STATE OF MINNESOTA
IN COURT OF APPEALS
A14-0253
In the Matter of Minnesota Power's Petitions for
Approval of its Boswell Energy Center Unit 4
Environmental Retrofit Project and
Boswell 4 Environmental Improvement Rider.
Filed November 3, 2014
Affirmed
Bjorkman, Judge
Minnesota Public Utilities Commission
File No. E015/M-12-0920
Leigh K. Currie, Minnesota Center for Environmental Advocacy, St. Paul, Minnesota (for
relators Minnesota Center for Environmental Advocacy, Izaak Walton League of
America – Midwest Office, Fresh Energy, and Sierra Club)
Lori Swanson, Attorney General, Lisa A. Crum, Kathryn Fodness, Assistant Attorneys
General, St. Paul, Minnesota (for respondent Minnesota Public Utilities Commission)
Michael C. Krikava, Elizabeth M. Brama, Briggs and Morgan, P.A., Minneapolis,
Minnesota; and
David R. Moeller, Minnesota Power, Duluth, Minnesota (for respondent Minnesota
Power)
Andrew Moratzka, Sarah Elizabeth Johnson Phillips, Stoel Rives LLP, Minneapolis,
Minnesota (for respondent Large Power Intervenors)
Considered and decided by Smith, Presiding Judge; Larkin, Judge; and Bjorkman,
Judge.
UNPUBLISHED OPINION
BJORKMAN, Judge
Relators challenge respondent commission’s approval of respondent power
company’s mercury-emissions-reduction plan, arguing that the commission erred by
approving the plan without the required environmental analysis. We affirm.
FACTS
Under the Mercury Emissions Reduction Act (MERA), Minn. Stat. §§ 216B.68-
.688 (2012), a public utility that owns a large coal-fired power plant in Minnesota must
prepare a plan for reducing the plant’s mercury emissions and submit the plan to
respondent Minnesota Public Utilities Commission (MPUC) for approval. There are six
such existing plants, including respondent Minnesota Power’s Boswell 4 facility.
On August 31, 2012, Minnesota Power filed a petition under Minn. Stat.
§ 216B.6851, seeking approval of its mercury-emissions-reduction plan for Boswell 4.
Minnesota Power proposed a four-year project to retrofit Boswell 4 with a semi-dry flue-
gas desulfurization system, fabric filter, and powder-activated carbon-injection system,
asserting that these measures would reduce the plant’s mercury emissions by 90%, reduce
the output of multiple other pollutants, and reduce plant wastewater. Minnesota Power
also detailed its process of identifying and evaluating various approaches to reducing
emissions of mercury and other pollutants, from a range of carbon-injection retrofit
options to retiring Boswell 4 in favor of a natural-gas replacement.
The Minnesota Pollution Control Agency (MPCA) reviewed Minnesota Power’s
retrofit plan. The MPCA determined that the plan presents a technically feasible, cost-
2
effective means of providing multiple environmental and public-health benefits,
including 90% reduction in mercury emissions. The MPCA also observed that
Minnesota Power described “alternatives to mercury controls that included replacing the
entire unit with natural gas-fired generation,” but it did not evaluate the environmental
effects of a natural-gas replacement. The MPCA recommended that the MPUC approve
the retrofit plan.
After two rounds of comments on the plan—including joint comments from
relators Minnesota Center for Environmental Advocacy, Izaak Walton League of
America–Midwest Office, Fresh Energy, and Sierra Club—and a public hearing, the
MPUC approved Minnesota Power’s retrofit plan. Relators petitioned for
reconsideration, which the MPUC denied. Relators appeal.
DECISION
The MPUC’s approval of a mercury-emissions-reduction plan is subject to appeal
under the Minnesota Administrative Procedure Act. See Minn. Stat. § 216B.52, subd. 1
(2012); In re N. States Power Co., 775 N.W.2d 652, 655-56(Minn. App. 2009). Under the act, we may affirm the MPUC’s decision, remand the case for further proceedings, or reverse or modify the decision if the petitioner’s substantial rights have been prejudiced because the findings, inferences, conclusions, or decision are affected by an error of law, unsupported by substantial evidence, or are arbitrary and capricious.Minn. Stat. § 14.69
(2012).
Relators argue that the MPUC committed legal error by approving Minnesota
Power’s retrofit plan in the absence of the full environmental assessment MERA requires.
3
This argument presents a question of statutory interpretation. While we defer to an
administrative agency on matters within its field of expertise, we do not defer to an
agency’s statutory interpretation when statutory language “is clear and capable of
understanding.” In re Annandale NPDES/SDS Permit Issuance, 731 N.W.2d 502, 511,
513(Minn. 2007). Instead, we effectuate the intent of the legislature by interpreting the text of the statute according to its plain language. Minn. Transitions Charter Sch. v. Comm’r of Minn. Dep’t of Educ.,844 N.W.2d 223, 227
(Minn. App. 2014), review denied (Minn. May 28, 2014). This includes consideration of the statute “as a whole,” accounting for the context of the surrounding words and sentences. In re Minn. Power,838 N.W.2d 747, 754
(Minn. 2013).
When a public utility submits a mercury-emissions-reduction plan for approval
under MERA, the MPCA is required to “evaluate” the plan and submit its evaluation to
the MPUC. Minn. Stat. § 216B.684. In doing so, the MPCA must
(1) assess whether the utility’s plan meets the requirements of
[Minn. Stat. § 216B.6851], (2) evaluate the environmental
and public health benefits of each option proposed or
considered by the utility, including benefits associated with
reductions in pollutants other than mercury, (3) assess the
technical feasibility and cost-effectiveness of technologies
proposed or considered by the utility for achieving mercury
emissions reduction, and (4) advise the commission of the
appropriateness of the utility’s plan.
Id. The MPCA may “request additional information from the utility, especially with
regard to alternative technologies or configurations applicable to the specific unit, and the
estimated costs of those alternatives.” Id.
4
Relators argue that the natural-gas-replacement alternative that Minnesota Power
mentioned in its petition is an “option” that the MPCA was required to evaluate, and that
the MPUC could not approve the retrofit plan without that evaluation. We disagree.
An “option” is something that is “available as a choice.” American Heritage
Dictionary 1238 (5th ed. 2011). The broader context of MERA defines whether a
particular mercury-emissions-reduction measure is “available as a choice” and therefore
requires MPCA assessment. MERA requires public utilities to reduce mercury emissions
at existing coal-fired power plants. See Minn. Stat. § 216B.68, subd. 8 (defining a
“targeted unit” as a “coal-fired electric generation unit”); see also Minn. Stat.
§§ 216B.682, subd. 1(a) (requiring utility to file a plan “for mercury emissions reduction
at each such unit”), .6851, subd. 3 (requiring plan “to achieve total mercury reduction at
targeted and supplemental units”). It does not mention retiring or repowering those
plants as a means of reducing their emissions of mercury or any other pollutant. 1 Instead,
MERA expressly anticipates that these reductions will be accomplished by installing
pollution-control equipment at those plants. See Minn. Stat. §§ 216B.68, subd. 7
(referring to “mercury-control equipment” being “installed at a targeted unit”), .686,
subd. 1 (referring to “pollution control equipment” being “installed at facilities in
1
The only mention in MERA of retiring or repowering coal-fired power plants is in the
narrow provision (undisputedly applicable only to Minnesota Power) that permits a utility
with two wet-scrubbed coal-fired power plants to stagger submission of mercury-
emissions-reduction plans but requires multi-faceted annual reports on the second plant,
including an assessment of whether state or federal pollution controls might warrant
“retiring or repowering” that plant, rather than installing mercury-emissions-reduction
technology. See Minn. Stat. § 216B.6851, subd. 5(b)(2)(iii).
5
Minnesota”). In short, the plain language of MERA indicates that the legislature
intended to regulate, not replace, coal-fired power plants.2
Replacing a coal-fired plant with a facility that uses a cleaner fuel source might be
a viable pollution-control measure. But it is an alternative to regulation under MERA,
not an “option” in a mercury-emissions-reduction plan that the MPCA is required to
evaluate. Accordingly, we conclude that the MPCA did not violate its statutory duty
under section 216B.684 by declining to substantively assess the prospect of retiring and
replacing Boswell 4 with a natural-gas facility.
Moreover, any deficiency occasioned by the MPCA’s failure to evaluate the
environmental effects of a natural-gas replacement is harmless. Under MERA, the
MPUC’s authority to do anything other than approve a utility’s preferred plan is limited.
The MPUC “shall approve a utility’s mercury emissions-reduction plan that [the MPUC]
reasonably expects will come closest to achieving” the 90 percent goal “in a manner that
provides for increased environmental and public health benefits without imposing
excessive costs on the utility’s customers.” Minn. Stat. § 216B.6851, subd. 6(b). Only if
the MPUC is “unable” to approve the utility’s preferred plan (the “90 percent reduction
plan filed under subdivision 3”) may it order the utility to implement some other plan. Id.
The MPCA thoroughly evaluated Minnesota Power’s retrofit plan, including its
environmental and public-health benefits, technical feasibility, and cost-effectiveness.
The MPUC considered that evaluation and the substantial evidentiary record and
2
Indeed, if a utility were to retire its coal-fired power plant, it would no longer be subject
to MERA.
6
determined that the retrofit plan achieves MERA’s 90% goal, provides for increased
environmental and public-health benefits, and does not impose excessive costs on
Minnesota Power’s customers. Relators do not challenge the sufficiency of the MPCA’s
review of the retrofit plan or any of the MPUC’s findings as to its effectiveness, benefits,
or costs. Under these circumstances, the MPUC was not only permitted but required to
approve the retrofit plan. Accordingly, we conclude that the MPUC did not commit legal
error by approving Minnesota Power’s retrofit plan.
Affirmed.