of the golf course. Following discussion of the revisions to the master plan, the commission extensively questioned Cottage Grove concerning the impacts of the development on specific portions of the property and CT Page 9297 possible alternatives. Cottage Grove's experts responded with explanations of why the alternatives were not feasible and prudent. The plaintiff was also permitted to question Cottage Grove and make comments on the proposed development. The hearing was again continued, to March 9, 2000.
At the continued hearing on March 9, 2000, Lowry summarized the changes to the plan and presented a drawing showing the relevant changes. Lowry also submitted a written summary of the project changes since the original application was filed on November 9, 2000. This indicates that the amount of proposed wetland filling was reduced from the original 6.33 acres to 3.89 acres, and the overstory clearing was reduced from the original 6.13 acres to 4.73 acres.1 Following the hearing and discussion by the commission members; the commission voted unammously to approve Cottage Grove's application for a permit to develop the property in accordance with the amended master plan, subject to twenty-two conditions. These conditions include the requirement that, prior to commencing construction, Cottage Grove submit 1" = 40 scale construction plans for staff review and confirmation by the commission that the wetlands impacts shown on the 40 scale plans are consistent with the impacts shown on the plans submitted with the application.
The final decision was published on March 15, 2000. The plaintiff brought this appeal by timely service of process on March 29, 2000.
The court finds, further, that the plaintiff has standing to appeal based on the provisions of Conn. Gen. Stats. sec.
A basic principle of administrative law is that the scope of the court's review of a decision by an administrative agency, such as the commission, is very limited. "Judicial review of an administrative agency decision requires a court to determine whether there is substantial evidence in the administrative record to support the agency's findings of basic facts and whether the conclusions drawn from those facts are reasonable. . . . Our ultimate duty is to determine, in view of all of the evidence, whether the agency, in issuing its order, acted unreasonably, arbitrarily, illegally or in abuse of its discretion." (Citations omitted; internal quotation marks omitted.) CadlerockProperties Joint Venture. L.P. v. Commissioner of Env. Protection,
Substantial evidence is "something less than the weight of the evidence, and the possibility of drawing two inconsistent conclusions from the evidence does not prevent an administrative agency's finding from being supported by substantial evidence. . . ." (Citations omitted; internal quotation marks omitted.) Id., 677.
"In challenging an administrative agency action, the plaintiff has the burden of proof. . . . The plaintiff must do more than simply show that another decision maker, such as the trial court, might have reached a different conclusion. . . . [T]he plaintiff must establish that CT Page 9299 substantial evidence does not exist in the record as a whole to support the agency's decision." (Citations omitted.) Samperi v. Inland WetlandsAgency,
"In reviewing an inland wetlands agency decision made pursuant to the act, the reviewing court must sustain the agency's determination if an examination of the record discloses (substantial) evidence that support any one of the reasons given. . . . the credibility of witnesses and the determination of factual issues are matters within the province of the administrative agency." (Internal quotation marks omitted.). Id. 587-588.
These familiar principles of our law present a formidable obstacle to the overturning by the court of the factual findings and conclusions of an administrative agency such as the defendant commission.
Our Supreme Court has considered and interpreted the statutory provisions in Samperi v. Inland Wetlands Agency, supra,
The plaintiff argues that Cottage Grove failed to comply with the applicable statutes and regulations by failing to present sufficient evidence that no feasible and prudent alternative existed with respect to each of the individual impacts that the project would have on the wetlands. In her brief and argument to the court, the plaintiff does not take issue with any particular judgment reached by Cottage Grove (or by the commission) with respect to an alternative to the project as a whole or to a component of it. Rather, the plaintiff contends that alternatives to the various components of the plan were not sufficiently presented and discussed. This contention may not be sustained.
This court's review of the record shows that a substantial portion of the presentation by Cottage Grove at the public hearing was devoted to an analysis of the details of its master plan of development and alternatives that it had considered and rejected. Furthermore, the commission, its staff, and members of the public suggested alternatives to various components of the master plan, either explicitly or implicitly, during the course of the hearing, and Cottage Grove either adopted those suggestions or gave reasons for rejecting them.
Initially, Cottage Grove described and discussed possible alternatives in the narrative which accompanied the master plan. This narrative is an eighty-one page document with voluminous appendices, diagrams and charts; record Item 4D. Possible alternatives to the project as a whole that were considered included (a) maintaining the status quo, (b) building new facilities without developing the surrounding land, (c) an outright sale of some of the property to offset the cost of demolishing the old facilities and building new ones, and (d) removal of its business from the site altogether. Each of these alternatives is discussed and reasons given why they were rejected as not feasible and prudent. These reasons included CIGNA's assessments of its need for new office buildings, the needs of the town of Bloomfield, the demands of existing and projected real estate markets, and the needs of the environment.
In addition to describing and discussing alternatives to the project as a whole, the narrative includes a discussion of the specific impacts of the golf course on the wetlands (holes 2, 3, 4, 5, 6, 7, 8, 10, 14, 16, 17 18) and contains drawings of the proposed layout and previous alternative layouts for holes 3, 5, 7 14. The narrative also contains a specific discussion of the non-golf course project components and CT Page 9301 alternative/avoidance analysis. In particular, it describes the five areas on the site where residential development is proposed, the impacts of each development on wetlands and the lack of feasible alternatives to these impacts. In another section, the narrative describes the office, commercial, and hotel development components, the impacts of each development on the wetlands and the lack of feasible alternatives to these impacts.
After submitting the application to the commission, alternatives were discussed with the commission, the town wetlands agent, and the town planner. As previously noted, Peter Castaldi, the town wetlands agent, presented written alternatives to the impacts proposed in the master plan for consideration by the commission. Cottage Grove responded to the report by Castaldi, and either agreed to change the plans as suggested or explained why an alternative suggested by Castaldi was not feasible and prudent. In particular, Cottage Grove made changes in the design of ten of the golf holes and changes to five non-golf related development projects, based on suggestions of Castaldi and the commission. In the court's view, these modifications in the master plan, including the substantial reduction in the area of wetlands affected by the project — from 6.33 acres to 3.89 acres — indicate that not only were numerous alternatives reviewed, but several of them were implemented as prudent and feasible alternatives having a significantly reduced impact on the wetlands.
Although the record shows that, at the close of the public hearing, the commission staff Mr. Castaldi in particular, continued to believe that more alternatives should be pursued, Castaldi agreed that many alternatives had been presented and discussed. The record also shows that the commission members reached the determination that there was sufficient appropriate consideration of alternatives, both general and specific. Chairman Colman, for example, stated during deliberations following the public hearing that "the applicant has at least convinced me that they have one, on their own, looked at a variety of alternatives and two, responded to a variety of suggestions made during the public hearing process." Another member of the commission stated that "[w]hen you consider the scope of this, there are certain things that could be done and can't be done. Considering the impacts that are being made against the impacts that could have been made, and considering that overall site will still look like, I think that all the feasible and prudent alternatives have been taken care of. It's difficult to keep in mind feasible and prudent because the first thing that comes to mind is money. They are trying to save money. I'd like to think we are making our decision based on the impact and the impacts are minimal."
In short, the record contains ample evidence that general and specific CT Page 9302 alternatives to the project's impact on wetlands were considered and discussed before the commission, along with the applicant's reasons for not adopting those considered not to be feasible and prudent. Cottage Grove presented expert testimony and evidence in support of its position, and the commission had the benefit of the opinions of its own expert and its experienced staff. Although the plaintiff also presented the testimony of her own expert in opposition, the commission was not bound to accept that testimony or to conclude that it devalued evidence presented by Cottage Grove. Indeed, as noted, it was the commission's duty to weigh all of the evidence before it, conflicting or not, and make the necessary findings of fact, including in this case whether there were prudent and feasible alternatives to the project that would have less impact on the wetlands.
The plaintiffs argument on these issues is directed in large part at the form of the commission's decision. In this regard, the commission's decision did not explicitly include a finding that no feasible and prudent alternative to the project as a whole existed, nor did it include findings concerning alternatives to specific components of the project. In Samperi v. Inland Wetlands Anency, supra,
The plaintiff has the burden of showing that the commission's decision was not supported by substantial evidence. The plaintiff contends that her expert, Dr. Harvey Luce, a soil scientist, did present evidence that the activities were reasonably likely to unreasonably pollute, impair or destroy the public trust in the air, water or other natural resources of the state. Cottage Grove presented evidence to the contrary. In particular, Cottage Grove's expert, Dennis Lowry, a wetland scientist, responded to Dr. Luce's testimony and written comments. Additionally, Cottage Grove's experts provided voluminous reports to the commission regarding the impacts of the project and responded to questions from the commission during four public hearings.
In Samperi v. Inland Wetlands Agency, supra,
The commission heard evidence from the plaintiffs expert and Cottage Grove's experts. It was the commission's responsibility to assess the testimony of the different experts and determine which were the more credible. The fact that the experts disagreed on the environmental impacts of the project, therefore, does not invalidate the commission's ultimate finding that Cottage Grove's activities would not unreasonably pollute or impair the natural resources of the state. The court concludes that the commission's decision in this regard is supported by substantial evidence on the record, and the court may not, therefore, substitute its judgment for that of the commission.
The plaintiff points to nothing in the record that would indicate that the commission's decision was not fair or was based on insufficient information as a result of the reduced scale. The commission conducted CT Page 9304 four public hearings, engaged in extensive discussions concerning alternatives to the plan and reviewed numerous reports submitted by environmental experts and engineers. In making its decision, the commission determined "that there has been sufficient data and information presented to make this decision; that all relevant facts and circumstances have been considered. . . ." The plaintiff has not sustained her burden of proving that the commission was unable to make a fair and informed decision as a result of the scale on the drawings submitted by Cottage Grove.
The plaintiff's due process argument is equally flawed. The process by which reduced scale plans were submitted with Cottage Grove's application complied with applicable regulations. Plans submitted with wetlands permit applications must comply with a checklist, which includes the requirement that plans to be drawn to 1' = 40' scale. Section 5.2(H) of the regulations provides, however, that "[s]ome information on the checklist may or may not apply to certain types of development. The Wetlands Agent shall determine which sections apply to all applications." Cottage Grove sought permission from the commission at a meeting on June 21, 1999 to submit a Master Development Plan that would comply with the checklist except it would be 100 scale rather than 40 scale. Bloomfield's wetland agent, Peter Castaldi stated that he "would feel comfortable doing that as long as it's understood that the detailed 40 scale plans have to come before the Wetlands Commission for approval." The commission thereupon granted permission to Cottage Grove to utilize the reduced scale in its submission.
When the commission ultimately approved the application, it did so subject to the conditions, among others, that Cottage Grove submit final plans drawn to the required 40 scale and that the commission and its staff determine that the wetlands impacts shown on the enlarged scale plans be consistent with the impacts shown on the reduced scale plans that were approved. In the absence of such determination, the application would fail final approval.
In Gardiner v. Conservation Commission,
The court has examined the plaintiffs arguments on this point and finds no denial of her due process rights.