Mayor of Cambridge v. Railroad Commissioners
Mayor of Cambridge v. Railroad Commissioners
Opinion of the Court
St. 1906, c. 520, was enacted on June 23, 1906. It was subsequently accepted by the city of Cambridge, and on June 29, 1906, it was accepted by the Boston Elevated Railway Company, which for convenience we shall speak of as the company.
On June 28, 1907, the company, in compliance with the provisions of § 3, filed with the city engineer of Cambridge a plan “ showing the proposed route or location ” of the subway and the “general form and method of construction [thereof] with the location of proposed tracks and stations and approaches.” The number of stations shown on this plan was two.
The mayor of Cambridge was notified of the filing of the plan, and his approval of it requested as required by § 3.
On July 29, 1907, the company filed this plan with the board of railroad commissioners, and applied to the board in writing to have it approved or altered in accordance with § 3. The company in this application stated that if the communication of the mayor dated July 23 was to be taken to be a determination by him of any question arising under St. 1906, c. 520, which he was authorized to determine, the application then filed was to be taken to be an application for a revision thereof under § 14 of that act.
The board set down this application for hearing on September 11. At the hearing on September 11, the mayor, by the city solicitor acting as his counsel,“ objected to any further hearing upon the ground that no subway stations had been located, and that there was no appeal from the action of the mayor upon the location of subway stations, with their exits and approaches, his authority upon that question being exclusive; that the board had no right, in the absence of the approval of the location of stations by the mayor, to consider the matter of stations in connection with the plan as filed, and that the other features of the plan were so comiected with the location of stations that it was impracticable for the board to proceed with the hearing upon that plan at all until the stations had been located with the approval of the mayor of the city of Cambridge.”
At this hearing a further question was raised, namely, whether the mayor had or had not exercised fully the authority given him by § 13. The hearing was then adjourned until September 17.
On September 16 a formal application was made to the mayor by the company, asking him to approve the location of the two stations shown on the plan then on file in the office of the rail
To this communication the mayor made no answer. The hearing was adjourned to September 20, and then to October 10.
On October 6 the petition and suit now before us were brought.
The petition is a petition for a writ of prohibition asking that the railroad commissioners may be forbidden to proceed with the hearing. The suit is a suit in equity, brought under § 31 of the act, (St. 1906, c. 520,) to have the commissioners enjoined from further proceeding with it.
Both are founded on the contention of the mayor, which already has been stated, that he has the sole and final authority to locate the stations, and that until the location of stations with their exits and approaches has been fixed by him, the time has not come for filing a plan and procuring the approval or alteration of it by the railroad commissioners.
If the petitioner’s is the true construction of St. 1906, c. 520, the building of this subway (which the mayor stated and truly stated in his letter of July 23 to be only “ primarily ” for the benefit of the citizens of Cambridge), is dependent upon the railway company’s being willing to accept the mayor’s determination, (first) as to how many stations are to be built, and (second) as to the exits and approaches to them. The second (the exits and approaches) is a matter of secondary importance in this connection. On the face of the matter it would be strange if the Legislature intended the building of this subway to be dependent upon the mayor of Cambridge coming to a just
We find nothing, however, in the act which bears out the mayor’s contention.
By § 3 a plan is to be filed with the railroad commissioners, within a year after the acceptance of the act by the company, and before the work of construction is begun, for their approval or alteration, “ whether the mayor has or has not approved” it. This plan is to show “ the proposed route or location . . . and . . . the general form and method of construction . . . with the location of proposed tracks and stations and approaches,” and the board, after notice and hearing, “ shall approve such plan or alter the same in such manner as it may deem necessary.”
So far as the matter of stations enters into the general problem, it is to be submitted to the railroad commissioners at this time and is to be decided by them after hearing. When that has been done, the time has come for the company to submit to the mayor under § 13 the exact location of the stations which are to be built under the plan which has then received the approval of the railroad commissioners, having regard to the question of these stations being at convenient points and to their having suitable exits and approaches to and from the streets.
Further, to prevent the possibility of a deadlock in the matter, if the mayor determines not to approve under § 13 what the public convenience requires should be approved, an appeal is given by § 14 from that determination to the railroad commissioners.
We are therefore of opinion that it is the duty of the railroad commissioners to proceed with the hearing on the petition of the company filed on July 29,1907. In view of the eonclu
The entry must be
Petition for prohibition denied; bill in equity dismissed.
Both cases were reserved for determination by the full court.