L. A. Swyer Co. v. Thomas J. Wolfstich, Inc.
Opinion of the Court
Appeal from a judgment of the Supreme Court in favor of defendant, entered November 15, 1968 in Albany County, upon a decision of the Court at a Trial Term without a jury. Appellant seeks to recover for damages caused when a water pipe burst during construction of a building. Appellant, a building contractor, and respondent, a plumbing contractor, were awarded contracts for the construction of an office building in Albany. Appellant subcontracted the excavation portion of its contract to Quick Way Excavators, Inc., whereas respondent performed its own excavating. Under its contract, respondent was required to lay a four-inch water pipe from the main to the building, a distance of 30 feet. In the autumn of 1965, respondent excavated to a depth of approximately five feet and placed pipe along the ground at the bottom of the excavation. The pipe was suspended in air for a distance of six feet since Quick Way Excavators, Inc., had previously excavated to a depth of nine feet around the building. Thus, a portion of the pipe remained unsupported until April of 1966 when Quick Way back-filled its excavation. On October 2, 1966, the pipe burst, presumably at some point where it traversed the building excavation, causing damage to the building, sidewalks and parking lot. The repairs were performed by appellant, who
Case-law data current through December 31, 2025. Source: CourtListener bulk data.