Benjamin v. Lehigh Valley Railroad
Benjamin v. Lehigh Valley Railroad
Opinion of the Court
The opinion of the court was delivered by
The plaintiff brought this action to recover damages from the Lehigh Valley Eailroad Company for an injury caused to plaintiff’s crops by a flooding of his farm lands by water which he alleges inundated his field because of the negligence of the defendant in its management of the Morris canal, of which canal the defendant is the lessee.
On June 16th, 1906, an almost unprecedented rain occurred which caused the water in the canal to overflow the banks. This water, with other surface water, gathered upon the land of the plaintiff, destroying portions of his potato crop, fodder corn then planted, and otherwise injuring his land and drowning his young chickens. . The plaintiff’s farm lies partly south of the Morris canal and partly to the north of the canal,, between the canal and the Lehigh Valley Eailroad Company’s tracks. The land slopes from the south to the north and there
The defendant is charged with negligence upon two grounds —first, in failing to keep the culverts under its canal open so as to afford a passage to the accumulated water on the south; second, in failing to so manage its apparatus for the discharge of water at its lock at the end of that level as to relieve the congestion of water above the lock and so prevent an overflow.
There is no contention by the plaintiff that the culverts were not of sufficient capacity, if open, to discharge the water that could be reasonably anticipated. These culverts were not constructed to permit the continual flow of any natural stream. They were placed under the canal obviously to permit the passage of such surface water as the contour of the ground would be likely to send in that direction.
As already observed, it is charged that these culverts became obstructed and so failed to do the work which they were designed to accomplish. The plaintiff suggests no. feasible way of keeping these culverts clean nor is any way apparent other than by keeping the ends of the culverts free from obstruction so that the water may freely enter and be discharged from these conduits. They would be naturally scoured and kept open by the flow of water. The evidence is clear and uncontradicted that five days before the storm the pits at the front of the ends of these culverts were cleaned out by the servants of the defendant. What more could have been done in the exercise of reasonable care is not apparent.
The cause of the unusual accumulation of water is accounted for by the unprecedented rainstorm of June 16th. The plaintiff, himself, says that he had lived on this farm for over fifty years and had never seen such a storm. Mr. Samuel D’Hart, a witness for plaintiff, says that he has seen heavy rainfalls but not so continuous and does not recall a
Nor do we perceive that the fact that the waters of the canal overflowed its banks and so added to the water accumulated upon plaintiff’s farm can be attributed to the lack of reasonable care on the part of the defendant’s lock tender. The only testimony which is relied upon to impute negligence to Mr. Axford is that of Samuel D’Hart, who says that when he got to the lock, at eleven-thirty in the forenoon of the day of the storm, the flood gates and the wickets provided for the discharge of the water from the canal were not yet opened. It appears that there is an overflow which usually accommodates the water in the canal. When Mr. D’Hart arrived at the lock the water was flowing over the bank of the canal near the lock. He says that Mr. Axford was trying to take off the boards which control the overflow so as to permit more water, flowing at a lower level, to pass out of the canal. He says that Mr. Axford was unable to take off the boards alone and he, D’Hart, assisted him in doing so, the work occupying about fifteen minutes. Mr. Axford corroborated the testimony of Mr. D’Hart respecting his statement that he, D’Hart, assisted Ax-ford in taking off the boards. Mr. Axford says, however, that he hoisted two wickets along about nine o’clock and the other two about quarter to eleven. He says that he always, before hoisting a wicket, takes off one board of each section, then if it does not go down to these boards they commence raising the wickets. Indeed, Mr. D’Hart admits, on cross-examination, that when he arrived at the locks Mr. Axford might have had one board off. Mr. D’Hart says he arrived there at eleven-thirty. Now, Mr. John D’Hart, another of
And if the gates were then opened it is impossible to attribute a want of reasonable diligence in doing what he could to prevent an overflow.
It is to be remarked that what was done by the servants of the canal company in effecting the water in the next lower level could have no influence in causing the injury complained of to plaintiff’s farm.
The rule to show cause should be made absolute.
Reference
- Full Case Name
- THOMAS W. BENJAMIN v. LEHIGH VALLEY RAILROAD COMPANY
- Status
- Published