Hughes v. Model Stoker Co.

Supreme Court of Maryland
Hughes v. Model Stoker Co., 92 A. 845 (Md. 1914)
124 Md. 283; 1914 Md. LEXIS 40
Burke

Hughes v. Model Stoker Co.

Opinion of the Court

*284 Burke, J.,

delivered the opinion of the Court.

This is an appeal from an order of the Circuit Court of Baltimore -City overruling exceptions to an auditor’s account, and finally ratifying and confirming the account in so far as it allowed a dividend upon the claim of the appellee, filed in the receivership proceedings of Thomas O. Basshor Company, a corporation, pending in that Court. The evidence was taken in open Court, and although the record is quite large, exhibiting great conflict upon a number of questions of fact, the legal principle which should control the case is well recognized and its application free from difficulty upon the established facts.

Oh the 6th day of September, 1910, the Thomas C. Basshor Company entered into a contract with the Mayor and City Council of Baltimore by which it agreed, among other thing, “to furnish all labor and materials necessary to completely install the four (4) 250 H. P. water tube steel boilers, together with mechanical stokers, in the boiler room of the power house on the grounds of Bay View Asylum in strict accordance with this specification and accompanying drawings, for the sum of seventeen 'thousand four hundred and ninety dollars ($17,490.00).

For the mechanical stokers the sum of thirty-nine hundred dollars ($3,900.00) is included in the above amount.”

It was provided that the contract was “subject to all the conditions, covenants, stipulations, terms and provisions contained in certain specifications, a copy of which is hereto attached, and in all respects made a part hereof, together with the drawings therein referred to', etc.”

The specifications which were attached to the contract are contained in the record, and are precise and elaborate. The portions of the specifications which bear upon the question involved in this case are here transcribed:

“First—-All specifications, drawings, and notes on drawings are to be accepted as a whole, and not separately, as they are intended to illustrate and explain each other and the work to be done, and anything omit *285 ted in the one or the other which is necessary for the completion of the work in a perfectly satisfactory manner shall he done by the contractor as if it was both shown and specified, and all conditions and requirements of these specifications shall be equally binding on sub-contractors for all branches of work herein mentioned, as though separately specified under each separate branch thereof.
“Second—Each boiler must be guaranteed to develop under ordinary working conditions 250 H. P. at the rating of 34.5 pounds of water per II. P. from and at 212 degrees P. into dry steam at 125 pounds, the gauge pressure at an evaporating economy of not less than 10.5 pounds of water per pound of dry coal, using a good commercial grade of bituminous coal.
“Each boiler must further be guaranteed to develop under test conditions, with a draft of not over % inch of water in the smoke breeching near boilers, a capacity .of 33 °/0 above the heretofore normal capacity of the boilers.
“Third—Each boiler is also to be equipped complete with a Jones automatic underfeed stoker or a stoker of fully-equal merit and capacity. The entire equipment to ho complete, including blower with direct connected engine of sufficient size to operate all stokers, all steam and drip piping, underground blast piping and lower sections of boiler fronts.
“Eourth—The accompanying drawing shows the available space for the installation of the four boilers as specified and the assigned floor space must not he exceeded. The ceiling over boiler room will be fireproof, and (he opening for the passage of the main smoke flue into stack will he provided under the building contract. The successful bidder, however, is required to submit detail shop drawings and specifications showing the arrangement and construction of the boilers and smoke breeching he proposes to install, and giving all detail dimensions of all construction parts and the amount of effective heating surface and *286 grate surface contained in each hoiler. Under effective heating- surface shall be understood the outer surface of the water tubes and fire exposed parts of headers and steam drums as far as water covered.
“Fifth—To prevent disputes and litigations, the Inspector of Buildings shall in all cases determine the amount, quality and acceptability . of the work which is to be paid for under the contract; shall determine all questions in relation to said work and the performance thereof, and shall in all cases decide every question which may arise relative to the fulfillment of the contract on the part of the contractor. His estimate and decision shall be final and conclusive, and in case any question shall arise between the parties touching the contract, such estimate and decision shall be a condition precedent to the rights of the contractor to receive any moneys under the contract.”

The Model Stokers, or furnaces contracted to be furnished by the Basshor Company were supplied by the appellee and installed under its instruction. The contract price o-f the four furnaces to the Basshor Company was $3,525.00, on which that company paid $1,259.82, leaving a balance of $2,265.18 due on the contract price. After the furnaces had been installed and the heating plant put in operation, the furnaces were condemned by the inspector of buildings and were removed by the city and replaced by other furnaces. The city refused to pay the Basshor Company for the furnaces and charged it with a large sum for removing the furnaces and installing new ones.

On December 20,1911, Mr. Clarence E. Stubbs, the inspector of buildings, wrote the Basshor Company as follows:

“After having made several tests of the boilers and stokers at the Bay View power house, I find that said stokers are not constructed for the capacity of the boilers installed at said power house, in that they have failed to meet with the requirements of the specifications for said boilers and stokers.
*287 “You aro hereby notified to remove said stokers and replace the same by stokers immediately that will meet with the requirements of the specifications.
“It is imperative that one battery, consisting of two (2) boilers, be operated day and night from this date on, until acceptance of the power plant. Said boilers to be operated at your expense.”

On December 27, 3 911, Mr. Stubbs wrote the Basahor Company another letter, as follows:

“It has been reported to me that you have workmen at the Bay View power house cutting out the grates of the boilers, for the purpose of installing blower in connection with present furnaces.
“I notified you on December 20, 1931, that the present furnace would have to be removed and that other furnaces of entirely different make, equal to the ones specified, or the stokers specified in the specifications, for the installation of the above boilers, etc., would have to be installed in place of the present stokers.
“Under the terms of the specifications which form a part of your contract and bond under ‘General Conditions,’ page 7, I hereby notify you to remove the present stokers now in place and replace stokers immediately that will meet with the requirements of the specifications, and that during the removal of said rejected stokers, it is imperative that one battery consisting of two (2) boilers, be operated day and night from this date on.
“Unless said rejected work and materials are removed from the premises within three days from date hereof (December 27th, 1931), I shall enter upon and complete the work as the interests of the city demand, and the payments under the contract shall cease.
“I have sent a copy of this letter to your bonding company.
“I also understand that there has been only one man firing the boilers for the past few' days, and that *288 it will be impossible for him to keep steam up when the engines and generators are turned over.
“Also must notify you that the receiver installed by you in Insane Asylum some time ago is not working properly.”

Mr. Stubbs testified in the case, and said he disapproved si the furnaces for the reason that they did not work properly and could not get up- sufficient steam to heat the buildings; that he had complaints about the plant not heating properly, and that he made several visits to the institution, and “I saw from the gauge myself that the steam could not get up more than 30 pounds on the gauge, which was not sufficient to carry the steam or to force the steam through the tunnels to the buildings for which this plant was erected to heat. * * * Erom noticing the gauge and from the several complaints that I had had from time to time that they were not getting sufficient steam, and after having seen the premises, seeing myself that the gauge would not register over 30 pounds of pressure, I took it upon myself at that time, upon the advice of Mr. Adams, and also Mr. Eairley, who was called in as a consulting engineer, to suggest flat shaking grates which were afterwards installed after the stokers were removed, and since that time the stokers were removed and the flat shaking grates have been installed I haven’t had any complaints about the pressure of steam there. * * * Mr. Cotton told me from time to time if I permitted him to do this, that or the other it would be all right, and one of the things he did was the putting in of a fan creating a forced draft. He said he would get a proper amount of steam to heat the buildings and also turn over the generators to1 operate the elevators. Hone of them worked properly, and I had to resort, after I found out they could not get up sufficient steam, to removing the stokers.”

Mr. Stubbs testified that he acted practically upon his own judgment formed from personal observation of the working of the furnaces in ordering their removal, although he advised *289 with Messrs. Adams and George E. A. Fairley, consulting engineers. He said that Mr. Cotton, the president of the appellee company, was at the institution for about a month trying different things.

The furnaces were sold to the Basshor Company by O. O. Woolson, the general sales agent of the appellee company and were to conform to the specifications.

We find as a fact that the appellee had knowledge of tho specifications and that a copy thereof was shown to Mi'. Wool-son and were in his possession before the contract was finally accepted.

The appellee must, therefore, be hold hound by the terms and provisions of the specifications, one of which was that they should be equally binding on sub-contractors for all branches of work therein mentioned. By another provision of the specifications it was declared that the inspector of buildings should “in all cases determine the amount, quality and acceptability of the work,” and that his estimate and decision should be final and conclusiva.

The inspector of buildings did decide that tho furnaces were not acceptable, that they did not conform to the specifications, and ordered their removal. His decision, in the absence of fraud, or bad faith—and there is no allegation or evidence of either in the record—is not reviewable by the Courts. The Courts of all the States, except Indiana, hold that an express stipulation, such as the one contained in these specifications, is valid and binding, and that the decision of the person designated to* decide the question in dispute is, when rendered, conclusive of the matter passed upon, in the absence of fraud or bad faith.

In Lynn v. B. & O. R. R. Co., 60 Md. 404, which was an action to recover damages for the breach of a written contract by which the plaintiff agreed to furnish a certain quantity of ice to the defendant. The contract contained a provision that the ice was to he good, clear, solid stock, not less than six inches thick, clear of snow, and subject to the inspection and approval of an agent of the company. J. F. *290 Legge was appointed by tbe company to inspect and approve tbe ice. Tbe plaintiff submitted to Legge samples of tbe ice be proposed to fumisb wbicb Legge rejected and no ice was ever, in fact, delivered. Tbe two following prayers were offered by tbe defendant and granted by Judges Alvey and Motter in tbe lower Court:

Eirst: If tbe jury find that in pursuance of tbe contract in evidence tbe said jST. S. Hill selected Jobn E. Legge, an agent of tbe defendant, to inspect and approve tbe ice offered by tbe plaintiff, and that said Legge accepted tbe duty and undertook its performance, and that be (plaintiff) submitted specimens of ice from time to time to tbe inspection of Legge, then in order to recover under tbe pleadings in tbis case it is incumbent on tbe plaintiff to prove that tbe said Legge did approve of ice so submitted for bis inspection and approval, unless tbe jury further find that Legge fraudulently, or in bad faith, rejected tbe ice offered by tbe plaintiff.

Second: That according to tbe terms of tbe contract between tbe plaintiff and defendant, read in evidence, it was tbe duty of tbe said ÜST. S. Hill to have appointed some agent of tbe company (defendant), to inspect and approve of tbe ice to be furnished by tbe plaintiff; and if tbe jury find that John E. Legge was selected and appointed by U. S. Hill to perform that duty, and that Legge was an agent of tbe defendant, and that Legge accepted tbe appointment, and undertook tbe duty assigned him, and that the plaintiff accordingly, from time to time, submitted to Legge specimens of ice for bis inspection and approval; and further find, that be did inspect tbe ice offered by tbe plaintiff, for the acceptance of tbe defendant; but that be did not approve of such ice, and rejected it; then, even though tbe jury may believe from tbe evidence that Legge unreasonably rejected the ice, tbe plaintiff cannot recover in tbis action unless the jury find that tbe action of Legge in rejecting tbe ice offered was fraudulent or done in bad faith.

Both prayers were approved on appeal, and the rule of law wbicb they announce has been consistently followed by tbis Court.

*291 In considering the fourth prayer, the Court, speaking through Judge Milleb, said: “By granting the fourth prayer, the jury were instructed that it was not sufficient for them to believe, from the evidence, that Legge unreasonably rejected the ice, unless they find that his action in this respect was fraudulent or done in had faith; and by the fifth instruction they were told that it is not enough to establish the fraud charged; that they may believe, from the evidence, that Legge rejected ice which they may believe he ought tc have accepted, or that he rejected ice which, in their opinion or that of others, corresponded in all particulars with that described in the agreement; hut in order to maintain the charge of fraud under the pleadings and evidence in this case, they must find that his judgment and action was the result of fraud or had faith, as described in the preceding prayers. While, as we have already said, the condition precedent in this contract will he dispensed with by proving that the judgment of the agent to whom the parties entrusted the duty of inspection and approval was the result of his fraud or mala fides, it is plain that nothing less will suffice.”

The appellee contended and offered evidence tending to prove that the furnaces did conform to the requirements of the contract, and that their failure to heat the building was due to conditions for which it was in no way responsible. But for the reasons stated, its contentions are not open to consideration in this Court. They are finally and conclusively determined adversely to the appellee by the decision of the inspector of buildings. It follows that the exceptions to the allowance of the appellee’s claim should have been sustained and that their claim should have been rejected.

The order reversed and came remanded that an order may be passed in conformity to this opinion; the appellee to pay the costs above and below.