Gerber v. Philadelphia
Gerber v. Philadelphia
Opinion of the Court
Opinion by
Fishers lane, now Lindley avenue, was confirmed to a width of sixty feet by the bureau of surveys of the city of Philadelphia on December 19, 1892, and so appeared on the city plan on October 9, 1912. The traveled way within the street lines occupied but thirty-three feet of this width. The city of Philadelphia, by ordinance of December 2, 1911, directed the street to be enlarged to its full width. Within three months afterwards the property owners were notified and on Jun,e 7, 1912, the city filed its bond to the property owners for the additional land outside the traveled way necessary to make the full width of sixty feet. Under its title thus acquired, the city proceeded to subject the unused part of the street to a public use, by constructing through it a sewer line running parallel with the traveled carriageway or highway. A contract was let to one Crowley for the work, which was started October 2, 1912. No attempt was made to close the street to public travel. This unused portion of the street separated a number of houses on the north side from Vhe traveled carriageway and sidewalk on the south side of the street. After the construction of the sewer
When the city so subjected the land it had acquired ■for the use contemplated, it was bound to use every reasonable precaution to prevent injuries to those who might use the highway in obtaining ingress and egress over the improvement to and from the buildings abutting thereon. What is required is reasonably safe precautions considering the nature and character of the work and the extent of travel- it was necessarily subjected to. If the city had closed the street to public travel and provided other means to reach the property, this plaintiff would have been bound thereby. When temporary crossings were placed as described in front of the houses, as an invitation to those occupying the.
The street having been left open for public travel, with the temporary crossings in place, brings the case in line with Johnson Co. v. Philadelphia, 236 Pa. 510, as to the liability of municipalities for injuries resulting from the work of an independent contractor in repairing a street. .
The fact that the work had actually started on October 2nd, the depth and length of the trench, with the temporary crossings in place for some time, was evidence from which the jury might find constructive notice. It is questionable if the letting of the contract itself was not sufficient notice to the city. The fourth and fifth assignments of error are overruled.
Complaint is made of the failure of the court to instruct the jury as to the proper measure of damages, in that it failed to particularly instruct that compensation to be allowed for any future loss of earnings must be its present worth. All that is said by the learned court with relation to future loss of earnings is embraced within the eighth assignment of error. It has been definitely decided that the failure to charge as to the present worth of future earnings and how they can be arrived at should not be treated as an inadequacy of charge, but as an erroneous charge. The authorities with respect to inadequacy of charge on the question of the measure of damages, where the verdict is reasonable and moderate, do not control, where the court failed to specifically charge on this essential element in connection with the measure of damages. As stated in Wilkinson v. N. E. Boro., 215 Pa. 486, “Under
The first, second, third, sixth and seventh assignments, specifying errors in the charge of the court, are not material. Beyond the exception of the error just noted the charge was eminently fair. In it the learned judge explained the many objections raised by counsel for the appellant. The case was carefully tried and the verdict in view of the evidence was quite moderate. With the exception of the eighth assignment of error, all other assignments of error are overruled.
The judgment is reversed and a venire facias de novo is awarded.
Reference
- Cited By
- 9 cases
- Status
- Published
- Syllabus
- Negligence — Municipalities—Open trench in street — Contributory negligence — Case for jury. 1. Where a city has by proper proceedings widened a street which was actually built up, and thereafter through a contractor opened a trench along the untraveled portion of the street for the purpose of constructing a sewer, and places temporary crossings over the trench in front of the houses, as an invitation to those occupying the houses and those visiting them to use the crossings, the city is bound properly to guard and light such crossing at night as will reasonably protect persons using them; and if a woman in the night-time attempts to use one of the crossings without negligence on her part, and falls into the trench and is injured, the city is liable to pay her for the injuries which she had sustained. 2. In such a case if the woman has but a vague knowledge of the existence of the trench, and there is no light at the crossing to guide her, or barriers along the side to protect her, she cannot be charged with contributory negligence as a matter of law in attempting the crossing. 3. Where a city lets out a contract for the construction of a sewer in a street, and the contractor opens a trench in the street, and a person is injured one week thereafter by falling into the trench a jury may find that the city had constructive notice of the existence of the trench. Negligence — Damages—Loss of earnings. 4. In a negligence case failure on the part of the trial judge to charge as to the present worth of future earnings and how they may be arrived at, is not to be treated as an inadequacy of charge, but as reversible error, and this is the case although no request is made by either side for specific instructions on the subject.