Cfn, Inc. v. Drake Petroleum Company
Opinion of the Court
These negotiations were memorialized in an August 25, 2006 letter of intent (Letter of Intent) drafted by Drake and executed by Zabatta on September 6, 2006. (Tr. 27; Pl.'s Ex. 3.) In the Letter of Intent, Drake proposed to (1) provide CFN with a $100,000 signing bonus; (2) convert the gas station to the Sunoco Horizon Image; (3) supply Sunoco branded gasoline; and (4) provide $2,000 annually for maintenance. (Pl.'s Ex. 3.) More specifically, as part of the re-imaging process, Drake proposed:
"[r]emoval of existing mansard canopy fascia with installation of Sunoco blue vertical fascia. Will also round canopy corners with installation of new graphics, paint location, including building to specifications, provide new twin pole ID and 3 product LED price *Page 3 sign reimage dispensers, and install Horizon graphics on each side of the car wash building. Drake's total expense will be approx[imately] $40,000.00." (Pl.'s Ex. 3.)
In the months leading up to the parties' execution of the Dealer Sales Contract (Contract), Plumer assembled vendor bid proposals in order to calculate the re-imaging budget. (Def.'s Ex. C.) On December 27, 2006, the parties executed the finalized Contract and Guaranty.3 (Pl.'s Ex. 2.) In addition to stipulating the terms for the purchase and supply of gasoline, 4 Drake also agreed to provide CFN with a cash advance of $100,000 as a signing bonus and $40,000 "to install improvements at the premises, including but not limited to the installation of a new twin pole ID digital price sign, refac[ing the] canopy with Sunoco fascia and Horizon decals, re-decal[ing the] dispenser and install[ing] valances and paint[ing] premises to Sunoco specifications."5 (Pl.'s Ex. 2 ¶ 25.)
In order to repay the $140,000 loan, 6 the Contract specified that $0.0311 would be added to each gallon of gasoline actually purchased by CFN. (Pl.'s Ex. 2 ¶ 26.) By adding $0.0311 to *Page 4 each gallon, the loan would be fully amortized by the time CFN fulfilled its obligation to purchase 4,500,000 gallons of gasoline. (Pl.'s Ex. 2 ¶¶ 9, 26.) In the event the Contract was terminated early, CFN would be required to pay Drake the sum of all of the following: (1) principal balance remaining on the $140,000 loan; (2) any and all costs, expenses (including attorneys fees), and damages arising as a result of a default; and (3) any and all other sums owed by CFN. (Pl.'s Ex. 2 ¶ 26.)
As additional security for the $140,000 loan, at the time the Contract was executed, the parties concurrently executed a note, guaranty, security agreement, a mortgage securing the payment of the $140,000 loan, and a second mortgage securing the performance of obligations under the Contract (Loan Documents). (Tr. 66-68.; Pl.'s Exs. 2, 11-14.) The Loan Documents ensured that CFN's obligation to repay the loan and its performance obligations under the Contract were secured by mortgages on the Property.
Following execution of the Contract, Plumer began the re-imaging process. In January 2007, he contacted Chris Krebs (Krebs) at Everbrite — an ID sign manufacturer for Sunoco — to request the specifications for the gas station's ID sign to be used in the permit application with the City of North Providence. (Tr. 94-95, 110-11; Def.'s Ex. H.) Krebs completed the engineering drawings for the seven-foot sign in April 2007, and Plumer submitted the application. (Tr. 110-11; Def.'s Ex. G.)
Throughout the course of the re-imaging, Plumer hired the contractors and oversaw the renovations and construction at the Property. Plumer contends that at several points throughout the re-imaging, requests were made by CFN leading to expenditures exceeding what had been budgeted for in the Contract by $21,761.53 (Overruns). (Tr. 118; Def.'s Ex. J.) As a result, in *Page 5 December 2007, Plumer presented Zabatta with an Agreement to Amend Dealer Sales Contract (Amendment), which Zabatta refused to sign.7 (Tr. 61-62, 127; Pl.'s Ex. 10.)
Zabatta now contends that Drake knew about many of its requests before calculating the $40,000 budget and should have increased the loan amount under the Contract to reflect these costlier expenditures. (Pl.'s Post Trial Mem. 6.) Plumer contends that these expenditures were made after execution of the Contract and with Zabatta's knowledge that the requests would result in overages and would necessitate execution of a contract amendment. (Def.'s Reply Mem. 1.)
In the months that followed, market conditions led to reduced sales at the gas station and Zabatta's gasoline orders reduced by half. (Tr. 53-54.) As a result, Zabatta approached Plumer about a temporary allowance8 to assist CFN in competing with a new Hess station that had opened nearby. (Tr. 53-54; 79.) Although Plumer may have accommodated the request on a few orders, Drake was ultimately unable to reduce the price, and Zabatta indicated to Plumer that CFN wished to terminate the Contract and "look elsewhere." (Tr. 53-54, 56, 80.)
In connection with this termination request, on June 3, 2008, Plumer faxed Zabatta a letter (Pay-off Letter) reflecting the unamortized balance of the loan, as well as the Overruns from the re-imaging. (Tr. 56, 80; Pl.'s Ex. 8.) The Pay-off Letter stated that "Drake would agree to mutually terminate [the Contract] at any point in the future that [CFN's] balance [was] paid in full." (Pl.'s Ex. 8.) Drake agreed to terminate the Contract if the account balance of $136,522.33 — reflecting the remaining amortization balance and the re-imaging Overruns — was paid off. (Tr. 125.) Zabatta claims he did not question the amount stated in the Pay-off Letter, having previously seen the Overruns amount in the Amendment. (Tr. 99-100.) Although *Page 6 Zabatta did not immediately pay off the account balance indicated in the Payoff Letter, he began looking for another oil company, eventually signing with Irving. (Tr. 81-83.)
On or about December 29, 2008, CFN tendered a check to Drake in the amount of $107,251.91 (Check). The check amount, with the exception of some disputed credits, represented the fully amortized balance of the $140,000 loan due under the Contract.9 (Tr. 82-83, 91.) Drake subsequently cashed the Check, and CFN thereafter affiliated with Irving. (Tr. 83.)
On January 20, 2009, a Notice of Default (Notice) was sent to CFN notifying Zabatta that the Contract was in default, and requesting payment of the additional $21,761.53 representing the outstanding expenditures for the re-imaging. (Tr. 92; Def.'s Ex. B.) The Notice stated that:
"[a]lthough Drake received a check dated December 29, 2008 in the amount of $107,215.91, the balancing remaining under the Contract [was] $21,761.53. Until said amount is paid to Drake, the Contract will remain in full force and effect. . . . If nothing is done within said time period, legal proceedings, including but not limited to a foreclosure action, will be instituted against CFN and you personally." (Def.'s Ex. B.)
CFN failed to comply with the Notice, and Defendant alleges that Plaintiffs are in default under the Contract. (Def.'s Reply Mem. 2.) As a result, Drake notified CFN of its intention to invoke its rights under the mortgages and to foreclose.
CFN now seeks declaratory and injunctive relief to prevent foreclosure. Drake counterclaims to recover the $21,761.53 Overruns, as well as lost profits from the approximately 3,500,000 gallons of gasoline not purchased under the Contract. (Tr. 129.) *Page 7
Alternatively, Drake challenges the accuracy of Plaintiffs' assertions and avers that the Overruns were requested and agreed to in the months subsequent to signing the Contract. (Def.'s Reply Mem. 1.) Drake claims that the Overruns were properly incorporated into the Contract through a subsequent unilateral amendment in December 2007 and that Plaintiffs are now in default for having failed to pay for the Overruns. (Def.'s Reply Mem. 2; Pl.'s Ex. 10.)
*Page 9"Terms with respect to which the confirmatory memoranda of the parties agree or which are otherwise set forth in a writing intended by the parties as a final expression of their agreement with respect to such terms as are included therein may not be contradicted by evidence of any prior agreement or of a contemporaneous oral agreement but may be explained or supplemented,
"(a) By course of performance, course of dealing, or usage of trade (§
6A-1-303 ); and"(b) By evidence of consistent additional terms unless the court finds the writing to have been intended also as a complete and exclusive statement of the terms of the agreement." G.L. 1956 §
6A-2-202 .
Therefore, assuming arguendo that discussions occurred during the parties' negotiations regarding the subject matter leading to the Overruns, evidence of these discussions would be inadmissible under §
It is well settled in Rhode Island, that "in the absence of fraud or mistake, parol or extrinsic evidence is not admissible to vary, alter or contradict a written agreement." Supreme WoodworkingCo. v. Zuckerberg,
Here, the Contract provides that in addition to the cash advance of $100,000, Drake will provide CFN with an additional $40,000 "to install improvements at the [Property], including but not limited to the installation of a new twin pole ID digital price sign, refac[ing the] canopy with Sunoco fascia and Horizon decals, re-decal[ing the] dispenser and install[ing] valances and paint[ing the Property] to Sunoco specifications." (Pl.'s Ex. 2 ¶ 25.) This provision is a clear and unambiguous expression of the parties' negotiations regarding the components of the re-imaging and their intent to limit the budget to $40,000. See Federal Deposit Ins. Corp. v.Singh, *Page 10
Further, a writing is fully integrated when it is adopted as the "final and complete expression of the agreement." Fram Corp,
Even assuming arguendo that the Contract did not constitute a complete and exclusive statement of the terms of the parties' agreement and that evidence of the parties' prior negotiations was admissible to clarify ambiguities within the Contract, the Court would still find the Defendant's testimony more credible and that the expenditures causing the Overruns were not included in the original $40,000 budget. Rodriques v. Santos,
In his testimony, Zabatta stated that his discussions regarding the light boxes to illuminate the canopy, the removal of the island and second planter, and the size of the ID sign *Page 11 took place prior to his signing the Contract. (Tr. 78.) Zabatta testified that he would have had discussions regarding these allegedly anticipated Overruns prior to signing the Contract because once he signed the Contract he knew he would not be able to "ask for anything else." (Tr. 78.) To support Zabatta's testimony, Plaintiffs rely on several drafts and a final version of the Letter of Intent as evidence of the content of the parties' negotiations. (Pl.'s Exs. 1, 3, 5, 6.) In addition, Plaintiffs point to a handwritten notation by Plumer on the top of a Rhode Island Hydraulics proposal from December 2006 as an indication that Plumer knew of the request for a larger, costlier nine-foot ID sign. (Pl.'s Ex. 4.) The Court, however, finds this testimony unconvincing.
Conversely, Defendant, through Plumer's testimony, has proffered sufficient evidence to establish a credible timeline and explanation of the events that transpired. See Hood,
Moreover, Plumer's testimony regarding the timing of the events that transpired is further supported by Defendant's Exhibits F and I, which indicate that the specifications and pricing for the nine-foot sign were not pulled from the Sunoco website until after execution of the Contract. (Tr. 119, 113; Def.'s Exs. F I.) While Plaintiffs' Exhibit 4 indicates that a proposal for a nine-foot *Page 12 sign was requested in December 2006, Plumer testified that he had budgeted for a seven-foot sign and only requested the additional bid in case a gas line located at the site impeded with the digging, footing, and placement of the previously quoted smaller sign. (Tr. 28-30, 34, 107; Pl.'s Ex. 4; Def.'s Exs. C E.)
Furthermore, Plumer testified that in January 2007, he contacted Krebs at Everbrite to request engineering drawings to include with the permit application for the signage. (Tr. 94-94, 110-114; Def.'s Ex. H G.) This request and Plumer's subsequent submission of the permit application for a seven-foot ID sign in the spring of 2007, provide additional support for Defendant's contention that discussions regarding the contested expenditures — such as a larger sign — did not occur until after execution of the Contract. Id. Accordingly, in light of the testimony and evidence set forth by the Defendant, the Court finds Defendant's testimony regarding the timing of Plaintiffs' requests for the Overruns more credible.
"a contract for the sale of goods for the price of $500 or more is not enforceable by way of action or defense unless there is some record sufficient to indicate that a contract for sale has been made between the parties and signed by the party against which enforcement is sought. . . ." G.L. 1956 §
6A-2-201 .
Thus, to be enforceable under the Statute of Frauds, a contract must not only be in writing, but it must also be signed by the party against whom enforcement is sought.13 G.L. 1956 §
Similarly, if a contract as modified comes within the Statute of Frauds, an oral modification is precluded and the requirements of the Statute of Frauds must be satisfied. See 2ALawrence's Anderson on the Uniform CommercialCode, § 2-209:75 (3d ed. 2008). Specifically, §
*Page 14"Modification, rescission, and waiver.
". . .
"(2) A signed agreement which excludes modification or rescission except by a signed writing cannot be otherwise modified or rescinded, but except as between merchants such a requirement on a form supplied by the merchant must be separately signed by the other party.
"(3) The requirements of the statute of frauds section of this chapter (§
6A-2-201 ) must be satisfied if the contract as modified is within its provisions. . . ." G.L. 1956 §6A-2-209 .
Where, as here, the Amendment, although in writing, is signed only by Drake, it fails to satisfy the signature requirement of § 2-201(1) and is therefore unenforceable against the Plaintiffs under § 2-209(3). G.L. 1956 §
Furthermore, having stipulated in the Contract that "[n]o amendment, alteration, or modification or waiver of this Contract shall be binding unless in writing . . .," Plaintiffs are not bound by any subsequent oral modifications between the parties.See
G.L. 1956 §
Accordingly, the Amendment, unilaterally executed by Drake in December 2007 is not binding. Without an enforceable amendment to the Contract, the additional amount of the Overruns has not been incorporated into the Contract, and the original terms of the Contract remain binding. *Page 15
In the instant matter, the Pay-off Letter stated that Drake "would agree to mutually terminate [the Contract] at any point in the future that [CFN's] balance [was] paid in full." (Pl.'s Ex. 8.) It further indicated that the account balance as of April 30, 2008 was $136,522.33. Id. In his testimony, Plumer stated that this "balance" reflected the remaining amortization of the re-imaging loan and the Overruns for the re-imaging. (Tr. 125; Pl.'s Ex. 9.) Although the Pay-off Letter requested payment of the "account balance" in order to mutually terminate the Contract, the Notice sent to CFN on January 20, 2009, clarifies that the balance sought was the "balance remaining under the Contract." (Def.'s Ex. B.)
At the time Plumer drafted the Pay-off Letter, he was acting under the assumption that Plaintiffs' balance remaining under the Contract included the Overruns that had been incorporated by the Amendment. (Tr. 125.) The Amendment, however, is unenforceable, and the original terms of the Contract remain intact. Accordingly, the $21,761.53 sought by Drake in the Pay-off Letter and Notice is not a balance owed or remaining under the Contract.
While the Check tendered by CFN in December 2008 differed from the amount indicated in the Pay-off Letter, it represented the fully amortized balance due under the Contract. (Tr. 82-83, 91.) By tendering payment for the amortized balance of the $140,000 loan, the "balance *Page 16 remaining under the Contract" was fully paid and the Contract was terminated in accordance with the Notice and Pay-off Letter.
Drake contends it is entitled to the lost profits resulting from Plaintiffs' failure to purchase the minimum amount of fuel specified in the Contract. (Def.'s Reply Mem. 2-3.) However, as the parties mutually terminated the Contract in December 2008, the Court finds that Plaintiffs did not breach the Contract and are not in default. As the parties' contractual rights and obligations have been fully satisfied, the Court finds Defendant has suffered no injury and denies Defendant's request for lost profits. See Rhode IslandManaged Eye Care, Inc. v. Blue Cross Blue Shield of R.I.,
The Statute, entitled "Future Loans and After-Acquired Property," provides a mechanism by which a real estate mortgage secures priority for both present and future advances. People's *Page 17 Sav. Bank v. Champlin Lumber Co.,
"(a) Whenever a mortgage deed in statutory form or other form mortgaging real property is entitled at the beginning thereof "Mortgage to secure present and future loans under §§
34-25-1 —34-25-5 " and contains in its provisions a provision to the effect that it is intended to secure present and future loans and states a maximum amount as the total of the principal amount of loans to be secured thereby, hereinafter referred to as the stated maximum amount, the mortgage deed shall be security from the time of its recording in the records for recording real estate mortgages in the city or town in which the real property mortgaged therein is located for all loans which at the time of or before the recordings are made or agreed to be made by the mortgagee to the mortgagor on the security of the mortgage and shall also constitute security from the time of its recording for all additional loans made from time to time by the mortgagee to the mortgagor on the security of the mortgage after the recording of the mortgage and prior to its discharge of record, whether or not made after reduction of the principal of any loan made on the security of the mortgage." G.L. 1956 §34-25-1 .
To qualify under the Statute, a mortgage securing present and future loans must state a maximum amount — the total of the principal amount of loans to be secured — and must contain the requisite language specified by the Statute.
While the Plaintiffs correctly assert that because the mortgages fail to specify a maximum amount, they fail to meet the requirements of the Statute, the Court notes that failure to abide by the Statute's requirements does not necessarily invalidate them.People's,
"§§34-25-1 to34-25-6 . . . shall not apply to nor affect, directly, or indirectly, or by implication, any mortgage thereafter made, whether or not it provides for future loans, unless it contains the provisions required under §34-25-1 and is also entitled at the *Page 18 beginning thereof "Mortgage to secure present and future loans under §§34-25-1 to34-25-5 ." G.L. 1956 §34-25-5 .
The plain language of the Statute does not invalidate mortgages that do not abide by its terms, but simply states that the protections afforded by Statute are not implicated and are not applicable.
Furthermore, the legislative history supports the Court's determination that the Statute is not implicated. The Statute was passed by the Rhode Island legislature to deal with the issue of whether a future loan made pursuant to a previously recorded real estate mortgage was superior to a subsequent mortgage recorded prior to the time of the future advancement. People's,
Claims based upon theories of unjust enrichment and quasi-contract are essentially identical. R B Elec. Co. v. Amco Constr.Co.,
In the instant matter, Drake spent $21,761.53 over and above the amount contracted for by the parties in order to satisfy CFN's requests throughout the re-imaging process. Having spent this money improving the property, furnishing materials, and rendering services, Drake conferred a benefit on CFN. NarragansettElec. Co. v. Carbone,
Furthermore, because CFN received additional benefit and value in the form of a nine-foot ID sign, removal and re-pavement of curbing, installation of canopy illumination, and *Page 20 painting of the Property — work not budgeted for as part of the re-imaging loan — the second element of unjust enrichment is satisfied. Id. at 100 (stating that the second element — appreciation of the benefit — is satisfied where the party profits from the benefit).
The final element of unjust enrichment is satisfied if a party "can prove the reasonable value of services rendered without payment." Id. at 100. Here, Drake spent an additional $21,761.53 complying with requests for which it has not been reimbursed. (Tr. 118; Def.'s Ex. J.) Drake spent these monies with the belief that they would be repaid as part of an "addendum" or amended contract. (Tr. 114-117.) Consequently, it would be unjust to now allow Plaintiffs to reap the benefit of the value conferred by Drake.14
Accordingly, Plaintiffs are ordered to pay Drake for the value of the unpaid Overruns — $21,761.53 — subject to the parties' proper amendment of the pleadings to conform to the evidence in accordance with Super. R. Civ. P. 15(b).15 Fram Corp,
As a result of this Court's determination that the Contract was mutually terminated and the parties' obligations satisfied when payment was tendered in December 2008, the Court finds that the mortgages securing the obligations of the Contract should be discharged and the security interests should be terminated. Accordingly, here, there is no need for injunctive relief.
Furthermore, there is no contractual liability to support an award of attorney's fees. The Court has already determined that CFN's tender of the balance remaining under the Contract terminated the Contract and the parties' rights and obligation therein. As a result, the Court finds that Plaintiffs are not in default of the Contract, and Defendant is not entitled to the "costs, expenses (including attorney's fees) and damages" provided for in the Contract in the event of a default. (Pl.'s Ex. 2 ¶ 26(b)(ii).)
Similarly, the parties' requests for attorney's fees and costs fail under a theory of statutory liability. The parties' have not invoked any statutory authority to support their claims for attorney's fees and costs, and the Court finds no statutory basis upon which to grant such relief. Accordingly, the Court finds that each party must bear its own attorney's fees, costs, and expenses.
Prevailing counsel may present an order consistent herewith which shall be settled after due notice to counsel of record.
"15. Entirety of Contract: No prior stipulation, agreement or understanding of the parties or their agents shall be valid or enforceable unless embodied in this Contract or covered by these provisions or by a writing duly executed. No amendment, alteration, or modification or waiver of this Contract shall be binding unless in writing and signed by [Drake]. [Drake's] right to require strict performance of this Contract shall not be affected by any previous waiver or course of dealing. If two or more persons are named as DEALER the obligations hereof shall be joint and several." (Pl.'s Ex. 2 ¶ 15.)
"(b) Amendments to Conform to the Evidence. When issues not raised by the pleadings are tried by express or implied consent of the parties, they shall be treated in all respects as if they had been raised in the pleadings. Such amendment of the pleadings as may be necessary to cause them to conform to the evidence and to raise these issues may be made upon motion of any party at any time, even after judgment; but failure so to amend does not affect the result of the trial of these issues." Super. R. Civ. P. 15(b).