The mortgage sought to be set aside is dated August 2, 1910, and is executed by Edward F. Garling and Ella E.
Then came the following conditions and agreements:
“And the said party of the second part in consideration of the conveyance and conveying of the above described property to it does hereby agree to furnish and provide for the use and benefit of the Mohawk Engineering & Construction Company the sum of thirteen thousand dollars ($13,000.00) to be used in the performance of the work of the said two contracts hereinbefore referred to the said sum to be paid by the said party of the second part to the Mohawk Engineering & Construction Company upon weekly estimates of the work done upon the two said contracts and the said weekly estimates to be made and furnished by one John J. Ryan of Albany, N. Y.
“it is hereby mutually agreed and understood that the party of the first part after the expiration of ninety days from the completion of the two contracts hereinbefore referred to shall be entitled to and shall have a reconveyance of the property hereinbefore described and conveyed from the party of the second part, its successors and assigns upon his showing to the satisfac*291 tion of the said -party of the second part, its successors and assigns that the said contracts have in all things been fully, properly and faithfully performed and completed and upon the said party of the first part paying to the said party of the second part, its successors or assigns the sum of thirteen thousand dollars ($13,000.00) with interest thereon at the rate of 6 per cent, per annum, and upon his likewise paying to the party of the second part such costs and expenses as it may have incurred in inspections made of and upon the work of said contracts and attorneys’ fees in the matter of this agreement and its preparation. ,
“It is further mutually expressly understood and agreed that should a loss be sustained in the performance of the work of either or both of said contracts which the said parts' of the second part might as a surety on the bond of the Mohawk Engineering & Construction Company be liable to pay that then and in that event the said party of the first part shall not be entitled to a reconveyance of the property hereinbefore described and conveyed until said loss shall have been adjusted, satisfied and fully paid and further that said party of the first part shall not be entitled to a re-conveyance of the said property hereinbefore described and conveyed until any liability that the party of the second part may have incurred as a surety on the bond of the Mohawk Engineering & Construction Company shall have been adjusted, settled and fully paid to the amount of the value of the property hereinbefore described and conveyed and that said property is not only liable, responsible and answerable to the party of the second part for the sum of thirteen thousand dollars ($13,000.00) and interest and costs and expenses hereinbefore mentioned but likewise for any loss, liability, damage or expenses that the said party of the second part may sustain or incur as a surety on the bonds of the said Mohawk Engineering & Construction Company.
“It is further expressly mutually agreed and understood that the liability of the said Edward E. Garling, the party of the first part hereto is not by the execution of this agreement in any way limited, modified or changed as an indemnitor on the bonds of the Mohawk Engineering & Construction Company upon which said bonds the party of the second part hereto is a surety.”
It appears on the face of this instrument, assuming the recitals to be correct, that Garling, the mortgagor, had already assumed a liability, contingent, of course, as indemnitor for the said Mohawk Company, which company was to perform the contracts referred to, and that he, in and by said mortgage, pledged the mortgaged property to the Bankers’ Surety Company as security for the repayment of the sum of $13,000 to be thereafter advanced by said surety company to or for the Mohawk Company, and which money was to be used in the prosecution of such work; that is, the work called for by the contracts.
April 12, 1910, H. W. Sylvester and Edward F. Garling had signed a bond to the Bankers’ Surety Company in the sum of $15,000, reciting that:
“Whereas the said Bankers’ Surety Company has become or is about to become surety at the request of the said Mohawk Engineering & Construction Company on a certain bond in the sum of $15,000, wherein Mohawk Engineering & Construction Company is principal, conditioned for the construction of the paving of the main street of the village of Matteawan, now the condition” etc. — which was that Sylvester and Garling would save harmless said Bankers’ Surety Company by reason of its becoming surety for the Mohawk Company.
On this bond was written and signed by Garling the following:
“I am worth in personal and real estate clear of debt above the sum of fifteen thousand dollars. Edward F. Garling.”
May 16, 1910, the Mohawk Company with the Bankers’ Surety Company gave a bond to Harry J. Warner in the sum of $13,000 to perform the work, etc., on the Barge Canal, contracts No. 20-C and No. 20-D, in accordance with the terms of the contract between the Mohawk Company and Harrjr J. Warner.
October 18, 1910, Warner released and canceled this bond as follows :
“I, the undersigned, hereby release, cancel and surrender this bond to the Bankers’ Surety Company in considération of an agreement executed concurrently herewith by and between the Bankers’ Surety Co. and myself. .
“Dated Albany, N. Y., Oct. 18, 1910. Harry J. Warner.”
The agreement referred to reads as follows:
“This agreement, made between the Bankers’ Surety Company of Cleveland, Ohio, party of the first part, and Harry J. Warner of Albany, N. Y., party of the second part, Witnesseth that:
“Whereas, the first party did heretofore issue a bond in the penalty of thirteen thousand dollars (,¥13,000.00), to the second party, conditioned for faithful performance of a contract entered into.between the said second party and the Mohawk Engineering & Construction Company; and
“Whereas, the said Mohawk Engineering & Construction Company has defaulted in the performance of the terms of said contract and abandoned same; and
“Whereas, the said first party did issue a bond in the penal sum of twenty thousand dollars (¥20,000.00), to the American Pipe & Construction Company, for the faithful performance of the work set forth and covered by a contract between the said second party and the said American Pipe & Construction Company, which latter contract is dated the 7th day of May, 1910, and the second party is totally unable to carry out the terms of said contract so entered into by him, with said American Pipe & Construction Company, and desires to be relieved of any liability on the bond so given, and of all liability of every kind and nature arising or growing out of the execution by him, of either or both said bonds, to the first party.
“Now witnesseth: That the said second party hereby surrenders to the first party, said bond-in the sum of thirteen thousand dollars ($13,000.00), issued to him by the Bankers’ Surety Company, for cancellation and surrender waiving any and all rights which said second party secured thereunder, by reason of default of the said Mohawk Engineering & Construction Company; and the first party in consideration thereof, hereby agrees to release and -discharge, and hold harmless the second party as principal or otherwise, of and from all liability arising or that may hereafter arise, under and by virtue, of a bond in the sum of twenty thousand dollars ($20,000.00), executed by the second party as principal to the American Pipe & Construction Company, on or about May 23, 1910.
“In witness whereof, the parties have hereunto set their hands and seals, this 18th day of October, one thousand nihe hundred and ten.
“The Bankers’ Surety Company, by
“Harry B. Sprague, Assistant Secretary. [L. S.]
“Harry J. Warner. [L. S.]”
May 23, 1910, the Mohawk Company, by said Sylvester, its president and said Garling, its treasurer, applied to the Bankers’ Surety
August 5, 1910, it was resolved by the board of directors of said Mohawk Company that John J. Ryan of Albany, N. Y., be appointed attorney in fact for said company for the purpose of collecting and receiving the said $13,000 to be advanced by said Bankers’ Surety Company under said mortgage agreement and applying said money in and towards the prosecution and carrying on of said paving work in Matteawan and in building and constructing the work of part of sections 2 and 3 of the said Barge Canal, and also for the purpose of receiving for and on behalf of the Mohawk Company all money due or to grow due upon either or both of said contracts for work done in execution of the Matteawan contract or in execution of contracts on sections 20-C and 20-D of the Barge Canal. Sylvester, as president of the Mohawk Company, was authorized and directed to execute the power of attorney.
The Bankers’ Surety Company by check paid to said John J. Ryan, attorney in fact, as follows:
August A 1910.■.... $ 3,000 00
August 12, 1010. 4,000 00
August 31, 1910. 2,000 00
September 7, 1910. 2,500 00
September 10, 1010. 1,500 00
Total .'.'. $13,000 00
John J. Ryan, attorney in fact, paid to Sylvester, president, by check as follows:
August 6, 1910. $2,500 00
August 6, 1910. 500 00
September 17, 1910. 1,200 00
September 17, 1910 (to Sylvester personally). 50 00
And to E. E. Garling treasurer by check as follows:
August 26, 1910. $3,167 19
August 26, 1910. 600 00
August 26,1910. 252 26
September 10, 1910. 3,077 12
September 10, 1910. 75 00
And also as follows:
August 13, 1910, H. W. Jackson. $2,761 36
August 13, 1910, H. W. Jackson.;. 200 00
August 13, 1910, Win. S. Ver Planck. 145 00
August 13, 1910, D. P. Bruk Co. 7 20
*294 August 13, 1910, H. L. Bond Oo. $ 694 85
August 13, 1910, O. A. Kappel Co. 250 00
August 20, 1910, L. J. Dooley. 500 00
August 23, 1910, Bose & Kienian. 1,024 28
August 23, 1910, P. Y. Baird. 50 00
August 24, 1910, D. S. Gardenier. 109 62
August 29, 1910,- D. S. Gardenier. 50 00
September 1, 1910, L. Hardware Co. 104 49
September 2, 1910, Bose & Kiernan. 252 26
September 3, 1910, Bose & Kiernan.'.. 3, 90
September 3, 1910, D. S. Gardenier. 109 07
September 3, 1910, D. S. Gardenier. 50 00
September 6, 1910, D. S. Gardenier. 121 36
September 6, 1910, P. P. Lent. 200 00
September 7, 1910, H. D. Schutt. 50 00
September 13, 1910, E. O. Brien. 337 40
September 13, 1910, Bose & Kiernan. 25 00
September 19, 1910, P. V. Baird. 35 00
October 5, 1910, Bose & Kiernan. 1 35
October 5, 1910, Bose & Kiernan. 76 00
October 9, 1910, Cash. 10 00
October 12, 1910, P. B. Paul. 2,043 00
October 11, 1910, P. B. Paul. 457 00
October 17, 1910, Mrs. J. W. Whalen. 21 50
October 17, 1910, Sewell & Alden. 20 00
November 10, 1910, an involuntary petition in bankruptcy was filed against said Mohawk Engineering & Construction Company, and January 28, 1911, it was duly adjudicated a bankrupt accordingly. August 2, 1910, Garling was not only a stockholder in the Mohawk Company; but its treasurer, as stated.
At the time the mortgage was given it appears that the Mohawk Company had proceeded with the work on the Matteawan contract and on the Barge Canal contract (known as the Tribes Hill Job) so long as their money lasted, and that they then went to the bonding company and made arrangements for a loan. Garling says:
“Q. Wbat was done to make arrangements for the loan? A. We arrived at the amount of $13,000 by my giving a bond and mortgage. Q. And that is the mortgage that has been introduced in evidence here dated August 2, 1910? A. Yes,”
At that time Garling had the following property: State street property ; Center street property; Helderberg avenue property; 3 life insurance policies; 5 Mohawk Brewing Company bonds; 25 shares of stock in the brewing company; 30 shares of stock in this Mohawk Company; also in cash $3,400.
tie was then owing:
Mohawk National Bank. $11,000 00
Schenectady Trust Company. 7,500 00
Wagon Watson Company. 1,900 00
Herald Bond Company...: 300 00
Other creditors about. 1,800 00
At that time there was no market for the stock of the Mohawk Company or the bonds of the Mohawk Brewing Company. The Mohawk 'Company was then engaged in doing the work on three contracts; Matteawan commenced in May, 1910; the Barge Canal (Tribes Hill); and a paving contract at St. Johnsville. It was then a going concern.
June 2, 1910, Mr. Garling made a statement of his assets and liabilities to the Bankers’ Surety Company in which he placed the value of his real estate at $82,000, subject to a mortgage of $3,000; that of his stocks and bonds at $7,500; with cash in bank about $6,000. He says he based real estate values on rents received, not market values.
The claims proved against Garling in the bankruptcy proceedings are $22,239.41. The claims proved against the Mohawk Company are $26,833.28.
The money received by Ryan and paid as attorney in fact over and above the $13,000 came from the Matteawan contract; nothing from the Tribes Hill contract. One P. B. Paul, employed by the Bankers’ Surety Company, completed the Matteawan contract, and on this there was a small profit. After putting in a cofferdam on the Tribes Hill contract at an expense of some $75,000, it was washed out, and that contract was abandoned. -
The plaintiff has given proof showing that August 2, 1910, the property of Garling was actually worth $32,150, and that his liabilities aside from his contingent liabilities by reason of having become indemnitor for the Mohawk Company were $17,382. Adding the contingent liabilities on the Matteawan contract $15,000, which never became fixed, and that on the Barge Canal contracts $15,000, and his total liabilities were $47,382. The mortgaged property was worth $23,250, at least leaving other property of the value of $7,900, or about.
In short, on the 2d day of August, 1910, Garling in order to secure a loan to the Mohawk Engineering & Construction Company of which he was treasurer and in which he was a stockholder and for which he had become indemnitor, to enable it to prosecute the work on the 'contracts which it had undertaken to do, mortgaged certain of his real estate to secure such loan to the Bankers’ Surety Company, which, of course, knew of Garling’s liability to it as indemnitor for the bonds it had given for the faithful and complete performance of the work. This was within four months of Garling’s bankruptcy. But Garling and the Bankers’ Surety Company went further than this, for the mortgage secured, so far as it would go, the Bankers’ Surety Company against its liability and possible loss by reason of having become surety on the bonds mentioned, and hence incidentally Garling gave the mortgage as security for his own liability as indemnitor to the Bankers’ Surety Company. That is, by making the loan of $13,000 to the Mo'hawk Company, and obtaining the agreement by which' the money was to be devoted to the work for the performance of which the surety company had given its bond, it secured the performance of so much of the work, obtained security for the repajnnent of the money thus lessening its own liability, and at the same time obtained security by .way of mortgage from Garling for his liability as indemnitor. This was the effect of the transaction. If the transaction was intended as a fraud on the other creditors of Garling within the meaning of the law, it could be set aside; but it was based on a valid consideration, and I do not see that it was intended by any one to cheat or defraud any one. Was the transaction a preference in the eye of the bankruptcy act? The Bankers’ Surety Company knew that the work to be done under
The agreement of October 18th, between the Bankers’ Surety Company and Warner, expressly recites that the Mohawk Company has defaulted in the performance of the contract (Barge Canal contract) and abandoned same. It also expressly recites the bond of $20,000 given by Warner to the American Pipe & Construction Company with the Bankers’ Surety Company as surety for the performance of this Barge Canal work, and that Warner is totally unable to perform his contract and desires to be relieved of liability on the bond given to the American Company and of all liability of every kind and nature arising or growing out of the execution by him of either or both of said bonds to the Bankers’ Surety Company. Hence Warner, protected by the $13,000 bond, surrenders and cancels it and waives all rights which he secured thereunder and the surety company in consideration of being released on such $13,000 bond releases and discharges Warner from his liability on such $20,000 bond. Here is a new contract and agreement with new obligations and liabilities on the part of the surety company, and I do not see that it can be held to operate to continue the liability of Garling to make good the Bankers’ Surety Company in case it as surety for the Mohawk Company was compelled to pay anything by reason of the default of the Mohawk Company to perform the contract. On default by the Mohawk Company, Warner voluntarily surrendered and canceled the bond, and as a consideration agreed with the surety company, waiving all rights which AVarner had thereunder by reason of the default of the Mohawk Company, that it would save him harmless on the $20,000 bond, a liability to the American Pipe & Construction Company. As the Matteawani contract paid out in full, the mortgage secures nothing on that, and, if Garling’s liability on the $13,000 bond vims released, the mortgage can only stand, in any event, as security for the $13,000 money advanced.
When A. gives a bond to B. with surety for the doing of a partic
I therefore hold, so far as the Matteawan contract is concerned, that there is and can be no liability under the mortgage, and, so far as the Barge Canal contract (Tribes Hill) is concerned, that there is not and cannot be any liability under the mortgage. The mortgage was given August 2, 1910, and the bond was surrendered and the surety released October 18, 1910. That mortgage was not a substitute for the bond of the surety company, nor a security in addition to that afforded by that bond, so far as the Barge Canal work is concerned. It was, and was intended to be, security for the obligation and liability' of Garling as indemnitor to the surety company. If not.so, so far as the Barge Canal work is concerned, it was and is without consideration and, as against the trustee, void. When Warner, the obligee in the bond, released the surety on that bond, he at the same time and thereby released the indemnitor of the surety company. Montgomery v. Sayre, 100 Cal. 182, 34 Pac. 646, 38 Am. St. Rep. 271; O’Mara v. Nugent, 37 N. J. Eq. 326; Dibble v. Richardson, 171 N. Y. 131;
“Upon the affirmance of the judgment by the latter court, the sureties on the last appeal bond took an assignment of the Judgments, and in their hands*299 there was no longer' any liability on the part of the sureties on the first appeal. Such sureties (first appeal) became, on the giving of the second undertaking to pay the judgments, sureties for the second sureties, and, when the second sureties paid or discharged their obligation to the owner of such judgments and took an assignment of them, they could not enforce them against the first sureties.”
That is, the release of’ the surety releases the surety of such surety.
Section 60a of the Bankruptcy Act provides :
“A person shall be deemed to have given a preference if, being insolvent, he has, within four months before the filing of the petition, * * * made a transfer of any of his property, and the effect of the enforcement of such * * * transfer will be to enable any one of his creditors to obtain a greater percentage of his debt than any other of such creditors of the same class.”
And section 60b provides:
“If a bankrupt shall have * * * made a transfer of any of his property, and if, at the time of the transfer, * * * the bankrupt be insolvent and the judgment and transfer then, operate as a preference, and the person receiving it or to be benefited thereby, *or his agent acting therein, shall then have reasonable cause to believe that the enforcement of such * * * transfer would effect a preference, it shall be voidable by the trustee and he may recover the property or its value from such person.” Act July 1, 1898, c. 541, 30 Stat. 562 (U. S. Comp. St. 1901, p. 3445), as amended by Act Feb. 5, 1903, c. 487, § 13, 32 Stat. 799 (U. S. Comp. St. Supp. 1911, p. 1506).
If this $13,000 had been advanced for the purpose of reducing a fixed obligation or indebtedness of the Mohawk Company which the surety company was obligated to make good and which Garling as in-demnitor was obligated to make good, we would have a case where
But it is urged that this $13,000 so advanced has been fepaid to the Bankers’ Surety Company. When this money was advanced, it was to be used in prosecuting the work on the Matteawan contract and the Barge Canal (Tribes Hill) contract. The evidence clearly shows that it was put into work on both contracts. Some $2,500 of it with the consent of Garling was used in the prosecution of another contract being performed by. this Mohawk Company. As already stated, there was a flood and a washout on this Barge Canal work and it was abandoned. The money put into it — stated to be something like $75,000— was a dead loss. But the Matteawan contract was completed by and under the direction of P. B. Paul, employed by the Bankers’ Surety Company, and-all the money put into it came back by way of compensation for the work done.
The power of attorney to Ryan authorized him to collect and receive: (1) The $13,000 from the Bankers’ Surety Company. (2) To apply same in and towards the prosecution and carrying on of the paving contract with the village of Matteawan and the work of building and constructing a part of sections 2 and 3 of the ‘Barge Canal. (3) And further to receive for and on behalf of the Mohawk Company all moneys due or to grow due upon either or both of said contracts by reason of any work done upon the said contracts.
Nothing was said as to the disposition to be made of these moneys due or to grow due on such contracts when collected by Ryan. When .collected it became the money of the Mohawk Company. Ryan was its attorney in fact and testifies that a-11 the $13,000, and all of the money received by him on the Matteawan contract was used on the Barge Canal contract and the Matteawan contract in payment of the debts of the Mohawk Company. That he mingled the $13,000 and money received from the Matteawan job and paid them out on the jobs. It must be presumed, in the absence of evidence to the contrary, that the .agent paid and disbursed the money as he was authorized to do by the Mohawk Company. I do not find that he was ever authorized or directed to pay anything on the $13,000 secured by the mortgage, or that .he ever did. I cannot find evidence to sustain the contention that
The assertion is made that as to the $13,000 advanced it was fully paid, but how and when I am not informed, unless it be on the assumption that all money received by Ryan on the Matteawan job and not put into it should have been applied to the mortgage and not used on the Canal job. But Ryan was agent of the Mohawk Company for receiving the money and, so far as appears, for paying it out, and it- does not appear that he violated any duty or instructions in carrying on the work on both contracts so long as he did and so long as he had money belonging to the Mohawk Company.
I am therefore forced to the conclusion that this mortgage is a good and valid security for the sum of $13,000 and interest on same from the dates the various sums making it up were advanced, less $1,598.67, and for no other or greater sum or liability. This is an equity action, and it seems to me that with the parties before the court a final judgment or decree can be pronounced as to the rights of the parties under this mortgage. 1 think the trustee can sell this mortgaged property free and clear of the mortgage lien if he .can sell it for more than the sum due thereon, and, if it brings more than the $13,000 and inter■est less the said $1,598.67, he will pay the defendant the amount found due it and retain the balance. This can be done under the direction of the referee approved by the court. Or on payment to the surety company, the defendant, of the sum of $13,000 and interest less the sum named, the trustee will be entitled to a cancellation and satisfaction of the mortgage.
There will be a decree that the sum now secured by the mortgage is $13,000 and interest as stated, and that it is a good and valid security for that sum less $1,598.67 and no more, and; to that 'extent and no more, a lien on the real estate described therein; that on payment of •such sum of $13,000 and interest thereon less $1,598.67 to the Bankers’ Surety Company the trustee will be entitled to a satisfaction or cancellation of such mortgage which the defendant will be directed to execute and deliver. In the meantime the defendant will be enjoined and restrained from foreclosing the mortgage.
63 N. E. 829.