Before the court is a "Motion of Cimarex Energy Co. to Dismiss Complaint" which the court converted
FACTUAL STATEMENT
Plaintiffs, David R. Daigle and Mary Ann Daigle, own the surface of approximately 115 acres of property in Allen Parish.
The land that is involved in this lawsuit is a 40-acre tract previously owned by Tyrrell L. Garth.
*607("Kash") which included the above-mentioned 40-acre tract.
On December 22, 2000, Kash assigned a 50% interest in the 2000 Oil and Gas lease to H & P.
In 2001, H & P built a road and an earthen fluid pit on the property.
At the time the Garth Well was drilled, H & P was aware that the usable groundwater aquifer in that region was 60' below the surface and could be threatened by the use of the unlined reserve pits, spills and/or failure to timely and completely restore the spill area.
On May 10, 2001, after the Garth Well was drilled, H & P hired a contractor to back fill the reserve pit and clean up the Garth Well location;
On January 7, 2002, U.S. Fish and Wildlife Service confirmed via a letter to H & P environmental consultant, Tim Morton, that the Daigles' property and surrounding areas are a suitable habitat for the endangered red cockaded woodpecker.
*608Subsequent to the closure of the earthen reserve pit at the Garth Well, no other pits were used in connection with Cimarex' operations at the Garth Well. Recompletion/workover operations at the Garth Well in July 2002, April 2003, December 2003, and July 2004 used the tanks of workover rigs; the July 2004 recompletion work utilized above-ground steel containers for produced water and completion fluids.
On July 12, 2002, H & P entered a "Contract of Release" ("2002 Release") with the Daigles.
On November 13, 2002, effective October 21, 2002, Cimarex succeeded H & P as operator of the Garth Well.
On July 29, 2004, the Garth Well was recompleted; on that same day Plaintiffs allege that an oilfield work truck overturned about 100 yards from the Garth Well and created a spill which allegedly caused a 1.8 acre dead tree area on the Daigles' property (hereinafter referred to as the "Dead Tree Area"). Plaintiffs allege that the truck was an agent of H & P; during this recompletion, 211 bbls of 9.6 ppg saltwater was "swabbed", i.e. circulated out from the Garth Well which had to be hauled off location.
Sometime after July 1, 2005, Mr. Daigle observed an area on the 40-acre tract which caused him to investigate further.
Mr. Daigle met with Cimarex representative/Production Manager, Rick White, on April 19, 2006, to inspect the spill site area. Mr. Daigle showed Mr. White the ruts where the truck had left the road on the *609west side as well as the ruts on the east side where the recovery truck made ruts removing the ditched truck.
On May 8, 2006, Cimarex hired Coastal Chemical to analyze the produced water from the Garth Well and nearby Kingery Estates Well. The analyses showed the presence of barium, sodium, calcium and chlorides which had also been reported in the soil and groundwater samples taken at the Garth Well and other locations on the Daigles' property.
Plaintiffs' expert, Mr. Arabie, performed certain tests in April 2008 at a location believed to be a former reserve pit site at the Garth Well. In September 25, 2008, Arabie Environmental Solutions issued a second report evaluating all test results performed to date; the report identified environmental damage to soil from LDR Statewide Order 29-B SAR and EC parameter soil exceedances in the area of the former and now closed Garth Well reserve pit.
The Oil, Gas and Mineral Lease covering Cimarex' oil and gas operations at the Garth Well (the "Garth Lease") expired in February 2009.
On January 9, 2015, Mr. Garth assigned to Plaintiffs any environmental damage related litigation rights he may have not earlier conveyed (hereinafter referred to as the 2015 Assignments of Rights").
The State court lawsuit
On June 1, 2006, Plaintiffs sued in state court to force a cleanup of the property; Plaintiffs sued Cimarex, H & P, and Kash, as present and/or former operators of the Garth Well and Moncla Well Services, Inc., the drilling contractor on Cimarex' July 2004 recompletion of the Garth Well.
On January 10, 2010, after Moncla was dismissed by Plaintiffs, Plaintiffs filed a First Amending and Supplemental Petition for Damages adding Calcasieu Rentals, Inc. ("CRI") as a defendant asserting the same claims they had against Moncla. In 2011, CRI filed a motion for summary judgment alleging that while it supplied saltwater disposal and vacuum trucks for the July 2004 Garth Well recompletion, none of its trucks spilled anything during the recompletion. On January 30, 2012, the court granted CRI's motion and dismissed CRI; Plaintiffs did not appeal the ruling. The only entity that supplied vacuum trucks during the July 2004 recompletion of the Garth Well was CRI.
In March 2012, Plaintiffs filed their Second Amended and Supplemental Petition for Damages and asserted claims against Cimarex based upon the Arabie September 2008 Report. Plaintiffs filed their Third Amending and Supplemental Petition for Damages on April 1, 2015, asserting claims against Cimarex based upon an alleged April 29, 2002 spill at the Garth Well; Plaintiffs also asserted claims against Cimarex based upon the "Garth Well Area" contamination.
On August 17, 2016, Plaintiffs provided a letter to Cimarex as notice of their intent to sue Cimarex under the citizen's suit provisions of the Louisiana Environmental Quality Act ("LEQA"). Also in August 2016, Plaintiffs attempted to fax-file their Fourth Amending and Supplemental Petition ("Fourth Petition") to assert their claims under LEQA against Cimerax.
Plaintiffs allege that the environmental damage at the Garth Well area is the result of (1) the improper construction and closure of the reserve pit: (2) reported and non-reported known spills; (3) contamination events that may have occurred at any or all of the five recompletion workovers
SUMMARY JUDGMENT STANDARD
Summary judgment is appropriate "if the pleadings, depositions, answers to interrogatories and admissions on file, together with the affidavits, if any, when viewed in the light most favorable to the non-moving party, indicate that there is no genuine issue as to any material fact and that the moving party is entitled to judgment as a matter of law.
LAW AND ANALYSIS
Cimarex asserts that (1) this court lacks subject matter jurisdiction over Plaintiffs' claims, (2) Plaintiffs fail to state a claim against it upon which relief can be granted under the CWA, (3) the Plaintiffs' claims under the CWA, LEQA, Tree Piracy Statutes and Post-2006 Tort claims are time barred, (4) Plaintiffs can assert no claims under the Garth Lease, (5) Plaintiffs' claims under the "2002 Surface Use Agreement" are premature, (6) Plaintiffs have no claim for unjust enrichment i.e., recovery of civil fruits, and (7) collateral estoppel as to Plaintiffs' Dead Tree Area claim.
Subject matter jurisdiction
Cimarex maintains that the Plaintiffs' suit under the CWA should be dismissed for lack of subject matter jurisdiction because: (1) the alleged misdeeds of Cimarex during its operation for the Garth Well constitute wholly past supposed violations of the CWA which are outside the jurisdictional grant of the citizen's suit portion of that Act; and (2) the Complaint, as amended, alleges only the residual effect of supposed past discharges which are legally insufficient to give rise to jurisdiction under the CWA. Defendant further asserts that the undisputed facts alleged preclude the Daigles from alleging the jurisdictional prerequisite of a continuous or intermittent violation of the CWA.
Cimarex maintains that a past violation, or the residual effects thereof cannot support a CWA citizen's suit. Cimarex remarks that Plaintiffs' Complaint, as amended, only alleges discrete instances of claimed discharges which supposedly occurred at or near the Garth Well in May, 2001, April 29, 2002 and July 2004. Thus, Plaintiffs' suit is in essence, based on the residual and possibly, continuing effects of long-past discharges; thus, there can be no subject matter jurisdiction under the relevant jurisprudence.
Cimarex relies on several cases including Hamker v. Diamond Shamrock Chemical Co.,
In Gwaltney of Smithfield v. Chesapeake Bay Found.,
Plaintiffs maintain that their CWA claims of residual contamination remain viable because they meet both prongs under Gwaltney. Gwaltney establishes two ways a plaintiff can demonstrate a violation through defendant's intermittent violations: "either (1) by proving violations that continue on or after the date the complaint is filed, or (2) by adducing evidence from which a reasonable trier of fact could find a continuing likelihood of a recurrence in intermittent or sporadic violations."
Plaintiffs argue that the CWA claims relate back to the original petition filed in state court on June 1, 2006 and there were ongoing violations of the CWA after the petition was filed. Plaintiffs also remark that recent photos of oilfield waste leaking beyond the protective "berm" and related sampling report shows that the leaks continue to this day.
Plaintiffs then assert that even if the first prong fails, the CWA claim will survive because the Daigles satisfy the "continuing violation" requirement-whether "a reasonable trier of fact could find a continuing likelihood of a recurrence in intermittent or sporadic violations." Plaintiffs again refer the court to recent photos and environmental sampling at the site to *613show the likelihood of recurrence in "intermittent" and "sporadic" violations.
Cimarex argues that in order to "be in violation" of the CWA, the citizen-plaintiff must allege a state of either continuous or intermittent violation-that is, a reasonable likelihood that a past polluter will continue to pollute in the future.
Plaintiffs next argue that even though Cimarex is a prior operator, case law establishes that former operators are viable defendants. Plaintiffs rely on PennEnvironment v. PPG, Indus., Inc.,
In Brossman Sales. Inc. v. Broderick,
In Friends of the Sakonnet v. Dutra,
Plaintiffs rely on Beartooth Alliance v. Crown Butte Mines,
As noted by Cimarex, Plaintiffs bear the burden of establishing subject matter jurisdiction by a preponderance of the evidence. There is no reasonable likelihood that a past polluter such as Cimarex will continue to pollute in the future. Thus, the court finds that the CWA is inapplicable to impose liability upon Cimarex and will dismiss Plaintiff's claims under the CWA.
Prescription under the CWA, LEQA, Tree Piracy Statutes and Post-2006 Tort Claims
Cimarex maintains that Plaintiffs' claims under the CWA, the LEQA, the Tree Piracy statutes and post-2006 tort claims in the instant action are time-barred. Plaintiffs allege that Cimarex violated the CWA with respect to the reserve pit utilized in the 2001 initial completion of the Garth Well, in April 2002 due to a leak, and in July 2004 when a vacuum truck allegedly overturned and spilled completion fluids. Cimarex maintains that as to timeliness, the suit is governed by
Plaintiffs, on the other hand, argue that the prescriptive periods were interrupted and thus have not prescribed. Plaintiffs further assert that the five year prescriptive period relied upon by Cimarex does not apply to the CWA and LEQA. Plaintiffs also assert that Cimarex does not argue that the pre-2006 tort and contract claims are prescribed, and therefore these claims should not be dismissed.
Plaintiffs argue that the state court suit filed on June 1, 2006, interrupted prescription and that prescription runs anew from the date of dismissal without prejudice on January 25, 2017.
Plaintiffs further assert that because there is a continuing violation, the CWA claims are not expired because Plaintiffs are seeking injunctive relief under section 505(a) which authorizes private citizens to commence a civil action for injunctive relief.
*615
Cimarex argues that because the state court filed petition did not assert claims under the CWA, there is no interruption of prescription as to that claim. As to the LEQA claim, Cimarex informs the court that in August 2016, Plaintiffs filed their Fourth Supplemental and Amending Petition in the Allen Parish lawsuit and alleged claims under LEQA. On December 15, 2016, the supplemental and amending petition was dismissed because the Plaintiffs failed to prove that the petition was properly fax-filed, thus it had no legal force or effect (Louisiana Revised Statute 13:850.C) and thus could not interrupt prescription.
Plaintiffs rely on Jackson Court Condominiums, Inc. v. City of New Orleans,
In Ford v. Stone,
[t]he fundamental purpose of prescription statutes is only to afford a defendant security of mind and affairs if no claim is made timely and to protect him from stale claims and from loss or non-preservation of relevant proof. They are designed to protect him against lack of notification of a formal claim within the prescriptive period...83
*616Also noted by Cimarex is the undisputed fact that there are mandatory pre-suit notice requirements under the CWA and LEQA which Plaintiffs failed to meet. Both the CWA
Plaintiffs inform the court that they are not seeking civil fines, penalties or forfeiture under the CWA. Because Cimarex argued this point so fervently, we could only infer that the complaint must have been interpreted by Cimarex to assert these particular claims. Thus, out of an abundance of caution we choose to address the prescription issue.
To the extent that the complaint asserts claims for civil penalties, fines and forfeitures under the CWA, the court finds that Plaintiffs' state court petition, as amended, which expressly stated that it did not assert any federal claims,
Plaintiffs maintain that the claims brought pursuant to the LEQA are imprescriptible based on the holding in Salvation Army v. Union Pac. R.R., Inc.
*617The Report and Recommendation adopted by the District Judge noted that the parties had not cited, nor had the court found any authority in either the Louisiana Supreme Court, the Louisiana constitution, or the states' statutes to support the principle that the LEQA statute had created a new tort and thus was subject to a one-year prescriptive period.
Cimarex argues that the district court in Salvation Army ignored the express language of LEQA which allows any adversely affected person to file suit under Louisiana Revised Statute 30:2026 to recover actual damages, injunctive relief and attorneys' fees.
The court notes that the statute further provides for civil penalties for each day of the continued noncompliance. There are two elements that must be established: (1) violation of the Environmental Quality Act, plus (2) a causal relationship between the violation and the "actual damages" suffered by the plaintiff.
Cimarex suggests that the court follow the Louisiana Supreme Court reasoning in La. Dept. of Transp. & Dev. v. Kansas City Southern Railway Co.,
The court agrees with Cimarex that claims brought pursuant to LEQA to recover damages in this lawsuit are akin to a tort based claim and are therefore subject to a one year prescriptive period pursuant to Louisiana Civil Code articles 3492 and 3493.
Post-2006 tort claims
As to Plaintiffs' post-2006 tort claims, Cimarex maintains that the Tree-Piracy claim was never raised in the Allen *618Parish lawsuit, and the remaining tort claims which were asserted in the Plaintiffs' Second and Third Supplemental and Amending Petitions, filed in 2012 and 2015, had prescribed long before they were asserted in state court.
The Tree Piracy Statute found in Louisiana Revised Statute 3:4278.1 provides in pertinent part, the following:
A.(1) It shall be unlawful for any person to cut, fell, destroy, remove, or to divert for sale or use, any trees, or to authorize or direct his agent or employee to cut, fell, destroy, remove, or to divert for sale or use, any trees, growing or lying on the land of another, without the consent of, or in accordance with the direction of, the owner or legal possessor, or in accordance with specific terms of a legal contract or agreement.
* * *
G. Notwithstanding any other provision of law to the contrary, a civil action pursuant to provisions of this Section shall be subject to a liberative prescriptive period of five years.
Cimarex maintains that Plaintiffs' claims under this statute are prescribed on the face of the complaint due to the five year prescriptive period. The five year prescriptive period was added via Act 226 in 2011.
Relation back theory
As to the post-2006 tort claims, Cimarex informs the court that Plaintiffs asserted these claims in the state court lawsuit in their Second and Third Supplemental and Amending Petitions which were filed in March 2012 and April 2015, respectively. Plaintiffs had knowledge of the damage as early as 2006 and as late as 2008 which would indicate that these claims prescribed long before they were alleged in the state lawsuit. Plaintiffs were put on notice of the tort claims from the September 25, 2008, Arabie report and from Jesse Ardoin's deposition taken on October 18, 2007.
Plaintiffs argue that the second and third petitions filed in the state lawsuit relate back to the original petition filed in 2006 and therefore are not prescribed. Cimarex maintains that because the claims asserted in 2012 and 2015 were supplemental and not amending, relation back under Code of Civil Procedure article 1153 does not apply to save these claims.
*619A supplemental petition may therefore be used to add a new cause of action related factually to a previously existing cause of action, even though the new claim does not, properly speaking, arise out of the original cause of action. The new supplemental cause of action, however, does not relate back in time to the date of the original petition; prescription of the new cause of action would generally be held to be interrupted as of the date of filing of the supplemental petition.
Cimarex argues that Plaintiffs' second and third supplemental and amending petitions are clearly "supplemental" and therefore do not relate back to the June 1, 2006, originally filed petition. The original petition sought damages against defendants, Cimarex, Moncla, H & P and Kash. The petition alleged that in conjunction with the recompletion, Moncla, the agent for H & P and Kash,
The supplemental petition must assert a new cause of action that is susceptible of being sued upon or which arose after the filing of the original petition.
The second petition relies upon the September 25, 2008 report which alleges widespread contamination across the surface of the property at the Garth Well due to failure to perform use and maintenance of Plaintiffs' property in a manner consistent with prudent industry practices.
The court agrees with Cimarex that Plaintiffs' tort claims as to the Garth Well former reserve pit, the April 29, 2002 purported spill and the Garth Well area spill are new claims and thus are clearly supplemental in nature. Thus, these claims do not relate back to the original petition.
*620Did prescription run anew from the date of dismissal?
Plaintiffs maintain that Louisiana law allows prescription to begin to run anew from the date of dismissal without prejudice of the state court lawsuit on January 25, 2017,
Plaintiffs rely on Louisiana Civil Code article 3462 which provides as follows:
Prescription is interrupted when the owner commences action against the possessor, or when the obligee commences action against the obligor, in a court of competent jurisdiction and venue. If action is commenced in an incompetent court, or an improper venue, prescription is interrupted only as to a defendant served by process within the prescriptive period.
Plaintiffs further rely on Louisiana Civil Code article 3463 which provides as follows:
An interruption of prescription resulting from the filing of a suit in a competent court and in the proper venue or from service of process within the prescriptive period continues as long as the suit is pending. Interruption is considered never to have occurred if the plaintiff abandons, voluntarily dismisses the action at any time either before the defendant has made any appearance of record or thereafter, or fails to prosecute the suit at the trial.
In the state court suit, Plaintiffs' Motion for the Entry of a Proposed Judgment on Defendants' Motion to Dismiss and Re-urged Exceptions was denied; the court signed a related "judgment/opinion" on January 25, 2017,
This court fails to understand how Plaintiffs' post-2006 tort claims that were clearly prescribed when filed in state court could somehow be resurrected via the January 25 2017 Judgment. The January 25, 2017 Judgment rendered pursuant to "Plaintiffs' Motion for the Entry of a Proposed Judgment on Defendants' Motion to Dismiss and re-urged Exceptions "
The December 15, 2016 Judgment dismissed without prejudice
The state court had previously dismissed without prejudice, Plaintiffs Second and Third Amending Petitions in a January 30, 2015 and May 2, 2016 Judgment On Exceptions due to failure to cure the problems as to vagueness, ambiguity and noncompliance previously communicated to Plaintiffs.
Collateral Estoppel
Cimarex maintains that any claim for damages to the Dead Tree Area caused by the alleged spill of completion fluids during the July 2004 recompletion of the Garth Well is barred by estoppel. In their original complaint, Plaintiffs asserted that the operators of the Garth Well, including Cimarex, were responsible for the damage to a 1.8 acre Dead Tree Area caused by an overturned vacuum truck.
In the instant lawsuit, Plaintiffs allege that during the July 2004 recompletion of the Garth Well, a vacuum truck overturned and spilled saltwater on Plaintiffs' property, causing the trees to die. Plaintiffs then allege that Cimarex is legally responsible for the overturned vacuum truck.
Cimarex seeks to dismiss this claim based on res judicata and relies on Louisiana Revised Statute 13:4231(3) which provides the doctrine of collateral estoppel or issue preclusion as follows:
A judgment in favor of either the plaintiff or the defendant is conclusive, in any subsequent action between them with respect to any issue actually litigated and determined if its determination was essential to that judgment.
The Restatement (Second) of Judgments,
When an issue of fact or law is actually litigated and determined by a valid and final judgment, and the determination is essential to the judgment, the determination is conclusive in a subsequent action *622between the parties, whether on the same or different claim.
Under Louisiana Revised Statute 13:4231, res judicata bars relitigation of a subject matter arising from the same transaction or occurrence as a previous suit. The chief inquiry is whether the second action asserts a cause of action that arises out of the transaction or occurrence that was the subject matter of the first action.
Louisiana Revised Statute 13:4231 embraces both claim preclusion (res judicata ) and issue preclusion (res judicata ).
Plaintiffs maintain that the January 30, 2012 Judgment was not final, and if it was the four elements of collateral estoppel are not met. Plaintiffs remark that the January 30, 2012 ruling was in favor of CRI, not Cimarex-a different party. In that ruling, the court held that "there is an absence of factual support connecting CRI with the alleged contamination."
Plaintiffs assert that the ruling was not a "final judgment" within the meaning of Louisiana Revised Statute § 13:4231.
Cimarex relies on Louisiana Code of Civil procedure 1841 which provides that "[a] judgment that determines the merits in whole or in part is a final judgment." CRI's motion for summary judgment
The court has reviewed CRI's motion for summary judgment in the state court lawsuit, and it expressly seeks dismissal with prejudice at Plaintiffs' costs. The Judgment grants the motion at Plaintiffs' costs. The court has also reviewed the memorandum in support of the motion and the opposition to the motion. The memorandum argued that there was an absence of evidence to support Plaintiffs' theory of liability against CRI, and there was no evidence presented to establish that the alleged overturned truck actually leaked any completion fluids. Plaintiffs opposed the motion and argued that there was a genuine issue of material fact because CRI was the only trucking company hired by Cimarex to haul water and completion fluids to the Garth Well during the relevant time period. There were other wells in the area being serviced, but there were no reports of a spill or an overturned truck.
Plaintiff, David Daigle, first noticed the dead pine trees sometime after July 1, 2005. A site inspection revealed deep ruts along the road and adjacent to the affected area. Lab results revealed that the area was impacted environmentally. Even though the judgment did not state with prejudice, the parties' memoranda indicate that the state court clearly ruled on the merits based on the parties' arguments which is buttressed by the fact that the motion for summary judgment expressly requested dismissal with prejudice and said request was granted. Thus, we find that the January 2012 Judgment was final and collateral estoppel or res judicata would apply.
Next, Plaintiffs maintain that Cimarex has failed to meet the elements necessary for collateral estoppel or res judicata to apply. Louisiana courts require four elements to be met before a prior judgment will bar relitigation of an issue of fact or law: (1) the parties must be identical; (2) the issue to be precluded must be identical to that involved in the prior action; (3) the issue must have been actually litigated; and (4) the determination of the issue in the prior action must have been necessary to the resulting judgment.
The court must determine if there was an identity of interests between Cimarex and CRI sufficient to treat them as identical parties. Cimarex points out that the Plaintiffs' claims in this lawsuit against Cimarex regarding the phantom overturned vacuum truck and the Dead Tree Area are identical to the claims asserted against Cimarex (and CRI) in the state court lawsuit.
Plaintiffs argue that there is no privity as to Cimarex and the aforementioned Judgment. Louisiana courts have established privity as follows: (1) where the nonparty is the successor in interest of a party; (2) where the nonparty controlled the prior litigation; or (3) where the nonparty's interests were adequately represented by a party to the action who may be considered the 'virtual representative' of the nonparty because the interest of the party and the nonparty are so closely aligned.
*624Plaintiffs assert that "Cimarex did not acquire any interest 'after' the prior litigation's commencement, so it is not a 'privy' " and it did not acquire an interest through "inheritance, succession, purchase, or assignment."
Cimarex asserts that the parties are the same and CRI, as owner/operator of the offending vacuum truck, is alleged to have been H & P's (Cimarex' predecessor by merger) agent making CRI the privy and virtual representative of Cimarex for preclusion purposes.
Cimarex, who was also a Defendant in the state court lawsuit, maintains that because of its relationship with CRI-H & P
Next, we must determine if the issues involved in the state court action are identical to the issues in this action. In their first supplemental and amending complaint, Plaintiffs added CRI as a defendant to replace Moncla. Plaintiffs also amended the complaint by making CRI joint and/or solidary obligor with the other named Defendants, one of which was Cimarex. The issue resolved by the state court ruling and judgment involved the overturned truck which allegedly spilled completion fluids causing damage to the Dead Tree Area. The court concluded that there was an absence of evidence as to the owner/operator of the truck and whether or not there was an actual spill. This issue was litigated and the judgment was not appealed. The court finds that Cimarex has satisfied both elements (the issues are identical and were actually litigated)
With respect to the last element, the court must decide if the determination of the issue in the prior action was necessary to the resulting judgment. Issue preclusion requires the issue to be precluded to have been a dispositive issue which the *625court must have considered in a contest between the same parties.
Plaintiffs assert that there is additional evidence not considered in the 2012 CRI Judgment that would link Cimarex to the Dead Tree Area contamination. While this may be so, our analysis as to issue preclusion is restricted to any contamination caused by the alleged phantom truck which overturned during the July 2004 recompletion of the Garth Well. This was the only issue raised and decided in the state court 2012 Judgment which dismissed CRI. To that end, the court finds that with regards to Plaintiffs' claims of liability against Cimarex and/or CRI for the overturned vacuum truck in July 2004, that issue was litigated and decided and will not be relitigated in this lawsuit.
Continuing tort
In Louisiana, to have a continuing tort, "the court must look to the operating cause of the injury sued upon and determine whether it is a continuous one giving rise to successive damages, or whether it is discontinuous and terminates, even though the damage persists and may progressively worsen."
Plaintiffs' rely on photos and sampling reports, however, these photos and sampling reports only show the alleged injury but does not indicate that Cimarex has control and/or is the operating cause of Plaintiffs' injury. Because there is no evidence to establish that Cimarex has any operational control of the alleged continuing leaks or spillage, Plaintiffs' assertion that Cimarex is committing a continuing tort is without merit.
Stipulation pour autrui under the Garth Lease
Cimarex maintains that Plaintiffs, as a matter of law, are not third party beneficiaries for restoration claims under the Garth Lease. Cimarex remarks that (1) the Garth Lease did not contain a provision for restoration of the Plaintiffs' property, and (2) Plaintiffs did not receive any assignment of rights pursuant to the January 9, 2015 Assignment of Rights between T.L. Garth and Plaintiffs.
Plaintiffs suggest that Cimarex analyzed the wrong lease language and argues that (1) there is a stipulation pour autrui in Clause 9 of the Lease, (2) there is a stipulation pour autrui under Andrepont v. Acadia Drilling Co.,
A stipulation pour autrui exists when some advantage to a third party is created as a condition to, or consideration of, a contract.
Cimarex relies on ¶ 8 of the Lease which provides as follows:
The Lessee shall be responsible for all damages to timber and growing crops of Lessor caused by Lessee's operations.140
Plaintiffs rely on Clause 9 of the Lease which provides as follows:
All provisions hereof shall inure to the benefit of and bind the successors and assigns (in whole or in part) of Lessor and Lessee, (whether by sale, inheritance, assignment, sub-lease or otherwise).
Plaintiffs then remark that there is both an assignment and a sale because Plaintiffs bought the property from the Lessor, T.L. Garth, making Plaintiffs a successor by sale. Plaintiffs maintain that the lease expressly creates a stipulation pour autrui for "successors" "by sale." The Louisiana Supreme Court has declared the following factors to consider when analyzing a potential stipulation pour autrui :
(1) The existence of a legal relationship between the promise and the third person involving an obligation owed by the promise to the beneficiary which performance of the promise will discharge; (2) the existence of a factual relationship between the promise and the third person, where (a) there is a possibility of future liability either personal or real on the part of the promise to the beneficiary against which performance of the promise [sic] will protect the former; (b) securing an advantage for the third person may beneficially affect the promise in a material way; (c) there are ties of kinship or other circumstances indicating that a benefit by way of gratuity was intended.141
Cimarex argues that neither the Garth Lease, nor the Assignments of Rights purport to assign to Plaintiffs any rights with respect to Plaintiffs' property. A stipulation pour autrui exists when some advantage to a third person is created as a condition or consideration of a communative contract.
First, Cimarex argues that the damages limitation in the Garth Lease actually negated third party beneficiary status for a mere surface owner. In Broussard v. Northcott Expl.,
In Broussard, the standard damage clause found in the original version of the mineral lease ("The Lessee shall be responsible for all damages to timber and growing crops of Lessor caused by Lessee's operations") was modified to read "for all surface damages." However, the mineral lease was not modified to expand Defendant's liability beyond the "damages of the lessor." Consequently, the Louisiana Supreme Court found that there was no stipulation pour autrui because the express language of the mineral lease restricted damages to that of the Lessor inferring no benefit on a third party.
In the Garth Lease, we find that same restrictive language-"for all damages to timber and growing crops of Lessor. " Thus, we can only conclude that at the time the mineral lease was created, the parties had no intention of bestowing a benefit to a third party, namely, Plaintiffs.
As their saving grace, Plaintiffs executed an Assignment of Rights in January 2015 wherein Mr. Garth purported to convey to Plaintiffs all of his "property damage rights and causes of action for and related to environmental damage to and pollution of [plaintiffs' property] against [Cimarex] occurring under or as a result of exploration and production related operations conducted pursuant to [the Garth Lease]". Cimarex notes that the Garth Lease expired in 2009 due to cessation of production for over ninety days; the Assignment of Rights was executed in January 2015. Cimarex cites several cases wherein the courts held that "it [i]s impossible to transfer rights to an assignee under an expired mineral lease."
In Lejeune, the Third Circuit Court of Appeal held that because a mineral lease had expired two (2) years prior to the Plaintiffs' acquisition of the subject property, the prior lessor was not a mineral lessor and could not assign any rights under the expired lease in a sale. Hence, the court concluded that there could not be a stipulation pour autrui because the lease clearly only provided rights under the lease to the Lessor; in this instance, this would be Mr. Garth.
In Global Marketing Solution, LLC v. Blue Mill Farms, Inc.,
2002 Contract of Release
Cimarex maintains that Plaintiffs' claims to restore the Garth Well pad under the 2002 Contract of Release
Plaintiffs maintain that there are other obligations under the 2002 Release for which Cimarex would be responsible as a prior operator. Plaintiffs refer the court to ¶ 155, of their Second Amended Complaint.
As noted by Cimarex, the 2002 Release released Cimarex from surface damages pertaining to the Garth Well in exchange for $10,000. The 2002 Release between Plaintiffs and H & P expressly released H & P and the co-owners, as well as their employees, agents, contractors and sub-contractors for all liability for surface damage to the lands within the existing well pads, access road, crops and appurtenance in connection with the parties' drilling operations and maintenance of oil and gas production that was associated with the drilling, completion, production and maintenance of the Kingrey Estate no. 1 and the T.L. Garth No. 1 wells.
When the well is plugged and abandoned, lease road and gravel pad will be restored, within six months, as near as possible to the original condition. Upon Closure, soil parameters will meet L.D.N.R. 29-B criteria and/or criteria provided by Governmental bodies having jurisdiction over the covered lands or operations
Plaintiffs assert that the 2002 Release expressly created contractual duties. Specifically that trash be "hauled off and not buried on location,"
*629Cimarex counters Plaintiffs' arguments and argues that a "novation" occurred which would in effect extinguish Cimarex' obligations under the 2002 Release. Cimarex relies on a 2010 agreement between Plaintiffs and Double Eagle Resources, LLC and refers the court to 68 of the Complaint which provides that
In May 2010, prior to restoring production for the Garth Well, Double Eagle Resources LLC secured a new road use agreement (Exhibit 37, the "2010 Road Use Agreement ") and a new surface use agreement (Exhibit 38, the "2010 Surface Use Agreement and Pipeline Right-of-Way ") with the [Plaintiffs] in conjunction with its new Garth Well and Kingrey Estates Well operations. Accordingly the Garth Lease, and the 2002 surface use agreement for the Garth Well and associated roads expired of their own terms and remain no longer in force or effect by their own terms by abandonments, and were superseded by/replaced with the new contract with Midnight Drilling/Double Eagle Resources, LLC.153
The 2010 Surface Use Agreement and Pipeline Right-of-Way ("2010 Surface Agreement") obligates the Grantee
Louisiana Civil Code article 1881 provides that a "novation takes place when, by agreement of the parties, a new performance is substituted for that previously owed...." meaning that a [n]ovation takes place when a new obligation is substituted for an old one, which is thus extinguished. The basic elements to an obligation are the parties to it, its object and its cause.
Plaintiffs argue that there was no novation because the 2010 Surface Agreement was between Plaintiffs and Double Eagle Resources, LLC only, not Cimarex, nor did the 2010 Agreement contain any express or implied release of Cimarex' obligations. Plaintiffs remark that when the 2010 Agreement was executed, suit had already been filed against Cimarex as to its restoration obligations.
A novation cannot be presumed; the intent to extinguish the original obligor must be "clear and unequivocal,"
However, as noted by Cimarex, the Garth Well is currently being operated by *630Drive Energy, so it is clear that because the Garth Well is not plugged and abandoned, Plaintiffs' claims to restore the lease road, gravel pad and soil parameters pursuant to the 2002 Agreement are premature.
Tree Piracy
In addition to dismissing the Tree Piracy claims due to prescription, Cimarex moves to dismiss these claims substantively, because the Tree Piracy Statute does not apply to unintentional, or negligent damage to another's trees. Louisiana Revised Statute 3:4278.1 makes it unlawful to "cut, fell, destroy, remove, or to divert for sale or use, any trees," or to direct one's agent or employee to "cut, fell, destroy, remove, or to divert for sale or use, any trees, growing or lying on the land of another" without the owner or legal possessor's consent. Section B of the statute establishes punitive damages for willful and intentional violations of the statute. Section C makes "good faith" violators of the statute liable for punitive damages.
Cimarex relies on Sullivan v. Wallace,
Plaintiffs maintain that the Tree Piracy statute applies beyond the context of illegal timber harvesting. Plaintiffs cite Mathews v. Steib,
Plaintiffs assert that Cimarex willfully, intentionally, illegally and improperly closed the pit and thus its actions were not accidental. Even if Cimarex was operating in "good faith" under the statute, Plaintiffs allege that Cimarex' actions destroyed the trees without the consent or direction of the owner of the trees. The court agrees that the Tree Piracy Statute would be applicable to Plaintiffs' claims of destruction of the trees in the Dead Tree Area. However, as previously noted, those claims are prescribed.
Recovery of civil fruits
Not to leave any stone unturned, Cimarex moves to dismiss Plaintiffs' claims of unjust enrichment/civil fruits for the "unauthorized use of the [Plaintiffs'] Property to store and dispose of toxic waste and contamination making Cimarex liable for the civil fruits derived from Defendants' trespass pursuant to Louisiana Civil Code article 486. Fortunately, for this court, Plaintiffs ungrudgingly concede that the civil fruits claim was previously dismissed in the state court lawsuit and hence, do not oppose dismissal of the civil fruits claim in this court.
*631CONCLUSION
For the reasons set forth above, the motion for summary judgment will be granted to the extent that this court lacks jurisdiction over Plaintiffs' claims under the Clean Water Act; the motion for summary judgment will be granted to the extent that the court finds that Plaintiffs' Complaint fails to state a claim upon which relief can be granted against Defendant, Cimarex, under the Clean Water Act as the court finds that the Act is not applicable to Defendant, Cimarex, due to termination of the lease and there being no reasonable likelihood that Cimarex will continue to pollute in the future; the motion for summary judgment will be granted dismissing as prescribed, Plaintiffs' claims under the Clean Water Act, the Louisiana Environmental Quality Act, the Louisiana Tree Piracy Statute, and the tort claims asserted by Plaintiff subsequent to 2006; the motion for summary judgment will be granted as to Plaintiffs' claim for damage caused by the overturned vacuum truck during the July 2004 recompletion of the Garth Well as barred by collateral estoppel; the motion for summary judgment will be granted as to Plaintiffs' claims for an alleged violation of the Garth Lease as the court finds that there is no stipulation pour autrui in favor of Plaintiffs and the January 2015 Assignment of Rights was ineffective to transfer rights to Plaintiffs; the motion for summary judgment will be granted as to Plaintiffs' claims for restoration pursuant to the 2002 Contract of Release as the court finds that this claim is premature; the motion for summary judgment will be granted as to Plaintiffs' claims for unjust enrichment and/or civil fruits; the motion for summary judgment will be denied as to Cimarex' assertion of a novation by the 2010 Surface Use Agreement and Pipeline Right-of-Way as the court finds that Cimarex failed to meet its burden of proof that a novation occurred; the motion for summary judgment will be denied as to Cimarex' assertion that the Tree Piracy Statute does not apply.
THUS DONE AND SIGNED in Alexandria, Louisiana on this 28th day of June, 2018.
See Electronic Order # 24 issued March 14, 2018.
R. # 1, ¶ 15, Plaintiff's Statement of Material Fact ("SOF") ¶ 2.
R. # 2, exhibit 7, ¶ 1; exhibit 1.
Plaintiff's exhibit 5, Cash Sale Deed.
Plaintiff's exhibit 10, Permit to Drill.
H & P contracted with Davies Construction.
Plaintiffs' exhibits 11 and 12.
Plaintiffs' exhibit 16, U.S. Dept. of Interior Correspondence.
R. # 2, exhibit 7, pp 9-11.
Plaintiffs' exhibit 20, Contract of Release.
Plaintiffs' exhibit 24, Activity Log.
Plaintiffs' exhibit 29, p.1.
SOF, ¶ 39.
Plaintiffs' exhibit 30, Correspondence. SOF, ¶ 40.
SOF, ¶ 41, Plaintiffs' exhibits 31 and 32.
SOF, ¶ 43, Plaintiffs' exhibit 34.
SOF, ¶ 46, Plaintiffs' exhibits 26 and 27.
R. # 2, ¶ 65.
See Assignment and Bill of Sale, R. # 2, ¶ 66, Cimarex exhibit 7 and exhibit 1 attached thereto.
Plaintiffs' exhibit 39, Assignment.
Plaintiffs' exhibit 13. DNR Well Information.
David Daigle and Mary Ann Daigle v. Cimarex Energy Co., Helmerich & Payne, Inc. and KASH Oil & Gas, Inc. Civ. Action 2006-270, (33rd Judicial District court) (hereinafter referred to as the "Allen Parish Lawsuit").
Cimarex exhibit A-1 at ¶¶ 7 and 9, attached to David Culpepper Declaration, ¶ 3.R. # 25-2. MR. Culpepper was lead counsel of record for Cimarex in the Allen Parish Lawsuit.
R. # 23, exhibit 1; Culpepper decl. ¶ 6.
R. # 23, exhibit 2, Culpepper decl. ¶¶ 6 and 7, and exhibit A-11, p. 18.
Complaint. Plaintiffs' exhibit 3.
Fed. R. Civ. P. 56(c).
Anderson v. Liberty Lobby, Inc.,
Stewart v. Murphy,
Vera v. Tue,
Anderson,
Celotex Corp. v. Catrett,
Matsushita Elec. Indus. Co. v. Zenith Radio Corp.,
Anderson,
Lujan v. Nat'l Wildlife Fed'n,
Auspro Enterprises, LP v. City of Austin,
See Chesapeake Bay Foundation, Inc. v. Gwaltney of Smithfield, Ltd.,
Photos attached to Complaint, R. # 1-41 and 1-43.
Citing Phillips Petroleum Co. v. Hardee,
Gwaltney,
Broderick,
Plaintiffs' opposition, p. 11, R. # 22.
Any tort claims asserted by Plaintiffs subsequent to 2006; Plaintiffs' tort claims asserted in their second and third petitions in the Allen Parish lawsuit for (1) contamination arising out of the .4 acre former reserve pit site, (2) the April 29, 2002 purported spill at the Garth Well, and (3) negligence, trespass and nuisance claims, and claims under La. Civ. Code art. 667 and Mineral Code arts. 11, 22, and 122.
Except as otherwise provided by Act of Congress, an action, suit or proceeding for the enforcement of any civil fine, penalty, or forfeiture, pecuniary or otherwise, shall not be entertained unless commenced within five years from the date when the claim first accrued if, within the same period, the offender or the property is found within the United States in order that proper service may be made thereon.
La. Civ. Code art. 3462 (and Comment (b) ); La. Civ. Code art. 3463 (and Comments (b) and (f) ); La. Civ. Code art. 3466.
United States v. Hobbs,
Citing Norris v. Bell Helicopter-Textron, Inc.,
§ 1365(b)(1)(A).
La. R.S. 30:2026.B.(1).
See Plaintiffs' Exhibit 8 attached to opposition, ¶¶ 45 and 46.
Id. at *9. (The statute is silent as to prescription and the Louisiana Supreme Court has neither adopted a prescription period for LEQA citizens nor otherwise analyzed the issue.)
Morris & Dickson Co., Inc. v. Jones Brothers Co. Inc.,
Enforcing Environmental Standards Under State Law: The Louisiana Environmental Quality Act,"
Murchison "Enforcing Environmental Stands Under State Law: The Louisiana Environmental Quality Act,"
Complaint, ¶ 125. R. # 1.
See Complaint, Prayer.
See also Eagle Pipe & Supply v. Amerada Hess Corp.,
See La. R.S. 3:4278.1.
See memorandum in support of motion for summary judgment, p. 4.
Cimarex' exhibits 25 and 17.
Cimarex exhibit A-3.
Cimarex exhibit A-4.
Boone v. Conoco Phillips Co.,
Kash was a joint venturer/working interest partner in the Garth Well and original lessor of the H & P oil lease. See Cimarex exhibit A-1, original complaint, ¶ 11. R. # 25-3.
Maraist, 1 La. Civ. L. Treatise, Civil Procedure, § 6.10, 9. 200 (Thomson-Reuters, 2d ed. 2008).
Taylor v. Babin,
Cimarex exhibit A-3.
Cimarex A-4.
Plaintiffs' exhibit A (notice of signing of judgment/opinion).
See La. C.C. art. 3462 (and Comment (b) ); La. C.C. art. 3463 (and Comments (b) and (f) ); La. C.C. art. 3466 ; see also Gonzalez v. Seal,
Plaintiff's exhibit A.
Citing LeBreton v. Rabito,
Under Louisiana Revised Statute 13:850.C., the Fourth Petition was dismissed as having "no force or effect." The court stated that "the plaintiffs have not carried their burden of proving that the documents that was fax-filed was forwarded to the Court within the five legal days as required by Louisiana Revised Statute 13:850(B). Accordingly, the court finds that it was not timely filed, and the court will find that it legally was not filed." Cimarex exhibit A-11, p. 18.
Fax-filings must be followed up by filing the original document within 5 days.
Cimarex exhibit A-11, p. 18.
See Complaint, ¶¶ 1 and 46. R. # 1.
Cimarex exhibits A-2 and A-10.
Cimarex exhibits A-5 and A-6.
Vol. 1, § 27, p. 250 (1982).
Terrebonne Fuel & Lube, Inc. v. Placid Refining Co.,
Leon v. Moore,
Mandalay Oil & Gas, 880 So.2d at 135.
Id. at 136.
Plaintiffs' exhibit 12, Judgment (emphasis added).
Federal jurisprudence may be consulted for guidance in interpreting Louisiana's res judicata principals and the Restatement of Judgments. See Lafreniere Park Foundation v. Broussard,
State Through Dept. of Public Safety and Corrections v. Louisiana Riverboat Gaming Com'n,
Cimarex exhibit A-5.
Sevin v. Par. of Jefferson,
Alphonse v. Arch Bay Holdings, L.L.C.,
Plaintiffs' opposition brief, p. 27, R. # 28.; see also Camsoft Data Sys., Inc. v. S. Elecs. Supply, Inc.,
Citing Mandalay Oil & Gas, LLC. v. Energy Dev. Co.,
H & P initially operated the Garth Well until its merger with Cimarex. The original petition named Moncla as the company hired to provide vacuum truck services. After discovery, it was determined that Moncla was not the company hired. CRI was added as a defendant in the First Amending and Supplemental petition.
Comment (d) to § 27, Restatement (Second) of Judgments, p. 255 (An issue is considered to have been actually litigated when it was submitted and determined within the context of a motion for summary judgment.)
Goodman v. Spillers,
Marin v. Exxon Mobil Corp.,
See Lejeune Bros., Inc. v. Goodrich Petroleum Co. LLC,
Louisiana Civil Code article 1871.
Paul v. La. State Employees Group Ben, Prog.,
Lease, Exhibit 4, ¶ 8 attached to Complaint. R. # 1-5.
Andrepont,
LSA-C.C. 1978. "A contracting party may stipulate a benefit for a third person called a third party beneficiary."
Lejeune Bros. v. Goodrich Petroleum Co.,
Contract of Release, R. # 1-21, referred to by Plaintiffs as the 2002 Surface Use Agreement.
R. # 12.
R. # 1-21.
Id. ¶ 1.
Id. ¶ 7.
Id. ¶ 8.
R. # 12, Second Amended Complaint.
Double Eagle Resources, LLC.
Exhibit 38 attached to Complaint, R. # 1-39,
Revision Comments-1984 at art. 1881 a (c).
La. Civ. C. art 1880.
La. Civ. C. art. 1884 (comment a).
Ciolino v. First Guar. Bank,
See e.g. Corley v. Gary,
La. R.S. 3:4278.1(C).
Plaintiffs' Opposition to Cimarex's Supplemental Memorandum in Support of Motion for Summary Judgment and Cimarex's Reply Brief for Motion to Dismiss, R. # 28, p. 15.
Reference
- Full Case Name
- David R. DAIGLE v. CIMAREX ENERGY CO.
- Cited By
- 5 cases
- Status
- Published