Howe v. C. H. Turner Construction Co.
Howe v. C. H. Turner Construction Co.
Opinion of the Court
The appellee as complainant below filed its bill in the Circuit Court of Escambia County in equity against the appellant as defendant below to enforce and foreclose a lien on Lot 3 of Block 180 New City Tract in the City of Pensacola for furnishing and laying a seAverage and water pipe connection between said lot and the seAver and water mains in the street abutting on said lot, the bill alleging that the complainant performed said work under contract Avith, and at the order of, said City after the defendant had been duly notified to make said connections prior to the paving of said abutting street, and Tvhich she had neglected and refused to do.
To this bill the defendant filed a plea setting up the following paragraph of the city ordinances of said City of Pensacola:
“When the property is improved a separate connection shall be made to accommodate each main building, and Avhere unimproved a separate connection shall be made to accommodate each city lot abutting on said street, except in corner lots Avhere said frontage may abut on the portion of the street or streets to be paved and improved, in which case one connection for each of the services above specified shall be made to accommodate a depth of not over one hundred and twenty-five feet.”
The plea alleges in substance that under this ordinance she Avas not required to connect said Lot No. 3 AAdth said
This plea was overruled on argument of same, and from this ruling the defendant below appeals here, assigning said ruling as error.
Our construction of the ordinance in question is that it requires each separate city lot abutting on the street to be paved according to the maps and plats of the city to be connected with the sewer and water mains whether improved or unimproved, and that where there are located two or more main buildings or residences requiring sewerage and water on the same city lot, that then separate connections with the sewer and water mains must be made for each of said main buildings or residences. With this construction, it being admitted that Lot 3 in question is a separate city lot, the ordinance requires it to be connected with the sewer and water mains even though it is at present used only as an appurtenance to the residence located on the adjacent lots 1 and 2, and it follows that the court below committed no error in the ruling appealed from.
The order of the court below appealed from is hereby affirmed at the cost of the appellant.