Flannery v. Sahagian
Opinion of the Court
This action was brought to recover a balance due upon a building contract, and for extra work. Under the findings of the learned referee, there was not a substantial performance of the contract. There was a failure to comply with the specifications, in very material matters, and the referee found the omitted work could not now be done, “except at great cost, and with great risk to the building.” It is only inadvertent and unimportant omissions or defects, and such as may be remedied by slight expenditures, that may be disregarded in a building contract. In this case the building has not been, and cannot be, completed as the plaintiff agreed to build it. In Oberlies v. Bullinger, 132 N. Y. 598, 30 N. E. 999, there was an error in the construction, by which the ridge of the roof was five inches lower than called for by the plans. This error did not affect the appearance or utility of the building, and, as it appeared in proof that all other defects were remedied by the contractor, it was held that there was a substantial performance of the contract. But in this case there is not only a failure to make the ceiling of the north store of the height required by the contract, but the cellar ceilings are in some places nearly two feet lower than the specifications re
Case-law data current through December 31, 2025. Source: CourtListener bulk data.