Boardwalk Apartments, L.C. v. State Auto Property & Casualty Insurance
Opinion of the Court
MEMORANDUM AND ORDER
This insurance coverage action arose out of a 2005 fire at Boardwalk Apartments, L.C.’s (“Boardwalk”) apartment complex in Lawrence, Kansas. Boardwalk was insured under a commercial property insurance policy issued by State Auto Property and Casualty Insurance Company (“State Auto”). The Policy’s business income, replacement cost, and coinsurance provisions were at issue in this case, the second of two lawsuits filed to resolve coverage disputes after the fire. The Court ruled on several matters on cross-motions for summary judgment, narrowing the issues to be decided at trial. Beginning on June 24, 2014, this case was tried to a jury. The jury returned verdicts in favor of Boardwalk on both breach of contract claims, calculating damages for each claim and finding consequential damages in the amount of $2,627,943. Before the Court is State Auto’s Motion to Alter or Amend Judgment Pursuant to Rule 59(e) and/or for Relief from Judgment Pursuant to Rule 60(b) (Doc. 358), which includes a request for remittitur. As described more fully below, the Court determines that the consequential damages award is excessive and conditions the denial of a new trial on the amount of consequential damages upon the acceptance by Boardwalk of a remitti-tur.
I. Background
The Boardwalk apartment complex in Lawrence, Kansas, was located on Frontier Way, which used to be called Fireside Drive. This dispute arises out of a fire that occurred on October 7, 2005 that destroyed Building 1 in the Boardwalk apartment complex. On March 27, 2006, State Auto filed a lawsuit on certain coverage issues against Boardwalk in the Western District of Missouri (“the Missouri Litigation”). The Missouri Litigation concluded on September 8, 2009. The Court determined on summary judgment that after the Missouri Litigation concluded, Boardwalk timely elected to rebuild Building 1. Boardwalk contended at trial that State Auto breached the insurance contract because it failed to pay the full amounts owed under the policy. Boardwalk sought the cost to replace Building 1, which Boardwalk contended at trial was $3,408,957. State Auto previously paid Boardwalk $2,128,794.17 as indemnity for Building 1, but Boardwalk contended in this lawsuit that State Auto owed it an additional amount for the replacement cost of Building 1. State Auto argued that the coinsurance provision of the Policy applied, reducing its obligation to pay the full re
Second, Boardwalk contended it was entitled under the insurance policy to its lost rental business income during the “period of restoration,” as well as consequential damages as a result of State Auto’s failure to pay what was owed to Boardwalk under the Policy. State Auto asserted a counterclaim that Boardwalk is not. entitled to any additional payments under the Policy because Boardwalk failed to cooperate with State Auto in the investigation or settlement of its claims. State Auto further asserted that Boardwalk’s actual business income losses are much lower than Boardwalk contended because Boardwalk should have replaced Building 1 more quickly than it did and because Boardwalk’s business income claim must be reduced by the interest income Boardwalk earned on the prior indemnity payment during the time it took to replace Building 1.
In the Pretrial Order entered on July 24, 2013, Boardwalk sought consequential damages on both of its breach of contract claims, including “increased business income losses and increased costs of construction due to building laws and ordinances passed during the pendency of litigation.”
On the replacement cost claim, Boardwalk requested the full replacement cost to rebuild Building 1 with no coinsurance, as well as “Additional Costs of Construction Due to Laws and Ordinances Regulating Reconstruction of Building 1,” to the extent that any limitation of coverage for these costs was deemed to be against Kansas public policy.
Boardwalk presented extensive evidence at trial about the business income losses on Building 1. Bello and Lesovitz testified as to their lost business income calculations and Randall Wilson testified on behalf of State Auto, presenting alternate calculations. In addition, Ernie Fleischer, the managing member of Boardwalk, testified that he wanted to rebuild Building 1 as soon as possible after the fire because he knew that the longer Building 1, the largest building in the complex, was vacant, the harder it would be to rent out the remaining units in the complex.
Prior to the jury instruction conference, the Court proposed to submit the following interrogatory to the jury on consequential damages based on its understanding that Boardwalk’s consequential damages claim was limited to business income loss on Building 1 that was in excess of the policy limit: “If the sum in answer to Question 1 [the replacement cost of Building 1] is greater than $2,128,794.17, did Boardwalk sustain “consequential damages” in the form of rental business income loss, as defined in Instruction [ ]?” Boardwalk moved to strike the language “in the form of rental business income loss, as defined in Instruction [ ]?” from this interrogatory, arguing that this was just one item of consequential damages sought by Boardwalk and supported by the evidence. Boardwalk pointed the Court to evidence that it was required to secure its own insurance valuation experts, Paul Werner and Joseph Lesovitz, and that it was required to acquire and maintain Fireside Drive as a result of code changes that occurred during the delayed insurance claim process.
At no point during the trial did Boardwalk request a specific amount of consequential damages, nor specify to the jury the categories of consequential damages it contended was supported by the evidence other than to reference ongoing maintenance of Fireside Drive. In his closing argument, counsel for Boardwalk referenced the profitability of the complex as follows:
We know from the charts after the fire that the entire complex went into a tailspin. Do you remember I showed Mr. Wilson? They were losing money every year after that fire, because Building 1 meant huge — it was huge in terms of profitability. Boardwalk is not seeking to recover its losses in relation to the entire complex, even though there obviously were additional damages. Not*1281 only did they lose the renters in Building 1, but it had to affect, adversely affect the other buildings. As I said before, with a football field long building that’s not there anymore, it obviously has.an effect. But we’re not asking for that, even though we could.11
And again, when discussing the saved expenses methodology on the business income claim, counsel pointed to State Auto expert Randall Wilson’s opinion that imputed “an even larger portion of savings” to Building 1 after the complex was demolished. He stated, “[t]hat would only be appropriate if Boardwalk was seeking lost rental for the entire complex, which they’re not.”
During deliberations, the jury presented three written question to the Court,
Second, the jury asked: “If we concludé there are consequential damages do we include the difference between the Replacement value & the $2.1mm advance in this amount with other damages?” The Court replied, after consultation with counsel, “You must 'be guided by Instruction Number 11, as well as Instruction Number 1, which instructs you to consider all the instructions as a whole.”
And third: “Will the jury be asked to provide explanation of our responses or to note the exhibits used to reach this decision?” The Court replied, after consultation with counsel, “No.”
The jury returned a verdict in favor of Boardwalk on both breach of contract claims — for replacement cost coverage and for business income loss. The verdict included a finding that the replacement cost of Building 1 was $3,914,727.50, that the value of the complex was an amount- that precluded application of the coinsurance provision, • that Boardwalk sustained $2,627,943 in consequential damages, that the Period of Restoration ended on August 21, 2011, that business income loss totaled $1,188,837.40, and that Boardwalk actually earned $99,706 in interest on the prior indemnity payment. The jury also found that Boardwalk did not fail to cooperate with State Auto during the investigation of its claims.
Based on the verdict, and after adjusting the damages awards for prior payments and deductibles, the Court entered Judgment in favor of Boardwalk and against State Auto oh July 10, 2014, in the following amounts: (1) $939,131.44 on the business income claim; (2) $1,785,933.33 on the replacement cost claim; and (3) $2,627,943.00 in consequential damages.
II. Discussion
The parties ’have filed extensive post trial briefs on several motions pending before the Court. State Auto challenges the consequential damages award in three of these motions: Motion for New Trial Pursuant to Rule 59(a) (Doc. 356), the instant Motion to Alter or Amend Judgment Pursuant to Rule 59(e) and/or for Relief from Judgment Pursuant to Rule 60(b) (Doc. 358), and its Renewed Motion for Judgment as a Matter of Law (Doc. 360). The renewed motion for judgment as a matter of law challenges, inter alia, the sufficiency of the evidence to support the conse
The Court heard oral argument on this, issue on November 18, 2014. Although the Court has considered the statements of counsel at oral argument in ruling on this motion, it will confine its analysis to the issues raised in the briefs, to which Boardwalk was allowed to respond. For example, at oral argument State Auto argued for the first time that consequential damages may not be awarded in an amount higher than the contract, and that Boardwalk could not recover consequential dant ages because of the doctrine of unclean hands. Neither argument is raised in the briefs and therefore the Court does not consider them.
The Court first addresses State Auto’s motion to alter or amend to based on unfair surprise and prejudice. The Court next considers the sufficiency of the evidence as to the consequential damages award, including State Auto’s request for remittitur, which must be considered as an alternative to a new trial. This is because “in an ordinary remittitur case, the plaintiff must be offered a choice between a new trial and accepting a remittitur to avoid a serious problem under the Seventh Amendment, which reserves to the jury the determination of damages.”
A. Unfair Surprise and Prejudice
A motion to alter or amend judgment pursuant to Rule 59(e) may be granted only if the moving party can establish: (1)an intervening change in the controlling law; (2) the availability of new evidence that could not have been obtained previously through the exercise of due diligence; or (3) the need to correct clear error or prevent manifest injustice.
(1) mistake, inadvertence, surprise, or excusable neglect;
(2) newly discovered evidence that, with reasonable diligence, could not have been discovered in time to move for a new trial under Rule 59(b);
(3) fraud (whether previously called intrinsic or extrinsic), misrepresentation, or misconduct by an opposing party;
(4) the judgment is void;
(5) the judgment has been satisfied, released or discharged; it is based on an earlier judgment that has been reversed or vacated; or applying it prospectively is no longer equitable; or
(6) any other reason that justifies relief.17
The Court agrees with Boardwalk that Rule 59(e) and 60 have a limited role in this post-trial analysis. Both are inappropriate grounds to challenge the sufficiency of the evidence on consequential damages, which instead must be consid
State Auto argues that the element of unfair surprise and prejudice here is based on the lack of notice in the Pretrial Order about the scope of consequential damages sought by Boardwalk. According to State Auto, Boardwalk is limited by the Pretrial Order to claim at most $588,755 in consequential damages based on the difference between Lesovitz’s alternative damages scenarios set forth in that document.
The Court disagrees with State Auto that the Pretrial Order limited the scope of consequential damages sought at trial by Boardwalk. The Pretrial Order made clear that Boardwalk sought all consequential damages that flowed from the breach, or were within the reasonable contemplation of the parties as resulting from the breach, i.e. the delayed payment for replacing Building 1. It made clear that Boardwalk sought additional business income losses in excess of the policy limit. It also made clear that it was seeking consequential damages for the maintenance of Fireside Drive, which Boardwalk acquired due to changes in laws and ordinances passed during the delay in payment. While increased law and ordinance costs were included in the replacement cost of Building 1, the costs to maintain the road were not, which is why these damages were sought “in addition to” the increased costs to comply with modern laws and ordinances passed in 2006 and 2008.
Moreover, the Pretrial Order, while controlling as to the parties’ claims and defenses, did not square off the specific amount of consequential damages Boardwalk could claim at trial. The Pretrial Order was entered in July 2013, before the Court’s summary judgment ruling, and before the Court ruled on State Auto’s Dau-hert motion with respect to Lesovitz. Based on those orders, the Court allowed both damages experts to amend their reports in order to address the Court’s ruling on interest income, a ruling that was unaccounted for at the time the Pretrial Order was drafted. As long as Boardwalk was able to show that the consequential damages it sought at trial derived from the breach — i.e. the delayed payment — those damages were sufficiently pled in the Pretrial Order and should not have come as an unfair surprise to State Auto.
B. Sufficiency and Excessiveness of the Consequential Damages Award and Request for Remitti-tur
State Auto challenges the consequential damages award as excessive and lacking an evidentiary basis and asks the Court to reduce the Judgment. This challenge is properly considered in the posture of a motion for remittitur.
In a diversity case such as this one, state law governs whether an award of damages is excessive or inadequate
The measure of damages recoverable for a breach of contract is limited to such as may fairly be considered as arising in the usual course of things from the breach itself, or as may reasonably be assumed to have been within the contemplation of the parties as the probable result of such a breach. The evidence allowed to support damages for breach of contract is the best evidence obtainable under the circumstances of the case to show the natural and ordinary consequences of the breach and which will enable the court or the jury to arrive at a reasonable estimate of the loss which resulted.27
Boardwalk contends that there was evidence of causation and damage on the following categories, sufficient to support the jury’s consequential damages award: (1) consequential business income loss on Building 1; (2) fees to obtain valuation of insurance losses of approximately $150,000 to Werner and Lesovitz; (3) architectural fees in the amount of $450,000 to Werner; (4) complex-wide rental income losses; (5) acquisition and maintenance of Fireside Drive as a result of code changes; and (5) interest and fees on a construction loan from Commerce Bank.
1. Additional Business Income Loss on Building 1
State Auto urges that Boardwalk is only entitled to recover consequential damages in the- form of business income lost after the period of restoration but before Building 1 was fully occupied. State Auto extrapolates the jury’s finding of a $16,799.24 loss figure for the thirty days after Building 1 was actually replaced,
Lesovitz testified about his business income loss findings for Building 1 under two scenarios. Under Scenario 1, he quantified rental income loss of $1,462,902 for the period October 7, 2005 through August 2011, assuming the historic rents of the former Building 1, which he testified slightly increased from 2006 through 2011 based on information he reviewed about the Lawrence, Kansas, market. In Scenario 2, Lesovitz quantified rental income loss of $2,051,656, assuming that a brand new building was built in the place of Building 1 in September 2006 that would have commanded higher-rents and higher occupancy rates. From October 2005 until October 2006, Scenario 2 relied on historic rental rates of former Building 1, and then starting in October 2006 through May 2012, relied on higher rent and occupancy rates.
State Auto argues that since Lesovitz’s two scenario timelines overlap, then Boardwalk could only recover consequential damages under Scenario 2 for the additional amount of rent over the historic rental rate between October 2006 and May 2012. State Auto argues that under this formula, Boardwalk’s damages could be no more than $588,754, the difference be-Iween Scenario 1 and Scenario 2. Boardwalk responds by arguing that instead, the jury could have simply subtracted its business income loss finding of $1,188,837.40, from Lesovitz’s Scenario 2 (after a reduction for the partial payment) to reach a consequential damages figure. After adjusting for interest earned and the prior payments, this would leave $962,514.56 as the amount of consequential.rental income damages Boardwalk would have earned had it been able to rebuild by September 2006, given Lesovitz’s Scenario 2 figures. Lesovitz testified that his figures were based on conservative assumptions.
The Court agrees with Boardwalk, that the jury could have reasonably relied on Lesovitz’s testimony that Scenario 2 represented consequential damages in the form of business income on Building 1 that would have exceeded historical rents, and would support $962,514.56 of the consequential damages given the jury’s actual damages finding. It is clear from the verdict that the jury found actual business income losses somewhere between the figures used by Bello in 2006, and the figurés used by Lesovitz in Scenario 1. The jury was entitled to credit and adjust the numbers provided by Lesovitz in awarding consequential damages even if it did not rely on those numbers to award actual damages, and the Court need not “run the exact numbers and calculations of a damages model with mathematical certainty.”
2. Insurance Valuation and Architectural Fees
State Auto concedes that there was evidence to support the insurance valuations and architectural fees to Werner and Le-sovitz.
3. Loss of Complex-Wide Business Income
As to complex-wide rental income, State Auto argues that there was no evidence of causation to support such damages because Boardwalk’s decision to demolish the other buildings was .not proximately caused by the fire. The Court finds that there was sufficient evidence of causation of complex-wide business income losses. The cause of Boardwalk’s consequential damages need not be the fire. The cause must derive from the breach — State Auto’s failure to pay the full replacement cost of Building 1. Boardwalk argues that it suffered complex-wide business income loss because Building 1 was the largest building in the middle of the complex and its demolition made it more difficult to rent out the other apartments remaining in the complex. Boardwalk points to Fleisher’s testimony that he wanted to rebuild Building 1 as soon as possible in order to avoid the lost rental income that he believed would result from a vacant lot where the biggest building in the complex once stood. And Lesovitz testified that while he did not quantify the complex-wide losses in either Scenario 1 or 2, those losses would have been much higher. Most probative, however, are the profit and loss statements offered by State Auto and discussed during Wilson’s testimony. Those profit and loss statements show that each year after the fire, the complex profits dropped dramatically, and by 2009, the complex was operating at a loss. The Court agrees that based on this evidence, the jury could have concluded that State Auto should have reasonably anticipated that delaying payment on the replacement cost claim would adversely affect Boardwalk’s business income on the other buildings in the complex.
While the Court finds that the complex-wide losses associated with the delayed payment on Building 1 is a correct measure of consequential damages, the
There was no evidence presented at trial that the complex was entirely untenantable after the fire. Nor was any evidence presented at trial about the degree to which the complex’s occupancy rate, or rental rate decreased due to the missing Building 1. Boardwalk essentially proposes a lost profits analysis on the complex, rather than a business income analysis, which would be dictated by the terms of the Policy.- Also, the Court disagrees with the degree of extrapolation by Boardwalk. Its $1.6 million estimate would account for a double recovery as it is inclusive of the business income losses associated with Building 1. Fully crediting Lesovitz’s testimony on this point, the evidence only would have permitted the jury to reasonably infer that some portion of the $100,-000-$150,000 remaining annual net profit on the complex was lost due to the delayed reconstruction of Building 1. This remaining net profit is one-half to three-quarters of the loss attributable to Building 1. Given that there was no evidence in the record about the degree to which the remaining buildings lost business income, it would be pure speculation for the jury to quantify non-Building 1 losses based solely on Le-sovitz’s testimony. Moreover, the timeline for business income loss would not necessarily be the same as for Building 1 given the undisputed evidence that Boardwalk began to evacuate tenants in the other buildings in 2009 in order to demolish the other buddings.
Likewise, while the jury could have considered Boardwalk’s profit and loss state-
4. Fireside Drive
Boardwalk also sought consequential damages in the form of maintaining Fireside Drive as a result of code changes during the period of restoration. Again, the Court finds that there was certainly evidence presented at trial that increased costs of maintaining Fireside Drive flowed from the breach. Werner testified at length about the decision to acquire Fireside Drive and how it was necessitated by code changes that took effect in the summer of 2006, while the Missouri litigation was pending. But again, the Court finds that there was no evidentiary basis for the jury to reasonably approximate a measure of these damages. In fact, Fleischer testified that he had tried to quantify these damages, but was unable to do so:
Q. Do you know — let me ask you to— when you say that Boardwalk has the responsibility to maintain the street, what does that mean?
A. Everything that the city had been doing before; cleaning the street, removing snow, filling potholes, oiling the street, re-paving the street. Everything that I had observed over my lifetime that I saw the city doing to make certain that the street in front of my house looked nice and cars wouldn’t break their axles, passengers would have a smooth ride.
Q. Is this an ongoing obligation, ever-ending — never-ending obligation?
A. Never-ending, going on forever.
Q. Okay. And do you know what this is going to cost?
A. I do not. I have attempted unsuccessfully in getting somebody to tell me what the cost is forever.37
Boardwalk did not present evidence of its current costs to maintain Fireside Drive. Boardwalk did not present evidence as to whether it contracted with an outside entity to provide all of these services, or whether it maintained the road in whole or in part by using its own employees. Boardwalk did not present invoices or bids from contractors that might provide the jury with a method to calculate these damages. Boardwalk instead focuses on Instruction No. 21, where the jury was told that it could “draw ■ reasonable inferences from the testimony and exhibits you feel are justified in the light of common experience.”
5. Commerce Bank Loan
Likewise, as Boardwalk admits, there was no evidence in the record about the loan amount, fees, or interest associated with the Commerce Bank loan Boardwalk was required to obtain in order to finish the complex replacement without the full insurance payment. The jury could not have relied on such costs as contributing to the compensatory damages associated with the breach.
III. Conclusion
“When a court concludes that there was error only in the excessive damage award, but not error tainting the.finding of liability, it may order a remittitur or grant a new trial if the plaintiff refuses to accept the remittitur.”
Unfortunately, while not the product of bias, passion, or prejudice, the award was excessive because it was not entirely supported by the evidence. The Court notés that the consequential damages claims in this case were economic, so they were capable of reasonable approximation in a manner not necessarily available in cases where the consequential damages are mainly non-economic.
As outlined above, while the Court finds that the jury’s verdict on consequential damages was excessive under Kansas law, it is satisfied that the verdict on liability and actual damages is sound and based on the jury’s careful consideration of the evidence and instructions in this case. As described in the Court’s order on the renewed motion for judgment as a matter of law, and motion for new trial, the jury’s determinations are consistent with the evidence when viewed in the light most favorable to Boardwalk.
The Court may not simply amend the judgment to reflect this reduced award. Under federal law, which governs the Court’s procedure in this case, Boardwalk must be offered the choice between a new trial and accepting the remittitur, in order to avoid problems under the Seventh Amendment to the United States Constitution.
IT IS THEREFORE ORDERED BY THE COURT that State Auto’s Motion to Alter or Amend Judgment Pursuant to Rule 59(e) and/or for Relief from Judgment Pursuant to Rule 60(b) (Doc. 358) is granted in part and denied in part.
lt Boardwalk chooses to accept remitti-tur of the damages awarded on its claim for breach of contract to $1,562,514.56, it shall file a written notice to that effect on or before January 28, 2015. If Boardwalk does not accept the remittitur, State Auto shall be entitled to a new trial on the issue of Boardwalk’s consequential damages for breach of contract.
. Doc. 170 at 30.
. Id. at 65, ¶ lO.a.l.
. Id.
. Id.
. Id. at 66, ¶ lO.a.l.
. Id. at 66-67, V 10.a.3.
.Id.
. Doc. 246.
. Trial Tr„ Vol. 7, Doc. 370 at 1361-62.
.Doc. 338, Instruction No. 11; see, e.g., Royal Coll. Shop, Inc. v. N. Ins. Co. of N.Y., 895 F.2d 670, 678 (10th Cir. 1990).
. Trial Tr., Vol. 7, Doc. 370 at 1413.
. Id. at 1414.
.Doc. 345.
. The Court notes for the record that the consequential damages award was less than the jury’s award of actual damages on the replacement cost claim.
. O’Gilvie v. Int'l Playtex, Inc., 821 F.2d 1438, 1447 (10th Cir. 1987).
. Servants of the Paraclete v. Does, 204 F.3d 1005, 1012 (10th Cir. 2000); Brumark Corp. v. Samson Res. Corp., 57 F.3d 941, 948 (10th Cir. 1995).
. Fed.R.Civ.P. 60(b).
. Elm Ridge Exploration Co. v. Engle, 721 F.3d 1199, 1216 (10th Cir. 2013).
. See O’Gilvie, 821 F.2d at 1447.
. See, e.g., O’Gilvie, 821 F.2d at 1447-48; Royal Coll. Shop, Inc. v. N. Ins. Co. of N.Y., 895 F.2d 670, 678-79 (10th Cir. 1990); M.D. Mark, Inc. v. Kerr-McGee Corp., 565 F.3d 753, 766 (10th Cir. 2009).
. Prager v. Campbell Cnty. Mem’l Hosp., 731 F.3d 1046, 1062 (10th Cir. 2013) (quotation marks and citations omitted).
. Palmer v. City of Monticello, 31 F.3d 1499, 1508 (10th Cir. 1994).
. Id. (citing Smith v. Ingersoll-Rand Co., 214 F.3d 1235, 1251 (10th Cir. 2000)).
. Hochman v. Am. Family Ins. Co., 9 Kan.App.2d 151, 673 P.2d 1200, 1203 (1984); see also Earth Scientists (Petro Servs.) Ltd. v. U.S. Fid. & Guar. Co., 619 F.Supp. 1465, 1475 (D.Kan. 1985).
. Denman v. Aspen Drilling Co., 214 Kan. 402, 520 P.2d 1303, 1307 (1974).
. Brown v. United Methodist Homes for the Aged, 249 Kan. 124, 815 P.2d 72, 86 (1991).
. Phillips & Easton Supply Co. v. Eleanor Int’l, Inc., 212 Kan. 730, 512 P.2d 379, 386 (1973) (citations omitted).
. Doc. 341, Interrogatory 6.c.
. In re Urethane Antitrust Litig., 768 F.3d 1245, 1268 (10th Cir. 2014) (quotation omitted); see also Russo v. Ballard Med. Prods., 550 F.3d 1004, 1019 (10th Cir. 2008) (affirming higher award than that testified to by
. Indeed, this evidence was elicited by State Auto. See Trial Tr. vol. 3, Doc. 366 at 773-74 (Werner testimony about approximately $400,000 to $500,000 in architectural fees and $50,000 in expert witness fees); Trial Tr. vol. 5, Doc. 368 at 927 (Lesovitz testimony about $100,000 expert witness fee).
. See, e.g., Trial Tr. Vol. 4, Doc. 367 at 889-95; Vol. 5, Doc. 368 at 961-62.
. Trial Tr. Vol. 5, Doc. 368 at 961-62.
. Trial Tr. Vol. 4, Doc. 367 at 894; Vol. 5, Doc. 368 at 961-62.
. Trial Tr. Vol. 4, Doc. 367 at 893; Vol. 5, Doc. 368 at 961.
. Ex. 491a.
. Trial Tr„ Vol. 7, Doc. 370 at 1413, 1414.
. Doc. 371, at 22.
. Doc. 338, Instruction No. 21.
. See, e.g., Denman v. Aspen Drilling Co., 214 Kan. 402, 520 P.2d 1303, 1307 (1974).
. Klein v. Grynberg, 44 F.3d 1497, 1504 (10th Cir. 1995).
. See, e.g., Prager v. Campbell Cnty. Mem'l Hosp., 731 F.3d 1046, 1062 (10th Cir. 2013) (declining to grant remittitur on loss of consortium claim); United Int’l Holdings v. Wharf (Holdings) Ltd., 210.F.3d 1207, 1229-30 (10th Cir. 2000) (declining to grant remitti-tur on compensatory damages claim where witness testimony established amount of damages); Palmer v. City of Monticello, 31 F.3d 1499, 1508 (10th Cir. 1994) (declining remitti-tur where jury awarded an amount of damages less than requested by the plaintiff and calculated by the expert); Griffith v. Mt. Carmel Med. Ctr., 842 F.Supp. 1359, 1371-72 (D.Kan. 1994) (granting remittitur as to non-economic damages where the jury’s determination was contrary to the evidence).
. O’Gilvie v. Int'l Playtex, Inc., 821 F.2d 1438, 1447-48 (10th Cir. 1987); see also In re Universal Serv. Fund Tel. Billing Practices Li-tig., No. 02-MD-1468-JWL, 2009 WL 435111, at *11 (D.Kan. Feb. 20, 2009), aff'd, 619 F.3d 1188 (10th Cir. 2010).