Johnson v. Church of St. Charles
Johnson v. Church of St. Charles
Opinion of the Court
This is an action to recover the contract price for the installation of a hot water beating plant for the defendant. There was a verdict
1. The plaintiffs agreed that the heating plant should have a stated heating capacity. The balance claimed in their complaint and supported by the proofs was $330.40. The verdict was for $300. A majority of the court are of the opinion that the verdict establishes the fact that the heating plant was constructed in conformity with the requirements of the contract. This being so it is not material whether the court gave the jury the correct measure of damages for a breach of the contract. A minority of the court are of the opinion that the verdict does not establish the performance of the contract and that the question of the proper measure of damages is for consideration. The writer is of the opinion of the minority.
2. In the installation of the plant the plaintiffs extended the hot water pipes, designated as risers, from the floor to the ceiling, where the pipes were angled off horizontally at convenient distances, and without uniformity, beneath the ceiling, and then extended through the ceiling to the floor above and connected with the radiators. There was evidence that this was not a workmanlike way of placing the pipes and that the rooms were made unsightly. The court charged the jury, in effect, that the placing of the pipes in this manner, instead of between the ceiling and the floor above, was of no particular consequence and nothing more than nominal damages could be allowed for it. There was evidence to the effect that it would cost $200 to put the pipes in the condition required by good workmanship. In its answer the defendant claimed damages of $100.
The claim of the defendant was not one to be disregarded. It was at the least for the jury and the charge was erroneous.
A new trial must be had unless the plaintiffs consent that their verdict be reduced by the sum of $100. If within 10 days after the going down of the remittitur the plaintiffs file such consent, the judgment will stand affirmed; otherwise it will stand reversed with directions for a new trial.
Judgment affirmed on condition.