Action to recover damages for personal injuries sustained by the plaintiff by a rear-end collision between two freight trains of the defendant at Osakis, this state, on September 27, 1904. Verdict for the plaintiff for $5,000. The defendant appealed from an order denying its alternative motion for judgment or for a new trial.
That the plaintiff-was injured to some extent'by the collision, and that it was caused by the negligence of the defendant’s servants in charge of the head train, is not controverted.
1. It is, however, the contention of the defendant that the evidence establishes the contributory negligence of the plaintiff as a matter of law, in that he violated rule 53 of the defendant which provided that:
All trains must- approach all stations and water tanks between stations under control, and so proceed until the track is plainly seen to be clear. The responsibility for a collision at a station, or at a water tank between -stations, will rest with the following or incoming train. This will not relieve train and enginemen from responsibility of protecting trains at stations and water tanks as provided by rules 49 and 57.
That is, by sending a flagman back a sufficient distance to warn other trains by the use of flags, torpedoes, or other signals.
Evidence was offered on the trial tending to establish the following facts: That the plaintiff was a locomotive engineer, and on September 27, 1904, at 2:25 o’clock a. m. he left Barnesville for Melrose, this state, in charge of a livestock train of twenty eight cars. The time schedule of his train to Evansville, and of a similar train preceding his own, was delivered to him. These particular trains had the right of way over all trains, except passenger trains, from Barnesville to Evansville, a distance of fifty six miles. The plaintiff reached Evansville one-half hour behind schedule time. Here he received an order fixing his time schedule to Melrose, the end of his run, with an admonition from the defendant’s superintendent to the effect that he did not make good time to Evansville, and to try and reach Melrose on time. No time schedule of the head train from Evansville to Melrose was given to him. He also had an order directing him to run not exceeding ten to twelve miles between switches at Osakis. He reached a
The statements of the plaintiff, made to the superintendent after the accident, differed in some material particulars from his testimony on the trial. The credibility of his testimony was for the jury, and his testimony tended to establish the facts we have stated. It is clear that the plaintiff did not have his train under such control, at the time of the collision, that he could have stopped it within a distance covered by the range of- his vision.
It is the contention of the defendant that it was the plaintiff’s absolute duty so to have his train under control that he could have stopped it within a distance limited by his range of vision, and that, failing so to 'do, he was guilty of contributory negligence as a matter of law. It is to be noted that rule 53 requires that all trains must approach all stations and water tanks under control and so proceed until the track is plainly seen to be clear, that it does not command the doing or not doing of any particular specific act, but that it is one calling for the
In principle the case at bar is not essentially different from the case of Hall v. Chicago, B. & N. Ry. Co., 46 Minn. 439, 49 N. W. 239. The rule in that case somewhat differed in its terms from the rule here in question, but it was quite as absolute and mandatory as to the duty of engineers to have their trains under control when approaching and passing stations as is the rule in this case. In that case the court refused to give a requested instruction to the effect that it was the engineer’s duty, while running through the yard and approaching the switches, to have his train under complete control so that he could stop it within the distance covered by his range of vision, and, failing to do so, would be guilty of contributory negligence. The refusal to give the instruction was held to be correct on appeal to this court, which held that the rule must receive a reasonable construction, and that the duty of the engineer under the rule must be determined in each particular case with reference to its facts and other rules and duties imposed upon him by the railway company. And further, that if compliance by a servant with a general rule is rendered impossible by other and inconsistent orders or duties given or imposed by the master, negligence cannot be imputed to the servant for not following the general rule.
The evidence in this case tending to show the time and place and circumstances of the collision, the time schedules given to the plaintiff by which to run his train, the admonition of the superintendent, and the order limiting the running time between switches at Osakis was sufficient to take the case to the jury upon the question of the plaintiff’s alleged contributory negligence. We do not discuss the evidence, as there must be a new trial ordered upon, another ground. It follows that the defendant’s motion for judgment absolute was correctly denied.
It is urged by plaintiff’s counsel that the error was not a reversible ■one, for the reason that the charge taken as a whole was correct. It is the rule of this court not to reverse for errors in the charge of the trial court to the jury when it fairly appears from the charge as a whole that the jury were properly instructed and could not have been misled by any technical errors. However, the difficulty in this case is that the error was fundamental, and was repeated several times; hence it •was manifestly reversible error.
3. The defendant also urges that the damages awarded are excessive. We have not considered this question, and we are not to be under
Order appealed from reversed and a new trial granted.