Howard v. City of Buffalo
Opinion of the Court
Action by the plaintiffs to recover damages caused by flooding certain lands in the southern part of the city of Buffalo and for an injunction compelling the defendants to remove obstructions in. the Buffalo river and certain embankments causing the floods complained of.
Action commenced January 2, 1906; trial commenced January 9, 190Y; cause submitted April 23, 1910.
- The Buffalo river and the Cazenovia creek have their sources in streams in the western portion of Wyoming county, flow generally westerly across the center of Erie county, uniting' at about South Park avenue, in the city of Buffalo; flowing thence in a general northwestern direction to Lake Erie, draining a watershed, of about four hundred square miles. From South Park avenue the river takes a very crooked and winding course of six miles to reach the lake, a distance of less than two miles j having a natural fall of about five feet; the water in ordinary stages being from six' .to ten feet deep and about one hundred and fifty to two hundred feet wide, confined in a channel with generally abrupt banks, four to eight feet above the water level, necessarily a slow and sluggish stream.
With quite persistent regularity this river reaches a highly-flooded condition twice each year, generally once in the fall or winter and once in the spring. These floods have annually occurred since the earliest recollection of living witnesses. Prior to about the year 1888 the flooded area and the bounds of the river in its flooded condition were generally limited and confined by the clearly defined flood banks, marking with cer
At the time the defendants the Lake Shore and Michigan Southern Railway Company, the Buffalo Creek Railroad Company, the Pennsylvania Railroad Company and the New York, Chicago and St. Louis Railroad Company constructed their bridges and approaches thereto across this flood channel, and the Delaware, Lackawanna and Western Railroad Company constructed its lower bridge and the approaches thereto across the same, openings were left in all their approaches to their said bridges, which resulted in allowing such river flood waters to flow down through the flood channel and escape to the lake without reaching plaintiffs’ lands. These openings were maintained by the defendant the Lake Shore and Michigan Southern Railway Company from 1852 to 1888; by the defendant the Buffalo Creek Railroad Company from 1872 to September, 1886; by the defendants the Pennsylvania Railroad Company and the New York, Chicago and St. Louis Railroad Company from 1882 to 1892. Since the construction of such crossings over the Buffalo river flood channel, and within twenty years prior to the commencement of this action, all the last-named defendant-railroad companies filled in all such openings with solid earth embankments, leaving no means for such flood waters to pass down such channel, except as were afforded by the channels under their respective bridges; and at about the same time all the said defendant railroad companies filled in all openings under their railroad tracks' to the west of lands north of Tifft street for a long • distance southerly from the Buffalo river. The defendant the Delaware, Lackawanna and Western Railroad Company, in about the year 1891, constructed a long earth embankment westerly from the point of the overflow of the Buffalo river in times of flood at Abbott street to its junction with the Buffalo Creek Railroad Company south of the Buffalo
It seems to be conceded by all parties that at the time when flood waters are escaping from the channel of the Buffalo river at Abbott road in the vicinity of Hopkins street- in quantities sufficient to reach plaintiffs’ lands the entire flood waters in the channel are equivalent toa discharge of about 25,000 cubic feet per second down the channel. It is established by satisfactory evidence that the waters have a mean velocity of 4% feet per second from a point just above the Lackawanna bridge to just below the Lake Shore bridge. Dividing the quantity of the
Lake Shore and Michigan Southern Railway Company bridge, with water at 6.85 feet above mean water level, 4,470 square feet; the Pennsylvania Railroad Company and the Hew York, Chicago and St. Louis Railroad Company bridge, with water at 1.06 feet above mean water level, 3,862 square feet; the Buffalo Creek Railroad Company bridge, with'water at 1.06 feet above mean water level, 3,805 square feet; the Abbott road bridge, with water at 9.01 feet above mean water level, 3,216 square feet; the lower Delaware, Lackawanna and Western Railroad Company bridge, with water at 8.08 feet above mean water level, 3,180 square feet.
A very careful and exhaustive comparison of all the testimony touching the capacity of these bridge openings justifies the acceptance of the foregoing figures as correct and reliable.
There is no answer to the proposition that it is impossible to get water requiring a channel measuring 5,555 square feet on a cross-section to pass through bridge openings having a capacity as above indicated without causing a large part of the water upstream from such openings being imprisoned and held back unless the current is increased to a degree not to be attained in this tortuous, winding river, with only a fall of about five feet in about as many miles.
There is testimony to the effect that the discharge of 25,000 cubic feet per second is moving at the rate of 6% feet per second, indicating that a bridge opening of 3,846 square feet
With such flood waters moving at the rate of 6% feet á second there would pass through the Lake Shore bridge opening of 4,470 square feet in one second 29,055 cubic feet of water. The fact is that 25,000 cubic feet of water does not passthrough this opening in one second; the fact is that the water in times of flood, reaching plaintiffs’ lands from a place on Abbott road, in the vicinity of Hopkins street, is five inches higher on the upstream side of the bridge than it is on the lower side at a time when the flood measures 25,000 square feet in sectional area.
With flood waters moving at the rate "of 6% feet a second there would pass through the Pennsylvania Railroad and the Hew York, Chicago and St.- Louis Railroad bridge opening of 3,862 square feet in one second 25,103 cubic feet of water; the fact is that 25,000 cubic feet of water does not pass through the
With flood waters moving at the rate of 6% feet a second there would pass through the Buffalo Creek bridge opening of 3,805 square feet in one second 24,732 cubic feet of water; the fact is that that quantity of water does not pass through such opening in one second; the fact is that the water in times of flood reaching plaintiffs’ lands from a place on Abbott road, in the vicinity of Hopkins street, on the upstream side of this bridge, is more than one foot higher than it is on the lower side.
With flood water moving at the rate of 6% feet a second there would pass through the lower Lackawanna bridge opening of 3,780 square feet in one second 24,570 cubic feet of water; the fact is that that quantity of water does not pass through such opening in one second; the fact is that in times of flood reaching plaintiffs’ lands from a place on Abbott road, in the vicinity of Hopkins street, the water on the upstream side of the bridge is more than one foot higher than it is on the lower side.
With flood waters moving at the rate of 6% feet a second there would pass through the upper Lackawanna bridge opening of 4,209 square feet in one second 27,358 cubic feet of water; thé fact is that 25,000 cubic feet of water does not pass through such opening in one second; the fact is that in times of flood reaching plaintiffs’ lands from overflow at Abbott road at this bridge the water on the upstream side of the bridge is twelve to eighteen inches higher than on its lower or downstream side.
While it may be true that a part of the flood waters are moving through the bridge openings at the rate of six and one-half feet a second, yet it is also true that a large part of such waters are not moving at anywhere near that rate. If all of such flood waters were so moving there would be no overflow of the flood channel of the river; there would be no appreciable difference between the height of water above and below such bridges. In whatéver way the situation is examined the con
The fact is that the water does not, go through the bridge openings; it in fact is set back and raised above these bridges; it in fact is higher above each bridge than immediately below; it in fact is higher above each railroad crossing than it would have been if the openings originally in the approaches had not been filled up. It in fact is higher above the upper Lackawanna bridge, where- it flows over the Abbott road, than it would be if the said abutments, approaches, piers and obstructions were not within its channel; it in fact does flow over the channel of the river at Abbott road, in the vicinity of Hopkins street, the lowest point in the river bank, and reaches plaintiffs’ land, causing the damage complained of. The weight of evidence is that a channel formerly sufficient to discharge 25,000 cubic feet of water a second without injury to plaintiffs’ premises has been filled in and obstructed by the approaches, abutments and piers of these bridges and stone, etc., placed therein to such an extent that the full efficiency of the watercourse has been destroyed. The cause of the periodical flow of water over the south banks of the flood channel at Abbott road, and the consequent flooding of plaintiffs’ premises,, is thus very readily accounted for.. Instances could be vastly multiplied and particularized from the more than 4,000 pages of testimony placing the cause of the floods that have flowed across Abbott road upon plaintiffs’ lands upon the defendants’ failure to observe the imperative necessity of crossing the flood channel in such a manner as to leave sufficient openings for the passage of ordinary flood waters. Such necessity was observed by these defendants when they originally constructed their various crossings, and they were- maintained for many years with. a view of allowing the ordinary flood waters to pass through their structures without injury and damage to the property of the plaintiffs and thousands of others owning and occupying lands annually flooded since about 1890, Since about.that date the defendants greatly reduced -the capacity of the openings in
The defendant the City of Buffalo, acting under the provisions of chapter 527 of the Laws of 1906, has undertaken and is now actively engaged in the improvement of the Buffalo river by deepening and widening the channel, necessarily resulting in the removal of the railroad and highway bridges that now span the river, and whatever part these bridges, abutments and piers have played in preventing and obstructing the flow of flood waters is in process of elimination. The plan of the proposed river improvement now being executed involves the deepening and widening of the stream from Hamburg street upstream to a point above the junction of the river and . Cazenovia creek. Work is at present in" actual progress under contract with the city requiring the dredging of the river to a depth of 20 feet below mean water level up to the Abbott road bridge, and the widening of the channel to 220 feet, exclusive of all piers. Such improvement is -a vast undertaking, and is said by competent engineers to be adequate to furnish capacity for all ordinary floods and to prevent future flooding of the plaintiffs’ lands from the overflowing of Buffalo river at Abbott road. The improvement at the Lake Shore and Michigan Southern Railway Company bridge will result in a cross-section of about 4,400 square feet below mean water level, and 6.85 feet above that level, reached by the flood of 1904, in a cross-sectional area of 5,907 square feet, thus affording at this bridge apparently ample capacity. The same improvement at all other bridges on the river will restore to the channel at those points all the efficiency destroyed by the filling of the approaches, etc., to the bridges by the defendant railroads, and remove the cause of the damage to plaintiffs’ lands. None of the railroad defendants offered any testimony relative to their co-operation with the city in this large improvement. It is apparent that unless the defendants remove their • embankments, abutments and piers in the river below the
While it is true that by chapter 201 of the Laws of 1884 the defendants’ bridges were then declared to-be lawful structures, such declaration must necessarily refer to the manner of their construction at that time, if in any particular that statute applies to the size or capacity of the opening for the passage of water. At the time the statute was passed the defendant railroad had many openings in the approaches to such bridges and the flood channel was not seriously obstructed. The closing of these various openings was negligence and has made such bridges, their approaches, abutments and piers serious obstructions in the river; has made the bridges unlawful structures and a nuisance. The periodical flooding of the plaintiffs’ lands by the overflow of the Buffalo river at Abbott road, caused by the defendants’ unlawful structures, is a nuisance causing irreparable damage for which plaintiffs have no adequate remedy at law. The abutments and piers of the bridges of the Lake Shore and Michigan Southern Railway Company, the Buffalo Creek Railroad Company, the Pennsylvania Railroad Company, the Hew York, Chicago'and St. Louis Railroad Company have been in place as noW located for more than twenty years, and such railroad companies may have as against the plaintiffs secured the right by prescription to maintain the same as now constructed. The acts of these defendants, however, in filling in the openings to the approaches to their bridges and dumping stone, etc., into the river were committed within twenty years prior to the commencement of this action.
The plaintiffs are entitled to a mandatory injunction requiring these - defendants to remove the embankments constituting the approaches to their bridges, and to provide openings in such embankments which, with the openings under their bridges, shall be of sufficient capacity to permit twenty-five thousand cubic feet of water, flowing at a speed of four and one-half feet per second, to flow under their railroad tracks crossing the Buffalo river without being - obstructed when the water at the upper Lackawanna bridge is nine feet above city datum.
More than forty years ago the Abbotts Corners -Plank Road Company constructed the highway crossing of the Abbott; road
In 1890 the defendant the City of Buffalo acquired the rights of the plank road company. At that time there existed three sluiceways across the Abbott road between Hopkins street and the Abbott road bridge of sufficient size to accommodate substantially all the water that could not flow down the channel under the Abbott road bridge; and upon each side of the Abbott road bridge, in the same vicinity, there were ditches running to the river. In times of ordinary floods, prior to 1890, the flood waters in the flood channel of the Buffalo river passed down through these sluiceways, ditches and bridge, openings and did not reach plaintiffs’ lands. After the defendant the City of Buffalo took over such Abbott road highway it rebuilt Abbott road bridge, using without change the abutments then existing, filled up the sluiceways and ditches with solid earth and paved Abbott road. By such act the city of Buffalo materially lessened the flood-carrying capacity of the openings through or under Abbott road in its crossing of the Buffalo river flood channel and contributed to the raising of flood water in the river at Abbott road in the vicinity of Hopkins street sufficient to cause the overflow at that point and the injury to plaintiffs’ lands. These sluiceways and ditches were originally placed in Abbott road highway for the purpose of taking care of the water naturally flowing down the channel, and to close them all up tight and make no provision for this lost efficiency of the channel for flood-carrying purposes was of such gross carelessness and in such disregard of the plaintiffs’ rights as to constitute negligence; it was the creation of a nuisance, and for damages legitimately attributable - thereto the municipality is liable. By closing these necessary openings under or through its highway the municipality thereby forced upon the Abbott road bridge opening a far larger burden than it was capable of carrying, and because of the insufficient carrying capacity of this bridge opening it then became, ever since has been and now is, a nuisance, and it is negligence for the city of Buffalo to longer continue its dangerous condition.
The city of Buffalo having negligently contributed to the cause of plaintiffs’ injury must respond in damages for the injuries it has occasioned, and be subjected to an injunction decree commanding the restoration of the flood channel of the Buffalo river at Abbott road between Triangle street aiid Lee street to the same condition that existed immediately before said defendant filled up the sluiceways under, and the ditches on the sides of Abbott road and lowered the grade of said road.
While it is true that the defendant the City of Buffalo, though its common council has committed itself to a plan of deepening and widening the river for a considerable distance upstream from Hamburg street, and such work is in actual progress from Hamburg street to the Abbott road bridge, yet the fact is that the subject of enlarging the channel of the river at Abbott road rests solely on supposition. So far as the evidence upon this trial reveals, the city of Buffalo is under no contractual obligation to do any effective work that will afford" practical relief from these floods on any part of the' river upstream from a point just below Abbott road bridge. Of all the obstructions to the flow of flood waters down the' flood channel of the Buffalo river, none is more effective than this Abbott
It very satisfactorily appears that the damages occasioned plaintiffs’ premises from flood waters of the Buffalo river and Cazenovia creek must be limited to injuries sustained by water overflowing the south flood channel bank of the river at Abbott road in the vicinity of Hopkins street. While it is true that the openings in the city highway bridges at Bailey avenue, South Park avenue, Stevenson street, Cazenovia street, Seneca street and South Ogden street are far too small and utterly fail to furnish sufficient capacity for ordinary floods, and these bridges and their approaches do obstruct the flow of water in time of ordinary floods and cause much damage to property in their immediate vicinity, yet the plaintiffs are not entitled to any relief therefrom, for the reason that they do not cause plaintiffs any damage, for they do not contribute to any flood in the river at Abbott road in the vicinity of Hopkins street that reaches plaintiffs’ lands. It is only on very rare occasions that any flood waters from Cazenovia creek or the Buffalo river above Abbott road near Hopkins street reach the plaintiffs’ premises. For the past forty years only three or four such floods have occurred; they were caused by prolonged, heavy rains, sudden melting of exceptionally heavy snow or by the sudden movements of very thick ice causing ice jams. The
The complaint contains no allegation charging the defendant City of Buffalo with negligence with reference to the overflow of South Park lake, nor with reference to its failure to remove the obstructions in the river placed there by the remaining defendants. Whatever testimony was received with reference to the overflow of South Park lake must be stricken from the record as inadmissible under the pleadings. Whatever there may be to the claim for damage caused by the overflowing of South Park lake it is of. no importance for the reason that the waters therefrom are so slight in amount that they in no way cause or contribute to any damage to plaintiffs’ lands.
The failure of the city of Buffalo to cause obstructions placed in the river by the remaining defendants to be removed might possibly make the city liable for damages caused by such obstructions while the river was being used for navigation purposes;. but the damage caused plaintiffs in no manner arises from such a use. The failure on the part of the city to remove such obstructions so placed by the other defendants is not such negligence as to make it liable for the flooding of plaintiffs’ premises. The affirmative act of the city in closing the openings under Abbott road and closing the ditches on each side of Abbott road between Hopkins street and Abbott road bridge, thus greatly impairing the flood-carrying capacity of the river channel, is of a far different character and constitutes such negligence as renders the city liable to plaintiffs.
The evidence does not reveal any act of the defendant the Delaware, Lackawanna and Western Railroad Company with reference to its crossing of the flood channel at its lower bridge, within twenty years, that has contributed to plaintiffs’ damage, except the filling up of the channel under its bridge with stone. A mandatory injunction is granted the plaintiffs requir
The defendant the Delaware, Lackawanna and Western Railroad Company originally crossed the Buffalo river flood channel at its upper bridge upon an open trestle about one-fourth of a mile long, approaching the bridge from the east; this trestle carried the railroad tracks over this territory from about Prenatt street to the bridge; the natural surface of the land for all this distance being very low, having a very slight elevation above the ordinary banks of the river and in time of ordinary floods being fully covered and forming a part of the flood channel; in times of ordinary floods the flood waters were about one-fourth of a mile wide directly under the railroad tracks, but freely passing down the channel through such trestle without damage to plaintiffs’ lands. In 1891 the defendant Delaware, Lackawanna and Western Railroad Company filled in this open trestle with solid earth embankment from the eastern bank of the flood channel of the Buffalo river up to the east end of its upper bridge, leaving no openings therein of any character and completely damming up the entire flood channel, except such opening as was provided under its bridge. In about 1895 the defendant Delaware, Lackawanna and Western Railroad Company unloaded several carloads of stone from this bridge into the river channel under the bridge, materially decreasing the efficiency of the flood-carrying capacity of the opening under its bridge. This bridge opening has a cross-sectional area below the surface of the water, when the water stands 4.30 feet above city datum, of 2,622 square feet. With water standing 4.30 feet above city datum the Buffalo river is in a practically hank-full condition. It is beyond dispute that the space occupied by the water just above the Lackawanna bridge, at a time when it overflows the south flood channel bank at Abbott road in the vicinity of Hopkins street
It is apparent that the opening provided by the defendant Delaware, Lackawanna and Western Railroad Company at its upper bridge for the passage of flood water down the flood channel is not much more than half large enough to accommodate thé water that might ordinarily be expected. The filling in of the long trestle across that lowland and the dumping of stone into the channel under the bridge, leaving such a meager opening under this upper bridge, is an obstruction to the waters in Buffalo river; such filling in and the erection of the tight embankment has made the bridge, the. abutments and piers unlawful structures; the method adopted by the defendant Delaware, Lackawanna and Western Railroad Company at its upper bridge to take care of ordinary flood waters is a nuisance deliberately created in violation- of plaintiffs’ rights; contributes with the acts of the other defendants to the plaintiffs’ injury and damage, and constitutes negligence. on its part for which this defendant is liable to the plaintiffs. The lay of the land is such that the removal of this obstructing embankment from Prenatt street to the east end of the bridge would permit all flood waters that ordinarily might he expected to flow down the Buffalo river flood channel to find ample accommodation to pass under the Delaware, Lacka- . wanna and Western Railroad Company tracks at its upper bridge, without regard to the question of whether the river is dredged. and deepened between the upper Lackawanna bridge and the Abbott road bridge. A space of 4,400 square feet, sectional area, below mean water level under this upper bridge would provide a cross-sectional area of something like. 6,500 square feet, with water at 10 feet above city datum. It is unknown whether the Buffalo river will ever be deepened and widened upstream from the Abbott road bridge to the upper Lackawanna bridge; thé court has no power to compel such work; the court has no power at this time to compel
A mandatory injunction is hereby granted directing the Delaware, Lackawanna and Western Bailroad Company to remove its earth embankments from the east end of its upper bridge to the south side of Prenatt street, to remove the stone placed in the river under its bridge and to restore the flood channel of the river between these points to its former condition before such embankment was placed in such channel.
It is very evident that the Buffalo river cannot be improved, widened and deepened for navigation and flood abatement purposes unless these bridges and railroad crossings over the river be reconstructed — bridges of a swing or draw type substituted — and the channel under such bridges made at least 220 feet wide and 20 feet deep below mean water level. Such reconstruction of all railroad and highway bridges and crossings below Bailey avenue bridge down to and including the Lake Shore, bridge would eliminate all causes of plaintiffs’ damage due to the negligent acts of the defendants in obstructing the flood channel of the Buffalo river. It is quite likely that all such defendants will comply with the requirements of the river improvement plan relative to their bridges and crossings.
The mandatory injunction to which plaintiffs are entitled, and which is hereby awarded them,' requiring the Lake Shore and Michigan Southern Bailway Company, the Buffalo Creek Bailroad Company, the Pennsylvania Bailroad Company and the Hew York, Chicago and St. Louis Bailroad Company to provide openings in their approaches in the flood channel; and the Delaware, Lackawanna and Western Bailroad Company to remove the stone thrown into the river at its lower bridge, will be suspended and withheld until such defendants
The mandatory injunction against the city of Buffalo requiring the restoration of the Abbott road crossing of the flood' channel to its former condition will be suspended and withheld until the city shall have a reasonable time in which to provide by contract or otherwise for the execution of the plan of river improvement from just below the Abbott road bridge upstream at least to the upper Lackawanna bridge.
The mandatory injunction requiring the defendant Delaware, Lackawanna and Western Railroad Company to remove its embankment from Prenatt street to its upper bridge, etc., will be suspended and withheld upon condition that it shall, within a reasonable time, provide an opening under its upper bridge of at least 4,400 square feet, sectional area, exclusive of piers, below mean water level, so constructed as to permit the free passage of all water in or over such area under its railroad tracks, without obstruction.
While it is true that in places the banks of the river have been raised and industrial enterprises have erected buildings and structures within the flood channel, yet in no instance have such structures obstructed the flow of flood waters down the flood channel or contributed to the raising of the flood waters above the flood banks at Abbott road in the vicinity of Hopkins street. At all such places the flood waters have flowed around the structures and have not been set back and contributed to causes that damaged the plaintiffs. The damages to the plaintiffs have been caused solely by the acts of the defendants.
The plaintiffs’ lands are situated about one mile south of the Buffalo river and are bounded on the north by Tifft street, on the east by Hopkins street, on the south by Manila street, and on the west by the railroad tracks and rights of way of the defendants the Buffalo, Rochester and Pittsburg Railroad Company, the South Buffalo Railway Company, the Hew York, Chicago and' St. Louis Railroad Company, the Pennsylvania Railroad Company, the Erie Railroad Company, and the Lake Shore and Michigan Southern Railway Company, consisting of about 150 acres of land. Running through the plaintiffs’ lands
About the year 1890 the defendant the Lake Shore and Michigan Southern Railway Company filled in all the openings under its tracks with solid earth embankments, completely shutting off the water of this Howard creek watercourse from outlet to the lake; the Erie Railroad Company, the Pennsylvania Railroad Company, the New York, Chicago and St. Louis Railroad Company, and the Buffalo, Rochester and Pittsburg Railroad Company filled in the openings under their tracks in the watercourse of Howard creek, leaving certain culverts and placing various sized iron pipes, improperly located and of insuf* ficient size to be of effective service in allowing the water of such watercourse to flow from the plaintiffs’ premises, and substantially shutting off the water of Howard creek from the ■ lake, except as such waters found outlet through ditches running northerly on the east of the various -railroad embankments to the Buffalo river. About the year 1900 the South Buffalo Railway Company constructed an embankment across the watercourse of Howard creek upon its right of way located just east of and adjoining the rights of way of the railroads to the west of plaintiffs’ lands. In such construction the South Buffalo Railway Company completely filled in such watercourse and left no opening in its embankment whatever, except a twenty-four-inch iron pipe so located and constructed as to be of little, if any,- service in allowing the water from the plaintiffs’ lands to flow away. All the railroads to the west of plaintiffs’ lands have attempted to take care of the water naturally flowing through the watercourse of the Howard creek by constructing' ditches northerly from such watercourse along the east side of their various embankments to the Buffalo river, but such ditches have proved to be utterly inadequate for such purpose. At a point about half a mile north from the Howard creek watercourse all of such ditches are run on a higher level than a part of plaintiffs’ lands. At a time when the water in the
It is asserted, however, that the conveyance by the plaintiffs on September 5, 1900, to the South Buffalo Railway Company of the premises now occupied by that defendant expressly granted the right to construct its railroad upon a solid fill or embankment from eight to fifteen feet high, and that by reason of such grant the plaintiffs cannot recover any damages caused by such constructed embankment. The difficulty with such contention is that the grant referred to does not authorize such construction. The deed describes the premises conveyed, using the following words as a part of such description, viz.: “ Center line of the railway of the party of the second part, as laid down upon the map of its railway filed in the office of the Clerk of the County of Brie on the 17th day of August, 1900.” The map referred to was introduced in evidence and shows, in addition to the location of the railroad, a profile of the same giving the elevations as completed. Because such profile shows no openings in the proposed embankments at the Howard creek watercourse it is argued that the deed of September 5, 1900, is a grant of the privilege of constructing the railroad with a water-tight embankment across such watercourse. The reference to the map in the deed is for the mere purpose of fixing the place of the center line of such proposed railroad as surveyed, to the end that the premises conveyed shall extend eighty-six feet easterly of such line. The profile attached to such map is not' referred to in the deed, and the purpose for which reference is made to the map has nothing whatever to do with the profile; the mere fact that the profile is upon the map and that the profile does not show any proposed openings in the elevated embankments did not relieve the South Buffalo Railway Company from its statutory obligations to restore the Howard creek watercourse to its former state of usefulness,
On March 22, 1910, leave was granted defendants to introduce in evidence a contract made by the plaintiffs, the Lackawanna Steel Company and the defendant South Buffalo Railway Company on the 12th day of February, 1910,.in and by which the plaintiffs agreed on or before April 1, 1910, to convey to the defendant South Buffalo Railway Company a strip of land on the western edge of their premises sixteen feet wide, extending from the center line of Tifft street southerly to the right of way of the Buffalo, Rochester and Pittsburg railroad and thence southeasterly to Hopkins street. The defendant South Buffalo Railway Company covenanted to construct a ditch along the easterly and northerly side of such strip placed suitable for drainage, and also that it would construct a ditch suitable for drainage on the southerly side of a part of such strip leading from Hopkins street to and into the ditch of the Buffalo, Rochester and Pittsburg railroad, it being stated in such contract that it was intended to construct a railroad switch track located on an earth embankment upon the premises to be conveyed; and it was provided that as the embankment on a portion of said premises would not admit of the construction of ditches on the premises conveyed, the plaintiffs’ lands adjoining the premises conveyed, not exceeding four feet in width, might be used for such ditches. The defendant South Buffalo Railway Company agreed in said contract toconstruct, at its own cost and expense on or before May 1, 1910, a switch, as delineated on a plan attached tó such contract, crossing at Tifft street and running southerly upon an earth embankment to within about five hundred feet of Hopkins street, the elevation of such embankment to be as indicated on such plan. From the plan attached to said contract it appears that such embankment is to be from seven to ten feet; nothing appears upon the plans to indicate any openings in the embankment for the passage of water.
It is the contention of the defendants that the plaintiffs by this conveyance have provided for a water-tight embankment, to be constructed across Howard creek watercourse; that all claims for future damages by reason of obstructing such water
Section 11 of the Railroad Law
While it is true that the contract of February 12, 1910, is silent as to any required openings through the proposed new
The plaintiff is entitled to a mandatory injunction requiring the defendants the Lake Shore and Michigan Southern Bail-way Company, the Erie Bailroad Company, the New York, Chicago and St. Louis Bailroad Company, the Pennsylvania Bailroad Company, the Buffalo, Bochester and Pittsburg Bail-road Company and the South Buffalo Bailway Company to restore the watercourse of Howard creek to its former condition; to provide and maintain suitable and proper openings of at least forty square feet sectional area in size in their embankments across the watercourse of Howard creek, the bottom thereof to be below one foot above city datum at proper grade, so as to permit all the water in said watercourse at all times to flow from the plaintiffs’ premises and pass through such embankments.
For the purpose of affording an opportunity of putting the present openings in the embankments to the west of plaintiffs’ premises and the ditches to the Buffalo river in a practical, serviceable condition so as to be suitable for drainage, without the expense of complying with the provisions. of the mandatory injunction herein provided for, the issuing of such injunction wiE be withheld a reasonable time.
About twenty-five acres of plaintiffs’ lands have been rendered useless for ten years by the acts of the defendants in obstructing Buffalo river, causing its ordinary flood waters to flow upon plaintiffs’ premises and preventing the same from flowing therefrom, and if the obstructions created by the defendants in the Buffalo river and Howard creek watercourse were to be deemed permanent the plaintiff would be entitled to recover in this action the value of the twenty-five acres, about $50,000, together with such additional sum as would be fair compensation for damages occasioned other portions of plaintiffs’ lands that have not been rendered entirely useless. The measure of damages, however, is not compensation for permanent injury, for the reason that the damages are not permanent. The obstructions created by the defend
The correct measure of damages seems to be the depreciation in the value of the annual use of the plaintiffs’ premises that has been caused by the acts of the defendants. It is undisputed that the plaintiffs’ premises have a fair rental value of $1,000 per annum freed from the flood conditions caused by the defendants’ negligent acts; that in its condition, as flooded by the defendants, such rental value is the sum of $450.
While it is true that plaintiffs’ lands have been annually flooded for more than six years prior to 1906, the time of the commencement of this action, the damages have been of a more permanent character since 1902; the depreciated rental value, however, being $550 for the past ten years.
The plaintiffs are entitled to recover such depreciated rental value for six years prior to the commencement of this action, and for the four years of the pendency of the same, a period of ten years, viz., the sum of $5,500. The acts causing this damage were not the joint acts of all the defendants. The two defendants, the Pennsylvania Bailroad Company and the New York, Chicago and St. Louis Bailroad Company, jointly committed the acts relative to the obstructions in the Buffalo river by filling in the openings in the approaches to their joint bridge, • and also the acts relative to the filling in of the openings through their joint embankment across the Howard creek watercourse. The acts of the remaining defendants in placing obstructions in the Buffalo river and across the Howard creek watercourse-were all committed at different times and places, and were the separate acts of each defendant; each of such defendants thus becomes solely liable for the damages it separately has occasioned. To fix and ascertain the exact amount of damage for which each defendant is liable may be an impossibility; but no more impossible than to exactly determine the total damages inflicted by all the defendants. In view of the character of the obstructions, the acts of the defendants, the relation existing between these acts and the damages occasioned, the plaintiffs are entitled to recover from the defendants the _ following sums:
Judgment is accordingly ordered, with costs against all the defendants. This being a difficult and extraordinary case, an extra allowance of five per cent is awarded the plaintiffs.
Q-en. Laws, chap. 39 (Laws of 1890, chap. 565), § 11; now Railroad. Law (Consol. Laws, chap. 49; Laws of 1910, chap. 481), § 31.— [Rep.
Dissenting Opinion
The judgment awarded requires the city of Buffalo and certain of the defendant railroad companies to undo certain things which, as is claimed, turn out of their natural course the flood waters of Buffalo river and Cazenovia creek, and obstruct the waters of Howard creek, casting the waters upon the plaintiffs’ premises, known as the Howard farm, situate in the southwestern part of the city, about a mile from Buffalo river and a half mile from Lake Erie. Howard creek (so called) runs westerly across the premises towards the lake. The judgment also awards damages so done in the past.
1. I think the injunctive relief awarded the plaintiffs against the city is unwarranted in law and impracticable, and even if carried out strictly, will not prevent the flood waters from reaching the plaintiffs’ land. The judgment requires the city to restore the so-called flood channel of Buffalo river across Abbott road, for a distance of about a mile, to the same condition as before the street was paved in 1892. That means, as I understand it, that the pavement must be taken up, the Lackawanna viaduct removed or rebuilt and the old plankroad grade, with ditches on either side of the roadway and connecting sluices underneath, restored.
If that is done the water will overflow elsewhere, for the natural channel of the river has always been too small to hold the water in flood times, and however serviceable the ditches
That the water will overflow in flood times and reach the plaintiffs’ land,, although a mile away from Buffalo river, seems reasonably certain. The natural slope is from the river and creek towards the plaintiffs’ land, the fall being about one foot in one thousand, and even with the grade as it is now, the Cazenovia creek has overflowed just above its junction with the river and the water run along and to the south of Abbott road. Moreover, the railroad ditches below Abbott road, which connect the plaintiffs’’ land with the river, are so much lower than the grade of Abbott road that the flood waters, it would seem, would reach their land by that means before they overflowed the Abbott road grade, if the ditches are kept open, as the plaintiffs insist they should be.
But above and beyond these considerations, I think the city had the right to grade and improve the street. It certainly could not be expected that a pavement would be laid upon this irregular and uneven plankroad grade, with ditches on the side and underneath. And unless it was negligent, the city is not liable for the consequences resulting therefrom.
Not only did the city have direct legislative authority for doing-what it did, but the Legislature has. from time to time made provision for abating the -floods (Laws of 1891, chap. 105, § 405, as amd. by Laws of 1900, chap. 571, § 1); and finally declared the condition a nuisance and made it mandatory upon the city to abate the flood conditions (Laws of 1906, chap. 527). The city has adopted á plan for enlarging the channel of the river, has spent hundreds of thousands of dollars in that work and is now actively engaged in carrying forward the work; and it is reasonably certain that within two years’ time, perhaps less, the work will have so far progressed as to entirely
I think the city should not now be hampered with this injunction. It is true that the injunctive relief is suspended for a reasonable time, to carry out that plan, but Buffalo river is a navigable waterway, is so recognized by both the State and the nation, and just what changes may be made in improving the river cannot now be foreseen. As the situation now is, with the work in progress, the most the plaintiffs can require, as it seems to me, is that the work shall be prosecuted with reasonable diligence. If the plaintiffs have no remedy under that act, I think they have no remedy at all. The Legislature has provided for abating the floods, and the plan adopted is the only effective way yet devised.
2. What has been said regarding the liability of the city applies largely to the liability of the railroad companies. They had the right to construct their railroads over the river and the question is whether they are at fault in the way in which they built the approaches and bridged the river. If not, no liability exists for the resulting consequential damages. (Bellinger v. New York Central Railroad, 23 N. Y. 42; Moyer v. N. Y. C. & H. R. R. R. Co., 88 id. 351; Gordon v. E. & K. R. R. Co., 195 id. 137.)
In bridging the river the railroad companies were required to use reasonable care and foresight not to obstruct the channel of the river or unnecessarily interfere with the flow of the waters thereof. Their duty, as it has been expressly declared by statute since 1850, is to restore the stream or watercourse which the railroad intersects or touches to its former state or to such a state as not to have unnecessarily impaired its-usefulness. (Laws of 1850, chap. 140, § 28, subd. 5, as amd. by Laws of 1880, chap. 133, and Laws of 1887, chap. 724; Railroad Law [Gen. Laws, chap. 39; Laws of 1890,. chap. 565], § 11; now embodied in Railroad Law. [Consol. Laws, chap. 49; Laws of 1910, chap. 481], § 21.)
It is contended by the plaintiffs that the channel under the bridges has been obstructed and its carrying capacity lessened, while the railroad defendants contend that although piers and abutments were built to support the bridges, as was necessary,
Whatever else may be said of the' injunctive relief, I think, to remove and open up the solid embankments and approaches to the bridges is unwarranted and would be ineffective to keep the waters from the plaintiffs’ land, and for reasons which have already been stated, relating to the injunctive relief awarded against the city.. The waters would be blocked by the improvements below and be cast upon or over the lands which .áre lower. Even if every building and improvement on either side of the river were removed, as far up the' river as above the Abbott road, so as to make a flood channel from 500 to 1,500 feet wide, as described in the decision, the flood waters would still find their way to the plaintiffs’ lowlands, as has been pointed out. •
If there is any liability here at all, it rests upon the doctrine that one may not so use his own as to encroach upon the legal rights of others.' The application of that■ principle must be determined largely by the rules of public policy—what would best conserve public interests as a whole.
A distinction has been made between surface waters and the waters of a natural watercourse, pointing out the difference between the civil law and the common law in that regard (Barkley v. Wilcox, 86 N. Y. 140); although it has been said by high authority that both rules rest upon substantially the same principles. (Boyd v. Conklin, 54 Mich. 583.)
According to the findings this stream has three channels or stages of importance, as it is said — low-water channel, 'bank-full channel and flood channel. The latter is stated to be from 500 to 1,500 feet wide> with well-defined banks. While it may
I do not think it is the law that the channel of a stream comprehends the entire area covered by a moving mass of flood water, within which the flow must not be interfered with to the detriment of the lands beyond this area. If so, a much larger territory than the flood channel, as here described and defined, must be withdrawn from use and permitted to lie in a state of nature.
Such a rule, rigidly applied, would prevent the upbuilding of the river valleys of the country, in many of which, like the Mississippi, the flood waters have moved along the course of the river in a solid mass, many miles in width; and to a large extent would have prevented the upbuilding of South Buffalo along the river and creek. Many streets besides Abbott road would be affected, which are now built up with residences, manufacturing plants and other improvements. Both sides of the river, from the lake to above Abbott road, have been largely built up and the banks of the river dyked and raised, all of which must be torn down and removed, if this so-called flood channel must be cleared and reduced to its former natural state. That, as it seems to me, is the logical effect of the decision.
I do not say that flood waters moving and connected with the main current of the stream may not, under certain conditions . and within certain limitations, be regarded as waters of the stream and the rules of watercourses applied thereto, although outside the ordinary channel of the stream; nor that the owners of lands in making improvements along this stream may not have encroached upon the legal rights of others. But the question now under consideration is whether, in view of the statute authorizing the railroad defendants to construct their railroads, and bridge the stream, they have been at fault in the way that has been done, to the detriment of the plaintiffs, and if so, to what legal redress the plaintiffs are entitled.
I think the plaintiffs are not entitled to the money judgment
3. As regards Howard creek: I have no doubt that originally there was a living stream, having its source in springs about a mile or more from the lake, flowing in a westerly direction over' the plaintiffs’ premises, the waters eventually finding their way into the lake. But there, is not much left of its characteristics as a stream. . The depression remains as far as the railroad embankments, but beyond there is little if any indication of a wafercouse, and the waters, before reaching the plaintiffs’ premises, have been largely intercepted and drained into city sewers, except when there is *an overflow in flood times. The only useful purpose which the channel would now serve is that of drainage, and I do not see how that would be effective, except for the railroad ditches. Even before the embankments were built, whatever waters of Howard creek found their way from the lowlands and swamps to a point west of the present railroads, were intercepted by the Tifft farm ditches, which connected with the Buffalo river.
But beyond that, I think that when the plaintiff’s predecessors in title conveyed the strips of land to the various railroads for railroad purposes, it was contemplated that the waters of Howard creek should be intercepted and drained into the river by ditches to be constructed by the railroad companies, and that the channel across the rights of way might be closed. The embankmentshave benefited rather than harmed the plaintiffs’ premises, for they have kept off the lake waters which swept through the open culverts from the lake and periodically submerged the plaintiffs’ land, with the other lowlands in this vicinity. I think the ditches were intended to take care of the waters of the creek with that of the other drainage.
While the plaintiffs are entitled to redress for the failure upon the part of any of the railroad defendants to fulfill their obligations, respecting the ditches, so far as they serve any useful purpose in connection with the lands now owned by the
4. As regards the damages: The damages awarded cover the six years before the commencement of the action and the four years thereafter, up to the time of the trial, allowed at the rate of $550 a year, amounting to $5,500. They were apportioned against the several defendants according to the damage done by each, as it is claimed, awarding $600 against the city and amounts ranging from $300 to $1,700 against eight of the defendant railroad companies, besides a proportionate amount of the costs against each of the defendants so held liable, the trial court holding that the defendants were not jointly liable, but each liable only for the damages done by it, following the rule of the O’Donnell case (O’Donnell v. City of Syracuse, 184 N. Y. 1).
The damages awarded seem to be the loss in rental value of the land overflowed from the flood waters, which according to the testimony of one of the witnesses is a depreciation annually of from $500 to $600. But the evidence seems to indicate that if there was any liability at all, the acts of others than those who are made parties to this action caused in part or contributed to the conditions for which the plaintiffs seek to recover damages. If so, it was improper to charge all the damages against these defendants; and even if they were liable, it would not justify making an arbitrary division of the damages among several defendants merely because they were incapable of separation and the proportions of liability could not be established, as was held in the O’Donnell Case (supra), and besides, the drainage ditches on plaintiffs’ land have not had the same care and attention since the death of the former owner as before.
I think the evidence fails to sustain the award of damages, either in gross against all the defendants or the amount apportioned against each of them.
I think the judgment should be reversed and a new trial ordered.