Randolph v. PowerComm Construction, Inc.
Randolph v. PowerComm Construction, Inc.
Opinion of the Court
MEMORANDUM OPINION
In this Fair Labor Standards Act (“FLSA”) case, Plaintiffs are former traffic controllers (commonly referred to as “flag-gers”) who allege that Defendant Power-Comm Construction, Inc. and its owner, Defendant David Kwasnik, Sr. (collectively “PowerComm”), failed to pay them appropriate overtime wages. The Court conditionally certified this case as a collective action on March 26, 2014, and the opt-in and discovery periods have now closed. Both parties have filed motions for summary judgment. See ECF Nos. 128 & 130. Additionally, Power-Comm has filed a motion to decertify the collective action and Plaintiffs move to certify the collective action. See ECF Nos. 129 & 131. A hearing on these motions is unnecessary. See Loe. R. 105.6(Md.). For the reasons that follow, both motions for summary judgment are granted, in part, and denied, in part; PowerComm’s motion to decertify the collective action is denied; and Plaintiffs’ motion to certify the collective action is granted.
I. BACKGROUND
PowerComm is an electrical utility construction company. See ECF No. 21 at 22.
PowerComm typically contracts with other companies to provide construction, upgrading, and maintenance services for overhead and underground distribution centers. See ECF No. 21 at 22. Specifically, PowerComm will erect utility poles and towers; replace poles, conductors, insulators, and transformers; install fiber-optic and coaxial cable; cast in place manholes; and remediate and demolish bridges, roads, sidewalks, and buildings. See id. During the relevant time period, PowerComm had one contract to provide flaggers to the Potomac Electric Power Company (“PEPCO”). See id. at 23; see also ECF No. 130-3 at 23. The flaggers typically reported to the PowerComm yard in the morning and remained until PowerComm instructed them where to go. See ECF No. 130-3 at 55-56. PowerComm would then send the flaggers to the location requested by PEPCO. See id. at 24.
On July 2, 2014, PowerComm filed a third motion for partial summary judgment, arguing that, if PowerComm did violate the FLSA, it had done so in good faith thus making liquidated damages unavailable. See ECF Nos. 82 & 83. The Court denied this motion as premature. See ECF No. 116. On August 5, 2014, Plaintiffs filed a Motion for Protective Order and for Sanctions, arguing that PowerComm had paid some of the opt-in Plaintiffs to opt-out of the collective action. See ECF No. 89. On August 29, 2014, the Court prohibited PowerComm from further contact with Plaintiffs regarding this lawsuit and invalidated all opt-out forms. See ECF No. 104.
PowerComm filed the pending fourth Motion for Summary Judgment on January 23, 2015 along with a Motion to Decertify the Conditional Collective Action. See ECF Nos. 128 & 129. Plaintiffs filed a Cross-Motion for Partial Summary Judgment and a Motion for Nonconditional Certification on February 6, 2015. See ECF Nos. 130 & 131. The parties raise numerous issues within their motions, which the Court will address in this Memorandum Opinion.
Further relevant facts will be discussed below. All facts referred to in this Opinion are undisputed unless stated otherwise.
II. STANDARD OF REVIEW
Summary judgment is proper when there is no genuine issue as to any material fact and the movant is entitled to judgment as a matter of law. See Meson v. GATX Tech. Servs. Corp., 507 F.3d 803, 806 (4th Cir. 2007) (citations omitted); see also Fed.R.Civ.P. 56(a). A genuine issue of material fact exists when “the evidence is such that a reasonable jury could return a verdict for the nonmoving party.” See Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 248,106 S.Ct. 2505, 91 L.Ed.2d 202 (1986). The moving party bears the burden of demonstrating that no genuine dispute exists with regard to material facts. See Pulliam Inv. Co., Inc. v. Cameo Props., 810 F.2d 1282,1286 (4th Cir. 1987). Notably, the moving party can demonstrate that there is no genuine issue of material fact by establishing that “there is an absence of evidence in support of the nonmoving party’s case.” See Celotex Corp. v. Catrett, 477 U.S. 317, 325, 106 S.Ct. 2548, 91 L.Ed.2d 265 (1986). If the party seeking summary judgment demonstrates that there is no admissible evidence to support the nonmoving party’s case, the burden shifts to the nonmoving party to identify specific facts showing that there is a genuine issue for trial. See Lorraine v. Market Am. Ins. Co., 241 F.R.D. 534, 535 (D.Md. 2007). However, the “mere existence of some alleged factual dispute between the parties will not defeat an otherwise properly supported motion for summary judgment----” See Anderson, 477 U.S. at 247-48, 106 S.Ct. 2505 (emphasis in original). The evidentiary materials presented must show facts from which the fact finder could reasonably find for the party opposing summary judgment. See id. at 252, 106 S.Ct. 2505.
III. MOTIONS FOR SUMMARY JUDGMENT
A. Employment status
Both parties move for summary judgment on the issue of employment status, providing competing theories on whether the flaggers were PowerComm employees, who would be covered under the FLSAl, or independent contractors, who would not be covered.
i. Degree of Control
The first Silk factor is the degree of control that the alleged employer has over the manner in which the work is performed. “Where putative employers provide specific direction for how workers, particularly low-skilled workers, are to perform their jobs, courts have weighed the control factor in
Here, PowerComm hired, fired, and trained the flaggers. See ECF No. 130-3 at 33-34 & 92. PowerComm required the flag-gers to fill out time sheets, kept records of the flaggers’ hours, and paid the flaggers an hourly wage. See EOF No. 128-1 at 11-12 & 27. PowerComm directed the flaggers to particular job sites and paired more senior flaggers with less experienced ones. See ECF No. 130-3 at 32 & 55-57. Further, PowerComm controlled who worked at the sites. Specifically, Mr. Kwasnik testified that the flaggers were not permitted to hire assistants or bring anyone with them to a site because PowerComm had to vet the flag-ger before he or she could work on the site. See id. at 43-44. In addition, PowerComm demonstrated its responsibility over the flag-gers when there were problems at the sites, such as when the flaggers were not receiving breaks, by contacting PEPCO to discuss the problem. See id. at 41. In contrast, the flaggers had little control over their work. They typically did not choose with whom they worked, when they worked, or how they performed their job duties. See e.g., ECF No. 136-2. Although PEPCO could request to work with a specific flagger, the flagger still needed to let PowerComm know where he or she was working. See ECF No. 130-3 at 55.
PowerComm does not appear to argue that the flaggers controlled their work schedules. Instead, PowerComm points to the fact that it shifts control over the work to the contractor on site. See id. at 45. But “the issue is not the degree of control that an alleged employer has over the manner in which the work is performed in comparison to that of another employer. Rather, it is the degree of control that the alleged employer has in comparison to the control exerted by the worker.” Schultz, 466 F.3d at 305 (emphasis in original). Even if PEPCO supervised the flaggers on the work site, the flaggers were not in control and certainly had less control over their work than Power-Comm. In total, the degree of control exercised by PowerComm over the flaggers leads the Court to weigh this factor in Plaintiffs’ favor.
ii. Opportunity for profit or loss
The second factor is the worker’s opportunities for profit or loss dependent on Ms or her managerial skills. “Where the putative employee’s work is, by its nature, time oriented, not project oriented, courts have weighed the second Silk factor in favor of employee status.” Montoya, 589 F.Supp.2d at 580. Here, while the flaggers may have been able to work additional hours to increase their wages, they could not make business strategy decisions that would typically be associated with the ability to increase the profits of an independent business such as what amount and type of equipment to use, what types of jobs to take, whether to hire assistants, whether to invest in advertisements, or whether to adjust pricing. Cf. Dole v. Snell, 875 F.2d 802, 809-10 (10th Cir. 1989) (“With respect to the tMngs upon wMch the volume of cakes depended, such as the number of retail outlets, and the quality and attractiveness of their decor, the selection and efficiency of the counter help, advertising for the business, the quality of the ingredients in the cakes, and so forth, the decorators had absolutely no input____Their earmngs did not depend upon their judgment or imtiative, but on the [] need for their work.”); Solis v. Cascom, Inc., 3:09-cv-257, 2011 WL 10501391 at *6 (S.D.OMo Sept. 21, 2011) (“While the alleged employees were free to work additional hours to increase their income, they had no decisions to make regarding routes, or acquisition of materials, or any facet normally associated with the operation of an independent business.”). As such, the flaggers’ work was time oriented without the opportumty to use their managerial skills to increase the profits of their alleged businesses. TMs factor weighs in favor of finding that the flaggers were employees.
The third factor is the worker’s investment in equipment or material, or his or her employment of other workers. As for employing other workers, Mr. Kwasnik testified that the flaggers could not hire an assistant or bring anyone along with them on a job. See ECF No. 130-3 at 43-44. As for investment in equipment or materials, “[i]n-vestment in this instance is understood to be large expenditures, such as risk capital, or capital investments, and not negligible items or labor itself.” Donovan v. Gillmor, 535 F.Supp. 154, 161 (N.D.Ohio 1982) (citations omitted). A flagger’s job is to maintain safe conditions on the road while construction is performed. See ECF No. 130-2 at 2. Mr. Kwasnik testified that PowerComm supplied the flaggers with the equipment necessary to perform that job: pickup trucks, paddles, cones, and walkie-talkies; and the individual flaggers supplied them own protective gear: hard hats, glasses, ear protection, vests, and steel-toed boots. See ECF No. 130-3 at 38-40. The investment in clothing and protective gear is not a significant enough investment to turn the flaggers into independent contractors. Indeed, protective gear is a negligible investment in comparison to PowerComm’s investment in the equipment necessary to perform the flagging work. Cf. Heath v. Perdue Farms, Inc., 87 F.Supp.2d 452, 458 (D.Md. 2000) (finding that crew lead-era’ investment in computers and personal protective equipment such as gloves and masks indicated that crew leaders were employees when compared to employer’s investment in the heavy equipment and machinery required to catch chickens); Real v. Driscoll Strawberry Assocs., Inc., 603 F.2d 748, 755 (9th Cir. 1979) (“[T]he appellants’ investment in light equipment hoes, shovels and picking carts is minimal in comparison with the total investment in land, heavy machinery and supplies necessary for growing the strawberries.”). Thus, it is unlikely that the flaggers were in the traffic control business for themselves when they only invested in protective gear, could not hire any workers of their own, and received all the equipment to do their job from PowerComm. This factor weighs in favor of finding the flaggers were PowerComm employees.
iv. Degree of skill
The fourth factor is the degree of skill required for the work. Mr. Kwasnik testified that the flaggers were required to pass a test and attend a two-to-four hour training at PowerComm. See ECF No. 130-3 at 92-93. Even if these requirements were considered to be a type of certification, a certification requirement does not necessarily mean a high level of skill is required to perform the job. See Quinteros, 532 F.Supp.2d at 770 (finding janitorial building maintenance is not considered a labor that requires a high degree of skill even though the job requires certification on certain machinery). The training and test for flaggers appear to be required to ensure safety because the job can be dangerous and not because the job requires a high degree of skill. Plaintiff Gregory Randolph stated that the hardest part of the job was “standing in traffic all day without getting hit by a car.” See ECF No. 130-2 at 2. While not minimizing the safety risk involved, directing traffic through a construction site is not labor that requires a high degree of skill or technical expertise. Cf Montoya, 589 F.Supp.2d at 581 (finding painting is not a high skilled job as “[ejvery task, whether skilled or unskilled, requires some degree of knowledge as to how to perform it and an ability to follow directions”); Heath, 87 F.Supp.2d at 458 (finding that catching chickens was unskilled labor and that the ability to do a job faster with experience is “true of most repetitive tasks, skilled or unskilled”). Indeed, neither party indicated that Plaintiffs had experience in traffic control before working for Power-Comm. See Solis, 2011 WL 10501391 at *6 (finding no special skills were needed where several workers did not have prior experience and could learn the skill involved after a few weeks on the job). The degree of skill required to work as a flagger does not suggest that Plaintiffs were in business for themselves as independent contractors.
v. Permanence of the working relationship
The fifth factor is the permanence of the working relationship. A lack of
vi. Integral part of the employer’s business
The final and sixth factor is the degree to which the services rendered are an integral part of the putative employer’s business. PowerComm “provide[s] construction services to utilities and the private industry throughout the Eastern United States.” See ECF No. 21 at 26. Specifically, PowerComm indicates that it performs utility line construction for other businesses. See ECF No. 130-3 at 19. Thus, PowerComm’s contract with PEPCO to provide the company with flaggers to direct traffic during roadside utility projects does not appear to be an integral part of its business, see ECF No. 21 at 23 & ECF No. 130 at 49-50, and this one factor out of six weighs at least slightly in favor of finding the flaggers were not PowerComm employees. But “one factor standing alone does not tip the balance towards a finding of [independent contractor].” Herman, 164 F.Supp.2d at 677.
After analyzing the above factors, the Court finds that the Plaintiffs were economically dependent on PowerComm and not in business for themselves. Thus, the Court finds that Plaintiffs were employees for FLSA purposes as a matter of law. Plaintiffs’ motion for summary judgment on this issue is granted.
B. Motions Involving Individual Plaintiffs
PowerComm contends that many of the opt-in Plaintiffs should be dismissed from this case for various individual reasons. The Court will address each of PowerComm’s arguments in turn.
i. Statute of limitations
This ease was filed on June 12, 2013, and the earliest that Plaintiffs began to opt-in was April 28, 2014.
Of the remaining ten Plaintiffs for which PowerComm argues the statute of limitations has run, Plaintiffs Alonzo Mudd, Raleigh Wall, and Jacqueline Ridgley state that they last worked at PowerComm in 2004, 2007, and 2009, respectively.
The remaining seven Plaintiffs have no evidence of when they worked for Power-Comm and are unable to refute Power-Comm’s evidence in any way. Indeed, Plaintiffs Andre Adams, Michael Allen, Van Eubanks, Regina Freeman, William Holland, David Peterson, and Robert Wall do not state when they worked for PowerComm in their answers to interrogatories. See ECF Nos. 136-3, 136-5, 136-23, 136-25, 136-32, 136-45, & 136-59. Without any evidence to refute PowerComm’s records as to when they worked for PowerComm, no reasonable fact-finder could find in favor of Plaintiffs and PowerComm is entitled to summary judgment with regard to these seven Plaintiffs. See Anderson, 477 U.S. at 252, 106 S.Ct. 2505 (finding that to defeat summary
ii. Failure to opt-in timely
PowerComm argues that all Plaintiffs who did not opt-in by June 2, 2014 should be barred from this litigation. This would include Cornelius Redfearn (opted-in on June 9, 2014, see ECF No. 78), Darnell Maddox (opted-in on June 20, 2014, see ECF No. 80), Ronald Young (opted-in on July 1, 2014, see ECF No. 81), and Calvin Gorham (opted-in on September 24, 2014, see ECF No. 114).
Opt-in deadlines are set by the trial court and not the FLSA. See Regan v. City of Charleston, S.C., 2:13-cv-3046-PMD, 2015 WL 1299967 at *2 (D.S.C. Mar. 23, 2015) (citing 29 U.S.C. §§ 216(b), 255 & 256) (additional citation omitted). “[T]he FLSA does not set forth or otherwise prescribe the standard under which a trial court should consider whether potential plaintiffs may join a collective action by filing the requisite opt-in consent forms after the stated deadline.” Id. (citing Ruggles v. Wellpoint, Inc., 687 F.Supp.2d 30, 37 (N.D.N.Y. 2009)). Instead, “courts have generally decided the question by balancing various combinations of the following factors: (1) whether ‘good cause’ exists for the late submissions; (2) prejudice to the defendant; (3) how long after the deadline passed the consent forms were filed; (4) judicial economy; and (5) the remedial purposes of the FLSA.” Id. (citing Ruggles, 687 F.Supp.2d at 37) (collecting cases) (internal quotation marks omitted).
In this case, Plaintiffs sent Power-Comm the interrogatory answers for all opt-in Plaintiffs at the same time.
Plaintiffs who opted-in before the deadline. Further, PowerComm had the information on these four Plaintiffs for several months before the end of discovery. See ECF No. 124. Thus, the late opt-in notices did not unduly prejudice PowerComm. “[The opt-in deadline was] chosen by the Court in its discretion and w[as] not constrained by any considerations other than the practicalities of the case and setting an appropriate deadline so that discovery could proceed.” Robinson-Smith v. Gov’t Emps. Ins. Co., 424 F.Supp.2d 117, 123 (D.D.C. 2006). Further, “there is little economy in spawning identical FLSA lawsuits that themselves might be properly joined with this lawsuit in the future.” Rug-gles, 687 F.Supp.2d at 38. Thus, the interests of judicial economy are best served by accepting the late opt-in notices. This approach is also consistent with the FLSA’s remedial statutory scheme. See Kelley v. Alamo, 964 F.2d 747, 749-50 (8th Cir. 1992) (“The FLSA should be given a broad reading, in favor of coverage. It is a remedial statute that ‘has been construed liberally to apply to the furthest reaches consistent with congressional direction.’ A generous reading, in favor of those whom [Cjongress intended to benefit from the law, is also appropriate when considering issues of time limits and deadlines.”) (quoting Mitchell v. Lublin, McGaughy & Assocs., 358 U.S. 207, 211, 79 S.Ct. 260, 3 L.Ed.2d 243 (1959)). For these reasons, Plaintiffs late opt-in notices are accepted and PowerComm’s request to dismiss the late opt-in Plaintiffs from the action is denied.
iii. Failure to indicate compensable claim
PowerComm contends that Plaintiffs Cornelius Redfearn and Ronald Wall claim no damages in their damage computation disclosures and should therefore be dismissed from the litigation.
In Plaintiffs’ second amended damages computation disclosures, filed on September 5, 2014, the damages for Plaintiffs Cornelius Redfearn and Ronald Wall are $0.00. See ECF No. 107. Plaintiffs Jeff Jordan and Calvin Gorham are not included in the disclosures. See id. However, Redfearn and Wall provided PowerComm with interrogatory answers indicating that they worked overtime and were not paid. See ECF Nos. 136-49 & 136-60. Jordan and Gorham also provided PowerComm with their interrogatory answers during discovery, which provided damages estimates. See ECF No. 136-28 & 136-36. Thus, PowerComm received information on damages for these Plaintiffs through them interrogatory answers and summary judgment in their favor is not the appropriate remedy for failure to provide a damages figure in the disclosures.
iv. Failure to answer interrogatories
PowerComm states that Plaintiffs Rodney Brooks, Terrence Dove, Jeff Jordan, Edward Robinson, Anthony Wills, Ronald Young, and Terence Brown
Under Fed.R.Civ.P. 33(b)(5), interrogatory answers must be signed, under oath, by the person making them. Thus, the Court agrees that a show cause order of some form is appropriate. As Plaintiffs admit that some signatures have not been provided, the Court orders that Plaintiffs provide those signatures within 14 days of this Memorandum Opinion and accompanying Order. If the signatures verifying the interrogatory answers are not provided, Plaintiffs Rodney Brooks, Terrence Dove, Jeff Jordan, Edward Robinson, Anthony Wills, Ronald Young, and Terence Brown will not be able to use those answers to support their claims. This will be an appropriate sanction given that Power-Comm has had these Plaintiffs’ interrogatory answers, albeit without signatures, since September 2014.
C. Amount of Overtime
PowerComm contends that they have produced the full and complete time records for Plaintiffs and therefore should be granted summary judgment as to the amount of overtime hours Plaintiffs worked. See ECF No. 128-1 at 10. Plaintiff carries the burden of proof in an FLSA claim for overtime wages. See Anderson v. Mt. Clemens Pottery Co., 328 U.S. 680, 686-87, 66 S.Ct. 1187, 90 L.Ed. 1515 (1946); Anderson, 477
Here, PowerComm asserts that it has produced Plaintiffs’ signed timesheets that were contemporaneously recorded and has therefore negated Plaintiffs’ evidence.
This case is readily distinguishable from White. Here, Plaintiffs question the authenticity and thoroughness of Power-Comm’s timesheets and have an arguable basis to do so. See ECF No. 135 at 1-2. Specifically, Plaintiffs asserts that Power-Comm originally claimed that it may have discarded the timesheets and only later found the alleged timesheets in storage. Id. Thus, the timesheets do not appear to have been consistently and methodically kept, raising the possibility that they may be incomplete or inaccurate. Plaintiffs’ argument has support in the record. Indeed, Power-Comm continuously supplemented its discovery with newly found documents. See ECF No. 130-19. Thus, PowerComm is not in a position to establish that the records produced are unequivocally the full and complete time records and should be relied on by the Court as a matter of law. Against Power-Comm’s timesheets, Plaintiffs provide interrogatory answers with overtime estimates. See ECF Nos. 136-1-136-68. The discrepancies between PowerComm’s summary of its timesheet records and Plaintiffs’ estimates are significant. Plaintiffs maintain that they regularly worked overtime and no Plaintiff has been confronted with the time-sheets to verify their signature or indicate whether they agree with PowerComm’s time calculations.
PowerComm has also moved for summary judgment on the issue of willfulness, arguing that Plaintiffs have failed to put forth evidence that PowerComm willfully violated the FLSA and that PowerComm has affirmatively refuted any such allegation through its reliance on the advice of counsel. ECF No. 128-1 at 20-23. Plaintiffs have filed a cross-motion for summary judgment on this issue, contending that their evidence undisputedly proves that PowerComm’s actions were willful. See ECF No. 130 at 36-37. When cross-motions for summary judgment are filed, the same standards of review apply. Bryant v. Better Bus. Bureau of Greater Maryland, Inc., 923 F.Supp. 720, 729 (D.Md. 1996). The Court must deny both motions if questions of material fact exist. Id.
The FLSA statute of limitations is two years, but it is extended to three years if the violation of the Act was willful. See 29 U.S.C. § 255(a). An employer is willful in its violation of the FLSA if the employer knows, or shows reckless disregard as to whether, its conduct is prohibited by the FLSA. See McLaughlin v. Richland Shoe Co., 486 U.S. 128, 133, 108 S.Ct. 1677, 100 L.Ed.2d 115 (1988). Negligent conduct is not enough to constitute “willful” conduct. See id. “Although this is ultimately a question of fact, a plaintiff must present sufficient evidence of willfulness to survive summary judgment.” Hantz v. Prospect Mortg., LLC, 11 F.Supp.3d 612, 617 (E.D.Va. 2014) (citing Pignataro v. Port Authority of New York and New Jersey, 593 F.3d 265, 273 (3d Cir. 2010)). Typically, willfulness is found when the defendant was already investigated for an FLSA violation or when there is evidence that the defendant tried to cover-up an FLSA violation. Williams v. Maryland Office Relocators, 485 F.Supp.2d 616, 621 (D.Md. 2007) (citing Chao v. Self Pride, Inc., RDB-03-3409, 2005 WL 1400740 at *10-11 (D.Md. 2005) (finding genuine dispute of material fact as to whether defendants were given specific warnings regarding FLSA violations that they did not heed)), Martin v. Deiriggi, 985 F.2d 129,136 (4th Cir. 1992) (finding evidence that the employer destroyed and withheld records in order to block the Department of Labor’s investigation of FLSA violations supported finding of willfulness), and Cubias v. Casa Furniture and Bedding, LLC, l:06cv286 (JCC), 2007 WL 150973 (E.D.Va. 2007) (granting plaintiffs summary judgment motion as to the issue of willfulness when defendant had split employees’ hours between its two companies so that it appeared on each individual company’s books that the employees were working less than 40 hours a week, and defendant had also signed an employment verification form stating that employees were being paid overtime when they were not).
Here, the evidence on the issue of willfulness is conflicting. On the one hand, Plaintiffs have produced evidence that suggests PowerComm knew the flaggers were employees and not independent contractors and nonetheless categorized them as independent contractors. For example, PowerComm had the flaggers sign an application for employment. See ECF No. 130-3 at 126-27. Additionally, at least one plaintiff produced evidence that PowerComm at times provided him with a W2 form, typically used for employees, and at other times with a 1099 form, typically used for independent contractors. See ECF No. 130-2. Notably, some of the flaggers assert that they requested overtime pay and some, at times, received overtime pay. See id. Finally, Plaintiffs assert that PowerComm did not consult an attorney until after classifying flaggers as independent contractors. See ECF No. 130 at 36.
On the other hand, Mr. Kwasnik testified that PowerComm believed the flaggers were independent contractors because the company did not control the flaggers’ day-to-day work and did not pay for the flaggers’ personal protective gear*. ECF 130-3 at 48-52. Specifically, Mr. Kwasnik noted that another contractor had control over the flaggers. See id. Further, there is no indication that PowerComm had on prior occasions been cited for related violations of the FLSA or otherwise had notice that it was not in compliance.
The Court finds there is enough conflicting evidence to create a genuine dispute of fact over the issue of PowerComm’s alleged will
E. Good Faith
Plaintiffs request summary judgment on the issue of whether PowerComm acted in good faith when classifying the flaggers as independent contractors. See ECF No. 130 at 29-36. Whereas a willful violation increases the amount of damages by lengthening the statute of limitations, a violation that was done in good faith may eliminate liquidated damages. See 29 U.S.C. § 260.
The FLSA provides that an employer who violates the Act shall be liable to the affected employee in the amount of their unpaid wages and “in an additional equal amount as liquidated damages.” 29 U.S.C. § 216(b). “Under the FLSA, there is a presumption in favor of liquidated damages against employers who violate the statute.” Rogers v. Savings First Mortgage, LLC, 362 F.Supp.2d 624, 637 (D.Md. 2005). However, under 29 U.S.C. § 260 of the Portal-to-Portal Pay Act, a court may, in its discretion, reduce or eliminate an award of liquidated damages if the employer shows that the “act or omission giving rise to [the FLSA] action was in good faith and that [the employer] had reasonable grounds for believing that [its] act or omission was not a violation of the [FLSA].” The employer has the “plain and substantial burden” of persuading the court that the “failure to obey the statute was both in good faith and predicated upon such reasonable grounds that it would be unfair to impose upon him more than a compensatory verdict.” Mayhew v. Wells, 125 F.3d 216, 220 (4th Cir. 1997) (citations and internal quotation marks omitted); see also 29 C.F.R. § 790.22(a)-(b). “This burden is a difficult one to meet ... and [d]ouble damages are the norm, single damages the exception.” Rogers, 362 F.Supp.2d at 638 (citation and internal quotation marks omitted). Further, deciding to preclude liquidated damages is within the court’s complete discretion; the decision to reduce or eliminate an award of liquidated damages is a judge, not a jury, determination. See 29 U.S.C. § 260(c).
Here, PowerComm argues good faith based on its reliance on the advice of counsel.
Under the evidence PowerComm has produced in this case, the Court is not convinced that PowerComm has met its “plain and substantial burden” that its “failure to obey the statute was both in good faith and predicated upon such reasonable grounds that it would be unfair to impose ... more than a compensatory verdict.” May-hew, 125 F.3d at 220 (citation and internal
F. Motion to Disqualify Defense Counsel
Plaintiffs have moved to disqualify Geoffrey Bohn, Esq. and Robert Battey, Esq. as counsel because Plaintiffs wish to call Mr. Bohn and Mr. Battey as witnesses to refute PowerComm’s advice of counsel defense. See ECF No. 130 at 46. As the Court has already found that good faith is not applicable in this case, the only remaining issue to which this testimony may be relevant is the issue of willfulness wherein PowerComm maintains that it did not willfully violate the FLSA because it consulted an attorney about classifying the flaggers as independent contractors. Thus, it is possible that Power-Comm’s attorneys, Mi*. Bohn and Mr. Battey, will be called to testify about advice they provided regarding FLSA compliance.
It has been recognized that “[disqualification is a drastic remedy since it deprives litigants of their right to freely choose their own counsel.” Gross v. SES Americom, Inc., 307 F.Supp.2d 719, 722 (D.Md. 2004) (citations omitted). Thus, “disqualification at the urging of opposing counsel is permitted only Svhere the conflict is such as clearly to call in question the fair and efficient administration of justice.’” Id. at 723 (citations omitted). The Court must also be mindful of the possibility that a disqualification motion may be abused for tactical purposes. See Shaffer v. Farm Fresh, Inc., 966 F.2d 142, 146 (4th Cir. 1992) (citation omitted). Accordingly, it is typically the movant who must satisfy a high standard of proof that disqualification is warranted. See Buckley v. Airshield Corp., 908 F.Supp. 299, 304 (D.Md. 1995). But “[w]hen the attorney in question is so clearly aware before the fact of the potential conflict between his roles as advocate and witness, then the scrutiny usually applied to an opposing party’s motion for disqualification is unnecessary, and the burden shifts to the attorney in question.” Klupt v. Krongard, 126 Md.App. 179, 728 A.2d 727, 741 (1999).
The Maryland Rules of Professional Conduct address the issue of serving as both an advocate and a witness. “A lawyer shall not act as advocate at a trial in which the lawyer is likely to be a necessary witness unless: (1) the testimony relates to an uncontested issue; (2) the testimony relates to the nature and value of legal services rendered in the case; or (3) disqualification of the lawyer would work substantial hardship on the client.” Md. Rule 16-812, Rules of Prof. Conduct, Rule 3.7(a). “Combining the roles of advocate and witness can prejudice the tribunal and the opposing party and can also involve a conflict of interest between the lawyer and client.” Id. cmt. 1.
In determining whether the potential for dual roles should be permitted based on substantial hardship to the client under Rule 3.7(a)(3), the court balances the
The most, and perhaps only, relevant potential testimony from Mr. Bohn is that any consultation regarding classification did not take place until 2013. Mr. Bohn has been questioned by Plaintiffs on this issue at his deposition. Thus, a stipulation as to what Mr. Bohn would testify to if called sufficiently balances the competing interests presented by this issue. If the parties agreed to such a stipulation, there would be no need to disqualify PowerComm’s counsel and the relevant evidence would be placed before the jury. The Court will give the parties fourteen days from the date of this Memorandum Opinion and accompanying Order to determine their course of action before ruling on Plaintiffs’ motion to disqualify.
IV. CROSS-MOTIONS TO DECERTIFY AND CERTIFY COLLECTIVE ACTION
The FLSA permits a plaintiff to bring an action on behalf of himself and other employees that are “similarly situated” to the plaintiff. See 29 U.S.C. § 216(b). When the plaintiff brings the action on behalf of other employees, who opt-in to the action, the action is known as a “collective action.” A collective action under the FLSA differs from a class action under Fed.R.Civ.P. 23. Gionfriddo v. Jason Zink, LLC, 769 F.Supp.2d 880, 886 (D.Md. 2011) (citing 7B Charles A. Wright, Arthur R. Miller & Mary K. Kane, Federal Practice and Procedure § 1807 (3d ed. 2005)). Unlike in class actions under Fed.R.Civ.P. 23, in FLSA collective actions, “plaintiffs must affirmatively ‘opt in’ to the suit in order to be considered a member of the class”; Rule 23’s requirements of numerosity, typicality, commonality, and adequacy do not apply; and plaintiffs need only show that they and potential class members are “similarly situated” for the Court to certify the collective action. Mancia v. Mayflower Textile Servs. Co., No. CCB-08-273, 2008 WL 4735344 at *2 (D.Md. Oct. 14,2008).
When deciding whether to certify a collective action pursuant to the FLSA, courts generally follow a two-stage process. See Syrja v. Westat, Inc., 756 F.Supp.2d 682, 686 (D.Md. 2010). In the first stage, commonly referred to as the notice stage, the court makes a “threshold determination of ‘whether the plaintiffs have demonstrated
The Court has broad discretion in determining whether the case should continue as a collective action after discovery. See Gionfriddo, 769 F.Supp.2d at 886 (citations omitted). The FLSA does not define similarly situated, but “[i]n making this determination, courts have considered three factors: (1) the disparate factual and employment settings of the individual plaintiffs; (2) the various defenses available to defendant which appear to be individual to each plaintiff; and (3) fairness and procedural considerations.” See id. (quoting Rawls, 244 F.R.D. at 300 (quoting Thiessen v. Gen. Elec. Capital Corp., 996 F.Supp. 1071, 1081 (D.Kan. 1998))). Essentially, collective action members are similarly situated when there are “issues common to the proposed class that are central to the disposition of the FLSA claims and that such common issues can be substantially adjudicated without consideration of facts unique or particularized as to each class member.” See LeFleur v. Dollar Tree Stores, Inc., 30 F.Supp.3d 463, 468 (E.D.Va. 2014) (citation and internal quotation marks omitted).
The Court first looks at the employment settings. PowerComm asserts that Plaintiffs had different employment settings because they worked under different contractors for different hours at different locations. See ECF No. 129-1. Plaintiffs allege that they all worked for PowerComm as flaggers, performing the same job functions, and Pow-erComm failed to pay them overtime. See ECF Nos. 136-1-136-68. In line with Plaintiffs’ argument, Mr. Kwasnik has acknowledged that all flaggers essentially have the same job. See ECF No. 130-3 at 37. Indeed, Mr. Kwasnik testified that the flaggers all worked with PEPCO. He has also indicated that flaggers are subject to a single set of standards, and has repeatedly discussed the policies and standards for flaggers in general terms, see, e.g., ECF No. 43-2 at ¶¶ 5-23, without any indication that the nature of a flagger’s work or payment conditions differed among work sites. Specifically, Mr. Kwasnik testified that the job of a “flagger” or “traffic controller” is regulated and that PowerComm follows those state and federal regulations. See ECF No. 130-3 at 28-29. Additionally, Plaintiffs all challenge PowerComm’s practice of failing to pay overtime. To that end, Plaintiffs have provided evidence to show that Mr. Kwasnik’s son, speaking on behalf of PowerComm, stated that “PowerComm doesn’t pay overtime” as a matter of policy. See ECF No. 42-3 at 2. Thus, Plaintiffs have provided sufficient evidence of a “company-wide policy which may violate the FLSA[.]” See Rawls, 244 F.R.D. at 300. Even if Plaintiffs worked different hours at different work sites, Plaintiffs performed the same job duties, were all classified as independent contractors by Power-Comm, and were all paid hourly. See ECF No. 136-1-136-68. Thus, the assessment of “Plaintiffs’ job duties, geographic location, supervision, and salary” leads to a finding that there was little factual difference between the individual Plaintiffs and their employment settings. See Rawls, 244 F.R.D. at 300. While there may be differences in hours worked, those differences are inevitable and do not preclude a finding of a similarly situated collective action. See, e.g., LaFleur, 30 F.Supp.3d at 468; Romero v. Mountaire Farms, Inc., 796 F.Supp.2d 700, 705 (E.D.N.C. 2011) (citation omitted).
As to the fairness and procedural considerations, the Court considers the primary objectives of a collective action under § 216(b), namely “(1) to lower costs to the plaintiffs through the pooling of resources; and (2) to limit the controversy to one proceeding which efficiently resolves common issues of law and fact that arose from the same alleged activity.” Moss v. Crawford & Co., 201 F.R.D. 398, 410 (W.D.Pa. 2000). The Court must also “determine whether it can coherently manage the class in a manner that will not prejudice any party.” Id. (citing Thiessen, 996 F.Supp. at 1084). Here, Pow-erComm contends that if this action is not decertified, it will need to prepare mini-trials for each Plaintiff. As explained above, this is not the ease. The members of the collective action share the common issue of whether PowerComm typically did not pay them overtime wages.
Given that some Plaintiffs did not work a significant amount of overtime, “[e]ach individual plaintiff would be unlikely to pursue his or her claim alone due to the costs involved relative to the damages sought.” See LaFleur, 30 F.Supp.2d at 475 (citing Russell v. Illinois Bell Tel. Co., Inc., 721 F.Supp.2d 804, 823 (N.D.Ill. 2010) (“Because of the modest amounts likely involved, many of the plaintiffs would be unable to afford the costs of pursuing their claims individually.”)). Thus, “[cjertification would significantly reduce the costs of litigation to members of the class.” See id. As such, these considerations weigh in favor of certification, especially because “it is an extreme step to dismiss a suit simply by decertifying a class, where a ‘potentially proper class’ exists and can be easily created.” Id. (citing Woe v. Cuomo, 729 F.2d 96,107 (2d Cir. 1984)). For all the reasons discussed, this case is certified and will continue as a collective action.
V. CONCLUSION
For the reasons explained above, both parties’ motions for summary judgment are granted, in part, and denied, in part. The Court grants Plaintiffs’ motion for summary judgment on the issue of employment status and finds that Plaintiffs are PowerComm employees covered by the FLSA. The Court also grants Plaintiffs’ motion for summary judgment on the issue of good faith and finds that liquidated damages will be applied if judgment for the Plaintiffs is rendered. The Court denies PowerComm’s motion for summary judgment on the issue of failure to timely opt-in and failure to indicate a com-pensable claim. PowerComm’s motion for summary judgment on the issue of statute of limitations is granted with respect to Plaintiffs Alonzo Mudd, Raleigh Wall, Jacqueline
A separate Order shall issue.
. All pin cites to documents filed on the Court’s electronic filing system (CM/ECF) refer to the page numbers generated by that system.
. As indicated previously, this is PowerComm's second request for summary judgment on this issue. See ECF No. 12-1 at 24. PowerComm’s prior request was denied by Judge Grimm. See
. Whether analyzed as a motion for summary judgment or motion for reconsideration of Judge Grimm’s earlier decision, PowerComm's motion on this issue is denied.
. The statute of limitations for an FLSA violation is generally two years, unless Plaintiffs can show that PowerComm’s violation was willful in which case it is extended to three years. See 29 U.S.C. § 255(a). The statute of limitations continues to run on unnamed class members’ claims until they opt-in to the collective action. See 29 U.S.C. § 256(b).
. Alonzo Mudd indicates in his interrogatory answers that he last worked for PowerComm in 2004. See ECF No. 130-12 at 6-9. Raleigh Wall indicates in his interrogatory answers that he last worked for PowerComm in 2007. See ECF No. 130-15 at 5-7. Jacqueline Ridley indicates in her interrogatory answers that she last worked for PowerComm in 2009. See ECF No. 130-14 at 9.
. The answers were provided on September 29, 2014. See ECF No. 136 at 7. The named Plaintiffs' interrogatory answers were provided in 2013. See id.
. PowerComm also includes Jacqueline Ridley and Raleigh Wall but they have already been dismissed from this case because their claims are time-barred.
. Fed.R.Civ.P. 37(a)(3)(A) authorizes a motion to compel disclosure of matters required under Rule 26(a). Here, PowerComm never filed a motion to compel.
. PowerComm originally included Leslie Gross but that signature page was provided. See ECF No. 132 at 9.
. Ronald Young’s interrogatory answers are signed by Kalyn Young and Terence Brown’s interrogatory answers are signed by his mother.
. PowerComm has also calculated the wages PowerComm owes based on its timesheets and records of overtime paid. Included in its calculations are payments PowerComm made to Plaintiffs while this lawsuit was pending for the overtime hours worked and not previously paid. See id. at 11. These attempted settlements would unlikely be counted as overtime paid when calculating damages.
. Plaintiffs did not include their interrogatory answers in their opposition to PowerComm's motion for summary judgment. However, they filed a "Motion for Leave to Supplement Pursuant to Fed.R.Civ.P. 56(3)(1),” which provided the Court with their evidence as to Plaintiffs’ hours. See ECF No. 136. Although PowerComm opposes this motion, the Court finds the motion helpful and PowerComm was able to fully respond to the motion. It is well settled that courts prefer to decide cases on their merits. See Colleton Preparatory Acad., Inc. v. Hoover Universal, Inc., 616 F.3d 413, 417 & n. 3 (4th Cir. 2010). Plaintiffs’ motion to supplement and PowerComm’s motion to file a surreply to Plaintiffs’ motion are granted and the Court will consider those filings. See ECF No. 136 & 139.
. According to PowerComm's timesheets summary, Plaintiffs typically did not work over forty hours a week, typically only worked two or three days a week, and sometimes did not work at all for several weeks in a row or worked one day a week. See ECF No. 128-5.
. The Court previously declined to address this issue when raised in PowerComm’s earlier motion for summary judgment as, at that time, liability had not been determined and the motion was premature. See ECF No. 116. Now, Pow-erComm has provided its own timesheets and essentially conceded that, if the flaggers were employees, it did not pay them proper overtime. Given the current status of the case, Plaintiffs’ motion for summary judgment on the issue of good faith is properly before the Court.
. The Court will not disqualify Mr. Battey. See Rule 3.7(b) of the Maryland Rules of Professional Conduct ("A lawyer may act as advocate in a trial in which another lawyer in the lawyer's firm is likely to be called as a witness unless precluded from doing so by Rule 1.7 or Rule 1.9."). While Plaintiffs contend Mr. Battey may have also discussed the issue with PowerComm, based on the standards outlined above, this is not sufficient to disqualify him as counsel at this time.