Clean Water Action v. Pruitt

District Court, District of Columbia

Clean Water Action v. Pruitt

Opinion

UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

CLEAN WATER ACTION, et al.,

Plaintiffs,

v. Civil Action No. 17-0817 (DLF) E. SCOTT PRUITT, Administrator, U.S. Environmental Protection Agency, et al.,

Defendants.

MEMORANDUM OPINION

Before the Court are five pending motions. For the reasons that follow, the Court will

deny the Plaintiffs’ Motion for Leave to Amend and Supplement the Complaint, Dkt. 63, and

grant the Defendants’ Motion to Dismiss, Dkt. 60. In addition, because the Court will grant

dismissal, the Court will deny as moot the Plaintiffs’ Motion for Summary Judgment, Dkt. 20,

the Defendants’ Cross-Motion for Summary Judgment or Dismissal or Transfer, Dkt. 32, and the

Intervenor-Defendant’s Cross-Motion for Summary Judgment or Dismissal or Transfer, Dkt. 49.

I. Background

The Clean Water Act prohibits “the discharge of any pollutant by any person” except as

authorized by the Act,

33 U.S.C. § 1311

(a), and it requires the Environmental Protection Agency

and its Administrator (collectively, the EPA) to promulgate effluent limitations and standards

governing the discharge of pollutants from power plants, see

id.

§§ 1311(b), 1314(b), 1316(a),

1317, 1342(a). An “effluent limitation” is “any restriction established by a State or the

Administrator on quantities, rates, and concentrations” of certain pollutants “discharged from

point sources,” such as power plants, into various waters. Id. § 1362(11). The Clean Water Act also requires the EPA to review and, if necessary, revise its effluent limitations and standards.

See id. §§ 1311(d), 1314, 1317(b).

The EPA enforces effluent limitations and standards through, among other programs, the

National Pollutant Discharge Elimination System program. Under that program, the EPA issues

permits allowing power plants to discharge pollutants that wash downstream “upon [the]

condition that such discharge will meet . . . all applicable requirements under [various provisions

of the Clean Water Act].” Id. § 1342(a)(1). The permits “impose limitations on the discharge of

pollutants, and establish related monitoring and reporting requirements, in order to improve the

cleanliness and safety of the Nation’s waters.” Nat’l Ass’n of Mfrs. v. Dep’t of Def.,

138 S. Ct. 617, 625

(2018) (quoting Friends of the Earth, Inc. v. Laidlaw Envtl. Servs.,

528 U.S. 167, 174

(2000)).

This case involves three actions taken by the EPA with regard to effluent limitations

under the Clean Water Act: a final rule promulgated in 2015, an indefinite stay issued in April

2017, and a subsequent final rule promulgated in September 2017.

A. Effluent Limitations under the Clean Water Act

The EPA promulgated the Steam Electric Power Plant Effluent Limitations Guidelines

Rule (ELG Rule) on November 3, 2015. See

80 Fed. Reg. 67,838

. Relevant here, the ELG Rule

addressed effluent limitations and standards for six wastestreams generated by steam electric

power plants: bottom ash transport water, combustion residual leachate, flue gas desulfurization

wastewater, flue gas mercury control wastewater, fly ash transport water, and gasification

wastewater. See

id. at 67

,841–42. The ELG Rule required most power plants to comply with the

effluent limitations “as soon as possible” after November 1, 2018, and no later than December

31, 2023.

Id. at 67,854

. Within that range, the particular compliance date for each plant would

2 be determined by the plant’s National Pollutant Discharge Elimination System permit, which is

typically issued by a state environmental agency. See

40 C.F.R. § 423.11

(t). The ELG Rule also

provided for effluent limitations that took effect immediately for “legacy wastewater,” i.e.,

certain wastewaters generated after the ELG Rule but before the future compliance deadlines

kicked in. 80 Fed. Reg. at 67,854–55. The ELG Rule quickly became the subject of legal

challenges: the EPA received seven petitions for review, which were consolidated before the

U.S. Court of Appeals for the Fifth Circuit. See Consolidation Order, U.S. Judicial Panel on

Multidistrict Litigation, Sw. Elec. Power Co. v. EPA, No. 15-60821 (5th Cir. Dec. 8, 2015), Doc.

513301255; see also

82 Fed. Reg. 43,494

, 43,495. The EPA also received petitions for

administrative reconsideration of the ELG Rule. See 82 Fed. Reg. at 43,495.

On April 25, 2017, the EPA issued an Indefinite Stay of the ELG Rule.

82 Fed. Reg. 19,005

. As authority for the Indefinite Stay, the EPA invoked Section 705 of the Administrative

Procedure Act, which permits an agency to “postpone the effective date of action taken by it,

pending judicial review,” when the agency “finds that justice so requires.”

5 U.S.C. § 705

; see

also 82 Fed. Reg. at 19,005–06. According to the EPA, the Indefinite Stay sought to preserve

the regulatory status quo while the Fifth Circuit litigation remained pending and the EPA

reconsidered the ELG Rule. Id. at 19,005. The Stay indefinitely postponed the compliance

deadlines for five of the six wastestreams addressed by the ELG Rule (all but combustion

residual leachate). Id. at 19,005–06. In addition, the EPA noted that it would conduct notice-

and-comment rulemaking in order to revise the ELG Rule’s compliance deadlines, see id. at

19,006, which the EPA initiated with a notice of proposed rulemaking in June 2017, see

82 Fed. Reg. 26,017

.

3 On September 18, 2017, the EPA promulgated the ELG Rule Amendment. See

Postponement of Certain Compliance Dates for ELGs for Steam Electric Power Generating Point

Source Category,

82 Fed. Reg. 43,494

. The ELG Rule Amendment withdraws the Indefinite

Stay and changes the earliest compliance deadlines for two wastestreams (bottom ash transport

water and flue gas desulfurization wastewater) from November 1, 2018 to November 1, 2020

while the EPA completes a new rulemaking on those wastestreams.

Id. at 43,496, 43,498, 43,500

. Also, by withdrawing the Indefinite Stay, the Amendment changes the “no later than”

compliance deadline for bottom ash transport water and flue gas desulfurization wastewater to

December 31, 2023, as it had been under the ELG Rule.

Id. at 43,496

; see also

40 C.F.R. § 423.13

(g)(1)(i), (k)(1)(i). And, for the other three wastestreams 1 affected by the Indefinite

Stay, the Amendment permits the effluent limitations and standards initially imposed by the ELG

Rule to go back into effect, and the Amendment announces that the EPA does not plan to

conduct a new rulemaking for those wastestreams. See 82 Fed. Reg. at 43,494–96, 43,498.

B. Procedural History

The plaintiffs are eight environmental advocacy organizations that seek to improve water

quality, particularly by reducing water pollution from large sources such as power plants.2

Compl. ¶ 9, Dkt. 1. On May 3, 2017, they filed this action as a challenge to the Indefinite Stay

for allegedly violating the Administrative Procedure Act in a number of ways. Id. ¶¶ 1, 19–20,

56–89. On June 13, 2017, the EPA moved to dismiss the case, transfer it to the Fifth Circuit

1 The three wastestreams are flue gas mercury control wastewater, fly ash transport water, and gasification wastewater. 82 Fed. Reg. at 19,005. 2 The eight organizations are Clean Water Action, Environmental Integrity Project, Sierra Club, Waterkeeper Alliance, Inc., PennEnvironment, Inc., Chesapeake Climate Action Network, Physicians for Social Responsibility Chesapeake, Inc., and Prairie Rivers Network. Compl. ¶¶ 1, 10–18; see also Proposed. Am. Compl. ¶¶ 1, 11–20, Dkt. 63-3.

4 pursuant to

28 U.S.C. § 1631

, or stay proceedings. Dkt. 18. The next day, the plaintiffs moved

for summary judgment. Dkt. 20. The Court then denied the EPA’s motion to dismiss without

prejudice but invited the EPA to reassert the same arguments in a consolidated brief in

opposition to the plaintiffs’ summary judgment motion. Dkt. 23. In the ensuing consolidated

briefing, the EPA accepted the Court’s invitation by opposing the plaintiffs’ motion for summary

judgment and cross-moving for summary judgment, dismissal, or transfer.3 Dkt. 32. The

consolidated briefing concluded on September 11, 2017. See Dkt. 57; Dkt. 58.

One week later, the EPA promulgated the ELG Rule Amendment. Soon after, on

September 21, 2017, the EPA again moved to dismiss this case, arguing that the case is moot

because the ELG Rule Amendment withdraws the Indefinite Stay challenged by the plaintiffs.

Dkt. 60.

On October 5, 2017, the plaintiffs moved for leave to amend and supplement their

complaint to add two claims challenging the ELG Rule Amendment under the Administrative

Procedure Act.4 See Dkt. 63; see also Proposed Am. Compl. ¶¶ 104–111, Dkt. 63-3. In

opposition, the EPA argued that the proposed claims are futile because the Court lacks

3 The intervenor-defendant Utility Water Act Group also cross-moved for summary judgment, dismissal, or transfer. Dkt. 49. 4 Contemporaneously, the plaintiffs filed a protective petition for review of the ELG Rule Amendment in the U.S. Court of Appeals for the D.C. Circuit. Clean Water Action v. Pruitt, No. 17-1216 (D.C. Cir. Oct. 11, 2017), Doc. 1698542. The D.C. Circuit transferred the petition to the Fifth Circuit pursuant to

28 U.S.C. § 2112

, explaining that such transfer “is appropriate ‘where the same or inter-related proceeding was previously under review in a court of appeals, and is now brought for review . . . in a follow-on phase.’” Order, Clean Water Action v. Pruitt, No. 17-1216 (D.C. Cir. Feb. 1, 2018) (per curiam), Doc. 1716063 (quoting Pub. Serv. Comm’n v. FPC,

472 F.2d 1270

, 1270 (D.C. Cir. 1972)); see also Dkt. 78 (notice of order). Upon receiving the transferred petition, the U.S. Court of Appeals for the Fifth Circuit stayed further proceedings until a decision by this Court on the pending motions in this case. See Order, Clean Water Action v. EPA, No. 18-60079 (5th Cir. Apr. 5, 2018), Doc. 514417108; see also Dkt. 84 (notice of order).

5 jurisdiction over them. Dkt. 70 at 2–6. In addition, the intervenor-defendants argued that the

proposed claims are futile because

28 U.S.C. § 2112

would require this Court to transfer the

proposed claims to the Fifth Circuit and, moreover, the proposed claims would unduly expand

and delay the litigation before this Court. Dkt. 69 at 18–21, 26–29. Briefing concluded on

October 26, 2017. See Dkt. 71. The case was reassigned to the undersigned judge on December

4, 2017. The plaintiffs have since submitted a notice of supplemental authority regarding a

recently decided United States Supreme Court case, National Ass’n of Manufacturers v.

Department of Defense,

138 S. Ct. 617, 623

(2018). Dkt. 74. The Court now addresses the

plaintiffs’ motion for leave to amend and supplement the complaint, followed by the EPA’s

motion to dismiss.

II. Plaintiffs’ Motion for Leave to Amend and Supplement the Complaint

Whereas their initial complaint challenged the Indefinite Stay, the plaintiffs now seek to

add two claims challenging the ELG Rule Amendment. Dkt. 63. The proposed claims assert

that the EPA violated the Administrative Procedure Act by promulgating the ELG Rule

Amendment (1) in excess of the agency’s statutory authority and (2) without considering all

relevant factors and providing an adequate justification for the agency’s decision. See Proposed

Am. Compl. ¶¶ 104–11. The proposed claims, however, are futile, and they would unduly delay

and alter the scope of this litigation. Therefore, the Court will deny the plaintiffs’ motion.

A. Legal Standard

An addition to a pleading may be an “amendment” under Rule 15(a) or a “supplement”

under Rule 15(d) of the Federal Rules of Civil Procedure. The distinction “is in most instances

of little moment,” but an amendment “typically rest[s] on matters in place prior to the filing of

the original pleading,” while the “distinguishing feature of [a supplement] is that it sets forth

6 ‘transactions or occurrences or events which have happened since the date of the pleading sought

to be supplemented.’” United States v. Hicks,

283 F.3d 380, 385

(D.C. Cir. 2002) (quoting Fed.

R. Civ. P. 15(d)). Because the plaintiffs here seek to add claims challenging a rule promulgated

months after the initial complaint, the plaintiffs’ request is best styled a motion for leave to

supplement their complaint.

Rule 15(d) of the Federal Rules of Civil Procedure provides that “the court may, on just

terms, permit a party to serve a supplemental pleading setting out any transaction, occurrence, or

event that happened after the date of the pleading to be supplemented.” Fed. R. Civ. P. 15(d)

(emphasis added). Some cases state that Rule 15(d) motions are “subject to the same standard”

as Rule 15(a) motions, see, e.g., Wildearth Guardians v. Kempthorne,

592 F. Supp. 2d 18, 23

(D.D.C. 2008), which would mean that leave is warranted “unless there is sufficient reason, such

as ‘undue delay, bad faith or dilatory motive . . . repeated failure to cure deficiencies by

[previous] amendments . . . [or] futility of amendment.’” Firestone v. Firestone,

76 F.3d 1205, 1208

(D.C. Cir. 1996) (quoting Foman v. Davis,

371 U.S. 178, 182

(1962)); see also Cause of

Action Inst. v. DOJ, No. 16-2226,

2017 WL 4541352

, at *3 (D.D.C. Oct. 10, 2017) (labeling any

difference between the two motions “a matter of semantics”).

But the two rules are not the same. Rule 15(d) is permissive: it tells courts that they

“may” grant leave to supplement, while Rule 15(a)(2) states that courts “should” give leave to

amend “when justice so requires.” Fed. R. Civ. P. 15; see also Jama v. ICE,

543 U.S. 335, 346

(2005) (“The word ‘may’ customarily connotes discretion. That connotation is particularly apt

where . . . ‘may’ is used in contraposition to the word ‘shall’ . . . .”); Lopez v. Davis,

531 U.S. 230, 241

(2001) (“Congress’ use of the permissive ‘may’ . . . contrasts with the legislators’ use

of a mandatory ‘shall’ in the very same section” and thus confers an “authority, but not [a]

7 duty[.]”); Baylor v. Mitchell Rubenstein & Assocs.,

857 F.3d 939, 947

(D.C. Cir. 2017) (“[I]t is

clear that [a Rule’s] use of the permissive verb ‘may’ refers to the permissive nature of the

district judge’s authority . . . .”); Anglers Conservation Network v. Pritzker,

809 F.3d 664, 671

(D.C. Cir. 2016) (“Ordinarily, legislation using ‘shall’ indicates a mandatory duty while

legislation using ‘may’ grants discretion.”); Baptist Mem’l Hosp. v. Sebelius,

603 F.3d 57, 63

(D.C. Cir. 2010) (“‘[M]ay’ is permissive rather than obligatory.”); Ala. Power Co. v. FERC,

160 F.3d 7, 12

(D.C. Cir. 1998) (same); Antonin Scalia & Bryan A. Garner, Reading Law 112 (2012)

(stating that the “traditional, commonly repeated rule . . . that ‘may’ is permissive” is “so obvious

as to be hardly worth the saying”). The plain text of Rule 15(d) thus permits a court to grant

leave to supplement, but imposes no standard requiring a court to do so. See Fed. R. Civ. P. 15

advisory committee’s note to 1963 amendment (“Rule 15(d) is intended to give the court broad

discretion in allowing a supplemental pleading.”); James Madison Project v. DOJ,

208 F. Supp. 3d 265, 277

(D.D.C. 2016) (“The decision to grant leave under Rule 15(d) is discretionary.”).

Even looking past the text of the rules to this Circuit’s caselaw discussing them, the Rule

15(d) standard overlaps with the Rule 15(a)(2) standard, but they are not the “same standard.”

Wildearth Guardians,

592 F. Supp. 2d at 23

. Compare Firestone,

76 F.3d at 1208

, with Hall v.

CIA,

437 F.3d 94, 101

(D.C. Cir. 2006). Both standards, however, consider futility and delay.

“[B]oth motions for leave to amend and motions to supplement should be denied where

amendment (or supplementation) would be futile,” i.e., if the proposed claim would not survive a

motion to dismiss. Sai v. DHS,

149 F. Supp. 3d 99, 126

(D.D.C. 2015); see also Hettinga v.

United States,

677 F.3d 471, 480

(D.C. Cir. 2012) (affirming denial of leave to supplement on

futility grounds). Also, “[d]elay and prejudice are precisely the matters to be addressed in

considering whether to grant motions for supplemental pleadings; such motions are to be ‘freely

8 granted when doing so will promote the economic and speedy disposition of the entire

controversy between the parties, will not cause undue delay or trial inconvenience, and will not

prejudice the rights of any of the other parties to the action.’” Hall v. CIA,

437 F.3d 94, 101

(D.C. Cir. 2006) (quoting 6A Wright & Miller, Federal Practice & Procedure § 1504, at 186–87

(2d ed. 1990)); see also Firestone,

76 F.3d at 1208

. Because futility and delay undergird the

Court’s decision to deny plaintiffs’ motion for leave to supplement the complaint, there is no

need to further analyze the precise differences between the two standards at this time.

B. Jurisdiction

In this case, the plaintiffs’ proposed claims are futile because this Court lacks jurisdiction

to review them. The Administrative Procedure Act generally provides for district court review

of EPA actions.

5 U.S.C. § 704

. But the Clean Water Act enumerates seven categories of EPA

actions for which review lies directly and exclusively in the federal courts of appeals.

33 U.S.C. § 1369

(b)(1); see also Nat’l Ass’n of Mfrs.,

138 S. Ct. at 623, 626, 628

. Under the category

relevant here, the federal courts of appeals have exclusive jurisdiction to review EPA actions “in

approving or promulgating any effluent limitation or other limitation under section 1311, 1312,

1316, or 1345 of [the Clean Water Act].”

33 U.S.C. § 1369

(b)(1)(E). The Act defines “effluent

limitation” as “any restriction established by a State or the Administrator on quantities, rates, and

concentrations” of certain pollutants “discharged from point sources” into various waters.

Id.

§ 1362(11). And “an ‘other limitation’ must be similar in kind to an ‘effluent limitation’: that is,

a limitation related to the discharge of pollutants.” Nat’l Ass’n of Mfrs.,

138 S. Ct. at 628

. “An

‘other limitation,’ for instance, could be a non-numerical operational practice or an equipment

specification that, like an ‘effluent limitation,’ restricts the discharge of pollutants, even though

9 such a limitation would not fall within the precise statutory definition of ‘effluent limitation.’”

Id.

at 628–29.

To begin, it is undisputed that the 2015 ELG Rule promulgated effluent limitations within

the meaning of Section 1369(b)(1). In particular, the ELG Rule established effluent limitations

for six wastestreams generated by new and existing steam electric power plants; the earliest

compliance deadlines for those effluent limitations were November 1, 2018. 5 See 80 Fed. Reg.

at 67,841–42. Also, the ELG Rule established effluent limitations for “legacy wastewater,” i.e.,

wastewater generated after the Rule’s effective date but before the compliance deadlines kicked

in. Id. at 67,854. Because the ELG Rule fell within the ambit of Section 1369(b)(1), the Rule’s

challengers filed in courts of appeals, and their actions were consolidated before the Fifth

Circuit. See Consolidation Order, U.S. Judicial Panel on Multidistrict Litigation, Sw. Elec.

Power Co. v. EPA, No. 15-60821 (5th Cir. Dec. 8, 2015), Doc. 513301255; see also, e.g.,

Petitions for Review, Sw. Elec. Power Co. v. EPA, No. 15-60821, Doc. 513280720 (5th Cir.),

Doc. 513302904 (8th Cir.), Doc. 513303045 (2d Cir.), Doc. 513319819 (9th Cir.).

The plaintiffs in this case, by contrast, maintain that the ELG Rule Amendment falls

outside the ambit of Section 1369(b)(1) because the Amendment does not promulgate “any new

limitations, but instead only postpones the effective date of effluent limitations that were

previously promulgated.” Pls.’ Reply at 7, Dkt. 71. Under the plaintiffs’ reading, the Clean

Water Act may require parallel and potentially redundant litigation: the courts of appeals

directly review any regulation that initially promulgates a new effluent limitation, while district

courts review any subsequent changes to the regulation that do not rise to the level of “new

5 As noted, the six wastestreams are: bottom ash transport water, combustion residual leachate, flue gas desulfurization wastewater, flue gas mercury control wastewater, fly ash transport water, and gasification wastewater. See 80 Fed. Reg. at 67,841–42.

10 restrictions.” Id. at 9; see also id. at 8–11; Pls.’ Mot. at 11–12, Dkt. 63. The Act, however, does

not require such parallel litigation in this case because the ELG Rule Amendment approves or

promulgates effluent limitations or other limitations within the meaning of Section 1369(b)(1) in

at least two ways.

First, the ELG Rule Amendment approves or promulgates “limitation[s] related to the

discharge of pollutants” by subjecting power plants to different effluent limitations for all five

wastestreams implicated by the Indefinite Stay issued in April 2017. Nat’l Ass’n of Mfrs.,

138 S. Ct. at 628

. The plaintiffs rely heavily on the argument that the Amendment does not create new

effluent limitations but rather “takes existing restrictions that were established by EPA in the

2015 ELG Rule and delays their compliance date by two years.” Pls.’ Reply at 9. But in doing

so, the plaintiffs ignore an intervening event—the Indefinite Stay—that changes the relevant

status quo ante.

When the ELG Rule Amendment was promulgated, much of the ELG Rule was not in

effect; rather, the Stay had indefinitely postponed compliance for five wastestreams. 82 Fed.

Reg. at 19,005–06. As a result, under the status quo immediately preceding the Amendment,

five wastestreams were not at all subject to “existing restrictions” established by the ELG Rule.

The Amendment, by withdrawing the Indefinite Stay, limits effluents compared to the status quo

ante. In particular, the Amendment (i) imposes December 31, 2023 as the “no later than”

compliance deadline for bottom ash transport water and flue gas desulfurization, as it had been

under the ELG Rule, see

40 C.F.R. § 423.13

(g)(1)(i) (flue gas desulfurization wastewater),

(k)(1)(i) (bottom ash transport water); see also 82 Fed. Reg. at 43,496; and (ii) imposes effluent

limitations initially set by the ELG Rule but indefinitely postponed by the Stay for three other

wastestreams: flue gas mercury control wastewater, fly ash transport water, and gasification

11 wastewater, see 82 Fed. Reg. at 43,494–96. In other words, the ELG Rule Amendment sets

“limitation[s] related to the discharge of pollutants” that were not in effect on the day before the

Amendment. Nat’l Ass’n of Mfrs.,

138 S. Ct. at 628

.

Second, the Amendment approves or promulgates limitations related to the discharge of

pollutants by revising the ELG Rule. In particular, the Amendment changes the ELG Rule’s

earliest compliance deadlines for two wastestreams: bottom ash transport water and flue gas

desulfurization wastewater. 82 Fed. Reg. at 43,496. Under the ELG Rule, the earliest

compliance deadlines for those effluent limitations would have been November 1, 2018. Under

the Amendment, the earliest deadlines are November 1, 2020. Id. at 43,500. Changing a

compliance deadline is “tantamount to amending . . . a rule.” Clean Air Council v. Pruitt,

862 F.3d 1, 6

(D.C. Cir. 2017). By amending a rule that established effluent limitations, the ELG

Rule Amendment revised the limitations and thus set different limitations. This is particularly

true because the Amendment, while changing the compliance deadlines, does not free bottom ash

transport water and flue gas desulfurization wastewater from all limitation until November 1,

2020. Rather, the Amendment subjects the two wastestreams to “legacy wastewater” limitations

for a longer period of time. Under the ELG Rule, the “legacy wastewater” limitations would

have applied until the earliest compliance deadlines in 2018. But under the ELG Rule

Amendment, power plants must comply with the “legacy wastewater” limitations until at least

2020.6 In this way, the Amendment approves or promulgates different limitations related to the

discharge of pollutants.

6 This point also distinguishes the ELG Rule Amendment from other EPA actions not considered effluent limitations in cases cited by the plaintiffs. See, e.g., Pls.’ Reply at 9–10, Dkt. 71. Those cases involved EPA actions that permanently exempted certain entities or effluents from compliance, and thus “impose[d] no restrictions,” Friends of the Everglades v. EPA,

699 F.3d 1280, 1286

(11th Cir. 2012), or “provide[d] no limitation whatsoever,” Nw. Envtl. Advocates v. 12 To illustrate, consider a road with a speed limit of forty miles per hour. Changing the

road’s speed limit sets a new speed limit, and the analysis is no different if the change only

affects future compliance deadlines. If a rule (like the ELG Rule) sets twenty miles per hour as a

new speed limit that will apply on the road starting in late 2018, and a later rule (like ELG Rule

Amendment) revises the compliance deadline to 2020, the later rule sets a different speed limit

on that road for the period from late 2018 to 2020: forty miles per hour instead of twenty miles

per hour.

In fact, the plaintiffs acknowledge as much. Their proposed amended complaint

characterizes the ELG Rule Amendment as “a revision of the ELG [R]ule’s effluent limitations.”

Proposed. Am. Compl. ¶¶ 108–11. And the proposed complaint asserts that the revision was

unlawful because the EPA did not make findings required by

33 U.S.C. § 1314

(b), which

provides “Effluent limitation guidelines” for “adopting or revising effluent limitations.”

33 U.S.C. § 1314

(b); Proposed Am. Compl. ¶¶ 108, 110 (citing

33 U.S.C. § 1314

(b)). The plaintiffs

thus fault the EPA for not complying with “effluent limitations guidelines” when promulgating

the ELG Rule Amendment, while maintaining—for jurisdictional purposes—that the EPA did

not approve or promulgate “effluent limitations or other limitations” via the ELG Rule

Amendment. The Court declines to join in their mental gymnastics and concludes that the ELG

EPA,

537 F.3d 1006, 1016

(9th Cir. 2008); see also

id.

(Section 1369(b)(1)(E) does not apply to a regulation that “creates the categorical and permanent exemptions of three types of discharges from any limit imposed by a permitting requirement”). In contrast, the ELG Rule Amendment does not permanently exempt bottom ash transport water and flue gas desulfurization wastewater from limitations; rather, the Amendment changes the relevant effluent limitations with which power plants must comply going forward. 13 Rule Amendment “approv[es] or promulgat[es] effluent limitation[s] or other limitations[s].”

33 U.S.C. § 1369

(b)(1)(E).7

Finally, the limitations are promulgated “under section 1311, 1312, 1316, or 1345,” as

required to fall within the scope of Section 1369(b)(1)(E); see also Friends of Earth v. EPA,

333 F.3d 184, 189

(D.C. Cir. 2003) (“[T]he references to particular sections . . . exclude others.”

(quoting Longview Fibre Co. v. Rasmussen,

980 F.2d 1307, 1313

(9th Cir. 1992)). Namely, the

limitations are under Section 1311. “[T]he statutory context makes clear that the prepositional

phrase—‘under section 1311’—is most naturally read to mean that the effluent limitation or

other limitation must be approved or promulgated ‘pursuant to’ or ‘by reason of the authority of’

[Section] 1311.”

Id.

Here, the EPA promulgated the ELG Rule Amendment by reason of its

7 The Court’s conclusion requires no recourse to the “practical-effects” test rejected as inconsistent with the statutory text in National Ass’n of Manufacturers, nor any other functional approach. See

138 S. Ct. at 617

; see also

id.

at 631–632 (rejecting a “functional interpretive approach” because it misconstrues prior caselaw and ignores the statutory text, albeit the text of Section 1369(b)(1)(F), not the specific provision at issue in this case); Pls.’ Reply at 6; Notice of Suppl. Authority, Dkt. 74 (asserting that National Ass’n of Manufacturers supports the plaintiffs’ argument that the ELG Rule Amendment “do[es] not fit with the plain text” of Section 1369(b)(1)(E)).

In National Ass’n of Manufacturers, the U.S. Supreme Court assessed whether courts of appeals or district courts have jurisdiction to review the EPA’s Waters of the United States Rule, which defines the geographic scope of “waters of the United States” for purposes of the Clean Water Act. See

80 Fed. Reg. 37,054

. The U.S. Supreme Court held that the Rule falls outside the ambit of Section 1369(b)(1)(E), even though the Rule might “have the ‘legal or practical effect’ of making [effluent] limitations applicable to certain waters.” Nat’l Ass’n of Mfrs.,

138 S. Ct. at 630

. In doing so, the Court emphasized that the Rule merely “announces” “‘a definitional rule that clarifies the scope of’ the statutory term ‘waters of the United States,’” but “does not establish any regulatory requirements” and “imposes no enforceable duty on any state, local, or tribal governments, or the private sector.”

Id. at 626

, 628 (quoting 80 Fed. Reg. at 37,054, 37,102).

The ELG Rule Amendment, by contrast, imposes enforceable duties and establishes regulatory requirements, specifically the limitations discussed above. Because the Amendment “impose[s] restrictions on the discharge of certain pollutants,” it falls within the ambit of Section 1369(b)(1)(E). Id. at 629. In accordance with National Ass’n of Manufacturers, this conclusion is “grounded in the statutory text,” not any functional approach. Id. at 630. 14 authority under Section 1311(d), which provides for EPA “review and revision of effluent

limitations.”

33 U.S.C. § 1311

(d); see 82 Fed. Reg. at 43,496 (explicitly invoking Section

1311(d)).

Therefore, the ELG Rule Amendment approves or promulgates limitations within the

meaning of Section 1369(b)(1), and challenges to the Amendment belong in the federal courts of

appeals.

33 U.S.C. § 1369

(b)(1)(E). Because this Court thus lacks jurisdiction over the

plaintiffs’ proposed claims challenging the Amendment, it would be futile for the plaintiffs to

pursue the claims before this Court.

C. Delay and Scope

Furthermore, the plaintiffs’ proposed claims would unduly delay and alter the scope of

this litigation. Leave to supplement is warranted if a plaintiff shows that leave “will promote the

economic and speedy disposition of the entire controversy between the parties, will not cause

undue delay or trial inconvenience, and will not prejudice the rights of any of the other parties to

the action.” Hall,

437 F.3d at 10

(internal quotation marks omitted); see Sai v. TSA,

155 F. Supp. 3d 1, 7

(D.D.C. 2016) (denying leave to supplement because the plaintiff “failed to carry his

burden” of demonstrating the Hall considerations).

Here, the plaintiffs’ proposed claims would delay resolution of this case. The parties

have already completed multiple rounds of briefing on various dispositive motions, see Dkt. 20;

Dkt. 32; Dkt. 49; Dkt. 60, including the pending motion to dismiss that predates the plaintiffs’

request to supplement the complaint. The EPA filed that motion on September 21, 2017. Dkt.

60. Fourteen days later, the plaintiffs filed their opposition brief, Dkt. 64, but also moved for

leave to supplement the complaint with two claims challenging the ELG Rule Amendment, Dkt.

63. Granting leave to supplement would necessitate yet another round of briefing based on a

15 different administrative record, and it would prevent the Court from resolving the pending

dispositive motions, which are otherwise ripe for resolution and which the Court addresses

today. See infra Section III; see also City of Williams v. Dombeck,

203 F.R.D. 10, 11

(D.D.C.

2001) (denying leave to amend in part because the time needed to compile the administrative

record and brief “yet another round” of dispositive motions “would delay resolution of the

case”); Biosafe-One, Inc. v. Hawks,

639 F. Supp. 2d 358, 370

(S.D.N.Y. 2009), aff’d,

379 F. App’x 4

(2d Cir. 2010) (denying leave to supplement because, having “already dismissed

plaintiffs’ complaint in its entirety in the same opinion, leave would “unduly delay resolution of

[the] case”).

Moreover, the plaintiffs’ proposed claims would significantly alter the scope of this case.

The current complaint asserts six claims against the Indefinite Stay, all of which are specific to

the Stay and Section 705 of the Administrative Procedure Act. See Compl. ¶¶ 56–89 (the

Indefinite Stay violates the Administrative Procedure Act because it does not comply with

various requirements of Section 705, departs from the EPA’s prior practice, is inadequately

justified, and was issued without notice and comment).

In contrast, the plaintiffs’ two proposed claims would challenge the ELG Rule

Amendment on wholly different grounds. Although the Amendment and the Stay are

superficially similar because both broadly relate to the ELG Rule, the Amendment is a different

type of agency action (a final rule promulgated after notice and comment instead of a Section

705 stay), promulgated based on a different administrative record, pursuant to different authority

(the effluent limitations provisions of the Clean Water Act, not Section 705 of the Administrative

Procedure Act). And due to these differences, the proposed claims assert different causes of

action, namely that (1) the Amendment exceeds the EPA’s statutory authority under the Clean

16 Water Act, which requires “compliance with effluent limitations” “as expeditiously as possible,

but in no case later than three years after the date such limitations are promulgated,” Proposed

Am. Compl. ¶¶ 104–106 (quoting

33 U.S.C. § 1311

); and (2) the EPA promulgated the

Amendment without making the findings required by the Clean Water Act for a lawful revision

of effluent limitations,

id.

¶¶ 107–111 (citing

33 U.S.C. § 1314

).

The proposed claims are thus factually and legally distinct from the current claims. And

because the current claims are moot, see infra Section III, permitting the plaintiffs to supplement

would effectively swap the current complaint for an entirely new complaint. Thus, the proposed

claims—in addition to being futile—would unduly delay and alter the scope of this litigation,

and the Court will therefore deny leave to supplement the complaint. See Nat’l Treasury Emps.

Union v. Helfer,

53 F.3d 1289, 1295

(D.C. Cir. 1995) (affirming denial where the amendment

“bore only [a] tangential relationship to the original claim” and did not prejudice the plaintiff

because the plaintiff “can file [the amendment as] an independent challenge”); Sai v. TSA,

155 F. Supp. 3d 1, 7

(D.D.C. 2016); Miss. Ass’n of Coops. v. Farmers Home Admin.,

139 F.R.D. 542, 544

(D.D.C. 1991) (denying leave because the amendment “would do far more than allow

plaintiff to fully litigate all the legal dimensions of their initial action,” but rather “permit

plaintiff to transform their case into something entirely new”).

III. Defendants’ Motion to Dismiss for Lack of Jurisdiction

Without any supplemental claims, the plaintiffs’ complaint challenges only the Indefinite

Stay issued by the EPA in April 2017. This challenge, however, is moot because the Stay was

withdrawn in September 2017 and the case does not implicate exceptions to the mootness

doctrine. Because the Court lacks jurisdiction to review moot cases, the Court will grant the

defendants’ motion to dismiss this case. Dkt. 60.

17 A. Legal Standard

Under Rule 12(b)(1), a party may move to dismiss an action when the court lacks subject-

matter jurisdiction. Fed. R. Civ. P. 12(b)(1). A motion to dismiss for mootness is properly

brought under Rule 12(b)(1) because “mootness itself deprives the court of jurisdiction.” Indian

River Cty. v. Rogoff,

254 F. Supp. 3d 15

, 18–19 (D.D.C. 2017). “Federal courts lack jurisdiction

to decide moot cases because their constitutional authority extends only to actual cases or

controversies.” Conservation Force, Inc. v. Jewell,

733 F.3d 1200, 1204

(D.C. Cir. 2013)

(quoting Iron Arrow Honor Soc’y v. Heckler,

464 U.S. 67, 70

(1983)); see also U.S. Const. art.

III, § 2. To ensure an actual controversy remains extant, mootness must be assessed at “all

stages of review.” Decker v. Nw. Envtl. Def. Ctr.,

568 U.S. 597, 609

(2013).

A case is moot “when the issues presented are no longer live or the parties lack a legally

cognizable interest in the outcome.” Schmidt v. United States,

749 F.3d 1064, 1068

(D.C. Cir.

2014) (quotation marks omitted). This occurs when, for example, “intervening events make it

impossible to grant the prevailing party effective relief,” Lemon v. Geren,

514 F.3d 1312, 1315

(D.C. Cir. 2008), or when the Court’s decision “will neither presently affect the parties’ rights

nor have a more-than-speculative chance of affecting them in the future,” Aref v. Lynch,

833 F.3d 242, 250

(D.C. Cir. 2016) (quotation marks omitted). Exceptions to the mootness doctrine

may arise, however, when a challenged action is “voluntarily ceased” or “capable of repetition

yet evades review.” See Cierco v. Mnuchin,

857 F.3d 407

, 414–15 (D.C. Cir. 2017).

“When ruling on a Rule 12(b)(1) motion, the court must treat the complaint’s factual

allegations as true and afford the plaintiff the benefit of all inferences that can be derived from

the facts alleged.” Jeong Seon Han v. Lynch,

223 F. Supp. 3d 95, 103

(D.D.C. 2016) (quotation

marks omitted). Those factual allegations, however, receive “closer scrutiny” than they would in

18 the Rule 12(b)(6) context.

Id.

Also, unlike the Rule 12(b)(6) context, a court may consider

documents outside the pleadings to evaluate whether it has jurisdiction. See Jerome Stevens

Pharm., Inc. v. FDA,

402 F.3d 1249, 1253

(D.C. Cir. 2005). If the court determines that it lacks

jurisdiction because a claim is moot, the court must dismiss the claim. Fed. R. Civ. P. 12(b)(1),

12(h)(3).

B. Mootness

This case is moot because the Indefinite Stay is no longer in effect. The EPA withdrew

the Stay via a final rule, the ELG Rule Amendement, in September 2017. See 82 Fed. Reg. at

43,495–96. The plaintiffs assert that the ELG Rule Amendment only “purports to withdraw” the

Indefinite Stay, see Pls.’ Opp’n at 5, Dkt. 64, but the plaintiffs offer no reason to think that the

Stay remains in effect. Contrary to the plaintiffs’ assertions, the ELG Rule Amendment directly

addresses the Stay and states that “EPA, hereby, withdraws that action.” 82 Fed. Reg. at 43,496.

In place of the withdrawn Stay, the ELG Rule Amendment postpones by two years the earliest

compliance deadlines for two of the five wastestreams affected by the Stay: bottom ash transport

water and flue gas desulfurization wastewater. Id. And, for the other three wastestreams

affected by the Stay, the Amendment permits compliance deadlines previously set by the ELG

Rule to go back into effect. Id. at 43,494.

The withdrawal of the Indefinite Stay and its replacement by the ELG Rule Amendment

were “intervening events [that] make it impossible to grant the prevailing party effective relief.”

Lemon,

514 F.3d at 1315

. The plaintiffs ask the Court to declare the Stay unlawful and vacate it,

see Compl. at 21, but the Court cannot grant that relief. Because the stay was withdrawn, there is

nothing for the Court to vacate, and a declaratory judgment would be an impermissible advisory

opinion. See Pub. Serv. Elec. & Gas Co. v. FERC,

783 F.3d 1270, 1274

(D.C. Cir. 2015) (“[T]he

19 oldest and most consistent thread in the federal law of justiciability is that the federal courts will

not give advisory opinions.” (quotation marks omitted)); Ctr. for Sci. in the Pub. Interest v.

Regan,

727 F.2d 1161

, 1164 (D.C. Cir. 1984) (holding a challenge moot because the superseded

agency action “no longer has any force” and “further judicial pronouncement on [the action]

would be purely advisory”); NRDC v. U.S. Nuclear Regulatory Comm’n,

680 F.2d 810

, 814–15

(D.C. Cir. 1982) (holding a challenge moot because “[i]n effect, [the plaintiff] seeks a

declaration from this court that the initial promulgation of the [superseded] rule was unlawful, an

advisory opinion which federal courts cannot provide”).

Likewise, the Court cannot grant the plaintiffs’ requests that the Court reinstate the

compliance deadlines imposed by the ELG Rule and indefinitely postponed by the Stay. See

Compl. at 21. The deadlines for three of the wastestreams were already reinstated by the ELG

Rule Amendment, see 82 Fed. Reg. at 43,494, and the Court “can hardly order [the agency] to do

something that it has already done,” Nat’l Ass’n of Home Builders v. Salazar,

827 F. Supp. 2d 1, 8

(D.D.C. 2011) (quoting NRDC,

680 F.2d at 814

). In addition, the deadlines for the other two

wastestreams were superseded by the ELG Rule Amendment, which proceeded through full

notice-and-comment rulemaking and replaced the relevant deadlines imposed by the ELG Rule

and postponed by the Stay. 82 Fed. Reg. at 43,496. The Court cannot reinstate those deadlines

absent a challenge to the ELG Rule Amendment, which is not properly before the Court. See

supra Section II; Ctr. for Sci., 727 F.2d at 1164 (“[I]t is not improper for an agency to engage in

new rulemaking to supersede defective rulemaking. . . . [A]n ultimate determination of the rights

and obligations of the parties concerning [the subject matter of the superseded rule] can emerge

only upon consideration of the validity of [the superseding rule].”). Because this case no longer

presents live issues and “nothing would turn on [its] outcome,” the case is moot. Coal. of Airline

20 Pilots Ass’ns v. FAA,

370 F.3d 1184

, 1191 (D.C. Cir. 2004) (quotation marks and alterations

omitted).

C. Exceptions

Moreover, this case does not implicate the mootness exceptions for challenged actions

that are “voluntarily ceased” or for actions that are “capable of repetition yet evade review.” See

Cierco, 857 F.3d at 414–15.

1. Voluntary Cessation

“As a general rule, a defendant’s ‘voluntary cessation of allegedly illegal conduct does

not deprive [a court] of power to hear and determine the case.” Id. at 414 (quoting Cty. of L.A. v.

Davis,

440 U.S. 625, 631

(1979)). Rather, voluntary cessation will only moot a case if the

defendant shows that (1) “there is no reasonable expectation that the alleged violation will recur”

and (2) “interim relief or events have completely and irrevocably eradicated the effects of the

alleged violation.”

Id.

at 414–15 (quotation marks and alterations omitted).

First, there is no reasonable expectation that the challenged stay will recur. The EPA not

only withdrew the Indefinite Stay, but also replaced the Stay with the ELG Rule Amendment.

As a result, this case does not present a situation in which the agency voluntarily ceased an

informal action but might reinstate the same action at any time. Rather, the EPA deliberated via

full notice-and-comment rulemaking, then decided that “there is no longer any need for the

Agency to maintain” the Stay and formalized that decision by partially changing compliance

dates for some wastestreams while imposing compliance dates for other wastestreams as

originally set by the ELG Rule. See 82 Fed. Reg. at 43,496.

Against this agency deliberation and rulemaking to withdraw and replace the Indefinite

Stay, the plaintiffs argue that the EPA might reinstate the Stay if the ELG Rule Amendment is

21 vacated by a court. See Pls.’ Opp’n at 10. But such speculation is insufficient to establish that

the challenged stay will likely recur. See Chamber of Commerce v. EPA,

642 F.3d 192, 208

(D.C. Cir. 2011) (“[T]he federal regulations [here, the ELG Rule and ELG Rule Amendment] are

currently in force, subject to the usual presumption of validity, and at this point the possibility

that they may be invalidated is nothing more than speculation.” (citation omitted)). In a similar

case, the D.C. Circuit held moot a challenge to the EPA’s decision to waive federal preemption

of California’s more stringent vehicle standards. After waiving preemption, the EPA

promulgated new vehicle standards as stringent as California’s. California, no longer needing a

waiver to enforce stringent standards, then withdrew its own standards in favor of the EPA’s.

Holding the case moot, the D.C. Circuit explained:

The prospect that litigants could be injured “if” a court were someday to invalidate the federal regulations and “if” California thereafter were to reimpose its standards, is little different from the prospect that any litigant could be injured “if” EPA (or Congress) were eventually to enact a rule it presently had under consideration. To seek judicial review of such a contemplated-but-not-yet- enacted rule is to ask the court for an advisory opinion in connection with an event that may never come to pass.

Id.

It would require similarly impermissible speculation to forecast that the ELG Rule

Amendment will be vacated and that the EPA will then decide to reinstate the Indefinite Stay

challenged in this case.

The plaintiffs look even further into the future when they assert that the EPA might

reinstate the stay if the agency is still reconsidering the ELG Rule in late 2020, i.e., when the

Amendment’s new compliance deadlines begin to kick in. See Pls.’ Opp’n at 10–11. In support,

the plaintiffs point to the preamble of the ELG Rule Amendment, which stated: “If EPA does

not complete a new rulemaking by November, 2020, it plans to further postpone the compliance

dates such that the earliest compliance date is not prior to completion of a new rulemaking.” 82

22 Fed. Reg. at 43,494. It is speculative to conclude, based on the preamble alone, that the EPA

will need more than three years from the ELG Rule Amendment to complete its new rulemaking.

Indeed, the three-years projection is not guesswork; rather, the EPA calculated that the new

rulemaking will take approximately three years by “reflecting on the time it typically takes the

Agency to propose and finalize revised effluent limitations guidelines and standards” and “the

characteristics of this industry and the anticipated scope of the next rulemaking.” Id. at 43,498.

And even if the rulemaking ends up requiring three years, the EPA may not issue a stay

like that challenged here. Instead, the EPA may postpone the compliance dates with a notice-

and-comment rule, just as it did via the ELG Rule Amendment. And any future stay would

likely involve only the two wastestreams currently under reconsideration, not the five

wastestreams addressed by the challenged stay, because the ELG Rule Amendment already

reinstated deadlines for three of the five wastestreams based on an explicit EPA decision not to

reconsider the ELG Rule’s requirements for those wastestreams. See 82 Fed. Reg. at 43,498.

These “hypothetical possibilities . . . are nothing more than possibilities regarding regulations

and enforcement policies that do not presently exist. This is not enough to give rise to a live

dispute.” Am. Bar Ass’n v. FTC,

636 F.3d 641, 647

(D.C. Cir. 2011).

Finally, and even more speculatively, the plaintiffs argue that the challenged stay is likely

to recur because the EPA and other agencies have stayed or might stay other regulations. See

Pls.’ Opp’n at 11–12. The plaintiffs identify one other action by the EPA to stay different

regulations under Section 705 of the Administrative Procedure Act, see

82 Fed. Reg. 32,357

(July 13, 2017), as well as two actions by the Department of Interior and the Bureau of Land

Management to stay different regulations promulgated under different substantive statutes, see

82 Fed. Reg. 27,430

(June 15, 2017) (BLM stay of regulations governing venting, flaring, and

23 leaking during oil and natural gas production activities on onshore federal leases); 82 Fed. Reg.

Fed. Reg. 11,823 (Feb. 27, 2017) (DOI stay of coal valuation rule); see also California v. BLM,

277 F. Supp. 3d 1106

(N.D. Cal. 2017) (analyzing BLM stay), appeal filed, No. 17-17456 (9th

Cir. Dec. 8, 2017); Becerra v. DOI,

276 F. Supp. 3d 953

(N.D. Cal. 2017) (analyzing DOI stay).

The plaintiffs also assert that the EPA might issue stays in the future because the agency has

expressed a general intent to review current regulations. See

82 Fed. Reg. 17,793

(Apr. 13,

2017). Such examples, however, have little bearing on whether the challenged stay will recur.

Isolated invocations of Section 705 to stay other regulations promulgated under other substantive

statutes do not indicate that the EPA will again stay the ELG Rule specifically, or even other

regulations generally promulgated under the Clean Water Act. And the examples certainly do

not indicate that the EPA will stay the particular aspects of the ELG Rule implicated in this case.

To the contrary, the EPA decided via the notice-and-comment process that the ELG Rule

Amendment made such a stay unnecessary. See 82 Fed. Reg. at 43,496. As a result, there is not

a reasonable expectation that the challenged stay will recur.

Turning briefly to the second prong of the “voluntary cessation” exception to mootness,

intervening events have completely and irrevocably eradicated the effects of the alleged

violation. Because the Indefinite Stay was withdrawn and replaced by the ELG Rule

Amendment, the Stay is “now devoid of any legal effect.” Coal. of Airline Pilots Ass’ns, 370

F.3d at 1191. To the extent that the plaintiffs suffer any harm from the modified compliance

deadlines going forward, the harmful effects will stem from the ELG Rule Amendment, not the

withdrawn Stay.

To resist this conclusion, the plaintiffs conjecture that the withdrawal “has not alleviated

. . . the disruptive effects that the [S]tay has had on state and utility implementation of the ELG

24 Rule.” Pls.’ Opp’n at 14. But regardless of whether the Indefinite Stay encouraged states and

utilities to delay implementation during summer 2017, the Stay ceased to have that effect when it

was withdrawn and replaced in September 2017. Consider the plaintiffs’ examples. The

plaintiffs assert that the Stay continues to have harmful effects because the state of Nebraska and

an Indiana utility cited the Stay in summer 2017 when making compliance decisions regarding

the ELG Rule. The extent to which these past compliance decisions would have differed in the

absence of the Stay, however, remains entirely speculative. And regardless of whether Nebraska

and the Indiana utility modified their behavior based on the Stay, the ELG Rule Amendment

requires them to adhere to a different compliance regime, from which any continuing harms will

stem. As a result, the ELG Rule Amendment eradicated the effects of the allegedly unlawful

stay, and the Court concludes that the “voluntary cessation” exception does not apply in this

case.

2. Capable of Repetition yet Evading Review

Similarly inapplicable is the mootness exception for disputes that are “capable of

repetition yet evade review.” This exception applies if the plaintiffs show that (1) “the

challenged action was in its duration too short to be fully litigated prior to its cessation or

expiration” and (2) “there was a reasonable expectation that the same complaining party would

be subjected to the same action again.” United Bhd. of Carpenters v. Operative Plasterers’ Int’l

Ass’n,

721 F.3d 678, 687

(D.C. Cir. 2013) (quoting Murphy v. Hunt,

455 U.S. 478, 482

(1982)).

First, the plaintiffs fail to show that the duration of the challenged action was by its nature too

short to be fully litigated. In this case, multiple dispositive motions, including cross-motions for

summary judgment, were fully briefed before the stay was withdrawn and replaced by the ELG

Rule Amendment; the litigation was thus ripe for decision. See Dkt. 20; Dkt. 32; Dkt. 49.

25 Moreover, the plaintiffs themselves cite two recent cases in which Section 705 stays have been

fully litigated. See California,

277 F. Supp. 3d at 1106

; Becerra,

276 F. Supp. 3d at 953

.

Second, even if the challenged action were too short to be fully litigated, the plaintiffs fail to

show a reasonable expectation that the same complaining party would be subjected to the same

action again. As discussed above, the EPA is unlikely to subject the plaintiffs to the same stay

again. See supra Section III.C.1. Therefore, the “capable of repetition yet evading review”

exception does not apply. This case is moot and must be dismissed.

CONCLUSION

For the foregoing reasons, the Court denies the Plaintiffs’ Motion for Leave to Amend

and Supplement the Complaint, Dkt. 63, and the Court grants the Defendants’ Motion to

Dismiss, Dkt. 60. In addition, because the Court dismisses this action, the Court denies as moot

the Plaintiffs’ Motion for Summary Judgment, Dkt. 20, the Defendants’ Cross-Motion for

Summary Judgment or Dismissal or Transfer, Dkt. 32, and the Intervenor-Defendant’s Cross-

Motion for Summary Judgment or Dismissal or Transfer, Dkt. 49. A separate order consistent

with this decision accompanies this memorandum opinion.

________________________ DABNEY L. FRIEDRICH United States District Judge Date: April 18, 2018