Lingren v. Nilsen
Can I rely on this case?
Citation treatment has not been reviewed for this case. The notes below come from the citation graph and the Minnesota Revisor's amendment records, not from a review of how later courts treated this decision.
(as of 9/30/2026)
Last cited by a Minnesota appellate court in 1927, among the opinions in this site’s citation index.
Not a substitute for Shepard’s or KeyCite — verify before relying.
See our Terms of Use before relying on these notes. Report an error
Cases that cite this one
2 later published cases cite this decision.
- Hydraulic Press Brick Co. v. Pierz Co-Operative Ass'n (Minn. 1927)
- H. S. Johnson Co. v. Ludwigson (Minn. 1921)
This list shows which later cases cite this one. It does not say how they treated it, and no review of that has been done. Not a substitute for Shepard’s or KeyCite — verify before relying.
Opinion of the Court
This action was originally brought byLingren & Co. as plaintiffs to enforce a lien against Lot three (3) in Block ten (10) South Side addition to Minneapolis, for materials by them furnished to the owner, one Nilsen, and used in the construction of a dwelling house thereon. Gillen and the Lombard Investment Company were, joined as parties defendant. The investment company claims to. have a mortgage upon the premises, and the defendant Gillen, by his pleading in the nature of a complaint in the action, sets up an affirmative claim for a lien for work done and materials furnished in the erection of a certain frame dwelling house βon the lot of land in the complaint described,β which, as we have seen, was Lot three (3)> in Block ten, (10,) above mentioned. The evidence shows that under the contract between the parties the frame house in question was-to be erected upon lot three (3.) It was not, however, built on that lot, but was by mistake built on lot four, (4,) in the same block, and. afterwards removed to lot two (2.) In the mean time the owner had caused a brick house to be erected upon lot three (3.)
The defendant Gillen made out and filed his statement and a claim-for a lien for the work and material furnished in the construction, of the frame dwelling house referred to, in which statement the building is described as situated upon lot two, (2,) and he therein claims, a lien therefor upon lot two (2) and not upon lot three (3.)
His claim could not, therefore, be allowed in this action, but was-, properly disallowed, and his complaint dismissed.
Order affirmed.