In Re McNeilus Manufacturing Explosion Coordinated Litigation

U.S. District Court, District of Minnesota

In Re McNeilus Manufacturing Explosion Coordinated Litigation

Trial Court Opinion

                  UNITED STATES DISTRICT COURT                           
                     DISTRICT OF MINNESOTA                               

In re: McNeilus Manufacturing Explosion  Case No. 17-cv-5237-PJS-KMM     
Coordinated Litigation                                                   

     Filed as to                             ORDER                       
        , 17cv5237; and                                                  
                            ,                                            
    18cv997                                                              


    This matter is before the Court on Swagelok Company’s and San Diego Valve and 
Fitting Company’s (“San Diego Valve”) Joint Motion to Certify Question to Minnesota 
Supreme Court and to Stay Proceedings.1 [ECF No. 131.] For the reasons that follow, 
Swagelok and San Diego’s joint motion is denied.                          
I.   Relevant Factual Background                                          
    This is a products-liability case arising out of an explosion that occurred at the 
McNeilus Truck and Manufacturing, Inc., facility in Dodge Center, Minnesota, on January 
11, 2017. McNeilus manufactures large trucks for waste removal purposes that are 
powered by a compressed natural gas (“CNG”) system, with the CNG stored in 
pressurized cylinders on top of the vehicles. During the manufacturing process, after 
the CNG trucks are painted, they are moved into a heated baking room so that the paint 
can cure.                                                                 

1    At the May 9, 2019 motions hearing, counsel for the defendants withdrew the 
request to stay these proceedings at this time. The Court denied the motion to stay on 
the record, noting that the possibility of a stay may be at a later date. 
    On January 11, 2017, McNeilus was finishing a CNG vehicle for Waste  
Management, a national disposal and recycling company. Four natural gas cylinders 
were mounted on the top of the truck, connected to a manifold with a high-pressure 
CNG hose. Swagelok and San Diego Valve manufacture and sell the high-pressure hose 

and the hose assemblies used on this vehicle. The truck was inside the baking room 
during the morning of January 11th.                                       
    At approximately 10:00 a.m., a massive explosion occurred inside the factory. 
Several workers were injured, two very seriously, and the facility suffered significant 
damage. Eemou See was the most severely injured. She and her husband, Sing See, 
brought this lawsuit against Swagelok and San Diego Valve under negligence and strict-

liability theories for the defective design and manufacture of the hose and hose 
assemblies, and for failure to attach proper warnings regarding use of the equipment. 
The Sees allege that Swagelok and San Diego Vale defectively manufactured the hose 
assemblies, causing the CNG to escape the canisters. Specifically, they claim that the 
gas was able to escape the hose assembly because the high-pressure hose was 
improperly seated in a fitting. The gas came into contact with a spark in the baking 
room, causing the explosion.                                              

    Swagelok, San Diego Valve, and McNeilus all agree that Ms. See is not at fault 
for her injuries, but they dispute who among them is responsible for the explosion. 
Swagelok and San Diego Valve deny that their hose assemblies are defective, and filed 
a third-party complaint against McNeilus, alleging that McNeilus is responsible for the 
explosion. They contend that McNeilus unreasonably allowed the CNG truck to be 
brought indoors without first defueling the vehicle. They claim that the industrial heater 
in McNeilus’ baking room raised the temperature near the CNG cylinders on the truck 
above 200 degrees Fahrenheit for an extended time prior to the explosion. These 
factors, according to Swagelok and San Diego Valve, were the cause of the explosion 
rather than a problem with the CNG hose. Moreover, even if they are found to be 

somewhat at fault, Swagelok and San Diego Valve assert that their responsibility for the 
harm in this case will be less than 50%.                                  
    Meanwhile, McNeilus sharply contests Swagelok and San Diego Valve’s  
allegations. [ McNeilus Mem. at 5–7, ECF No. 136.] McNeilus argues that: (1) the 
hose was under-inserted into its fitting at the time of the explosion, causing the hose to 
separate and allowing the release of CNG; (2) testing of the non-involved end of the 

same hose reveals that it was also significantly under-inserted in its fitting; and 
(3) McNeilus has used the same process and the same oven for curing the paint in the 
baking room for many years at its plant with no prior instance of a CNG release in the 
paint building. [ ] McNeilus, therefore, takes the position that Swagelok and San Diego 
Valve are fully responsible for the explosion and Ms. See’s injuries. Indeed, McNeilus 
has filed its own complaint against Swagelok and San Diego for the damage caused to 
the McNeilus factory.                                                     

    Procedural History                                                   
    The Sees filed their original Complaint in November of 2017. [ECF No. 1.] On 
May 22, 2018, this case was consolidated with several that were filed by other 
McNeilus employees who were injured in the January 11, 2017 explosion. [Order 
Granting Consolidation (May 22, 2018).] The Court has held several status conferences 
with the parties to discuss the progress of the litigation, to aid in their efforts at 
resolution, and to resolve certain discovery disputes. This case is not in its earliest 
stages, and significant work has already been accomplished by the parties. 
Nevertheless, the schedule anticipates that there is more to be done. The deadline for 
completion of fact discovery is still a month away. Expert disclosures and discovery will 

not be completed until September 20, 2019, and dispositive motions, which are 
anticipated, must be served, filed, and heard by October 15, 2019. [Third Am. 
Scheduling Order (Mar. 5, 2019), ECF No. 123.] The case is expected to be trial-ready 
in December 2019.                                                         
    In addition to litigation, there have been meaningful efforts to resolve all of the 
cases arising from the explosion at McNeilus. All parties participated in two days of 

private mediation in January 2019 with retired Magistrate Judge Arthur Boylan. Then, 
the Court held a global settlement conference on April 10, 2019 for the cases that were 
not resolved at the mediation. Although many of the cases that arose from this tragedy 
have now been settled, the Sees, Swagelok, and San Diego Valve were unable to come 
to a resolution. The day before the undersigned held the April 10th settlement 
conference, Swagelok and San Diego filed the pending motion to certify a question to 
the Minnesota Supreme Court. [ECF No. 131.]                               

II.  The Motion to Certify                                                
    Swagelok and San Diego Valve argue that the Court should certify the following 
question to the Minnesota Supreme Court:                                  
    When a worker is injured through the combined fault of the employer and 
    third-party tortfeasors, can the third-party tortfeasors be held jointly and 
    severally liable for payment of the entire verdict amount if, when the 
    employer’s fault is compared, they are neither individually nor in the 
    aggregate more than 50% at fault?                                    
[Defs.’ Mem. at 1, ECF No. 133.] The defendants assert that they have structured their 
defense to demonstrate that McNeilus is solely, or at least 50%, at fault for Ms. See’s 
injuries based on the holding of               , 
22 F. Supp. 3d 966
       
(D. Minn. 2014). In   , United States District Judge Joan N. Ericksen concluded 
that when an injured employee sues a third-party tortfeasor, the third party is only 
jointly and severally liable for paying an entire award of damages “if [the third party] is 

found to be more than 50% at fault.”   at 981. However, the Minnesota Court of 
Appeals recently reached the opposite conclusion in         , 
923 N.W.2d 337
 (Minn. Ct. App. 2019).2 The court of appeals concluded that, in such 
circumstances, a third-party tortfeasor can be held liable for the entire amount of a 
verdict even if the jury finds that the third party’s fault is less than 50%.   at 340–44. 
    The importance of this legal question to the present litigation is obvious. If the 
rule followed in    is correct, and Swagelok and San Diego Valve persuade a 

jury that they are less than 50% at fault, they would only be required to pay a fraction 
of the damages that may be awarded to the Sees. If, on the other hand,  states the 
correct rule of law, Swagelok and San Diego Valve could be required to pay the entire 
verdict if the jury finds them to be in any way at fault, even if they are still considerably 
less at fault than McNeilus.  and  are at odds, and although the Minnesota 
Supreme Court has now granted review in  , it has not previously answered the 
question. Swagelok and San Diego Valve’s joint motion asks this Court to give the 


2    The Minnesota Supreme Court granted review in  on April 16, 2019.    
http://macsnc.courts.state.mn.us/ctrack/docket/docketEntry.do?action=edit&deID=1031
177&csNameID=86884&csInstanceID=105809&csIID=105809.                      
Minnesota Supreme Court the chance to resolve the uncertainty created by these 
opposing decisions. For the reasons explored below, that motion is denied.3 
      A.  Legal Standard                                                 
    Minnesota has adopted the Uniform Certification of Questions of Law Act 

(“QLA”). 
Minn. Stat. § 480.065
. Pursuant to the QLA, a federal court may certify a 
question of law to the Minnesota Supreme Court “if the answer may be determinative of 
an issue in pending litigation in the certifying court and there is no controlling appellate 
decision, constitutional provision, or statute of [the State of Minnesota].” 
Minn. Stat. § 480.065
, subd. 3.                                                       
    If a federal court certifies a question of law, the order must include:  

    (1) the question of law to be answered;                              

    (2) the facts relevant to the question, showing fully the nature of the 
      controversy out of which the question arose;                       

    (3) a statement acknowledging that the Supreme Court of [Minnesota], 
      acting as the receiving court, may reformulate the question; and   

    (4) the names and addresses of counsel of record and the parties     
      appearing without counsel.                                         

  § 480.065, subd. 6(a). The Minnesota Supreme Court is not required to accept a 
certified question.   § 480.065, subd. 3 (providing that the supreme court “may 

3    The Sees oppose the motion to certify, arguing in part that  is so clearly 
correct and consistent with settled Minnesota law that there is “no uncertainty” to be 
resolved. [Pl.’s Opp’n at 3, 9, ECF No. 137.] The Court disagrees with this assessment. 
The    and        decisions are both well-reasoned, grounded in precedent, and 
persuasive. While the plaintiffs may be correct that the holding of   will ultimately be 
affirmed by the Minnesota Supreme Court, the opposite outcome is just as possible. It is 
an overstatement of the clarity of the legal landscape to describe the issues as “well-
settled.”                                                                 
answer” a certified question);   § 480.065, subd. 7 (providing for the supreme 
court to “notify the certifying court of acceptance or rejection of the question”). 
    Whether to certify a question under the QLA is a question committed to the 
federal courts’ sound discretion.                         , No. 16-       

CV-1747 (SRN/KMM), 
2016 WL 7007489
, at *1 (D. Minn. Nov. 29, 2016), (“It is clear, 
however, that the decision ultimately ‘rests in the sound discretion’ of the district 
court.”) (quoting             , 
416 U.S. 386, 391
 (1974)),                
       
900 N.W.2d 162
 (Minn. 2017). The key factor is whether the federal court is 
“genuinely uncertain about a question of state law.”                      
               , 
935 F.2d 151, 153
 (8th Cir. 1991);                      

 , 
409 F. Supp. 2d 1139
, 1144 n.2 (D. Minn. 2006) (declining to certify a question 
where the governing authority was “sufficiently clear to allow for our independent 
interpretation” of the Minnesota Civil Damages Act). In the absence of a close question, 
“a federal court should not avoid its responsibility to determine all issues before it.” 
                                                  , 
771 F.2d 1153
,       
1157 n.2 (8th Cir. 1985). Finally, the federal courts should only use their power to 
certify “sparingly.”   , 
2016 WL 7007489
, at *1.                          

      B.  Analysis                                                       
    For two reasons, the Court declines to invoke its authority to certify a question 
to the Minnesota Supreme Court in this case. First, the Court finds that certification of 
the question would be premature. The motion to certify here is premised upon the 
possibility that a jury would find that Swagelok and San Diego Valve together are less 
than 50% at fault. As noted above, however, there is significant dispute about the 
percentage of fault attributable to McNeilus, Swagelok, and San Diego Valve. Discovery 
is ongoing, dispositive motions have yet to be filed, and the case is many months away 
from trial. Though Swagelok and San Diego Valve confidently allege that their products 
are not at all responsible for Ms. See’s injuries, it remains entirely possible that a jury 

could find them to be primarily at fault for the explosion.   
Minn. Stat. § 604.02
, 
subd. 1 (providing that parties severally liable for harm must contribute to awards “in 
proportion to the fault attributable to each,” but that a person greater than 50% at fault 
is “jointly and severally liabile for the whole award”). The facts relevant to the 
proposed question are far from settled. Certification of the question crafted by the 
defendants at this point would essentially ask the Minnesota Supreme Court to issue an 

advisory opinion as to the law that would govern allocation of damages in the event of 
one possible jury verdict. However, if Swagelok and San Diego Valve’s prediction about 
their percentage of fault is incorrect, the answer to the certified question will ultimately 
have no bearing on how an award of damages is apportioned in this case. The entire 
certification procedure would waste the State of Minnesota’s judicial resources and the 
time and energy of the parties.                                           
    None of the cases cited by Swagelok and San Diego in their memorandum 

certified a question of law where the legal issue had potentially significant impact, but 
had not yet become ripe.4 For example, in  , United States District Judge 

4    Swagelok and San Diego also cite            , 
935 F.2d 151
 (8th      
Cir. 1991), and                         , No. 15-cv-3149 (MJD/FLN),       
2016 WL 4196816
 (D. Minn. May 31, 2016). Both of these cases involve denials of 
requests for certification of a question of law. Neither can be read to suggest that 
certification is appropriate at a stage of litigation where a legal issue has not yet 
become ripe.                                                              
Susan R. Nelson granted a motion to certify a question to the Minnesota Supreme Court 
regarding the effect of an amendment to the Minnesota Whistleblower Act (“MWA”) on 
the plaintiff’s claims. 
2016 WL 7007489
, at *5. The plaintiff’s employer, Edwards, 
moved for judgment on the pleadings, arguing in part that Friedlander’s whistleblower 

claim failed as a matter of law under existing precedent because Friedlander had not 
exposed any illegality, but merely reported something about which Edwards already 
knew.  at *1, 4. Meanwhile, Friedlander argued that a 2013 amendment to the MWA 
legislatively overruled the cases relied upon by Edwards.  at *4. Because the issue 
was raised in a motion for judgment on the pleadings, the question before Judge Nelson 
was whether, taking Mr. Friedlander’s factual allegations as true, Edwards was entitled 

to judgment as a matter of law.  at *2. In particular, the court noted: “[i]n light of 
the procedural posture, the facts relevant to resolution of this matter are 
uncontested....”   (citing                                                
                   , 
627 F.2d 853, 855
 (8th Cir. 1980) (discussing standards 
governing a motion under Fed. R. Civ. P. 12(c))). Unlike the situation facing the court in 
       , here the facts relevant to resolution of the proposed question are 
vigorously contested.5                                                    

    Second, the Court finds certification in this case is unnecessary and imprudent 
because the Minnesota Supreme Court granted review in  . The question raised by 
Swagelok and San Diego Valve is almost certain to be answered by the Minnesota 

5       McNeilus Mem. in Opp’n to Mot. to Certify at 5–7 (arguing that the evidence 
does not support apportioning more than 50% of fault to McNeilus based on an 
examination showing the Swagelok hose was under-inserted into the fitting), ECF 
No. 136.                                                                  
Supreme Court because it is squarely presented by the appeal in  . While it is 
     , as the defendants allege, that the  court might reverse its grant of review 
or frame the opinion in a way that avoids answering the critical question common to 
both   and this litigation, such outcomes are far less likely than the court issuing an 

opinion that resolves the damages-allocation issue and settles whether the lower 
court’s ruling in  or Judge Ericksen’s ruling  is correct.                
    Swagelok and San Diego Valve argue that the Minnesota Supreme Court’s grant 
of review in   favors certification here because it would give them a chance to 
present their view of the issue to be decided in that case. They claim to be entitled to a 
“seat at the table” for the  decision because of its potential importance to this case. 

This argument is ultimately unpersuasive. Swagelok and San Diego Valve essentially 
seek certification so that they can intervene and offer legal argument in the  appeal. 
However, they offer no support, and this Court is not aware of any, for the proposition 
that the certification procedures in the QLA may be invoked by parties in ongoing 
federal district court litigation who want to weigh in on a pending state court appeal. 
Indeed, if Swagelok and San Diego Valve were defending this case in state court, there 
would be no procedural mechanism for “intervening” in the  appeal from the 

discovery stage of similar, but entirely unrelated litigation. The certification statute 
should not be employed to create such a vehicle here.                     
    Swagelok and San Diego Valve also argue that certification will allow the 
Minnesota Supreme Court to see the unfair consequences of adopting the  rule in a 
case with facts as “egregious” as this one—they posit that it would be unfair to find 
them liable for the entire award when their percentage of fault will likely be as low as 
1%. Again, the Court is not persuaded. Not only is it sheer speculation that the 
apportionment of fault in this case would lead to an egregious outcome if  remains 
good law, but  itself presents a similarly stark factual scenario.  involves a jury 
verdict that found the third-party tortfeasor to be only 20% at fault and an employer to 

be 75% at fault. 
923 N.W.2d at 339
 (“The case was tried to a jury, which found Wells 
[the employer], Ramler [the third party], and Fish [the plaintiff] causally negligent and 
apportioned fault 75% to Wells, 20% to Ramler, and 5% to Fish.”). Even without 
certification here, the Minnesota Supreme Court is certainly capable of imagining 
scenarios in which a third-party tortfeasor is assigned well under 20% fault, and the 
   rule would require payment of the entire award. There is also no indication in the 

record that counsel representing the third-party tortfeasor in   is incapable of 
vigorously advocating the same position that Swagelok and San Diego Valve take in this 
case. This is particularly true since the Minnesota Supreme Court will also have the 
benefit of briefing from at least two amici.            , No. A18-        
0143 (Minn. May 2, 2019) (granting amici motions of Minnesota Defense Lawyers 
Association and Minnesota Association for Justice), http://macsnc.courts.state.mn.us/ 
ctrack/docket/docketEntry.do?action=edit&deID=1034125&csNameID=86884&csInstanc

eID=105809&csIID=105809.                                                  
    Because the question Swagelok and San Diego Valve seek to certify is ultimately 
going to be answered in  , it is only a matter of time before the parties in this case 
have the assistance of a settled legal landscape. Because clarification of the legal issue 
is on the horizon and the motion is premature, the certification motion is denied.6 

ORDER

    For all the foregoing reasons, Swagelok and San Diego’s Joint Motion to Certify 

Question to Minnesota Supreme Court and to Stay Proceedings [ECF No. 131] is 
DENIED.                                                                   

Date: May 17, 2019                                                       
                                   Katherine Menendez                    
                                   United States Magistrate Judge        













6    Though there is currently a December 2019 trial-ready date in this case, it is 
difficult to say when a trial may actually take place. It is also uncertain whether the 
Minnesota Supreme Court will have issued its decision in   ahead of any trial date. If 
the parties here are unable to resolve the litigation ahead of trial, the Court can revisit 
the question of a stay down the road.                                     

Trial Court Opinion

                  UNITED STATES DISTRICT COURT                           
                     DISTRICT OF MINNESOTA                               

In re: McNeilus Manufacturing Explosion  Case No. 17-cv-5237-PJS-KMM     
Coordinated Litigation                                                   

     Filed as to                             ORDER                       
        , 17cv5237; and                                                  
                            ,                                            
    18cv997                                                              


    This matter is before the Court on Swagelok Company’s and San Diego Valve and 
Fitting Company’s (“San Diego Valve”) Joint Motion to Certify Question to Minnesota 
Supreme Court and to Stay Proceedings.1 [ECF No. 131.] For the reasons that follow, 
Swagelok and San Diego’s joint motion is denied.                          
I.   Relevant Factual Background                                          
    This is a products-liability case arising out of an explosion that occurred at the 
McNeilus Truck and Manufacturing, Inc., facility in Dodge Center, Minnesota, on January 
11, 2017. McNeilus manufactures large trucks for waste removal purposes that are 
powered by a compressed natural gas (“CNG”) system, with the CNG stored in 
pressurized cylinders on top of the vehicles. During the manufacturing process, after 
the CNG trucks are painted, they are moved into a heated baking room so that the paint 
can cure.                                                                 

1    At the May 9, 2019 motions hearing, counsel for the defendants withdrew the 
request to stay these proceedings at this time. The Court denied the motion to stay on 
the record, noting that the possibility of a stay may be at a later date. 
    On January 11, 2017, McNeilus was finishing a CNG vehicle for Waste  
Management, a national disposal and recycling company. Four natural gas cylinders 
were mounted on the top of the truck, connected to a manifold with a high-pressure 
CNG hose. Swagelok and San Diego Valve manufacture and sell the high-pressure hose 

and the hose assemblies used on this vehicle. The truck was inside the baking room 
during the morning of January 11th.                                       
    At approximately 10:00 a.m., a massive explosion occurred inside the factory. 
Several workers were injured, two very seriously, and the facility suffered significant 
damage. Eemou See was the most severely injured. She and her husband, Sing See, 
brought this lawsuit against Swagelok and San Diego Valve under negligence and strict-

liability theories for the defective design and manufacture of the hose and hose 
assemblies, and for failure to attach proper warnings regarding use of the equipment. 
The Sees allege that Swagelok and San Diego Vale defectively manufactured the hose 
assemblies, causing the CNG to escape the canisters. Specifically, they claim that the 
gas was able to escape the hose assembly because the high-pressure hose was 
improperly seated in a fitting. The gas came into contact with a spark in the baking 
room, causing the explosion.                                              

    Swagelok, San Diego Valve, and McNeilus all agree that Ms. See is not at fault 
for her injuries, but they dispute who among them is responsible for the explosion. 
Swagelok and San Diego Valve deny that their hose assemblies are defective, and filed 
a third-party complaint against McNeilus, alleging that McNeilus is responsible for the 
explosion. They contend that McNeilus unreasonably allowed the CNG truck to be 
brought indoors without first defueling the vehicle. They claim that the industrial heater 
in McNeilus’ baking room raised the temperature near the CNG cylinders on the truck 
above 200 degrees Fahrenheit for an extended time prior to the explosion. These 
factors, according to Swagelok and San Diego Valve, were the cause of the explosion 
rather than a problem with the CNG hose. Moreover, even if they are found to be 

somewhat at fault, Swagelok and San Diego Valve assert that their responsibility for the 
harm in this case will be less than 50%.                                  
    Meanwhile, McNeilus sharply contests Swagelok and San Diego Valve’s  
allegations. [ McNeilus Mem. at 5–7, ECF No. 136.] McNeilus argues that: (1) the 
hose was under-inserted into its fitting at the time of the explosion, causing the hose to 
separate and allowing the release of CNG; (2) testing of the non-involved end of the 

same hose reveals that it was also significantly under-inserted in its fitting; and 
(3) McNeilus has used the same process and the same oven for curing the paint in the 
baking room for many years at its plant with no prior instance of a CNG release in the 
paint building. [ ] McNeilus, therefore, takes the position that Swagelok and San Diego 
Valve are fully responsible for the explosion and Ms. See’s injuries. Indeed, McNeilus 
has filed its own complaint against Swagelok and San Diego for the damage caused to 
the McNeilus factory.                                                     

    Procedural History                                                   
    The Sees filed their original Complaint in November of 2017. [ECF No. 1.] On 
May 22, 2018, this case was consolidated with several that were filed by other 
McNeilus employees who were injured in the January 11, 2017 explosion. [Order 
Granting Consolidation (May 22, 2018).] The Court has held several status conferences 
with the parties to discuss the progress of the litigation, to aid in their efforts at 
resolution, and to resolve certain discovery disputes. This case is not in its earliest 
stages, and significant work has already been accomplished by the parties. 
Nevertheless, the schedule anticipates that there is more to be done. The deadline for 
completion of fact discovery is still a month away. Expert disclosures and discovery will 

not be completed until September 20, 2019, and dispositive motions, which are 
anticipated, must be served, filed, and heard by October 15, 2019. [Third Am. 
Scheduling Order (Mar. 5, 2019), ECF No. 123.] The case is expected to be trial-ready 
in December 2019.                                                         
    In addition to litigation, there have been meaningful efforts to resolve all of the 
cases arising from the explosion at McNeilus. All parties participated in two days of 

private mediation in January 2019 with retired Magistrate Judge Arthur Boylan. Then, 
the Court held a global settlement conference on April 10, 2019 for the cases that were 
not resolved at the mediation. Although many of the cases that arose from this tragedy 
have now been settled, the Sees, Swagelok, and San Diego Valve were unable to come 
to a resolution. The day before the undersigned held the April 10th settlement 
conference, Swagelok and San Diego filed the pending motion to certify a question to 
the Minnesota Supreme Court. [ECF No. 131.]                               

II.  The Motion to Certify                                                
    Swagelok and San Diego Valve argue that the Court should certify the following 
question to the Minnesota Supreme Court:                                  
    When a worker is injured through the combined fault of the employer and 
    third-party tortfeasors, can the third-party tortfeasors be held jointly and 
    severally liable for payment of the entire verdict amount if, when the 
    employer’s fault is compared, they are neither individually nor in the 
    aggregate more than 50% at fault?                                    
[Defs.’ Mem. at 1, ECF No. 133.] The defendants assert that they have structured their 
defense to demonstrate that McNeilus is solely, or at least 50%, at fault for Ms. See’s 
injuries based on the holding of               , 
22 F. Supp. 3d 966
       
(D. Minn. 2014). In   , United States District Judge Joan N. Ericksen concluded 
that when an injured employee sues a third-party tortfeasor, the third party is only 
jointly and severally liable for paying an entire award of damages “if [the third party] is 

found to be more than 50% at fault.”   at 981. However, the Minnesota Court of 
Appeals recently reached the opposite conclusion in         , 
923 N.W.2d 337
 (Minn. Ct. App. 2019).2 The court of appeals concluded that, in such 
circumstances, a third-party tortfeasor can be held liable for the entire amount of a 
verdict even if the jury finds that the third party’s fault is less than 50%.   at 340–44. 
    The importance of this legal question to the present litigation is obvious. If the 
rule followed in    is correct, and Swagelok and San Diego Valve persuade a 

jury that they are less than 50% at fault, they would only be required to pay a fraction 
of the damages that may be awarded to the Sees. If, on the other hand,  states the 
correct rule of law, Swagelok and San Diego Valve could be required to pay the entire 
verdict if the jury finds them to be in any way at fault, even if they are still considerably 
less at fault than McNeilus.  and  are at odds, and although the Minnesota 
Supreme Court has now granted review in  , it has not previously answered the 
question. Swagelok and San Diego Valve’s joint motion asks this Court to give the 


2    The Minnesota Supreme Court granted review in  on April 16, 2019.    
http://macsnc.courts.state.mn.us/ctrack/docket/docketEntry.do?action=edit&deID=1031
177&csNameID=86884&csInstanceID=105809&csIID=105809.                      
Minnesota Supreme Court the chance to resolve the uncertainty created by these 
opposing decisions. For the reasons explored below, that motion is denied.3 
      A.  Legal Standard                                                 
    Minnesota has adopted the Uniform Certification of Questions of Law Act 

(“QLA”). 
Minn. Stat. § 480.065
. Pursuant to the QLA, a federal court may certify a 
question of law to the Minnesota Supreme Court “if the answer may be determinative of 
an issue in pending litigation in the certifying court and there is no controlling appellate 
decision, constitutional provision, or statute of [the State of Minnesota].” 
Minn. Stat. § 480.065
, subd. 3.                                                       
    If a federal court certifies a question of law, the order must include:  

    (1) the question of law to be answered;                              

    (2) the facts relevant to the question, showing fully the nature of the 
      controversy out of which the question arose;                       

    (3) a statement acknowledging that the Supreme Court of [Minnesota], 
      acting as the receiving court, may reformulate the question; and   

    (4) the names and addresses of counsel of record and the parties     
      appearing without counsel.                                         

  § 480.065, subd. 6(a). The Minnesota Supreme Court is not required to accept a 
certified question.   § 480.065, subd. 3 (providing that the supreme court “may 

3    The Sees oppose the motion to certify, arguing in part that  is so clearly 
correct and consistent with settled Minnesota law that there is “no uncertainty” to be 
resolved. [Pl.’s Opp’n at 3, 9, ECF No. 137.] The Court disagrees with this assessment. 
The    and        decisions are both well-reasoned, grounded in precedent, and 
persuasive. While the plaintiffs may be correct that the holding of   will ultimately be 
affirmed by the Minnesota Supreme Court, the opposite outcome is just as possible. It is 
an overstatement of the clarity of the legal landscape to describe the issues as “well-
settled.”                                                                 
answer” a certified question);   § 480.065, subd. 7 (providing for the supreme 
court to “notify the certifying court of acceptance or rejection of the question”). 
    Whether to certify a question under the QLA is a question committed to the 
federal courts’ sound discretion.                         , No. 16-       

CV-1747 (SRN/KMM), 
2016 WL 7007489
, at *1 (D. Minn. Nov. 29, 2016), (“It is clear, 
however, that the decision ultimately ‘rests in the sound discretion’ of the district 
court.”) (quoting             , 
416 U.S. 386, 391
 (1974)),                
       
900 N.W.2d 162
 (Minn. 2017). The key factor is whether the federal court is 
“genuinely uncertain about a question of state law.”                      
               , 
935 F.2d 151, 153
 (8th Cir. 1991);                      

 , 
409 F. Supp. 2d 1139
, 1144 n.2 (D. Minn. 2006) (declining to certify a question 
where the governing authority was “sufficiently clear to allow for our independent 
interpretation” of the Minnesota Civil Damages Act). In the absence of a close question, 
“a federal court should not avoid its responsibility to determine all issues before it.” 
                                                  , 
771 F.2d 1153
,       
1157 n.2 (8th Cir. 1985). Finally, the federal courts should only use their power to 
certify “sparingly.”   , 
2016 WL 7007489
, at *1.                          

      B.  Analysis                                                       
    For two reasons, the Court declines to invoke its authority to certify a question 
to the Minnesota Supreme Court in this case. First, the Court finds that certification of 
the question would be premature. The motion to certify here is premised upon the 
possibility that a jury would find that Swagelok and San Diego Valve together are less 
than 50% at fault. As noted above, however, there is significant dispute about the 
percentage of fault attributable to McNeilus, Swagelok, and San Diego Valve. Discovery 
is ongoing, dispositive motions have yet to be filed, and the case is many months away 
from trial. Though Swagelok and San Diego Valve confidently allege that their products 
are not at all responsible for Ms. See’s injuries, it remains entirely possible that a jury 

could find them to be primarily at fault for the explosion.   
Minn. Stat. § 604.02
, 
subd. 1 (providing that parties severally liable for harm must contribute to awards “in 
proportion to the fault attributable to each,” but that a person greater than 50% at fault 
is “jointly and severally liabile for the whole award”). The facts relevant to the 
proposed question are far from settled. Certification of the question crafted by the 
defendants at this point would essentially ask the Minnesota Supreme Court to issue an 

advisory opinion as to the law that would govern allocation of damages in the event of 
one possible jury verdict. However, if Swagelok and San Diego Valve’s prediction about 
their percentage of fault is incorrect, the answer to the certified question will ultimately 
have no bearing on how an award of damages is apportioned in this case. The entire 
certification procedure would waste the State of Minnesota’s judicial resources and the 
time and energy of the parties.                                           
    None of the cases cited by Swagelok and San Diego in their memorandum 

certified a question of law where the legal issue had potentially significant impact, but 
had not yet become ripe.4 For example, in  , United States District Judge 

4    Swagelok and San Diego also cite            , 
935 F.2d 151
 (8th      
Cir. 1991), and                         , No. 15-cv-3149 (MJD/FLN),       
2016 WL 4196816
 (D. Minn. May 31, 2016). Both of these cases involve denials of 
requests for certification of a question of law. Neither can be read to suggest that 
certification is appropriate at a stage of litigation where a legal issue has not yet 
become ripe.                                                              
Susan R. Nelson granted a motion to certify a question to the Minnesota Supreme Court 
regarding the effect of an amendment to the Minnesota Whistleblower Act (“MWA”) on 
the plaintiff’s claims. 
2016 WL 7007489
, at *5. The plaintiff’s employer, Edwards, 
moved for judgment on the pleadings, arguing in part that Friedlander’s whistleblower 

claim failed as a matter of law under existing precedent because Friedlander had not 
exposed any illegality, but merely reported something about which Edwards already 
knew.  at *1, 4. Meanwhile, Friedlander argued that a 2013 amendment to the MWA 
legislatively overruled the cases relied upon by Edwards.  at *4. Because the issue 
was raised in a motion for judgment on the pleadings, the question before Judge Nelson 
was whether, taking Mr. Friedlander’s factual allegations as true, Edwards was entitled 

to judgment as a matter of law.  at *2. In particular, the court noted: “[i]n light of 
the procedural posture, the facts relevant to resolution of this matter are 
uncontested....”   (citing                                                
                   , 
627 F.2d 853, 855
 (8th Cir. 1980) (discussing standards 
governing a motion under Fed. R. Civ. P. 12(c))). Unlike the situation facing the court in 
       , here the facts relevant to resolution of the proposed question are 
vigorously contested.5                                                    

    Second, the Court finds certification in this case is unnecessary and imprudent 
because the Minnesota Supreme Court granted review in  . The question raised by 
Swagelok and San Diego Valve is almost certain to be answered by the Minnesota 

5       McNeilus Mem. in Opp’n to Mot. to Certify at 5–7 (arguing that the evidence 
does not support apportioning more than 50% of fault to McNeilus based on an 
examination showing the Swagelok hose was under-inserted into the fitting), ECF 
No. 136.                                                                  
Supreme Court because it is squarely presented by the appeal in  . While it is 
     , as the defendants allege, that the  court might reverse its grant of review 
or frame the opinion in a way that avoids answering the critical question common to 
both   and this litigation, such outcomes are far less likely than the court issuing an 

opinion that resolves the damages-allocation issue and settles whether the lower 
court’s ruling in  or Judge Ericksen’s ruling  is correct.                
    Swagelok and San Diego Valve argue that the Minnesota Supreme Court’s grant 
of review in   favors certification here because it would give them a chance to 
present their view of the issue to be decided in that case. They claim to be entitled to a 
“seat at the table” for the  decision because of its potential importance to this case. 

This argument is ultimately unpersuasive. Swagelok and San Diego Valve essentially 
seek certification so that they can intervene and offer legal argument in the  appeal. 
However, they offer no support, and this Court is not aware of any, for the proposition 
that the certification procedures in the QLA may be invoked by parties in ongoing 
federal district court litigation who want to weigh in on a pending state court appeal. 
Indeed, if Swagelok and San Diego Valve were defending this case in state court, there 
would be no procedural mechanism for “intervening” in the  appeal from the 

discovery stage of similar, but entirely unrelated litigation. The certification statute 
should not be employed to create such a vehicle here.                     
    Swagelok and San Diego Valve also argue that certification will allow the 
Minnesota Supreme Court to see the unfair consequences of adopting the  rule in a 
case with facts as “egregious” as this one—they posit that it would be unfair to find 
them liable for the entire award when their percentage of fault will likely be as low as 
1%. Again, the Court is not persuaded. Not only is it sheer speculation that the 
apportionment of fault in this case would lead to an egregious outcome if  remains 
good law, but  itself presents a similarly stark factual scenario.  involves a jury 
verdict that found the third-party tortfeasor to be only 20% at fault and an employer to 

be 75% at fault. 
923 N.W.2d at 339
 (“The case was tried to a jury, which found Wells 
[the employer], Ramler [the third party], and Fish [the plaintiff] causally negligent and 
apportioned fault 75% to Wells, 20% to Ramler, and 5% to Fish.”). Even without 
certification here, the Minnesota Supreme Court is certainly capable of imagining 
scenarios in which a third-party tortfeasor is assigned well under 20% fault, and the 
   rule would require payment of the entire award. There is also no indication in the 

record that counsel representing the third-party tortfeasor in   is incapable of 
vigorously advocating the same position that Swagelok and San Diego Valve take in this 
case. This is particularly true since the Minnesota Supreme Court will also have the 
benefit of briefing from at least two amici.            , No. A18-        
0143 (Minn. May 2, 2019) (granting amici motions of Minnesota Defense Lawyers 
Association and Minnesota Association for Justice), http://macsnc.courts.state.mn.us/ 
ctrack/docket/docketEntry.do?action=edit&deID=1034125&csNameID=86884&csInstanc

eID=105809&csIID=105809.                                                  
    Because the question Swagelok and San Diego Valve seek to certify is ultimately 
going to be answered in  , it is only a matter of time before the parties in this case 
have the assistance of a settled legal landscape. Because clarification of the legal issue 
is on the horizon and the motion is premature, the certification motion is denied.6 

ORDER

    For all the foregoing reasons, Swagelok and San Diego’s Joint Motion to Certify 

Question to Minnesota Supreme Court and to Stay Proceedings [ECF No. 131] is 
DENIED.                                                                   

Date: May 17, 2019                                                       
                                   Katherine Menendez                    
                                   United States Magistrate Judge        













6    Though there is currently a December 2019 trial-ready date in this case, it is 
difficult to say when a trial may actually take place. It is also uncertain whether the 
Minnesota Supreme Court will have issued its decision in   ahead of any trial date. If 
the parties here are unable to resolve the litigation ahead of trial, the Court can revisit 
the question of a stay down the road.                                     

Reference

Status
Unknown