Sierra Club MacKinac Chapter v. Department of Environmental Quality
Sierra Club MacKinac Chapter v. Department of Environmental Quality
Opinion of the Court
I. OVERVIEW
Petitioner Sierra Club Mackinac Chapter (the Sierra Club) appeals by leave granted the trial court’s order affirming a declaratory ruling issued by the Department of Environmental Quality (DEQ). The DEQ issued the declaratory ruling as a result of administrative proceedings brought by the Sierra Club challenging the
This case presents three issues for our consideration. First, we must consider whether the Sierra Club properly sought judicial review of the DEQ’s declaratory ruling in state court. Second, we must consider whether the discharge rates of a concentrated animal feeding operation’s (CAFO) nutrient management plan are “effluent limitations” as the Clean Water Act defines them. And third, if we conclude that such nutrient management plans are effluent limitations, then we must consider whether the DEQ must include the nutrient management plan in the terms of the general permit itself, subject to public review and comment before the DEQ approves the permit.
With respect to the first issue, we conclude that the Sierra Club properly sought judicial review of the DEQ’s ruling in state court. Under the circumstances here, state court, rather than federal court, is the proper forum for review of a state agency’s declaratory ruling. Regarding the second issue, we conclude that the discharge rates of a CAFO’s nutrient management plan are effluent limitations, as the Clean Water Act defines them. We conclude that such discharge rates are effluent limitations because they affect the rates of discharge from a point source into navigable waters. Therefore, in the interest of maintaining the biological integrity of the nation’s navigable waters, such discharge rates must be subject to the DEQ’s meaningful review. Regarding the third issue, because the Clean Water Act requires public participation in the development, revision, and enforcement of any effluent limitation, we conclude that the DEQ must include a CAFO’s
II. BASIC FACTS AND PROCEDURAL HISTORY
A. BACKGROUND
This case concerns the application and construction of § 301 of the Clean Water Act.
The Clean Water Act defines “point source” as “any discernible, confined and discrete conveyance, including but not limited to any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding operation, vessel or other floating craft, from which pollutants are or may be
In an effort to dispose of the enormous amounts of liquid and solid waste generated at CAFOs, many CAFO owners and operators apply manure as fertilizer to agricultural fields adjacent to the confinement facilities.
In 1973, the EPA delegated authority to Michigan to administer its own NPDES program. Under the provisions of Michigan’s Natural Resources and Environmental Protection Act (NREPA) relating to protection of water resources,
In 2003, to address water pollution associated with improper or excessive application of manure by CAFOs, the EPA promulgated the “CAFO Rule,”
According to the DEQ, the federal CAFO Rule “set forth a framework for states and other permitting authorities to use as a baseline for the development of their own CAFO permitting programs.” In light of the changes to the federal scheme, Michigan promulgated its own administrative rules specific to the NPDES for CAFOs,
In February 2005, a federal court examined and partially vacated the federal CAFO Rule. In Waterkeeper Alliance Inc v United States Environmental Protection Agency, the United States Court of Appeals for the Second Circuit addressed how the EPA [was] handling federal nutrient management plans. Specifically, the petitioners in Waterkeeper, a group of concerned citizens and environmental interest groups, argued that the federal “CAFO Rule was unlawful because: (1) it empowered] NPDES authorities to issue permits to Large CAFOs in the absence of any meaningful review of the nutrient management plans those CAFOs have developed; and (2) it fail[ed] to require that the terms of the nutrient management plans be included in the NPDES permits.”
Underlying Waterkeeper’s second and third findings was the conclusion that under the plain language of the Clean Water Act, the terms of each nutrient management plan were “effluent limitations.”
B. THE PRESENT CASE
On June 11, 2004, the DEQ issued a general permit, entitled General Permit No. MIG010000 (General Permit I), for Michigan CAFO owners based on the federal CAFO Rule and state administrative rules governing the NPDES program. According to the DEQ, it issues general permits whenever it determines that a specific category of discharges is so similar in type and quality that one permit will provide sufficient control over any
A business or individual seeking a “certificate of coverage” under the general permit must develop a comprehensive nutrient management plan and submit a “notice of intent” for coverage. According to General Permit I, the comprehensive nutrient management plan “describes the production practices, equipment, and structure(s) that the owner/operator of an agricultural operation now uses and/or will implement to sustain livestock and/or crop production in a manner that is both environmentally and economically sound.”
In January 2005, the Sierra Club requested a declaratory ruling from the DEQ on three issues:
1. Whether the general permit which allows a CAFO to develop its own Comprehensive Nutrient Management*541 Plan specifying how the operator intends to meet the effluent limitations of the [Clean Water Act], without review or approval from the Michigan DEQ and without incorporation of its terms in a permit violates the [Clean Water Act] sections 301 and 402, 33 USC §§ 1311, 1342?
2. Whether the general permit’s failure to provide for adequate public participation in the permitting process and enforcement of the [Clean Water Act] standards against CAFOs contravenes [Clean Water Act] section 101(e), 402(a), 402(j), 402(k) and 505, 33 USC §§ 1251(e), 1342(a), 1342(j), 1342(k) and 1365?
3. Whether the general permit violates section 402 of the [Clean Water Act], 33 USC § 1342, and its implementing regulations, by authorizing the discharge of pollutants without ensuring that the discharge will meet the water quality requirements of the [Clean Water Act]?
In June 2005, the DEQ issued Declaratory Ruling 2005-01, rejecting the Sierra Club’s claims but directing the Water Bureau of the DEQ to (1) reorganize the “minimum standards” section of the general permit for clarity; (2) identify all proposed “land application areas” and adjacent water bodies at the time a CAFO applies for authorization; and (3) make the comprehensive nutrient management plan submitted in accordance with the general permit’s requirements “available to the public upon request.” More specifically, regarding the Sierra Club’s assertion that the general permit created a self-regulatory scheme, the DEQ responded that the general permit imposes more specific requirements than the federal regulations require inasmuch as the general permit prohibits discharges that may cause or contribute to a violation of state water-quality standards.
The DEQ rejected the Sierra Club’s assertion that the general permit violated the public participation requirements of the Clean Water Act, pointing out that
The DEQ also rejected the Sierra Club’s assertion that the general permit failed to ensure that discharges met the water-quality requirements of the Clean Water Act. The DEQ shared the Sierra Club’s “concerns that impaired watersheds must be protected from additional impairment due to CAFO discharges” and that “[t]his concern is precisely why the blanket prohibition on any CAFO discharge that causes or contributes to a viola
The DEQ issued a reorganized general permit in November 2005, which it denoted as General Permit No. MIG019000 (General Permit II).
The Sierra Club appealed Declaratory Ruling 2005-01 in the circuit court. The Sierra Club argued, in pertinent part, that a CAFO’s nutrient management plan is an effluent limitation, which requires public review and a public hearing. The Sierra Club claimed that its argument was adopted by the federal court of appeals in Waterkeeper and that “this case is on all fours” with Waterkeeper.
Ruling from the bench, the circuit court affirmed the DEQ’s declaratory ruling for the following reasons:
The Court has read the applicable Clear [sic] Water Act, 33 USC § 1251e regarding public participation and 33 USC § 1342a, which outlines the administrator [sic] and opportunity for a public hearing to issue a permit, [the Sierra Club] is alleging in essence that the MDEQ’s Declaratory Ruling was arbitrary, capricious and a clear abuse of discretion. The Court disagrees. ...
In this Court’s opinion the ruling was “. . . reasonable and logical”. The MDEQ did identify some problems with the structure of the general permit and required that MDEQ... reformat the general permit.... In addition, judging [the Sierra Club]’s concern with the public not having an opportunity to review, comment and/or request a hearing on permits, the ruling required the following: Identification of all proposed land applications and adjacent water; allow a time for a permitee to submit notice of intent to coverage.
*544 Second, to insure the public has an opportunity to provide comment on the notice of intent of any proposed certificate of coverage or making it available on the DEQ website for 14 days and in removing that from the site this feature allows the public to submit comments and ask for public hearing address electronically, acquire a copy of the [comprehensive nutrient management plan] to be submitted [to] the appropriate DEQ Water Bureau District.
The Declaratory Ruling is neither arbitrary, capricious or an abuse of unwarranted discretion. Therefore, the ruling is permitted and affirmed.
Thereafter, this Court granted the Sierra Club’s application for leave to appeal.
III. JURISDICTION
A. STANDARD OF REVIEW
The Sierra Club argues that its challenge to the DEQ’s declaratory ruling is properly in state court. The DEQ raises the issue of jurisdictional propriety on appeal, but did not raise it below. However, “jurisdictional defects may be raised at any time, even if raised for the first time on appeal.”
B. ANALYSIS
Under Michigan’s Administrative Procedures Act (APA),
The Clean Water Act sets forth the procedure for judicial review of the EPA’s approval of a state CAFO permitting program as follows:
Review of the [EPA] Administrator’s action ... in making any determination as to a State permit program submitted under [33 USC 1342(b)],. .. [and] in issuing or denying any permit under [33 USC 1342],.. . may be had by any interested person in the Circuit Court of Appeals of the United States for the Federal judicial district in which such person resides or transacts business which is directly affected by such action upon application by such person.*546 Any such application shall be made within 120 days from the date of such determination,.. . issuance or denial, or after such date only if such application is based solely on grounds which arose after such 120th day.[45 ]
The DEQ asserts that various lower federal courts have held that federal jurisdiction over the EPA’s approval of a state permit program is exclusive.
In this case, the EPA originally approved Michigan’s NPDES permit program in 1973. The approval letter referred to the state’s indication of “a willingness and ability to comply with both the spirit and the letter of the” Clean Water Act, and reminded the state of its responsibility to comply with federal standards. Twenty-five years later, in 2003, the EPA issued the CAFO Rule to account for the massive shift in the farming industry to CAFOs,
In its August 9, 2004, petition, the Sierra Club argued that Michigan’s implementation of the approved
Dear [DEQ Director]:
I am writing with regard to Michigan’s National Pollutant Discharge Elimination System (NPDES) program for concentrated animal feeding operations (CAFOs).
USEPA, Region 5, has reviewed the Michigan revised program. We conducted the review under 40 CFR 123.62. With this letter, I am pleased to inform you that we approve the revision.
On February 28, 2005, the United States Court of Appeals for the Second Circuit vacated provisions of the federal regulations which allow permit authorities to issue permits to CAFOs without including the terms of nutrient management plans in the permits, without reviewing plans, and with plans remaining at the CAFO and thus unavailable to the public (see Waterkeeper Alliance, et al. v USEPA (No. 03-4470 (L)). USEPA, Region 5, has evaluated R 323.2196(5)(b), Mich. Adm. Code, in the context of the Waterkeeper decision. This rule provides that, “[a] copy of the CAFO’s [Comprehensive Nutrient Management Plan] shall be maintained at the CAFO and made available to the department upon request. In addition, the executive summary shall be submitted to the department.” We find that the rule will not prevent the State from administering its program consistent with the Waterkeeper decision. The rule is therefore included within the scope of the approval communicated above. We understand that the State will administer its program consistent with the decision with respect to nutrient management plans. . . .
As for the content of the EPA’s July 2005 letter, it refers to Rule 323.2196, not to either general permit in issue. Further, it does not say that Rule 323.2196 complies with the Clean Water Act and Waterkeeper. Indeed, it does not even indicate that the rule will advance compliance with Waterkeeper. Rather, it indicates “that the rule will not prevent the State from administering its program consistent with the Water-keeper decision.”
The following statement from American Paper is applicable: “[T]o find [federal] jurisdiction to review the state permits in this case would mean that Congress intended a most improbable and awkward division of
Accordingly, we conclude that jurisdiction is proper in state court because the Sierra Club did not contest any action taken by the EPA administrator. Rather, the Sierra Club asked the DEQ for a declaratory ruling that Michigan’s NPDES plan was contrary to federal law. Review of declaratory rulings is proper in state court.
IV THE DECLARATORY RULING
A. STANDARD OF REVIEW
The Sierra Club argues that Michigan’s general permit does not include the required minimum federal effluent limitations and is inconsistent with the Clean Water Act, its implementing regulations, and Michigan state law. This Court’s standard for reviewing the lower court’s decision reviewing the administrative agency decision requires it to determine, in pertinent part, “whether the lower court applied correct legal principles.”
B. NUTRIENT MANAGEMENT PLAN AS AN “EFFLUENT LIMITATION”
Waterkeeper observed that “[t]he EPA has focused on the [CAFO] industry because CAFOs . . . generate millions of tons of manure every year.”
Application rates for manure, litter, and other process wastewater applied to land under the ownership or operational control of the CAFO must minimize phosphorus and nitrogen transport from the field to surface waters in compliance with the technical standards for nutrient management established by the Director. Such technical standards for nutrient management shall:
(i) Include a field-specific assessment of the potential for nitrogen and phosphorus transport from the field to surface waters, and address the form, source, amount, timing, and method of application of nutrients on each field to achieve realistic production goals, while minimizing nitrogen and phosphorus movement to surface waters; and
(ii) Include appropriate flexibilities for any CAFO to implement nutrient management practices to comply with the technical standards, including consideration of multiyear phosphorus application on fields that do not have a high potential for phosphorus runoff to surface water, phased implementation of phosphorus-based nutrient management, and other components, as determined appropriate by the Director.[54 ]
Waterkeeper reasoned that “[b]y not providing for permitting authority review of these application rates, the CAFO Rule fails to adequately prevent Large CAFOs from ‘misunderstanding or misrepresenting’ the application rates they must adopt in order to comply with state technical standards.”
Further, to implement the requirements of a comprehensive nutrient management plan, the CAFO must submit the plan to the DEQ,
The Clean Water Act “unquestionably provides that all applicable effluent limitations must be included in each NPDES permit.”
While the phosphorus-testing provisions of General Permit II serve to restrict land discharges somewhat,
C. PUBLIC PARTICIPATION
With respect to public participation in the process, 33 USC 1251(e) provides as follows:
Public participation in the development, revision, and enforcement of any regulation, standard, effluent limitation, plan, or program established by the Administrator or any State under this chapter shall be provided for, encouraged, and assisted by the Administrator and the States. The Administrator, in cooperation with the States, shall develop and publish regulations specifying minimum guidelines for public participation in such processes.
The Clean Water Act further provides that there be an “opportunity for public hearing” before an NPDES permit issues;
We first conclude that 33 USC 1251(e), which requires public participation in development, revision, and enforcement of effluent limitations, is applicable to development, revision, and enforcement of the comprehensive nutrient management plans, which we have concluded are effluent limitations. We note further that even if we had not so concluded, 33 USC 1251(e) would nevertheless apply to comprehensive nutrient management plans because they certainly are a “plan” that is subject to public participation.
General Permit II provides that a CAFO must provide a copy of its comprehensive nutrient management plan to the DEQ.
The DEQ asserts that the Sierra Club and other “concerned citizens” can access a comprehensive nutrient management plan “through Michigan’s Freedom of Information Act.” However, this is a rather circuitous path to encouraging and assisting public participation.
We conclude that Michigan’s CAFO permit program does not satisfy the requirements of the Clean Water Act because it does not require inclusion of the required minimum effluent limitations in the general permit and it does not provide for the requisite public participation. Therefore, the trial court’s declaratory ruling contains a substantial and material error of law.
We reverse and remand for further proceedings consistent with this opinion. We do not retain jurisdiction.
33 USC 1251 et seq.
33 USC 1311.
33 USC 1251(a).
33 USC 1311(a), 1342, 1362(12).
See 33 USC 1342, 1370.
33 USC 1370.
33 USC 1362(14).
40 CFR 122.23(b)(2).
40 CFR 122.23(b)(2); see also Mich Admin Code, R 323.2102(i).
40 CFR 122.23(b)(4); General Permit No. MIG019000, Part II.A (defining large CAFO).
See General Permit No. MIG019000, Part I.A.4.b.7.
See Waterkeeper Alliance, Inc v United States Environmental Protection Agency, 399 F3d 486, 494 (CA 2, 2005), amended 2005 US App LEXIS 6533.
MCL 324.3101 et seq.
33 USC 1362(11); see also 40 CFR 122.41(a)(1).
The CAFO Rule is codified within 40 CFR parts 9, 122, 123, and 412.
40 CFR 122.23(d)(1).
40 CFR 122.42(e).
Mich Admin Code, R 323.2102, R 323.2103, R 323.2104, and R 323.2196.
Mich Admin Code, R 323.2196(1)(b).
Mich Admin Code, R 323.2196(5).
General Permit I, Part I.B.1.
See id., Part I.B.2.
Id., Part I.B.2.a. “CNMP” is the acronym for “comprehensive nutrient management plan.”
Id., Part I.B.2.a.8.
Id., Part I.B.3.
Id., Part I.B.3.e.
Id., Part I.B.2.C.
Id., Part I.B.4.
Id., Part I.B.2.a.
Mich Admin Code, R 323.2196(5)(f)(vii).
Polkton Charter Twp v Pellegrom, 265 Mich App 88, 97-98; 693 NW2d 170 (2005).
WPW Acquisition Co v City of Troy (On Remand), 254 Mich App 6, 8; 656 NW2d 881 (2002).
MCL 24.201 et seq.
Huron Valley Schools v Secretary of State, 266 Mich App 638, 651; 702 NW2d 862 (2005), quoting MCL 24.263.
MCL 24.301.
MCL 24.263.
MCL 24.306(1)(a), (e), (f); Adrian School Dist v Mich Pub School Employees Retirement Sys, 458 Mich 326, 332; 582 NW2d 767 (1998); Michigan Ass’n of Intermediate Special Ed Administrators v Dep’t of Social Services, 207 Mich App 491, 494-495; 526 NW2d 36 (1994).
33 USC 1369(b)(1).
See, e.g., American Canoe Ass’n, Inc v United States Environmental Protection Agency, 30 F Supp 2d 908, 924 (D Va, 1998); Chesapeake Bay Foundation, Inc v United States, 445 F Supp 1349, 1354 (ED Va, 1978).
See, e.g., American Paper Institute, Inc v Environmental Protection Agency, 890 F2d 869, 874 (CA 7, 1989).
American Paper, Inc, supra at 874.
Boyd v Civil Service Comm, 220 Mich App 226, 234; 559 NW2d 342 (1996).
Michigan Ass’n of Intermediate Special Ed Administrators, supra at 494-495.
40 CFR 412.4(c)(2).
General Permit II, Part I.A.4.b.7.c.
Id., Part I.A.4.b.7.a.
Id., Part I.A.4.b.7.b.B.
Id., Part I.A.5.b, and Part II.A.
Id., Part I.A.5.a.
Id., Part II.A.
Id., Part I.A.5.d.
See Waterkeeper, supra at 499 (observing that “most glaringly, the CAPO Rule fails to require that permitting authorities review the nutrient management plans developed by Large CAFOs before issuing a permit that authorizes land application discharge.”). See also 72 Fed Reg 26582, 26584 (May 10, 2007) (“Permitting authorities would be required to review the [nutrient management plan] . . . .”).
Waterkeeper, supra at 502, citing 33 USC 1311(a), 1311(b), 1342(a).
33 USC 1362(11).
General Permit II, Part I.A.4.b.7.a.
33 USC 1311(a).
33 USC 1251(a).
General Permit II, Part I.A.4.b.7.c.A.
Id., Part I.A.4.b.7.b.B.
See 72 Fed Reg 26582, 26584 (May 10, 2007) (“Permitting authorities would also be required to incorporate terms of the [nutrient management plan] as NPDES permit conditions.”); 40 CFR 122.42(3)(e)(1).
33 USC 1342(a)(1), 1342(b)(3).
33 USC 1342(j).
33 USC 1365(a).
General Permit II, Part I.A.5.b.
See Waterkeeper, supra at 503, quoting 33 USC 1251(e).
See 72 Fed Reg 26582, 26584 (May 10,2007) (“Permitting authorities would be required to review the [nutrient management plan] and provide the public with an opportunity for meaningful public review and comment.”).
MCL 24.306(1)(a), (f); Adrian School Dist, supra at 332.
Dissenting Opinion
(dissenting). I respectfully dissent. I conclude that the dispositive issue in this case is whether the Department of Environmental Quality (DEQ) complied with all applicable state statutory and regulatory requirements under Michigan’s federally approved program to issue National Pollutant Discharge Elimination System (NPDES) permits to concentrated animal feeding operations (CAFOs). I conclude that the Sierra Club failed to meet its burden of establishing that the DEQ’s construction, interpretation, and application of its state permitting program as set forth in the declaratory ruling here under review were arbitrary, capricious, or not in accordance with applicable law. I would affirm the circuit court’s order affirming the declaratory ruling issued by the DEQ.
Because I conclude that the dispositive issue before this Court is whether the DEQ’s program for the issuance of NPDES permits to CAFOs complies with Michigan law, I agree that this Court has jurisdiction in
To be sure, the CWA influences many aspects of our state’s permitting process. However, the EPA has authorized Michigan and 44 other states to issue NPDES permits pursuant to state law. In so doing, the EPA determined that Michigan’s permitting program is at least as stringent as the federal EPA permit program. As the majority notes, “[i]n 1973, the EPA delegated authority to Michigan to administer its own NPDES program.” Ante at 535. On July 1, 2005, the EPA approved revisions to Michigan’s program for issuing NPDES permits to CAFOs. Upon EPA approval of this program, the federal permitting program was suspended in Michigan and the state program operated in lieu of the federal program. 33 USC 1342(c). See also Ringbolt Farms Homeowners Ass’n v Hull, 714 F Supp 1246, 1253 (D Mass, 1989).
Significantly, the EPA’s sanction of the Michigan permitting program is not a declaration that the DEQ stands in the shoes of the EPA to administer the EPA’s federal permitting process. Likewise, the EPA’s approval of Michigan’s permitting program is not an indication that the state and federal permitting programs are identical. Rather, the EPA reviewed the overall efficacy of the Michigan permitting program and
Because there is no requirement that Michigan’s state permitting program be identical to the federal permitting program, any challenge that the state program is insufficient to satisfy the requirements of federal law is either an unsubstantiated state-law claim or a challenge to the EPA’s approval of the Michigan permitting program. However, as previously stated, challenges to the EPA’s approval of Michigan’s state permit program must be pursued in the federal circuit courts. Accordingly, while this matter is properly before this Court, we must limit our review to whether the general permit process challenged by the Sierra Club is contrary to or in some way fails to comply with state law.
As pointed out by the DEQ, the Sierra Club has done little more than make “sweeping assertions that [Michigan’s general CAFO] permit is contrary to state law.” The Sierra Club has not pointed to any Michigan statute or regulation that has been violated. What the Sierra Club seeks is not information regarding the effluent limitations applicable to entities issued certificates of coverage under a general permit. Here, the Sierra Club sought and received the ability to influence how CAFO operators manage their farms in order to satisfy the effluent limitations set forth in the general permit. Nothing in state or federal law grants the Sierra Club such authority.
I would affirm.