Brenton's Cove Condo Assoc. v. Tikoian, 03-6066 (r.I.super. 2005)
Opinion of the Court
The DEM filed a Special Exception application on March 5, 2003. The CRMC held a public hearing with respect to the application on June 10, 2003, at which time a variety of evidence was introduced for consideration. The CRMC heard testimony from both proponents and objectors. Several members of the Association testified regarding the negative impact this dock would have on the birds in the area and the water quality. (Tr. at 81-82.) Other members of the public testified in favor of the Special Exception, citing safety and public need. (Tr. at 84-87.) CRMC staff engineering and biological findings were also introduced into evidence.
In the CMRC's Engineering Review ("Engineering Review"), the staff found that the courtesy ramp would be available to the public with access to the shore, would enhance the safety and function of the existing facility, would not represent an expansion to the boat ramp or boating in the nearby harbor, and would not result in any negative environmental impact. Engineering Review at p. 1. Furthermore, the Engineering Review found that because the DEM's proposal was to enhance the existing ramp, there would be no other reasonable alternative available to fulfill that purpose. Id.
The CRMC Biologist's Report ("Biologist Report") noted that impact to the natural area currently exists due to the current use at Fort Adams. Biologist Report at p. 1. It also found that the courtesy ramp as proposed by DEM would appear to have minimal impact on coastal biological processes. Id. Consequently, it concluded that there would be "no biological objections to this project provided the `assent stipulations' are strictly adhered to." Id.
Following the public hearing, the CRMC reached a unanimous decision granting the Special Exception. The CRMC noted that it was adopting and incorporating the findings made by the CRMC staff that the dock would have minimal biological effects on the environment and that it would be safe from an engineering perspective. Furthermore, the CRMC found that the DEM had met its required burden of proof. Specifically, the CRMC concluded that the courtesy dock would:
"a. Serve a compelling public purpose which does provide benefits to the public as a whole as opposed to individual or private interests; b. All reasonable steps have been taken to minimize environmental impacts and/or use conflicts; c. There is no reasonable alternative means of, or location for serving, the compelling public purpose cited." (CRMC Decision at 3.)
The Association subsequently filed an appeal to this Court. In essence, the Association contends that CRMC in granting the Special Exception erred in finding that DEM had met its burden of proof, failed to adhere to its own policy regarding the subject water, and/or otherwise contravened the provisions of the Federal Clean Water Act,
"The court shall not substitute its judgment for that of the agency as to the weight of the evidence on questions of fact. The court may affirm the decision of the agency or remand the case for further proceedings, or it may reverse or modify the decision if substantial rights of the appellant have been prejudiced because the administrative findings, inferences, conclusions, or decisions are:
(1) In violation of constitutional or statutory provisions;
(2) In excess of the statutory authority of the agency;
(3) Made upon unlawful procedure;
(4) Affected by other error or law; [sic]
(5) Clearly erroneous in view of the reliable, probative, and substantial evidence on the whole record; or
(6) Arbitrary or capricious or characterized by abuse of discretion or clearly unwarranted exercise of discretion. G.L. §
42-35-15 (g)(1).
In reviewing decisions of administrative agencies, the Superior Court sits without a jury and confines its review to the record. EnvironmentalScientific Corporation v. Durfee,
Turning to the first requirement, there is considerable record evidence to support the conclusion that the Special Exception would serve a compelling public purpose. There is substantial evidence that the proposed courtesy ramp will enhance use of the facility. There is also considerable evidence that the courtesy ramp will provide greater public access to Brenton's Cove and Newport Harbor, more generally. Furthermore, the evidence supports the conclusion that the ramp will provide a safe means for boaters to embark and disembark their vessels.
Regarding the second requirement, there is substantial evidence which demonstrates that the proposed courtesy ramp will have minimal impact on the surrounding environment while carrying out its intended purpose. The size of the ramp allows it to effectuate the CRMC's objectives of safety while the physical habitat is minimally impacted. There is also evidence that the ramp will aid in lowering emissions while maintaining the current amount of users.
As relates to the last requirement, there is sufficient evidence to demonstrate that there is no reasonable alternative location for this courtesy ramp. The alternatives for the location of the ramp were considered in the preliminary stages of planning. However, they were found to be impracticable. At a meeting with the Newport Waterfront Commission, other options were considered for a location of this ramp, and, again, no other location was found. The removal and relocation of the entire ramp was considered to have a negative environmental impact, as well.
There is nothing in the record to suggest that the evidence was misconstrued by CRMC when it approved the Special Exception.1 Putting aside the testimonial evidence, the numerous exhibits, including site plans, photographs, engineering reviews, biological report, water quality certifications, and preservation reports, are more than adequate for CRMC to conclude that each of the three elements had been proven. Although various members of the Association opposed the granting of the Special Exception, the CRMC was not constrained to accept that testimony over the compelling body of countervailing evidence as discussed previously. There is simply no basis in law or fact for this Court to reverse the findings made by CRMC. To the contrary, the evidence clearly demonstrates that the CRMC's findings were well supported by legally competent evidence.
On the basis of the entire record, it is apparent that the CRMC has not ignored its own general policy regarding Type 1 waters. Although the courtesy dock may be a prohibited use and the CRMC's goal is to eliminate any such non-conforming use as provided in Section 200.1C.3 of the CRMP, it is equally clear that the CRMC had the authority to grant the Special Exception and in doing so made the relevant inquiry and necessary findings.
The CRMC has been given broad authority to develop policies in order to effectuate the primary goal of the CRMC, which is to "preserve, protect, develop, and where possible, restore the coastal resources of the state for this and succeeding generations. . . ." Section
". . . approve, modify, set conditions for, or reject the design, location, construction, alteration, and operation of specified activities or land uses when these are related to a water area under the agency's jurisdiction, regardless of their actual location."
Furthermore, §§
"shall be required to demonstrate that its proposal would not (I) Conflict with any resources management plan or program; (II) Make any area unsuitable for any uses or activities to which it is allocated by a resources management plan or program adopted by the council; or (III) Significantly damage the environment of the coastal region."
The CRMC possesses broad powers to enact rules in order to regulate specific tidal waters in Rhode Island and is bound by both the enabling legislation and its promulgated rules. Id. At 9. Furthermore, any proposal that may have an effect on tidal waters must not conflict with the CRMP, and it must be adopted by the CRMC.
In fulfilling the legislative mandate of §§
"(1) The proposed activity serves a compelling public purpose which provides benefits to the public as a whole as opposed to individual or private interests. The activity must be one or more of the following: (a) an activity associated with public infrastructure such as utility, energy, communications, transportation facilities; (b) a water-dependent activity that generates substantial economic gain to the state; and/or (c) an activity that provides access to the shore for broad segments of the public.
(2) All reasonable steps shall be taken to minimize environmental impacts and/or use conflict.
(3) There is no reasonable alternative means of, or location for, serving the compelling public purpose cited."
The record demonstrates that the CRMC adhered to its own rules and regulations. Section 130 of the CRMP provides an avenue for relief from prohibited uses. Furthermore, that section establishes the factors to be considered when an applicant wishes to participate in what the CRMC delineates as a prohibited activity. All the parties involved in this matter, including the CRMC, recognize that constructing a courtesy dock is a prohibited activity in Type 1 waters. However, relief from prohibited activities may be permitted when an applicant meets the Section 130 requirements. Those standards were met at the hearing as previously found by this Court.
"(a) The State shall develop and adopt a statewide antidegradation policy and identify the methods for implementing such policy pursuant to this subpart. The antidegradation policy and implementation methods shall, at a minimum, be consistent with the following:
(1) Existing instream water uses and the level of water quality necessary to protect the existing uses shall be maintained and protected."
40 C.F.R. § 131.12 .
Section 402 (o) of the Clean Water Act, the Anti-Backsliding Program has been codified as
"(1) General Prohibition
In the case of effluent limitations, established on the basis of subsection (a)(1)(B) of this section, a permit may not be renewed, reissued, or modified on the basis of effluent guidelines promulgated under section 1314(b) of this title subsequent to the original issuance of such permit, to contain effluent limitations which are less stringent than the comparable effluent limitations in the previous permit."
The Association's contention is without merit. CRMC's decision is in compliance with applicable water quality criteria. Specifically, the Special Exception does not violate the FCWA. To argue that the Special Exception violates the "anidegradation policy" as provided in