W. Watersheds Project v. Zinke
W. Watersheds Project v. Zinke
Opinion of the Court
Pending before the Court is Plaintiffs' Motion for Preliminary Injunction (Dkt. No. 30). The Court has heard oral argument from counsel and has carefully considered the record. Being fully advised, the Court enters the following Memorandum Decision and Order:
I. SUMMARY OF DECISION
The Bureau of Land Management ("BLM") is a federal agency that, among other things, handles the leasing of oil and gas rights on certain federal lands. The procedures that BLM follows in doing so changed earlier this year when it put into place an Instruction Memorandum ("IM"), supplying new instructions to the agency's offices about how to handle such leases. This new directive is known as IM 2018-034.
Plaintiffs Western Watersheds Project and Center for Biological Diversity (collectively "WWP" or Plaintiffs) contend that IM 2018-034 unlawfully constrains environmental review of, and public participation in, BLM oil and gas lease decisions that affect and threaten sage-grouse populations and habitats across the western United States. WWP asks the Court to stop BLM, through a preliminary injunction, from conducting oil and gas lease sales under the procedures of IM 2018-034 and instead follow the requirements which existed previously - specifically those contained in IM 2010-117 (issued in 2010, during *1212the prior presidential administration) - until the legal challenges to IM 2018-034 can be adjudicated on the merits.
After the Complaint was filed, two parties, the State of Wyoming ("Wyoming") and an oil and gas industry association known as Western Energy Alliance ("WEA"), asked the Court to allow their intervention to participate in the lawsuit, which the Court allowed.
On September 6, 2018, the Court conducted a hearing to consider WWP's request for a preliminary injunction. The Court took under advisement the arguments of the parties, both in the written briefing and the oral argument, and now issues this Memorandum Decision and Order upon the Motion for a Preliminary Injunction. Under the legal standards that apply to preliminary injunctions and the requirements of federal law found in the Federal Land Policy and Management Act ("FLPMA"), the National Environmental Policy Act ("NEPA"), and the Administrative Procedure Act ("APA"), the Court concludes that Plaintiffs have shown a substantial case for success on the merits of their claims and that irreparable harm is likely to result in the absence of an injunction. Further, the Court concludes, after a weighing of the equities and the public interest, that such equities tip in favor of, and the public interest is best served by, granting the Motion. Although this Memorandum Decision and Order reflects that the Court is persuaded on the present record that Plaintiffs have a likelihood of success on the merits, this is not a final decision on the merits of the case.
The preliminary injunction requires that, for oil and gas leases scheduled for the fourth quarter of 2018 and thereafter, BLM must (1) re-implement certain provisions contained in IM 2010-117 as to the nature of, and time periods for, public involvement and protest in the oil and gas leasing process; and (2) discontinue the use of conflicting procedures contained in IM 2018-034. In general, the requirement that BLM return to the provisions of IM 2010-117 on these specific matters will allow a fuller opportunity for public involvement and comment in BLM's decision-making processes affecting potential oil and gas leases on federal lands in areas of federally-recognized sage-grouse habitat. Doing so will remedy for present purposes the harm and hardships caused by BLM's curtailment or preclusion of the opportunity for meaningful public participation in the oil and gas leasing process (as implemented in IM 2018-034), which on the present record appears to violate public participation requirements of both FLPMA and NEPA. Further, the requirements of the preliminary injunction will serve the public interest by providing BLM with the benefit of more meaningful public participation in the agency decision-making process. The details of what is required of BLM to comply with the preliminary injunction are found in the body of this Memorandum Decision and Order.
The preliminary injunction does not apply to BLM oil and gas lease procedures on federal lands that are not within federally-recognized boundaries encompassing greater sage-grouse habitat management areas (as described and depicted more fully below). Plaintiffs contend that their standing to bring this lawsuit and the alleged injuries they have suffered or will suffer are directly tied to those areas of the federally-owned or federally-managed lands. Further, the preliminary injunction does not apply to oil and gas leases that have been the subject of sales already conducted or that are currently scheduled in the remainder of the third quarter of 2018. For those oil and gas leases, the weighing of the hardships and the public interest does not tip in favor of Plaintiffs, but rather tips in Defendants' favor, and those who have received such leases or are *1213bidding, or have bid, upon such leases. Finally, the preliminary injunction does not affect the existing six-month "Parcel Review Timeframe" implemented in IM 2018-034.
II. BACKGROUND
Broadly speaking, this case challenges what WWP contends are unlawful actions by the Trump Administration, through Federal Defendants, to promote and expedite oil and gas leasing on public lands that, according to WWP, "will adversely impact essential habitats and populations across the range of the greater sage-grouse ..., and violate bedrock environmental laws including [FLPMA], [NEPA], and the [APA]." Compl. ¶ 1 (Dkt. 1). More specifically, WWP alleges that Federal Defendants have issued a series of orders, scientific reports, and directives that cast aside and disregard previously implemented protections for sage-grouse populations. At the same time, contends WWP, such actions also limit or preclude opportunities for public involvement during the oil and gas leasing process - materializing (as of the time that WWP initiated this case) in eight "final" BLM oil and gas lease sales (three in Montana, one in Utah, and four in Wyoming) that impact sage-grouse habitats. See id. at ¶¶ 1-14, 73-225.
WWP challenges these leasing actions as violating the 2015 Sage-Grouse Plan Amendments to BLM Resource Management Plans, FLPMA, NEPA, and the APA. See id. at ¶¶ 276-307. WWP additionally challenges two recently-implemented BLM IMs that WWP claims revised BLM oil and gas leasing and development decision process without any public procedures (notice and comment) or environmental review: (1) IM 2018-026, which overrides the "prioritization" requirement of the 2015 Sage-Grouse Plan Amendments (prioritizing oil and gas leasing outside of identified sage-grouse habitat); and (2) IM 2018-034, which impacts environmental analysis of oil and gas leasing and development decisions, while limiting public notice and involvement in those decisions. See id. at ¶¶ 98-112. The pending motion for injunctive relief pertains to IM 2018-034 only.
Issued on January 31, 2018, IM 2018-034 contains this language as to its claimed purpose:
Purpose: This Instruction Memorandum (IM) sets out the policy of the Bureau of Land Management (BLM) to simplify and streamline the leasing process to alleviate unnecessary impediments and burdens, to expedite the offering of lands for lease, and to ensure quarterly oil and gas lease sales are consistently held in accordance with the Mineral Leasing Act (30 U.S.C. § 226 ), Executive Order 13783, and Secretary Order 3354.
IM 2018-034, "Purpose" p. 1, attached as Ex. A to Lucas Decl. (Dkt. 30-11). IM 2018-034 "supersedes existing policy" contained in IM 2010-117 and replaces "any conflicting guidance or directive found in the BLM Manual or Handbook."
According to WWP, BLM issued IM 2018-034 without any public notice, comment, or environmental review, and directs BLM offices to discard procedures under the previous IM 2010-117 for environmental reviews and limit public involvement in oil and gas leasing decisions. Such action, WWP contends, violates FLPMA, NEPA, and the APA. WWP seeks injunctive relief prohibiting Federal Defendants from implementing certain IM 2018-034's provisions, while reinstating corresponding provisions from IM 2010-117 - in particular:
• Enjoin IM 2018-034, Section III.A - "Parcel Review Timeframes" and reinstate IM 2010-117, Section III.A - "Parcel Review Timeframes";
• Enjoin IM 2018-034, Section III.B.5 - "Public Participation" and reinstate *1214IM 2010-117, Section III.C.7 - "Public Participation";
• Enjoin IM 2018-034, Section III.D - "NEPA Compliance Documentation" and reinstate IM 2010-117, Section III.E - "NEPA Compliance Documentation"; and
• Enjoin IM 2018-034, Section IV.B - "Lease Sale Parcel Protests" and reinstate IM 2010-117, Section III.H - "Lease Sale Parcel Protests."
See WWP's Mot. for PI 2 (Dkt. 30).
A comparison of the pertinent language from the two IMs (with supplied emphases) illustrates the different templates they provide for oil and gas leasing:
Enjoin IM 2018-034 Reinstate IM 2010-117 § III.A - Parcel Review Timeframes § III.A. - Parcel Review Timeframes State/field offices are required, by statute, State offices will continue to hold sales four times per and implementing regulation, to hold year, as required by the Mineral Leasing Act ..., quarterly lease sales, when eligible lands when eligible lands are determined by the state office are available for lease. Lease sales should to be available for leasing. However, state offices occur in the last month of each calendar will develop a sales schedule with an emphasis on year quarter. rotating lease parcel review responsibilities among field offices throughout the year to balance the The BLM accepts Expressions of Interest workload and to allow each field office to devote (EOI) in lands for potential leasing through sufficient time and resources to implementing the the National Fluids Lease Sale System parcel review policy established in this IM. State (NFLSS). Members of the public submit offices will extend field office review timeframes, as EOIs electronically to the BLM using necessary, to ensure there is adequate time for the NFLSS. Once submitted, the public can field offices to conduct comprehensive parcel view all EOIs submitted to the BLM. The reviews. EOI submitter can track its EOI status using the EOI-specific tracking number provided [No timeframe for parcel review] by NFLSS. NFLSS can display the dates when the EOI was submitted to, and accepted by, the BLM, and its status, such as pending review by the state office, field office, or surface management agency. The BLM also uses the NFLSS to describe lands that the BLM has identified for leasing consideration. NFLSS provides a link to upcoming lease sales. The BLM will identify in NFLSS a deadline for receiving EOIs for each upcoming sale. The deadline will be six months prior to the lease sale month. This EOI deadline also will be posted on the state office website along with the upcoming lease sale schedule. The timeframe for parcel review for a specific lease sale is to be no longer than 6 months. This will include adjudicating and creating the preliminary parcel list from all timely received EOIs and the other lands identified for leasing consideration in the NFLSS, recognizing there will be exceptions due to unforeseen circumstances, including delays associated with SMA consent.
*1215BLM will no longer use a rotating schedule for lease sales, as described in IM No. 2010-117. Each state office will review all lands that are identified in EOIs that were submitted before the EOI cutoff date for a particular quarterly lease sale and will offer all parcels determined to be eligible and available within the state office's jurisdiction § III.B.5 - Public Participation § III.C.7 - Public Participation State and field offices may provide for State and field offices will provide for public public participation during the NEPA participation as part of the review of parcels process as part of the review of parcels identified for potential leasing through the NEPA identified for potential leasing compliance documentation process (see section III.E). State and field offices will identify groups and individuals with an interest in local BLM oil and gas leasing, including surface owners of split estate lands where Federal minerals are being considered for leasing. Interested groups, individuals, and potentially affected split estate surface owners will be kept informed of field office leasing and NEPA activities through updated websites and email lists, and will be invited to comment during the NEPA compliance process. § III.D - NEPA Compliance Documentation § III.E - NEPA Compliance Documentation The state/field office will determine the The IDPR Team will complete site-specific NEPA appropriate form of NEPA compliance compliance documentation for all BLM surface and documentation for all lease sale parcels on split estate lease sale parcels. The IDPR Team may BLM-managed lands, including parcels for include the review of multiple parcels in a single federal subsurface minerals in split estate document. Site-specific NEPA compliance lands. documentation must incorporate appropriate information gained through the lease parcel review If, through the lease parcel review process, process described above. In accordance with this the authorized officer confirms that the IM, the NEPA compliance documentation for oil proposed leasing action has been and gas leasing must include an opportunity for adequately analyzed in existing NEPA public review, as described below, and the filed document(s) and is in conformance with the office must verify that all legal requirements have approved RMP, a Determination of NEPA been met (e.g., ESA and NHPA). Adequacy (DNA) will be used to document NEPA compliance for the leasing decision. If, through the lease parcel IDPR Team review If the authorized officer deems additional process, the authorizing official confirms that the analysis to be necessary, then the BLM can proposed leasing action is adequately analyzed in an prepare an Environmental Assessment (EA) existing NEPA document, such that prepared during *1216or Environmental Impact Statement (EIS), the MLP process, and is in conformance with the as appropriate. approved RMP, a Determination of NEPA Adequacy (DNA) may be used to document NEPA compliance If the BLM concludes that a DNA will for the leasing decision.... Although not required adequately document that existing NEPA by law or regulation, field offices will provide a 30-day analysis is sufficient to support the public review and comment period for the DNA. proposed action and the action is After consideration of any public comments consistent with the RMP, no further public received on the document, the field office will either comment period is required for the DNA. finalize the DNA or initiate other appropriate NEPA compliance review. It is expected that the The State Director or the officer with DNA process will only be appropriate in cases where delegated decision-making authority will the existing NEPA documentation has adequately use the information provided by the field incorporated the most current program-specific office authorized officer to determine which guidance. If a DNA is not appropriate, then the field parcels to include on an upcoming lease office will determine the appropriate NEPA sale. compliance documentation (e.g., environmental assessment (EA) or environmental impact statement (EIS)) to be prepared. Most parcels that the field office determines should be available for lease will require site-specific NEPA analysis. This analysis will typically take the form of an EA, which would be tiered, as appropriate, to the RMP/EIS or a MLP/EA or EIS, if one has been completed for any of the parcels. Scoping for these EAs is optional; however, the inter disciplinary review of lease sale parcels will provide input on the issues, impacts, and potential alternatives to be addressed in the EA. The EA will analyze a no action alternative (no leasing), a proposed leasing action (leasing the parcel(s) in conformance with the land use plan), and any alternatives to the proposed action that may address unresolved resource conflicts. In cases where the field office determines that the necessary terms and conditions under which leasing would be appropriate are not in conformance with the RMP, it will be necessary to amend the RMP before leasing is appropriate. If it is necessary to amend the RMP, the leasing EA (or EIS) must either meet the standards for NEPA documentation to support a plan amendment ..., or the affected lease parcels must be withdrawn or deferred from leasing until a plan amendment or revision can be completed at a later date. Although not required by law or regulation, field offices will provide a 30-day public review and *1217comment period for the EA and unsigned Finding of No Significant Impact (FONSI) of oil and gas leasing before forwarding the leasing recommendation to the State Director .... Note: Plan amendments are subject to additional public involvement and protest requirements.... The field office will finalize the EA and FONSI considering any public comment received on those documents. If a FONSI is not warranted, the field office may recommend that the parcel be withheld from leasing or that an EIS be prepared to address the site-specific issues in compliance with NEPA § IV.B - Lease Sale Parcel Protests § III.H - Lease Sale Parcel Protests A 10-day public protest period will begin A 30-day protest period will begin the day the sale the day the sale notice is posted, along with notice is posted, as it has in the past. The earlier applicable NEPA documentation. State posting of the sale notice will provide the state and offices should attempt to resolve protests in field offices with at least 60 days to review protests a signed decision before the sale of the before the oil and gas lease sale. The process protested parcels. Parcels subject to outlined in this IM - which includes site-specific protests that are not resolved (i.e., pending parcel analysis and increased public participation - protests) will be offered for lease sale. A will help identify, address, and resolve most issues decision to deny or dismiss a protest will before the lease sale. When possible, state offices advise the protesting parties of their right to should attempt to resolve protests before the sale of appeal to the Interior Board of Land the protested parcels. Protests that are not resolved Appeals (IBLA) and will state that an do not prevent bidding on protested parcels at the appeal will not automatically halt the auction. Protest decisions should advise the auction process. protesting parties of their right to appeal denied protests to the Interior Board of Land Appeals The number of parcels protested and the (IBLA), but that appeals will not automatically halt status of the protests (i.e., protests the auction or issuance of leases. dismissed, denied, upheld, or pending) must be publicly posted the day before the sale [Public notice of the sale is to be given 90 days prior starts on the BLM state office website and to the sale § III.G] the internet auction website so that bidders understand the protest status of each parcel. Protests upheld should be posted on the state office website and the NFLSS, using normal processes with amendments/notices to withdraw the parcel, no later than the day before the sale starts, and if applicable, on the online leasing website for the sale no later than the day before the sale starts. [Public notice of the sale is to be given 45 days prior to the sale § IV.A]
Compare IM 2018-034, with IM 2010-117, attached as Ex. B to Lucas Decl. (Dkt. 30-12) (emphasis added) (internal citations omitted); see also, e.g. , Compl. at ¶¶ 105-112.
III. LEGAL STANDARDS
A. Administrative Procedure Act ("APA")
"Challenges to final agency actions are reviewed under the deferential standard of the [APA]." Greater Yellowstone Coal. v. Larson ,
Under the APA, the reviewing court must set aside the agency's decision if it is "arbitrary, capricious, an abuse of *1218discretion, or otherwise not in accordance with law, ... in excess of statutory jurisdiction, ... [or] without observance of procedure required by law."
Nevertheless, where an agency "entirely failed to consider an important aspect of the problem," the decision is arbitrary and capricious and must be set aside. Motor Vehicle Mfrs. Ass'n of the U.S., Inc. v. State Farm Mut. Auto. Ins. Co. ,
B. Preliminary Injunction
Within the frame of Rule 65, a preliminary injunction requires that a party establish (1) a likelihood of success on the merits, (2) a likelihood of irreparable harm in the absence of preliminary relief, (3) that the balance of equities tips in its favor, and (4) that an injunction is in the public interest. See Winter v. Natural Res. Def. Council ,
As to a likelihood of success on the merits, that factor has been measured in various ways, including "reasonable probability," "fair prospect," "substantial case on the merits," and "serious legal questions ... raised." See Lair v. Bullock ,
Ordinarily, a preliminary injunction maintains the status quo pending a final decision on the merits. See Univ. of Tex. v. Camenisch ,
IV. DISCUSSION
A. Federal Defendants' Opposition
Part and parcel with their overall critique of WWP's likelihood of success on the merits of their underlying claims, Federal Defendants argue that the Court lacks the authority to issue a preliminary injunction in the first instance when (1) WWP has failed to adequately demonstrate standing; (2) WWP's Motion fails to challenge final agency action and therefore is not reviewable under the APA; and (3) WWP's Motion is not ripe for review. See Fed. Defs.' Opp. to Mot. for PI 13-24 (Dkt. 52). The Court is not persuaded by these arguments.
1. WWP Has Standing
Article III of the United States Constitution limits judicial power to deciding cases and controversies. This limitation, known as the standing doctrine, requires that a plaintiff have a "personal stake in the outcome of the controversy ... to warrant his invocation of federal-court jurisdiction." Warth v. Seldin ,
Relying on Summers v. Earth Island Inst. ,
id="p1220" href="#p1220" data-label="1220" data-citation-index="1" class="page-label">*1220
Reversing, the Supreme Court rejected the plaintiffs' claimed procedural injury - namely, that they had been denied the ability to file comments on some Forest Service actions and will continue to be so denied. See
We know of no precedent for the proposition that when a plaintiff has sued to challenge the lawfulness of certain action or threatened action but has settled that suit, he retains standing to challenge the basis for that action (here, the regulation in the abstract), apart from any concrete application that threatens imminent harm to his interests. Such a holding would fly in the face of Article III's injury-in-fact requirement.
Respondents have identified no other application of the invalidated regulations that threatens imminent and concrete harm to the interests of their members.
....
But deprivation of a procedural right without some concrete interest that is affected by the deprivation - a procedural right in vacuo - is insufficient to create Article III standing. Only a person who has been accorded a procedural right to protect his concrete interests can assert that right without meeting all the normal standards for redressibility and immediacy. Respondents alleged such injury in their challenge to the Burnt Ridge Project, claiming that but for the allegedly unlawful abridged procedures they would have been able to oppose the project that threatened to impinge on their concrete plans to observe nature in that specific area. But Burnt Ridge is now off the table.
WWP has identified several specific applications of IM 2018-034 in the 2018 lease sales across the sage-grouse range - each one allegedly threatening lands that various staff and members of WWP use and enjoy. See, e.g. , Compl. at ¶¶ 130-225 (identifying current leases that "threaten sage-grouse habitats and populations"). In other words, unlike the already-settled Burnt-Ridge Project that evaporated the plaintiffs' procedural claims in Summers , there is no equivalent circumstance here. Summers is therefore distinguishable from this case.
Regardless, though reversing the Ninth Circuit and ruling that the plaintiffs lacked standing, Summers nonetheless confirmed the rule that environmental organization plaintiffs can assert the standing of their members. See Summers , 555 U.S. at 494,
In contrast, here, WWP's supporting declarations establish that its members frequently and extensively utilize the areas where oil and gas leases overlap with sage-grouse habitats and populations. For example:
• "[T]he Wyoming September 2018 lease sale contains parcels within the Thunder Basin National Grassland, an area that I have visited repeatedly and for which I have advocated strong conservation protections since 2001. I have viewed sage-grouse in this area, camped and hiked in this area, and engaged in photography of this area." Molvar Decl. ¶ 47 (Dkt. 30-3).
• "The Wyoming December 2018 lease sale contains parcels in Kinney Rim and Adobe Town that are not only priceless due to their outstanding archaeological, scenic, and paleontological values, but also for the excellent sagebrush steppe habitat they provide for sage-grouse. ... I have extensively explored these areas both as part of my professional efforts to advocate for their protection and for personal recreation over the past two decades or more." Id. at ¶ 49.
• "The June 2018 Nevada lease sale on the Battle Mountain District also includes parcels I have visited in my yearly sage-grouse viewing trips in March, which provide important sage-grouse habitat. I frequently travel to Nevada, including to Monitor Valley, where oil and gas leasing is proposed. I have viewed and photographed sage-grouse on a lek (sage-grouse mating ground) in Monitor Valley that is adjacent to one of the lease parcels in years past, and plan to return there in 2019 and other future dates in hopes of viewing this iconic species." Id. at ¶ 50.
• "On several occasions, I have visited the area where the Normally Pressured Lance (NPL) oil and gas development is proposed .... During these visits, I have engaged in wildlife viewing - particularly pronghorn and golden eagles, looked for sage-grouse, and enjoyed the unspoiled scenic vistas and undisturbed sage-grouse habitats in these areas. Major portions of the NPL project area are Priority Habitat Management Areas designated under the Wyoming Greater Sage-Grouse RMP Amendments, and/or winter concentration areas important for the entire sage-grouse population in the Upper Green River Valley." Id. at ¶ 51.
• "I have a long history of recreational experience traveling to and inventorying lands on Nevada BLM's Tonopah and Shoshone-Eureka Field Offices, *1222including extensive experiences viewing sage-grouse in the Little Fish Lake and Monitor Valleys where oil and gas leasing will occur as part of the June 2018 lease sale." Cunningham Decl. ¶ 12 (Dkt. 30-5).
• "I have in the past enjoyed hiking, birdwatching, wildlife-viewing, photography, field-sketching, and camping in several of the areas where June oil and gas lease sales are occurring, including: Monitor Valley, Little Fish Lake Valley, Hot Creek Valley, and Big Sand Springs Valley." Id. at ¶ 13.
• "I have been visiting the Monitor Valley every summer since 2006, and I plan to return this summer and in the future as often as I can during vacations. Seeing oil rigs in the vista would negatively impact my ability to escape artificial human developments and seek solitude, quiet, and natural wild landscapes. I have walked around Monitor Valley in the areas of oil and gas leases 006, 002, 011, and 014 to botanize, photograph scenic landscapes, and birdwatch on the valley floor. I plan to return to the Monitor Valley to explore new trailheads in the Monitor Range, and look for sage-grouse, in August 2018." Id. at ¶ 14.
• "I have camped in Little Fish Lake Valley in the green Monster trailhead that accesses the Table Mountain Wilderness Area in the Monitor Range, as well as at clear Creek trailhead, which accesses an impressive gorge on the east side of the Monitor Range overlooking Little Fish Lake Valley. This is in the vicinity of oil and gas leases 019 and 025, which I have traveled through to access hiking points and photographic vistas. Oil and gas drilling here would ruin the feel of wild, remote Nevada that I am seeking. I plan to go back here to camp and hike in July 2018." Id. at ¶ 15.
• "For recreational purposes I have hiked into the Hot Creek Range, camping in the mountains from an access road at South Sixmile Canyon by Morey Peak, driving through the Hot Creek Valley from Highway 6 at Tybo junction. This lies in numerous proposed oil and gas leases in Hot Creek Valley, and would impact my experience of camping and hiking in a remote area."Id. at ¶ 16.
• "I have toured the Hot Creek Canyon road that enters at Hot Creek Ranch in the vicinity of oil and gas leases 049, 045, and 048. This is a very scenic canyon with stream, meadows, cliffs, and rock formations. I have undertaken wildlife viewing here of desert bighorn sheep, viewing wild horses, landscape photography, botanizing, birdwatching, hiking, and camping. Oil and gas drilling at the mouth of this canyon would negatively affect my ability to escape the signs of industrial developments." Id. at ¶ 17.
• "I have hiked and camped at Lunar Crater Volcanic Field, which is south of the Big Sands Springs lease area, but in view of the lease area. I have visited this area several times since 1992. There is also a BLM-signed interpretive area ... that shows a relatively recent basalt volcanic flow in Big Sand Spring Valley that could be in lease areas 134 and 128. This area has a very remote and wild feel, and I come here to get away from urban developments and experience the spiritual renewal that wild central Nevada landscapes can provide. Oil and gas developments would destroy this feel." Id. at ¶ 19.
*1223• "I have visited many of the parcels offered in the Nevada June oil and gas lease sales during personal and professional trips and am gravely concerned about the impacts the sale and development of those parcels will have on the environment." Emmerich Decl. ¶ 26 (Dkt. 30-7).
• "I have hiked and camped in the vicinity of the following leases: 008, 009, 011, 006, 002, 014, 010, and 008 - Monitor Range and Monitor Valley. I have personally seen Greater sage-grouse in this part of Monitor Valley..... I have plans to visit Monitor Valley several times in the future. The development of these oil and gas leases will impact my visitor experience to Monitor Valley in the following ways ...." Id. at ¶ 27.
• "I have hiked and camped in the vicinity of the following leases: 053, 056, 058, 021, 022, 027, 025, 052, 050, and 019 - Little Fish Lake Valley. I have seen Greater sage-grouse here.... I have plans to visit Little Fish Lake Valley again in the future. The development of these oil and gas leases will impact my visitor experience to Little Fish Lake Valley in the following ways ...." Id. at ¶ 28.
• "I have hiked and camped in the vicinity of the following leases: 100, 111, 105, 097, 099, 049, 045, and 046 - the Hot Creek Range and Hot Creek Valley.... I have seen a Greater sage-grouse in this region.... I have plans to visit the Hot Creek Range and Hot Creek Valley in the future. The development of these oil and gas leases will impact my future visitor experience ...." Id. at ¶ 29.
• "I have hiked and camped in the vicinity of the following leases: 134, 138, 142, 136, and 101. The development of these oil and gas leases will impact my future visitor experience in the following ways ...." Id. at ¶ 30.
• "For educational, professional, and recreational purposes, I have camped, hiked, and viewed sage-grouse in Nevada's Monitor Valley, where, under the procedures established by IM 2018-034, oil and gas leases within greater sage-grouse Priority Habitat Management Areas were sold as part of BLM's June 2018 Nevada oil and gas lease sale." Saul Supp. Decl. ¶ 12 (Dkt. 63-2).
• "On May 15-16, 2018, I camped in the Monitor Valley on Mosquito Creek, and had the opportunity to view and photograph over ten greater sage-grouse exhibiting dancing behavior on a lek in the Monitor Valley north of Mosquito Creek. The Monitor Valley and Monitor Range provide extraordinary opportunities for solitude, natural beauty, and viewing of greater sage-grouse and pronghorn, and I intend to return again in the spring of 2019 to camp, hike, and attempt to observe greater sage-grouse."Id. at ¶¶ 13-14 (attaching photo).
• "The Monitor Valley is currently undisturbed by oil and gas exploration or development. Potential oil and gas exploration, development, and/or infrastructure authorized by BLM leasing activity will adversely affect the recreational and aesthetic qualities of the area, and has the potential to limit opportunities for continued greater sage-grouse viewing on the (currently-undisturbed) leks in the Valley." Id. at ¶ 16.
These individuals assert that past and future oil and gas leasing decisions, driven in-part by IM 2018-034's alleged accelerated timelines and detours around public participation, will cause aesthetic, recreational, *1224scientific, and spiritual injury across the sage-grouse range. Such statements support organizational standing. See Cottonwood Envtl. L. Ctr. v. U.S. Forest Serv. ,
Finally, independent of injuries related to the issuance of leases and the eventual development of oil and gas leases themselves, WWP members also provide in-depth accounts of how simply attempting to "comply" with IM 2018-034 over the past year has resulted in separate, tangible, procedural injuries. They describe having to devote more of otherwise limited personal and organizational resources in response to the abbreviated comment and protest periods. See, e.g. , Fuller Decl. ¶¶ 37-52 (Dkt. 30-4); Fuller Supp. Decl. ¶¶ 17-19 (Dkt. 63-1); Saul Decl. ¶¶ 21-46 (Dkt. 30-2); Saul Supp. Decl. at ¶ 11; see also infra. Even if Summers could be read to say that standing in procedural injury cases presupposes an implementing project as representing the necessary "concrete harm," the Ninth Circuit has since concluded otherwise. See Cottonwood ,
With all this in mind, the Court is persuaded that there is a sufficient basis for standing as presented in the current record.
2. IM 2018-034 is a Final Agency Action
The APA permits judicial review of "final agency action for which there is no other adequate remedy in a court."
In measuring the finality of an action, the "agency's characterization of its action as being provisional or advisory is *1225not necessarily dispositive"; instead, "courts consider whether the practical effects of an agency's decision make it a final agency action, regardless of how it is labeled." Columbia Riverkeeper v. U.S. Coast Guard ,
Federal Defendants argue that IM 2018-034 is not a final agency action because it does not meet either of the two prongs of the above-referenced Bennett test. See Fed. Defs.' Opp. to Mot. for PI 17. The Court disagrees.
a. IM 2018-034 Was the Consummation of BLM's Decision-Making Process
Stating that IM 2018-034 "merely establishes guidelines that BLM will follow in reviewing parcels for potential leasing," Federal Defendants argue that it ultimately "leaves considerable discretion to BLM state and field offices as to precisely what procedures to follow." Fed. Defs.' Opp. to Mot. for PI 18. But this position contradicts the actual language used within IM 2018-034 which is more edict in nature than "merely tentative or interlocutory...." For example, IM 2018-034:
• "sets out the policy of the Bureau of Land Management (BLM) to simplify and streamline the leasing process to alleviate unnecessary impediments and burdens, to expedite the offering of lands for lease, and to ensure quarterly oil and gas lease sales are consistently held in accordance with the Mineral Leasing Act (30 U.S.C. § 226 ), Executive Order 13783, and Secretary Order 3354." IM 2018-034, "Purpose" p. 1; see alsoid. at "Background" p. 4 (same).
• "supersedes existing policy announced in IM No. 2010-117, Oil and Gas Leasing Reform - Land Use Planning and Lease Parcel Reviews , issued on May 17, 2010, and replaces any conflicting guidance or directive found in the BLM Manual or Handbook."Id. at "Purpose" p. 1.
• "applies to the leasing of Federal minerals under Bureau of Land Management (BLM) administered surface, state-owned surface, and private surface estates."Id. at "Policy/Action" p. 1.
• "will be implemented across the BLM as described."Id. at p.1, n.1 .
• "(1) addresses land use planning, lease parcel review, lease sales and lease issuance, and IM implementation; and (2) directs the BLM to incorporate the revised policy, as appropriate, into affected BLM handbooks and manuals."Id.
• provides that "[t]he timeframe for parcel review for a specific lease sale is to be no longer than 6 months[,]" to "include adjudicating and creating the preliminary parcel list from all timely received EOIs and the other lands identified for leasing consideration in the NFLSS" except in unforeseen circumstances.Id. at § III.A p. 2.
• provides that, "[i]f, through the lease parcel review process, the authorized officer confirms that the proposed leasing action has been adequately analyzed in existing NEPA document(s) and is in conformance with *1226the approved RMP, a Determination of NEPA Adequacy (DNA) will be used to document NEPA compliance for the leasing decision."Id.
• provides that, "[i]f the BLM concludes that a DNA will adequately document that existing NEPA analysis is sufficient to support the proposed action and the action is consistent with the RMP, no further public comment period is required for the DNA."Id.
• establishes "[a] 10-day public protest period [that] will begin the day the sale notice is posted, along with applicable NEPA documentation" and "[p]arcels subject to protests that are not resolved (i.e., pending protests) will be offered for lease sale."Id. at § IV.B. p. 3
• "is effective immediately in order to achieve full compliance with the parcel review 6-month timeframe" and "will guide leasing procedures for all current and future parcels under review by the field offices as of the date of this IM."Id. at "Implementation Timeframe" p. 4.
In these provisions, IM 2018-034 goes beyond a general statement of policy; rather, it implements a required template for BLM's oil and gas leasing process in language that can only be understood as "finally determinative of the issues or rights to which it is addressed." Pacific Gas & Elec. Co. v. Fed. Power Comm'n ,
It can be said that IM 2018-034 is a patchwork of both policy and rule. See
Moreover, IM 2018-034 unequivocally replaces IM 2010-117 and was "effective immediately" (as of January 31, 2018) "across the BLM." See supra. Such definiteness lets the air out of any argument that IM 2018-034 operates only as provisional guidance. See, e.g. , Chiang v. Kempthorne ,
Together, these considerations support the conclusion that IM 2018-034 was the consummation of BLM's decision-making process - the first Bennett final agency action prong.
b. IM 2018-034 Determines Rights/Obligations and Has Legal Consequences
Federal Defendants argue that IM 2018-034 does not determine rights or obligations nor does it have legal consequences because it is only "a general statement of policy," infused with discretion throughout. Fed. Defs.' Opp. to Mot. for PI 18-19 ("IM 2018-034 does not create new binding substantive requirements and it gives BLM officials ample discretion in conducting the leasing process - in fact, it gives BLM more discretion than the previous guidance in IM 2010-117."). But this self-serving position largely ignores the definitive pronouncements contained within IM 2018-034 that more accurately frame the scene. Those directive provisions make clear that IM 2018-034 is markedly different than IM 2010-117, and illustrate that IM 2018-034 expressly changes how BLM conducts its oil and gas leasing. See supra. Where there once was no deadline for BLM review of nominated lease parcels, IM 2018-034 now imposes a 6-month review period; where public participation in the NEPA review process was absolutely permitted, IM 2018-034 now leaves whether to have any public participation to BLM's discretion; where there was a 30-day public review and comment period for every lease sale, IM 2018-034 now eliminates that requirement; and, where there had been a 30-day protest period, IM 2018-034 now imposes a 10-day deadline for public protests of proposed lease sales, including sales as to which no specific prior public participation had been allowed. Compare IM 2010-117 §§ III.A, III.C.7, III.E, IV.B, with IM 2018-034 §§ III.A, III.B.5, III.D, III.H.
Even if some strands of discretion are involved in the layers of these provisions, they collectively prescribe and require an unmistakably different regulatory framework in which BLM now handles its oil and gas lease parcel reviews and leasing decisions and, likewise, in which WWP is (or, WWP contends, is not) able to participate in the same. As such, IM 2018-034 has practical effects on both BLM and WWP's rights and obligations in a manner different than IM 2010-117. See, e.g. , W. Energy All. v. Salazar ,
*1228Additionally, legal consequences necessarily flow from the changes included within IM 2018-034 - namely, the shortened protest deadline (from 30 to 10 days). As described by WWP in its briefing, if interested parties "do not comply with this highly-abbreviated time-frame, they risk losing the ability to challenge a lease sale later, either through administrative appeal or in federal court." WWP's Reply ISO Mot. for PI 6 (Dkt. 63). The result of an untimely protest may be the same under either IM, but the fact that the IM 2018-034 deadline is only one-third as long as previously prescribed (and a ten day period which includes non-business days) greatly increases the peril of a member of the public missing the deadline, or being unable to finish the work upon a protest within the time period allowed. This risk is compounded by the overlapping comment and protest periods, combined with accelerated oil and gas lease parcel reviews generally, all of which are left in the wake of IM 2018-034. See, e.g. , Ex. 1 to Stellberg Decl. (illustrative table setting forth schedules for September 2018 and December 2018 oil and gas lease sales in BLM's western states, including public comment opportunities and protest deadlines). Plus, the burden of such constraints upon public participation and compressed protest periods falls most heavily upon members of the public, as those who have nominated potential lease parcels and BLM have had far more time to evaluate and consider the details of such parcels. Hence, there are cognizable and significant legal consequences that can be argued to result from IM 2018-034.
IM 2018-034 impacts the parties' rights and obligations while also contributing to a different milieu of legal consequences. Therefore, the Court is satisfied that Bennett's second final agency action prong is also met. Set against that backdrop, IM 2018-034 is a final agency action. See Indus. Customers of Nw. Utilities v. Bonneville Power Admin. ,
3. WWP's Request for Injunctive Relief is Ripe
Ripeness is a justiciability doctrine designed "to prevent the courts, through avoidance of premature adjudication, from entangling themselves in abstract disagreements over administrative policies, and also to protect the agencies from judicial interference until an administrative decision has been formalized and its effects felt in a concrete way by the challenging parties." Abbott Labs. v. Gardner ,
" 'Absent [a statutory provision providing for immediate judicial review], a regulation is not ordinarily considered the type of agency action 'ripe' for judicial review under [the APA] until the scope of the controversy has been reduced to more manageable proportions, and its factual components fleshed out, by some concrete action applying the regulation to the claimant's situation in a fashion that harms or threatens to harm him ....' " Nat'l Park Hosp. Ass'n v. Dept. of Interior ,
To begin, WWP's claims extend beyond specific challenges to individual leases and leasing decisions:
Hence, the heart of the dispute is not solely about how a local BLM office handled a lease sale, but rather over the legal propriety of "national policies" that Plaintiffs contend have eroded protections for the sage-grouse and cut the public out of oil and gas planning on public lands.
....
It can reasonably be assumed, and Federal Defendants affirmatively contend, that there are state-specific interests in the discussed oil and gas lease sales. The subject-matter of this lawsuit, however, is much more expansive. Plaintiffs contend that, as to such sales (regardless of which state is involved), there are common violations of federal laws predicated on strategic policy directives from the Trump Administration, which, in turn, will result in cumulative impacts threatening sage-grouse across the sage-grouse range. The Plaintiffs' claims are not specific to any particular transferee district; hence, they argue, and the Court is persuaded, that nothing about the fact of the lease sales (and any corresponding local interest in the same) raises a compelling argument in favor of transfer. In short, they exist independently from whether Federal Defendants complied with federal law; the leases may be local, but the challenged national policies that created them are not.
Plaintiffs do seek to upend the lease sales, but their challenges are not focused directly upon those sales. Hence, the fact that there is a remedy that seeks to prevent such sales is a piece of the venue analysis. It is not, however, a dispositive piece, as Plaintiffs' more far-reaching claim is that Defendants' oil and gas lease polices are fundamentally rotten to the core when it comes to sage-grouse protections.
9/4/18 MDO 9, 11, n.10 (Dkt. 66) (internal quotation marks and citations omitted); see also supra (discussing WWP's standing). As WWP reiterates, the "final agency action challenged in this Motion for Preliminary *1230Injunction is IM 2018-034." WWP's Reply ISO Mot. for PI 12. In that focus, no further administrative action or further factual development is needed, and hence there is nothing to be considered under the second and third prongs in Ohio Forestry's ripeness analysis. The decision in Cottonwood confirms as much:
Judicial intervention does not interfere with further administrative action when an agency's decision is "at an administrative resting place." Citizens for Better Forestry v. U.S. Dep't of Agric. ,341 F.3d 961 , 977 (9th Cir. 2003). Further, no additional factual development is necessary after a procedural injury has occurred. See Ohio Forestry Ass'n ,523 U.S. at 737 ,118 S.Ct. 1665 ... (holding that a procedural dispute is ripe "at the time the [procedural] failure takes place.").
The Forest Service's arguments rest on the false premise that Cottonwood is pursuing a substantive ESA claim. As explained above, Cottonwood does not argue for a particular substantive result, but rather alleges that the Forest Service failed to comply with the procedural requirements of the ESA when it declined to reinitiate consultation. When a party such as Cottonwood suffers a procedural injury, it "may complain of that failure at the time the failure take place, for the claim can never get riper."Id. at 737 ,118 S.Ct. 1665 .... The imminence of project-specific implementation "is irrelevant to the ripeness of an action raising a procedural injury." Citizens for Better Forestry , 341 F.3d at 977 ; see also Seattle Audubon Soc'y v. Espy ,998 F.2d 699 , 703 (9th Cir. 1993). Because the alleged procedural violation - failure to reinitiate consultation - is complete, so too is the factual development necessary to adjudicate the case. See [W. Watersheds Project v.] Kraayenbrink , 632 F.3d [472], 486 [ (9th Cir. 2011) ].
Cottonwood ,
Logically then, BLM's ongoing utilization of IM 2018-034 - in and of itself - causes hardship to WWP. See Cottonwood ,
For these reasons, WWP's request for injunctive relief is ripe.
B. WWP Is Likely to Succeed on the Merits
1. Legal Framework
WWP alleges that Federal Defendants violated FLPMA and NEPA by (1) adopting *1231IM 2018-034 without undertaking notice-and-comment rulemaking,
a. FLPMA
In enacting FLPMA in 1976, "Congress declared that it is the policy of the United States to manage the public lands 'in a manner that will protect the quality of scientific, scenic, historical, ecological, environmental, air and atmospheric, water resource, and archeological values.' " Ctr. for Biological Diversity ,
To help achieve these purposes, FLPMA requires that land use plans (known as Resource Management Plans ("RMPs") for BLM lands) be developed with "public involvement" and then used in managing the public lands. See
In exercising his authorities under this Act, the Secretary, by regulation, shall establish procedures, including public hearings where appropriate, to give ... the public adequate notice and an opportunity to comment upon the formulation of standards and criteria for, and to participate in, the preparation and execution of plans and programs for, and the management of, public lands.
b. NEPA
NEPA "establishes a 'national policy [to] encourage productive and enjoyable harmony between man and his environment,' and was intended to reduce or eliminate environmental damage and to promote 'the understanding of the ecological systems and natural resources important to' the United States." Dep't of Transp. v. Pub. Citizen ,
At the core of NEPA is the requirement that agencies prepare a detailed statement - an Environmental Impact Statement ("EIS") - in connection with "proposals for ... major Federal actions significantly affecting the quality of the human environment."
If an agency is unsure if an EIS is required (i.e. , unsure if the proposed project will have a significant effect on the human environment), it may first prepare an Environmental Assessment ("EA") to assist in making that decision.
The salutary and critical role of the NEPA process has been described in myriad agency decisions and court decisions over many decades. When properly implemented, NEPA procedures "ensure[ ] that the agency will inform the public that it has indeed considered environmental concerns in its decision-making process." Balt. Gas & Elec. Co. v. Nat. Res. Def. Council ,
2. IM 2018-034 is Procedurally Invalid
IM 2018-034 was not preceded by a public notice and comment period before being implemented by BLM. WWP says that, because there was no notice and comment at the outset, IM 2018-034 was "dead on arrival" under both FLPMA and NEPA. See WWP's Mem. ISO PI 17-20. Federal Defendants say that this fact is inconsequential because of their position that IM 2018-034 "is a statement of policy and did not require notice and comment rulemaking." Fed. Defs.' Opp. to Mot. for PI 25.
Under the APA, an agency generally must use notice and comment procedures to make any "rule."
There is space to argue both sides of the issue if only piecing out the content of IM 2018-034's wording. But, for reasons already articulated, IM 2018-034 is not a general statement of policy. It is written in binding terms. It is treated as binding in the field. See supra. Though it permits discretion in limited measure, it allows for no discretion as to essential details, e.g. a 6-month review period; no automatic public participation in the NEPA review process; elimination of a 30-day public review and comment period for each proposed lease, and imposition of a shortened, 10-day, protest period. See supra. These are requirements (not general statements of policy) for oil and gas leasing on BLM-administered lands.
As previously discussed, these procedures did not follow notice and comment rulemaking. IM 2018-034 thus fails FLPMA's requirement that "the Secretary, by regulation , shall establish procedures ... to give the ... the public adequate notice and an opportunity to comment upon the formulation of standards and criteria for, and the management of, the public lands."
Plaintiffs correctly assert that Congress has mandated implementation of the public participation provisions by regulation, leaving no discretion to the agency. Congress has addressed this precise question. Both sections 309(e) and 202(f) of FLPMA use the imperative "shall" and specify that their public participation opportunities will be established "by regulation." If the intent of Congress is clear, that is the end of the matter; for the court, as well as the agency, must give effect to the unambiguously expressed intent of Congress."
Defendants respond to these undeniable facts by suggesting that plaintiffs' insistence on the protection provided by regulations "trivialize[s] Section 309(e) of FLPMA since public participation procedures are spelled out in an agency handbook, and the handbook cannot be changed such as to terminate public participation without violating the Federal Advisory Committee Act. Whether or not the stability of the current public participation rules is adequately guaranteed without additional regulations is a policy question. Congress left the Secretary no discretion in how to provide that guarantee: notice and comment rulemaking. Consequently plaintiffs' Motion for Summary Judgment must be granted.
Jamison ,
Consistent with Jamison , IM 2018-034 did not adhere to FLPMA's requirement *1235concerning notice and comment rulemaking.
3. IM 2018-034 Improperly Constrains Public Participation in BLM Oil and Gas Leasing Decisions
It is well-settled that public involvement in oil and gas leasing is required under FLPMA and NEPA. See Kraayenbrink ,
FLPMA and NEPA parallel each other in their emphasis upon public participation, and their statutory framework reads largely in unison on such a requirement. For example:
• "In exercising his authorities under this Act, the Secretary, by regulation, shall establish procedures, including public hearings where appropriate, to give ... the public adequate notice and an opportunity to comment upon the formulation of standards and criteria for, and to participate in, the preparation and execution of plans and programs for, and the management of, the public lands. "43 U.S.C. § 1739 (e) (emphasis added).
• "The Secretary shall allow an opportunity for public involvement and by regulation shall establish procedures, including public hearings where appropriate, to give ... the public adequate notice and opportunity to comment upon and participate in the formulation of plans and programs relating to the management of the public lands. "43 U.S.C. § 1712 (h) (emphasis added).
• "The term 'public involvement' means the opportunity for participation by affected citizens in rulemaking, decision-making, and planning with respect to the public lands , including public meetings or hearings held at locations near the affected lands, or advisory mechanisms, or such other procedures as may be necessary to provide public comment in a particular instance."43 U.S.C. § 1702 (d) (emphasis added).
• "Federal agencies shall to the fullest extent possible ... [i]mplement procedures to make the NEPA process more useful to decision-makers and the public" and "[e]ncourage and facilitate public involvement in decisions which affect the quality of the human environment. "40 C.F.R. § 1500.2 (a), (d) (emphasis added).
*1236• "NEPA procedures must insure that environmental information is available to public officials and citizens before decisions are made and before actions are taken. The information must be of high quality. Accurate scientific analysis, expert agency comments, and public scrutiny are essential to implementing NEPA ...."40 C.F.R. § 1500.1 (b) (emphasis added).
• "In determining whether to prepare an environmental impact statement the Federal agency shall ... [if the proposed action is not covered by paragraph (a) of this section], prepare an environmental assessment. The agency shall involve environmental agencies, applicants, and the public, to the extent practicable , in preparing assessments required by § 1508.9(a)(1)." 40 C.F.R. 1501.4(b) (emphasis added).
• "Agencies shall [m]ake diligent efforts to involve the public in preparing and implementing their NEPA procedures [and] solicit appropriate information from the public. "40 C.F.R. § 1506.6 (a), (d) (emphasis added).
On a very fundamental level, it strains common sense to see how these requirements are fulfilled when just comparing IM 2018-034 to IM 2010-117. That is, how can it be said that IM 2018-034 provides the required public participation "to the fullest extent possible" and "to the extent practicable," when it is dramatically more restrictive (at least on the issue of public participation) than the previously-established IM (IM 2010-117) it only recently replaced?
Further, and more obviously, IM 2018-034 eliminates the prior requirement contained in IM 2010-117 that BLM "[s]tate and field offices will provide for public participation as part of the review of parcels identified for potential leasing through the NEPA compliance documentation process," swapping in its place the more discretionary "may provide for public participation during the NEPA process ....". Compare IM 2010-117 § III.C.7, with IM 2018-034 § III.B.5 (emphasis added). Discretionary public participation opportunities are not consistent with FLPMA and NEPA. See W. Watersheds Project v. Kraayenbrink ,
This concern is heightened because IM 2018-034 also departs from IM 2010-117 by declaring that public comment is not required in lease sales in which the agency issues a Determination of NEPA Adequacy ("DNA"),
The Ninth Circuit has ruled that federal agencies "must provide the public with sufficient environmental information, considered in the totality of circumstances, to permit members of the public to weigh in with their views and thus inform the agency decision-making process." Bering Strait Citizens for Responsible Res. Dev. v. U.S. Army Corps of Eng'rs ,
There is, to be sure, room for differing viewpoints about how federal lands are to be managed, and how the resources of federal lands are to be used. Conflicts are not unusual over decisions made by federal agencies, such as BLM, who have the responsibility to make those decisions and there is a well-understood zone of discretion in the law that is given to agencies in the consideration, making, and implementation of such decisions. As referenced earlier in this Memorandum Decision and Order, that discretion is hard-baked into the APA. See supra (citing
But in this case, the record contains significant evidence indicating that BLM made an intentional decision to limit the opportunity for (and even in some circumstances to preclude entirely) any contemporaneous public involvement in decisions concerning whether to grant oil and gas leases on federal lands. BLM has discretion in those spaces, so long as the decisions made meet the requirements of the law - specifically, here, FLPMA and NEPA. The evidence illustrates that the intended result of the at-issue decisions was to dramatically reduce and even eliminate public participation in the future decision-making process. Doing so certainly serves to meet the stated "purpose" of IM 2018-034 - that is, reducing or precluding public participation will "streamline the leasing process to alleviate unnecessary impediments and burdens, to expedite the offering of lands for lease ...." IM 2018-034, "Purpose" p. 1. Yet, the route chosen by BLM to reach that destination is problematic because the public involvement requirements of FLPMA and NEPA cannot be set aside in the name of expediting oil and gas lease sales. The benefits of *1239public involvement and the mechanism by which public involvement is obtained are not "unnecessary impediments and burdens."
In summary, IM 2018-034 is subject to judicial scrutiny under the APA as a reviewable agency action. And, where IM 2018-034 appears to be both procedurally and substantively invalid under FLPMA and NEPA, the APA is likewise implicated. The Court's findings on these points (as preliminary as they may be) are the product of applying the law to IM 2018-034's blueprint - which, when done, reveals that WWP has a reasonable likelihood of prevailing on its related FLPMA, NEPA, and APA claims. To be clear, this conclusion is grounded in the requirements of the statutes - the Court is not substituting its judgment in place of BLM's; nor, obviously, is the Court blindly rubber-stamping BLM's decisions.
C. WWP Is Likely to Suffer Irreparable Harm
Pointing to BLM's ongoing use of IM 2018-034 - with its shortened (or no) public comment and protest periods - WWP argues that it and the public will be irreparably harmed in three ways: (1) the environmental or aesthetic harms to public lands threatened by oil and gas leases; (2) the bureaucratic commitment to continued oil and gas leasing projects without unbiased examinations of their environmental impacts; and (3) the inability to fully and effectively contribute to whatever public participation process may take place due to IM 2018-034's significantly-compressed deadlines. See WWP's Mem. ISO Mot. for PI 30-35. The Court generally agrees.
IM 2018-034 limits WWP's ability to participate in the oil and gas leasing process, likely causing WWP (and groups like WWP) irreparable harm in the absence of an injunction. See, e.g. , Kraayenbrink ,
There is traction to WWP's argument that, even though a lease sale and subsequent lease issuance may not automatically authorize any on-the-ground disturbance (see Fed. Defs.' Opp. to Mot. for PI 34-35), the decision by BLM to commit to a particular outcome before completing a full NEPA analysis may foreclose or diminish the prospect for an open-minded examination of alternatives down the road. See WWP's Mem. ISO Mot. for PI 32-34; see also WWP's Reply ISO Mot. for PI, 21 ("The further the agency advances toward an outcome, the harder it will be to convince the agency to change direction. In the NEPA context, that risk is not purely procedural but rather grounded in the environmental harm caused by an outcome chosen through inadequate deliberation.")
*1240(emphasis in original). Federal courts elsewhere have held, sensibly in this Court's view, that "bureaucratic momentum" can support an argument of irreparable harm in circumstances similar to the instant record. For example, in Sierra Club v. Marsh ,
[T]he harm at stake is a harm to the environment , but the harm consists of the added risk to the environment that takes place when governmental decision-makers make up their minds without having before them an analysis (with prior public comment) of the likely effects of their decision upon the environment. NEPA's object is to minimize that risk, the risk of uninformed choice, a risk that arises in part from the practical fact that bureaucratic decision-makers (when the law permits) are less likely to tear down a nearly completed project than a barely started project.....
....
A district court, when considering a request for a preliminary injunction, must realize the important fact of administrative life ...: as time goes on, it will become ever more difficult to undo an improper decision (a decision that, in the presence of adequate environmental information, might have come out differently). The relevant agencies and the relevant interest groups ... may become ever more committed to the action initially chosen. They may become ever more reluctant to spend the ever greater amounts of time, energy and money that would be needed to undo the earlier action and to embark upon a new and different course of action. Given the realities, the farther along the initially chosen path the agency has trod, the more likely it becomes that any later effort to bring about a new choice ... will prove an exercise in futility.
....
To repeat, the harm at stake in a NEPA violation is a harm to the environment , not merely to a legalistic "procedure," nor, for that matter, merely to psychological well-being. The way that harm arises may well have to do with the psychology of decision-makers, and perhaps a more deeply rooted human psychological instinct not to tear down projects once they are built. But the risk implied by a violation of NEPA is that real environmental harm will occur through inadequate foresight and deliberation. the difficulty of stopping a bureaucratic steam roller, once stared, seems to us ... a perfectly proper factor for a district court to take into account in assessing that risk, on a motion for a preliminary injunction.
The Court sees good reason to follow the lead of these other courts and concludes that an incomplete observance of environmental laws and procedure (through abbreviated NEPA reviews and less complete public comments or none at all), aided by agency inertia, combine to create irreparable harm. The Court is aware that WWP has made its views known (at least to some degree) in various of the upcoming (or recently completed) oil and gas lease sales. See, e.g. , Wells Decl. ¶ 3 (table identifying September and December oil and gas lease sales along with comment schedules and fact of comments made); Ex. 1 to Stellberg Decl. (same); see also Def.-Interv. WEA's Sur-Reply to Mot. for PI 6-7 ("Plaintiffs request for injunctive relief for the September oil and gas lease sales is moot. Plaintiffs submitted detailed comments for the High Plains District EA and the Second WY EA during the comment periods..... Simply put, Plaintiffs' claim of injury due to an allegedly compressed comment period simply does not hold up to the facts of this case."). However, the fact of such comments, without more, does not mean that WWP has meaningfully contributed, or as meaningfully as it could contribute in a different public participation framework, to the leasing decision process given the framework contained in IM 2018-034. The Court is satisfied that, on this record, WWP is likely to suffer irreparable harm in the absence of an injunction.
D. The Balance of Hardships Alongside the Public Interest Favors an Injunction for the Fourth Quarter Oil and Gas Lease Sales, But Not for the Third Quarter Oil and Gas Lease Sales
Where environmental injury is established, the Court must still engage in the traditional balancing of harms test before entering an injunction, which includes a consideration of the economic injuries that will result from imposition of an injunction. See *1242Idaho Conserv. League v. Atlanta Gold Corp. ,
WWP contends that it has attempted to carefully style its requested injunctive relief, in that WWP seeks to prohibit Federal Defendants from implementing four provisions of IM 2018-034 in relation to third and fourth quarter (September and December) 2018 oil and gas lease sales and beyond; and to require, instead, that BLM follow provisions in IM 2010-117 which deal with the same subjects. See supra. WWP contends that it "do[es] not seek to halt any lease sale or reverse any lease upon this injunction motion." WWP's Reply ISO Mot. for PI, 1. Notwithstanding whatever description WWP assigned to the request, the Court concludes that WWP's Motion essentially requests that, moving forward, Federal Defendants be required to comply with IM 2010-117 and not IM 2018-034.
The record indicates that the majority of (if not all) third quarter 2018 lease sales are either completed or in their final stages. See Fed. Defs.' Opp. to Mot. for PI 39 (as of August 10, 2018: "Plaintiffs ignore the fact that for most of the upcoming lease sales in September, the NEPA process has already occurred, and the protest period is already underway.") (citing Wells Decl. ¶ 3 (identifying "sale dates" of September 5-6, 11, 18-20, 2018); see also Ex. 1 to Stellberg Decl. (same). This is significant because, given the timing of the litigation notwithstanding its expedited handling, WWP's requested relief arguably seeks to unwind completed or nearly-completed sales. Regardless of whether WWP seeks - directly or indirectly - such relief as to completed or nearly-completed sales, imposing such requirements on BLM as to such sales at this point in time would upend the time, effort, and expense expended by Federal Defendants and other involved parties in preparing for the third quarter lease sales. See Wells Decl. ¶¶ 4-8 (discussing BLM resources devoted to preparing for September lease sales, noting that "[d]elaying the September lease sales would cause business uncertainty and disrupt those planning and protest efforts, and result in a waste of the associated private resources" and require BLM "to post amendments to their notices of competitive lease sales and issue press releases to inform the public of the postponements and announce the new comment and protest periods."); see also Def.-Interv. Wyoming's Opp. to Mot. for PI 8-11 (Dkt. 50) (discussing Wyoming's and its citizens "substantial socioeconomic benefits from federal oil and gas leasing);
As previously described, WWP has participated in some number of the public comment periods leading up to the September lease sales. WWP will have opportunity to protest leases that have been or are soon to be issued. All in all, and on the current record, the Court concludes that the balance of hardships and the public interest do not support a preliminary injunction affecting the further denouement of the third quarter oil and gas lease sales.
*1243However, the equation changes when applied to the fourth quarter oil and gas lease sales, and subsequent sales. The Federal Defendants and some entities represented by the Intervenor Defendants may well be working on or have completed work connected to such sales. See Wells Decl. ¶¶ 4, 7, 8. Even so, such sales are sufficiently in the future that the importance of the hardships faced by WWP and others, who would involve themselves in the public participation process concerning upcoming sales along with the overall public interest, outweigh the interests of the Defendants.
E. The Preliminary Injunction Will Be Geographically Limited
Though an extraordinary remedy, a preliminary injunction is proper in this instance. Still, its scope must be narrowly and specifically tailored to fit the dispute that gives rise to its issuance, and not more. See Stormans, Inc. v. Selecky ,
This case is tied to oil and gas leases that affect greater sage-grouse habitats.
F. A Bond is Justified
Rule 65(c) states that a preliminary injunction may issue "only if the movant gives security in an amount that the court considers proper to pay the costs and damages sustained by any party found to have been wrongfully enjoined or restrained." Fed. R. Civ. P. 65(c). Plaintiffs argue that, as "non-profit environmental groups seeking to advance the public interest in this litigation[,] ... the Court should waive the bond requirement, or impose a nominal bond of $100 under the public interest exception to [ Rule] 65(c)." WWP's Mem. ISO Mot. for PI 37 (citing *1246Barahona-Gomez v. Reno ,
The decision as to whether to require security, and how much, is a discretionary task. See Johnson v. Couturier ,
There is a line of cases, not referenced by any of the parties, that hints at a so-called "NEPA exemption" to the bond requirement. See Earth Island Inst. v. U.S. Forest Serv. ,
In the instant case, neither WWP nor CBD has provided information concerning its financial condition even though, as non-profit corporations, federal law requires that their recently filed Form 990 returns be available for public inspection. Hence, their financial status is not clear from the record, and the contention that they are non-profit environmental groups is not a basis to conclude that they possess insufficient resources to post a bond when seeking injunctive relief.
Although this nettlesome issue is sometimes glossed over, it was touched upon in the Earth Island decision. There, the intervenor defendants pointed out that the plaintiffs' (also non-profit environmental groups) 2004 published tax returns show total year-end assets of $5.99 million for Earth Island Institute and $2.35 million for the Center for Biological Diversity (also a Plaintiff in this case) and argued *1247that the plaintiffs " 'should be able to afford a sizeable bond' without potentially thwarting the viability of environmental citizen actions." See Earth Island ,
There is, in addition to those uncertain details, the further uncertainty of what "costs and damages" will be "sustained" by BLM if, after the case is fully considered on the merits, it is found that BLM was wrongfully enjoined or restrained. That is the touchstone of Rule 65(c). BLM has contended that there will be need for, in effect, some backtracking in developing and posting updated sales schedules as well as the need to publish press releases to inform the public of the extensions of the comment/protest periods. See Wells Decl. ¶¶ 7-8. There perhaps would be some overlap of personnel effort from what has been done to what needs to be done, and perhaps some additional hard costs, but in an electronic communication age any such hard costs would be minimal. The time and effort of employees in doing that rewind would also be minimal, as the details of the changes are limited and the revised process by which the potential sales will be considered and implemented is already a path on the agency's floorboards. Further, as to the effort already expended on such potential sales by persons or entities connected to the Defendant-Intervenors, there is no reason to believe that any of that effort and expense will go to waste. If the circumstances after a greater opportunity for public involvement support a sale, then the sale will occur. If the circumstances after a greater opportunity for public involvement do not support a sale, or result in BLM placing conditions for the sale to meet other responsibilities of the agency in regard to protecting sage-grouse or other environmental interests, then the purposes of FLPMA and NEPA have been met and there is little if any room for a potential lessee, or a successful lessee, to feel aggrieved.
In consideration of the matters described above, and in the exercise of the Court's discretion, the Court concludes that a bond amount of $10,000.00 is sufficient in this case.
V. ORDER
Based on the foregoing, IT IS HEREBY ORDERED that Plaintiffs' Motion for Preliminary Injunction (Dkt. No. 30) is GRANTED, in part, and DENIED, in part, as follows:
1. Plaintiffs' Motion for Preliminary Injunction is GRANTED and therefore a preliminary injunction is issued, enjoining and restraining the Government Defendants *1248and those persons and entities described in Rule 65(d)(2), in this manner:
a. For fourth quarter/December 2018 (and succeeding) oil and gas lease sales, IM 2018-034, Section III.B.5 - "Public Participation" is enjoined and replaced with IM 2010-117, Section III.C.7 - "Parcel Review Timeframes."
b. For fourth quarter/December 2018 (and succeeding) oil and gas lease sales, IM 2018-034, Section III.D - "NEPA Compliance Documentation" is enjoined and replaced with IM 2010-117, Section III.E - "NEPA Compliance Documentation."
c. For fourth quarter/December 2018 (and succeeding) oil and gas lease sales, IM 2018-034, Section IV.B - "Lease Sale Parcel Protests" is enjoined and replaced with IM 2010-117, Section III.H - "Lease Sale Parcel Protests."
d. The preliminary injunction applies only to oil and gas lease sales contained in whole or in part within the Sage-Grouse Plan Amendments' recognized "Planning Area Boundaries" encompassing "Greater Sage-Grouse Habitat Management Areas."
2. Plaintiffs' Motion for Preliminary Injunction is DENIED insofar as:
a. IM 2018-034 applies to the third quarter/September 2018 oil and gas lease sales; no part of IM 2010-117 will be applied to the third quarter/September 2018 oil and gas lease sales.
b. For fourth quarter/December 2018 (and succeeding) oil and gas lease sales, IM 2018-034, Section III.A - "Parcel Review Timeframes" will not be enjoined and will not be replaced with IM 2010-117, Section III.A - "Parcel Review Timeframes."
3. No later than the close of the Court's business day on September 28, 2018, Plaintiffs are required pursuant to Rule 65(c) to post $10,000.00 as security, in cash or by surety in a form compliant with applicable federal law.
There is an arguably uncertain interplay between Cottrell's "sliding scale" approach and the Winter factors. However, even if certain Winter factors, in the exercise of a trial court's discretion, may serve to overcome less obvious (or perhaps inapplicable) factors under Cottrell , a preliminary injunction cannot issue without a threshold showing of a substantial claim to relief.
Germane here, IM 2018-034 goes on to describe certain of the "following steps" in more compulsory terms. See, e.g. IM 2018-034, § III.B.1 ("State/field offices will gather and evaluate existing environmental resource information and compile documentation of compliance with applicable laws, regulations, and executive orders ....) (emphasis added); id. at § III.B.2 ("State/field offices will determine whether leasing the parcel is in conformance with the RMP.") (emphasis added). While somewhat incongruous against the arguments put forward by the Government Defendants, these details are not dispositive on the question of whether IM 2018-034 is a final agency action.
Federal Defendants argue that Western Energy Alliance is inapplicable because IM 2018-034 "does not establish binding norms and instead leaves to BLM's discretion what procedures to follow at various steps in the review process." Fed. Defs.' Opp. to Mot. for PI 19, n.5. But the fact of BLM's discretion now under IM 2018-034, in contrast to its lack of discretion under IM 2010-117, suggests that IM 2018-034 is a "final, binding, and substantive change to" IM 2010-117 - precisely what Western Energy Alliance contemplated.
The record indicates that IM 2010-117, which WWP seeks to re-implement by judicial order, also was adopted without notice and comment procedures. WWP acknowledges this, but contends that the Court can properly act within its discretion to require BLM to return to the procedures prescribed in IM 2010-117, and further contends that IM 2010-117 is "more consistent with FLPMA's mandates for public involvement in public lands decisions and were intended to improve BLM oil and gas leasing decisions ...." WWP's Mem. ISO Mot. for PI 19, n.10. The circumstances are incongruous, but so far as the Court is aware there has been no similar challenge to IM 2010-117.
On this point, Federal Defendants seem to argue that, because IM 2018-034 is already substantively compliant with NEPA, any upfront notice and comment period is unnecessary pursuant to either FLPMA or NEPA. See generally Fed. Defs.' Opp. to Mot. for PI 25-32. Those specific arguments are addressed later in this Memorandum Decision in the context of WWP's additional claim that IM 2018-034 improperly limits public participation.
Though raising this question in their briefing (see WWP's Reply ISO Mot. for PI 15), WWP has stated that "FLPMA Section 310 further directs BLM to follow APA rulemaking procedures. " WWP Mem. ISO Mot. for PI 18 (emphasis added) (citing
Federal Defendants question Jamison 's import here, arguing that, in Jamison , "the Department of the Interior, at the time of the suit, had not adopted regulations regarding public participation in the coal leasing process." Fed. Defs.' Opp. to Mot. for PI 26, n. 10. But, as WWP notes, BLM has similarly "[not] adopted comprehensive regulations regarding public participation in the oil and gas leasing process like those at issue in Jamison " (beyond the Department of Interior's adoption of "general NEPA regulations"). WWP's Reply ISO Mot. for PI 14. Federal Defendants offer no authority for equating NEPA's environmental review process to FLPMA Section 309(e).
It is not necessary for the Court to rule upon whether IM 2018-034 violates the notice and comment procedures required under CEQ's NEPA regulations. See
In Kraayenbrink , the agency removed certain organizations from a list of "interested publics" who were to receive notice of issues concerning grazing allotments. The agency also eliminated public involvement from a variety of actions involving grazing, including "adjustments to allotment boundaries," "changes in active use," "emergency allotment closures," and the "issuance or renewal of individual permits or leases." Kraayenbrink ,
According to Federal Defendants, "[i]n some instances, BLM may rely on an existing NEPA document to satisfy its obligations under NEPA. In such instances, BLM will prepare a [DNA] to confirm that the environmental impacts of an action have already been analyzed in a prior NEPA document." Fed. Defs.' Opp. to Mot. for PI 5 (internal citations omitted).
Within its November 1, 2017 "Final Report: Review of the Department of Interior Actions That Potentially Burden Domestic Energy," the Department of Interior commented that, "[f]or too long, America has been held back by burdensome regulations on our energy industry," requiring the "[e]liminat[ion of] harmful regulations and unnecessary policies."
Federal Defendants understandably point out situations in which public participation existed with respect to upcoming lease sales. See Fed. Defs.' Opp. to Mot. for PI 27 ("In fact, for most of the upcoming September lease sales, BLM has provided for public participation in some form, either through comments on a draft EA or scoping comments.") (emphasis added) (citing Wells Decl. ¶ 3); see also Def.-Interv. WEA's Sur-Reply to Mot. for PI 4-7 (Dkt. 65-1) ("Importantly, Plaintiffs' supplementary declarations also ignore the fact that Plaintiffs were provided significant advance notice of the lease sales they seek to enjoin, and that Plaintiffs provided BLM with public comments on the lease sales .... Even more detrimental to Plaintiffs' allegations that the third and fourth quarter lease sales should be enjoined because IM 2018-034 prevents adequate notice and comment process is the fact that the NEPA process worked."). Even if true, these arguments ignore the flaws inherent in IM 2018-034 that do not dissolve away based upon what a federal agency has (or has not) done as to particular lease sales. But see infra (discussing harm and hardships).
The Court has given careful consideration to Federal Defendants' contention that IM 2018-034 is consistent with BLM's regulations. See Fed. Defs.' Opp. to Mot. for PI 25-26. But even if true, the regulations contain a floor, not a cap. FLPMA and NEPA variously require public participation "to the fullest extent possible" and "to the extent practicable." See supra.
Sierra Club clarified Commonwealth of Mass. v. Watt ,
"When the government is a party, [the balance of hardships and public interest factors] merge." Drakes Bay Oyster Co. v. Jewell ,
Though properly considered in deciding what best serves the public interest, Wyoming's tax/royalty revenue would not be eliminated if immediate future sales are conducted under some of the prior IM 2010-117 procedures. Such revenues are inchoate unless and until leases are issued and production obtained.
Weighing the nature of WWP's alleged organizational hardship is an imprecise task. WWP has submitted declarations stating that the changes in the oil and gas leasing process has disrupted the organization's usual work patterns, has caused difficulty in being able to meet the workload that has been created (in scope and in quality), and requires that some staff people work long hours and take time away from other responsibilities. Such difficulties may arise from a shortage of qualified personnel, or a lack of resources to hire additional staff people, or an internal decision about allocation of the organization's resources. But the hardships described in this record do not necessarily go away with IM 2010-117. Nor is the fact of having too much work to do in a short amount of time a hardship that is, for some reason, weightier than similar challenges faced by other litigants in the lawsuits that WWP brings. Perhaps WWP could hire more people or prioritize resources in a different manner. Those are the choices of the organization, not a place for supposition or imposition by the Court. Ultimately, however, such issues do not preclude entry of injunctive relief, given the full extent and nature of the irreparable harm involved here. See supra.
WWP filed a "suggestion" at the outset of this case, requesting that case be reassigned sua sponte to U.S. District Judge B. Lynn Winmill because of similar issues in two other sage-grouse-related cases Judge Winmill is presiding over. See Not. of Related Cases, 2-4 (Dkt 3) ("The present case and these two related cases all involve legal challenges over the conservation of greater sage-grouse on public lands administered by [BLM] .... Judge Winmill also has substantial experience and knowledge regarding greater sage-grouse science, public lands management, and conservation needs from other prior litigation, as referenced in the Complaint herein (¶ 25)..... That knowledge and experience is useful and directly relevant to the adjudication of the claims presented in this case, including because this case presents Second and Third Claims for Relief (Complaint ¶¶ 285-307) which allege that BLM is violating FLPMA, NEPA, and the APA in not applying the best available science in approving the oil and gas leasing and development decisions challenged in this case.").
Aside from noting the "several months preparing for the many lease sales" and the related time and effort involved with "postpon[ing] the lease sales and redo[ing] the NEPA public comment processes and protest periods for several different lease sales," Federal Defendants do not tender any substantive evidence on the issue, nor do they specifically respond to WWP's argument that Rule 65(c)'s security requirement be waived. The Defendant-Intervenors similarly focus upon the time, effort and expense expended by those who would bid upon such leases, if offered, and upon the revenues lost to the state and federal government and the affected states. See supra.
See, e.g., W. Watersheds Project v. Bureau of Land Mgmt. ,
This assumes that IM 2010-117's public participation provisions can be fulfilled within IM 2018-034's 6-month time-frame for parcel review. The record is undeveloped on this issue and/or the Court is not clear that the such provisions conflict.
Reference
- Full Case Name
- WESTERN WATERSHEDS PROJECT, and Center for Biological Diversity v. Ryan K. ZINKE, Secretary of Interior David Bernhardt, Deputy Secretary of Interior and United States Bureau of Land Management, an agency of the United States, and State of Wyoming Western Energy Alliance, Defendants-Intervenors.
- Cited By
- 4 cases
- Status