Concurring Opinion
(concurring). I am now strongly inclined to the opinion, though I do not dissent, that th'e facts of this case show title in Cooley by reason of assignments by contract from Brown to Burton-Lingo Company and from the latter to the Guaranty Trust & Banking Company of the original Brown notes and mechanic’s lien, and last, by judicial sale by the receiver to him, made,under order of the court and duly confirmed, and cannot be collaterally attacked. Guaranty State Bank & Trust Co. v. Thompson, 195 S. W. 960. That the equitable doctrine of subrogation in its true sense does not apply, *649 but that when the court, through) its receiver, sold the Marls Miller note ($5,627.25) sued upon, as one of the assets of the bank, and it containing the original Brown obligation, Cooley succeeded to all the rights of the bank, and when,, in the instant case, the judgment in No. 7388 was set aside and all muniments of title executed under the Mark Miller bank agreements were set aside, it left the original suit pending with the right of the bank to proceed, had it not parted with its title through the sale to Cooley. Having done so, Cooley is now in the position of the bank and is entitled to judgmeht for the whole of thJe debt and to foreclose the Brown mechanic’s lien upon the homestead.
Opinion of the Court
In view of the voluminous record presented, we will at the outset make a statement of the facts, none of which are disputed, and, as well as we can, in the order in which the record shows them to have occurred:
From the record, it is 'made to appear that on February 12, 1904, Mark Miller and wife, Adelle Miller, owned, as a part of their community estate, lots 1 and 2 in block 2 in Mun-dy Heights addition to the city of El Paso; *643 the lots then being unimproved. On said day, Mark Miller and Adelle Miller entered into a written contract with OS. F. Brown, a contractor and builder, for the erection by said Brown, at his own expense, of a cottage on said lots; the said contract being duly acknowledged by the parties, filed for record, and duly recorded on February 16, 1904. The contract duly recited that Brown should have an express mechanic’s, builder’s, and contractor’s lien on the said lots and improvements to secure the contract price of $2,500 for erecting said building, $500 of said amount paid in cash and $2,000 of said amount to be paid to said Brown in four installments of $500 each and evidenced by four promissory notes, each in the sum of $500 and due and payable respectively in one, two, three, and four years after said date, and providing that on failure to pay any one of said notes at maturity, at the option of the holder, all the notes should become due and payable. Brown erected said cottage according to contract, and the said four notes were executed by Miller and wife and delivered to Brown.
Thereafter, Brown indorsed the said four notes in blank and delivered them to Burton-Lingo Company, a building material company, which had theretofore furnished the material and advanced the money to Brown to erect said building. Credits for amounts paid by Miller are indorsed on the back of each note. The unpaid balance of said Brown notes not being paid at maturity, Burton-Lingo Company brought suit thereon in the district court of El Paso county, on the 2d day of February, 1908, against Mark Miller and Adelle Miller to recover the amount due and to foreclose the said mechanic’s, builder’s and contractor’s lien. The file number of that suit is 7388. Two citations- were issued in, said cause, one each to Mark Miller and Adelle Miller. The citation to Mark Miller was duly served. The return on the citation to Adelle Miller showing service and an attorney appearing and answering for her on the trial, the trial court rendered judgment therein.
On special issues submitted by the court in the ease at bar, the jury found: That Adelle Miller was not duly served with citation in the case of Burton-Lingo Company v. Mark Miller and Adelle Miller in cause No. 7388; that she did not file an answer in the case through an attorney authorized to represent her, nor did she appear at the trial in person or by attorney; that she had no notice of the pendency of the suit; that at and prior to the execution and delivery of the Brown contract the property in controversy was the homestead of Mark Miller and his wife, Adelle Miller; that the officers and attorneys of the Guaranty Trust & Banking Company had no notice that, at the trial of the case of Burton-Lingo Company v. Mark Miller and wife, Adelle Miller did not appear in person and was not present in person or represented by an attorney authorized to do so; the Guaranty Trust & Banking Company, acting by and through its authorized agents, agreed, in substance, with Mark Miller that judgment should be entered in the case of Burton-Lingo Company v. Mark Miller and Adelle Miller; that the Guaranty Trust & Banking Company should acquire said judgment from the Burton-Lingo Company, have an order of sale issued thereon, should through an agent buy the property at the sale, should cause the said property to be deeded by its agent to Mark Miller for a consideration in excess of the amount of the mechanic’s lien notes on which said judgment was obtained, said consideration to be evidenced by Mark Miller’s promissory notes, secured by a lien on the property in controversy. There being, apparently, a conflict in the next two findings, we quote them:
“Question No. 8. Do you find from a preponderance of the evidence that said agreement was carried out?” To which the jury answered: “No.”
“Question No. 9. Do you find from a preponderance of the evidence that said agreement was made -and carried out without the consent and acquiescence of Mrs. Adelle Miller?” To which the jury answered; “Yes.”
The Burton-Lingo Company suit against Miller and wife, No. 7388, resulted in a judgment in said cause on the 5th day of March, 1910, in favor of Burton-Lbiigo Company against Mark Miller and Adelle Miller for the unpaid balance of the Miller-Brown notes in the sum of $2,350, with interest, costs, and foreclosure of the mechanic’s, contractor’s, and builder’s lien; no personal judgment being rendered against Mrs. Miller. An order of sale of said property under said judgment in cause No. 7388, with bill of costs annexed, of date April 18, 191<⅜ was duly issued, levy made, sale published, property sold to Sam D. Ware, and sheriff’s deed to Ware executed, and return of sale made.
Burton-Lingo Company, on March 5, 1910, in consideration of the said sum of $2,350, paid by the Guaranty Trust & Banking Company to Burton-Lingo Company, duly transferred and assigned to the Guaranty Trust & Banking Company the said judgment it had theretofore obtained against Mark Miller and wife in cause No. 7388, and at the same time, and by the said instrument, also transferred to the Guaranty Trust & Banking Company all of the rights and interest it had in said judgment, or in or to the said real estate described (being that in controversy) by reason of said judgment, or by reason of the lien contract and notes upon which said judgment was rendered, and further gave to the said Guaranty Trust & Banking Company full power and authority to demand and receive the amount of said judgment to its *644 own use, and to execute proper discharges and releases, and to sue out execution or order of sale and all other process necessary to the enforcement of the said judgment. By an arrangement between Mark Miller and the Guaranty Trust .& Banking Company, in consideration of the amount of the Burton-Lingo Company judgment paid by Guaranty Trust & Banking Company, the accrued interest thereon, and additional sums of money paid to Mark Miller by the Guaranty Trust & Banking Company, and certain notes of Mark Miller held by the bank canceled and returned to Miller, amounting in the aggregate to $5,-627.25, this sum evidenced by four promissory notes, signed by Mark Miller and payable to Sam D. Ware, representing the said bank, and expressing and retaining a vendor’s lien on the property, Sam D. Ware and wife conveyed the property in question to Mark Miller. Mark Miller also executed to Sam D. Ware certain interest notes, a deed of trust on said property to W. B. Ware, as trustee, to secure the said notes. All of said notes were indorsed without recourse by Sam D. Ware, and by him assigned to the Guaranty Trust & Banking Company, together with the said deed of trust and the said vendor’s lien, and all rights, equities, and interest then had by them by reason thereof.
The said Miller-Ware notes not having been paid at maturity, the Guaranty Trust & Banking Company, on the 11th day of December, 1911, brought this suit against Mark Miller and Adelle Miller and S. D. Ware and wife and W. B. Ware, trustee. The first count in the petition is the ordinary action of trespass to try title to recover the premises in controversy; the second count set up the ownership of the Miller-Ware notes and asked for judgment against Mark Miller on said notes and the foreclosure of the vendor’s lien expressed in the notes and the said deed of trust lien. Adelle Miller having become insane, W. H. Anderson was appointed her 'guardian ad litem. Numerous pleadings and amendments thereto were filed by all the parties litigant up to the rendition of the judgment on the 11th day of September, 1917. As we conceive it, the material issues finally joined on the trial, after numerous amendments and trial amendments, are substantially the following:
The issue made by the Guaranty Trust & Banking Company is: That by the execution and delivery by Mark Miller and Adelle Miller to Brown of the mechanic’s, builder’s, and contractor’s lien and notes, and the erection of said building by Brown, and the assignment by Brown of said notes and the mechanic’s, builder’s, and contractor’s lien to Burton-Dingo Company, the judgment obtained by said Burton-Dingo Company and the transfer and assignment to plaintiff bank, by Burton-Dingo Company, of all of its rights and interests in its said judgment against Miller and wife on said notes and the foreclosure of said lien, and the lien contract on which said judgment was rendered, and likewise, by the transfer and assignment to it of the Miller-Ware notes and trust deed lien by S. D. Ware, as hereinabove set out, it is the legal owner and holder by purchase and sub-rogation of the said Miller-Ware notes and liens, and it asked judgment establishing same and foreclosing its said liens on said lots.
The Guaranty Trust & Banking Company having become insolvent, John H. Harper was appointed receiver, in cause No. 10079, Forty-Eirst district court, El Paso county. The receiver adopted the pleadings of the banking company as to its ownership of said notes and liens; that, acting under the orders of the court, he took possession of and offered for sale the said Miller-Ware notes and mortgage lien and thereafter, on the 4th day of May, 1915, made sale of same to Winchester Cooley, and that said sale was in all tilings approved by the court, and pleaded that, if mistaken that said sale conveyed to Cooley the title to the notes and lien and causes of action, then the receiver was the owner thereof. Intervener, Cooley, adopted the allegations of receiver, Harper; pleaded the facts heretofore stated as pleaded by the Guaranty Trust & Banking Company and the receiver; and alleged that by reason thereof he is now the owner and holder of said four Miller-Ware notes, the said liens and causes of action, and that by reason of his purchase of said Miller-Ware notes he became subro-gated to the right and title to said notes, lien, judgment, etc. Guardian ad litem, Anderson, after various pleas and exceptions, which we need not state here, pleaded the statute of limitation of two and four years as to all causes of action; general denial; that the said property was at all times and is the homestead of herself and husband; states the filing of suit by Burton-Dingo Company and the issuance of citation, the service of citation upon Mark- Miller; that, while the return upon the citation states service upon her, service of citation was not had upon her in cause 7388; that, while an attorney had appeared aná answered for her in said cause, she denied that she had at any time authorized an attorney to appear and ¿nswer for her; pleaded the agreement or arrangement entered into between the Guaranty Trust & Banking Company and her husband, Mark Miller, as set forth herein-above, and in which judgment was entered in favor of said Burton-Dingo Company, a foreclosure sale under said judgment, of the mechanic’s, builder’s, and contractor’s lien had, and purchase made by Ware and resale of said property to Mark Miller for the consideration stated, was false and fraudulent, *645 and said judgment was rendered and proceeding had thereunder without her knowledge and consent. We need not state the issues tendered as to parties other than as above. As to Adelle Miller, the only party appealing, the trial court set aside the judgment entered in cause No. 7388 in favor of Burton-Lingo Company against Mark Miller and Adelle Miller on the Miller-Brown notes and foreclosing the mechanic’s, builder’s, and contractor’s lien on the said lots; but the Miller-Brown notes never having been paid and the said lien discharged, and the Miller-Brown notes being a part of the consideration for the Miller-Ware notes purchased by Cooley at the receiver’s sale, the trial court found that Winchester Cooley, inter-vener, has a valid mechanic’s, builder’s, and contractor’s lien on the property described by reason of the contract of February 12, 1904, entered into between Mark Miller and Adelle Miller and Brown, and ordered the foreclosure of said lien to satisfy the Miller-Brown notes, amounting to the sum of $4,010. From that judgment, Adelle Miller, through her guardian ad litem, and next friend, Anderson, takes this appeal.
Opinion.
Appellant, Adelle Miller, through her guardian ad litem and next friend, Anderson, presents 36 assignments of error and many propositions thereunder as grounds for reversal and rendition of judgment in her favor. We will not undertake to discuss each of the assignments and propositions in detail, but will consider what we conceive to be the material and controlling issues presented by the record. It is unquestionably true that the premises in controversy were the homestead of Mark Miller and his wife, Adelle Miller, on the 12th day of February, 1904, and that on that date they each entered into- and executed the four negotiable promissory notes to II. F. Brown aggregating the sum of $2,000 as the unpaid part of the consideration for the erection by Brown on said premises of the cottage, and at the same time executed in writing in due form and delivered to Brown a mechanic’s, builder’s, and contractor’s lien on said premises to secure the payment of said four notes and the interest agreed therein to be paid. No question is made by brief or argument, but that Brown fully performed his part of the contract in erecting said cottage and duly indorsed, transferred, and assigned, for a valuable consideration, the said four notes (which we will designate as the Miller-Brown notes) and the said lien contract, to the Burton-Lingo Company, and that said company, by direct purchase and payment of the consideration expressed, became the owner of said notes and lien contract. It is not claimed that Mark Miller and Adelle Miller, or either of them, at any time made payment of the said notes, or in any wise discharged said lien contract other than by such credits and partial payments as are indorsed on some one or more of said notes. The notes by their terms became due, and a suit was duly filed thereon by Burton-Lingo Company against Mark Miller and Adelle Miller,' praying judgment against them and the foreclosure of the mechanic’s lien, and citations were duly issued to Mark Miller and Adelle Miller and service had on Mark Miller, but no service was had on Adelle Miller, though the sheriff’s return showed service, and an attorney filed answer for her and appeared and represented her on the trial at the instance of Mark Miller, but without authority from her to do either. The record shows that, at that stage of the proceeding, Mark Miller had knowledge of the fact that his wife had not been served with citation, had not employed an attorney to represent her on the trial, and that he was the only person having such knowledge. The record further shows that, not only no person other than Mark Miller had knowledge of the want of service on his wife and want of authority from the wife to file answer and appear for her at the trial, but the record shows that such knowledge was not made known or imparted to any person prior to the time of the filing of the answer for Adelle Miller in the case at bar. Judgment was entered in favor of Burton-Lingo Company against Mark Miller and Adelle Miller on said notes, and foreclosing said mechanic’s lien.
Before and in anticipation of the foreclosure sale of the property in controversy, Mark Miller and thfe Guaranty Trust & Banking Company entered into the arrangements hereinabove stated, by which it was agreed and carried out that the Guaranty Trust & Banking Company should purchase of Burton-Lingo Company the said judgment, and that said foreclosure sale should be made. Ware became the purchaser, a resale of said property for the consideration stated «including the amount of the Miller-Brown notes in the Miller-Ware notes, and a transfer and assignment by Ware of the Miller-Ware vendor lien notes to the Guaranty Trust & Banking Company. This arrangement was carried out, but without the ‘ knowledge or consent of Adelle Miller, and without her in any way being made a party to the transaction.
This suit filed by the Guaranty Trust & Banking Company, and by the receiver, and by the intervener, appellee here, is based on the Miller-Ware notes and the rights growing out of the Burton-Lingo Company judgment and assignment thereof to the Guaranty Trust & Banking Company, and th!e right of subro-gation by reason of having paid the Miller-Brown notes and the debt evidenced thereby. The trial court evidently treated the answer of Adelle Miller as being in the nature of a bill of review of the ease of Burton-Lingo Co. *646 v. Mark Miller and Adelle Miller, No. 7388, and as being a direct attack on tbe judgment rendered therein, and set that judgment aside on the findings of the jury stated herein; but it not appearing either by pleading or proof that the debt evidenced by the Miller-Brown notes 'and the mechanic’s, builder’s, and contractor’s lien on thie premises in controversy had ever been paid off or discharged by Miller and wife, but was carried into and formed a part of the consideration of the Miller-Ware notes to the extent and sum of $4,010, and having found that, by reason thereof, intervener Cooley, being the purchaser of said notes at the receiver’s sale, has a valid contractor’s and builder’s lien on said premises to the full amount of said notes, the court, while setting aside thie judgment in the case of Burton-Lingo Co. v. Mark Miller and Adelle Miller, rendered judgment against Mark Miller for said $4,010 and foreclosed said contractor’s and builder’s lien in favor of intervener Cooley as to each of the Millers for the full amount of the unpaid balance of the Miller-Brown notes as expressed and represented in the Miller-Ware notes. Appellant, Adelle Miller, through her guardian ad litem, by several assignments, attacks the said judgment foreclosing the mechanic’s and builder’s lien as to her, but all tending to the one question: Did intervener, Cooley, by his purchase at the receiver’s sale of the Miller-Ware notes, acquire the legal or equitable title or rights of Burton-Lingo Company to the Miller-Brown notes, or the claim or debt of which the notes were but the evidence, and the right to foreclose the mechanic’s lien as to the full amount of the unpaid Miller-Brown notes. There was no direct assignment and delivery of the Miller-Brown notes, except that of Brown to Burton-Lingo Company. Burton-Lingo Company assigned to the Guaranty Trust & Banking Company the judgment it had obtained in the Miller-Brown notes, and all its rights obtained by reason of that judgment, as the consideration for thie payment by the Guaranty Trust & Banking Company to it of the judgment against the Millers; but the record does not show an assignment or delivery by Burton-Lingo Company to the Guaranty Trust & Banking Company of the Miller-Brown notes, nor an assignment of the building contract lien. Whatever rights, title, or interest in or to the mechanic’s and builder’s lien the Guaranty Trust & Banking Company received by the assignment to it of the judgment, it was through! subrogation and by reason of the fact that, in paying the judgment, it paid the debt Mark Miller and Adelle Miller owed to Burton-Lingo Company, as the assignee of Brown, for the erection of the building.
In Fears v. Albea, 69 Tex. 437, 6 S. W. 286, 5 Am. St Rep. 78, after referring with approval to the Fieval v. Zuber Case, supra, the Supreme Court of this state said:
“It is said upon high authority that when a mortgage is paid by one who is under no obligations to pay it, although he does not take a formal assignment, he is subrogated to the rights of the mortgagee in the mortgaged property, and holds the title so acquired against subsequent incumbrancers, although he had also acquired the equity of redemption. In such ease, no proof of intention on his part to keep the1 mortgage alive is necessary to give him the benefit of it. Even if a person advancing money to pay a mortgage, under an agreement with the owner of the equity of redemption that it should be assigned to him as security for the money advanced, takes a discharge of the mortgage, he is entitled to be subrogated to the rights of the mortgagee and have the discharge vacated.”
“The parties after the sale stood as they did before the ineffectual attempt at sale took place.” Jones on Mortgages, § 1902.
Has the original debt to Brown or to Brown’s assignee, Burton-Lingo Company, the legal owner and holder of the notes, been discharged? It is evident that it has not been paid by either of the Millers, or by the property upon which, by their express agreement, it was charged, and which was to be the primary source from which payment was to come. It is not claimed that the foreclosure sale of th!e property under the Burton-Lingo Company judgment had the effect to either release the property from the lien or to pay the debt. The foreclosure sale having been set aside, the Miller debt for the erection of the building having been paid by the Guaranty Trust & Banking Company, it is subrogated to the rights of Burton-Lingo' Company in the notes and mechanic’s lien. Under such circumstances, the lien on the property not being extinguished, equity required, if necessary, that justice might be done all parties, that the original debt and the builder’s lien, should be recognized as a subsisting charge upon the lots. Monroe v. Buchanan, 27 Tex. 243. In that case, the Supreme Court said:
“It is a matter of no importance whether the note was in actual existence or not, or whether it was still susceptible of assignment as negotiable paper. The facts show that the debt evidenced by it was unpaid.”
For reasons stated, we think the Guaranty Trust & Banking Company was subrogated to all of the rights that Burton-Lingo Company had at the time and since the rendition of the judgment' against Mark Miller and Adelle Miller to the full amount of said debt,
We have found that Blark 'Bliller was the only person who knew that Adelle Bliller was not served with citation in the Burton-Lingo Company suit, and that she was not in that suit represented by an attorney authorized to do so, and that these facts were not made known by Mark Bliller to any person until about the time Adelle Bliller filed her answer in this suit. In our judgment there is no semblance of a fraud on the part of the Guaranty Trust & Banking Company shown in the agreement between it and Blark Miller in the absence of any knowledge of such facts on its part, and, while the grounds on which the court set aside the Burton-Lingo Company judgment are not stated, we apprehend that it was for want of service and appearance, in that case on her part.
Under the view we take of the case, we think we need not further discuss the issues in detail as presented in appellant’s assignments. They have been considered and are overruled. The judgment of the trial court is reformed as to Mark Bliller, Adelle Bliller, and W. H. Anderson, her guardian, ad litem, so as to read that Winchester Cooley, intervener, have a valid contractor's and builder’s lien on the premises in controversy to secure the payment of the sum of $50, and interest thereon at the rate of 6 per cent, per annum from the date of its payment to the receiver, viz., the 4th day of Blay, 1915, until paid, and that said lien be, and here now is,, in all things established and foreclosed; and in all other respects the judgment of the lower court is in all things affirmed. The costs of this appeal are taxed against the intervener.
<S=>For other cases see same topic and KEY-NUMBER in all Key-Numbered Digests and Indexes
Reference
- Full Case Name
- MILLER v. GUARANTY TRUST & BANKING CO. Et Al.
- Cited By
- 7 cases
- Status
- Published