I. Koblitz & Son v. Duffie
Opinion of the Court
The actions are to foreclose two mechanics liens in part, and also to marshall the liens upon the property sought to be charged.
I. Koblitz & Son did a large amount of plumbing work upon a number of buildings situated upon lots fronting on Nantucket street and also upon a number of buildings situated upon Kensington street. These buildings were erected upon contiguous lots. Two liens were prepared and filed; one for materials and labor furnished and performed in doing the plumbing work upon the buildings on Nantucket street and the other for the material and labor furnished and performed in doing the plumbing work on the buildings on Kensington street. Each of these liens covered several buildings and lots on each of the streets; while the action in each case is to foreclose the lien upon one of the buildings and the lot upon which the building stands. The suit must be maintained under favor of either Sec. 3184 R. S. (Sec. 8308 G. C.) or Sec. 3184Z> R. S. (See. 8310 G. C.) for the reason that the legislature having made provision for mechanic’s liens and providing how the same may be obtained and enforced these provisions are exclusive.
It must be conceded that under Sec. 3184 (8308) the con
In this ease each building was situated upon a distinct lot and the lot and building was complete in itself, therefore the lien necessarily should have been taken out on each building and lot. Reliance is placed on Sec. 3184 (8308). It is, however, said that the liens can be supported and are effective under See. 3184d R. S. (Sec. 8311 Gr. C.). That no doubt would be true if the contract under which the materials were furnished and labor performed came under the provisions of Sec. 3184d (8311). It will be observed that this section supplements Sec. 3184 (8308), and it provides:
“When the improvement consists of two or more buildings united together and sitting upon the same lot or contiguous lots or upon separate buildings upon contiguous lots and erected under one general contract, it shall not be necessary to file a separate lien upon each building for the work done or material furnished on the erection of such improvements.”
In order to make this section apply, the buildings must be erected under one general contract for the same. That is, the buildings must be erected under a contract that they are to be erected upon one lot. The word “general” refers to all the buildings to be erected, that is generally to the buildings, but there must be a contract in refereneeNo the particular buildings and the particular lots.
The contract shown in these cases does not refer to any particular lot or lots, or whether the lots were contiguous or not. This contract, it is true, was general, entirely too general. The contract was to do all the plumbing work for James F. Stevens at any place in the city and of all character and description, and had no particular reference to these particular lots or buildings upon these two streets, and if the plaintiffs desire to secure themselves by the mechanic’s lien it should have been taken out
The decree will be in favor of the defendants, dismissing the petitions of plaintiffs in each case. If the intervenors desire any finding and decree upon their cross-petitions they can have the entry so provide, as we understand that there is no contention between those parties.