Fay v. Brooklyn Heights Railroad
Opinion of the Court
The plaintiff was the foreman of a firm of contractors named Snare & Triest, who were engaged in extending the platform on the northerly side of the Hew York terminal of the Brooklyn bridge. This structure was built of iron, and at the time of the accident the plaintiff liad commenced putting in place an iron girder about twenty-five feet long and weighing about one and a quarter tons. The defendant was running a line of surface street cars over the bridge. It operated two tracks, one on each side of the platform then being extended. There had been an excavation in the floor of the bridge through which the girders used in the extension of the platform were to be hoisted. The southerly rail of the defendant’s westerly track was about eight inches from the platform. On December 20, 1905, about a quarter to eight in the morning, the plaintiff, who was the foreman of the men engaged in the work, started to hoist a girder through the excavation in the
It seems to mo that there was no evidence to justify a finding of negligence against the railroad company. There was no relation between the plaintiff and the railroad company that imposed upon the latter the duty of an employer towards an employee. The plaintiff was in charge of the work. He was perfectly familiar with the situation and could see the danger in allowing this girder to swing out over the railroad track, and it was his duty to take measures to prevent an accident. He made no request to the railroad company to stop the trains while he was engaged in this work, but expected to be able to hold the girder back so that trains could
The motorman testified that everything was clear on the track as he approached, and that there was nothing to indicate that there was any danger in proceeding, and this is confirmed by the plaintiff ; that the first he knew of any danger was when the girder crashed into the second car, and that the plaintiff gave the motorman no signal to stop.
It is quite impossible to see what more the defendant could have done, except to suspend the operation of its trains entirely, which was not requested, and there was no indication of danger in the train continuing, as the track was clear when it approached.
The defendant moved to dismiss the complaint both at the close of the plaintiff’s case and at the close of all the testimony. That motion was denied, but it does not appear that the defendant excepted. The question as to whether the verdict was against the evidence is, however, presented by the appeal from the order denying a motion for a new trial. I also think it was error to refuse to charge, as requested by the defendant, that “ if in approaching this iron the motorman saw that his car could pass in safety and there was sufficient room for him to pass in safety and the plaintiff gave no signal to indicate that he understood to mean to stop, then their verdict must be for the defendant, the iron having come in contact with the body of the car after the front had passed.” The court refused to charge this request, and charged the jury that, “ if the circumstances were such that an ordinary prudent person in charge of this car would have been justified in concluding that he could have passed in safety, then the defendant would not have been
The judgment and order should, therefore, be reversed and a new trial ordered, witlx costs to appellant to abide the event.
Patterson, P. J., Laughlin and Scott, JJ., concurred ; Clarke, J., dissented.
Judgment and order reversed, new trial ordered, costs to appellant to abide event.