Town of Huntington v. Albicocco
Opinion of the Court
In consolidated actions, inter alia, to permanently enjoin defendants from completing the construction of a steel bulkhead and from depositing fill on underwater lands allegedly owned by the plaintiffs, the defendants appeal from so much of a judgment of the Supreme Court, Suffolk County, entered December 5, 1977, as (1) severed their counterclaim to declare the Marine Conservation Law of the Town of Huntington invalid, (2) directed them to apply to the State Department of Environmental Conservation for a permit with respect to the bulkhead work, and (3) directed them to apply to the Town of Huntington Department of Engineering, Building and Housing, for a permit with respect to the deposit of fill. Judgment modified, on the law, by deleting the third decretal paragraph thereof, which directs defendants to make an application to the State Department of Environmental Conservation, and substituting therefor a provision that defendants need not make such an application. As so modified, judgment affirmed insofar as appealed from, without costs or disbursements. The defendant Nick Bros. Fuel Oil Corp. (Nick Bros.) is the owner of a parcel of real property in the hamlet of Halesite, Town of Huntington, County of Suffolk, which abuts the navigable waters of Huntington Harbor. Title was acquired from defendants Albicocco and Nicoletto. Nick Bros, utilizes the parcel in its retail fuel oil business. On the property is a 500,000 gallon fuel oil storage tank which is capable of being supplied by barges. On another portion of the property is a dock used to off-load trap rock from barges that transport this stone from the Hudson River and Connecticut. It is the only such dock in the Town of Huntington. More than 20 years ago, defendants Albicocco and Nicoletto constructed a wooden bulkhead along the frontage of this property which faced the harbor. By 1973 the bulkhead had become so deteriorated that it had to be replaced; it was bulging and falling and behind it, within 80 feet, was the 500,000 gallon fuel oil storage tank. By February, 1974 the bulkhead was in even worse condition. Accordingly, a sheet steel bulkhead was designed to be erected just outside the old wooden bulkhead. Work was started immediately for fear the old bulkhead would collapse. As a precaution, the fuel oil was pumped out of the storage tank. The sheet steel bulkhead was placed in a straight line just outside the old wooden bulkhead. At some places it was 16 to 18 inches outside the old bulkhead and at the south end, to keep it straight, it extended some 6 to 10 feet out into the harbor. The void between
Concurring Opinion
Both Trial Term
and the majority are of the view that defendants have to apply to the Town of Huntington Department of Engineering, Building and Housing with respect to their proposed deposit of fill. I disagree. Except for the payment of
Case-law data current through December 31, 2025. Source: CourtListener bulk data.