Romano v. Site Acquisitions

District Court, D. New Hampshire
Romano v. Site Acquisitions, 2017 DNH 124 (2017)

Romano v. Site Acquisitions

Opinion

UNITED STATES DISTRICT COURT FOR THE DISTRICT OF NEW HAMPSHIRE

Christopher Romano, et al.

v. Civil No. 15-cv-384-AJ Opinion No.

2017 DNH 124

Site Acquisitions, LLC

MEMORANDUM AND ORDER

Christopher Romano, Michael Petros, Shane Bruneau, Israel

Carey, and Bradley Matthews (collectively the plaintiffs) bring

this action against Site Acquisitions, LLC (“SAI”), alleging

that SAI improperly withheld incentive bonuses that were due to

the plaintiffs in 2013. SAI moves for summary judgment (doc.

no. 38), and the plaintiffs object (doc. no. 41).1 The court

held a hearing on June 5, 2017. For the reasons that follow,

SAI’s motion is granted in part and denied in part.

Summary Judgment Standard

Summary judgment is appropriate where “there is no genuine

dispute as to any material fact and the movant is entitled to

judgment as a matter of law.” Fed. R. Civ. P. 56(a); see also

Xiaoyan Tang v. Citizens Bank, N.A.,

821 F.3d 206, 215

(1st Cir.

1 SAI filed a reply to the plaintiffs’ objection. See doc. no. 44. 2016). “An issue is ‘genuine' if it can be resolved in favor of

either party, and a fact is ‘material' if it has the potential

of affecting the outcome of the case.” Xiaoyan Tang,

821 F.3d at 215

(internal quotation marks and citations omitted). At the

summary judgment stage, the court “view[s] the facts in the

light most favorable to the non-moving party” and “draw[s] all

reasonable inferences in the nonmovant's favor . . . .” Garmon

v. Nat’l R.R. Passenger Corp.,

844 F.3d 307, 312

(1st Cir. 2016)

(citation and quotation marks omitted). The court will not,

however, credit “conclusory allegations, improbable inferences,

and unsupported speculation.” Fanning v. Fed. Trade Comm’n,

821 F.3d 164, 170

(1st Cir. 2016) (citation and quotation marks

omitted) cert. denied,

137 S. Ct. 627

(2017).

“A party moving for summary judgment must identify for the

district court the portions of the record that show the absence

of any genuine issue of material fact.” Flovac, Inc. v. Airvac,

Inc.,

817 F.3d 849, 853

(1st Cir. 2016). Once the moving party

makes the required showing, “‘the burden shifts to the nonmoving

party, who must, with respect to each issue on which [it] would

bear the burden of proof at trial, demonstrate that a trier of

fact could reasonably resolve that issue in [its] favor.'”

Id.

(citation omitted). “This demonstration must be accomplished by

reference to materials of evidentiary quality, and that evidence

2 must be more than ‘merely colorable.'”

Id.

(citations omitted).

The nonmoving party’s failure to make the requisite showing

“entitles the moving party to summary judgment.”

Id.

Background

SAI, a Massachusetts corporation, provides “turf vendor”

services to telecommunications companies. Doc. no. 38-5 at 3;

Affidavit of Israel Carey (doc. no. 38-2) at 50.2 In this

capacity, SAI is responsible for the “siting, modification, and

installation of wireless communications facilities . . . on

certain cell towers or structures.” Declaration of Shawn

Hancock (doc. no. 39) ¶ 5. During all periods relevant to this

case, SAI served as a turf vendor for AT&T Mobility LLC

(“AT&T”). See Hancock Dec. ¶ 6–7. This relationship was

memorialized in a “Turf Program Agreement,” which the parties

entered into on December 16, 2011. Id.; see also doc. no. 38-5;

doc. no. 41-13.

The Turf Program Agreement was in effect in 2013, the year

most relevant to the present case. Hancock Dec. ¶ 6. During

that year, SAI was responsible for modifying and installing AT&T

facilities, including cell towers. Id. ¶ 8. To accomplish this

2 The excerpts of deposition transcripts provided to the court by SAI contain four numbered transcript pages per document page. All citations to depositions will be to the transcript page.

3 work, SAI employed several of its own “tower crews,” id., whose

responsibilities included working on the ground and up on the

towers at the tower sites, see, e.g., Deposition of Israel Carey

(doc. no. 38-2) at 52. SAI also had dozens of additional tower

crews at its disposal through subcontracts with tower companies.

Hancock Dec. ¶ 8.

In March of 2013, AT&T informed its turf vendors, including

SAI, that it was initiating an incentive program (“incentive

program” or “incentive bonus program”). Id. ¶ 10; see also doc.

no. 38-6. This program was designed to help turf vendors

“obtain[] tower crew resources.” Hancock Dec. ¶ 6; see also

doc. no. 41-4, at 1. In early April, AT&T provided SAI with two

policies — VCC Policy 130325 (the “325 policy”) and VCC Policy

130327 (the “327 policy”) — detailing the incentive program.

Doc. no. 41-3; doc no. 41-4. At some point thereafter, AT&T

provided SAI with two Power Point presentations related to the

incentive program. Doc. no. 41-5; doc. no. 41-6.

Under the incentive program, AT&T would award a series of

bonuses so long as certain conditions were met. Doc. no. 41-4 at

2. The conditions, known as “drivers,” related generally to the

quality and speed of work on the towers sites. Id. Bonuses

ranged from $500 to $8,000 per driver per site, id., with a

4 total bonus amount of $13,000 available per site.3

There is no dispute in the record that Shawn Hancock, SAI’s

director of construction, met with SAI’s tower crews in May of

2013 to discuss the incentive bonus program (“May 2013

meeting”). Nor is there any dispute that Bruneau, Petros,

Matthews, and Carey were present at that meeting. These facts

are attested throughout the record, including in Bruneau,

Petros, Matthews, and Carey’s deposition testimony and

affidavits, and Hancock’s declaration.4

The parties do, however, dispute what specifically was said

at the May 2013 meeting, with Hancock’s recollection differing

considerably from the recollections of Bruneau, Petros,

Matthews, and Carey. As Bruneau, Petros, Matthews, and Carey

are nonmoving parties, the court must credit their accounts for

the purposes of the present discussion. See Garmon,

844 F.3d at 3

The driver bonuses in the 327 policy, when added together, total $14,667. See doc. no. 41-4 at 2. The parties do not appear to dispute, however, that the maximum total bonus available per site was $13,000. The court will accordingly assume the same for the purposes of this order.

4 See Hancock Dec. ¶ 16; Carey Dep. beginning at 69; Deposition of Shane Bruneau (doc. no. 38-3) beginning at 53; Deposition of Michael Petros (doc. no. 38-7) beginning at 36; Deposition of Bradley Matthews (doc. no. 38-14) beginning at 56; Carey Aff. (doc. no. 41-7) ¶ 3; Affidavit of Bradley Matthews (doc. no. 41-9) ¶ 3; Affidavit of Shane Bruneau (doc. no. 41-10) ¶ 3; Affidavit of Michael Petros (doc. no. 41-11) ¶ 3.

5 312.5

The May 2013 meeting immediately followed a regularly-

scheduled safety meeting. Hancock entered at the end of the

safety meeting and, according to two of the plaintiffs, waited

for the electricians leave. Carey Dep. at 69, 72; Matthews Dep.

at 62. Jason Rossi, an SAI construction manager who had

presided over the safety meeting, remained in the room and was

present at the May 2013 meeting.

Hancock informed the tower crews that AT&T had initiated an

incentive bonus program. This was the first time any of the

plaintiffs had heard about this program. Hancock indicated that

AT&T would pay up to $13,000.00 in bonuses per tower site. He

indicated that the full amount of any given bonus would be

generally determined by the speed and quality of the work done

on that site. According to two of the plaintiffs, Hancock

and/or Rossi stated that the bonuses would be “huge” or

“significant.” See Carey Dep. at 79; Bruneau Dep. at 55.

Hancock indicated that the bonuses would go directly to the

tower crews and that the bonuses would be paid out at the end of

These accounts are generally consistent, and to the extent 5

they are, the court relies on the deposition excerpts and affidavits generally without citing to any particular document. The court will cite to specific deposition excerpts or affidavits to the extent they differ materially from the other accounts or contain information not otherwise included in the other accounts.

6 the year.6 Three plaintiffs recall Hancock or Rossi stating that

that Carey, a salaried employee, would also be entitled to the

bonuses because he worked on the towers. Carey Dep. at 69;

Bruneau Dep. at 126; Petros Dep. at 45. Two plaintiffs

specifically recall Hancock instructing the tower crews not to

tell other SAI employees, including electricians, about the

bonuses, as those employees were not part of the incentive bonus

program. See, e.g., Bruneau Dep. at 53, 70; Petros Dep. at 37.

Three plaintiffs testified during their depositions that they

were “excited” by the news of the incentive program due to the

amount of bonus money they believed they were going to receive.

See Carey Dep. at 99; Petros Dep. at 30–40; Matthews Dep. at 70.

Romano was not present at the May 2013 meeting, as he had

not yet been hired by SAI. See Deposition of Christopher Romano

(doc. no. 38-13) at 73–75; Affidavit of Christopher Romano (doc.

no. 41-8) ¶ 6. His understanding of the incentive bonus program

developed over several months based on four separate events.

See Romano Dep. at 125–29. Romano was initially informed that

an incentive program existed in late May of 2013, during his

6 The accounts differ as to how these bonuses would be paid out, with some plaintiffs understanding that the bonuses would be divided among the tower crews who worked on each tower, and others understanding that the bonuses would be pooled and divided equally among all of the tower crews. Compare, e.g., Bruneau Aff. ¶ 3 with Carey Aff. ¶ 3.

7 interview with Rossi. Romano Aff. ¶ 3. Rossi indicated that

vendors appreciated the work that tower crew members do and that

he knew of a vendor that was offering incentive rewards to tower

crews, but did not indicate which vendor it was or provide any

additional details. Romano Dep. at 39–40; Romano Aff. ¶ 3, 5.

Romano later asked Hancock about the incentive program, but was

not provided any additional information. Romano Dep. at 126–27.

After that conversation — on or around July 4, 2013 — Carey

informed Romano that AT&T was the vendor.

Id.

at 127–28; Romano

Aff. ¶ 7. Carey later indicated that the bonus money would be

evenly distributed between the tower crew members. Romano Dep.

at 127–28. Romano did not learn of the total amount AT&T might

pay for each tower site until after his employment with SAI

ended. Romano Aff. ¶ 10

Following the May 2013 meeting, the incentive bonuses were

a popular topic of conversation among the tower crew members.

Carey Dep. at 109; Bruneau Dep. at 67-70; Matthews Dep. at 77–

78. At some point in the late spring or early summer of 2013,

the plaintiffs learned that incentive bonuses were being

included in the regular paychecks of tower crews working on AT&T

tower sites for SAI subcontractors. Bruneau Dep. at 67; Petros

Dep. at 83. As a result, tower crew members started asking

about the incentive bonuses during regular Monday safety

8 meetings with SAI officials. Bruneau Dep. at 67–71; see also

Matthews Dep. at 77–79. When asked about the bonuses, SAI

officials responded with statements such as, “it's coming and

you're going to get what you get,” Bruneau Dep. at 72, and

“we're working on something,” Romano Dep. at 128.

At their depositions, Carey, Bruneau, Petros, and Matthews

each testified that they worked harder after learning of the

incentive bonus program. For instance, Carey stated that the

tower crews “worked longer hours to get more sites done during

the week” and “tried [their] hardest to get the most out of the

sites that [they] could.” Carey Dep. at 100. Bruneau similarly

testified that “with the incentive, there was a lot more

effort . . . . [T]here was that carrot . . . dangling in front

of you. So everybody's going to run a lot faster and a lot

harder to try to get that carrot.” Bruneau Dep. at 45. Petros

stated that he believed Hancock “was giving [the tower crews]

some kind of incentive to work longer hours and weekends” and

that he worked long hours and weekends at least in part because

of the incentive program. Petros Dep. at 88, 90. Matthews

testified that he believed the tower crews “hustled” a little

more as a result of the program. Matthews Dep. at 53.

Additionally, Bruneau stated that he continued to work at SAI at

least in part due what Hancock said during the May 2013 meeting.

9 Bruneau Dep. at 132.

Each of the plaintiffs received bonuses from SAI in

December of 2013. Bruneau received a bonus of $4,400. Bruneau

Dep. at 72. Carey, Petros, and Matthews each received bonuses

of $4,100. Carey Dep. at 110–11; Petros Dep. at 48; Matthews

Dep. at 47. Romano received a bonus of $3,000. Romano Dep. at

115. SAI typically paid its employees discretionary “Christmas”

bonuses at the end of each year. Though the bonuses the

plaintiffs received in 2013 were larger than the “Christmas”

bonuses they were awarded in other years, they were less than

what the plaintiffs believed they would receive in light of the

incentive bonus program. Carey Dep. at 111; Bruneau Dep. at 73;

Petros Dep. at 50; Matthews Aff. ¶ 7; Romano Dep. at 115–16.

Several plaintiffs believe that their 2013 bonuses were their

regular “Christmas” bonuses and that they never received any of

the incentive bonus money paid by AT&T. See Carey Aff. ¶ 9;

Bruneau Aff. ¶ 9; Matthews Aff. ¶ 7; Romano Aff. ¶ 9.

There is no dispute that SAI received payments from AT&T

under the incentive bonus program. Hancock Dec. ¶ 20. Some of

that money was passed through to the tower companies with which

it subcontracted.

Id.

SAI allocated a portion of the payments

it retained to its “discretionary annual bonus program,” which

provided bonuses to tower crew members (including the

10 plaintiffs), construction managers, and other construction

department employees. Id. ¶ 21. SAI also used some of the

incentive bonus payments to purchase equipment and to pay taxes

and other expenses incurred as a result of the incentive bonus

program. Id.

Discussion

The plaintiffs allege that SAI unlawfully retained some or

all of the incentive bonus money paid by AT&T for the work they

performed on AT&T towers during 2013. Their third amended

complaint is comprised of five counts. All five plaintiffs

bring counts of breach of contract under a third-party

beneficiary theory (“Count I”); breach of contract under a

promissory estoppel theory (“Count II”); and unjust enrichment

(“Count III”). All of the plaintiffs other than Carey also

bring counts for failure to pay overtime wages in violation of

the Fair Labor Standards Act (“FLSA”),

29 U.S.C. § 207

(a)(3)(c)

(“Count IV”) and failure to pay all wages due in violation of

N.H. Rev Stat. Ann. (“RSA”) § 275:44 (“Count V”). SAI moves for

summary judgment on all counts.

I. Third-Party Beneficiary

The New Hampshire Supreme Court (“NHSC”) has recognized the

third-party beneficiary doctrine as “an exception to the general

rule that a non-party to a contract has no remedy for breach of

11 contract.” Brooks v. Trustees of Dartmouth Coll.,

161 N.H. 685, 697

(2011) (citation omitted). “Third-party beneficiaries are

nonparties to a contract who are nevertheless allowed to sue to

enforce it because the parties intended them to have that

right.”

Id.

(citation omitted).

Under New Hampshire law, a third-party beneficiary

relationship exists if:

(1) the contract calls for a performance by the promisor, which will satisfy some obligation owed by the promisee to the third party; or (2) the contract is so expressed as to give the promisor reason to know that a benefit to a third party is contemplated by the promisee as one of the motivating causes of his making the contract.

Id.

(citation omitted). In the latter scenario, “[a] benefit to

a third party is a ‘motivating cause' of entering into a

contract only where the promisee intends to give the beneficiary

the benefit of the promised performance.”

Id.

at 697–98

(citation omitted).

“The fact that a third party is to receive some benefit

through the performance of the contract does not make that party

a third-party beneficiary of the contract.”

Id. at 698

(citation omitted). This is true even when that benefit is

pecuniary in nature. See Numerica Sav. Bank, F.S.B. v. Mountain

Lodge Inn, Corp.,

134 N.H. 505, 512

(citation omitted). In

order for a third party to have standing to sue under a

contract, the contract must “directly benefit the would-be

12 beneficiary . . . .” Brooks,

161 N.H. at 698

. To this end, the

NHSC has adopted Restatement (Second) of Contracts § 302(1)(b),

requiring that “the promise and its circumstantial setting must

evince an intent on the part of the promisee to confer the

benefit of promised performance on the would-be beneficiary.”

Id. (citation omitted). “In such cases, if the beneficiary

would be reasonable in relying on the promise as manifesting an

intention to confer a right on him to enforce the promise, he is

an intended beneficiary.” Id. (citations omitted).

SAI contends that the plaintiffs were never the intended

beneficiaries of any agreement SAI entered into with AT&T with

respect to the incentive bonuses. In support of this argument,

SAI points to the original Turf Program Agreement between SAI

and AT&T, as well as the 325 and 327 policies. SAI contends

that these documents, which it seemingly concedes comprise the

operative agreement between SAI and AT&T with respect to the

incentive bonuses,7 fail by their plain terms to confer third-

party beneficiary status upon the plaintiffs.

SAI has met its burden of demonstrating the absence of any

genuine issue of material fact with respect to the plaintiffs’

third-party beneficiary claim. Neither of the excerpts of the

7 In its motion, SAI relies on the Turf Program Agreement. At the hearing, however, SAI conceded that it accepted the terms of the 325 and 327 policies through its performance.

13 Turf Bonus Agreement provided by the parties demonstrates an

intention to confer a right upon the plaintiffs to enforce the

terms of the incentive bonus program. See doc. no. 38-5; doc.

no. 41-13. Indeed, neither excerpt makes any mention of the

incentive bonus program at all. And while the 325 and 327

policies do clearly speak to the incentive bonus program,

neither contains language sufficiently definite to confer a

direct, enforceable benefit on the plaintiffs. See doc. no. 41-

3; doc. no. 41-4. For instance, the policies are silent as to

whether the tower crews were entitled to any amounts paid by

AT&T under the incentive bonus program. They are similarly

silent as to whether the tower crews possessed the right to

enforce the terms of the incentive bonus program. Thus,

assuming these documents comprise the full scope of the

incentive bonus program agreement, SAI has sufficiently

demonstrated a lack of any language evincing an intent to confer

an exclusive right on the plaintiffs to the benefits under that

program.

In response, the plaintiffs rely on the two Power Point

presentations related to the incentive bonus program. See doc.

no. 41-5; doc. no. 41-6.8 Yet the plaintiffs identify no

8 The plaintiffs rely in particular on language in one of these presentations stating that the incentive bonus program was

14 evidence suggesting that these presentations were incorporated

into the incentive bonus agreement between SAI and AT&T, and

provide no coherent legal argument to support such a conclusion.

Instead, the plaintiffs appear to ask the court to infer the

enforceability of the terms of these presentations based on

their very existence in the record. To this end, the plaintiffs

repeatedly state, without further elaboration, that these

presentations constitute “relevant contract documents.” These

conclusory statements are insufficient to satisfy the

plaintiffs’ burden in the face of SAI’s showing of an absence of

any genuine issue of material fact in the record with respect to

this claim. See Flovac,

817 F.3d at 853

. As such, SAI is

entitled to summary judgment on the plaintiffs’ third-party

beneficiary claim.

Accordingly, SAI’s motion for summary judgment is granted

as to the plaintiffs’ third-party beneficiary claim.

II. Promissory Estoppel

Promissory estoppel is a theory “under which a promise

reasonably understood as intended to induce action is

enforceable by one who relies upon it to his detriment or to the

benefit of the promisor.” Panto v. Moore Bus. Forms, Inc., 130

“[i]ntended to be a direct pass through to the tower crews themselves.” Doc. no. 41-5, at 3 (emphasis in original).

15 N.H. 730

, 738 (1988). The NHSC “has adopted the definition of

promissory estoppel from Section 90 of the Restatement (Second)

of Contracts.” Rockwood v. SKF USA Inc.,

687 F.3d 1, 9

(1st

Cir. 2012) (citing Marbucco Corp. v. City of Manchester,

137 N.H. 629, 632

(1993)). Section 90 defines promissory estoppel

as follows:

A promise which the promisor should reasonably expect to induce action or forbearance on the part of the promisee or a third person and which does induce such action or forbearance is binding if injustice can be avoided only by enforcement of the promise. The remedy granted for breach may be limited as justice requires.

Restatement (Second) of Contracts § 90 (1981).

SAI makes three arguments as to why it is entitled to

summary judgment on the plaintiffs’ promissory estoppel claim.

First, SAI argues that there are no facts in the record from

which a reasonable trier of fact could conclude that SAI ever

made a sufficiently definite promise to the plaintiffs with

respect to the incentive bonus program. Next, SAI argues that

even if there is a genuine dispute as to the definiteness of

Hancock’s statements during the May 2013 meeting, SAI’s

subsequent statements to the plaintiffs made it unreasonable for

them to rely upon that initial promise. Finally, SAI contends

that there is no evidence in the record demonstrating that

Hancock’s statements resulted in any action or forbearance on

the part of the plaintiffs.

16 The court concludes that there is a genuine dispute of

material fact in the record that precludes summary judgment

against Matthews, Bruneau, Petros, and Carey on their promissory

estoppel claims. Based on the evidence in the record, a trier

of fact could reasonably conclude, among other things, as

follows: (1) that each of these plaintiffs was present for the

May 2013 meeting with Hancock; (2) that each learned of the

incentive bonus program from Hancock for the first time at that

meeting; (3) that Hancock and/or Rossi stated that the bonuses

could potentially be “huge” or “substantial; (4) that Hancock

stated that the incentive bonuses were being provided by AT&T;

(5) that Hancock stated that AT&T would award bonuses of up to

$13,000 per site, assuming certain conditions were met; (6) that

Hancock stated that the bonuses would be paid at the end of the

year; and (7) that Hancock stated that these bonuses were only

available to the tower crews. A reasonable jury could conclude,

based on these facts, that SAI made a promise to those

plaintiffs present at the May 2013 meeting with respect to the

incentive bonuses that could reasonably have been expected to

induce action or forbearance on the part of those plaintiffs.

SAI relies on discrepancies between each plaintiff’s

specific recollection of the May 2013 meeting in an attempt to

demonstrate that Hancock’s statements could not have been

17 sufficiently definite as a matter of law. This argument is

unavailing, because it requires the court to make weight and/or

credibility determinations with respect to the plaintiffs’

statements. Such determinations are beyond the scope of the

court’s review at the summary judgment stage. See, e.g., Hicks

v. Johnson,

755 F.3d 738, 743

(1st Cir. 2014) (when determining

whether summary judgment is appropriate, a court “may neither

evaluate the credibility of witnesses nor weigh the evidence”).

SAI further contends that Hancock’s statements did not

constitute a sufficiently definite promise because Hancock did

not inform the plaintiffs precisely how much bonus money they

would receive. The court declines to conclude now as a matter

of law that a promissory estoppel claim cannot sound when the

amount owed under the promise is conditioned upon the quality

and/or quantity of the promisee’s performance. Here, it was

impossible for the plaintiffs to know at the time of the May

2013 meeting either how much they would receive per tower or how

many towers they would work on. But crediting the statements in

their affidavits and depositions, these plaintiffs were informed

that AT&T would award bonuses of up to $13,000 per site and that

this money was only available to the tower crews. This is

enough, at present, for their promissory estoppel claim to

survive.

18 The court is also unpersuaded by SAI’s argument with

respect to subsequent statements made to the plaintiffs

regarding the incentive bonuses. SAI argues that its officials

equivocated when asked about the incentive bonus program after

the May 2013 meeting. SAI points to statements such as “it's

coming and you're going to get what you get” and “we're working

on something” in support of this argument. Yet, as the

plaintiffs noted at the hearing, a jury could reasonably

conclude that any uncertainty expressed in these statements

related to how much AT&T would pay per tower and how many towers

the crews would complete, rather than whether (and, if so, how

much) SAI would allot to plaintiffs out of the incentive bonus

money it received. The court therefore cannot conclude now, as

a matter of law, that these statements made it unreasonable for

Matthews, Bruneau, Petros, and Carey to rely on Hancock’s

statements at the May 2013 meeting.9

9 SAI relies on a number of First Circuit cases in support of its arguments on the reasonableness of the plaintiffs’ reliance in the wake of these statements. See doc. no. 38-1, at 18–19 (citing Sands v. Ridefilm Corp.,

212 F.3d 657

(1st Cir. 2000); Steinke v. Sungard Financial Systems, Inc.,

121 F.3d 763

(1st Cir. 1997); Coll v. PB Diagnostic Systems, Inc.,

50 F.3d 1115

(1st Cir. 1995). Even assuming these cases cannot be distinguished factually from the present case, the court declines to find that they control here. In each of these cases, the court applied the law or laws of states in which the promissory estoppel doctrine is substantially more developed than it is in New Hampshire. See Sands,

212 F.3d at 664

(applying Massachusetts law); Steinke, 121 F.3d at 776–77

19 Finally, SAI contends there is no evidence in the record

demonstrating that Hancock’s statements actually resulted in any

action or forbearance on the part of the plaintiffs. The court

disagrees. Each of the four plaintiffs present at the May 2013

meeting stated in his deposition and/or affidavit that the

availability of incentive bonuses caused the tower crews to

hustle more and work harder. There are also statements to the

effect that the plaintiffs strove to become more efficient and

to finish towers in less time than it would have taken absent

the incentive bonuses. And at least one of the plaintiffs

appears to state that he continued to work for SAI due at least

in part to Hancock’s statements regarding the incentive bonuses.

In light of these facts, a reasonable jury could conclude that

Hancock’s statements caused an act or forbearance on the part of

Matthews, Bruneau, Petros, and Carey.

The above notwithstanding, the court concludes that SAI is

entitled to summary judgment on Count II with respect to Romano.

There is no dispute that Romano was not present at the May 2013

(applying Pennsylvania law and discussing Massachusetts law); Coll,

50 F.3d at 1124

(applying Massachusetts law). Whatever foundational similarities the promissory estoppel doctrines in those states share with that of New Hampshire, the court declines to imply into New Hampshire common law principles or restrictions from other states that have not yet been addressed by the NHSC or the First Circuit when applying New Hampshire law.

20 meeting and accordingly did not learn about the incentive

program at that time. He initially learned that an incentive

program existed during his interview with Rossi, but did not

learn that AT&T was the vendor or how the bonuses were going to

be divided until later interactions with Carey. Moreover,

Romano states in his affidavit that he did not learn of the

amount of bonuses available per site until after his employment

with SAI ended. Romano Aff. ¶ 10. He further conceded during

his deposition that he did not rely upon any SAI representations

when deciding to continue working for SAI or to work longer

hours, longer workweeks, or weekends. See Romano Dep. at 171.

Thus, there is simply no basis in the record to conclude that

SAI ever made any promise to Romano with respect to the

incentive bonuses or that Romano was ever induced into an action

or forbearance by such a promise. SAI’s motion is accordingly

granted as to Romano’s promissory estoppel claim.

In sum, SAI’s motion for summary judgment is granted in

part and denied in part as to the plaintiffs’ claims for

promissory estoppel.

III. FLSA

Under the FLSA, non-exempt employees must ordinarily be

compensated “at a rate not less than one and one-half times the

regular rate at which he is employed” for any hours worked in

21 excess of forty in a given week.

29 U.S.C. § 207

(a)(1). “[T]he

‘regular rate' at which an employee is employed shall be deemed

to include all remuneration for employment paid to, or on behalf

of, the employee,” subject to certain exceptions.

Id.

§ 207(e).

Here, SAI raises two arguments as to why payments under the

incentive bonus plan did not count toward the plaintiffs’

regular rate. First, SAI argues that the incentive payments

were gifts, excepted from the regular rate by

29 U.S.C. § 207

(e)(1). Second, SAI argues that the incentive payments were

discretionary bonuses, excepted by

29 U.S.C. § 207

(e)(3). The

court considers these arguments in reverse order.

“In order for a bonus to qualify for exclusion as a

discretionary bonus under [§ 207(e)(3)] the employer must retain

discretion both as to the fact of payment and as to the amount

until a time quite close to the end of the period for which the

bonus is paid.”

29 C.F.R. § 778.211

(b). “If an employer

promises in advance to pay a bonus, he has abandoned his

discretion with regard to it.”

Id.

“Bonuses which are

announced to employees to induce them to work more steadily or

more rapidly or more efficiently or to remain with the firm are

regarded as part of the regular rate of pay.”

Id.

§ 778.211(c).

Here, there is a genuine dispute of fact as to whether SAI

retained discretion regarding both the fact of payment incentive

22 bonuses to the tower crews and the amount of any such payment.

As discussed above, there is evidence in the record that Hancock

stated the following during the 2013 meeting: (1) that AT&T

would award bonuses of up to $13,000 per site, assuming certain

conditions were met; (2) that the bonuses would be paid at the

end of the year; and (3) that the bonuses were only available to

tower crews. There is also evidence to suggest that these

bonuses induced members of the tower crews to work harder or

more efficiently, or to remain with SAI. Based on this

evidence, a reasonable jury could conclude that SAI relinquished

discretion over both the fact these bonuses would be paid to the

plaintiffs and the amount that would be paid. Thus, the court

cannot conclude as a matter of law that the incentive bonuses

were discretionary.10

SAI is similarly not entitled to summary judgment on the

plaintiffs’ FLSA claim on the basis that the incentive bonuses

were gifts under § 207(e)(1). “To qualify for exclusion under

[this section] the bonus must be actually a gift or in the

nature of a gift.”

29 C.F.R. § 778.212

(b). “If it is measured

by hours worked, production, or efficiency, the payment is

10Unlike with the promissory estoppel claim, SAI has not raised any separate argument as to why it is entitled to summary judgment with respect to Romano on the FLSA claim or the state wage claim. The court therefore does not conduct separate analyses with respect to Romano on these claims.

23 geared to wages and hours during the bonus period and is no

longer to be considered as in the nature of a gift.”

Id.

It is undisputed in the record that AT&T paid incentive

bonus money to SAI based on certain “drivers,” including the

quality and the speed of the work on the tower sites. If SAI

did not have discretion to retain some or all of these payments,

and instead had to pass them directly on to the tower crews,

then these “drivers” determined how much the tower crews would

receive in incentive bonuses. Under such circumstances, the

payments would plainly be measured by the tower crews’

production and/or efficiency. There is therefore no basis to

conclude now, as a matter of law, that these payments were

necessarily gifts.

In sum, SAI’s motion for summary judgment is denied as to

the plaintiffs’ FLSA claim.

IV. State Wage Claim

Under RSA § 275:53, an employee may bring an action “to

recover unpaid wages and/or liquidated damages . . . in any

court of competent jurisdiction . . . .” “The term ‘wages'

means compensation . . . for labor or services rendered by an

employee, whether the amount is determined on a time, task,

piece, commission, or other basis of calculation.” RSA §

275:42.

24 Relying on its arguments with respect to the plaintiffs’

other claims, SAI contends that the plaintiffs “cannot prove

entitlement to any additional incentive payments.” Doc. no. 38-

1 at 24. As previously discussed, however, there is a genuine

dispute of fact in the record as to what SAI said to the

plaintiffs with respect to the incentive bonuses. As SAI

provides no alternative argument as to the plaintiffs’ state

wage claim, this claim also survives for the reasons discussed

above.

SAI’s motion for summary judgment is accordingly denied as

to plaintiffs’ state wage law claim.

V. Unjust Enrichment

“Unjust enrichment is an equitable remedy that is available

when an individual receives a benefit which would be

unconscionable for him to retain.” Axenics, Inc. v. Turner

Const. Co.,

164 N.H. 659, 669

(2013) (internal quotation marks

and citation omitted) (emphasis in original). “It is not a

boundless doctrine, but is, instead, narrower, more predictable,

and more objectively determined than the implications of the

words unjust enrichment.”

Id.

(internal quotation marks and

citation omitted). “[U]njust enrichment generally does not form

an independent basis for a cause of action.” Gen. Insulation

Co. v. Eckman Const.,

159 N.H. 601, 611

(2010) (citation

25 omitted).

The plaintiffs’ unjust enrichment claim fails as a matter

of law. Courts in this district have repeatedly concluded that

recovery under an unjust enrichment theory is not available

under New Hampshire law when a plaintiff has an adequate legal

remedy. E. Elec. Corp. v. FERD Const., Inc., No. 05-cv-303-JD,

2005 WL 3447957

, at *2 (D.N.H. Dec. 15, 2005) (collecting

cases); Parsons Infrastructure & Tech. Grp., Inc. v. Gilbane

Bldg. Co., No. 05-cv-01-PB,

2005 WL 2978901

, at *1 (D.N.H. Nov.

7, 2005). The plaintiffs have failed to explain how their wage

claims and promissory estoppel claims, which survive for the

above-stated reasons, fail to provide them with an adequate

legal remedy here. Cf. Mangiardi Bros. Trucking v. Dewey

Envtl., LLC, No. 12-cv-481-JD,

2013 WL 1856338

, at *3 (D.N.H.

Apr. 30, 2013). Thus, recovery under an unjust enrichment

theory is not available to the plaintiffs in this case.11

11Though courts in this district have referred to promissory estoppel as an “equitable” principle, see, e.g., Derry & Webster, LLC v. Bayview Loan Servicing, LLC, No. 14-cv- 211-PB,

2014 WL 7381600

, at *7 (D.N.H. Dec. 29, 2014), there does not appear to be any authority from the NHSC, the First Circuit, or any state or federal court in a First Circuit state supporting the conclusion that a claim for promissory estoppel is similarly barred any time there is an adequate legal remedy available. The only comparable bar to a promissory estoppel claim recognized under New Hampshire law is that the doctrine can only be applied in the absence of an express contract. See Ruivo v. Wells Fargo Bank, N.A., No. 11-cv-466-PB,

2012 WL 5845452

, at *5 (D.N.H. Nov. 19, 2012), aff'd,

766 F.3d 87

(1st

26 SAI’s motion for summary judgment is therefore granted as

to plaintiffs’ unjust enrichment claim.

Conclusion

Based on the foregoing, SAI’s motion for summary judgment

(doc. no. 38) is granted on Count I and Count III as to all

plaintiffs and on Count II as to Romano. The motion is

otherwise denied.

SO ORDERED.

__________________________ Andrea K. Johnstone United States Magistrate Judge

June 19, 2017

cc: Leslie H. Johnson, Esq. Peter G. Callaghan, Esq.

Cir. 2014) (citing Great Lakes Aircraft Co., Inc. v. City of Claremont,

135 N.H. 270, 290

(1992)). SAI does not argue that there is any express contract that the plaintiffs can enforce with respect to the incentive bonuses. In fact, SAI takes the exact opposite position in its argument for summary judgment on the plaintiffs’ third-party beneficiary claim. The promissory estoppel claim is therefore not similarly barred.

27