Higgins v. Williams Energy Partner, L.P.
Higgins v. Williams Energy Partner, L.P.
Opinion of the Court
The plaintiff, Leroy Mitchell, appeals a trial court judgment granting summary judgment in favor of Williams Olefins, L.L.C., (defendant) and dismissing his claim with prejudice. For the reasons that follow, we affirm.
FACTUAL AND PROCEDURAL HISTORY
This litigation arises out of a June 13, 2013 chemical explosion at the Williams Olefins chemical plant near Geismar, Louisiana that is located in both Iberville and Ascension Parishes. The explosion occurred in connection with the production of propylene in the fractionation area of the plant. Specifically, a reboiler
In the instant matter, the plaintiff was employed by Chicago Bridge and Iron Company (CB & I) as a pipefitter at the defendant's facility at the time of the chemical explosion. The plaintiff was "on top of a scaffold approximately 10 feet off the ground when the chemical explosion occurred." The plaintiff allegedly "suffered severe and debilitating injuries when an area of [the defendant's] refinery known as the propylene fractionation area exploded." On June 12, 2014, the plaintiff filed a petition for damages against the defendant
1.33. ... [The defendant] owned and operated the subject refinery, and it employed the workers at the refinery. [The defendant] controlled the piping from which the propylene leaked on the date in question. [The defendant had] known for years that [EA-425B] was substantially certain and likely to over pressurize. [The defendant's] management ignored that risk over [sic] and over. As a result, eventually [EA-425B] over pressurized and exploded.
On January 19, 2016, the defendant filed a motion for summary judgment to dismiss the plaintiff's intentional tort claim on the grounds that there remained no genuine issue of material fact and that it was entitled to judgment as a matter of law.
4. The over-pressurization of the out-of-service reboiler was caused by the union of three separate and distinct events occurring simultaneously: (1) the out-of-service reboiler (EA-425B) unexpectedly contained liquid propane/propylene despite having its process valves closed; (2) a valve was improperly opened that allowed heated quench water to flow into the out-of-service reboiler; and (3) the pressure relief path for the out-of-service reboiler [EA-425B] was blocked due to the process inlet and outlet valves being closed. All three of these factors had to occur simultaneously for this accident to occur. If any one of them had not happened, the fire would not have occurred. The simultaneous occurrence of three events like this had never occurred in the history of the Geismar facility.
****
8. In July, 2006, the [defendant] ... began a revalidation of the Process Hazard Analysis ("PHA") Study for various process areas of the plant, one of which included the area where the June 13, 2013 fire eventually occurred. These PHA revalidation studies are part of an on-going process safety management plan that the [defendant's] management team implements at the [defendant's] facility. ... The study ... contain[ed] numerous recommendations ... [and] [t]he specific recommendation at issue here is Recommendation 18, which state[d]: "Consider locking open at least one of the manual valves associated with each *1137of the propylene fractionator reboilers (EA-425 A/B) so that the relief valves on top of the propylene fractionator can provide thermal relief protection for these reboilers."
Thus, the defendant argued that the unusual, simultaneous occurrence of the three factors solely caused the chemical explosion. The defendant stated as to the first factor, the defendant's investigating committee was unable to determine the precise cause of the presence of the liquid hydrocarbons in the out-of-service reboiler. For the second factor, "the quench water flow valve to the out-of-service reboiler was improperly opened just minutes before the reboiler ruptured. It was opened by an operations department employee who was trouble-shooting quench water problems through the in-service reboiler." For the third factor, the defendant argued that Mr. Bayer's affidavit evidences that the pressure relief path was blocked for the out-of-service reboiler because a PHA recommendation by the defendant's management team was inadvertently implemented in a different manner than recommended. However, this error in implementation was not detected until the chemical explosion occurred three years later.
In response, the plaintiff filed a memorandum in opposition to the defendant's motion, arguing that the defendant knew with substantial certainty of the dangerous condition associated with the out-of-service reboiler (EA-425B), but failed to address the problem. In support of his memorandum, the plaintiff attached exhibits, which included the expert affidavits of Gregg S. Perkin, an independent engineer consultant employed by Engineering Partners International, LLC, and Greg McCormack, an engineer consultant. The experts' affidavits provided the history of the reboilers' modifications at the defendant's facility. Mr. Perkin stated in his affidavit that around 2001, block valves were added to the inlet and outlet process flow lines for the reboilers. According to Mr. Perkin, this modification left the reboilers in an unsafe condition because they were isolated from the pressure relief system of the defendant's facility, a hazard that would substantially result in over-pressurization.
Additionally, Mr. Perkin stated in his affidavit that the employees of the defendant knew the substantial risk of over pressurization of the reboilers because the defendant was warned multiple times that pressure relief was needed to the reboilers or they would fail. He stated that in 2006 the defendant underwent a PHA
There [were] block valves at the inlet and outlet to the shell side of the EA-425 A/B. Because those valves [were] not [car-sealed open], SV-421QA/QA w[ould] not provide overpressure protection to the shell side of the reboilers in the event of a fire or in the event of liquid expanding/vaporizing due to heat input from the hot side. Unless these valves [were] car[-] sealed open, additional *1138overpressure protection w[ould] be needed for the shell side of EA-425A/B.7
The plaintiffs further argued that the defendant was aware of the hazardous condition because in 2010 the defendant reported that it car-sealed open the process outlet valves for both reboilers. However, in 2012 while updating the facility's piping and instrumentation diagram (P & ID),
In sum, the plaintiff argued that the defendant was aware of the dangerous condition as early as 2001, and unquestionably aware of the dangerous condition by 2006 after the PHA. Specifically, the plaintiff argued that in 2006, after the defendant underwent the PHA for safety management at its facility, the defendant recognized that the reboilers lacked the required pressure-relief outlet, and recommendations were made to it to correct the problem throughout the years. However, the plaintiff argued that the defendant ignored the recommendations ultimately resulting in the chemical explosion.
In response, the defendant filed a reply memorandum, objecting to portions of the plaintiff's experts' affidavits stating that they contained "inadmissible opinions as to ultimate issues of subjective knowledge and intent" regarding the chemical explosion. The defendant argued that subjective knowledge and intent were beyond the scope of appropriate expert testimony pursuant to La. C.E. art. 702. The defendant further argued that contrary to the plaintiff's assertion, the undisputed facts showed that the chemical explosion was an accident caused by human error. The defendant stated that the record revealed that it intended to implement the PHA recommendation to car-seal open both reboilers, but a field-level mistake was made when implemented.
On May 24, 2016, the trial court held a hearing on the defendant's motion for summary judgment. Before hearing arguments on the merits, the trial court sustained the defendant's objection, striking portions of the plaintiff's experts' affidavits pursuant to La. C.C.P. art. 967 and La. C.E. art. 702. The plaintiff did not contemporaneously object to the trial court's ruling.
*1139The defendant argued that in December of 2008, the defendant's management team implemented the 2006 PHA recommendation and it assigned this task to the operations department to implement. In January of 2010, the operations department reported that the 2006 PHA recommendation had been implemented. The defendant argued that it discovered that a mistake was made during the implementation of the 2006 PHA recommendation. This mistake included failing to car-seal open the out-of-service reboiler (EA-425B). The defendant argued that although it made a mistake, it did not fail to address the hazardous condition of the reboilers, as Mr. Bayer's affidavit affirmed that the defendant was under the impression that it had addressed the reboiler pressure-relief problem by January 2010.
At the conclusion of the hearing, the trial court took the matter under advisement. On July 11, 2016, the trial court signed a motion for summary judgment in favor of the defendant and the plaintiff's claim was dismissed with prejudice. The trial court provided reasons for judgment on July 12, 2016. Thereafter, the plaintiff appealed assigning as error: (1) that the trial court erred by not allowing any of the plaintiffs to conduct adequate discovery in this case; (2) that the trial court erred by granting the defendant's motion for summary judgment; and (3) that the trial court erred by failing to follow the Law of the Case.
As to the plaintiff's first and third assignments of error, we find that they have no merit as they have both been raised before this court for the first time on appeal. The well-settled jurisprudence of this court establishes that as a general matter, appellate courts will not consider issues raised for the first time, which are not pleaded in the court below and which the trial court has not addressed. Council of City of New Orleans v. Washington, 2009-1067 (La. 5/29/09),
STANDARD OF REVIEW
Summary judgment procedure is favored and "is designed to secure the just, speedy, and inexpensive determination of every action ... and shall be construed to accomplish these ends." La. C.C.P. art. 966(A)(2). In reviewing the trial court's decision on a motion for summary judgment, this court applies a de novo standard of review using the same criteria applied by the trial courts to determine whether summary judgment is appropriate. Smith v. Our Lady of the Lake Hospital, Inc., 93-2512 (La. 7/5/94),
The initial burden of proof is on the mover. If the mover will not bear the burden of proof at trial, the mover's burden does not require him to negate all essential elements of the adverse party's claim, but only to point out to the court the absence of factual support for one or more of the elements necessary to the adverse party's claim. Thereafter, the burden is on the adverse party to produce factual support that is sufficient to establish the existence of a genuine issue of material fact or that the mover is not entitled to judgment as a matter of law. La. C.C.P. art. 966(D)(1).
After an opportunity for adequate discovery, a motion for summary judgment shall be granted if the motion, memorandum, and supporting documents show that there is no genuine issue as to material fact and that the mover is entitled to judgment as a matter of law. La. C.C.P. art. 966(A)(3). A fact is material if it potentially ensures or precludes recovery, affects a litigant's ultimate success, or determines the outcome of the legal dispute. A genuine issue of material fact is one as to which reasonable persons could disagree; if reasonable persons could reach only one conclusion, *1140there is no need for trial on that issue and summary judgment is appropriate. Larson v. XYZ Insurance Company, 2016-0745 (La. 5/3/17),
DISCUSSION
Intentional Tort
The plaintiff assigns as error that the trial court granted the defendant's motion for summary judgment because the defendant intentionally desired to bring about his injuries since it knew with substantial certainty that a chemical explosion would occur. The plaintiff argues that the defendant had notice that the out-of-service reboiler (EA-425B) was not car-sealed open and did not have pressure relief, resulting in the reboiler failing and causing serious injuries. We must first examine whether the plaintiff met his burden of proving an intentional tort against the defendant under La. R.S. 23:1032(B). To meet his burden, the plaintiff must prove that the defendant: (1) consciously desired the physical result of its act, whatever the likelihood of that result happening from its conduct, or (2) knew that the result is substantially certain to follow from its conduct, whatever its desire may be as to that result. Miller v. Sattler Supply Co., Inc., 2013-2558 (La. 1/27/14),
The plaintiff does not allege that the defendant consciously desired to cause him harm.
Additionally, the plaintiff relies on the P & ID revision approval form that was presented to the defendant's management to argue that the defendant's management was aware of the substantial risk associated with having the out-of-service reboiler (EA-425B) blocked. The plaintiff argues that the P & ID revision approval form evidences that the defendant's management approved for reboiler (EA-425A) to be car-sealed open, but reboiler (EA-425B) remain closed, which eventually led to the out-of-service reboiler being filled with propylene and introduced to heat, and because *1141there was not a pressure relief system in place, the reboiler failed.
The defendant counters that it never intended to injure the plaintiff and that the chemical explosion was an accident caused by human error. The defendant argues that the Louisiana Supreme Court has made it clear that the intentional tort exception to workers' compensation immunity is reserved only for those cases in which actual intent to cause the specific injury at issue can reasonably be inferred. The defendant admits that it made mistakes, however it did not intentionally desire for the plaintiff to be injured or knew that the chemical explosion was substantially certain to occur.
The defendant further argues that the "substantially certain to follow" requirement mandated by La. R.S. 23:1032(B) requires more than a reasonable probability that an injury will occur and certain has been defined to mean "inevitable" or "incapable of failing." See Sibert v. National Oilwell Varco, L.P., 48,789 (La. App. 2 Cir. 2/26/14),
After a de novo review of the record, it is clear that the defendant's management was aware that the blocked reboiler was a hazard, but it is not evident that they were substantially certain that the chemical explosion was to occur from that hazard. The record reveals that the reboiler had been in a potentially hazardous condition since 2001 and had never failed or hurt anyone before the explosion in 2013. Mr. Bayer's affidavit reveals that the reboiler being blocked was only one of the three simultaneous factors that led to the explosion. The unexpected presence of the liquid hydrocarbon in the out-of-service reboiler and the improper introduction of the heated water simultaneously caused the chemical explosion. Thus, the evidence does not show that the defendant knew with substantial certainty that the blocked reboiler, which had been filled with nitrogen, would be filed with propylene or that it would be heated, ultimately causing the chemical explosion.
Considering all of the evidence, which was not objected to in the plaintiff's opposition to the motion for summary judgment, it does not appear that the chemical explosion rises to the level of an intentional tort by the defendant. Jurisprudence *1142shows that despite the fact that the defendant's management was aware of the hazardous condition, that alone does not equate to substantial certainty under La. R.S. 23:1032(B) and instead falls within the range of negligent acts that are covered by the Louisiana Workers' Compensation Act, La. R.S. 23:1020.1, et seq. (LWCA). See Miller v. Sattler Supply Co., Inc., 2013-2558 (La. 1/27/14),
While we recognize that the out-of-service reboiler (EA-425B) was in a hazardous condition on the day of the chemical explosion, resulting in the plaintiff sustaining injuries, jurisprudence is clear that it cannot reasonably be said that the defendant was substantially certain that the plaintiff would be injured. Our courts have narrowly construed the intentional act exception according to its legislative intent and have almost universally held that employers are not liable under the intentional act exception for violations of safety standards or for failing to provide safety equipment. Reeves,
CONCLUSION
Based on the foregoing, the judgment appealed from is affirmed. Costs of this appeal are assessed to the plaintiff, Leroy Mitchell.
AFFIRMED.
A reboiler is a pressure vessel that operates as a heat exchanger to heat a process fluid to separate the gases from the heavier components.
The trial court consolidated the various suits for discovery purposes to division "D" of the trial court to be joined with the suit captioned "Travis Higgins v. Williams Energy Partners, L.P., et al., Suit No. 109,244 ."2 The consolidated cases consisted of Artie Hudson and Jeffery Wells, et al v. Williams Olefins Development, L.L.C., et al, Suit No. 109,301 and Leroy Mitchell v. Williams Companies, Inc., et al, Suit No. 110,285. We note that while La. C.C.P. art. 1561 provides that two or more actions may be consolidated for trial, there is no provision that allows cases to be consolidated for discovery purposes. See Boh v. James Indus. Contractors, L.L.C., 2003-1211 (La. App. 4 Cir. 2/11/04),
The plaintiff named several other defendants in his petition for damages who were dismissed from the suit or their claims are not being contested in the instant matter.
An intentional tort does not have to be plead with any specificity. See Mayer v. Valentine Sugars, Inc.,
We note that the Louisiana Code of Civil Procedure was amended by 2015 La. Acts, No. 422, § 1, effective January 1, 2016. Section 2 of the 2015 La. Acts, No. 422, provides that: "[t]he provisions of this Act shall not apply to any motion for summary judgment pending adjudication or appeal on the effective date of this Act." Here, the filing of the motion for summary judgment was filed after the effective date of 2015 La. Acts, No. 422. Thus, the new version of La. C.C.P. art. 966 applies to the instant matter.
The PHA was attached as an exhibit in the plaintiff's memorandum in opposition to the defendant's motion.
A car seal is a device that is placed on a valve in the designated position as an administrative control to keep the valve in the designated position.
The piping and instrumentation diagram is a drawing that shows what is installed in the field, all of the piping and equipment, and any instrumentation and electrical components.
The defendant's management who approved the P & ID included: Larry Bayer (plant manager), Parker Tucker (operational manager), Erick Comeaux (technical manager), Jake Beret (safety manager).
Upon our de novo review, we find no error in the trial court's ruling to strike portions of the plaintiff's expert's affidavits and note that the parties did not raise this issue on appeal.
We note that the defendant produced undisputed testimony establishing that it did not intend to injure the plaintiff or itself.