Perkins v. Yazoo & Mississippi Valley Railroad
Perkins v. Yazoo & Mississippi Valley Railroad
Opinion of the Court
Plaintiff sues defendant company in damages for $1300.00 for the destruction of timber, canebrakes^ pas
The train ‘which is alleged to have caused the fire runs from Woodville, Miss., to Slaughter, La., each morning, and returns in the afternoon. It passes through what is known as Burrus Cut, which is situated between St. Erancisville and Slaughter. This Cut is deep and is bordered on each side by small hills as was described by the witnesses.
At the time of the fire, October 27, 1924, the land adjoining this Cut was covered by sage grass 'and broom straw which had grown to the height of some four or five feet. The sage grass and broom straw which had likewise grown in the Burrus Cut along defendant’s track had, at that time, been cut by defendant company, but had not been burned or removed. This fact is well established by a preponderance of the evidence.
The train claimed by plaintiff to have set the fire which spread from this Cut to his adjacent property passed through this Cut at about 10:55 in the forenoon of October 27, 1924, according to the testimony of ■ E. H. Stegar, ■ engineer of defendant company. Josh Haney, a witness for plaintiff, it is true, says he passed about 400 -yards from this Cut on his • way to Bayou Sara- at about 11 o’clock in the forenoon- of October 27, and that he' saw no fire in the Cut. It will be noticed that the train in question had passed through the Cut about the same ■ time or a few minutes before. If set by sparks emitted from the engine it had only started wnep Haney passed along there, and aue to the Mgh banks on each side of the Cut could not have been seen by Haney. Anotner witness for plaintiff, Henry Stewart, whose house was about a mile from the Cut, also says he did not see any fire then in the loienOon of October 27. bio doubt, his view was also obstructed by the hill or bank on the side of the Cut-, and' he could not therefore see any fire, although it could have been smouldering at that time. It is also true that Stegar, the engineer, says he did not see any lire in the Cut when he went through it on that morning, but this is explained by his statement that in running his train he could set fire without ever knowing it as he “would be ahead of it all the time.” In the afternoon of the same- day, about 2 o’clock, Haney, on his way back from Bayou Sara, saw fire in the Cut, and Stegar, the engineer, on reaching the Cut about the same time on his return trip from Slaughter says the fire had then spread from the Cut and was climbing to the top of the hill side. The engineer says he was furnished with another engine at Slaughter on the day of the fire. The reason was, he says, that the conductor said the “engine was throwing fire”. He says -he had changed engines three or four times the year before which occurred every time the conductor would “find a fire”. Asked,' point blank, whether he had caused the fire, the engineer answered: “I don’t think I did, but I may have, though.” It was shown besides that several fires had occurred along the track of the defendant company and in the vicinity of the fire in question. With such facts, and testimony ‘ of ■ that character, we have no hesitancy in concluding that if
. We find that the amount of 81000.00 allowed below is a fair and equitable estimate of the damages suffered which should not be either increased or reduced.