Hindustan Zinc Ltd. v. Tennant, Sons & Co.
Hindustan Zinc Ltd. v. Tennant, Sons & Co.
Opinion of the Court
This case concerns a contract for the long-term supply of zinc concentrates between an Indian zinc smelter and an international trader of metals, ores and concentrates based in New York. Plaintiff Hindustan Zinc Limited (“HZL”), the buyer under the contract, seeks damages from defendant C. Tennant, Sons & Co. of New York (“Tennant”), the seller, for its failure to deliver eight shipments during the period 1977-81. Tennant counterclaims for damages relating to the same shipments on the ground that HZL wrongfully rejected Tennant’s offers of conforming material.
After hearing the testimony of eight witnesses at trial — including experts for both sides, reading the deposition testimony of several other witnesses, and examining hundreds of pages of documentary exhibits, I find this to be the rare case in which the parties to an ambiguous contract had such fundamentally different meanings in mind when they ostensibly agreed on terms that the contract is void under the doctrine of unilateral mistake. Alternatively, I find that even if the contract were not void, neither party has adduced sufficient proof of damages to support a money judgment in its favor.
I.
HZL is a corporation owned and controlled by the government of India which operates domestic lead-zinc mines and refineries, including an electrolytic zinc refinery in Viaskhapatnem on the southeast coast of India which is known as the Vizag smelter.
The number and amount of both payable elements and impurities found in concentrates vary substantially depending on the mine source, and may also vary between ores taken from different parts of the same mine. Contracts for the supply of zinc concentrate generally specify either the mine source of the concentrate or the assay — expressed as a percentage for each of as many as 25 named ingredients — of the concentrate expected to be delivered under the contract. The purchase price is generally expressed as a percentage of the currently reported price of zinc and each other element designated as payable under the contract, less a negotiated deduction known as a “treatment charge,” with some provision for the allocation of freight costs between buyer and seller.
The most common method for the commercial recovery of refined zinc is the electrolytic process. This process involves several stages in which impurities are removed, reduced, or separated by the use of heat or chemical additives before the final product emerges as zinc ingot. It is in the nature of the process that the non-zinc residue recirculates in the smelting system. If the impurities contained in the concentrate are not removed or sufficiently controlled in the roasting or purification stages, the extraction of zinc may be impaired or the final product rendered substandard. The cyclical nature of the process complicates these problems by permitting the buildup of both impurities and chemical additives. Although most electrolytic smelters use the same basic process, they vary significantly in the design of the purification stage. • Plants constructed to utilize specific concentrates of known composition from captive sources such as a mine owned by the smelter are designed with less complex, less flexible purification capabilities than “custom” smelters built to process concentrates from diverse sources.
The Vizag smelter was designed as a custom smelter by a Polish engineering firm under a contract with the Indian government. The parties agree that the engineering firm’s assay specifications for concentrate suitable for the Vizag smelter were so restrictive that no known mine production would conform.
Although construction of the Vizag smelter was not substantially completed until 1977, HZL in 1971 solicited offers from a number of producers and traders, including Tennant, for the long-term supply of concentrate for the new smelter. The solicitation letter described the facility as a new electrolytic smelter which was intended to process concentrate entirely imported from outside India.
Following the solicitation of supply proposals, representatives of Tennant and HZL corresponded and met periodically regarding the terms pursuant to which Tennant might provide concentrate to the Vizag smelter as well as HZL’s other refinery, the Debari smelter in northwest India. In the early exchanges of proposals, HZL described the material it would require by listing “permissible limits” of each of over 20 elements, expressed either as decimal percentages followed by the words “maxi
We have a great number of small productions of zinc concentrates available to us in Mexico, Peru and Canada and naturally the assays tend to vary to a large extent between productions. For this reason it is almost impossible to advise comprehensive assays for all productions, and indeed it is not usually the smelter’s practice to insist on assays for very minor or trace elements. I do not think that we have any productions available to us which would meet the permissible limits which you have set for zinc concentrates, in every respect. Accordingly if you have no flexibility in these limits, there may be no way for us to do business together.9
In November 1971, Tennant sent HZL a pro-forma contract containing specifications equivalent to earlier assays discussed by the parties but preceded by the words “zinc ores assaying typically.”
Representatives of HZL and Tennant met several times in London in November 1972 to negotiate a long-term supply contract for the Vizag smelter. The only available witnesses to the London meetings — Miguel Cantella, a Tennant Vice President and head of its ores department, and S.N. Roy, HZL’s Senior Electrical Engineer — did not testify at trial although both were deposed. HZL refused Tennant’s request that Mr. Roy, who is still employed by HZL, be present to testify at trial. The recollections of Messrs. Cantella and Roy do not shed much light on the 1972 negotiations. Mr. Roy stated that Tennant personnel refused HZL’s repeated requests to identify the mine sources it would use to fulfill the contract.
Subsequent correspondence between the parties reflected the agreements reached at the London negotiations,
We have a number of productions qualifying within the range of assays described in our Clause “Material”, therefore, we do not foresee any problems in supplying your refinery with the material we have under this contract.15
The final contract signed by the parties in May and July of 1973 contained a “Material” clause which reads:
Flotation zinc concentrates assaying approximately as follows:
Zn [zinc] 52-54%
Pb [lead] 1.2-2.5%
Cd [cadmium] 0.2-0.5%
Fe [iron] 5.0-6.5%
Cu [copper] 0.2-0.5%
Mn [manganese] 0.2-0.3%
As [arsenic] 0.1-0.2%
Sb [antimony] 0.05-0.10%
*1004 S [sulfur] 30-32%
Co [cobalt] 0.002% Maximum
Ni [nickel] 0.002% Maximum
Ge [germanium] 0.002% Maximum
Sn [tin] 0.004% Maximum
CaO [calcium oxide]
MgO [magnesium oxide] 1.0- 1.5%
Si02 [silica] 1.0- 1.5%
Cl [chlorine] 0.06% Maximum
A1203 [aluminum oxide] 0.5-1.0%
F [fluorine] 0.01% Maximum
Au [gold] Trace
Ag [silver] 2.0- 6.0 oz/DMT [dry metric ton]
H20 [water] 6-8%
The contract specified deliveries of “about 12,000 metric tons per year from July, 1975 through July, 1980.” The parties agree that they know of no mine source from which zinc concentrates conforming precisely to the numerical specifications in the contract could have been obtained.
During 1974-75 Tennant offered five concentrates of varying assays for shipment under the contract’s delivery schedule.
In early 1976 Tennant proposed another shipment, which HZL accepted, and 6000 metric tons of material were shipped aboard the vessel Atlantic Hawk in April, arriving in India in June 1976. The assay of this concentrate, as described in Tennant’s offer, fell within the contract specifications, with the exception of the percentage for calcium oxide.
In December 1976 HZL informed Tennant that the Vizag smelter would not be operational prior to the first quarter of 1977 and that no further shipments of concentrates would be required until the first quarter of 1978.
Representatives of Tennant and HZL met in New York in September and October of 1977 to discuss the renegotiation requested by HZL. Among the Tennant delegation were Mr. Cantella and Stephen Naegle, manager of zinc concentrate trading during the relevant period, who testified at trial. Included in the HZL negotiating team was B.D. Sharma, then head of HZL’s commercial division, who also testified at trial. The result of the meetings was an amendment to the contract, signed by both sides and dated October 6, 1977, which in essence rescheduled and reduced the volume of concentrate shipments under the contract (the 54,000 tons of undelivered 1975-80 shipments were converted into eight semi-annual shipments of 6000 tons each to begin in December 1977 and end in June 1981), increased the treatment charge (a deduction from the contract price) from $67 to $136 per ton, and raised the freight cost absorbed by the seller from $15.50 to $25 per ton with any excess to be borne equally by the parties (instead of by HZL alone, as under the original contract).
The parties strongly disagree about what was said in the course of the negotiations about concentrate specifications. Mr. Sharma testified at trial that the HZL representatives requested that the specifications in the existing contract be made tighter by replacing the percentage ranges with maximum and minimum numbers or, alternatively, that Tennant should identify a particular mine source, but that the Tennant representatives refused both requests, stating that they preferred to retain the original contract specifications and would have no difficulty meeting them.
Days after the contract amendment was signed in October 1977, Tennant sent HZL an assay of the material it proposed to use to fulfill the December 1977 shipment, the first delivery under the amended contract’s revised shipment schedule.
In late November HZL wired Tennant that a letter of credit for the December 1977 shipment would be opened as soon as “detailed assays and freight rate” were provided.
Thereafter Tennant proposed shipment of actual Peruvian San Vicente concen
Although additional efforts were made by Tennant to secure Pine Point concentrate in May 1978, curtailed mine production made a purchase from Comineo impossible
We find it impossible to locate concentrates that meet the contract specifications so we are forced to say that unless you express your willingness to acceptably change the assay ranges and limits we will be forced to declare force majeure.61
Tennant made several further offers of concentrates to HZL before and after the May 1 communication, including May 31 and June 8 offers of four concentrates which included material from the San Vicente, Woodlawn, and Broken Hill mines which Tennant maintains were approved at the 1977 negotiations.
There was testimony at trial about the system used by HZL to determine whether concentrates proposed by Tennant were acceptable under the contract. Mr. Sharma explained that each time an offer was made, his department, the Commercial Division, would compare each specification in the assay of the offered material with the specifications in the contract. If a single “critical” element — which was defined to include cobalt, nickel, germanium, tin, chlorine, and fluorine
II.
In accordance with the contract’s choice of law clause, this action is governed by the law of Great Britain.
Consequently, both sides argue that their interpretation of the contract is the most reasonable under the circumstances that existed between the parties and in the zinc concentrate business at the times the original contract and the 1977 amendment were signed. HZL contends that the contract should be read as requiring delivery of zinc concentrates which were the closest commercially available equivalent to the specifications in the contract. HZL argues that the assay it requested at the time of the original contract negotiations made clear that it intended to procure a particularly clean grade of concentrate, and the use of máximums in the specifications was intended to limit the amount of certain impurities that posed a problem for the Yizag smelter. According to HZL, the inclusion of “approximately” preceding the assay ranges could only be understood by the parties to have afforded minimal leeway in order to
Tennant contends that the parties intended that the approximate assay specifications in the contract would be flexible enough to include the material offered by Tennant. According to Tennant, its interpretation of the contract is the more reasonable one in light of the exchange of correspondence and discussions between the parties leading up to the 1973 contract, the primitive nature of concentrate production (i.e., the lack of uniformity in both mining and concentrate preparation from day to day even at a single mine source), and the expected processing capacity of what HZL represented to be a modern electrolytic refinery. Tennant argues that its interpretation of the contract is also supported by the parties’ agreement during the 1977 renegotiations that four specific mine productions — each varying to some extent from the contract assay — would be acceptable to HZL.
What the parties have succeeded in demonstrating is not that either of their interpretations of the contract is the more reasonable but rather that each entered into and emerged from contract negotiations— not once, but twice — with radically different notions of what Tennant was required to supply and HZL required to accept under the contract. This is not to say, however, that the parties’ understandings of the meaning of the contract terms were unreasonable.
Tennant correctly points out that HZL’s original solicitation described the Vizag smelter as a modern electrolytic custom smelter, not as an outmoded facility that could process only super clean concentrates, and Tennant’s expert, Jacques Jerusalem, a man with 30 years experience purchasing zinc concentrates, testified that most of the concentrates Tennant offered would have been usable by normal modern electrolytic plants.
For its part, HZL could reasonably have understood the contract it signed with Tennant to impose strict requirements for the supply of concentrate. Although Tennant balked in 1971 at the imposition of such comprehensive and precise limits, by 1973 it not only agreed to HZL’s request for the specification “maximum” following certain elements but assured HZL that it had a number of productions conforming to the assay range in the contract. Moreover, if Mr. Sharma’s recollection of the 1977 renegotiations is credited, Tennant was content to continue to proceed under the original contract specifications even after HZL had repeatedly rejected Tennant’s proposed concentrates in 1974-75. In addition, the offer and acceptance of the Atlantic Hawk material had demonstrated by the time of the renegotiations that Tennant was capa
The only conclusion that can be reached under all the circumstances of the making of the contract and its renegotiation is that Tennant and HZL had entirely different meanings in mind when they described the material to be delivered pursuant to the contract. Under British law the contract is therefore void according to the doctrine of unilateral mistake, and neither side can be held liable for breach of contract.
The terms offered by a party (including his description of the subject-matter) may contain a latent ambiguity, so that they may reasonably be understood by the offeree in a sense other than that which was quite as reasonably intended by the offeror. If the parties are genuinely at cross-purposes in this way, the contract is void for want of certainty.
Benjamin’s Sale of Goods § 216 (1974). Although the doctrine of unilateral mistake is utilized restrictively in Great Britain, it appears to apply in this case.
In most eases the application of the objective test [i.e., the language used by one party, whatever his real intention, is to be construed in the sense in which it would be reasonably understood by the other] will preclude a party who has entered into a contract under a mistake from setting up his mistake as a defence to an action against him for breach of contract. If a reasonable man would have understood the contract in a certain sense, then, despite his mistake, the court will hold that the mistaken party is bound. But where parties are genuinely at cross-purposes as to the subject matter of the contract and the terms of the offer and acceptance are so ambiguous that it is not possible to point to one or other of the interpretations as the more probable, the court must necessarily hold that no contract exists.
Chitty on Contracts § 330 (25th ed. 1983).
The parties’ persistence in their respective intentions with regard to the contract specifications is evident from the comedy of errors that was played out in the year following the signing of the amendment. As Tennant continued to offer and HZL continued to reject various shipments during 1977-78, their communications often evinced genuine surprise, frustration, and even insult at what each perceived to be the other’s inexplicable behavior. Amazingly, even after numerous abortive attempts at delivery, a full-scale contract renegotiation, and countless telex communications, the parties appeared to inhabit different commercial worlds.
This case presents the rare instance in which both parties are mistaken as regards the other’s intention and neither party’s understanding is objectively correct. See, e.g., Raffles v. Wichelhaus, 159 Eng.Rep. 375, 2 Hurl. & C. 906 (Ex. 1864) (buyer and seller entered into contract for the sale of cotton due to arrive aboard the “Peerless” from Bombay, where unknown to the parties there were two ships of that name coming from Bombay, one in October and one in December, and each party contemplated delivery aboard a different vessel). A careful discussion of the case law governing a situation such as this, in which it can be said that “the parties are not ad idem as to the subject matter of the agreement” or that “there was a failure to have a true meeting of the minds as to the subject matter of the agreement,” is contained in CH Pearce & Sons Ltd. v. Stone-
III.
Even if either side had been able to show that its interpretation of the terms of the contract was objectively reasonable or that the other party actually understood the contract in the same way, I would still conclude that no damages should be awarded since neither party has succeeded in proving its damages.
A.
Because HZL made no cover purchases, it seeks damages for non-delivery on the theory contained in § 51(3) of the United Kingdom Sale of Goods Act (1979), which provides: “Where there is an available market for the goods in question the measure of damages of prima facie to be ascertained by the difference between the contract price and the market or current price of the goods at the time or times when they ought to have been delivered____” HZL’s expert, Mr. Marvin, who was responsible for the purchase and sale of zinc concentrates for New Jersey Zinc Company from 1976 to 1981, was the architect of HZL’s damage calculation.
Tennant challenges HZL’s damage claim on a number of grounds. Tennant contends that awarding HZL damages would grant it a windfall because as a result of production problems with the Vizag smelter and the ensuing excessive concentrate inventories,
At the heart of HZL’s revised damage calculation is the spot market price premium. In order to determine this premium during the period covered by the contract between the parties, HZL’s expert drew a curve, labelled a trend line, by extrapolating from what appear to be six points, each representing the price paid for an actual shipment of zinc concentrate purchased on the spot market.
There are serious flaws in this presentation. In the first place, HZL’s expert did not produce at trial the actual contracts from which the six key price points were calculated,
A different problem with the damage calculation — apart from the inability to verify the underlying data and the way it was calculated — is the validity of the process used to derive the spot market price differential. As an initial matter, it is not at all clear how the crucial curve, which is intended to cover a four-year period, was drawn. It appears to have been traced not by extrapolating from clusters of many spot prices but rather by connecting six discrete
The upshot of this analysis is that HZL’s case for damages is far too uncertain to permit the granting of any more than nominal damages even if it had proved that Tennant had breached the contract.
B.
Less need be said on the score of Tennant’s proof of damages on its counterclaim. Tennant contends that, relying on HZL’s commitment to purchase 12,000 tons of concentrate per year beginning in 1975, it accumulated sufficient material to fulfill its obligations under the contract and suffered losses when during 1977-78 it sold 45,000 tons of concentrates which represented its excess inventories resulting from HZL’s failure to accept Tennant’s proposed shipments. Mr. Naegle testified that Tennant began drawing down these inventories as early as the summer of 1977 in light of the difficulties encountered in making shipments under the contract up to that time and continued to sell off such material through 1978.
The fatal flaw in Tennant’s damage presentation is the absence of any satisfactory explanation of how the particular concentrates claimed to have been accumulated to satisfy the HZL contract were selected from the total inventory. Tennant’s principal expert witness on damages testified that before he performed the damage calculations other Tennant officials instructed him that there were a series of sales that were made in regard to HZL.
HZL correctly points out a number of problems with the concentrates that were selected, taken as a group, that call into question the method of selection. First, little attempt was made at trial to show that the concentrates used for Tennant’s
Consequently, Tennant too has failed to make out a case for damages.
In sum, I conclude that the contract between the parties is void under the doctrine of unilateral mistake, and alternatively, that neither party has succeeded in proving its damages. This Memorandum constitutes my findings of fact and conclusions of law as required by Rule 52 of the Federal Rules of Civil Procedure. For all the reasons expressed above, judgment is granted dismissing the complaint and dismissing Tennant’s counterclaim.
It is so ordered.
. Unless otherwise indicated, the facts found by the court are drawn from the extensive stipulations of fact entered into by the parties prior to trial. See Joint Pre-Trial Order at 1-21 (Jan. 9, 1987) (hereafter "PTO”).
. PTO, Stipulated Fact No. 18 & Appendix (hereafter "App") A.
. Trial Transcript (hereafter "Tr.”) at 58-59.
. Plaintiffs Post-Trial Brief at 2 n. 3 (June 17, 1987).
. Plaintiff's Exhibit (hereafter “PX”) 3 at 1.
. Id. at 3.
. PX 3; PX 5; PX 16. It is not clear what the parties understood the specification "trace” to mean. Aubrey Fletcher, the Tennant executive who signed the original contract, defined the term as an amount sufficient to be detected but not measured with precision, such as ,001-.003%. Fletcher Deposition (hereafter "Dep.”) at 420/167. HZL engineer S.N. Roy, who participated in the negotiation of the contract, stated that the term meant less than .001%. Roy Dep. at 423.
. PX 4; PX 6; PX 13-14 [PX 14 incorporates PX 13’s specifications].
. PX 6 at 1.
. PX 17 at 2.
. Roy Dep. at 419.
. Cantella Dep. at 191-92, 203.
. Roy Dep. at 434; Cantella Dep. at 193.
. PXX 29, 30, 31, 33.
. PX 30 at 1.
. PX 1 at 1.
. PTO, Stipulated Fact 24.
. PTO, App. J at 1.
. PXX 36, 44, 46, 52.
. PX 39.
. PX 40.
. PX 41.
. PTO, App. J at 1. The parties appear to agree that the material shipped aboard the Atlantic Hawk was a blend of concentrates. Cantella Dep. at 320-21. Mr. Cantella testified that Tennant in the normal course of its business blended concentrates from different sources in order to meet the specifications contained in particular contracts. Id. at 92-100.
. Tr. at 772-85 (testimony of Stephen Naegle).
. PX 60.
. PX 64; PTO, App. K.
. PTO, App. J at 1.
. PXX 66, 67, 68.
. PX 61.
. Compare PX 2 (1977 amendment) with PX 1 (original contract).
. PX 2 at 2.
. Tr. at 230-31, 364-66.
. Tr. at 233-34.
. Cantella Dep. at 290, 299-300, 308-09.
. Id. at 300-01, 304-06.
. Tr. at 811-13.
. Tr. at 815-16.
. Tr. at 816-18.
. PX 62.
. Tr. at 820-21 (Naegle). In this instance, Tenant traded Bolivian concentrate, which contained high levels of silver and indium as well as a number of impurities which posed problems for the Vizag smelter, to Comineo, the owner of the Pine Point mine and itself the owner of a complex refinery with the ability to recover silver and indium — both precious metals — and cope with high levels of other impurities. Thus, to Comineo, the relatively less “clean” Bolivian concentrate was more valuable than its own Pine Point production, while HZL required "clean" concentrate and could not recover either silver or indium. See Cantella Dep. at 123, 135. Swapping was one of the methods Tenant relied on in the normal course of its business to fulfill its contract obligations. Id. at 146-47.
. PX 64.
. PX 68.
. PX 66 (telex to Tenant’s agent requesting moisture content); Tr. at 375-76 (Sharma).
. PX 69.
. PX 70.
. PX 77.
. PXX 73, 74, 75.
. PXX 76, 78.
. PX 79.
. PX 81.
. PX 82B.
. Tr. at 834-35 (Naegle).
. PX 83.
. Defendant’s Exhibit (hereafter “DX") 78.
. PX 84.
. PX 86.
. PX 87.
. Tr. at 842-43.
. Tr. at 843-44; PXX 89, 91.
. PX 94.
. PX 91.
. PXX 96, 99.
. PXX 98, 101.
. PX 105.
. PX 107; PX 1 at 6 (force majeure clause in contract).
. Mr. Wadhawan also included arsenic and antimony in his list of critical impurities. Tr. at 21.
. Tr. at 215-16, 294-97.
. Tr. at 298-99, 301-03.
. Tr. at 120-21, 123-28.
. PX 1 at 6.
. Tr. at 673-80; 708-10.
. Tr. at 491-501.
. Tr. at 435-60.
. PX 127.
. PX 125.
. PX 128.
. This first calculation compared the price of concentrate shipments containing payable zinc content as specified in the contract with the price of named substitute concentrate shipments containing significantly higher zinc content, resulting in a damage figure of just under $2.25 million. PX 126. HZL withdrew this calculation in mid-trial and revised it so that both contract and substitute shipments were assumed to have the same zinc content, resulting in a damage figure of under $1.43 million. PX 142.
. The parties vigorously disagree about the levels of concentrate inventory at the Vizag facility during the relevant period. Compare DXX 163-69 with Plaintiffs Objections to Exhibits D-163 to D-169 Inclusive (June 23, 1987).
. PX 128. The prices used in the graph are expressed as percentages of the market price for refined zinc.
. PX 142 at line 6(b).
. Tr. at 593-94, 597.
. Tr. at 594-95, 599-606.
. DX 144 at 13-17.
. E.g., Tr. at 477 (responding at deposition to question about a point on the graph: "I don't know. I can’t verify that at all. I don’t know what the hell that is.”); Tr. at 586 (responding to question why certain concentrates were selected for use in damage calculation chart: "I just selected them.”); Tr. at 608 (responding to question about method by which contract prices based on U.S. prices were converted to percentages of European Producer Price: “If that gives you that figure, why, that’s what I did, yes.”).
. Tr. at 606-14.
. PX 125.
. Tr. at 481-571.
. PX 128. To add to the mystery, the six points appear not to correspond to actual spot contract prices but to the points used as references for calculation of the spot premium on the contract shipment dates. One would expect the tracing of the curve to precede the determination of the points on the curve which correspond to the shipment dates.
. Tr. at 594.
. Tr. at 847-52.
. DX 158 at 2; Tr. at 956-57 (Thomas Mulhere, Tennant metals and raw materials trader).
. Tr. at 957, 979-80.
. Tr. at 980.
. Assays for some of the concentrates used in Tennant’s damage calculation are collected at PTO, App. R.
. See note 40 supra. Of course, the Bolivian concentrate was a perennial candidate for a swap with Comineo for Pine Point concentrate, which was acceptable to HZL; however, Tennant made no attempt to show that such swaps were likely or even possible at particular shipment dates under the contract or whether the Bolivian concentrate was acquired for the express purpose of effecting such swaps.
. DX 158 at 1.
. Plaintiffs Post-Trial Brief at 29 n. 28; DX 158.
. DX 158 at 2, references A, A-l, B, C.
Reference
- Full Case Name
- HINDUSTAN ZINC LIMITED v. C. TENNANT, SONS & CO., OF NEW YORK
- Status
- Published