Osterberg v. Rector of Trinity Church
Opinion of the Court
The complaint alleges that the defendant retained and employed the plaintiffs as consulting engineers to supervise the general engineering work in connection with and required by the improvement of certain premises owned by the defendant, including the preparation of plans and specifications for the construction and installation of an electric plant, and the supervision of the same, and, in connection therewith and preliminary thereto, to investigate the report upon the electric plant then in existence and operation upon the said premises; that subsequent to such employment the defendant notified the plaintiffs in writing that the defendant would not require their services as electrical engineers in
The contract, as alleged in the complaint, contemplated the supervision by the plaintiffs of the electrical work required by the improvement of the defendant’s premises, including the preparation oi the plans and specifications for the construction and installation lof the electric plant, and, in connection therewith and preliminary ■thereto, to investigate and report upon the electric plant then in ■existence and operation upon the said premises. The services that ■were performed by the plaintiffs finder the employment are alleged to be consultation with officers and employés of the defendant, the examination of the said electric plant and of its efficiency, and the preparation of a report thereupon as to the cost and efficiency of the proposed new electric plant, and the preparation of preliminary plans and specifications therefor, and the obtaining of estimates from divers manufacturers for the manufacture and supply of the electrical apparatus, boilers, engines, and other machinery necessary -therefor. There is no allegation that the plaintiffs actually made ■plans and specifications for the construction and installation of •the electric plant, or supervised the construction of the same. The plaintiffs, not having actually performed the contract, would not be entitled to recover the full contract price, as a recovery for the contract price could only be allowed upon the performance of the services to be rendered by the plaintiffs under the contract. If,
Mr. Osterberg, one of the plaintiffs, who was called as a witness to prove the contract, testified that in consequence of a verbal message which purported to come from the defendant, received by him in June, 1898, he called at the office of the defendant, and had a conversation with Col. Cruger; that Col. Cruger explained to the witness that the defendant had certain property in Varick street upon which it intended to erect a set of buildings, and states that the defendant had already erected a building called the “Garvin Machine Works” upon a part of said premises, upon which had been installed certain electrical machinery, but it would seem that such machinery had not been entirely satisfactory, consuming much more power than was expected; he therefore requested the plaintiff “to make an investigation to find out where the loss came in, if there was any, and, if there was no loss, where the power was being consumed”; stating that the corporation intended to build these other buildings in that neighborhood, and that the plant as laid out in the Garvin Machine Works should form the basis of transmission to the other stores; that he (Col. Cruger) wished the plaintiff to meet a Mr. Hall, a consulting engineer, on the following day, to go through the Garvin Machine Works, to show what work had been done there, and to show the plaintiffs the property upon which the net/ building was to be erected. The witness further testified that he met Mr. Hall, and went through the Garvin Building, and had a general discussion with him as to the requirements of the manufacturing establishments on the block; that the same day he again saw Col. Cruger, and stated that he had been through the buildings with Mr. Hall, and had investigated and inspected the location of the present power house and the proposed new buildings, and that Mr. Cruger told him to make a report for him for his own convenience; that Cruger then asked the witness about the terms under which he would work; that he told Cruger that he would work on two different bases:
“I either worked on a percentage basis, which is five per cent, of the total cost of the entire work, or on a regular fixed sum for the entire piece of work, which latter, however, I could not determine, as far as the figures were concerned, because 1 had no idea of the amount of work which was to be done and the amount of machinery to be installed; and then he asked me whether there was any special form of contract which engineers usually entered into, and X told him that in general and in a good many eases I have no contract at all with my clients, but that it was immaterial to me whether I made one or not. He told me that the corporation generally always made contracts in writing, and for that purpose I should come back on Friday and see him in the vestry room, where he would have Mr. Oammann meet me; and I told him then I would give him the report, which I wanted him to consider not entirely official, because as far as the*582 figures were concerned I could not possibly have time to go into very considerable detail in those three days. I then left. * * * He [Cruger] told me that he wanted me to attend to the electrical work very definitely, but that he could not say at that time whether I would have anything to do with the steam engineering work, because he did not know but what Mr. Hall, who had been their consulting engineer, would continue in that duty and in charge of that part of the work.”
This was on Tuesday, and the witness testified that he devoted the next two days, Wednesday and Thursday, practically to the preparation of a report, in which he made a rough calculation of the power consumed, and tried to determine the points which were necessary—the foundation points necessary—to lay out a large section of plant for such a set of buildings, and the witness wrote a report bringing out those principal points, not in exact detail, but approximately. Mr. Cruger died suddenly, on Thursday; and on Friday the witness went to the defendant’s office, and met Mr. Cammann and Mr. Caswell.
Mr. Cammann was then called as a witness, and .testified that he was a vestryman of Trinity Church, and was such on the 24th day of June, 1898; that he subsequently, and in December, 1898, became controller of the corporation, in the meantime discharging the duties of acting controller under a resolution of the vestry. The plaintiff (Osterberg) was then recalled, and testified that he saw Mr. Cammann, and said to him that it was not his intention to come on that day on account of carrying out the contract which Mr. Cruger had asked him to come for; that he had brought his preliminary report, which he would give to Mr. Cammann, under the circumstances, for his approval; that Mr. Cammann then stated that he was not familiar with the details of Cruger’s work, and desired to meet the witness on the premises, and go over the ground with him, and that he did go over the various conversations which he had had with Cruger on the Monday and Tuesday that he had before testified to; that he then made an appointment to meet Mr. Cammann upon the premises, and that he then delivered to Mr. Cammann the written report that he had prepared; that subsequently the witness had received the report back from Mr. Cammann, and that report was introduced in evidence. This report discussed the new plant to be erected upon the premises, and made suggestions as to the buildings and machinery. The witness testified that he subsequently met Mr. Cammann upon the premises upon which the new building was to be erected, and made suggestions as to the location of the power house and the other buildings; that Mr. Cammann told him to “go ahead and continue on my. report, and also to start at once on the Garvin Machine Works, and give him a report of them as soon as I possibly could”; that the witness had another interview with Mr. Cammann in regard to the general layout of the new work; that Mr. Cammann showed him the plans which had been prepared by some one, giving the approximate location of the power house and the general distribution, and Mr. Cammann then spoke to the witness about the terms of payment. The witness testified:
*583 “I told liim at that time that the conversation which I had had with Col. Cruger was to the effect that my engagement was on a five per cent, basis, or that I would make a fixed price after I could form a basis of opinion of what the value of the work would be for the total amount which was to be done. I also mentioned to him at that time that Gol. Cruger wanted me to meet him Friday, the 24th, the day after Col. Cruger died, to make a contract with me in writing, and to introduce me to Mr. Cammann, and that, of course, that was first; and Mr. Cammann asked me then to give "him in writing a proposition based on the better knowledge which I had then, under what conditions—for how much—X would do that particular work in connection with the engineering of the new buildings. That was about all. I wrote a letter to the corporation in accordance with that request, either that day or the day after.”
This letter was introduced in evidence. It was dated June 28, 1898, and contained two propositions: First, that the defendant might retain the plaintiffs under regular engineers’ fee of 5 per cent, on the total contract work to be given out for the engines, dynamos, piping, heating, wiring, and construction work of the power house. “Regarding the investigations carried on in connection with the Garvin Works, we will in that case charge only $20 per week (the salary of our superintendent).” Second, that the plaintiffs would be pleased to receive “your official appointment as consulting engineers for the corporation at a fixed salary of $2,000 per year, with 1% in addition for plans, specifications, and supervision of contracts; in that case the services of our superintendent would be practically at your disposal all the time for such investigations as we are about to make in the Garvin Building,”—the letter ending, “Trusting that either one of these propositions will meet with your approval, we remain,” etc. It does not appear that the plaintiffs heard anything more from the defendant until August 4th, when Mr. Cammann, as acting controller, wrote to the plaintiffs as follows:
“In consequence of some changes that we have made in connection with buildings on Hudson, Spring, and Vandam streets, we shall not require your services as electrical engineers in connection with said work. When you have completed your examination of the amount of electricity used by the Garvin Machine Co., will you be kind enough to make your report, and send in statement of your account?”
It must be quite apparent that there was here no definite contract for the employment of the plaintiffs as engineers to prepare the plans and specifications and superintend the erection of this electrical plant. The nature of the employment was left indefinite as to whether it was to be a contract for this specific work, as alleged in the complaint, or an employment by thd year as consulting engineer. That such was the plaintiffs’ understanding of the condition of the negotiation is apparent from the letter of June 28th, when they say:
“As per request, we take pleasure in proposing different forms of contract which we would like to enter into with your honorable body in connection with consulting engineering work for which we have been retained.”
The defendant in its answer alleged and admitted that it had employed the plaintiffs to make certain investigations and report in relation to the electrical work in the building then in existence, and that they had performed those services, and the court hold that, upon that allegation in the answer, the amount to which the plaintiffs were entitled for their services rendered under that employment could be ascertained. As the defendant does not appeal from the judgment entered on a verdict of the jury determining the value of the services actually performed, the question as to whether or not the court was justified, under the circumstances, in allowing a recovery by the plaintiffs for a distinct and different cause of action from that alleged in the complaint, is not necessary to be determined; but upon the record as it stands the plaintiffs certainly cannot object that the court allowed a recovery upon a cause of action not set out in the complaint, and which was based upon an entirely different employment from that upon which the plaintiffs based their right to recover. The contract alleged in the complaint
It follows that the judgment should be affirmed, with costs.
VAN BRUNT, P. J., and PATTERSON and HATCH, JJ., concur. LAUGHLIN, J., dissents.