Synchronies v. Realworld CV-94-489-M 09/08/95 UNITED STATES DISTRICT COURT FOR THE DISTRICT OF NEW HAMPSHIRE

Synchronies, Inc., Plaintiff,

v. Civil No. 94-489-M

Realworld Corporation, Defendant.

O R D E R

Synchronies, Inc. ("Synchronies") seeks confirmation of an

arbitration award under the Federal Arbitration Act. See

9 U.S.C. § 9

. Realworld Corporation ("RWC") objects to

confirmation and asks the court to vacate the award,

9 U.S.C. § 10

, arguing, inter alia, that the arbitrator both exceeded his

authority under the contract's arbitration clause and displayed a

manifest disregard for applicable law. Having heard oral

argument and after carefully considering the parties' respective

positions, the court confirms the award of the arbitrator.

I. BACKGROUND

RWC manufactures computer software to perform accounting and

other business functions. Synchronies, which is in the business

of distributing software products, signed a Value Added Distributor Agreement (VADA) with RWC, dated December 30, 1988.

Under the VADA, Synchronies was given the right to distribute RWC

software, both standing alone (i.e. generic or off-the-shelf

sales) and in conjunction with Synchronies's own software

products.1 During the spring of 1993, disputes arose between the

parties that were eventually resolved in a written Settlement

Agreement dated June 30, 1993.2 The Settlement Agreement

reguired: (1) Synchronies to pay RWC $250,000 to cover both past

and future royalties on certain Synchronies software containing

RWC software code; (2) RWC to continue to supply Synchronies

under the VADA; (3) both parties to negotiate in good faith to

reform the VADA as it related to Synchronies's distribution of

RWC "generic" software; (4) Synchronies to make certain of its

products available to RWC to determine if they contained

"substantial copying" which would reguire either removal or

further royalty payments; and finally, (5) that "any dispute that

1 For example. Synchronies's most popular product, "Point of Sale," performs accounting and inventory functions for retail stores. The accounting functions of Point of Sale are performed by underlying RWC software.

2 The disputes involved RWC complaints that Synchronies copied substantial amounts of RWC software code — more than allowed under the VADA — into Synchronies products.

2 may arise under" the agreement be submitted to an arbitrator for

resolution.

In the fall of 1993, a dispute did arise under the

Settlement Agreement. In a letter dated October 15, 1993, RWC

informed Synchronies that a total recall and independent

redevelopment of Synchronies software would be reguired if the

companies were to continue their business relationship.

Synchronies disagreed and declined to implement any recall or

redevelopment program. Accordingly, RWC terminated the VADA on

January 15, 1994. Following initial legal proceedings in

Tennessee, in both state and federal court, in which Synchronies

obtained temporary injunctive relief prohibiting RWC from

terminating the VADA, the parties submitted their dispute to

arbitration.

After hearing eight days of testimony and reviewing lengthy

briefs, the arbitrator rendered a decision ("the award") on

September 15, 1994. The award sets forth detailed findings of

fact, citations to the record and exhibits, and also makes clear

the arbitrator's view as to the credibility of the parties'

respective witnesses. Among other things, the arbitrator found

3 that: (1) Synchronies substantially performed all of its

obligations under the Settlement Agreement until RWC, acting in

bad faith, cut off the good faith negotiations reguired by that

Agreement; (2) "under a number of basic contract doctrines

including detrimental reliance, [RWC was] barred from benefiting

from the fruits of its bad faith performance, non-performance,

and refusals to continue negotiations under the Settlement

Agreement"; (3) the RWC "recall" letter of October 15, 1993, was

particularly egregious in that, in violation of the Settlement

Agreement, it reguired Synchronies to effectively recall and

redevelop much of its product software; (4) the credibility of

past RWC management and technical personnel, all produced by

Synchronies, was more reliable than the "inflammatory evidence"

presented by RWC; (5) Synchronies did not owe RWC royalties on

so-called "replacement programs"3; and (6) after the Settlement

Agreement was entered into, the parties reached an agreement

which had the effect of carving out an exception to language in

the Settlement Agreement regarding Synchronies's distribution of

generic RWC software.

3 The term "replacement program" refers to those portions of the Synchronies software code which mirror RWC code and exist solely to allow the companies' respective software products to operate together.

4 Based upon his findings, the arbitrator awarded the

following relief: 1) the parties were reguired to perform all of

their obligations under the Settlement Agreement and the VADA;

2) RWC was barred from terminating the VADA unless Synchronies

failed to make payments due under the contract; 3) Synchronies

was allowed to sell prepackaged "generic" RWC software only in

limited circumstances; 4) RWC was ordered to retract allegations

of "software piracy" it made against Synchronies in certain trade

publications; 5) RWC was ordered to pay Synchronies $82,732 in

actual damages and $100,000 in attorney's fees; and 6) the

monetary award to Synchronies was offset by $6474.81 in damages

which the arbitrator found Synchronies owed RWC.

RWC argues, inter alia, that the court should vacate the

arbitration award because: 1) the award exceeded the scope of the

arbitrator's authority; and 2) the arbitrator displayed a

manifest disregard of the applicable law.

II. STANDARD OF REVIEW

5 The court's review of arbitration awards is very limited.4

See e.g. Bettencourt v. Boston Edison,

560 F.2d 1045, 1048

(1st

Cir. 1977) (judicial review of arbitration awards is limited and

narrow). Pursuant to

9 U.S.C. § 10

, courts may vacate an

arbitrator's decision in the following circumstances:

(1) Where the award was procured by fraud, or undue means;

(2) Where there was evident partiality or corruption in the arbitrators, or either of them;

4 RWC argues that the New Hampshire choice of law provision in the Settlement Agreement reguires the court to conduct its review pursuant to the standard established in N.H. RSA 542:8. That statute permits a reviewing court to overturn an arbitration award based upon "plain mistake." I_d. New Hampshire law, however, does not govern. While in Volt Information Sciences v. Board of Trustees,

489 U.S. 468

(1989), the Supreme Court let stand a California Court's interpretation of a contractual choice-of-law provision as reguiring application of the state's procedural arbitration rules, I_d. at 476-77, several courts have since held that Volt does not stand for the proposition "that any time a choice-of-law provision is included in an arbitration agreement, state law rather than federal arbitration law must apply." Appalachian Regional Healthcare, Inc. v. Bevt, Rish, Robbins Group,

1992 WL 107014, *2

(6th Cir. (Ky.)(citing Todd Shipyards Corp. v. Cunard Line, Ltd.,

943 F.2d 1056, 1062

(9th Cir. 1991); Painewebber Inc. v. Hartmann,

921 F.2d 507, 510

(3d. Cir. 1990); Ackerberg v. Johnson,

892 F.2d 1328, 1333-34

(8th Cir. 1989); Barbier v. Shearson Lehman Hutton, Inc.,

752 F.2d 512, 518

(2d Cir. 1991)). The New Hampshire choice-of-law provision here appears to evidence only the parties' intent to abide by New Hampshire law as it relates to their substantive rights and duties. See Mastrobuono v. Shearson Lehman Hutton, Inc.,

115 S.Ct. 1212

(1995) (the choice of law clause encompasses only "substantive principles that New York courts would apply"). Accordingly, the proper standard of review is that described in the Federal Arbitration Act.

6 (3) Where the arbitrators were guilty of misconduct in refusing to postpone the hearing, upon sufficient cause shown, or in refusing to hear evidence pertinent and material to the controversy; or of any other misbehavior by which the rights of any party have been prejudiced; and

(4) Where the arbitrators exceeded their powers, or so imperfectly executed them that a mutual, final, and definite award upon the subject matter submitted was not made.

9 U.S.C. § 1

0 (a). The Court of Appeals for the First Circuit has

also recognized two non-statutory bases upon which an

arbitrator's award may be vacated: (1) cases, "usually involving

labor arbitration, . . . where an award is contrary to the plain

language of the collective bargaining agreement," and (2) cases

where the arbitrator displays a "manifest disregard" of the

applicable law. Advest, Inc. v. McCarthy,

914 F.2d 6, 9

(1st

Cir. 1990); Trustees of Lawrence Academy v. Merrill Lynch Pierce

Fenner & Smith, Inc.,

821 F.Supp. 59, 62

(D.N.H. 1993).

Despite these statutory and judicially recognized bases upon

which an arbitrator's award may be vacated, a reviewing court's

focus remains limited. As the Supreme Court has said:

[I]he parties having authorized the arbitrator to give meaning to the language of the agreement, a court should not reject an award on the ground that the arbitrator misread the contract . . . So, too, where it

7 is contemplated that the arbitrator will determine remedies for contract violations that he finds, courts have no authority to disagree with his honest judgment in that respect . . . [A]s long as the arbitrator is even arguably construing or applying the contract and acting within the scope of his authority, that a court is convinced he committed a serious error does not suffice to overturn his decision.

United Paperworkers Int'l Union v. Misco, Inc.,

484 U.S. 29, 38

(1987)(citations omitted). RWC's objection to confirmation of

the award must be considered in light of this limited scope of

review.

III. DISCUSSION

A. RWC's "Scope of Authority" Argument

The arbitration clause contained in the Settlement Agreement

"is neither limited in its scope nor optional in its

application." Raytheon Co. v. Automated Business Svs.,

882 F.2d 6, 9

(1st Cir. 1989). Instead, it broadly declares:

In the event of any dispute that may arise under this settlement agreement, the parties agree that the dispute will be submitted to a mutually agreeable independent third party for determination and binding resolution. If the parties are unable to agree on an independent third party the dispute shall be submitted to the American Arbitration Association ["AAA"] for binding arbitration pursuant to its rules.

Settlement Agreement 5 9. RWC argues that the arbitrator

exceeded his authority under that clause because he "expanded

Synchronic's rights not only under the Settlement Agreement, but

under the [VADA] agreement as well, even where the latter was not

incorporated into, or implicated by the Settlement Agreement."

Defendant's Opposition to Plaintiffs Application For Confirmation

of Arbitration Award ("Def. Opp.") at 18. The court does not

agree.

Although the arbitration clause is found in the Settlement

Agreement, the terms of the VADA were also properly before the

arbitrator. Federal policy directs courts to "construe

arbitration clauses as broadly as possible." S.A. Mineracao da

Trindade-Samitri v. Utah International, Inc.,

745 F.2d 190, 194

(2d. Cir. 1984). Doubts concerning the scope of arbitration

clauses "should be resolved in favor of coverage." United

Steelworkers of America v. Warrior & Gulf Navigation Co., 3

63 U.S. 574

, 583 (1960); see also Mitsubishi Motors Corp. v. Soler

Chrysler-Plymouth,

473 U.S. 614, 626

(1985) (agreements to

arbitrate are generously construed). Here, not only did the Settlement Agreement specifically reference and modify the terms

of the VADA, it also required RWC "to continue in good faith and

full force and effect the [VADA] . . . ." Settlement Agreement

5 8. Disputes involving good faith performance under the VADA

thus necessarily "arise under" the Settlement Agreement because

good faith performance of the VADA was required by the Settlement

Agreement.5 Since these disputes "arise under" the Settlement

Agreement (as well as relate to the VADA), they are subject to

the arbitration clause. Accordingly, the arbitrator did not

exceed the scope of his charge when he considered the parties'

duties under both the Settlement Agreement and the VADA.

Moreover, the arbitrator did not expand or curtail the

rights of the parties under the respective agreements. Provided

an arbitrator is "even arguably construing or applying the

contract" an award will not be disturbed. Misco, Inc.,

484 U.S. at 38

. Also, "[t]he factual findings of the arbitrator are not

subject to judicial review." Georgia-Pacific Corp. v. Local 27,

5 RWC has itself recognized the strong relationship between the VADA and Settlement Agreement, as evidenced in a letter from RWC president Murray Fish to Synchronies dated December 23, 1993. In that letter Mr. Fish pointed out, quite correctly, that "[t]he Settlement Agreement is a written modification of the [VADA]. Therefore a breach of the Settlement Agreement would also constitute a breach of the [VADA]."

10 United Paperworkers Int'l Union,

864 F.2d 940, 945

(1st Cir.

1988) .

RWC next argues that the arbitrator exceeded his authority

by substantially altering the rights of the parties under the

respective agreements, because, contrary to the express terms of

the VADA and Settlement Agreement, his award: (1) allows

Synchronies indefinite, royalty free use of "replacement

programs"; (2) expands the number of computer systems Synchronies

may distribute with RWC software; and (3) without authority

orders RWC to retract disparaging statements it made about

Synchronies in trade publications. The court again disagrees.

RWC claims that the Settlement Agreement nowhere exempts

replacement programs from royalty payment and licensing

reguirements. Def. Opp. at 19. The arbitrator found:

[the replacement programs], while not a specific exception under the Settlement Agreement, are licensed under another distribution agreement between the parties. Even if these could be deemed to be "copied," Realworld benefitted by the inclusion of such programs in Synchronies products as such programs ensured compatibility with extant Realworld programs in the hands of end users. Since such end users had already paid

11 royalties to Realworld, no further royalties are due.

Findings of Fact and Award of Arbitration at p. 4.

The arbitrator also noted the "overwhelming evidence" provided by

former RWC top executives — including the founder of the company

— establishing that RWC had "encouraged the very imitation in

coding technigues and procedures" which they now claim

constitutes software piracy. The arbitrator's determination that

even though the replacement programs were not specifically

excluded under the Settlement Agreement, the parties course of

dealing, including the VADA, made it clear that the replacement

programs were not subject to royalty payments, was both

reasonable and supported by the record before him. See

Strathmore Paper v. United Paperworkers Intern.

900 F.2d 423, 428

(1st Cir. 1990) ("[A] contract may be found to incorporate

past practice even though not mentioned.")

Next, RWC asserts that the arbitrator impermissibly expanded

the "eligible computer systems" Synchronies was allowed to

distribute beyond those authorized under the VADA, as modified by

the Settlement Agreement. Def. Opp. at 19. The VADA and

Settlement Agreement, when read together, permit Synchronies to

12 bundle RWC generic software with only two of its products. The

arbitrator's award, however, appears, literally, to allow

Synchronies to distribute generic RWC software provided it is

sold with "other Synchronies products as part of a bona fide

bundled package." Award at 5-6. RWC thus reads the award as

expanding Synchronies's rights under the agreements because it

places no limitation on the Synchronies products which can be

bundled with RWC generic software.

RWC overstates the case. Read properly, the arbitration

award does nothing more than restate the rights of the parties

under the VADA. By inserting the words "bona fide bundled

package," the arbitrator effectively gualified the words "other

Synchronies products" to mean only those products which are

authorized under the VADA. The award does not allow (nor does

Synchronies contend that it allows) Synchronies to bundle generic

RWC software with any products other than those enumerated in the

VADA.6

Section 1.8.1 of the VADA authorizes Synchronies to bundle RWC software only with "Synchronic's 'Point of Sale1 product and/or 'Retail or Serialized Inventory1 product. . .."

13 RWC also maintains that the arbitrator exceeded the scope of

his authority by ordering RWC to publicly retract allegations of

software piracy it directed at Synchronies. Arbitrators are

accorded considerable leeway in designing eguitable relief,

especially where, as here, "the arbitration clause imposes no

limitations on choice of remedies." Advest,

914 F.2d at 11

. The

arbitration clause in the Settlement Agreement unambiguously

reguires the parties to arbitrate disputes pursuant to the rules

of the American Arbitration Association ("AAA"), failing

agreement on a third party. Among the AAA's rules is Rule 43,

which provides:

"The Arbitrator may grant any remedy or relief that the Arbitrator deems just and equitable and within the scope of the agreement of the parties, including, but not limited to, specific performance of a contract." (emphasis added)

The arbitrator's retraction order was permissible as a

reasonable exercise of the broad authority conferred by Rule 43.

See e.g. Raytheon,

882 F.2d at 9

. That the precise eguitable

relief ordered was not specifically contemplated in advance by

RWC does not mean that the retraction order fell outside the

scope of the arbitrator's authority. See

Id. at 10

(arbitrator's

punitive damages award upheld, despite lack of explicit

14 contractual authorization for such, where arbitration clause

empowered arbitrator to grant any "equitable" relief); Gilmer v.

Interstate/Johnson Lane Corp.,

895 F.2d 195, 199

(4th Cir. 1990)

("Arbitrators enjoy broad equitable powers. They may grant

whatever remedy is necessary to right the wrongs within their

jurisdiction.). And of course, given the requirement that RWC

act in good faith, an essential aspect of the Settlement

Agreement, the arbitrator's retraction order would seem to fall

comfortably within the scope of his authority to provide a remedy

that effectively redressed RWC's bad faith attempt to injure and

intimidate Synchronies through the trade journal media. In that

sense, the equitable relief awarded — an order of retraction —

falls within the scope of the parties' Settlement Agreement.

B. Manifest Disregard of the Law

Speaking to the narrow circumstances under which an

arbitrator's decision may be vacated based on a manifest

disregard of the law, the Court of Appeals for this Circuit has

said:

the phrase 'manifest disregard1 . . . means that, to vacate an arbitration award,'there must be some showing in the record other than the result obtained, that the arbitrator knew the law and expressly disregarded it.1 In

15 this context, then 'disregard' implies that the arbitrators appreciated the existence of a governing legal rule but willfully decided not to apply it.

Advest,

914 F.2d at 10

(guoting O.R. Securities, Inc. v.

Professional Planning Assoc., Inc.,

857 F.2d 742, 747

(11th Cir.

1988)) .

Notwithstanding the difficulty of meeting such a high

standard, RWC makes the following contentions regarding the

arbitrator's application of relevant law: (1) he misconstrued and

failed to apply the decision in Computer Assocs. Int'l v. Altai,

Inc.,

982 F.2d 693

(2d. Cir. 1992); and, (2) he "incorrectly

applied" New Hampshire law with respect to, inter alia, the

statute of frauds.

First, Altai is a Second Circuit decision. Its usefulness

to the arbitrator in applying New Hampshire's substantive law was

a matter for the arbitrator to determine. That the arbitrator

may have overlooked decisional law which he had no strict

obligation to follow is of little conseguence under the "manifest

disregard" standard. But even if it were controlling precedent,

Altai does not appear to be directly on point. In Altai a

16 computer programmer who worked for the plaintiff later went to

work for the defendant software company, bringing with him

certain source codes he had developed for plaintiff.

Id. at 700

.

The former employee, using plaintiff's source codes, proceeded to

create a new program for the defendant. Plaintiff responded by

filing, among other things, a copyright infringement claim

against defendant. Defendant, in turn, unilaterally rewrote the

allegedly offending software, excising those portions that

impermissibly used plaintiff's source codes. In order to insure

production of non-infringing software, defendant assigned eight

programmers that knew nothing of plaintiff's source codes to

develop the software, and in addition excluded plaintiff's former

employee from the process (in what is commonly referred to as a

"clean room" procedure).

The Altai court set forth a "three-step procedure . . . to

determine whether the non-literal elements of two or more

computer programs are substantially similar."

Id. at 706

.

Applying that test to the facts, the court held, in part, that

there was no infringement as to the rewritten ("clean room")

software. The Altai court also extended copyright protection to

17 the non-literal elements (source codes) of computer programs.

Id.

at 7 02.

The issue before the arbitrator in this case was more

discrete — involving the extent to which the VADA and Settlement

Agreement permitted Synchronies to use RWC's concededly

proprietary software code in order to facilitate operation of its

products with RWC's . Altai describes a test useful in

determining the "scope of copyright protection,"

Id. at 703

, but

that precise issue was not before the arbitrator in this case.

The arbitrator cannot be said to have "manifestly disregarded"

the law when he found that RWC effectively agreed to

Synchronies's limited use of its source code.

RWC fairs no better with its claims that the arbitrator

manifestly disregarded New Hampshire's statute of frauds, N.H.

Rev. Stat. Ann. ch. ("RSA") 506:2. RWC maintains that the

arbitrator erred when he found that the parties had entered into

an oral agreement modifying the Settlement Agreement to permit

Synchronies to distribute generic RWC software to so-called

"medallion dealers." RWC says that no such agreement was

reached, that such an agreement would be directly contrary to the

18 terms of the Settlement Agreement, and that enforcement of such

an oral agreement would be violative of New Hampshire's Statute

of Frauds.

New Hampshire has long recognized that detrimental reliance

can provide an exception to the usual application of the statute

of frauds. White v. Poole,

74 N.H. 71

(1906) . The arbitrator

specifically noted that his decision to enforce the oral

agreement (which he found to exist as a factual matter) was

based, at least in part, on Synchronies's reliance upon it. The

oral contract was sufficiently evidenced by customer letters

approved by both parties, and, based upon his own assessment of

the evidence and resolution of disputed facts, the arbitrator

could have reasonably concluded that an oral agreement was

reached and was enforceable. Accordingly, the arbitrator did not

manifestly disregard New Hampshire law with respect to the

statute of frauds.

Additionally, RWC maintains that the arbitrator disregarded

New Hampshire's law of contract interpretation. The New

Hampshire Supreme Court has consistently held that contracts are

to be construed to effectuate the intent of the parties at the

19 time of the agreement. See R. Zoppo Co. v. City of Dover,

124 N.H. 666, 671

(1984); Trombly v. Blue Cross/Blue Shield, 12

0 N.H. 764

, 770 (1980). The intent of the parties is to be judged

objectively. Logic Assocs v. Time Share Corp.,

124 N.H. 565, 572

(1984), and the contract is to be given "a meaning that would be

attached to it by a reasonable person." Kilroe v. Troast,

117 N.H. 598, 601

(1977). Furthermore, a court must "consider the

situation of the parties at the time of their agreement and the

object that was intended thereby, together with all of the

provisions of their agreement taken as a whole." R. Z o p p o C o .,

124 N.H. at 671; (citations omitted).

First, RWC claims that the arbitrator expanded Synchronies's

ability to distribute RWC's generic software with "any"

Synchronies product rather than only Synchronies's "Point of

Sale" or "Inventory Plus" products as described in the VADA. As

mentioned above, RWC misreads the award. The award does not

allow, nor does Synchronies contend that it allows, bundling of

generic RWC software with any Synchronies product other than the

two specifically referenced in the VADA.

20 RWC also contends that the arbitrator ignored the Settlement

Agreement in finding that Synchronies was entitled to royalty-

free use of non-corrected RWC software used in Synchronies's

products after June 30, 1993. RWC again reads more into the

award than is there. Simply stated, the award holds that

Synchronies does not owe RWC additional royalties for the use of

non-corrected software because Synchronies attempted to honor the

Settlement Agreement while RWC acted in bad faith when it

thwarted Synchronies's efforts to comply.

RWC's final assertion, that the arbitrator ignored the plain

meaning of the Settlement Agreement in holding Synchronies did

not have to pay royalties for use of the "replacement programs,"

also fails, as explained above.

IV. CONCLUSION

The arbitration award comports with New Hampshire's law of

contract construction and validly determines the intent of the

parties at the time they signed the Settlement Agreement. The

court has reviewed RWC's remaining arguments and finds them to be

without merit. For the reasons set forth above, the award of the

arbitrator is CONFIRMED.

21 SO ORDERED.

Steven J. McAuliffe United States District Judge

September 8, 1995

cc: Daniel A. Laufer, Esq. Michael E. Goldstein, Esq. Richard V. Wiebusch, Esq.

22

Reference

Status
Published