Nunn v. Brillhart
Opinion of the Court
Jacob H. Brillhart, as owner of a building in Dallas, Tex., made a contract with Simpson & Co., by which Simpson & Co. agreed, for the consideration of $840, to install a hot-water heating system in Brill-hart’s building. The contract contained this provision:
“Contractor guarantees said system to raise temperature to 70° Fahrenheit, in each room of first and second floors of said building, in zero weather, and to supply two gallons of water per minute for periods necessary in household use for a period of one year. Failing to do this, contractor shall remove all portions and parts of system without cost to owner and repay to owner all money paid on account of this contract.”
The contractors gave a bond, on which appellant, W. G. Nunn, was surety, which was conditioned that Simpson & Co. should “well and truly perform and fulfill all the obligations imposed upon them” by said contract. The heating system was installed in the summer of 1916, and Brillhart paid Simpson & Co. in full for the work. During the following winter the heating system did not fulfill the terms of the said guaranty,- either as to the heating of the rooms or the delivery of the hot water for domestic use. Simpson & Co. were notified of such fact and repeatedly requested to remedy the defects, and finally requested to remove the system from the building, as provided by the contract. This they failed to do. Brillhart thereafter had the system reconstructed, and in doing so used portions of the original plant. He alleged that the reasonable value of the work and material used in thus fixing up the heating system so as to conform to the contract, was the sum of $690, and brought this suit against Simpson & Co. and the surety, W. G. Nunn, for the recovery of such amount. On trial the plaintiff recovered judgment for said sum of $690 against Simpson Co., and the surety, Nunn, and the said Nunn has appealed from said judgment.
What, then, is the measure of plaintiff’s damage? The appellant insists that it is the difference between the value of the heating plant as installed and its value had it been installed so as to meet the conditions of the contract. This is the rule to be applied in many cases, but it is not the invariable rule. In many cases of contracts for building, repairs or installation of machinery, etc., where the work of the contractor does not come up to the specifications of the contract, the damage allowed is such an amount as will cover the reasonable cost of remedying the defects, so as to fulfill the terms of the contract. Without going into a detailed discussion of the authorities on this question, or attempting to state the limitations under which the rule is to be applied we think there was no error in applying it in this case. American Surety Co. v. Lyons, 44 Tex. Civ. App.T50, 97 S. W. 1080. Writ of error was denied in this case, and it was cited with approval by the Supreme Court in the cases of Graves v. Al-lert, 104 Tex. 614, 142 S. W. 869, 39 L. R. A. (N. S.) 591; Graves v. Hillyer, 48 S. W. 889; American Surety Co. v. Gonzales Water Co., 211 S. W. 251; Waco Cement Stone Co. v. Smith, 162 S. W. 1159; Stillwell Mfg. Co. v. Phelps, 130 U. S. 520, 9 Sup. Ct. 601, 32 L. Ed. 1035; Marsh v. McPherson, 105 U. S. 709, 26 L. Ed. 1139; Benjamin v. Hillard, 64 U. S. (23 How.) 149, 16 L. Ed. 518; notes to 39 L. R. A. (N. S.) 592 ; 9 C. J. p. 811.
The plaintiff was entitled to receive what he had contracted for — an installed heating plant, sufficient to heat his building to a certain temperature. If the plant put in by Simpson & Co. would not heat the rooms to a temperature of more than 55° in cold weather, as plaintiff’s evidence shows, it had little value to the plaintiff, as it thus stood.
The difference between the value of what the plaintiff received and what he was entitled to receive might, as a practical proposition, be arrived at in two ways: If the system could be used to advantage in adding to, remodeling, and correcting its defects, so as to make it satisfy the contract, then the cost of the material and labor necessary to do this would be the most direct method of arriving at the damage. If the system as installed could not be used to advantage in this way, then its value would be only that of the material after it had been removed from the building, less the cost of removal, and plaintiff’s damage would be the difference between this value and the cost of installing a new plant sufficient to heat the building. In either event, there might be special consequential damages in addition. There is no evidence to show that the plant installed by defendant could not be used to advantage, and in the absence of such showing we do not think there was any error in allowing recovery under the rule referred to.
We-think this objection should have been sustained. The plaintiff was entitled only to recover the reasonable cost of what was reasonably necessary to remedy the defect, and while the plaintiff was qualified to testify and did testify as to the reasonable cost of the work that was actually done, he admitted that he was not qualified to testify as to what was reasonably required to be done. Our courts have held in a variety of cases that, when expenditures are made necessary by the wrong of another, the party making expenditures, before he can recover the amount paid, must show that there was a necessity for incurring thetexpense and that the amounts paid were reasonable. St. Louis Southwestern Ry. Co. v. Kirby, 146 S. W. 1005; P. & N. T. Ry. Oo. v. McMeans, 188 S. W. 694; Seago v. White, 45 Tex. Civ. App. 539, 100 S. W. 1015. And we see no reason why the principles announced in these cases should not apply in this instance. Sutherland on Damages, § 91; Hottel v. Poudre Valley Reservoir Co., 41 Colo. 370, 92 Pac. 918; Ragan v. Keyes, 204 Mass. 294, 90 N. E. 847. We therefore sustain this assignment.
' Eor these reasons the cause will be reversed and remanded.