Court of Civil Appeals of Texas, 2015

in Re Forum Studio, Inc. and Clayco, Inc.

in Re Forum Studio, Inc. and Clayco, Inc.
Court of Civil Appeals of Texas · Decided November 16, 2015

in Re Forum Studio, Inc. and Clayco, Inc.

Opinion

FILED 15-0674 11/16/2015 2:17:39 PM tex-7866695 SUPREME COURT OF TEXAS BLAKE A. HAWTHORNE, CLERK 1R ,QWKH 6XSUHPH&RXUWRI7H[DV                      † 2ULJLQDO3URFHHGLQJ       † ,QUH)RUXP6WXGLR,QF † DQG&OD\FR,QF    † )URPWKHWK'LVWULFW&RXUW  Relators † † † 2I'DOODV&RXQW\7H[DV                5HDO3DUW\LQ,QWHUHVW¶V$SSHQGL[               Real Party In Interest files this Appendix to their Response to Petition for Writ of Mandamus . The Court is requested to consider the following attachments: Exhibit 1: Affidavit of Greg C. Noschese ( R.P. Appx. 003-006) Exhibit 2: Defendant's Original Answer (R.P. Appx. 007-009) Exhibit 3: Defendant's Counterclaim Against Clayco, Inc. (R.P. Appx. 010-191) Exhibit 4: Respondents' Objections, Reservation of Rights and, Subject to and Without Waiver of the Same, Their Answering Statement (R.P. Appx. 192-199) Exhibit 5: Order Partially Granting and Partially Denying Respondents' Motion to Dismiss on Statutes of Limitations (R.P. Appx. 200- 204) Exhibit 6: Plaintiffs' Original Petition (R.P. Appx. 205-303)

R.P. Appx. 001 Exhibit 7: Order on Plaintiffs' Application to Stay Arbitration (R.P. Appx. 304) Exhibit 8: Order Denying Plaintiffs' Application for Temporary Restraining Order (R.P. Appx. 305) Exhibit 9: Defendant Intellicenter Dallas Investment LLP's Motion to Compel Arbitration (R.P. Appx. 306-311) Exhibit 10: Defendant Intellicenter Dallas Investments LLP's Response to Plaintiff's Application to Stay Arbitration (R.P. Appx. 312-410) Exhibit 11: Texas Board of Architectural Examiners Public Information results regarding Hans Hecker (R.P. Appx. 411) Exhibit 12: Texas Board of Architectural Examiners Public Information results regarding Clayco, Inc. (R.P. Appx. 412-413)

R.P. Appx. 002 No. I S-0674 In the Supreme Court of Texas

§ Origi.nal Proceeding § In re Forum Studio, I nc. § and Clayco, Inc., § From tbe 1601h District Cour t Relators. § § § Of Dallas County, Texas

Affidavit of Greg C. Noscbese

STATEOFTEXAS § § COUNTY OF DALLAS § BEFORE ME, the undersigned Notary Public, on this day appeared Greg C.

Noschese, who is personally known by me, and after first being duly sworn according to law upon his oath, deposed and said: 1. "My nan1e is Greg C. Noschese. I am over eighteen years of age, am of sound mind and am competent to make this affidavit. The facts stated herein are within my personal knowledge and are all true and correct.

2. 1 am an attorney licensed to practice Jaw in the State of Texas. I am an attorney of record for Intellicenter Dallas Investments LLP, the Real Party in Interest in this proceeding and in the underlying proceeding before Respondent.

Affidavit of Greg C. Noschese R.P. Appx. 003 3. The following documents, which are being presented as Exhibits to the Court in the Appendix to the Response to Petition for Writ of Mandamus, are true and correct copies of the original documents filed in the underlying trial court and arbitration proceedings: Exhibit 2- Defendant's Original Answer (Cause No. DC-15-020 18); Exhibit 3 -Defendant's CountercJaim Against Clayco, Inc. (Cause No. DC-15-020 18); Exhibit 4 - Respondents' Objections, Reservation of Rights and, Subject to and Without Waiver of the Same, Their Answering Statement (AAA Case No. 01- 14-0001-0249); Exhibit 5 - Order Partially Granting and Partially Denying Respondents' Motion to Dismiss on Statutes of Limitations (AAA Case No. 01-14-0001-0249); Exhibit 6 - Plaintiffs' Original Petition (Cause No. DC-15-02018); Exhibit 7 - Order on Plaintiffs' Application to Stay Arbitration (Cause No. DC-15-02018); Exhibit 8 - Order Denying Plaintiffs' Application for Temporary Restraining Order (Cause No. DC-15-020 18); Exhibit 9 - Defendant Intellicenter Dallas Investment LLP's Motion to Compel Arbitration (Cause No. DC-15-02018); and Exhibit 10 - Defendant Intellicenter Dallas Investments LLP's Response to Plaintiffs Application to Stay Arbitration (Cause No. DC-15-020 18).

4. The following docwnents, which are being presented as Exhibits to the Court in the Appendix to the Response to Petition for Writ of Mandamus, are

Affidavit of Greg C. Noschese 2 R.P. Appx. 004 true and correct print-outs of the information via the Internet obtained from the official website of the Texas Board of Architectural Examiners: Exhibit II - Texas Board of Architectural Examjners Public Information License Search Results regarding Hans Hecker; and Exhibit 12 - Texas Board of Architectural Examiners Public Information License Search Results regarding Clayco, Inc. Further affiant sayeth not."

Affidavit of Greg C. Noschese 3 R.P. Appx. 005 - SUBSCRIBED AND SWORN TO BEFORE ME, on this the 16ih day of November 2015.

~C1~LD (~J{ib=l_ Sharon D. Blackstock Notary Public in and for the State of Texas My Commission Expires: 01-21-19

SHAROND. BlACKSTOCK My Commfeilon Expjtue • January 21, 2018

Affidavil of Greg C. Noschese 4 R.P. Appx. 6672351v.1 006 5554/38 FILED DALLAS COUNTY 3/2/2015 4:05:16 PM FELICIA PITRE DISTRICT CLERK Candace Tyler DC-15-02018 FORUM STUDIO, INC. and § IN THE DISTRICT COURT CLAYCO, INC., § § Plaintiffs, § § v. § OF DALLAS COUNTY, TEXAS § INTELLICENTER DALLAS § INVESTMENTS LLP, § § Defendants. § 160TH JUDICIAL DISTRICT DEFENDANT’S ORIGINAL ANSWER Intellicenter Dallas Investments LP (the “Defendant” or “Intellicenter”) files its answer to Clacyo’s and Forum Studios’ Original Petition as follows: I.

General Denial 1. Intellicenter denies generally each and every, all and singular, the material allegations contained in Plaintiffs’ Original Petition for Declaratory Relief and demand strict proof thereof by a preponderance of the evidence.

Rule 54 Denial of Condition Precedent 2. Intellicenter hereby denies that Defendants have satisfied all conditions precedent entitling them to the relief sought by their petition.

II.

Affirmative Defenses 3. All or part of Plaintiffs’ claims are barred by waiver.

4. All or part of Plaintiffs’ claims are barred by estoppel.

5. All or part of Plaintiffs’ claims are barred by Texas Civil Practice and Remedies Code Section 16.069.

6. All or part of Plaintiffs’ claims are barred by first material breach.

DEFENANT’S ORIGINAL ANSWER - Page 1 5990124v.1 5554/38

R.P. Appx. 007 7. All or part of Plaintiffs’ claims are barred by fraud.

8. All or part of Plaintiffs’ claims are barred by illegality.

9. All or part of Plaintiffs’ claims are barred by misrepresentation.

WHEREFORE, PREMISES CONSIDERED, Defendant respectfully request that upon trial or hearing of this matter, Plaintiffs take nothing by way of their causes of action, that Defendant go hence with their costs, attorney’s fees and all other relief to which they may show themselves justly entitled.

Respectfully submitted, MUNSCH HARDT KOPF & HARR, P.C.

/s/ Greg C. Noschese _________________ Greg C. Noschese, SB No. 00797164 North Akard Street, Suite 3800 Dallas, Texas 75201-6659 (214)855-7500 (Telephone) (214)855-7584 (Facsimile) Email: [email protected] ATTORNEYS FOR DEFENDANT

DEFENANT’S ORIGINAL ANSWER - Page 2 5990124v.1 5554/38

R.P. Appx. 008 CERTIFICATE OF SERVICE I hereby certify that on this the 2nd day of March, 2015, a true and correct copy of the foregoing instrument was served on the following by Eserve: Kenneth B. Chaiken CHAIKEN & CHAIKEN, PC 5801 Tennyson Pkwy, Suite 440 Plano, TX 75024 (214)265-0250 (214)265-1537 (fax) Email: [email protected] R. Thomas Avery BLITZ, BARDGETT & DEUTSCH, LC South Central Avenue, Suite 1650 St. Louis, Missouri 63105 (314)863-1500 (314)863-1877 (Fax) Email: [email protected]

/s/ Greg C. Noschese _________________ Greg C. Noschese

DEFENANT’S ORIGINAL ANSWER - Page 3 5990124v.1 5554/38

R.P. Appx. 009 FILED DALLAS COUNTY 3/2/2015 4:05:16 PM FELICIA PITRE DISTRICT CLERK Candace Tyler DC-15-02018 FORUM STUDIO, INC. and § IN THE DISTRICT COURT CLAYCO, INC., § § Plaintiffs, § § v. § OF DALLAS COUNTY, TEXAS § INTELLICENTER DALLAS § INVESTMENTS LLP, § § Defendants. § 160TH JUDICIAL DISTRICT DEFENDANT’S COUNTERCLAIM AGAINST CLAYCO, INC. Intellicenter Dallas Investments LP (the “Defendant” or “Intellicenter”) files its Counterclaim against Clacyo, Inc. as follows: I.

Counterclaim Against Clayco 1. On or about May 19, 2006, Intellicenter Dallas Investments, LP contracted with Clayco, Inc. ("Clayco") under a Design Build contract ("Design Build Contract") for the design and construction of a 4 story speculative office building consisting of approximately 211,637 square feet located at 3701 Regent Boulevard, Irving Texas ("Project"). A true and correct copy of the Design Build Contract is attached here to as Exhibit “A”.

2. Among other things, the Design Build Contract provided that the Clayco shall be responsible to Intellicenter for acts and omissions of the Clayco’s employees, subcontractors and their agents and employees, and other persons, including the project architect, engineers and other design professionals, performing any portion of Clayco's obligations with respect to the design of the Project. Clayco was also required to cause all architects, engineers and other design professionals performing design work for the Project to maintain Professional Liability Insurance having minimum limits of One Million Dollars ($1,000,000) per claim and in the aggregate (including excess coverage) (claims made basis). Such Professional Liability

R.P. Appx. 010 Insurance policies were required to (i) provide coverage for claims arising out of any act, error, or omission with respect to the rendering of or failure to render design, engineering, professional or architectural services by architects, engineers or other Design Professionals (and their respective officers, directors, employees or agents) who may be employed, engaged or otherwise utilized by Contractor to perform Contractor’s design, engineering, architectural and professional duties, obligations and responsibilities under the Contract Documents, (ii) include Owner, and its partners members, officers, directors, employees, agents, successors and assigns as “additional insureds”, (iii) be written on an occurrence basis and not on a claims-made basis, (iv) waive any rights of subrogation against Owner and its partners, members, officers, directors, employees, agents, successors and assigns, and (v) be written by an insurance company or compliance with a current A.M.

Best Company rating of A-/IX or better and be admitted to do business in the state where the Land is located. Contract General Conditions 11.1.4 (emphasis added). Clayco was also required to obtain a commercial general liability policy on a similar basis naming Owner as an additional insured and providing coverage on an occurrence basis. Contract 15.1.7.

3. The Design Build Contract Documents included a specification manual which required the elevated floor slabs to be designed for a 100lb live load with Code allowance reductions. Clayco allegedly completed construction on March 6, 2007 as indicated in the architect's certification under the Certificate of Substantial Completion. Throughout the course of the Project, Clayco and its subcontractors, including, without limitation, the design professionals repeatedly represented to Intellicenter that the Project was being built in accordance with the Design Build Contract specifications. Intellicenter relied upon these representations in authorizing payments.

4. In September 2007, six months after Substantial Completion, the architect, Forum Studio Inc. ("FS")., represented to Intellicenter that the Project was built in accordance

R.P. Appx. 011 with the plans and specifications. A true and correct copy of the architect’s certificate is attached hereto as Exhibit “B” (“Architect’s Certificate”). The Architect’s Certificate specifically provided, “[w]e understand that you and the Venture are relying on this letter and that you or the Venture may pursue a claim against us in the event that you or the Venture has any loss or damage as a result of the facts and circumstance that exist at the Project which make any of our certifications incorrect or inaccurate.” The unsealed Architect’s Certificate was signed by Hans Hecker even though Mr. Hecker is not licensed in Texas as an Architect and the Architect’s Certificate provided what it described as “professional opinions” regarding a Texas project. Mr. Hecker also identified himself as a “principal” which under the Texas Occupations Code means he is a Texas architect even though there does not appear to be any record that Mr. Hecker is a registered Texas architect. The Architect’s Certificate also purports to offer opinions on the structural aspects of the Project, which Intellicenter now knows were untrue or inaccurate.

5. In late 2013, as Intellicenter was preparing the building for sale, a broker noted some cracking in the exterior tilt panels. After evaluating the cracks, the design, and the building, Intellicenter learned that the cracks, some of which appeared to have been intentionally concealed by repair at the time of initial construction, were the result of inadequate structural design in portions of the perimeter concrete wall panels and a portion of the steel beam to wall panel connections in such a way that some, if not all, failed to meet applicable building code based upon contract specified live load on design drawings. The Architect’s Certificate had not disclosed that inadequate structural design in portions of the perimeter concrete wall panels and a portion of the steel beam to wall panel connections in such a way that some, if not all, failed to meet applicable building code based upon contract specified live load on design drawings.

6. Upon its first discovery of the cracks, Intellicenter wrote Clayco and requested that Clayco correct the damage resulting from the deficient design and/or construction and even

R.P. Appx. 012 requested contractually required insurance information for occurrence based insurance policies.

A true and correct copy of the September 16, 2013 letter Intellicenter sent Clayco is attached hereto as Exhibit “C”. At Clayco’s request, Intellicenter even met with Clayco in person, allowed an inspection, provided data, evaluated information provided by Clayco, though it appeared incomplete and Intellicenter requested even more information. Despite information establishing Clayco’s failure to deliver a Project that could support the specified live loads, Clayco refused to take any action to assist with the diagnosis and/or repair of the Project. Clayco also failed to provide Intellicenter with the insurance information required to be furnished under the Contract.

Despite the request to repair the deficiency and/or provide insurance information, Clayco has refused to correct the design and construction deficiencies and/or provide the requested insurance information. Because of Clayco's refusal to repair the Project, Intellicenter has sought bids and contracted for the Project to be repaired to correct the defects. Before undertaking the repairs necessitated by Clayco’s acts and/or omissions, Intellicenter had not made any repairs to the outside of the Project.

7. On September 5, 2014, Intellicenter initiated a demand for arbitration in accordance with the American Arbitration Association Construction Industry Rules. The parties abated the arbitration to allow Clayco and its design professionals to inspect the property.

During the agreed inspection, additional cracks were discovered requiring even more repairs.

Clayco continues and refuses to repair the Project despite never disputing the need for the repairs. On February 20, 2015, Plaintiffs commenced this case, and are now asking this court to provide affirmative relief under the Declaratory Judgment Act and also seeking attorney’s fees.

8. As a result of Clayco’s acts and or omissions detailed above, Intellicenter has suffered actual damages, including, without limitation, repair costs, expert and testing costs, diminution in value and other damages as provided by law.

R.P. Appx. 013 Breach of Contract 9. By the acts and/or omissions described above, Clayco breached the Design Build Contract and has caused Intellicenter damages in the maximum amount of $3.5 million dollars exclusive of attorney’s fees.

Negligent Misrepresentation 10. By the acts and/or omissions described above, Clayco and/or its agents, subcontractors or design professionals it is responsible for under the Design Build Contract supplied false information to Intellicenter for the guidance in its business. Such false information included, without limitation, misstatements of fact, misstatements of opinion and misrepresentation by non-disclosure. Neither Clayco nor and/or its agents, subcontractors or design professionals it is responsible for under the Design Build Contract exercised reasonable care in obtaining or communicating the information. Intellicenter justifiably relied upon the information provided and has now suffered pecuniary losses as a proximate result of the negligent misrepresentations for which it now seeks recovery.

Fraud 11. Through the acts and/or omissions detailed above, Clayco made false representations of fact with the intent that Intellicenter rely upon them by either affirmatively misrepresenting facts and or failing to disclose facts when it or its agents, subcontractors or design professionals it is responsible for under the Design Build Contract had a duty to disclose Intellicenter justifiably relied upon said false representations of fact to its detriment because the false representations related to specialized and technical matters and knowledge that were known only to Clayco and its agents, subcontractors or design professionals it is responsible for under the Design Build Contract. Clayco’s false representations and/or the false representations it is responsible for and/or Clayco’s nondisclosure and or the nondisclosure it is responsible for caused actual damages and/or injuries to Intellicenter for which Intellicenter now

R.P. Appx. 014 seeks recovery.

Exemplary Damages 12. As a result of Clayco’s fraud and or the fraud it is responsible for, Intellicenter hereby seeks exemplary damages as provided by law.

Texas Civil Practice & Remedies Code Section 16.069 13. While Intellicenter disputes that limitations has run on any of its claims, to the extent Clayco, or any other party claims limitations has run, Intellicenter affirmatively pleads the operation and effect of Section 16.069, in addition to any other tolling provision supported by the above plead facts.

WHEREFORE, PREMISES CONSIDERED, Respondent respectfully request that upon trial or hearing of this matter, Plaintiffs take nothing by way of their causes of action, that Intellicenter have and recover judgment on its counterclaim against Clayco including actual damages including without limitation, repair costs, expert and testing costs, and/or diminution in value, and exemplary damages. Additionally, Intellicenter requests that upon judgment it go hence with its costs, attorney’s fees and all other relief to which it may show herself justly entitled.

Respectfully submitted, MUNSCH HARDT KOPF & HARR, P.C.

/s/ Greg C. Noschese _________________ Greg C. Noschese, SB No. 00797164 North Akard Street, Suite 3800 Dallas, Texas 75201-6659 (214)855-7500 (Telephone) (214)855-7584 (Facsimile) Email: [email protected] ATTORNEYS FOR DEFENDANT

R.P. Appx. 015 CERTIFICATE OF SERVICE I hereby certify that on this the 2nd day of March, 2015, a true and correct copy of the foregoing instrument was served on the following by Eserve: Kenneth B. Chaiken CHAIKEN & CHAIKEN, PC 5801 Tennyson Pkwy, Suite 440 Plano, TX 75024 (214)265-0250 (214)265-1537 (fax) Email: [email protected] R. Thomas Avery BLITZ, BARDGETT & DEUTSCH, LC South Central Avenue, Suite 1650 St. Louis, Missouri 63105 (314)863-1500 (314)863-1877 (Fax) Email: [email protected]

/s/ Greg C. Noschese _________________ Greg C. Noschese

R.P. Appx. 016 AlA Document A11 f" - 1997 Standard Form of Agreement Between Owner and Contractor where the basis for payment is the COST OF THE WORK PLUS A FEE with a negotiated Guaranteed Maximum Price AGREEMENT made as of the nineteenth day of May in the year two thousand six (In words, indicate day, month and year) BETWEEN the Owner: (Name, address and other information) This document has important legal consequences.

Consultation with an attorney is encouraged with respect to its completion or modification.

Intellicenter Dallas Investments. LLP This document is not intended for 8115 Preston Rd., Suite #700 use in competitive bidding.

Dallas. TX 75225 AlA Document A201-1997, and the Contractor: General Conditions of the (Name, address and other information) Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified.

Clayco Inc. This document has been 2199 Innerbelt Business Center Drive approved and endorsed by the St. Louis Missouri 63114 Associated General Contractors of America.

The Project is: (Name and location) The design and construction of a 4-story speculative office building consisting of aPProximately 211.637 gross square feet located at 3701 Regent Blvd.. Irving Texas.

The Architect is: (Name, address and other information) FS Architecture PC c/o Forum Studios. Inc. 2199 Innerbelt Business Center Drive St. Louis. Missouri 63114

Structural. mechanical electrical and civil engineering services and the consulting services of other Design Professionals for the Project will be provided contractually through the Architect except as follows: Topographic and boundarv survey to be provided by Owner.

The Owner and Contractor agree as follows.

AlA Document A1111N -1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Architects.

All rights reserved. WARNING: This AlA"' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or 1 distribution of this AlA"' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:11:31 on 05/19/2006 under Order No.10001B2995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A111 - Koll- lntellicenter- Dallas v3 (5·19-06) (2347931739)

R.P. Appx. 017 ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this specifically modified Agreement, the specifically modified AlA Document A201-1997, General Conditions af the Caatraet (Geaeral, Sl:lflJlle'fR@Rta~ aaa ather Ceaaitieas), ("A201") Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement; these form the Caatraet, "Contract," and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 15. If anything in the other Contract Documents is inconsistent with this Agreement, this Agreement shall govern.

ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others.

ARTICLE 3 RELATIONSHIP OF THE PARTIES The Contractor accepts the relationship of trust and confidence established by this Agreement and covenants with the Owner to cooperate with the Architect and exercise the Contractor's skill and judgment in furthering the interests of the Owner; to furnish efficient business administration and supervision; to furnish at all times an adequate supply of workers and materials; and to perform the Work in an expeditious and economical manner consistent with the Owner's interests. The Owner agrees to furnish and approve, in a timely manner, information required by the Contractor and to make payments to the Contractor in accordance with the requirements of the Contract Documents.

The Contractor will enter into a direct contractual relationship with the Architect. engineers, design/build subcontractors and other design professionals (collectively the ''Design Professionals") to provide the design of the Project The Owner acknowledges and agrees that the Contractor is not a licensed architect or engineer and is not agreeing to perform services which require such a license in the State in which the Project is located. Such services will be performed by licensed architects engineers and design/build subcontractors under separate agreements. The fees and. expenses of all such design professionals shall be included as part of the Cost of the Work. The Contractor shall cause the Architect to prepare and submit, as part of the Cost of the Work. the Construction Documents necessary for the construction of the Project. The contractual obligations of such the Architect engineers and other design persons or entities are undertaken and performed in the interests of the Contractor. The agreements between the Contractor and the Architect engineers and other design professionals· shall be in writing and these arrangements. including financial arrangements with respect to the Project. shall be promptly and fully disclosed to the Owner upon request. The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's employees. subcontractors and their agents and employees. and other persons, including the Architect engineers and other Design Professionals, performing any portion of the Contractor's obligations under this Article 3 with respect to the design of the Project. The "Construction Documents" may include drawings. specifications. and other documents and electronic data setting forth the requirements for construction of the Work. and shall (i) be consistent with the intent of the Project as a whole (ii) provide information for the use of those in the building trades; and (iii) include documents customarily required for regulatory agency approvals. The fees and expenses of all such Design Professionals shall be included as part of the Contract Sum.

ARTICLE 4 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 4.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement, if it differs from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed.)

February 21.2006.

If, prior to commencement of the Work, the Owner requires time to file mortgages, mechanic's liens and other security interests, the Owner's time requirement shall be as follows;

AlA Document A111TM -1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Architects.

All rights reserved. WARNING: This AlA" Document is protected by U.S. Copyright law and International Treaties. Unauthorized reproduction or 2 distribution of this AlA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at15:11 :31 on 05/19/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A111 - Koll - lntellicenter- Dallas v3 (5-19-06) (2347931739)

R.P. Appx. 018 § 4.2 The Contract Time shall be measured from the date of commencement.

§ 4.3 The Contractor shall achieve Substantial Completion of the entire Work not later than aays frem December 26, 2006 subject to extensions for any delays contemplated in Paragraph 4.1 of this Agreement or Paragraph 8.3.1 of the form the General Conditions (AlA Document No. A201) attached hereto. such completion date ef eemmsaesment, er being referred to herein as fellew!r.the "Substantial Completion Date." (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of commencement. Unless stated elsewhere in the Contract Documents, insert any requirements for earlier Substantial Completion of certain portions of the Work.)

I PeFtien ef Wel=k SubstaRtial Cempletien date

, subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to complete on time, or for bonus payments for early completion of the WeFk:iWork. )The initial construction schedule (the "Project Schedule" J for the Project is attached hereto as Exhibit "A

ARTICLE 5 BASIS FOR PAYMENT § 5.1 CONTRACT SUM § 5.1.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum is the Cost of the Work as defined in Article 7 plus the Contractor's Fee.

§ 5.1.2 The Contractor's Fee is: (State a lump swn, percentage of Cost of the Work or other provision for determining the Contractor's Fee, and describe the method of adjustment of the Contractor's Fee for changes in the Work.)

The "Contractor's Fee" shall be four percent (4%) of the Cost of the Work subject to an increase in the fee of four percent (4%) on all Change Orders. as defined in Paragraph 6.3 herein below. increasing the Cost of the Work, and subject to a decrease in the fee of four percent (4%) on all Change Orders decreasing the Cost of the Work.

§ 5.2 GUARANTEED MAXIMUM PRICE § 51.1 The sum of the Cost of the Work and the Contractor's Fee is guaranteed by the Contractor not to exceed ~Fourteen Million Three Hundred Fifty-Three Thousand Nine Hundred Seventy-Three and 001100 Dollars ($14.353.973.00). subject to additions and deductions by Change Order as provided in the Contract Documents.

Such maximum sum is referred to in the Contract Documents as the Guaranteed Maximum Price (as the same may be adjusted from time to time by Change Order or otherwise the "Guaranteed Maximum Pfi€e;..Price"). Costs which would cause the Guaranteed Maximum Price to be exceeded shall be paid by the Contractor without reimbursement by the Owner If. upon Final Completion the GMP exceeds Cost of the Work plus the Contractor's Fee then the amount of such excess shall be referred to herein as the "savings": and the savings shall be shared by the Owner and the Contractor as follows: sixty percent (60%) of the savings shall be retained by the Owner; and fortv percent (40%) of the savings shall be paid to the Contractor as a fee in addition to the Gwaer.Contractor' s Fee described in Paragraph 5.1.2 above. (Insert specific provisions if the Contractor is to participate in any savings.)

AlA Document A111TM -1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of ArcMects.

All rights reserved. WARNING: This AlA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or 3 distribution of this AlA"' Document, or any portion of it, may result in severe civH and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:11:31 on 0511912006 under Order No.1000182995_1 which expires on 712312006, and is not for resale.

User Notes: Clayco A111 - Koll • lntellicenter- Dallas v3 (5-19-06) (2347931739)

R.P. Appx. 019 § 5.2.2 The Guaranteed Maximum Price is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If decisions on other alternates are to be made by the Owner subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when the amount expires.)

See Outline Soecification & Drawings (the "Outline Specs") attached to this Contract as Exhibit "B" (consisting of pages).

§ 5.2.3 Unit prices, if any, are as follows: DeseriptiaR Prise($ 0.00) See Outline Specs.

§ 5.2.4 Allowances, if any, are as follows (Identify and state the amounts of any allowances, and state whether they include labor, materials, or both.)

.O.maunt ($ 0.00) IRslulfed items See Outline Specs. If the Contract Documents provide for any allowances then the parties agree that Ci) the GMP shall be reduced by the amount if any. by which the allowance exceeds the actual cost of the item for which such allowance was made. and (ii) the GMP shall be increased by the amount, if any. by which the actual cost of the item for which such allowance was made exceeds the allowance.

§ 5.2.5 Assumptions, if any, on which the Guaranteed Maximum Price is based are as follows:

Contractor's general conditions as set forth in the Division 1 costs shall not exceed 125% of the amount set forth on the Clayco Control Budget attached as Exhibit "C'.

See Outline Specs.

§ 5.2.6 To the extent that the Drawings and Specifications are anticipated to require further development by the Architect, the Contractor has provided in the Guaranteed Maximum Price for such further development consistent with the Contract Documents and reasonably inferable therefrom. Such further development does not include such things as changes in scope, systems, kinds and quality of materials, finishes or equipment, all of which, if required, shall be incorporated by Change Order.

ARTIClE 6 CHANGES IN THE WORK § 6.1 Adjustments to the Guaranteed Maximum Price on account of changes in the Work may-:shall be determined by aHJ sf fue metheas listed in Seetiea 7.:U sf AlA Deelimeat A291 1997.accordance with Paragraph 6.5 below.

saeeeat~=aets (eKeept these awarded with the Owaer' s ~fier eeaseat sa the §..!,_§ 6.2 Ia ealallatffig adj\lstmeats te aasis sf east plas a fee), the terms "east" aaEl "fee" as ased ia Seetiea 7.3.3.3 sf AlA Deeameat A291 1997 arul the terms "eests" aad "a reaseaable alle·;vaaee fur everheaa aBd flFS:fit" as l!seel iR Seeeea 7.3.a sf All Deeameat A291 1997 shall have the meaaiags assigaee te tRBm iR '\Ii• Deeumeat A2Q1 1997 aaa shall RSt ae meeifiea ay Artieles 3, 7 ana8 sf this Agreemeat. Aejastmeets te sabseatrasts a•;'iffileEl with the Ovmer's ~rier seaseat ea the basis ef eest plas a fee shall be ealealatea ie aeseraaase 'Nith the terms ef these subseatraets.

~In calculating adjustments to the Guaranteed Maximum Priee,Price or the impact of any Change Order the terms "cost" and "costs" as used in the above-referenced provisions of AlA Document A20I-1997 shall mean the Cost of the Work as defined in Article 7 of this Agreement and the terms "fee" and "a reasonable allowance for overhead and profit" shall mean the percentage for the Contractor's Fee as ElefiReEl-indicated in Section 5.1.2 of this Agreement.

AlA Document A111TII-1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Jnslitute of Architects.

All rights reserved. WARNING: This AlA'" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or 4 distribution of this AlA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:11:31 on 05/19/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A111 . KoR- lntellicenter- Dallas v3 (5-19-06) (2347931739)

R.P. Appx. 020 § 6.4 If aa Sfleeifie fJrevisiaa is made ia Seetiaa 3.1 fer aajastmeat ef the CaRtraeter's l'ee ia the ease af ehaages ia the V 'ark, ar if the ~<teat af saell ehaages is saeh, ia the aggregate, that aflf3lieatiaa af the aajustmeat flF8Visiaas af Seetian 3 .I will ea\ise slibstaatial iae~aity ta the 0" 'Her ar Cantraetar, the CeHtrootar' s Pee shall be e~aitably aajlistea eH the basis af the Pee established fer the arigiaal Wark, aaa tke Gliaraateea Ha~dmam Priee shall ee aajlistea aesardiagly.

§ 6.3 If (a) the Owner requests a change in the Work or (b) the Contractor otherwise is entitled to a Change Order as provided in the Contract Documents then the Contractor shall have the right to submit to the Owner a written change order request (a "CO Reguesf'). which shall set forth such change to the Contract as shall be appropriate.

Such CO Request shall be in writing and shall set forth the appropriate changes, if any, to the (i) Cost of the Work (ii) the Contractor's Fee. (iii) the Guaranteed Maximum Price. (iv) the Contract Sum {v) the schedule of values, (vi) the Substantial Completion Date. or (vii) any other provisions of the Contract. Each CO Request shall constitute an offer by the Contractor to amend the Contract. If the Owner accepts such offer in writing and without revision. then such offer and acceptance together shall constitute a "Change Order" which shall operate to amend the Contract. If the Owner accepts such offer subject to revisions not previously agreed to by the Contractor in writing then such "acceptance" shall constitute a counteroffer by the Owner to the Contractor which the Contractor may either accept in writing or reject. If the Contractor accepts such counteroffer in writing the same shall constitute a written Change Order. The Contractor shall have no obligation or right to perform any changes in the Work except pursuant to a Change Order made as provided herein.

ARTICLE 7 COSTS TO BE REIMBURSED § 7.1 COST OF THE WORK The term Cost of the Work shall mean costs necessarily incurred by the Contractor in the proper performance of the Work Such costs shall be at rates not higher than the standard paid at the place of the Project except with prior . written consent of the Owner. The Cost of the Work shall include only the items set forth in this Article 7.

§ 7.2 LABOR COSTS § 7.2.1 Wages of construction workers directly employed by the Contractor to perform the construction of the Work at the site or, with the Owner's approval, at off-site workshops.

§ 7.2.2 Wages or salaries of the Contractor's supervisory and administrative flli!FSeflHel personnel. based upon the time expended on the Project when stationed at the site with the Owner's ~re"'al.written approval Time expended on the Project by the Contractor's Project Manager for the Project shall be included as a Cost of the Work regardless of where the Project Manager is located. (If it is intended that the wages or salaries of certain personnel stationed at the Contractor's principal or other . offices shall be included in the Cost of the Work; identify in Article 14 the personnel to be included and whether for all or only part of their time, and the rates at which their time will be charged to the Work.)

§ 7.2.3 Wages and salaries of the Contractor's supervisory or administrative personnel engaged, at factories, workshops or on the road, in expediting the production or transportation of materials or equipment required for the Work, but only for that portion of their time required for the Work.

§ 7.2.4 Costs paid or incurred by the Contractor for taxes, insurance, contributions, assessments and benefits required by law or collective bargaining agreements and, for personnel not covered by such agreements, customary benefits such as sick leave, medical and health benefits, holidays, vacations and pensions, provided such costs are based on wages and salaries included in the Cost of the Work under Sections 7 .2.1 through 7 .2.3.

§ 7.3 SUBCONTRACT COSTS § 7.3.1 Payments made by the Contractor to Subcontractors (including. without limitation. the Contractor if the Contractor or a division of the Contractor is also a subcontractor but only if approved in writing in advance by Owner) in accordance with the requirements of the subcontracts.

§ 7.4 COSTS OF MATERIALS AND EQUIPMENT INCORPORATED IN THE COMPLETED CONSTRUCTION § 7.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in the completed construction.

AlA Document A111 111 - 1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Architects.

All rights reserved. WARNING: This AlA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or 5 distribution of this AlA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:11 :31 on 05119/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A111 - Koll- lntellicenter ·Dallas v3 (5·19·06) (2347931739)

R.P. Appx. 021 § 7.4.2 Costs of materials described in the preceding Section 7.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials, if any, shall become the Owner's property at the completion of the Work or, at the Owner's option, shall be sold by the Contractor. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work.

§ 7.5 COSTS OF OTHER MATERIALS AND EQUIPMENT, TEMPORARY FACILITIES AND RELATED ITEMS § 7.5.1 Costs, including transportation and storage, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment, and hand tools not customarily owned by construction workers, that are provided by the Contractor at the site and fully consumed in the performance of the Work; and cost (less salvage value) of such items if not fully consumed, whether sold to others or retained by the Contractor. Cost for items previously used by the Contractor shall mean fair market value.

§ 7.5.2 Rental charges. for temporary facilities, machinery, equipment, and hand tools not customarily owned by construction workers that are provided by the Contractor at the site, whether rented from the Contractor or others, and costs of transportation, installation, minor repairs and replacements, dismantling and removal thereof. Rates and quantities of equipment rented from the Contractor shall be sHBjeet te not exceed the Owner's 13rier apprevaLfair market value thereof.

§ 7.5.3 Costs of removal of debris from the site.

§ 7.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, telephone service at the site and reasonable petty cash expenses of the site office.

§ 7.5.5 That portion of the reasonable expenses of the Contractor's personnel incurred while traveling in discharge of duties connected with the Work.

§ 7.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, if approved in advance by the Owner.

§ 7.6 MISCELLANEOUS COSTS § 7.6.1 That portion of insurance aml beaa pFemiiHBs that can be directly attributed to this Contract. The parties stipulate and agree that Contractor's cost for providing such insurance is six tenths of one percent (0. 75%) of the Cost of the Work. excluding such cost of insurance. Ceatrae~: § 7.6.2 Sales, consumer. use or similar taxes imposed by a governmental authority that are related to the Work.

§ 7.6.3 Fees and assessments for the building permit and for other permits, licenses and inspections for which the Contractor is required by the Contract Documents to pay.

§ 7.6.4 Fees of laboratories for tests required by the Contract Documents, except those related to defective or nonconforming Work for which reimbursement is excluded by Section 13.5.3 of AIA Document A201-1997 or other provisions of the Contract Documents, and which do not fall within the scope of Section 7. 7.3.

§ 7.6.5 ReyalJies aHa Iieease fees flaiS fer the liSE! sf a partieHlar aesiga, pmeess sr fli'BBH6t FeE!Hirea by the Csmraet I>eeHmeats; the east sf aefeaaillg suits sF elaiFHs fer iflfriagemeat sf flalea~ rights arisiag frsFH sHell reEIUi£emes ~ ef the Ceatraet I>eeaFll:eHts; asa fl~'HieHts Fll:aae ia aeeeramee with legal jHagFHeHts agaiast the CeHtFaeteF Fi!SHltiHg frem sueh suits sF elaifll:s aaa p~·mems sf settlefll:eats FHaae "'ita the Owaer's eeaseat lie· ·e"er, sueh eests sf legal aefeases, juagmeats aaa settlefll:8Bts shall aet be iaeluaea ia the ealeHlatiea sf the CeatraeteF' s Fee Sf sllbjeet te the Gliaranteea Maxifll:Hm Prise. If sHell reyalties, fees aaa eests are exeluaea by the last seRteaee sf Seetiea 3.17.1 ef i\L\ I>eeameat A2Ql 199+ er ether flFSYisieas ef the Ceatraet I>eeHFHeats, thea they shall B:et be iRelaaea ia the Cast ef the Wefk: § 7.6.5 Royalties and license fees paid for the use of a particular design, process or product required by the Contract Documents if such royalty and license fees are disclosed to Owner prior to Contractor commencing construction of the Project and Owner approves same in writing.

§ 7.6.6 Data processing costs related to the Work.

AlA Document A111Tll-1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The Amertcan Institute of Architects.

All rights reserved. WARNING: This AlA" Document is protected by U.S. Copyright law and International Treaties. Unauthorized reproduction or 6 distribution ot this AlA"' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum eKtent possible under the law. This document was produced by AlA software at15:11:31 on 05/19/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not tor resale.

User Notes: Clayco A111 • Koll- lntemcenter- Dallas v3 (5-19-06) (2347931739)

R.P. Appx. 022 § 7.6. 7 Deposits lost for causes other than the Contractor's negligence or failure to fulfill a specific responsibility to the Owner as set forth in the Contract Documents.

§ 7.6.8 Legal, mediation and arbitration costs, including attorneys' fees, other than those arising from disputes between the Owner and Contractor, reasonably incurred by the Contractor in the performance of the Work and with the Owner's prior written approval; which approval shall not be unreasonably withheld.

§ 7.6.9 Expenses incurred in accordance with the Contractor's standard personnel policy for relocation and temporary living allowances of personnel required for the Worlc, if approved by the Owner.

§ 7.6.1 0 Payments by the Contractor into reserves established under the CCIP for the Project for providing Subcontractor insurance. The Contractor represents that the amount of such reserve payments shall not exceed the insurance premiums that reasonably would be incurred for the Project in the absence of the CCIP.

§ 7.6.11 Other direct reasonable expenses incurred by the Contractor in connection with the Project to the extent not described in this Section 7.6.

§ 7.6.12 Design service fees payable to the Architect and any other design professionals engaged by Architect or the Contractor to Provide the design for the Project.

§ U OTHER COSTS AND EMERGENCIES § 7.7.1 Other costs incurred in the performance of the Work if and to the extent approved in advance in writing by the Owner.

§ 7.7.2 Costs due to emergencies incurred in taking action to prevent threatened damage, injury or loss in case of an emergency affecting the safety of persons and property, as provided in Section 10.6 of AIADocumentA201-1997.

§ 7. 7.3 Costs of repairing or correcting damaged er aeaeenfefflliag Work executed by the Contractor, Subcontractors or suppliers, provided that such damaged er aeaeeaferraiag Work was not caused by aegligeBee NEGLIGENCE, intentional misconduct or failure to fulfill a specific responsibility of the Contractor and only to the extent that the cost of repair er eerrestiea is not reeeverallle recovered by the Contractor from in~urance, sureties, Subcontractors or suppliers.

ARTICLE 8 COSTS NOT TO BE REIMBURSED § 8.1 The Cost of the Work shall not include: § 8.1.1 Salaries and other compensation of the Contractor's personnel stationed at the Contractor's principal office or offices other than the site office, except as specifically provided in Sections 7 .2.2 and 7 .2.3 or as may be provided in Article 14.

§ 8.1.2 BJ'fleases Except to the extent provided in Article 7 exoenses of the Contractor's principal office and offices other than the site office.

§ 8.1.3 Overhead and general expenses, except as may be expressly included in Article 7.

§ 8.1.4 The Contractor's capital expenses, including interest on the Contractor's capital employed for the Work.

§ 8.1.5 Rental costs of machinery and equipment, except as specifically provided in Section 7.5.2.

§ 8.1.6 Except as provided in Section 7. 7.3 of this Agreement, costs due to the negligence or failure to fulfill a specific responsibility of the Contractor, Subcontractors and suppliers or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable.

§ 8.1. 7 Any cost not specifically and expressly described in Article 7.

AlA Document A1111N -1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Architects.

All rights reserved. WARNING: This AlA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or 7 distribution of this AlA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:11:31 on 05/19/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A 111 · Koll • lntellicenter- Dallas v3 (5·19-06) (2347931739)

R.P. Appx. 023 § 8.1.8 Costs, other than costs included in Change Orders approved by the Owner, that would cause the Guaranteed Maximum Price to be exceeded.

§ 8.1.9 The release or waiver or bonding. of any liens or claims which may be claimed. threatened or recorded so long as Owner paid Contractor all undisputed amounts under this Contract.

Costs recovered by Contractor through insurance or otherwise.

ARTICLE 9 DISCOUNTS, REBATES AND REFUNDS § 9.1 Cash discounts obtained on payments made by the Contractor shall accrue to the Owner if ( 1) before making the payment, the Contractor included them in an Application for Payment and received payment therefor from the Owner, or (2) the Owner has deposited funds with the Contractor with which to make payments; otherwise, cash discounts shall accrue to the Contractor. Trade discounts, rebates, refunds and amounts received from sales of surplus materials and equipment shall accrue to the Owner, and the Contractor shall make provisions so that they can be secured.

§ 9.2 Amounts that accrue to the Owner in accordance with the provisions of Section 9.1 shall be credited to the Owner as a deduction from the Cost of the Work.

ARTICLE 10 SUBCONTRACTS AND OTHER AGREEMENTS § 10.1 The Owner hereby agrees that portions of the Work may be subcontracted to the Contractor or any division of the Contractor if agreed to in writing in advance by Owner. Those portions of the Work that the Contractor does not e~:~stsmafifj perform with the Contractor's own personnel (or which are not subcontracted to the Contractor or a division thereof as aforesaid) shall be performed under subcontracts or by other appropriate agreements with the Contractor. The Owner may designate specific persons or entities from whom the Contractor shall obtain bids. The Contractor shall obtain bids from Subcontractors and from suppliers of materials or equipment fabricated especially for the Work and shall deliver such bids to the Arehi:teet. Owner. The Owner shall then determine, with the advice of the Csfttfaetsr and the .'\rehiteet, Contractor. which bids will be accepted. The Contractor shall not be required to contract with anyone to whom the Contractor has reasonable objection. For each portion of the Work having an estimated cost in excess of $50,000. Contractor shall endeavor in good faith. using significant efforts. to obtain, and provide to Owner uoon reauest. bids for said portion of the Work from at least 3 qualified subcontractors. If Contractor cannot obtain bids from 3 qualified bidders. Contractor shall inform Owner of this before entering into the relevant Subcontract Contractor shall not subcontract performance of all or any portion of the Project under the Contract Documents pursuant to any subcontract in excess of $50.000 without first notifying Owner of the intended subcontracting and obtaining Owner's acceptance in writing of the subcontracting and the subcontractor. which acceptance or rejection shall be promptly given. If requested by Owner. Contractor shall furnish Owner a copy of the prooosed subcontract for Owner's review of the terms and conditions thereof and shall not execute such subcontract until Owner has accepted such terms. Failure of Contractor to comply with this Section may be deemed to be a material breach of the Contract Documents. Contractor shall not remove any of the following major subcontractors and replace any of such major subcontractors with any other subcontractor without Owner's prior written approval. which shall not be unreasonably withheld or delayed. provided the prooosed replacement subcontractor has the experience, financial backing and historv of quality construction for projects of the nature and timing of the Project The major subcontractors that can onlv be rerlaced in accordance with the t(\regoing procedures are as follows: anv CSl Division 15 or 16 subcontractor aud any subcontractor pe1forrning roofing or exterior glass or glazing work. Contractor shall not be relieved of obligations under the Contract Documents by virtue of Owner's approval of any subcontractors.

§ 10.2 If a specific bidder among those whose bids are delivered by the Contractor to the .'\relriteet Owner ( 1) is recommended to the Owner by the Contractor; (2) is qualified to perform that portion of the Work; and (3) has submitted a bid that conforms to the requirements of the Contract Documents without reservations or exceptions, but the Owner requires that another bid be accepted, then the Contractor may require that a Change Order be issued to adjust the Guaranteed Maximum Price by the difference between the bid of the person or entity recommended to the

AlA Document A111 711 -1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963,1967,1974,1978, 1987 and 1997 by The American Institute of Architects.

All rights reserved. WARNING: This AlA"' Document is protected by U.S. Copyright law and International Treaties. Unauthorized reproduction or 8 distribution of this AlA~ Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:11:31 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A 111 - Koll - lntellicenter - Dallas v3 (5· 19·06) (2347931739)

R.P. Appx. 024 Owner by the Contractor and the amount of the subcontract or other agreement actually signed with the person or entity designated by the Owner.

§ 10.3 Subcontracts or other agreements shall conform to the applicable payment provisions of this Agreement, and shall be lump sum contracts and shall not be awarded on the basis of a fixed fee or cost plus a fee without the prior consent of the Owner.

§ 10.4 The Owner shall be invited to all subcontract bid and design review meetings.

§ 10.5 Contractor will. and will cause its subcontractors to comply with the terms of the Contract Documents applicable to the portion of the Project performed by them. If any portion of the Project that has been subcontracted by Contractor is not prosecuted in accordance with the Contract Documents. on request of Owner the subcontractor shall be replaced and shall not be employed again on the Project.

§ 10.6 Contractor shall include a provision in the contract with each subcontractor authorizing assignment of such contract to Owner in the event of a termination by Owner of the Contract Documents with Contractor.

§ 10.7 As used in the Contract Documents. the term "subcontract" shall also include purchase orders and rental agreements for materials or equipment and the term "subcontractor" shall also include vendors or suppliers of such material or equipment ARTICLE 11 ACCOUNTING RECORDS The Contractor shall keep full and detailed accounts and exercise such controls as may be necessary for proper financial management under this Contract, and the accounting and control systems shall be satisfactory to the Owner. The Owner and the Owner's accountants shall be afforded access to, and shall be permitted to audit and copy, the Contractor's records, books, correspondence, instructions, drawings, receipts, subcontracts, purchase orders, vouchers, memoranda and other data relating to this Contract, and the Contractor shall preserve these for a period of three years after final payment, or for such longer period as may be required by law.

ARTICLE 12 PAYMENTS § 12.1 PROGRESS PAYMENTS § 12.1.1 Based upon Applications for Payment submitted to the Arehiteet Owner by the Cem£aeter ana Certifieates fur Paymem: issasa by the ,'\Fehiteet, Contractor, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

§ 12.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows:

§ 12.1.3 Provided that an Application for Payment is received by the Ar€hlteet Owner not later than the first (l ' 1) day of a month, the Owner shall make payment to the Contractor not later than the twentieth (20th) day of the same month. If an Application for Payment is received by the A:rehiteet Owner after the application date fixed above, payment shall be made by the Owner not later than f--+twenty (20) days after the A.i'€hiteet Owner receives the Application for Payment.

§ 12.1.4 With each Application for Payment, the Contractor shall su bruit .@}_payrolls, petty cash accounts, receipted invoices or invoices with check vouchers attached, and any other evidence required by the Owner er '\relli>eet to demonstrate that cash disbursements already made by the Contractor on account of the Cost of the Work equal or exceed (1) progress payments already received by the Contractor; less (2) that portion of those payments attributable to the Contractor's Fee; plus (3) payrolls for the period covered by the present Application for Pavment (b) unconditional lien waivers in such form as Owner may reasonably require for the prior month's oayment by Owner to Contractor. executed by Contractor and all first tier subcontractors mechanics and materialmen on the Project. (c) conditional lien waivers in such form as Owner may reasonably require for Paymeat.the current month's payment by Owner to Contractor. executed by Contractor and all first tier subcontractors. mechanics and materialmen on the Project the only condition thereof being the receipt of payment from Owner (or Contractor in the case of the subcontractors. mechanics and materialmen). (d) an affidavit executed by Owner indicating the names of all AlA Document A111'M -1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 ancl1997 by The American Institute of Architects.

All rights reserved. WARNING: This AlA"' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or g distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:11:31 on 05119/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A111 • Koll-lntellicenter ·Dallas v3 (5·19-06) (2347931739)

R.P. Appx. 025 subcontracts and materialmen that have worked on the Project since the date of the last Application for Payment. and (e) within 45 days after the foundation for the Project has been poured. a foundation survey showing the location of the foundation for the Project. along with the boundaries of the Land the location of any flood plain and all easements and other title exceptions affecting the Land and any set back or other building restrictions as set forth on the most recent Survey.

§ 12.1.5 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor and approved in writing by Owner in accordance with the Contract Documents. The schedule of values shall allocate the entire Guaranteed Maximum Price and the Contractor's current estimate of the Cost of the Work among the various portions of the Worlc, except that the Contractor's Fee shall be shown as a single separate item.

The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Arefiiteet Owner may require. This schedule, unless objected to by the Arekiteet, Owner. shall be used as a basis for reviewing the Contractor's Applications for Payment.

§ 12.1.6 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. The percentage of completion shall be the lesser of (1) the percentage of that portion of the Work which has actually been completed; or (2) the percentage obtained by dividing (a) the expense that has actually been incurred by the Contractor on account of that portion of the Work for which the Contractor has made or intends to make actual payment prior to the next Application for Payment by (b) the share of the Guaranteed Maximum Price allocated to that portion of the Work in the schedule of values.

§ 12.1.7 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 take that portion of the Guaranteed Maximum Price properly allocable to completed Work as determined by multiplying the percentage of completion of each portion of the Work by the share of the Guaranteed Maximum Price allocated to that portion of the Work in the schedule of values.

Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute shall be included as provided in Section 7.3.8 of AJA Deeumeat A2Gl 1997;the A201: .2 add that portion of the Guaranteed Maximum Price properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the Work, or if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing; .3 add the Contractor's Fee, less retainage of ( ).Tke ten oercent CIO%) of the first 50% of the Cost of the Work (using the Guaranteed Maximum Price as the Cost of the Work for this pumose) and zero percent (0%) retainage thereafter. The Contractor's Fee shall be computed upon the Cost of the Work described in the two preceding Clauses at the rate stated in Section 5. L2 or, if the Contractor's Fee is stated as a fixed sum in that Subparagraph, shall be an amount that bears the same ratio to that fixed- sum fee as the Cost of the Work in the two preceding Clauses bears to a reasonable estimate of the probable Cost of the Work upon its completion; .4 subtract the aggregate of previous payments made by the Owner; .5 subtract the shortfall, if any, indicated by the Contractor in the documentation required by Section 12. 1.4 to substantiate prior Applications for Payment, or resulting from errors subsequently discovered by the Owner's accountants in such documentation;aad .6 subtract amounts, if any, for which the Arebiteet Owner has ritkkelEI er aellified not approved a CeFtifieate fer Payment as provided in Section 9.5 of AlA Document A201 1997.A201-1997· and .

.7 Thirty {30) days after Substantial Completion of the Work any retainage then held by the Owner shall be due and payable to the Contractor provided that such payment may be reduced by the cost of completing any incomplete Work or the disputed amount of any unsettled claims.

§ 12.1.8 Except with the Owner's prior approval, payments to Subcontractors shall be subject to retainage efast less tkae ( ). as set forth in Section 12.1.7.3 above. The Owner and the Contractor shall agree upon a mutually AlA Document A111TM -1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Architects.

All rights reserved. WARNING: This AlA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or 10 distribution of this AlA"' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:11:31 on 05119/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A111 - Koll- lntellicenter- Dallas v3 (5-19-06) (2347931739)

R.P. Appx. 026 acceptable procedure for review and approval of payments and retention for Subcontractors. Thirtv days after any Subcontractor fully performs all of its obligations under its Subcontract and the Contractor has approved and the Owner has accepted such work upon reauest of the Contractor. the Owner shall release the full amount of the retain age for such Subcontractor to the Contractor for payment to the Subcontractor provided that such Subcontractor has provided a final lien release aPPlicable to such payment (as described in Section 12.1.4 above conditional until payment clears. with an unconditional lien release to follow within 10 days after such payment clears).

§ 12.1 .9 Ia takiag aetiea ea the Cealfaetar' s l.o.flplieat:iaas fur P~·meat, the Attshiteet shall be eatitled te rely aa the aeeuraey aad eampleteaess af the iafurmat:iaa famished by the CaatFaetar aad shall aat be deemed ta represeat that the Arelritest has macie a eetailed eJtamiRatiea, aallit er aritt.metie "erifieatiea sf the deeWHeatatiaa submitted ia aeeerdaaee •, ith Seetiea 12.1. 4 er ether sapflert:iag data; that the Attshiteet has made elffiaust:i, e er eeatiaaeas ea site iRSfleetiaas er that the Arehitest kas maEie eJ<aminatieas te aseertaiR he'." er fur what f!HffJeses the CeBtraster has ased ameaats pre• ·ieasly paie en aeeaaat af the Ceatraet. Sueh el<amiaat:iaas, aaEiits aaEI ·;erifisat:ieas, if reE}IlireEI by the Ovlaer, will be perfermed by the Ow-aer' s aeeaaataats aetiag iR the sale iaterest af the 0 , aer.

§ 12.1.9 As the Project reaches Substantial Completion Contractor and Owner shall schedule and conduct a joint inspection of the Project and identify in writing all punch list items ("Punch List Items"). Contractor must complete all such Punch List Items prior to Owner making final payment to the Contractor. Owner may continue to retain one hundred ten percent (110%) of the estimated cost of completing the Punch List items until the completion of same.

All Punch List Items shall be completed on or before the 45th day after Substantial Completion.

§ 12.1.10 Upon completion of25% 50% and 75% of the Worlc, Contractor shall provide to Owner a project cost reoort that includes art estimated cost to complete the Project a listing of modifications and pending Change Orders and other items reasonably requested by Owner. Uooncompletion of25%. 50%. 75% and 100% of the Work.

Contractor shall submit to Owner a written reconciliation report evidencing the difference. if any. between (a) the amounts Owner has paid to Contractor under the Schedule of Values plus the portion of the Contractor's Fee paid by Owner and Cb) the actual Cost of the Work incurred to the applicable date plus the portion of the Contractor's Fee owed to the applicable date under this Agreement. If such written reconciliation reoort shows that Owner's payments pursuant to the Schedule of Values plus the Contractor's Fee has resulted in a payment to Contractor in excess of the actual Cost of the Work plus the Contractor's Fee then owed the overoayment shall be credited to Owner with the credit being soread over the remaining draws until the excess payments have been fully accounted for by Owner or. if no further draws are to be made then promptly refunded to Owner.

§ 12.2 FINAL PAYMENT § 12.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when: .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2.2 of AlA Document A201-1997, and to satisfy other requirements, if any, whiCh extend beyond final paymeat; aadpayment.

.2 a fiaal CeFtif-reate fur Paymeat kas bees issued by the Arehiteet. .2 the other requirements of this Section 12.2 have been fully met.

§ 12.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issaaaee af Contractor has delivered the following to the Owner (but in no event earlier than the 1'\rehitest' s fiaal Certifieate fur Paymest, eras feHaws:date set forth in Section 12.2.3 hereof):

(i) executed fmallien waivers from all frrst tier Subcontractors and the Contractor (which may be conditioned only upon receipt of Owner's final payment). and (ii) a copy of as-built olans and an as-built survey for the Project, (iii) evidence that all Punch List Items prepared at Substantial Completion of the Work have been completed. The Contractor agrees to obtain final and unconditional lien waivers from all first and second tier Subcontractors Cor post an aPPropriate bond over such lien) and to provide a final unconditional lien waiver from the Contractor within thirty days after receipt of final payment.

§ 12.2.3 The Owner's accountants will review and report in writing on the Contractor's final accounting within 30 days after delivery of the final accounting to the 1'\rehiteet Owner by the Contractor. Based upon such Cost of the AlA Document A111TM -1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1976, 1967 and 1997 by The American Institute of Architects.

All rights reserved. WARNING: This AlA'" Document is protected by U.S. Copyright law and International Treaties. Unauthorized reproduction or 11 distribution of this AlA" Document, or any portion of It, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:11:31 on 05119/2006 under Order No.10001B2995_1 which expires on 7/2312006, and is not for resale.

User Notes: Clayco A 111 - Koll- lntellicenter- Dallas v3 (5-19·06) (2347931739)

R.P. Appx. 027 Work as the Owner's accountants report to be substantiated by the Contractor's final accounting, and provided the other conditions of Sestien-Sections 12.2.1 and 12.2.2 have been met, the AFehiteet Owner will, within seveR-twenty .aiD._days af.ter reeei13t ef thereafter. either make the wr-ittea Fef'9Ft ef the Ov1Ae£' s aeeeeataats, either is see final payment. or deliver to the OwHer-Contractor a fiaal CeFtifieate fer Paj'HieAt uith a copy te-<Jf the Ceatraeter, er Owner's accountant's report and notify the Contractor aaa Ov1aer in writing of the l\.rebiteet's Owner's reasons for withholding a eertifieate payment as provided in Section 9.5.1 of the AlA Document A201-1997. The time periods stated in this Section 12.2.3 supersede those stated in Section 9.4.1 of the AlA Document A201-1997.

§ 12.2.4 If the Owner's accountants report the Cost of the Work as substantiated by the Contractor's final accounting to be less than claimed by the Contractor, the Contractor shall be entitled to aeH!anEl a£-l:Jitratiea ef the aisf!HteG am.eaHt witeeat submit such matter as a fuFther Eleeisiea Claim under Section 4.3 of the Arehiteet. A201. Such GeHiaBEl fer a£-l:Jitratiea Claim shall be made by the Contractor within 30 days after the Contractor's receipt ef a ee13y of the Areeiteet' s final CeFtifieate fer Paj H!ent; Owner's accountants' report; failure to EleH!aad ar-llitratien submit such Claim within this 30-day period shall result in the substantiated amount reported by the Owner's accountants becoming binding on the Contractor. Pending a final resolution ey arbitratiea, of the Claim the Owner shall pay the Contractor the amount certified in the Areltiteet' s fiaal Ce£tifieate fer Paj'HieRt. Owner's accountants' report.

§ 12.2.51f, saeseqaeHt te fffial flaymeat anEI at the Owaer's reqaes~ the CeHtraeter iBears eests Eleseribea iBl\.-tiele 7 anEI aet tH<elaaea ey /' Ftiele 8 te eeHeet Elefeet:P•e er aeaeeBfefHiiHg Werk, the Owaer shall reiH!barse the Ceatraeter SHeh eests aaa the CeRtraeter' s Fee aflf!lieable therete ea the same basis as if sash eests haa bee a iaearrea flr-ier te tmal flayHI:eHt, bat aet ia e*eess ef the Gaaranteea M<H<iHIHHI Prise. If the Ceatraeter has flaFtieiflatea ia sa·iiBgs as l*'Svideel iB Seetiea 5.2, the amelHlt ef sash saviags shall be reealeelatea aBEl af!flFSflriate eredit givea te the Owaer iB determiHiBg the aet aHI.euHt te be paiel by the OvlRer te the Ceatraeter.

ARTICLE 13 TERMINATION OR SUSPENSION § 13.1 The Contract may be terminated by the Contractor, or by the Owner for convenience, as provided in Article of AlA Document A201-1997. However, the amount to be paid to the Contractor under Section 14.1.3 of AlA Document A201-1997 shall not ~ause the aH!.ellRt the CeHtraeter rewa ee eatmea Guaranteed Maximum Price to reeei>•e aaaer Seetiea 13.2 eelew, eJ<eeflt that the Ceatraeter's Fee shall be eale11late8 as if the Werk hael eeea flllly eeHiflletea B) the Ceatraeter, iaelaeliag a reaseaaele estiHiate ef the Cest ef the Werk fer 'Nerk aet aet\ially eeHipleted.exceeded..

§ 13.2 The Contract may be terminated by the Owner for cause as provided in Article 14 of AlA Document A201- 1997. The amount, if any, to be paid to the Contractor under Section 14.2.4 of AlA Document A201-1997 shall not cause the Guaranteed Maximum Price to be exceeded, nor shall it exceed an amount calculated as follows: § 13.2.1 Take the Cost of the Work incurred by the Contractor to the date of termination; § 13.2.2 Add the Contractor's Fee computed upon the Cost of the Work to the date of termination at the rate stated in Section 5. 1.2 or, if the Contractor's Fee is stated as a fixed sum in that Section, an amount that bears the same ratio to that fixed-sum Fee as the Cost of the Work at the time of termination bears to a reasonable estimate of the probable Cost of the Work upon its completion; and § 13.2.3 Subtract the aggregate of previous payments made by the Owner.

§ 13.3 The Owner shall also pay the Contractor fair compensation, either by purchase or rental at the election of the Owner, for any equipment owned by the Contractor that the Owner elects to retain and that is not otherwise included in the Cost of the Work under Section 13.2.1. To the extent that the Owner elects to take legal assignment of subcontracts and purchase orders (including rental agreements), the Contractor shall, as a condition of receiving the payments referred to in this Article 13, execute and deliver all such papers and take all such steps, including the legal assignment of such subcontracts and other contractual rights of the Contractor, as the Owner may require for the purpose of fully vesting in the Owner the rights and benefits of the Contractor under such subcontracts or purchase orders.

§ 13.4 The Work may be suspended by the Owner as provided in Article 14 of AlA Document A201-1997; in such case, the Guaranteed Maximum Price and Contract Time shall be increased as provided in Section 14.3.2 of AlA

AlA Document A111"' -1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Architects.

All rights reserved. WARNING: This AlA"' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or 12 distribution of this AlA"' Document, or any portion of it, may result in severe ciVil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:11:31 on 05119/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A111 • Koll • Jntellicenter. Dallas v3 (5-19·06) (2347931739)

R.P. Appx. 028 Document A201-1997 except that the tenn "profit" shall be understood to mean the Contractor's Fee as described in Seetisas Section 5.1.2 aaa Seetisa 6.4 of this Agreement.

ARTICLE 14 MISCELLANEOUS PROVISIONS § 14.1 Where reference is made in this Agreement to a provision of AlA Document A201-1997 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents.

§ 14.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any.)

One percent (1 %) over the "prime rate" as reported in The Wall Street Journal.

(Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulations at the Owner's and Contractor's principal places of business, the location of the Project and elsewhere may affect the validity of this provision. Legal advice should be obtained with respect to deletions or modifications, and also regarding requirements such as written disclosures or waivers.)

§ 14.3 The Owner's representative is: (Name, address and other infonnation.)

Mike Rosamond 8411 Preston Road Suite 700 Dallas. Texas 75225 With copy of all notices to: Wayne Angel 8411 Preston Road. Suite 700 Dallas Texas 75225 § 14.4 The Contractor's representative is: (Name, address and other infonnation.)

Attn:Tom Sieckhaus Clayco. Inc. 2199 Innerbelt Business Center Drive St. Louis Missouri 63114 At all times during the course of the Project. Contractor shall provide at the job site a qualified. competent and resoonsible supervisor who shall be satisfactory to Owner. The supervisor shall be Doug Gellner. Any employee of Contractor reasonably deemed by Owner to be objectionable shall be removed from the job site promptly uoon Owner request and shall be promptly replaced by Contractor at no extra exoonse to Owner. Contractor shall nevertheless retain all authority and control over its employees. including responsibility for all costs arising from providing reasonable accommodations for its employees.

§ 14.5 Neither the Owner's nor the Contractor's representative nor the supervisor shall be changed without ten days' written notice to the other ~party and only with the other party's approval which approval may not be unreasonably withheld or delayed.

AlA Document A111Tlll-1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Architects.

All rights reserved. WARNING: This AlA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or 13 distribution of this AlA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:11:31 on 05119/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is nol for resale.

User Notes: Clayco A111 • Koll- lntelficenter ·Dallas v3 (5·19·06) (2347931739)

R.P. Appx. 029 § 14.6 Other provisions:

.1 If there is any conflict among the Contract Documents, then the following prioritv shall be given to the same: first. the provisions of any Change Orders, Change Directives or other modifications shall govern. with later modifications controlling over earlier modifications. second, this Agreement (Alii) shall govern, third. the provisions of the General Conditions (A201). shall govern. fourth the most recent version of the Drawings approved by Owner and Contractor in writing shall govern and filth the Outline Srecs shall govern (provided that as to design matters. the Outline Specs shall govern over A Ill or A20 1) .

.2 The Owner represents that it is the owner of fee simple title to the land on which the Project will be constructed (the "Land") .3 The Owner is committed to providing a safe working environment on the jobsite. In endeavoring to achieve a safe workplace. the Owner requires that the Contractor imolement a substance abuse policy covering all Contractor Subcontractor and Sub-subcontractor employees of any tier throughout the duration. of this Project. Contractor agrees that such policy shall be in accordance with the Contractor's coroorate substance abuse oolicy; provided that such policy shall meet or exceed the standards set forth by the St. Louis Construction Industry Substance Abuse Consortium.

ARTICLE 15 ENUMERATION OF CONTRACT DOCUMENTS § 15.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: § 15.1.1 The Agreement is this executed 1997 edition of the Standard Form of Agreement Between Owner and Contractor, AlA Document Alll 1997.AI 11-1997. as modified herein.

§ 15.1.2 The General Conditions are the 1997 edition of the General Conditions of the Contract for Construction, AlA Document 1"~Ql 1997.A201-1997. as modified in the form attached to this Agreement.

§ 15.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated , and are as follows:

§ 15.1.4 The Specifications are those contained in the Project Manual dated as in Section 15.1.3, and are as follows: (Either list the Specifications here or refer to an exhibit attached to this Agreement.)

See Outline Specs.

SeGtioo

§ 15.1.5 The Drawings are as fellews, and are dated aHless a di#eFeDt date is she"'H belew:follows: (Either list the Drawings here or refer to an exhibit attached to this Agreement.)

See Outline Specs.

NumbeF

§ 15.1.6 The Addenda, if any, are as follows: AlA Document A111TM -1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Architects.

All rights reserved. WARNING: This AlA~ Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or 14 distribution of this AlA" Document, or any portion of it, may result in severe civil and criminal penallies, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:11:31 on 05/19/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not for resale.

User Noles: Clayco A111 - Koll- lntellicenter- Dallas v3 (5-19-06) (2347931739)

R.P. Appx. 030 'Numbef Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 15.

§ 15.1.7 Other Documents, if any, forming part of the Contract Documents are as follows: (List here any additional documents, such as a list of alternates that are intended to form part of the Contract Documents. AlA Document A201-1997 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.)

The Clayco Control Budget attached hereto as Exhibit "C". The Clayco Control Budget is not attached for the puroose of (a) establishing a maximum cost of each such item. it being agreed that the Contractor's sole obligation with respect to the Cost of the Work is set forth in Paragraph 5.2.1 herein or (b) defining the scope of the Work that · the Contractor is obligated to provide under this Contract it being agreed that the Outline Specs and the other Contract Documents (excluding such Control Budget) shall define the Contractor's scope of Work.

ARTICLE 16 INSURANCE AND BONDS (List required limits of liability for insurance and bonds. AlA Document A201-1997 gives other specific requirements for insurance and bonds.)

Type ef iASUFaAGe bimit ef liability {$ 0.00) The Contractor will obtain and maintain at all times Builder's Risk insurance for the Project and such insurance shall name the Owner .Owner's equity partner and Owner's construction lender as additional insureds. Current evidence of such insurance shall be furnished to Owner upon request. Contractor will maintain the following insurance coverage: (i) a oolicy of commercial general liability insurance (occurrence form) as described in paragraph 11.1 of the General Conditions CA201) with coverage limits of not less than $1 000.000 per occurrence and $2 000 000 in the aggregate (ii) employer's liability coverage with limits of not less than $1.000.000. (iii) worker's compensation with limits of not less than $1 000.000 covering all persons employed by Contractor in the conduct of its operations at the Project (including the all states endorsement and. if applicable the volunteers endorsement). Civ) automobile liability coverage of not less than $1 000 000 (v) umbrella policy of commercial general Iiabilitv insurance with limits of not less than $10 000 000. Such insurance oolicies shall be issued by insurance companies with a rating of not less than A-Class VIII in the latest edition of Best's Insurance Guide.

Owner and Prudential Insurance Company of America ("Prudential") shall be a named additional insured partv on all such insurance oolicies and Contractor shall deliver to Owner certified copies of such insurance policies together with certificates evidencing the coverage of Owner and Prudential under all such insurance policies and a certified copy of the declarations page to each of the insurance policies. promptly uoon issuance or renewal thereof.

Simultaneously with the execution hereof. Contractor shall enter into the Construction Indemnity and Assignment in the form attached hereto as Exhibit "D".

AlA Document A1ttTM -1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Architects.

All rights reserved. WARNING: This AlA" Document is protected by U.S. Copyright law and International Treaties. Unauthorized reproduction or 15 distribution of this AlA~ Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 15:11:31 on 05/19/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A111 • Koll- lntemcenter- Dallas v3 (5·19-06) (2347931739)

R.P. Appx. 031 This Agreement is entered into as of the day and year first written above and is executed in at least three original copies, of which one is to be delivered to the Contractor, one to the Architect for use in the administration of the Contract, and the remainder to the Owner.

Exhibit "A" - Project Schedule Exhibit "B"- Outline Specifications & Drawings Exhibit "C" -Clay co Control Budget Exhibit "D" - Construction Indemnity and Assignment Exhibit "E"- Architect's Certificate Exhibit "F'- Civil Engineer's Certificate Exhibit "G" - Contractor's Consent and Agreement THIS AGREEMENT CONTAINS A BINDING ARBITRATION PROVISION WHICH MAY BE ENFORCED BY THE PARTIES.

IN1ELLICEN1ER DALLAS INVESlMENTS LLP CLAYCO INC. By: KDC-HPB Investments Dallas LP its partner By: KDC-HPB Inve.~tments Dallas GP LLC its general oortner By: Koll Development Comoany L LP. Member By: SWV LLC Managing General Partner

OWNER (Signature) CONTRACTOR (Signature)

(Printed name and title) (Printed name and title) V!Ar /!t.~l~ d.C O/d'Cffl#l&({

AlA Document A111TM -1997. Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Architects.

All rights reserved. WARNING: This AlA"' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or 16 distribution of this AlA"' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the taw. This document was produced by AlA software at 15:11:31 on 05/19/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A111 - Koll- lntellicenter- Dallas v3 (5-19-06) (2347931739)

R.P. Appx. 032 Document A201™ -1997 General Conditions of the Contract for Construction

for the following PROJECT: (Name and location or address):

The design and construction of a 4-story speculative office building, consisting of approximately 211,637 gross square feet, located at 3701 Regent Blvd., Irving, Texas. This document has important legal consequences.

THE OWNER: Consultation with an attorney (Name and address): is encouraged with respect to its completion or modification.

Intellicenter Dallas Investments, LLP This document has been approved and endorsed by The 8115 Preston Rd., Suite #700 Associated General Contractors Dallas, TX 75225 of America THE ARCHITECT: (Name and address): FS Architecture, PC c/o Forum Studios, Inc. 2199 Innerbelt Business Center Drive St. Louis, Missouri 63114

TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 OWNER 3 CONTRACTOR 4 ADMINISTRATION OF THE CONTRACT 5 SUBCONTRACTORS 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 7 CHANGES IN THE WORK 8 TIME 9 PAYMENTS AND COMPLETION 10 PROTECTION OF PERSONS AND PROPERTY 11 INSURANCE AND BONDS AlA Document A201"' -1997. Copyright © 1911, 1915,1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 1 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 033 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) 12 UNCOVERING AND CORRECTION OF WORK 13 MISCELLANEOUS PROVISIONS 14 TERMINATION OR SUSPENSION OF THE CONTRACT

AlA Document A20FM -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 2 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 034 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) INDEX 3.1.3, 4.2, 4.3.4, 4.4, 9.4, 9.5 (Numbers and Topics in Bold are Section Headings) Architect's Approvals 2.4, 3.1.3, 3.5.1, 3.10.2, 4.2.7 Acceptance of Nonconforming Work Architect's Authority to Reject Work 9.6.6, 9.9.3, 12.3 3.5.1, 4.2.6, 12.1.2, 12.2.1 Acceptance of Work Architect's Copyright 9.6.6, 9.8.2, 9.9.3, 9.10.1, 9.10.3, 12.3 1.6 Access to Work Architect's Decisions 3.16, 6.2.1, 12.1 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 4.3.4, 4.4.1, 4.4.5, Accident Prevention 4.4.6, 4.5, 6.3, 7.3.6, 7.3.8, 8.1.3, 8.3.1, 9.2, 9.4, 4.2.3, 10 9.5.1, 9.8.4, 9.9.1, 13.5.2, 14.2.2, 14.2.4 Acts and Omissions Architect's Inspections 3.2, 3.3.2, 3.12.8, 3.18, 4.2.3, 4.3.8, 4.4.1, 8.3.1, 4.2.2, 4.2.9, 4.3.4, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 13.5 9.5.1, 10.2.5, 13.4.2, 13.7, 14.1 Architect's Instructions Addenda 3.2.3, 3.3.1, 4.2.6, 4.2.7, 4.2.8, 7.4.1, 12.1, 13.5.2 1.1.1, 3.11 Architect's Interpretations Additional Costs, Claims for 4.2.11, 4.2.12, 4.3.6 4.3.4, 4.3.5, 4.3.6, 6.1.1, 10.3 Architect's Project Representative Additional Inspections and Testing 4.2.10 9.8.3, 12.2.1, 13.5 Architect's Relationship with Contractor Additional Time, Claims for 1.1.2, 1.6, 3.1.3, 3.2.1, 3.2.2, 3.2.3, 3.3.1, 3.4.2, 3.5.1, 4.3.4, 4.3.7, 8.3.2 3.7.3, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.2, 4.1.3, 4.2, ADMINISTRATION OF THE CONTRACT 4.3.4, 4.4.1, 4.4.7, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 3.1.3, 4, 9.4, 9.5 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 11.4.7, 12, Advertisement or Invitation to Bid 13.4.2, 13.5 1.1.1 Architect's Relationship with Subcontractors Aesthetic Effect 1.1.2, 4.2.3, 4.2.4, 4.2.6, 9.6.3, 9.6.4, 11.4.7 4.2.13, 4.5.1 Architect's Representations Allowances 9.4.2, 9.5.1, 9.10.1 ' 3.8 Architect's Site Visits All-risk Insurance 4.2.2, 4.2.5, 4.2.9, 4.3.4, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 11.4.1.1 13.5 Applications for Payment Asbestos 4.2.5, 7.3.8, 9.2, 9.3, 9.4, 9.5.1, 9.6.3, 9.7.1, 9.8.5, 10.3.1 9.10, 11.1.3, 14.2.4, 14.4.3 Attorneys' Fees Approvals 3.18.1, 9.10.2, 10.3.3 2.4, 3.1.3, 3.5, 3.10.2, 3.12, 4.2.7, 9.3.2, 13.4.2, 13.5 Award of Separate Contracts Arbitration 6.1.1, 6.1.2 4.3.3, 4.4, 4.5.1, 4.5.2, 4.6, 8.3.1, 9.7.1, 11.4.9, Award of Subcontracts and Other Contracts for 11.4.10 Portions of the Work Architect 5.2 4.1 Basic Defmitions Architect, Definition of 1.1 4.1.1 Bidding Requirements Architect, Extent of Authority 1.1.1, 1.1.7, 5.2.1, 11.5.1 2.4, 3.12.7, 4.2, 4.3.6, 4.4, 5.2, 6.3, 7.1.2, 7.3.6, 7.4, Boiler and Machinery Insurance 9.2, 9.3.1, 9.4, 9.5, 9.8.3, 9.10.1, 9.10.3, 12.1, 12.2.1, 11.4.2 13.5.1, 13.5.2, 14.2.2, 14.2.4 Bonds, Lien Architect, Limitations of Authority and 9.10.2 Responsibility Bonds, Performance, and Payment 2.1.1, 3.3.3, 3.12.4, 3.12.8, 3.12.10, 4.1.2, 4.2.1, 7.3.6.4, 9.6.7, 9.10.3, 11.4.9, 11.5 4.2.2, 4.2.3, 4.2.6, 4.2.7, 4.2.10, 4.2.12, 4.2.13, 4.4, Building Permit 5.2.1, 7.4, 9.4.2, 9.6.4, 9.6.6 3.7.1 Architect's Additional Services and Expenses Capitalization 2.4, 11.4.1.1, 12.2.1, 13.5.2, 13.5.3, 14.2.4 1.3 Architect's Administration of the Contract Certificate of Substantial Completion AlA Document A201m -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1956, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 035 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (9865361 BB) 9.8.3, 9.8.4, 9.8.5 1.6.1, 3.2.2, 3.6, 3.7, 3.12.10, 3.13, 4.1.1, 4.4.8, 4.6.4, Certificates for Payment 4.6.6, 9.6.4, 10.2.2, 11.1, 11.4, 13.1, 13.4, 13.5.1, 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7.1, 9.10.1, 13.5.2, 13.6, 14.1.1, 14.2.1.3 9.10.3, 13.7, 14.1.1.3, 14.2.4 Concealed or Unknown Conditions Certificates of Inspection, Testing or Approval 4.3.4, 8.3.1, 10.3 13.5.4 Conditions of the Contract Certificates of Insurance 1.1.1, 1.1.7, 6.1.1, 6.1.4 9.10.2, 11.1.3 Consent, Written Change Orders 1.6, 3.4.2, 3.12.8, 3.14.2, 4.1.2, 4.3.4, 4.6.4, 9.3.2, 1.1.1, 2.4.1, 3.4.2, 3.8.2.3, 3.11.1, 3.12.8, 4.2.8, 4.3.4, 9.8.5, 9.9.1, 9.10.2, 9.10.3, 11.4.1, 13.2, 13.4.2 4.3.9, 5.2.3, 7.1, 7.2, 7.3, 8.3.1, 9.3.1.1, 9.10.3, CONSTRUCTION BY OWNER OR BY 11.4.1.2, 11.4.4, 11.4.9, 12.1.2 SEPARATE CONTRACTORS Change Orders, Definition of 1.1.4, 6 7.2.1 Construction Change Directive, Definition of CHANGES IN THE WORK 7.3.1 3.11, 4.2.8, 7, 8.3.1, 9.3.1.1, 11.4.9 Construction Change Directives Claim, Defmition of 1.1.1, 3.12.8, 4.2.8, 4.3.9, 7.1, 7.3, 9.3.1.1 4.3.1 Construction Schedules, Contractor's Claims and Disputes 1.4.1.2, 3.10, 3.12.1, 3.12.2, 4.3.7.2, 6.1.3 3.2.3, 4.3, 4.4, 4.5, 4.6, 6.1.1, 6.3, 7.3.8, 9.3.3, 9.10.4, Contingent Assignment of Subcontracts 10.3.3 5.4, 14.2.2.2 Claims and Timely Assertion of Claims Continuing Contract Performance 4.6.5 4.3.3 Claims for Additional Cost Contract, Definition of 3.2.3, 4.3.4, 4.3.5, 4.3.6, 6.1.1, 7.3.8, 10.3.2 1.1.2 Claims for Additional Time CONTRACT, TERMINATION OR 3.2.3, 4.3.4, 4.3.7, 6.1.1, 8.3.2, 10.3.2 SUSPENSION OF THE Claims for Concealed or Unknown Conditions 5.4.1.1, 11.4.9, 14 4.3.4 Contract Administration Claims for Damages 3.1.3, 4, 9.4, 9.5 3.2.3, 3.18, 4.3.10, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, Contract A ward and Execution, Conditions Relating 11.1.1, 11.4.5, 11.4.7, 14.1.3, 14.2.4 to Claims Subject to Arbitration 3.7.1, 3.10, 5.2, 6.1, 11.1.3, 11.4.6, 11.5.1 4.4.1, 4.5.1, 4.6.1 Contract Documents, The Cleaning Up 1.1, 1.2 3.15, 6.3 Contract Documents, Copies Furnished and Use of Commencement of Statutory Limitation Period 1.6, 2.2.5, 5.3 13.7 Contract Documents, Definition of Commencement of the Work, Conditions Relating to 1.1.1 2.2.1, 3.2.1, 3.4.1, 3.7.1, 3.10.1, 3.12.6, 4.3.5, 5.2.1, Contract Sum 5.2.3, 6.2.2, 8.1.2, 8.2.2, 8.3.1, 11.1, 11.4.1, 11.4.6, 3.8, 4.3.4, 4.3.5, 4.4.5, 5.2.3, 7.2, 7.3, 7.4, 9.1, 9.4.2, 11.5.1 9.5.1.4, 9.6.7, 9.7, 10.3.2, 11.4.1, 14.2.4, 14.3.2 Commencement of the Work, Definition of Contract Sum, Definition of 8.1.2 9.1 Communications Facilitating Contract Contract Time Administration 4.3.4, 4.3.7, 4.4.5, 5.2.3, 7.2.1.3, 7.3, 7.4, 8.1.1, 8.2, 3.9.1, 4.2.4 8.3.1, 9.5.1, 9.7, 10.3.2, 12.1.1, 14.3.2 Completion, Conditions Relating to Contract Time, Definition of 1.6.1, 3.4.1, 3.11, 3.15, 4.2.2, 4.2.9, 8.2, 9.4.2, 9.8, 8.1.1 9.9.1, 9.10, 12.2, 13.7, 14.1.2 CONTRACTOR COMPLETION, PAYMENTS AND 3 9 Contractor, Definition of Completion, Substantial 3.1, 6.1.2 4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, Contractor's Construction Schedules 9.10.4.2, 12.2, 13.7 1.4.1.2, 3.10, 3.12.1, 3.12.2, 4.3.7.2, 6.1.3 Compliance with Laws Contractor's Employees

AlA Document A201"'- 1997. Copyright © 1911. 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is notfor resale.

R.P. Appx. 036 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) 3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3, 6.2.5, 3.14 11.1.1, 11.4.7, 14.1, 14.2.1.1, Damage to Construction of Owner or Separate Contractor's Liability Insurance Contractors 11.1 3.14.2, 6.2.4, 9.2.1.5, 10.2.1.2, 10.2.5, 10.6, 11.1, Contractor's Relationship with Separate Contractors 11.4, 12.2.4 and Owner's Forces Damage to theWork 3.12.5, 3.14.2, 4.2.4, 6, 11.4.7, 12.1.2, 12.2.4 3.14.2, 9.9.1, 10.2.1.2, 10.2.5, 10.6, 11.4, 12.2.4 Contractor's Relationship with Subcontractors Damages, Claims for 1.2.2, 3.3.2, 3.18.1, 3.18.2, 5, 9.6.2, 9.6.7, 9.10.2, 3.2.3, 3.18, 4.3.10, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.4.1.2, 11.4.7, 11.4.8 11.1.1, 11.4.5, 11.4.7, 14.1.3, 14.2.4 Contractor's Relationship with the Architect Damages for Delay 1.1.2, 1.6, 3.1.3, 3.2.1, 3.2.2, 3.2.3, 3.3.1, 3.4.2, 3.5.1, 6.1.1, 8.3.3, 9.5.1.6, 9.7, 10.3.2 3.7.3, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.2, 4.1.3, 4.2, Date of Commencement of the Work, Definition of 43.4, 4.4.1, 4.4.7, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 8.1.2 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 11.4.7, 12, Date of Substantial Completion, Definition of 13.4.2, 13.5 8.1.3 Contractor's Representations Day, Definition of 1.5.2, 3.5.1, 3.12.6, 6.2.2, 8.2.1, 9.3.3, 9.8.2 8.1.4 Contractor's Responsibility for Those Performing the Decisions of the Architect Work 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 4.3.4, 4.4.1, 4.4.5, 3.3.2, 3.18, 4.2.3, 4.3.8, 5.3.1, 6.1.3, 6.2, 6.3, 9.5.1, 4.4.6, 4.5, 6.3, 7.3.6, 7.3.8, 8.1.3, 8.3.1, 9.2, 9.4, 10 9.5.1, 9.8.4, 9.9.1, 13.5.2, 14.2.2, 14.2.4 Contractor's Review of Contract Documents Decisions to Withhold Certification 1.5.2, 3.2, 3.7.3 9.4.1, 9.5, 9.7, 14.1.1.3 Contractor's Right to Stop the Work Defective or Nonconforming Work, Acceptance, 9.7 Rejection and Correction of Contractor's Right to Terminate the Contract 2.3, 2.4, 3.5.1, 4.2.6, 6.2.5, 9.5.1, 9.5.2, 9.6.6, 9.8.2, 4.3.10, 14.1 9.9.3, 9.10.4, 12.2.1, 13.7.1.3 Contractor's Submittals Defective Work, Definition of 3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 7.3.6, 9.2, 9.3, 3.5.1 9.8.2, 9.8.3, 9.9.1, 9.10.2, 9.10.3, 11.1.3, 11.5.2 Definitions Contractor's Superintendent 1.1, 2.1.1, 3.1, 3.5.1, 3.12.1, 3.12.2, 3.12.3, 4.1.1, 3.9, 10.2.6 4.3.1, 5.1, 6.1.2, 7.2.1, 7.3.1, 7.3.6, 8.1, 9.1, 9.8.1 Contractor's Supervision and Construction Delays and Extensions of Time Procedures 3.2.3, 4.3.1, 4.3.4, 4.3.7, 4.4.5, 5.2.3, 7.2.1, 7.3.1, 1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 4.3.3, 6.1.3, 7.4.1, 8.3, 9.5.1, 9.7.1, 10.3.2, 10.6.1, 14.3.2 6.2.4, 7.1.3, 7.3.4, 7.3.6, 8.2, 10, 12,14 Disputes Contractual Liability Insurance 4.1.4, 4.3, 4.4, 4.5, 4.6, 6.3, 7.3.8 11.1.1.8, 11.2, 11.3 Documents and Samples at the Site Coordination and Correlation 3.11 1.2, 1.5.2, 3.3.1, 3.10, 3.12.6, 6.1.3, 6.2.1 Drawings, Definition of Copies Furnished of Drawings and Specifications 1.1.5 1.6, 2.2.5, 3.11 Drawings and Specifications, Use and Ownership of Copyrights 1.1.1, 1.3, 2.2.5, 3.11, 5.3 1.6, 3.17 Effective Date of Insurance Correction of Work 8.2.2, 11.1.2 2.3, 2.4, 3.7.4, 4.2.1, 9.4.2, 9.8.2, 9.8.3, 9.9.1, 12.1.2, Emergencies 12.2, 13.7.1.3 4.3.5, 10.6, 14.1.1.2 Correlation and Intent of the Contract Documents Employees, Contractor's 1.2 3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3, Cost, Definition of 11.1.1, 11.4.7, 14.1, 14.2.1.1 7.3.6 Equipment, Labor, Materials and Costs 1.1.3, 1.1.6, 3.4, 3.5.1, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 2.4, 3.2.3, 3.7.4, 3.8.2, 3.15.2, 4.3, 5.4.2, 6.1.1, 6.2.3, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.6, 9.3.2, 9.3.3, 9.5.1.3, 7.3.3.3, 7.3.6, 7.3.7, 7.3.8, 9.10.2, 10.3.2, 10.5, 11.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.2 11.4, 12.1, 12.2.1, 12.2.4, 13.5, 14 Execution and Progress of the Work Cutting and Patching AlA Document A201™ -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966,1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 037 User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 (5-19-06) (986536188) 1.1.3, 1.2.1, 1.2.2, 2.2.3, 2.2.5, 3.1, 3.3, 3.4, 3.5, 3.7, Insurance, Project Management Protective 3.10, 3.12, 3.14, 4.2.2, 4.2.3, 4.3.3, 6.2.2, 7.1.3, 7.3.4, Liability 8.2, 9.5, 9.9.1, 10.2, 10.3, 12.2, 14.2, 14.3 11.3 Extensions of Time Insurance, Property 3.2.3, 4.3.1, 4.3.4, 4.3.7, 4.4.5, 5.2.3, 7.2.1, 7.3, 7.4.1, 10.2.5, 11.4 9.5.1, 9.7.1, 10.3.2, 10.6.1, 14.3.2 Insurance, Stored Materials Failure of Payment 9.3.2, 11.4.1.4 4.3.6, 9.5.1.3, 9.7, 9.10.2, 14.1.1.3, 14.2.1.2, 13.6 INSURANCE AND BONDS Fau1tyWork 11 (See Defective or Nonconforming Work) Insurance Companies, Consent to Partial Occupancy Final Completion and Final Payment 9.9.1, 11.4.1.5 4.2.1, 4.2.9, 4.3.2, 9.8.2, 9.10, 11.1.2, 11.1.3, 11.4.1, Insurance Companies, Settlement with 11.4.5, 12.3.1, 13.7, 14.2.4, 14.4.3 11.4.10 Financial Arrangements, Owner's Intent of the Contract Documents 2.2.1, 13.2.2, 14.1.1.5 1.2.1, 4.2.7, 4.2.12, 4.2.13, 7.4 Fire and Extended Coverage Insurance Interest 11.4 13.6 GENERAL PROVISIONS Interpretation 1 1.2.3, 1.4, 4.1.1, 4.3.1, 5.1, 6.1.2, 8.1.4 Governing Law Interpretations, Written 13.1 4.2.11, 4.2.12, 4.3.6 Guarantees (See Warranty) Joinder and Consolidation of Claims Required Hazardous Materials 4.6.4 10.2.4, 10.3, 10.5 Judgment on Final Award Identification of Contract Documents 4.6.6 1.5.1 Labor and Materials, Equipment Identification of Subcontractors and Suppliers 1.1.3, 1.1.6, 3.4, 3.5.1, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 5.2.1 42.6, 4.2.7, 5.2.1, 6.2.1, 7.3.6, 9.3.2, 9.3.3, 9.5.1.3, Indemnification 9.10.2, 10.2.1, 10.2.4, 14.2.1.2 3.17, 3.18, 9.10.2, 10.3.3, 10.5, 11.4.1.2, 11.4.7 Labor Disputes Information and Services Required of the Owner 8.3.1 2.1.2, 2.2, 3.2.1, 3.12.4; 3.12.10, 4.2.7, 4.3.3, 6.1.3, Laws and Regulations 6.1.4, 6.2.5, 9.3.2, 9.6.1, 9.6.4, 9.9.2, 9.10.3, 10.3.3, 1.6, 3.2.2, 3.6, 3.7, 3.12.10, 3.13, 4.1.1, 4.4.8, 4.6, 11.2, 11.4, 13.5.1, 13.5.2, 14.1.1.4, 14.1.4 9.6.4, 9.9.1, 10.2.2, 11.1, 11.4, 13.1, 13.4, 13.5.1, Injury or Damage to Person or Property 13.5.2, 13.6, 14 4.3.8, 10.2, 10.6 Liens Inspections 2.1.2, 4.4.8, 8.2.2, 9.3.3, 9.10 3.1.3, 3.3.3, 3.7.1, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.2, Limitation on Consolidation or Joinder 9.8.3, 9.9.2, 9.10.1, 12.2.1, 13.5 4.6.4 Instructions to Bidders Limitations, Statutes of 1.1.1 4.6.3, 12.2.6, 13.7 Instructions to the Contractor Limitations of Liability 3.2.3, 3.3.1, 3.8.1, 4.2.8, 5.2.1, 7, 12, 8.2.2, 13.5.2 2.3, 3.2.1, 3.5.1, 3.7.3, 3.12.8, 3.12.10, 3.17, 3.18, Insurance 4.2.6, 4.2.7, 4.2.12, 6.2.2, 9.4.2, 9.6.4, 9.6.7, 9.10.4, 3.18.1, 6.1.1, 7.3.6, 8.2.1, 9.3.2, 9.8.4, 9.9.1, 9.10.2, 10.3.3, 10.2.5, 11.1.2, 11.2.1, 11.4.7, 12.2.5, 13.4.2 9.10.5, 11 Limitations of Time Insurance, Boiler and Machinery 2.1.2, 2.2, 2.4, 3.2.1, 3.7.3, 3.10, 3.11, 3.12.5, 3.15.1, 11.4.2 4.2.7, 4.3, 4.4, 4.5, 4.6, 5.2, 5.3, 5.4, 6.2.4, 7.3, 7.4, Insurance, Contractor's Liability 8.2, 9.2, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 11.1 9.10, 11.1.3, 11.4.1.5, 11.4.6, 11.4.10, 12.2, 13.5, Insurance, Effective Date of 13.7, 14 8.2.2, 11.1.2 Loss of Use Insurance Insurance, Loss of Use 11.4.3 11.4.3 Material Suppliers Insurance, Owner's Liability 1.6, 3.12.1, 4.2.4, 4.2.6, 5.2.1, 9.3, 9.4.2, 9.6, 9.10.5 11.2 Materials, Hazardous 10.2.4, 10.3, 10.5 AlA Document A2Q1TM -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) R.P. Appx. 038 Materials, Labor, Equipment and 1.6, 2.1.1, 2.3, 2.4, 3.4.2, 3.8.1, 3.12.10, 3.14.2, 4.1.2, 1.1.3, 1.1.6, 1.6.1, 3.4, 3.5.1, 3.8.2, 3.8.23, 3.12, 3.13, 4.1.3, 4.2.4, 4.2.9, 4.3.6, 4.4.7, 5.2.1, 5.2.4, 5.4.1, 3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.6, 9.3.2, 9.3.3, 6.1, 6.3, 7.2.1, 7.3.1, 8.2.2, 8.3.1, 9.3.1, 9.3.2, 9.5.1, 9.5.1.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.2 9.9.1, 9.10.2, 10.3.2, 11.1.3, 11.3.1, 11.4.3, 11.4.10, Means, Methods, Techniques, Sequences and 12.2.2, 12.3.1, 13.2.2, 14.3, 14.4 Procedures of Construction Owner's Financial Capability 3.3.1, 3.12.10, 4.2.2, 4.2.7, 9.4.2 2.2.1, 13.2.2, 14.1.1.5 Mechanic's Lien Owner's Liability Insurance 4.4.8 11.2 Mediation Owner's Loss of Use Insurance 4.4.1, 4.4.5, 4.4.6, 4.4.8, 4.5, 4.6.1, 4.6.2, 8.3.1, 10.5 11.4.3 Minor Changes in the Work Owner's Relationship with Subcontractors 1.1.1, 3.12.8, 4.2.8, 4.3.6, 7.1, 7.4 1.1.2, 5.2, 5.3, 5.4, 9.6.4, 9.10.2, 14.2.2 MISCELLANEOUS PROVISIONS Owner's Right to Carry Out the Work 13 2.4, 12.2.4. 14.2.2.2 Modifications, Definition of Owner's Right to Clean Up 1.1.1 6.3 Modifications to the Contract Owner's Right to Perform Construction and to 1.1.1, 1.1.2, 3.7.3, 3.11; 4.1.2, 4.2.1, 5.2.3, 7, 8.3.1, A ward Separate Contracts 9.7, 10.3.2, 11.4.1 6.1 Mutual Responsibility Owner's Right to Stop the Work 6.2 2.3 Nonconforming Work, Acceptance of Owner's Right to Suspend the Work 9.6.6, 9.9.3, 12.3 14.3 Nonconforming Work, Rejection and Correction of Owner's Right to Terminate the Contract 2.3, 2.4, 3.5.1, 4.2.6, 6.2.5, 9.5.1, 9.8.2, 9.9.3, 9.10.4, 14.2 12.2.1, 13.7.1.3 Ownership and Use of Drawings, Specifications Notice and Other Instruments of Service 2.2.1, 2.3, 2.4, 3.2.3, 3.3.1, 3.7.2, 3.7.4, 3.12.9, 4.3, 1.1.1, 1.6, 2.2.5, 3.2.1, 3.11.1, 3.17.1, 4.2.12, 5.3 4.4.8, 4.6.5, 5.2.1, 8.2.2, 9.7, 9.10, 10.2.2, 11.1.3, Partial Occupancy or Use 11.4.6, 12.2.2, 12.2.4, 13.3, 13.5.1, 13.5.2, 14.1, 14.2 9.6.6, 9.9, 11.4.1.5 Notice, Written Patching, Cutting and 2.3, 2.4, 3.3.1, 3.9, 3.12.9, 3.12.10, 4.3, 4.4.8, 4.6.5, 3.14, 6.2.5 5.2.1, 8.2.2, 9.7, 9.10, 10.2.2, 10.3, 11.1.3, 11.4.6, Patents 12.2.2, 12.2.4, 13.3, 14 3.17 Notice of Testing and Inspections Payment, Applications for 13.5.1, 13.5.2 4.2.5, 7.3.8, 9.2, 9.3, 9.4, 9.5.1, 9.6.3, 9.7.1, 9.8.5, Notice to Proceed 9.10.1, 9.10.3, 9.10.5, 11.1.3, 14.2.4, 14.4.3 8.2.2 Payment, Certificates for Notices, Permits, Fees and 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7.1, 9.10.1, 2.2.2, 3.7, 3.13, 7.3.6.4, 10.2.2 9.10.3, 13.7, 14.1.1.3, 14.2.4 Observations, Contractor's Payment, Failure of 1.5.2, 3.2, 3.7.3, 4.3.4 4.3.6, 9.5.1.3, 9.7, 9.10.2, 14.1.1.3, 14.2.1.2, 13.6 Occupancy Payment, Final 2.2.2, 9.6.6, 9.8, 11.4.1.5 4.2.1, 4.2.9, 4.3.2, 9.8.2, 9.10, 11.1.2, 11.1.3, 11.4.1, Orders, Written 11.4.5, 12.3.1, 13.7, 14.2.4, 14.4.3 1.1.1, 2.3, 3.9, 4.3.6, 7, 8.2.2, 11.4.9, 12.1, 12.2, Payment Bond, Performance Bond and 13.5.2, 14.3.1 7.3.6.4, 9.6.7, 9.10.3, 11.4.9, 11.5 OWNER Payments, Progress 2 4.3.3, 9.3, 9.6, 9.8.5, 9.10.3, 13.6, 14.2.3 Owner, Definition of PAYMENTS AND COMPLETION 2.1 9 Owner, Information and Services Required of the Payments to Subcontractors 2.1.2, 2.2, 3.2.1, 3.12.4, 3.12.10, 4.2.7, 4.3.3, 6.1.3, 5.4.2, 9.5.1.3, 9.6.2, 9.6.3, 9.6.4, 9.6.7, 11.4.8, 6.1.4, 6.2.5, 9.3.2, 9.6.1, 9.6.4, 9.9.2, 9.10.3, 10.3.3, 14.2.1.2 11.2, 11.4, 13.5.1, 13.5.2, 14.1.1.4, 14.1.4 PCB Owner's Authority 10.3.1 AlA Document A201 ™- 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 7 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the Jaw. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) R.P. Appx. 039 Performance Bond and Payment Bond Review of Contractor's Submittals by Owner and 7.3.6.4, 9.6.7, 9.10.3, 11.4.9, 11.5 Architect Permits, Fees and Notices 3.10.1, 3.10.2, 3.11, 3.12, 4.2, 5.2, 6.1.3, 9.2, 9.8.2 2.2.2, 3.7, 3.13, 7.3.6.4, 10.2.2 Review of Shop Drawings, Product Data and PERSONS AND PROPERTY, PROTECTION Samples by Contractor OF 3.12 10 Rights and Remedies 1.1.2, 2.3, 2.4, 3.5.1, 3.15.2, 4.2.6, 4.3.4, 4.5, 4.6, 5.3, Polychlorinated Biphenyl 5.4, 6.1, 6.3, 7.3.1, 8.3, 9.5.1, 9.7, 10.2.5, 10.3, 10.3.1 12.2.2, 12.2.4, 13.4, 14 Product Data, Definition of Royalties, Patents and Copyrights 3.12.2 3.17 Product Data and Samples, Shop Drawings Rules and Notices for Arbitration 3.11, 3.12, 4.2.7 4.6.2 Progress and Completion Safety of Persons and Property 4.2.2, 4.3.3, 8.2, 9.8, 9.9.1, 14.1.4 10.2, 10.6 Progress Payments Safety Precautions and Programs 4.3.3, 9.3, 9.6, 9.8.5, 9.10.3, 13.6, 14.2.3 3.3.1, 4.2.2, 4.2.7, 5.3.1, 10.1, 10.2, 10.6 Project, Definition of the Samples, Definition of 1.1.4 3.12.3 Project Management Protective Liability Samples, Shop Drawings, Product Data and Insurance 3.11, 3.12, 4.2.7 11.3 Samples at the Site, Documents and Project Manual, Definition of the 3.11 1.1.7 Schedule of Values Project Manuals 9.2, 9.3.1 2.2.5 Schedules, Project Representatives 1.4.1.2, 3.10, 3.Construction12.1, 3.12.2, 4.3.7.2, 4.2.10 6.1.3 Property Insurance Separate Contracts and Contractors 10.2.5, 11.4 1.1.4, 3.12.5, 3.14.2, 4.2.4, 4.2.7, 4.6.4, 6, 8.3.1, PROTECTION OF PERSONS AND PROPERTY 11.4.7, 12.1.2, 12.2.5 .

10 Shop Drawings, Definition of Regulations and Laws 3.12.1 1.6, 3.2.2, 3.6, 3.7, 3.12.10, 3.13, 4.1.1, 4.4.8, 4.6, Shop Drawings, Product Data and Samples 9.6.4, 9.9.1, 10.2.2, 11.1, 11.4, 13.1, 13.4, 13.5.1, 3.11, 3.12, 4.2.7 13.5.2, 13.6, 14 Site, Use of Rejection of Work 3.13, 6.1.1, 6.2.1 3.5.1, 4.2.6, 12.2.1 Site Inspections Releases and Waivers of Liens 1.2.2, 3.2.1, 3.3.3, 3.7.1, 4.2, 4.3.4, 9.4.2, 9.10.1, 13.5 9.10.2 Site Visits, Architect's Representations 4.2.2, 4.2.9, 4.3.4, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.5 1.5.2, 3.5.1, 3.12.6, 6.2.2, 8.2.1, 9.3.3, 9.4.2, 9.5.1, Special Inspections and Testing 9.8.2, 9.10.1 4.2.6, 12.2.1, 13.5 Representatives Specifications, Definition of the 2.1.1, 3.1.1, 3.9, 4.1.1, 4.2.1, 4.2.10, 5.1.1, 5.1.2, 1.1.6 13.2.1 Specifications, The Resolution of Claims and Disputes 1.1.1, 1.1.6, 1.1.7, 1.2.2, 1.6, 3.11, 3.12.10, 3.17 4.4, 4.5, 4.6 Statute of Limitations Responsibility for Those Performing the Work 4.6.3, 12.2.6, 13.7 3.3.2, 3.18, 4.2.3, 4.3.8, 5.3.1, 6.1.3, 6.2, 6.3, 9.5.1, Stopping the Work 10 2.3, 4.3.6, 9.7, 10.3, 14.1 Retainage Stored Materials 9.3.1, 9.6.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3 6.2.1, 9.3.2, 10.2.1.2, 10.2.4, 11.4.1.4 Review of Contract Documents and Field Subcontractor, Definition of Conditions by Contractor 5.1.1 1.5.2, 3.2, 3.7.3, 3.12.7, 6.1.3 SUBCONTRACTORS AlA Document A201,., -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized S reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 040 User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 {5-19-06) (986536188) 5 TERMINATION OR SUSPENSION OF THE Subcontractors, Work by CONTRACT 1.2.2, 3.3.2, 3.12.1, 4.2.3, 5.2.3, 5.3, 5.4, 9.3.1.2, 14 9.6.7 Tests and Inspections Subcontractual Relations 3.1.3, 3.3.3, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 5.3, 5.4, 9.3.1.2, 9.6, 9.10 10.2.1, 11.4.7, 11.4.8, 14.1, 9.10.1, 10.3.2, 11.4.1.1, 12.2.1,13.5 14.2.1, 14.3.2 TIME Submittals 8 1.6, 3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 7.3.6, 9.2, Time, Delays and Extensions of 9.3, 9.8, 9.9.1, 9.10.2, 9.10.3, 11.1.3 3.2.3, 4.3.1, 4.3.4, 4.3.7, 4.4.5, 5.2.3, 7.2.1, 7.3.1, Subrogation, Waivers of 7.4.1, 8.3, 9.5.1, 9.7.1, 10.3.2, 10.6.1, 14.3.2 6.1.1, 11.4.5, 11.4.7 Time Limits Substantial Completion 2.1.2, 2.2, 2.4, 3.2.1, 3.7.3, 3.10, 3.11, 3.12.5, 3.15.1, 4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, 4.2, 4.3, 4.4, 4.5, 4.6, 5.2, 5.3, 5.4, 6.2.4, 7 .3, 7.4, 9.10.4.2, 12.2, 13.7 8.2, 9.2, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, Substantial Completion, Definition of 9.10, 11.1.3, 11.4.1.5, 11.4.6, 11.4.10, 12.2, 13.5, 9.8.1 13.7, 14 Substitution of Subcontractors Time Limits on Claims 5.2.3, 5.2.4 4.3.2, 4.3.4, 4.3.8, 4.4, 4.5, 4.6 Substitution of Architect Title to Work 4.1.3 9.3.2, 9.3.3 Substitutions of Materials UNCOVERING AND CORRECTION OF 3.4.2, 3.5.1, 7.3.7 WORK Sub-subcontractor, Definition of 12 5.1.2 Uncovering of Work Subsurface Conditions 12.1 4.3.4 Unforeseen Conditions Successors and Assigns 4.3.4, 8.3.1, 10.3 13.2 Unit Prices Superintendent 4.3.9, 7.3.3.2 3.9, 10.2.6 Use of Documents Supervision and Construction Procedures 1.1.1, 1.6, 2.2.5, 3.12.6, 5.3 1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 4.3.3, 6.1.3, Use of Site 6.2.4, 7.1.3, 7.3.6, 8.2, 8.3.1, 9.4.2, 10, 12, 14 3.13, 6.1.1, 6.2.1 Surety Values, Schedule of 4.4.7, 5.4.1.2, 9.8.5, 9.10.2, 9.10.3, 14.2.2 9.2, 9.3.1 Surety, Consent of Waiver of Claims by the Architect 9.10.2, 9.10.3 13.4.2 Surveys Waiver of Claims by the Contractor 2.2.3 4.3.10, 9.10.5, 11.4.7, 13.4.2 Suspension by the Owner for Convenience Waiver of Claims by the Owner 14.4 4.3.10, 9.9.3, 9.10.3, 9.10.4, 11.4.3, 11.4.5, 11.4.7, Suspension of the Work 12.2.2.1, 13.4.2, 14.2.4 5.4.2, 14.3 Waiver of Consequential Damages Suspension or Termination of the Contract 4.3.10, 14.2.4 4.3.6, 5.4.1.1, 11.4.9, 14 Waiver of Liens Taxes 9.10.2, 9.10.4 3.6, 3.8.2.1, 7.3.6.4 Waivers of Subrogation Termination by the Contractor 6.1.1, 11.4.5, 11.4.7 4.3.10, 14.1 Warranty Termination by the Owner for Cause 3.5, 4.2.9, 4.3.5.3, 9.3.3, 9.8.4, 9.9.1, 9.10.4, 12.2.2, 4.3.10, 5.4.1.1, 14.2 13.7.1.3 Termination of the Architect Weather Delays 4.1.3 4.3.7.2 Termination of the Contractor Work, Definition of 14.2.2 1.1.3 Written Consent AlA Document A201"'- 1997. Copyright © 1911. 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized g reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 041 User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 {5-19-06) {986536188) 1.6, 3.4.2, 3.12.8, 3.14.2, 4.1.2, 4.3.4, 4.6.4, 9.3.2, 2.3, 2.4, 3.3.1, 3.9, 3.12.9, 3.12.10, 4.3, 4.4.8, 4.6.5, 9.8.5, 9.9.1, 9.10.2, 9.10.3, 11.4.1, 13.2, 13.4.2 5.2.1, 8.2.2, 9.7, 9.10, 10.2.2, 10.3, 11.1.3, 11.4.6, Written Interpretations 12.2.2, 12.2.4, 13.3, 14 4.2.11, 4.2.12, 4.3.6 Written Orders Written Notice 1.1.1, 2.3, 3.9, 4.3.6, 7, 8.2.2, 11.4.9, 12.1, 12.2, 13.5.2, 14.3.1

AlA Document A201TM -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the 1O maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 042 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) ARTICLE 1 GENERAL PROVISIONS § 1.1 BASIC DEFINITIONS § 1.1.1 THE CONTRACT DOCUMENTS The Contract Documents consist of the Agreement between Owner and Contractor (hereinafter the Agreement), Agreement, this specifically modified AlA Document A201-1997, General Conditions of the Contract (General, SHpplementary and other Conditions), ("A201"), Drawings, Specifications, Addenda issued prior to execution of the Contract, other documents listed in the Agreement and Modifications issued after execution of the Contract. A Modification is (1) a written amendment to the Contract signed by both parties, or (2) a Change Order, (3) a Construction Change Directive or (4) a written order for a minor change in the \Vork issued by the ,\Tchitect. Order.

Unless specifically enumerated in the Agreement, the Contract Documents do not include other documents such as bidding requirements (advertisement or invitation to bid, Instructions to Bidders, sample forms, the Contractor's bid or portions of Addenda relating to bidding requirements). References herein to the "Agreement" shall mean and refer to the specifically modified Standard Form of Agreement Between Owner and Contractor, or Owner and Construction Manager, which may be an AlA Document A1 01, A111 or A121, whichever is applicable.

§ 1.1.2 THE CONTRACT The Contract Documents form"the Contract for Construction. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. The Contract may be amended or modified only by a Modification. The Contract Documents shall not be construed to create a contractual relationship of any kind (1) between the Architect and Contractor, (2) between the Owner and a Subcontractor or Sub-subcontractor, (3) between the Owner and Architect or (4) between any persons or entities other than the Owner and Contractor. The ,\Tchitect shall, however, be entitled to performance and enforcement of obligations under the Contract intended to facilitate performance of the ,\Tchitect' s duties.

§ 1.1.3 THE WORK The term "Work" means the construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor's obligations. The Work may constitute the whole or a part of the Project.

§ 1.1.4 THE PROJECT The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part and which may include construction by the Owner or by separate contractors.

§ 1.1.5 THE DRAWINGS The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams.

§ 1.1.6 THE SPECIFICATIONS The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for theWork, and performance of related services.

§ 1.1.7 THE PROJECT MANUAL The Project Manual is a volume assembled for the Work which may include the bidding requirements, sample forms, Conditions of the Contract and Specifications.

§ 1.2 CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS § 1.2.1 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results.

§ 1.2.2 Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade.

AlA Document A20FM -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961,1963, 1966,1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 11 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 043 User Notes: Clayco A201 · Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) § 1.2.3 Unless otherwise stated in the Contract Documents, words which have well-known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings.

§ 1.3 CAPITALIZATION § 1.3.1 Terms capitalized in these General Conditions include those which are (1) specifically defined, (2) the titles of numbered articles or (3) the titles of other documents published by the American Institute of Architects.

§ 1.41NTERPRETATION § 1.4.1 In the interest of brevity the Contract Documents frequently omit modifying words such as "all" and "any" and articles such as "the" and "an," but the fact that a modifier or an article is absent from one statement and appears in another is not intended to affect the interpretation of either statement.

§ 1.5 EXECUTION OF CONTRACT DOCUMENTS § 1.5.1 The Contract Documents shall be signed by the Owner and Contractor.If either the Owner or Contractor or both do not sign all the Contract Documents, the Architect shall identify such unsigned Documents upon request § 1.5.2 Execution of the Contract by the Contractor is a representation that the Contractor has visited the site, become generally familiar with local conditions under which the Work is to be performed and correlated personal observations with requirements of the Contract Documents.

§ 1.6 OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS AND OTHER INSTRUMENTS OF SERVICE § 1.6.1 The Drawings, Specifications and other documents, including those in electronic form, prepared by the Architect and the Architect's consultants are Instruments of Service through •.v>flich the ·work to be executed by the Contractor is described. The Contractor may retain one record set. Neither the Contractor nor any Subcontractor, Sub subcontractor or material or equipment supplier shall own or claim a copyright in the Drav;ings, Specifications and other documents prepared by the Architect or the Architect's consultants, and 1:mless otherwise indicated the Architect and the Architect's consultants shall be deemed the authors of them and will retaiR all common law, statutory and other reserved rights, in addition to the copyrights. All copies of Instruments of Service, except the Contractor's record set, shall be returned or suitably accmmted for to the Architect, on request, upon completioR of the Work. The DmwiRgs, SpecificatioRs and other doCl:l:ments prepared by the Architect and the Architect's consultants, and copies thereof furnished to the Contractor, are for use solely with respect to this Project They are not to be ased by the Contractor or any Sabcontractor, Sab sabcontractor or material or equipment sapplier oR other projects or for additioru; to this Project outside the scope of the Work '<Vithout the specific writteR consent of the Owner, Architect and the Architect's coRsultants. The Contractor, SabcoHtractors, Sab subcontractors and material or equiprneRt suppliers are authori2:ed to use and reproduce applicable portions of the DrawiRgs, SpecificatioRs and other docUffierl:ts prepared by the Architect and the Architect's coRsultants appropriate to and for use in the execation of their Work uRder the CoRtract Documents. All copies made under this authori2:ation shall bear the staffitory copyright notice, if any, sho'.Vfl on the Dra·Nings, Specifications and other documents prepared by the Architect afld the Architect's consultants. Sabmittal or distribntion to meet official regulatory requirements or for other purposes in connection with this Project is not to be constrl:l:cd as pablication in derogation of the Architect's or Architect's consultants' copyrights or other resePred rights.

§ 1.6.1 The Drawings, Specifications and other documents prepared by the Architect or by any engineer or other design consultant working under the Architect or the Contractor (the "Other Design Consultants") for this Project (the "Design Documents") are instruments of the Architect's and Other Design Consultants' service through which the Work to be executed by the Contractor is described and, unless otherwise provided, the Architect and Other Design Consultants shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright until such time as the Owner has provided full and final payment to the Contractor for all services provided by the Architect and Other Design Consultants under this Agreement. Until final payment has been made by Owner, the Contractor shall cause the Architect and Other Design Consultants to grant in writing, upon execution of this Agreement, to the Owner a full and exclusive license for all copyright rights and privileges held by the Architect and Other Design Consultants with respect to the Design Documents. Such written agreement by the Architect and Other Design Consultants shall also provide that, upon full and final payment for Architect's and the Other Design Consultants' services, all rights reserved for the Architect and the Other Design Consultants with respect to the Design Documents shall pass to the Owner. The Architect and Other Design Consultants shall be permitted to retain copies, including reproducible and electronic copies, of the Design Documents for information and for use in the marketing of the Architect's and Other Design Consultants' services.

AlA Document A20FM -1997. Copyright © 1911, 1915,1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 044 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) Architect and the Other Design Consultants shall also be permitted to use any standard details from the Design Documents for other projects by the Architect or Other Design Consultants.

Any use of the copyright license or use or distribution of the Design Documents by the Owner, other than for this specific project, shall be at the Owner's sole risk. The Owner waives any right to make claims and waives, to the fullest extent permitted by law, any claim or cause of action against the Architect, the Other Design Consultants, their employees, agents or sub consultants, which may arise out of the Owner's use of this copyright license or its use or distribution of the Design Documents for other than this specific project without the concurrent and associated use of the Architect's or Other Design Consultants' services. The Owner hereby agrees to defend, indemnify and hold harmless the Contractor, Architect and Architect's consultants from any and all claims, damages, liabilities, losses and expenses, including reasonable attorney's fees, arising out of or resulting from the use of the "instruments of service." This does not relieve the Architect or Other Design Consultants from their responsibility to properly design this project for future renovations or expansions to the extent the criteria for such are specifically identified by the Owner and documented in the programming of this project.

The Architect and Other Design Consultants shall deliver to the Owner a complete set of the Design Documents prepared by the Architect, Other Design Consultants or their subconsultants in the form of electronic files within thirty (30) days of the Substantial Completion date or the date of the last Owner-initiated revision, whichever is latest. Architect and the Other Design Consultants shall also maintain an electronic copy of the Design Documents for a period of three (3) years from the date of Substantial Completion of the Project.

ARTICLE 2 OWNER § 2.1 GENERAL § 2.1.1 The Owner is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The Owner shall designate in writing a representative who shall have express authority to bind the Owner with respect to all matters requiring the Owner's approval or authorization.

Except as otherwise provided in Section 4.2.1, the Architect does not have such authority. The term "Owner" means the Owner or the Owner's authorized representative.

§ 2.1.2 The Owner shall furnish to the Contractor within fifteen days after receipt of a written request, information necessary and relevant for the Contractor to evaluate, give notice of or enforce mechanic's lien rights. Such information shall include a correct statement of the record legal title to the property on which the Project is located, usually referred to as the site, and the Owner's interest therein.

§ 2.21NFORMATION AND SERVICES REQUIRED OF THE OWNER § 2.2.1 The Owner shall, at the written request of the Contractor, prior to commencement of the Work and thereafter, furnish to the Contractor reasonable evidence that financial arrangements have been made to fulfill the Owner's obligations under the Contract. Furnishing of such evidence shall be a condition precedent to commencement or continuation of the Work. After such evidence has been furnished, the Owner shall not materially vary such financial arrangements without prior notice to the Contractor.

§ 2.2.2 Except for permits and fees, including those required under Section 3.7.1, which are the responsibility of the Contractor under the Contract Documents, the Owner shall secure and pay for necessary approvals, easements, assessments and charges required for construction, use or occupancy of permanent structures or for permanent changes in existing facilities.

§ 2.2.3 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, Project (the "Surveys"), and a legal description of the site. The Contractor shall be entitled to rely on the accuracy of information furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work. The Owner shall disclose, to the extent known to the Owner, the results and reports of studies, prior tests, inspections or investigations conducted for the Project (collectively, the "Project Information") involving: structural or mechanical systems; chemical, air and water pollution; hazardous materials; geotechnical conditions; Surveys; studies and plans or other environmental, subsurface or concealed conditions. The Owner shall disclose all information known to the Owner regarding the presence of hazardous materials, pollutants or contaminants at the Project's site. The Contractor shall review all such Project Information and shall cause the Architect, the structural engineer and other Design Professionals hired by Contractor and/or Architect to design, and

AlA Document A201 TM- 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 13 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 - Koll- lntellicenter -Dallas v2 (5-19-06) (986536188) R.P. Appx. 045 Contractor shall construct, the Project in accordance with the recommendations and findings set forth in such Project Information.

§ 2.2.4 Information or services required of the Owner by the Contract Documents shall be furnished by the Owner with reasonable promptness. Any other information or services relevant to the Contractor's performance of the Work under the Owner's control shall be furnished by the Owner after receipt from the Contractor of a written request for such information or services.

§ 2.2.5 Unless otherwise provided in the Contract Documents, the Contractor will be furnished, free of charge, such copies of Drawings and Project Manuals as are reasonably necessary for execution of the Work.

§ 2.3 OWNER'S RIGHT TO STOP THE WORK § 2.3.1 If the Contractor fails to correct Work which is not in accordance with the requirements of the Contract Documents as required by Section 12.2 or persistently fails to carry out Work in accordance with the Contract Documents, the Owner may issue a written order to the Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, the right of the Owner to stop theW ork shall not give rise to a duty on the part of the Owner to exercise this right for the benefit of the Contractor or any other person or entity, except to the extent required by Section 6.1.3. No part of the time lost due to any such stop work orders shall be made the subject of a claim for extension of time or for increased costs or damages by Contractor.

§ 2.4 OWNER'S RIGHT TO CARRY OUT THE WORK § 2.4.1 If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails within a seven-day period after receipt of written notice from the Owner to commence and continue correction of such default or neglect with diligence and promptness, the Owner may after such seven-day period give the Contractor a second written notice to correct such deficiencies within a three-day period. If the Contractor within such three-day period after receipt of such second notice fails to commence and continue to correct any deficiencies, the Owner.may, without prejudice to other remedies the Owner may have, correct such deficiencies. In such case an appropriate Change Order shall be issued deducting from payments then or thereafter due the Contractor the reasonable cost of correcting such deficiencies, including Owner's expenses aHd COHJ:fleB:satioR for the Architect's additioB:al sePiices made necessary by such default, neglect or failure. Sach actioB: by the OwRe£ and aHJ:OaRts charged to the Cornractor are both sabject to IJrior aiJflFOYal of the Architect. If payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the difference to the Owner. If the Contractor defaults in the Contractor's obligations to the Owner, the Architect shall grant a license to the Owner to use the drawings, specifications, and other documents and electronic data furnished by the Architect to the Contractor for the completion of the Project.

ARTICLE 3 CONTRACTOR § 3.1 GENERAL § 3.1.1 The Contractor is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term "Contractor" means the Contractor or the Contractor's authorized representative.

§ 3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents.

§ 3.1.3 The Contractor shall not be relieved of obligations to perform the Work in accordance with the Contract Documents either by activities or duties of the Architect in the Architect's administration of the Contract, or by tests, inspections or approvals required or performed by persons other than the Contractor.

§ 3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR § 3.2.1 Since the Contract Documents are complementary, before starting each portion of the Work, the Contractor shall carefully study and compare the various Drawings and other Contract Documents relative to that portion of the Work, as well as the information furnished by the Owner pursuant to Section 2.2.3, shall take field measurements of any existing conditions related to that portion of the Work and shall observe any conditions at the site affecting it.

These obligations are for the purpose of facilitating construction by the Contractor and are not for the purpose of discovering errors, omissions, or inconsistencies in the Contract Documents; however, any errors, inconsistencies or omissions discovered by the Contractor shall be reported promptly to the Architect Owner as a request for information in such form as the Architect Owner may reasonably require.

AlA Document A201TM -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 14 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 046 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 {5-1 9-06) (986536188) § 3.2.2 Any design errors or omissions noted by the Contractor during this review shall be reported promptly to the Architect, Owner, but it is recognized that the Contractor's review is made in the Contractor's capacity as a contractor and not as a licensed design professional1:1nless othenvise specifically provided in the Contract Docl:llllents. professional. The Contractor is not reql:li:red shall cause the Architect and other design professionals to ascertain that the Contract Documents are in accordance with applicable laws, statutes, ordinances, building codes, and rules and regulations, including, without limitation, the Americans with Disabilities Act, but any nonconformity discovered by or made-make known to the Contractor shall be promptly reported promptly to the ArcHitect. Owner.

§ 3.2.3 If the Contractor believes that additional cost or time is involved because of clarifications or instructions issued by the ArcHitect Owner in response to the Contractor's notices or requests for information pursuant to Sections 3.2.1 and 3.2.2, the Contractor shall make Claims as provided in Sections 4.3.6 and 4.3.7. If the Contractor fails to perform the obligations of Sections 3.2.1 and 3.2.2, the Contractor shall pay such costs and damages to the Owner as would have been avoided if the Contractor had performed such obligations. The Contractor shall not be liable to the Owner or ArcHitect for damages res1:1lting from errors, inconsistencies or omissions i:n the Contract Doc1:1ments or for differences between field measl:lfements or conditions and the Contract Docaments anless the Contractor recognized sash error, inconsistency, omission or difference and knowingly failed to report it to the t'\rcffitect.

§ 3.3 SUPERVISION AND CONSTRUCTION PROCEDURES § 3.3.1 The Contractor shall supervise and direct the Work, using the Contractor's best skill and attention. The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract, unless the Contract Documents give other specific instructions concerning these matters. If the Contract Documents give specific instructions concerning construction means, methods, techniques, sequences or procedures, the Contractor shall evaluate the jobsite safety thereof and, except as stated below, shall be fully and solely responsible for the jobsite safety of such means, methods, techniques, sequences or procedures. If the Contractor determines that such means, methods, techniques, sequences or procedures may not be safe, the Contractor shall give timely written notice to the Owner and ArcHitect and shall not proceed with that portion of the Work without further written instructions from the ArcHitect. Owner. If the Contractor is then instructed to proceed with the required means, methods, techniques, sequences or procedures without acceptance of changes proposed by the Contractor, the Owner shall be solely responsible for any resulting loss or damage.

§ 3.3.2 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's employees, Subcontractors and their agents and employees, and other persons or entities performing portions of the Work for or on behalf of the Contractor or any of its Subcontractors.

§ 3.3.3 The Contractor shall be responsible for inspection of portions of Work already performed to determine that such portions are in proper condition to receive subsequent Work.

§ 3.4 LABOR AND MATERIALS § 3.4.1 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of theW ork, whether temporary or permanent and whether or not incorporated or to be incorporated in theW ork.

§ 3.4.2 The Contractor may make substitutions only with the consent of the Owner, after evaluation by the Architect and in accordance with a Change Order.

§ 3.4.3 The Contractor shall enforce strict discipline and good order among the Contractor's employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them.

§ 3.4.4 The Contractor shall inspect all materials, supplies and equipment that are to be incorporated into the Project.

In addition, Contractor shall be responsible for construction quality control for all Work. Contractor's quality control program and inspection procedures for the foregoing shall be submitted in writing to Owner for review and approval, in sufficient detail to delineate those items to be inspected and the manner in which they are to be AlA Document A20FM -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 15 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 047 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) inspected. and shall adequately describe all construction quality control activities contemplated, including provision for adequate documentation of Contractor's performance of such quality control and inspection.

§ 3.4.5 Contractor shalL during the course of performance of the Project hereunder, without additional compensation. make or cause to be made all inspections required by the Contract Documents. Owner may require at Owner's expense additional inspections. Contractor shall furnish Owner with satisfactory documentation of the results of all inspections. Owner shall be given not less than three (3) working days notice of any inspections to be made by Contractor or Contractor's subcontractors in order that Owner may witness any such inspections.

§ 3.4.6 Owner and its representatives, and others as may be required by applicable laws. ordinances and regulations. shall have the right at all reasonable times to inspect the Project and all material and equipment for the Project at the job site and at Contractor's and its subcontractors' shops for conformance with the Contract Documents. Contractor shall provide. or cause to be provided access and sufficient, safe and proper facilities for such inspections.

§ 3.4.7 Neither the failure by Owner to make any inspection under the Contract Documents nor to discover defective workmanship, materials or equipment, nor approval of any Work or payment to Contractor for such Work shall constitute Contractor's satisfaction of its obligations under the Contract Documents. nor shall any such inspections or approvals prejudice the rights of Owner.

§ 3.5 WARRANTY § 3.5.1 The Contractor warrants to the Owner ana Arehiteet that materials and equipment furnished under the Contract will be of good quality and new unless otherwise required or permitted by the Contract Documents, that the Work will be free from defects not inherent in the quality required or permitted, and that the Work will conform to the requirements of the Contract Documents. Work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective. The Contractor's warranty excludes remedy for damage or defect caused by abuse, modifications not executed by the Contractor, improper or insufficient maintenance, improper operation, or normal wear and tear and normal usage. If required by the A:Fehiteet, Owner. the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. All warranties under this Paragraph shall commence as of the date of Substantial Completion of the Work. and shall continue for a period of one (1) year. except as otherwise noted in the Outline Specs (as such term is defmed in the Agreement). THE CONTRACTOR HEREBY DISCLAIMS ANY AND ALL EXPRESS OR IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES OF FITNESS FOR ANY PARTICULAR PURPOSE, EXCEPT AS EXPRESSLY WARRANTED HEREIN. THERE ARE NO WARRANTIES BEYOND THE DESCRIPTION ON THE FACE HEREOF. All subcontractor's and manufacturer's warranties shall be deemed furnished and assigned to the Owner pursuant to this Contract without further action by the Contractor upon Final Payment by the Owner as required under this Contract § 3.6 TAXES § 3.6.1 The Contractor shall pay sales, consumer, use and similar taxes for the Work provided by the Contractor which are legally enacted when bids are received or negotiations concluded, whether or not yet effective or merely scheduled to go into effect.

§ 3.7 PERMITS, FEES AND NOTICES § 3.7.1 Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building permit and other permits and governmental fees, licenses , waivers, consents. approvals and authorizations and make all material registrations. qualifications. designations and filings required and shall secure and pay for all inspections necessary for proper execution and completion of theWork which are customarily secured after execution of the Contract and which are legally required when bids are received or negotiations concluded.

§ 3.7.2 The Contractor shall comply with and give notices required by laws, ordinances, rules, regulations and lawful orders of public authorities applicable to performance of the Work.

§ 3.7.3 It is HBt Contractor shall cause the Ceatfaeter's resfleasieility Architect and other design professionals to ascertain that the Contract Documents are in accordance with applicable laws, statutes, ordinances, building codes, and rules and regulations. However, if the Contractor observes that portions of the Contract Documents are at variance therewith, the Contractor shall promptly notify the A:Fehiteet aaEl Owner in writing, and necessary changes shall be accomplished by appropriate Modification.

AlA Document A201"' -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 048 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 {5-19-06) {986536188) § 3.7.4 If the Contractor performs Work knowing it to be contrary to laws, statutes, ordinances, building codes, and rules and regulations without such notice to the Architect and Owner, the Contractor shall assume appropriate responsibility for such Work and shall bear the costs attributable to correction.

§ 3.8 ALLOWANCES § 3.8.1 The Contractor shall include in the Contract Sum all allowances stated in the Contract Documents. Items covered by allowances shall be supplied for such amounts and by such persons or entities as the Owner may direct, but the Contractor shall not be required to employ persons or entities to whom the Contractor has reasonable objection.

§ 3.8.2 Unless otherwise provided in the Contract Documents: .1 allowances shall cover the cost to the Contractor of materials and equipment delivered at the site and all required taxes, less applicable trade discounts; .2 Contractor's costs for unloading and handling at the site, labor, installation costs, overhead, profit Contractor's Fee based on the percentage set forth in Section 5.1.2 of the Agreement and other expenses contemplated for stated allowance amounts shall be included in the Contract Sum but not in the allowances; .3 whenever costs are more than or less than allowances, the Contract Sum shall be adjusted accordingly by Change Order. The amount of the Change Order shall reflect (1) the difference between actual costs and the allowances under Section 3.8.2.1 and (2) changes in Contractor's eo-sts-costs, Contractor's Fee based on the percentage set forth in Section 5 .1.2 of the Agreement and other expenses under Section 3.8.2.2.

§ 3.8.3 Materials and equipment under an allowance shall be selected by the Owner in sufficient time to avoid delay in the Work.

§ 3.9 SUPERINTENDENT § 3.9.1 The Contractor shall employ a competent superintendent and necessary assistants who shall be in attendance at the Project site during performance of the Work. The superintendent shall represent the Contractor, and communications given to the superintendent shall be as binding as if given to the Contractor. Important communications (including but not limited to any communication that may affect the items in subparagraphs (i) through (vii) of Section 6.5 of the Agreement) shall be confirmed in writing. Other communications shall be similarly confirmed on written request in each case.

§ 3.10 CONTRACTOR'S CONSTRUCTION SCHEDULES § 3.1 0.1 The Contractor, promptly after being awarded the Contract, shall prepare and submit for the Owner's and Architect's information a Contractor's construction schedule for the Work. The schedule shall not exceed time limits current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the Work and Project, shall be related to the entire Project to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the Work.

§ 3.10.2 The Contractor shall prepare and keep current, for the Architect's Owner's approval, a schedule of submittals which is coordinated with the Contractor's construction schedule and allows the Architect Owner reasonable time to review submittals.

§ 3.1 0.3 The Contractor shall perform the Work in general accordance with the most recent schedules submitted to the Owner and i\rchitect. Owner.

§ 3.11 DOCUMENTS AND SAMPLES AT THE SITE § 3.11.1 The Contractor shall maintain at the site for the Owner one record copy of the Drawings, Specifications, Addenda, Change Orders and other Modifications, in good order and marked currently to record field changes and selections made during construction, and one record copy of approved Shop Drawings, Product Data, Samples and similar required submittals. These shall be available to the Architect Owner and shall be delivered to the Architect for sl:lbmittal to the Owner upon completion of the Work.

AlA Document A201™ -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 17 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 049 User Notes: Clayco A201 - Koll · lntellicenter- Dallas v2 (5-19-06) (986536188) § 3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES § 3.12.1 Shop Drawings are drawings, diagrams, schedules and other data specially prepared for the Work by the Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

§ 3.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate materials or equipment for some portion of the Work.

§ 3.12.3 Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which theWork will be judged.

§ 3.12.4 Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents. The purpose of their submittal is to demonstrate for those portions of the Work for which submittals are required by the Contract Documents the way by which the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documents. Review by the Architect Owner is subject to the limitations of Section section 4.2.7. Informational submittals upon which the Architect Owner is not expected to take responsive action may be so identified in the Contract Documents. Submittals wh:i€h-that are not required by the Contract Documents may be returned by the Architect Owner without action.

§ 3.12.5 The Contractor shall review for compliance with the Contract Documents, approve and ~irect the Owner to review the Arehitect Shop Drawings, Product Data, Samples and similar submittals required by the Contract Documents with reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of the Owner or of separate contractors.Sllbmittals '.Vhich are not marked as reviewed for compliance with the Contract Doc\fments and approved by the Contractor may be returned by the Architect witholft action.

§ 3.12.6 By approving and submitting Shop Drawings, Product Data, Samples and similar submittals, the Contractor represents that the Contractor has determined and verified materials, field measurements and field construction criteria related thereto, or will do so, and has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents.

§ 3.12.7 The Contractor shall perform no portion of the Work for which the Contract Documents require submittal and review by the Owner of Shop Drawings, Product Data, Samples or similar submittals until the respective submittal has been approved by the Architect. Owner.

§ 3.12.8 The Work shall be in accordance with approved submittals except that the Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents by the Architect's Owner's approval of Shop Drawings, Product Data, Samples or similar submittals unless the Contractor has specifically informed the Architect Owner in writing of such deviation at the time of submittal and (1) the Architect Owner has given written approval to the specific deviation as a minor change in the Work, or (2) a Change Order or Constrlfction Change Directive has been issued authorizing the deviation. The Contractor shall not be relieved of responsibility for errors or omissions in Shop Drawings, Product Data, Samples or similar submittals by the Architect's Owner's approval thereof.

§ 3.12.9 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data, Samples or similar submittals, to revisions other than those requested by the Architect Owner on previous submittals. In the absence of such written notice the Architect's Owner's approval of a resubmission shall not apply to such revisions.

§ 3,12.10 The Contractor shall not be required to provide professional services which constitute the practice of architecture or engineering unless such services are specifically required by the Contract Documents for a portion of the Work or unless the Contractor needs to provide such services in order to carry out the Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. The Contractor shall not be required to provide professional services in violation of applicable law. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of the Contractor by the Contract Documents, the Owner and the Architect will specify all performance and design criteria that such services must satisfy. The Contractor shall cause such services or certifications to be provided by a properly licensed design professional, whose signature and seal shall appear on all drawings, calculations, AlA Document A201""- 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 18 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 050 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) {986536188) specifications, certifications, Shop Drawings and other submittals prepared by such professional. Shop Drawings and other submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to the Architect. Owner. The Owner and the Architect shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided the Owner and Architect have has specified to the Contractor all performance and design criteria that such services must satisfy. Pursuant to this Section 3.12.10, the Architect Owner will review, approve or take other appropriate action on submittals only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. The Contractor shall not be responsible for the adequacy of the performance or design criteria required by the Contract Documents.

§ 3.13 USE OF SITE § 3.13.1 The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits and the Contract Documents and shall not unreasonably encumber the site with materials or equipment.

§ 3.14 CUTTING AND PATCHING § 3.14.1 The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

§ 3.14.2 The Contractor shall not damage or endanger a portion of the Work or fully or partially completed construction of the Owner or separate contractors by cutting, patching or otherwise altering such construction, or by excavation. The Contractor shall not cut or otherwise alter such construction by the Owner or a separate contractor except with written consent of the Owner and of such separate contractor; such consent shall not be umeasonably withheld. The Contractor shall not unreasonably withhold from the Owner or a separate contractor the Contractor's consent to cutting or otherwise altering the Work.

§ 3.15 CLEANING UP § 3.15.1 The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or rubbish caused by operations under the Contract. At completion of the Work, the Contractor shall remove from and about the Project waste materials, rubbish, the Contractor's tools, construction equipment, machinery and surplus materials.

§ 3.15.2 If the Contractor fails to clean up as provided in the Contract Documents, the Owner may do so and the cost thereof shall be charged to the Contractor.

§ 3.16 ACCESS TO WORK § 3.16.1 The Contractor shall provide the Owner and Architect access to theWork in preparation and progress wherever located.

§ 3.17 ROYALTIES, PATENTS AND COPYRIGHTS § 3.17.1 The Contractor shall pay all royalties and license fees. The Contractor shall defend suits or claims for infringement of copyrights and patent rights and shall hold the Owner and Architect harmless from loss on account thereof, but shall not be responsible for such defense or loss when a particular design, process or product of a particular manufacturer or manufacturers is required by the Contract Documents or where the copyright violations are contained in Drawings, Specifications or other documents prepared by the Owner or Architect. Owner. However, if the Contractor has reason to believe that the required design, process or product is an infringement of a copyright or a patent, the Contractor shall be responsible for such loss unless such information is promptly furnished to the Architect. Owner.

§ 3.181NDEMNIFICATION § 3.18.1 To the fullest extent permitted by law and to the extent claims, damages, losses or expenses are not covered by .ill}_Project Management Protective Liability insurance purchased by the Contractor in accordance with Section ~ 11.3 or (b) builder's risk or property insurance maintained with respect to the Project, the Contractor shall indemnify and hold harmless the Owner, Architect, Architect's consaltants, and agents and employees of aay of them-from and against claims, damages, losses and expenses, including but not limited to reasonable attorneys' fees, arising out of or resulting from performance of the Work, provided that such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than theWork itself), but only to the extent caused by the negligent acts or omissions of the Contractor, a Subcontractor, AlA Document A201TM -1997. Copyright © 1911, 1915,1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966,1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 19 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 051 User Notes: Clayco A201 . Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) anyone directly or indirectly employed by them or anyone for whose acts they may be liable, regardless but only to the extent that such claim, damage, loss or expense is not caused by breach, or acts of omissions of the Owner. To the fullest extent permitted by law, the Owner shall indemnify and hold harmless the Contractor, its Subcontractors, and the agents and employees of any of whether or them from and against claims, damages, losses and expenses, including but not limited to reasonable attorneys' fees, arising out of the Project, provided that such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property, but only to the extent caused by the Owner's breach of this Contract, or the acts or omissions of the Owner, the Owner's separate contractors (as provided in part:-subparagraph 6.1.4), anyone directly or indirectly employed by them or anyone for whose acts they may be liable (other than the Contractor and its Subcontractors), and only to the extent that such claim, damage, loss or expense is not caused by a-breach, or acts or omissions of the party indemnified hereunder. Such obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Section 3.18. The obligations of the Contractor and the Owner herein are subject to the provisions of Subparagraphs 4.3.10 and 11.4.7.

§ 3.18.2 In claims against any person or entity indemnified under this Section 3.18 by an employee of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, the indemnification obligation under Section 3.18.1 shall not be limited by a limitation on amount or type of damages, compensation or benefits payable by or for the Contractor or a Subcontractor under workers' compensation acts, disability benefit acts or other employee benefit acts.

ARTICLE 4 ADMINISTRATION OF THE CONTRACT § 4.1 ARCHITECT § 4.1.1 The Architect is the person lawfully licensed to practice architecture or an entity lawfully practicing architecture identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term "Architect" means the Architect or the Architect's authorized representative.

§ 4.1.2 Duties, responsibilities and limitations of authority of the Architect as set forth in the Contract Documents shall not be restricted, modified or extended without written consent of the Owner, Contractor Owner and l\rchit:ect. the Contractor. Consent shall not be unreasonably withheld.

§ 4.1.3 If the employment of the Architect is terminated, the Gwner-Contractor shall employ a new Architect against whom the Contract:or Owner has no reasonable objection and-whose status under the Contract Documents shall be that of the former Architect.

§ 4.2 ARCHITECT'S ADMINISTRATION OF THE CONTRACT § 4.2.1 The Architect: v1ill provide administration oft:he Contract: as described in t:he Contract: Doctunerns, and will be an Owner's represernat:ive (1) dming construction, (2) Hntil fmal payment: is dlle and (3) with t:he Owner's conea:rrence, from time to time daring the one year period for eorreetion of Work deseribed in Seetion 12.2. The Architect v.'ill have anthority to act: on behalf of the Owner only to the ext:ern provided in the Contract: Doeumerns, unless ot:herwise modified in writing in aceordanee with other provisions of the Cornract.

§ 4.2.1 The Contractor shall keep the Owner informed of the progress and quality of the Work. Within thirty (30) calendar days after full execution and delivery of the Contract Documents and before submittal of the first progress payment invoice, and at each construction progress meeting on site, Contractor shall submit to Owner for Owner's reasonable approval (i) a revised Project Schedule (the most recent schedule so approved in writing by Owner becoming the revised Project Schedule for all purposes of the Contract Documents) showing changes from the prior Project Schedule, the sequence in which Contractor proposes to perform the Project, the start and completion dates of all separable portions of the Project in sufficient detail, manpower forecasts (incremental and cumulative percent complete), materials procurement and delivery plans, the anticipated Substantial Completion Date and the anticipated date that Contractor will tender possession of the Project and any other information reasonably specified by Owner pertaining to the construction schedule, along with (ii) a proforma Project Schedule that "looks ahead" two weeks containing the same details as set forth in subpart (i) above. Contractor agrees to adhere to the Project Schedule and attend and participate in scheduled progress and coordination meetings called by Owner. Within thirty (30) calendar days after full execution and delivery of the Contract Documents and before submittal of the first progress payment invoice, and at each construction progress meeting on site, Contractor shall also submit to Owner a revised budget for the Project, in form and content reasonably approved by Owner, including all hard and soft construction costs (the "Budget"), along with a construction cost report in form and content reasonably acceptable to Owner. Contractor shall use commercially reasonable efforts to keep the Budget as accurate as possible.

AlA Document A2Q1TM -1997. Copyright © 1911, 1915,1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 20 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 052 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) Contractor shall provide Owner with monthly reports no later than the tenth (lOth) day of each month, which shall, at the minimum, include the most current Project Schedule and a Project Change Order log update (with pricing information).

§ 4.2.2 In the event Contractor's performance of the Project is not in compliance with the Project Schedule, Owner may, in writing, require the Contractor to submit its plan for schedule recovery, or specify in writing the steps to be taken to achieve compliance with such Project Schedule, and/or exercise any other remedies under the Contract Documents. Contractor shall thereupon take such commercially reasonable steps as may be directed by Owner or otherwise necessary to improve its progress.

§ 4.2.2 The Architect, as a representative of the Owuer, '.vill visit the site at iHtervals appropriate to the stage of the Contractor's operations (1) to become generally familiar ·.vith aHd to keep the Ovmer iH:formed aboat the progress aud q-aality of the portion of the 'Nork completed, (2) to endeavor to guard the Owuer against defects and deficiencies iH the Work, aHd (3) to determine in general if the Work is being performed iu a mar.Jler iudicatiug that the Vlork, when fally completed, '.Vill be in accordaHce 'tvith the Coutract Docameuts. flov/ever, the Architect '.Ytll uot be req-aired to make exhaastiye or coutioooas ou site iuspectious to check the EJ:aality or q-aaHtity of the Work.

The Architect will neither have control over or charge of, uor be responsible for, the coustractiou meaRs, methods, techiliEJ:aes, seq-aeuces or procedares, or for the safety precaations aHd programs iu coHHectiou ,,vith the Work, siuce these are solely the Coutractor's rights aud responsibilities ander the Contract Docaments, except as provided iu Section 3.3.1.

§ 4.2.3 Contractor acknowledges and agrees Prudential Insurance Company of America ("Prudential") shall employ one or more construction consultants or engineers (collectively, the "Prudential Construction Consultant") to advise Prudential with respect to the progress of construction and compliance of construction with the construction plans and specifications for the Project, applicable legal requirements and good construction practices. Contractor shall inform the Prudential Construction Consultant of the usual location, date and time of periodic construction meetings for the Project. The Prudential Construction Consultant shall be permitted to attend all such construction meetings. Contractor shall provide the Owner and Prudential Construction Consultant with at least three (3) business days' prior notice of any change in the date, time or location of a periodic construction meeting. Contractor shall permit Owner and the Prudential Construction Consultant to have access to the Project during the period of construction to enable the Owner and Prudential Construction Consultant to examine all aspects of such construction and all matters related thereto. Contractor shall provide Owner and the Prudential Construction Consultant with at least three (3) business days' prior written notice of each of the following trades commencing construction at the Project: mechanical, electrical, plumbing, framing, paving, curtain wall installation and foundations. Contractor shall provide to Owner and the Prudential Construction Consultant reasonable access during normal business hours to all books, records, shop drawings, and engineering and other reports and tests related to the Project as may be requested by Owner or the Prudential Construction Consultant. The Owner and the Prudential Construction Consultant shall have the right to make copies of all such materials. Contractor shall provide to Owner and the Prudential Construction Consultant a reasonable working space and access to telephone and other such facilities as may be reasonably requested by Owner or the Prudential Construction Consultant. Upon execution of this Agreement, Contractor shall deliver to Owner and the Prudential Construction Consultant a list of all current and potential bidders who may perform work at or supply materials to the Project together with a list of all bid packages which were sent to any of such bidders and all bids which were received from such bidders. Such bidding information shall be updated by Contractor on a monthly basis by delivering revised lists to Owner and the Prudential Construction Consultant. The Owner and the Prudential Construction Consultant shall have the right to review any bid packages or any bids received upon request.

§ 4.2.3 The Architect will uot be responsible for the Contractor's failure to perform the Work iu accordance with the req-airemeuts of the Coutract Docaments. The Architect 'tVill not ha'le coutrel over or charge of and will not be responsible for acts or omissions of the Contractor, Subcoutractors, or their agents or employees, or any other persons or entities performing portio as of the Work.

§ 4.2.4 If requested by Owner, Contractor shall furnish it with the names of the subcontractors who have performed or are performing the Work hereunder. ~Communications Facilitating Contract Administration. EJ<cept as otherwise provided iu the Coutract Docameuts or wheu direct commaHicatious have beea specially aHthorized, the Owner aHd Coutractor shall endeavor to commaHicate with each other throagh the Architect abeat matters arising oat of or relating to the Coutract. CommuHicatioas lly aHd v.9th the Architect's coasaltants shall be through the Architect. . Communications AlA Document A201""' -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 053 User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 (5-19-06) (986536188) by and with Subcontractors and material suppliers shall be through the Contractor. Communications by and with separate contractors shall be through the Owner.

§ 4.2.5 'BaseEl eR the Arehiteet's evalaatieRs efthe Ceooaeter's l.cJ3J3lieatieas fer Paymefl:t, the Arehiteet will review aaEl eert-ify the ameafl:ts Elae the CeRtraeter aBEl v/ill issae Certifieates fer Paymefl:t iR saeh ameaE:ts.

§ 4.2.6 Upon request of Owner, Contractor will furnish it with a certificate satisfactory in form to Owner that goods furnished by Contractor in performance of the Contract Documents were produced in full compliance with the requirements of Sections 6, 7, and 12 of the Fair Labor Standards Act of 1938, as amended, and the regulations and orders of the U.S. Department of Labor issued under Section 14 thereof. ~The Arehiteet Owner will have authority to reject Work that does not conform to the Contract Documents. Whenever the Arehiteet Owner considers it necessary or advisable, the Arehiteet Owner will have authority to require inspection or testing of the Work in accordance with Sections 13.5.2 and 13.5.3, whether or not such Work is fabricated, installed or completed. However, neither this authority of the Arehiteet Owner nor a decision made in good faith either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the A£ehiteet Owner to the Contractor, Subcontractors, material and equipment suppliers, their agents or employees, or other persons or entities performing portions of the Work.

§-4m 4.2.8 As set forth in paragraph 3.12 above, the Owner will review submittals such as Shop Drawings, Product Data and Samples. The ,\rehiteet Owner will review and approve or take other appropriate action upon the Contractor's submittals such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. The Arehiteet' s Owner's action will be taken with such reasonable promptness as to cause no delay in the Work or in the activities of the O•.vner, Contractor or separate contractors, while allowing saffieieE:t time iR the Arehiteet' s J3refessieRalja8gmefl:t to permit adequate review. Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities, or for substantiating instructions for installation or performance of equipment or systems, all of which remain the responsibility of the Contractor as required by the Contract Documents. The ,\rehiteet's Owner's review of the Contractor's submittals shall not relieve the Contractor of the obligations under Sections 3.3, 3.5 and 3.12. The Arehiteet's Owner's review shall not constitute approval of safety precautions er, lfllless etherwise SJ3eeifieally stateEl lly the Arehiteet, or of any construction means, methods, techniques, sequences or procedures. The ,\rehiteet' s Owner's approval of a specific item shall not indicate approval of an assembly of which the item is a component.

§ 4.2.8 The Arehiteet will )3reJ3are Change OrElers aBEl CeRstmetieR ChaRge Direetives, aB:Ei may a1:1therize miRer ehaRges ia the JNerk as J3reviEleEl iR SeetieR 7.4.

§ 4.2.9 The Owner will submit CO Requests as provided in Section 6.5 of the Agreement. ~The ,\rehiteet Owner will conduct inspections to determine the date or dates of Substantial Completion and the date of final esmJ3letieR, will reeeive aBEl ferwarEl te the OwRer, fer the Ovmer' s reYiew aBEl reeerEls, writteR warrafl:ties aB:Ei relateEl EleeameRts reEJ:llireEl lly the Cestraet aBEl assemeleEl by the CeRtraeter, asEl will issae a fiaal Certifieate fer Paymefl:t ll)3BR eeffij3liaaee with the reEJ:HiremeE:ts ef the Cestraet DeeameRts.completion.

§ 4.2.10 If the Ovmer asEl Arehiteet agree, the Arehiteet will 13reviEle eRe er mere J3rsjeet represestatives te assist ia earryiag eat the ,\rehiteet' s respessibilities at the site. The Elaties, respeasibilities aREllimitatieas ef aatherity ef saeh J3rejeet represeE:tatives shall be as set ferth ill aB: eJ<:bibit te lle iRe8fJ38rateEl ill the CeRtraet Deeamefl:ts.

§ 4.2.11 Contractor represents and warrants it is an independent contractor and an employer subject to all applicable unemployment compensation, occupational safety and health, workers' compensation, or similar statutes so as to relieve Owner of any responsibility or liability for treating Contractor's employees as employees of Owner for the purpose of their safety or of keeping records, making reports or paying of any pavroll taxes or contribution.

Contractor agrees to defend, indemnifv and hold Owner harmless and reimburse them for any expense or liability incurred under said statutes in connection with employees of Contractor, including a sum equal to any unemployment benefits paid to those who were Contractor's employees, where such benefit payments are charged to Owner under any merit plan or to Owner reserve accounts pursuant to any statute. Nothing contained in the Contract Documents or any subcontract awarded by Contractor shall create any contractual relationship between any subcontractor and Owner.

AlA Document A201'M -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966,1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the 22 maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 054 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) {9865361 BB) § 4.2.11 The Architect will interpret and decide matters concerning performance «nder and req-uirements of, the Contract Doc«ments on written req-uest of either the Ovmer or Contractor. The Architect's response to s«ch req-uests vlill be made in writing within any time limits agreed upon or otherwise vlith reasonable promptness. If no agreement is made concerning the time within vihich interpretations req-uired of the Architect shall be furnished in compliance ·.vi:th this Section 4.2, then delay shall not be recognized on accol:lllt offail«re by the Architect to furnish s«ch interpretations l:llltill5 days after vlritten req-uest is made for them.

§ 4.2.12 Contractor represents and warrants that it will keep and have available all necessarv records and make all payments, reports, collections and deductions and otherwise do any and all things so as to fully comply with all federal, state and local laws, ordinances and regulations as they affect performance of the Contract Documents, so as to fully relieve and protect Owner from any and all responsibility or liability therefore or in regard thereto: (1) the production, purchase and sale, furnishing and delivering, pricing, and use or consumption of materials, supplies and equipment; (2) the hire, tenure or conditions of employment of employees and their hours of work and rates of the payment of their Work, and (3) the keeping of records, making of reports, and the payment, collection and/or deduction of federal, state, commonwealth and local taxes, contributions, pension funds, welfare funds, or similar assessments.

§ 4.2.12 Interpretations and decisions of the Architect 'tVill be consistent vlith the intent of and reasonably inferable from the Contract Doc«ments and will be in writing or in the form of drawffigs. \¥hen making s«ch interpretations and initial decisions, the Architect will endeavor to secl:lfe faithful performance by both Owner and Contractor, will not show partiality to either and \Vill not be liable for res«lts of interpretations or decisions so rendered in good faith.

§ 4.2.13 The Architect's decisions on matters relating to aesthetic effect will be final if consistent with the intent expressed in the Contract Doc«ments.

§ 4.2.13 Nothing in the Contract Documents shall be deemed to represent that Contractor, or any of Contractor's employees or agents, are the agents, representatives or employees of Owner. Contractor shall be an independent contractor and shall have responsibility for and control over the details and means for performing the Project.

Anvthing in the Contract Documents that may appear to give Owner the right to direct Contractor as to the details of the performance of the Project or to exercise a measure of control over Contractor shall mean that Contractor shall follow the desires of Owner only as to the intended results of the Project.

§ 4.3 CLAIMS AND DISPUTES § 4.3.1 Definition. A Claim is a demand or assertion by one of the parties seeking, as a matter of right, adjustment or interpretation of Contract terms, payment of money, extension of time or other relief with respect to the terms of the Contract. The term "Claim" also includes other disputes and matters in question between the Owner and Contractor arising out of or relating to the Contract. Claims must be initiated by written notice. The responsibility to substantiate Claims shall rest with the party making the Claim.

§ 4.3.2 Time Limits on Claims. Claims by either party must be initiated within 21 days after occurrence of the event giving rise to such Claim or within 21 days after the claimant first recognizes the condition giving rise to the Claim, whichever is later. Claims must be initiated by written notice to the Architect and the other party.

§ 4.3.3 Continuing Contract Performance. Pending final resolution of a Claim except as otherwise agreed in writing or as provided in Section 9.7.1 and Article 14, the Contractor shall proceed diligently with performance of the Contract and the Owner shall continue to make payments in accordance with the Contract Documents.

§ 4.3.4 Claims for Concealed or Unknown Conditions. If conditions are encountered at the site which are (1) subsurface or otherwise concealed physical conditions which differ materially from those indicated in the Contract Documents or (2) unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, then notice by the observing party shall be given to the other party promptly before conditions are disturbed and in no event later than 21 days after ftrst observance of the conditions. The Architect '.Vfll promptly investigate s«ch conditions and, if they differ materially and ca«se an increase or decrease in the Contractor's cost of, or time req-uired for, performance of any part of the Work, will recommend an eq-uitable adjHstment in the Contract S«m or Contract Time, or both. If the Architect detefiDffies that the conditions at the site are not materially different from those indicated in the Contract DocHments and that no change in the terms of the Contract is j«stified, the Ai=chitect shall so notify the Owner and Contractor in writing, stating the reasons. Claims by either party in opposition to s«ch determination IDl:lSt be made within 21 days after the Architect has given notice of the decision. If AlA Document A2QPM -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 23 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 055 User Notes: Clayco A201 · Koll · lntellicenter- Dallas v2 (5-19·06) (986536188) the conditions encountered are materially different, the Contract Sum and Contract Time shall be equitably adjusted, but if the Owner and Contractor cannot agree on an adjustment in the Contract Sum or Contract Time, the adjastruent matter shall be referred to the Architect for initial determination, sttbject to further proceedings parsaant to Section 4 .4 .considered a Claim and be resolved in accordance with Sections 4.4-4.6 below.

§ 4.3.5 Claims for Additional Cost. If the Contractor wishes to make Claim for an increase in the Contract Sum, written notice as provided herein shall be given before proceeding to execute the Work. Prior notice is not required for Claims relating to an emergency endangering life or property arising under Section 10.6.

§ 4.3.6 If the Contractor believes additional cost is involved for reasons including but not limited to (1) a written interpretation from the Architect, Owner, (2) an order by the Owner to stop the Work where the Contractor was not at fault, (3) a written order for a minor change in the Work issued by the Architect, Owner, (4) failure of payment by the Owner, (5) termination of the Contract by the Owner, (6) Owner's suspension or (7) other reasonable grounds, Claim shall be filed in accordance with this Section 4.3.

§ 4.3.7 Claims for Additional Time § 4.3. 7.1 If the Contractor wishes to make Claim for an increase in the Contract Time, written notice as provided herein shall be given. The Contractor's Claim shall include an estimate of cost and of probable effect of delay on progress of theW ork. In the case of a continuing delay only one Claim is necessary.

§ 4.3.7.2 If ad¥eflle •.veather conditions are the basis for a Claim for additional time, sach Claim shall be docaruented by data sabstantiating that weather conditions were abnormal for the period of time, coald not have been reasonably anticipated and had an adverse effect on the schedaled construction.

§ 4.3.7.2 Adverse weather conditions or adverse site conditions caused by adverse weather may be the basis for a Claim for additional time to the extent that the days lost during a particular calendar month due to such inclement weather exceeds three (3) days of lost time (in work days) for the calendar month. If adverse weather conditions or adverse site conditions caused by adverse weather are the basis for a Claim for additional time, such Claim shall be documented by data substantiating that either (i) weather conditions had an adverse effect on the scheduled construction, or (ii) weather conditions prevented the type of Work then scheduled, or (iii) adverse site conditions caused by adverse weather prevented the type of Work then scheduled.

§ 4.3.8 Injury or Damage to Person or Property. If either party to the Contract suffers injury or damage to person or property because of an act or omission of the other party, or of others for whose acts such party is legally responsible, written notice of such injury or damage, whether or not insured, shall be given to the other party within a reasonable time not exceeding 21 days after discovery. The notice shall provide sufficient detail to enable the other party to investigate the matter.

§ 4.3.9 If unit prices are stated in the Contract Documents or subsequently agreed upon, and if quantities originally contemplated are materially changed in a proposed Change Order or Construction Change Directive so that application of such unit prices to quantities of Work proposed will cause substantial inequity to the Owner or Contractor, the applicable unit prices shall be equitably adjusted.

§ 4.3.10 Claims for Consequential Damages. The Contractor and Owner waive Claims against each other for consequential damages arising out of or relating to this Contract. This mutual waiver includes: .1 damages incurred by the Owner for rental expenses, for losses of use, income, profit, financing, business and reputation, and for loss of management or employee productivity or of the services of such persons; and .2 damages incurred by the Contractor for principal office expenses including the compensation of personnel stationed there, for losses of financing, business and reputation, and for loss of profit except anticipated profit arising directly from the Work.

This mutual waiver is applicable, without limitation, to all consequential damages due to either party's termination in accordance with Article 14. Nothing contained in this Section 4.3.10 shall be deemed to preclude an award of liquidated direct damages, when applicable, in accordance with the requirements of the Contract Documents.

AlA Document A201™ -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 24 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 056 User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 (5-19-06) (986536188) § 4.41NDEMNITY &RESOLUTION OF CLAIMS AND DISPUTES § 4.4.1 Decision of Architect. Claims, inclHding those alleging an error or omission by the Architect bHt ffiCclHding those arising Hnder Sections 10.3 throHgh 10.5, shall be referred initially to the Architect for decision. i\n initial decision by the Architect shall be reqHired as a condition precedent to mediation, arbitration or litigation of all Claims between the Contractor and Ovmer arising prior to the date final payment is dHe, anless 30 days have passed after the Claim has been referred to the Architect with no decision having been rendered by the Architect. The Architect will not decide dispHtes between the Contractor and persons or entities other than the O'.vner.

§ 4.4.1 Contractor agrees to defend, indemnify and hold Owner, the affiliated companies of Owner, and all of their directors, officers, employees, agents and representatives, harmless from and against any claim, demand, cause of action, liability, loss or expense arising: .1 By reason of Contractor's actual or asserted failure to comply with any law, ordinance, regulation, rule or order, or with the Contract Documents. This Section 4.4.1.1 includes, but is not limited to, fines or penalties by government authorities and claims arising from Contractor's actual or asserted failure to pay taxes .

.2 From actual or asserted violation or infringement of rights in any patent, copyright, proprietary information, trade secret or other property right caused or alleged to be caused by the use or sale of goods, materials, methods, processes, designs or information, including construction methods, construction equipment and temporary construction facilities, furnished by Contractor or its subcontractors in performance of the Project. Should any goods or services provided by Contractor become, or appear likely to become, the subject of a claim of infringement of a patent, copyright or other property right, Contractor shall, at Owner's option, either procure for Owner the right to continue using such goods or services, replace same with equivalent, non-infringing goods or services, or modify the goods or services so that the use thereof becomes non-infringing, provided that any such modification or replacement is of equal quality and provides equal performance to the infringing goods or services .

.3 From actual or alleged contamination, pollution, or public or private nuisance, directly caused by any negligence or intentional misconduct of the Contractor or its subcontractors.

§ 4.4.2 The Architect will reYiew Claims and v:ithin ten days of the receipt of the Claim take one or more of the follmving actions: (1) reqHest additional sHpporting data from the claimant or a response v,rith sHpporting data from the other party, (2) reject the Claim in whole or in part, (3) approve the Claim, (4) sHggest a compromise, or (5) advise the parties that the Architect is anable to resolve the Claim if the Architect lacks safficient information to eyaffiate the HJ:erits of the Claim or if the Architect conclHdes that, in the Architect's sole discretion, it v,roHld be inappropriate for the Architect to resor;e the Claim.

§ 4.4.2 Contractor's indemnity obligations in this Subparagraph 4.4 are subject to the provisions of Subparagraphs 4.3.10 and 11.4.7 and Article 10, and shall apply to the extent that the amount to be indemnified was not caused by the negligence or willful misconduct of, or by defects in design furnished by, the party to be indemnified. Contractor's defense and indemnity obligations shall include the duty to reimburse any attorneys' fees and expenses reasonably incurred by Owner for legal action to enforce Contractor's indemnity obligations.

§ 4.4.3 In !:WalHating Claims, the Architect may, bHt shall not be obligated to, consHk '+'lith or seck information from either party O£ from persons 'i'i'ith special knowledge or expertise who may assist the Architect in rendering a decision. The Architect may reqHest the Owner to aHthorize retention of sach persons at the Owner's ~ense.

§ 4.4.3 In the event that the indemnity provisions in the Contract Documents are contrary to the law governing the Contract Documents, then the indemnity obligations applicable hereunder shall be construed to be to the fullest extent allowed by applicable law.

§ 4.4.4 If the Architect reqHests a party to provide a response to a Claim or to furnish additional sapporting data, sHch party shall respond, '.Vithin ten days after receipt of sach reqaest, and shall either provide a response on the reqttested sHpporting data, advise the Architect '.Vhen the response or SHpporting data '.Vill be furnished or advise the Architect that no sHpporting data will be furnished. Upon receipt of the response or sapporting data, if any, the Architect 'Nill either reject or appro';e the Claim in vihole or in part.

§ 4.4.4 With respect to claims by employees of Contractor or its subcontractors, the indemnity obligations created under this Section 4.4 shall not be limited by the fact of, amount, or type of benefits or compensation payable by or for Contractor, its subcontractors or suppliers under any workers' compensation, disability benefits, or other employee benefits acts or regulations, and Contractor waives any limitation of liability or immunity arising from workers' compensation or such other acts or regulations.

AlA Document A201 TM -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 0001 82995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 · Koll- lntellicenter- Dallas v2 (5·19-06) (9865361 88) R.P. Appx. 057 § 4.4.5 The Architect v;ill approve or reject Claims by written decision, which shall state the reasons therefor and which shall notify the parties of any change in the Contract Sum or Contract Time or both. The approval or rejection of a Claim by the Architect shall be final and binding on the parties but subject to mediation and arbitration.

§ 4.4.5 Unless Contractor has provided Owner with a bond or other form of security in form and amount reasonably acceptable to Owner, amounts may be retained from payments otherwise due Contractor as shall reasonably be considered necessary to satisfy any mechanics' or materialmen's liens for damages that fall within Contractor's indemnity obligations under this Section 4.4 until such claims suits or liens have been settled and satisfactory evidence to that effect has been furnished to Owner. Notwithstanding anything to the contrary in the foregoing, if the Contractor provides the Owner with a lien bond or other form of security sufficient to cover mechanics' liens filed by the Contractor or any Subcontractor, the Owner shall not withhold pavment as set forth in this Section or in Section 9.5.1 herein. The Contractor will diligently pursue the removal of any lien filed by a Subcontractor, and, regardless of whether a lien bond is provided as set forth above, during such time the Owner shall not satisfy or pay off the lien or otherwise settle or compromise the Contractor's claim; provided, however, that promptly after a final, non-appealable judgment is rendered directing that the property be sold to satisfy the lien, and in any event prior to the date of such sale, the Contractor will satisfy the lien and pay the Contractor all amounts owing.

§ 4.4.6 ·when a written decision of the Architect states that (1) the decision is final but subject to mediation and arbitration and (2) a demand for arbitration of a Claim covered by such decision must be made within 30 days after the date on which the party making the demand receives the final written dscision, then faiffire to demand arbitration within said 30 days' period shall result in the Architect's decision becoming final and binding upon the Ov/ner and Contractor. If the Architect renders a decision after arbitration proceedings have been initiated, such decision may be entered as evidence, but shall not supersede arbitration proceedings unless the decision is acceptable to all parties concerned.

§ 4.4.6 Notwithstanding any provision in the Contract Documents to the contrary, Owner and Contractor mutually waive any and all claims against the other for special, consequential or punitive damages arising out of or relating to the Contract Documents. This waiver includes but is not limited to damages incurred for rental expenses, for losses of use, income, profit, financing, business and reputation, and for loss of management or employee productivity or of the services of such persons.

§ 4.4.7 Upon receipt of a Claim against the Contractor or at any time thereafter, the A-rchitect or the Owner may, but is not obligated to, notify the surety, if any, of the nature and amount of the Claim. If the Claim relates to a possibility of a Contractor's default, the Architect or the Owner may, but is not obligated to, notify the surety and request the surety's assistance in resolving the controversy.

§ 4.4.8 If a Claim relates to or is the subject of a mechanic's lien, the party asserting such Claim may proceed in accordance with applicable law to comply with the lien notice or filing deadlines prior to resolution of the Claim by the A-rchitect, Claim, by mediation or by arbitration.

§ 4.5 MEDIATION § 4.5.1 Any Claim arising out of or related to the Contract, except Claims relating to aesthetic effect and except those waived as provided for in Sections 4.3.10, 9.10.4 and 9.10.5 shall, after initial decision by the Architect or 30 days after submission of the Claim to the Architect, be subject to mediation as a condition precedent to arbitration or binding arbitration. Except with the Owner's prior written consent, neither the assertion of a Claim nor the institution prosecution of kgal--mediation or equitable proceedings by either party.arbitration hereunder shall cause any Work to be halted pending resolution of same.

§ 4.5.2 The parties shall endeavor to resolve their Claims by mediation which, unless the parties mutually agree otherwise, shall be in accordance with the Construction Industry Mediation Rules of the American Arbitration Association currently in effect. Request for mediation shall be filed in writing with the other party to the Contract and with the American Arbitration Association. The request may be made concurrently with the filing of a demand for arbitration but, in such event, mediation shall proceed in advance of arbitration or legal or equitable proceedings, which shall be stayed pending mediation for a period of 60 days from the date of filing, unless stayed for a longer period by agreement of the parties or court order.

AlA Document A201 TM- 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 26 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 {5-19-06) {986536188) R.P. Appx. 058 § 4.5.3 The parties shall share the mediator's fee and any filing fees equally. The mediation shall be held in the place where the Project is located, unless another location is mutually agreed upon. Agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof.

§ 4.6 ARBITRATION § 4.6.1 Any Claim arising out of or related to the Contract, except Claims relating to aesthetic effect and e2mept those waived as provided for in Sections 4.3.10, 9.10.4 and 9.10.5, shall, after decision by the Architect or 30 days after sHbmission of the Claim to the Architect, shall be subject to binding arbitration. Prior to arbitration, the parties shall endeavor to resolve disputes by mediation in accordance with the provisions of Section 4.5.

§ 4.6.2 Claims not resolved by mediation shall be decided by binding arbitration which, unless the parties mutually agree otherwise, shall be in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association currently in effect. The demand for arbitration shall be filed in writing with the other party to the Contract and with the American Arbitration ,A,ssociation, and a copy shall be filed with the A.rchitect.Association. BY INITIALING IN THE SPACE BELOW YOU ARE AGREEING TO HAVE ANY DISPUTE DECIDED BY NEUTRAL ARBITRATION AND YOU ARE GIVING UP ANY RIGHTS YOU MIGHT POSSESS TO HAVE THE DISPUTE LITIGATED IN A COURT OR JURY TRIAL.

Owner Initials Contractor Initials

§ 4.6.3 A demand for arbitration shall be made within the time limits specified in Sections 4.4.6 and 4.6.1 as applicable, and in other cases within a reasonable time after the Claim has arisen, and in no event shall it be made after the date when institution of legal or equitable proceedings based on such Claim would be barred by the applicable statute of limitations as determined pursuant to Section 13.7.

§ 4.6.4 Limitation on Consolidation or Joinder. No arbitration arising Ollt of or relating to the Contract shall inclllde, by consolidation or joinder or in any other manner, the Architect, the Architect's employees or consnkants, except by written consent containing specific reference to the Agreement aHd signed by the Architect, Ov:ner, Contractor and any other person or entity sollght to be joined. No arbitration shall inelllde, by consolidation or joinder or in any other manner, parties other than the Owner, Contractor, a separate contractor as described in Article 6 and other persons sHbstantially in•;olved in a common qHestion of fact or law '.'i'!i:ose presence is required if complete relief is to be accorded in arbitration. No person or entity other than the Owner, Contractor or a separate contractor as described in Article 6 shall be inclllded as an original third party or additional third party to an arbitration •.vhose interest or responsibility is insHbstantial. Consent to arbitration involving an additional person or entity shall not constitute consent to arbitration of a Claim not described therein or with a person or entity not named or described therein. The foregoing agreement to arbitrate and other agreements to arbitrate with an additional person or entity duly consented to by parties to the Agreement shall be specifically enforceable under applicable law in any court having jurisdiction thereof.

§ 4.6.5 Claims and Timely Assertion of Claims. The party filing a notice of demand for arbitration must assert in the demand all Claims then known to that party on which arbitration is permitted to be demanded.

§ 4.6.6 Judgment on Final Award. The award rendered by the arbitrator or arbitrators shall be final, and judgment may be entered upon it in accordance with applicable law in any court having jurisdiction thereof.

ARTICLE 5 SUBCONTRACTORS § 5.1 DEFINITIONS § 5.1.1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the Work at the site. The term "Subcontractor" is referred to throughout the Contract Documents as if singular in number and means a Subcontractor or an authorized representative of the Subcontractor. The term "Subcontractor" does not include a separate contractor or subcontractors of a separate contractor.

§ 5.1.2 A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to perform a portion of theWork at the site. The term "Sub-subcontractor" is referred to throughout the Contract

AlA Document A201 1 M -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 059 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5·19-06} (986536188) Documents as if singular in number and means a Sub-subcontractor or an authorized representative of the Sub- subcontractor.

§ 5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE WORK § 5.2.1 Unless otherwise stated in the Contract Documents or the bidding requirements, the Contractor, as soon as practicable after award of the Contract, shall furnish in writing to the Owner ilireagh the i\rehiteet the names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for each principal portion of the Werlt-Wark and will, upon request therefor by Owner update such list during construction of the Project. The Arehiteet Owner will promptly reply to the Contractor in writing stating whether or not the 0'vaer er the Arehiteet, Owner, after due investigation, has reasonable objection to any such proposed person or entity. Failure of the Owner er Arehiteet to reply promptly shall constitute notice of no reasonable objection. Notwithstanding anything herein to the contrary, the Contractor may subcontract portions of the Work to the Contractor or divisions of the Contractor pursuant to a subcontract agreement and the subcontract sum thereof shall constitute a Cost of the Work, but only if such subcontract agreement is approved in writing in advance by Owner.

§ 5.2.2 The Contractor shall not contract with a proposed person or entity to whom the Owner er A:rehiteet has made reasonable and timely objection. The Contractor shall not be required to contract with anyone to whom the Contractor has made reasonable objection.

§ 5.2.3 If the Owner er ,'\rehiteet has reasonable objection to a person or entity proposed by the Contractor, the Contractor shall propose another to whom the Owner er Arehiteet has no reasonable objection. If the proposed but rejected Subcontractor was reasonably capable of performing the Work, the Contract Sum and Contract Time shall be increased or decreased by the difference, if any, occasioned by such change, and an appropriate Change Order shall be issued before commencement of the substitute Subcontractor's Work. However, no increase in the Contract Sum or Contract Time shall be allowed for such change unless the Contractor has acted promptly and responsively in submitting names as required.

§ 5.2.4 The Contractor shall not change a Subcontractor, person or entity previously selected if the Owner er ,\i=ehiteet makes reasonable objection to such substitute.

§ 5.3 SUBCONTRACTUAL RELATIONS § 5.3.1 By appropriate agreement, written where legally required for validity, the Contractor shall require each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by terms of the Contract Documents, and to assume toward the Contractor all the obligations and responsibilities, including the responsibility for safety of the Subcontractor's Work, which the Contractor, by these Documents, assumes toward the Ovmer aHd ,'\reffiteet. Owner. Each subcontract agreement shall preserve and protect the rights of the Owner aad t'\rehiteet under the Contract Documents with respect to the W ark to be performed by the Subcontractor so that subcontracting thereof will not prejudice such rights, and shall allow to the Subcontractor, unless specifically provided otherwise in the subcontract agreement, the benefit of all rights, remedies and redress against the Contractor that the Contractor, by the Contract Documents, has against the Owner. Where appropriate, the Contractor shall require each Subcontractor to enter into similar agreements with Sub-subcontractors. The Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract agreement, copies of the Contract Documents to which the Subcontractor will be bound, and, upon written request of the Subcontractor, identify to the Subcontractor terms and conditions of the proposed subcontract agreement which may be at variance with the Contract Documents. Subcontractors will similarly make copies of applicable portions of such documents available to their respective proposed Sub-subcontractors.

§ 5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS § 5.4.1 Each subcontract agreement for a portion of the W ark is assigned by the Contractor to the Owner provided that: .1 assignment is effective only after termination of the Contract by the Owner for cause pursuant to Section 14.2 and only for those subcontract agreements which the Owner accepts by notifying the Subcontractor and Contractor in writing; and .2 assignment is subject to the prior rights of the surety, if any, obligated under bond relating to the Contract.

AlA Document A201 TM- 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the 28 maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 (5-19-06} (986536188} R.P. Appx. 060 § 5.4.2 Upon such assignment, if the Work has been suspended for more than 30 days, the Subcontractor's compensation shall be equitably adjusted for increases in cost resulting from the suspension.

ARTICLE 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS § 6.1 OWNER'S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS § 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Section 4.3.

§ 6.1.2 When separate contracts are awarded for different portions of the Project or other construction or operations on the site, the term "Contractor" in the Contract Documents in each case shall mean the Contractor who executes each separate Owner-Contractor Agreement.

§ 6.1.3 The Owner shall provide for coordination of the activities of the Owner's own forces and of each separate contractor with the Work of the Contractor, who shall cooperate with them. The Contractor shall participate with other separate contractors and the Owner in reviewing their construction schedules when directed to do so. The Contractor shall make any revisions to the construction schedule deemed necessary after a joint review and mutual agreement. The construction schedules shall then constitute the schedules to be used by the Contractor, separate contractors and the Owner until subsequently revised.

§ 6.1.4 Unless otherwise provided in the Contract Documents, when the Owner performs construction or operations related to the Project with the Owner's own .ferees;-forces or pursuant to separate contracts with other contractors, the Owner shall be deemed to be subject to the same obligations and to have the same rights which apply to the Contractor under the Conditions of the Contract, including, without excluding others, those stated in Article 3, this Article 6 and Articles 10, 11 and 12. Without limiting the generality of the foregoing, if the Owner awards separate contracts with any other contractors for any work at the Project site during the performance of the Work, then the Owner shall cause each and every such other contractor (and their subcontractors of any tier) to name the Contractor as an additional insured on all liability insurance policies maintained by such other contractor (and their subcontractors of any tier) to the extent such policies cover liabilities relating to the Project or other work being performed at the Project site. The Owner shall furnish to the Contractor written evidence that such insurance is in effect and that the Contractor has been named an additional insured as aforesaid upon the first to occur of the award or execution of any such separate contract.

§ 6.2 MUTUAL RESPONSIBILITY § 6.2.1 The Contractor shall afford the Owner and separate contractors reasonable opportunity for introduction and storage of their materials and equipment and performance of their activities, and shall connect and coordinate the Contractor's construction and operations with theirs as required by the Contract Documents.

§ 6.2.2 If part of the Contractor's Work depends for proper execution or results upon construction or operations by the Owner or a separate contractor, the Contractor shall, prior to proceeding with that portion of the Work, promptly report to the Arehiteet Owner apparent discrepancies or defects in such other construction that would render it unsuitable for such proper execution and results. Failure of the Contractor so to report shall constitute an acknowledgment that the Owner's or separate contractor's completed or partially completed construction is fit and proper to receive the Contractor's Work, except as to defects not then reasonably discoverable.

§ 6.2.3 The Owner shall be reimbursed by the Contractor for costs incurred by the Owner which are payable to a separate contractor because of delays, improperly timed activities or defective construction of the Contractor. The Owner shall be responsible to the Contractor for costs incurred by the Contractor because of delays, improperly timed activities, damage to the Work or defective construction of a separate contractor.

§ 6.2.4 The Contractor shall promptly remedy damage wrongfully caused by the Contractor to completed or partially completed construction or to property of the Owner or separate contractors as provided in Section 10.2.5.

§ 6.2.5 The Owner and each separate contractor shall have the same responsibilities for cutting and patching as are described for the Contractor in Section 3.14.

AlA Document A201'M -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966,1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the 29 maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 (5-19-06) {986536188) R.P. Appx. 061 § 6.3 OWNER'S RIGHT TO CLEAN UP § 6.3.1 If a dispute arises among the Contractor, separate contractors and the Owner as to the responsibility under their respective contracts for maintaining the premises and surrounding area free from waste materials and rubbish, the Owner may clean up and the ,\:rehiteet will alleeate the cost among those resfleRsillle.responsible shall be equitably allocated.

ARTICLE 7 CHANGES IN THE WORK § 7.1 GENERAL § 7.1.1 Changes in the Work may be accomplished after execution of the Contract, and without invalidating the Contract, by Change Order, CeRstruetieR Change Direetive er erder fer a mifler ehaRge iR the Werk, subject to the limitations stated in this Article 7 and elsewhere in the Contract Documents.

§ 7.1.2 A ChaRge Order shall be eased llj3eR agreemeRt ameRg the Ovmer, CeRtraeter aRd A-rehiteet; a CeRStruetieR Change Direetive teEfHires agreemem by the Ov.1:1er illld Arehiteet illld may er may Ret be agreed te by the CeRtraeter; illl erder fer a miRer ehaRge in the '.Verk may Be issued ey the ,\:rehiteet aleae.

§ 7.1.2 A Change Order shall be based upon agreement between the Owner and the Contractor as provided in Section 6.5 of the Agreement.

§ 7.1.3 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the Contractor shall proceed promptly, unless otherwise provided in the Change Order, CeRstrHetieR ChaRge Direetive er erder fer a mifler ehange iR the '.Verk.Order.

§ 7.2 CHANGE ORDERS § 7.2.1/'t ChaRge Order is a r.vritteR iRstrHmeRt j3rej3ared ey the A-rehiteet illld sigaed by the OwRer, CeRtraeter aRd ,\:rehiteet; statiRg their agreemeRt UfleR all ef the fellw.viag: .1 eltaRge iH the J,Verk; .2 the ameunt ef the aajustrHeRt, if any, iR the CeRtraet Sum; aHEl .3 the B*teflt ef the aajustmeRt, if illl)', iR the CeRtraet Time.

§ 7.2.1 If the other provisions of the Contract require that a Change Order be issued and the Owner and the Contractor are unable to agree upon the terms thereof as provided in Section 6.5 of the Agreement within ten days of a written demand given by either party to the other party to so agree. then the dispute shall be resolved as provided in Article 4 herein. In any such dispute resolution proceedings the parties agree that the terms of the Change Order set forth in subparagraphs (i)-(vii) of Section 6.5 of the Agreement shall be determined.

§ 7.2.2 Metheds In any dispute resolution proceeding over a Change Order. the methods used in determining adjustments to the Contract Sum may include those listed in Section ':f....d+.7.33.

§ 7.2.3 Contractor shall not suspend performance of the Contract Documents during the review and negotiation of any Change Order.

§ 7.3 CONSTRUCTION CHANGE DIRECTIVES § 7.3.1 A CeRstrHetieR Chilllge Direetive is a r,vritteR erder j3rej3ated ey the Arehiteet and sigaed by the Ovffler aRd .AFehiteet, direetiHg a ehange iR the Werk ]3rier te agreemeRt SR aajustmeRt, if any, iR the CeRtraet Sum er CeRtraet Time, er eeth. The Ov.'Rer may ey CeRstrHetieR ChaRge Direetive, 'NitheHt iRvalidatiRg the CeRtraet, erder ehilllges iR the 'Verk withiR the geaeral see13e ef the CeRtraet eeRsistiag ef additieRs, deletieas er ether revisieRs, the CeRtraet Sum illld CeRtraet Time eeiRg aajastea aeeenliagly.

§ 7.3.1 [Intentionally Omitted].

§ 7.3.2 ! .. CeRstruetieR Chaage Direetive shallee used iR the abseRee ef tetal agreemeRt eR the terms ef a Chaage Order:- § 7.3.2 [Intentionally Omitted].

§ 7.3.3 If the CeRstrHetieR Change Direetive Order provides for an adjustment te--in the Contract Sum, the adjustment shall-may be based on one of the following methods:

AlA Document A201TM -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the 30 maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) R.P. Appx. 062 .1 mutual acceptance of a lump sum properly itemized and supported by sufficient substantiating data to permit evaluation; .2 unit prices stated in the Contract Documents or subsequently agreed upon; .3 cost to be determined in a manner agreed upon by the parties and a ffit:ltl:lally acceptable fixed or Contractor Fee based on the percentage feet-set forth in Section 5 .1.2 of the Agreement; or .4 as provided in Section 7.3.6.

§ 7.3.4 Upon receipt of a Constil:lction Change Directive, the Contractor shall promptly proceed with the change in the Work ffivoh<ed and advise the Architect of the Contractor's agreement or disagreement with the method, if any, provided in the Construction Change Directive for determining the proposed adjustment in the Contract gum or Contract Time.

§ 7.3.4 [Intentionally Omitted].

§ 7.3.5 [Intentionally Omitted].

§ 7.3.5 A Constil:lction Change Directi'<'e signed by the Contractor indicates the agreement of the Contractor therewith, including adjustment in Contract Sum and Contract Time or the method for determining them. Such agreement shall be effective immediately and shall be recorded as a Change Order.

§ 7.3.6 If-In any dispute between the Contractor does not respond promptly or disagrees with and the Owner over the method for adjustment in the Contract &um;-Sum in connection with any Change Order or in connection with any other adjustment in the Contract Sum to which the Contractor is entitled under the Contract Documents, then the method and the adjustment shall be determined by the Architect on the basis of reasonable expenditures and savings of those performing the Work attributable to the change, including, in case of an increase in the Contract Sum, a reasonable allowance for overhead and profit. Contractor's Fee based on the percentage set forth in Section 5 .1.2 of the Agreement. In such case, and also under Section 7.3.3.3, the Contractor shall keep and present, in such form as the Architect Owner may reasonably prescribe, an-a reasonably itemized accounting together with appropriate supporting data. Unless otherwise provided in the Contract Documents, costs for the purposes of this Section 7.3.6 shall be limited to the following: .1 costs of labor, including social security, old age and unemployment insurance, fringe benefits required by agreement or custom, and workers' compensation insurance; .2 costs of materials, supplies and equipment, including cost of transportation, whether incorporated or consumed; .3 rental costs of machinery and equipment, exclusive of hand tools, whether rented from the Contractor or others; .4 costs of premiums for all bonds and insurance, permit fees, and sales, use or similar taxes related to the W ork;and .5 additional costs of supervision and field office personnel directly attributable to the change. change; and .6 if the Agreement is an AlA Document A111 or A121, all other costs which would be considered to be Costs of the Work under the Agreement.

§ 7.3.7 The amount of credit to be allowed by the Contractor to the Owner for a deletion or change which results in a net decrease in the Contract Sum shall be actual net cost as confirmed by the Architect. cost. When both additions and credits covering relatedWork or substitutions are involved in a change, the allowance for overhead and profit shall be figured on the basis of net increase, if any, with respect to that change.

§ 7.3.8 Pending final determination of the total cost of a Constil:lction Change Directiv:e to the Owner, Order, amounts not in dispute for such changes in the Work shall be included in Applications for Payment accompanied by a Change Order indicating the parties' agreement with part or all of such costs. For any portion of costs and the Owner shall be obligated to pay such cost that remains costs together with a Contractor's Fee based on the percentage set forth in dispute, the A-rchitect 'NiH make an interim determination for purposes of monthly certification for payment for those costs. That determination Section 5 .1.2 of cost shall adjust the Contract gum on the same basis as a Change Order, subject Agreement to the right of either party to disagree and assert a claim in accordance with Article 4.Contractor.

§ 7.3.9 When the Owner and Contractor agree with the determination made by the Architect concerning tho-ill!Y adjustments in any one or more of the Work, the Contract Sum and-or the Contract Time, or otherwise reach AlA Document A201™ -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 31 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 (5-19-06) (986536188) R.P. Appx. 063 agreement upon the adjastments, adjustments in the items set forth in subparagraphs (i)-(vii) of Section 6.5 of the Agreement, such agreement shall be effective immediately and shall be recorded by preparation and execution of an appropriate Change Order.

§ 7.4 MINOR CHANGES IN THE WORK § 7.4.1 The Architect Owner will have authority to effier.-make minor changes in the Work not involving adjustment in the Contract Sum or extension of the Contract Time and not inconsistent with the intent of the Contract Documents. Such changes shall be effected by written order and shall be binding on the Owner and Contractor. The Contractor shall carry out such written orders promptly.

ARTICLE 8 TIME § 8.1 DEFINITIONS § 8.1.1 Unless otherwise provided, Contract Time is the period of time, including authorized adjustments, allotted in the Contract Documents for Substantial Completion of the Work.

§ 8.1.2 The date of commencement of the Work is the date established in the Agreement.

§ 8.1.3 The date of Substantial Completion is the date certified by tbe Architect when Substantial Completion is actually achieved in accordance with Section 9.8.

§ 8.1.4 The term "day" as used in the Contract Documents shall mean calendar day unless otherwise specifically defined.

§ 8.2 PROGRESS AND COMPLETION § 8.2.1 Time limits stated in the Contract Documents are of the essence of the Contract. By executing the Agreement the Contractor confirms that the Contract Time is a reasonable period for performing the Work.

§ 8.2.2 The Contractor shall not knowingly, except by agreement or instruction of the Owner in writing, prematurely commence operations on the site or elsewhere prior to the effective date of insurance required by Article 11 to be furnished by the Contractor and Owner. The date of commencement of the Work shall not be changed by the effective date of such insurance. Unless the date of commencement is established by the Contract Documents or a notice to proceed given by the Owner, the Contractor shall notify the Owner in writing not less than five days or other agreed period before commencing the Work to permit the timely filing of mortgages, mechanic's liens and other security interests.

§ 8.2.3 The Contractor shall proceed expeditiously with adequate forces and shall achieve Substantial Completion within the Contract Time.

§ 8.3 DELAYS AND EXTENSIONS OF TIME § 8.3.1 If tbe Colltractor is delayed at any time in tbe commencement or progress of the Work by an act or neglect of tbe Owner or Architect, or of an employee of either, or of a separate contractor employed by the Ovmer, or by changes ordered in tbe Work, or by labor displ:ltes, fire, l:lfil:lsaal delay in deliveries, anavoidable casaalties or otber caases beyond the Contractor's control, or by delay aathorized by tbe Owner pending mediation and arbitration, or by otber canses \Nhich tbe Architect determines may jastify delay, tben the Colltract Time shall be extended by Change Order for sach reasonable time as the Architect may determine.

§ 8.3.1 If the Contractor is delayed at any time in the commencement or progress of the Work that adversely affect the sequencing of the Work resulting in a delay in Substantial Completion by (i) an act or neglect of the Owner, or of an employee of Owner, or of a separate contractor employed by the Owner, or (ii) changes ordered in the Work, or (iii) labor disputes, or (iv) fire, or (v) unusual delay in deliveries, or (vi) the imposition after the date of the Agreement of quotas or other restrictions on the ability of the Contractor to obtain material or equipment, or (vii) unavoidable casualties or (viii) other causes not reasonably foreseeable on the date the Work commenced or which are beyond the Contractor's control, or (ix) adverse weather conditions or adverse site conditions as set forth in Section 4.3.7.2, or (x) delays caused by governmental authorities (not caused as a result of fault on the part of the Contractor) or (xi) delay authorized by the Owner pending mediation and arbitration (provided that no such event has been caused by the delay or negligent or other wrongful act or omission of the Contractor or any of its employees or agents), and provided that Contractor has delivered to Owner written notice of the occurrence of such event within ten (10) business days after the occurrence thereof, then the Contract Time shall be extended by AlA Document A201 TM- 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 (5-19-06) (986536188) R.P. Appx. 064 Change Order for a reasonable time and the Contract Sum shall be adjusted to the extent reasonably necessary to compensate the Contractor for any increases in the Cost of the Work caused by such delay.

§ 8.3.2 Claims relating to time shall be made in accordance with applicable provisions of Section 4.3.

§ 8.3.3 This Section 8.3 does not preclude recovery of damages for delay by either party under other provisions of the Contract Documents.

ARTICLE 9 PAYMENTS AND COMPLETION § 9.1 CONTRACT SUM § 9.1.1 The Contract Sum is stated in the Agreement and, including authorized adjustments, is the total amount payable by the Owner to the Contractor for performance of the Work under the Contract Documents.

§ 9.2 SCHEDULE OF VALUES § 9.2.1 Before the first Application for Payment, the Contractor shall submit to the Architect Owner a schedule of values allocated to various portions of the Work, prepared in such form and supported by such data to substantiate its accuracy as the Architect Owner may require. This schedule, unless objected to by the Architect, Owner, shall be used as a basis for reviewing the Contractor's Applications for Payment.

§ 9.3 APPLICATIONS FOR PAYMENT § 9.3.1 At least te!t-twenty days before the date established for each progress payment, the Contractor shall submit to the Architect Owner an itemized Application for Payment for operations completed in accordance with the schedule of values. Such application shall be notarized, if required, and supported by such data substantiating the Contractor's right to payment as the Owner or Architect may reasonably require, such as copies of requisitions from Subcontractors and material suppliers, and reflecting retainage if provided for in the Contract Documents. See the Agreement for additional provisions relating to Applications for Payment.

§ 9,3.1.1 As provided ia Section 7.3 .8, such applications may include requests for payment oa acconnt of changes in the Work vfhich hwre lleea properly authori,.,ed by Construction Change Directives, or lly interim determinations of the Architect, llut aot yet iac!Hded in Change Orders.[Intentionally Omitted].

§ 9.3.1.2 Such applications may not include requests for payment for portions of theWork for which the Contractor does not intend to pay to a Subcontractor or material supplier, unless such Work has been performed by others whom the Contractor intends to pay.

§ 9.3.2 Unless otherwise provided in the Contract Documents, payments shall be made on account of materials and equipment delivered and suitably stored at the site for subsequent incorporation in the Work. If approved in advance by the Owner, payment may similarly be made for materials and equipment suitably stored off the site at a location agreed upon in writing. Payment for materials and equipment stored on or off the site shall be conditioned upon compliance by the Contractor with procedures satisfactory to the Owner to establish the Owner's title to such materials and equipment or otherwise protect the Owner's interest, and shall include the costs of applicable insurance, storage and transportation to the site for such materials and equipment stored off the site.

§ 9.3.3 The Contractor warrants that title to all Work covered by an Application for Payment will pass to the Owner no later than the time of payment. The Contractor further warrants that upon submittal of an Application for Payment all Workfor which Certificates for Payment payments have been previously issued and payments received from the Owner shall, to the best of the Coatractor' s knowledge, iaformatioa aad belief, shall be free and clear of liens, claims, security interests or encumbrances in favor of the Contractor, Subcontractors, material suppliers, or other persons or entities making a claim by reason of having provided labor, materials and equipment relating to the Work. To the extent permitted by applicable law, good and clear title to all materials furnished by Contractor under the Contract Documents for the Project shall pass to Owner upon incorporation into the Project. Contractor shall ensure that subcontractors from whom Contractor obtains materials do not retain or reserve title to such items, and Contractor shall defend, indemnify and hold Owner harmless from any such claims by Contractor's subcontractors.

Notwithstanding the foregoing, the care, custody and control of Contractor's Work incorporated into the Project shall remain with Contractor until such Work has been accepted in writing by Owner and shall thereon pass to Owner unless Owner notifies Contractor in writing that such care, custody and control is assumed by Owner at a earlier date.

AlA Document A20FM -1997. Copyright © 1911, 1915,1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966,1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 33 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 065 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) § 9.4 CERTIFICATES FOR PAYMENT § 9.4.1 The Arefliteet Owner will, within ~twenty days after receipt of the Contractor's Application for Payment, either issHe ts Ql!Y_the OwBer a Ceftifieate amount of such Application for PaymeBt, with a espy Payment to the Contractor, fer sHeh amsHBt as the Attehiteet determines is prsperly EiHe, or notify the Contractor and Owner in writing of the ,\refliteet' s Owner's reasons for withholding eertifieatisn payment in whole or in part as provided in Section 9.5.1.

§ 9.4.2 The issaanee sf a Certifieate fer Paymefl:t will esnstitHte a r6J3resefl:tatisn ey the ,\refliteet ts the Ovmer, eased sB tbe J\.rehiteet' s eva±Hatisn sf the \Vsrk and the data esmprising the Applieatisn fer PaymeHt, that the 'Nsrk has )3£Sgressed ts the )38ifl:t indieated and tbat, ts the Best sf the Af'effiteet' S kflswledge, infsfifl:atiSB and eeJief, the EJ:Hality sf tbe \Vsrk is ill aeesrdanee v.ith the CsHtraet DseHmeHts. The feregsiHg r6J3resefl:tatisns are sl:!Bjeet ts an evalHatisH sf the \Vsrk fer esnfsfifl:anee ·.vith the CsHtraet DseHmefl:ts HJ3Sn S'HBstantial CsiBJ3letisH, ts resHlts sf SHBSeEJ:Hefl:t tests and ffisj3eetisHs, ts esrreetisH sf miner deviatisHs frsm the Csfl:traet DseHFB:eHts prier ts 6SffiJ3letisH and ts speeifie EJ:HalifieatisHS eol'fJfessed ey tbe Arehiteet. The issHanee sf a Ceftifieate fer Paymefl:t will fintller esHstimte a represefl:tatisH tbat the CsHtraetsr is eHtitled ts fla-J'FB:elit in the amsHBt eeftified. He·Never, the issaanee sf a Certifieate fer PaymeHt will net ee a represeHtatisn that the ,\£ehiteet has (1) made ffiffianstive sr esHtinHsHs en site iHspeetisas ts eheek tbe EJ:Hality sr EJ:Hafl:tity sf the Wsrk, (2) revie Ned esHstruetisH means, metbsds, teeliDiEJ:HeS, seEJ:HeHees sr prseedHres, (3) rev-iewed espies sf reEJ:HisitisHs reeeived frsm S'HBesHtraetsrs and material SHJ3pliers aHa ether data feEJ:Hested ey the OwBer ts s'HBstaHtiate the CsHtraetsr's right ts payFB:efl:t, Sf (4) made eJmmiHatisH ts aseertain he ;v sr fer '.Vhat fntrpsse the CsHtraetsr has Hsed ffiSHey prev-isHsly paid SH aeesHBt sf the CsHtraet &ar!t-[lntentionally Omitted].

§ 9.5 DECISIONS TO WITHHOLD CERTIFICATION § 9.5.1 The J\.refliteet FB:ay Viithhsld a Certifieate fer Payment in v.hsle sr in part, ts If the eJEtefl:t reassHaely Beeessary ts prsteet the Ov. Her, if in the Attehiteet' s 8)3ini8H the represefl:tatiSHS ts the Owner reEJ:Hired ey SeetisH 9.4 .2 eanoot ee made. If the Arehiteet is HHaele ts eertify withholds a payment in the amsHBt of all or any portion of an Application for Payment, then the P.r)3)31ieatisa, the Arehiteet Owner will notify the Contractor and OwBer as provided in Section 9.4.1. If the Contractor and ,\rehiteet the Owner cannot agree on a revised amount, the J\.rehiteet Owner will promptly issHe a Certifieate fer Paymefl:t fer Ql!Y_the amount fer-which the ,\rehiteet is aele ts make sHeh represeHtatisHs ts the OwHer. not in dispute. The ,\f'efliteet Owner may alse-withhold a Ceftifieate fer Paymefl:t payment or, because of subsequently discovered evidence, may BHllify-:reguest a refund of the whole or a part of a Ceftifieate fer Paymefl:t payment previously issaetl;-made to such extent as may be reasonably necessary iH--the J\.refliteet' s spinieR to protect the Owner from loss for which the Contractor is responsible, iHelHding less resulting from acts and omissions described in Section 3.3.2, because of: .1 defective Work not remedied; .2 third party claims filed or reasonable evidence indicating probable filing of such claims against Owner, the Land or the Project or reasonable evidence indicating the probable filing of such claims, unless security acceptable to the Owner is provided by the Contractor to protect Owner against such claims (such security may include, without limitation, Contractor's compliance with its indemnification or bonding obligations under the CsHtraetsr;Contract); .3 failure of the Contractor to make payments properly to Subcontractors or for labor, materials or equipment; .4 reasonable evidence that the Work cannot be completed for the unpaid balance of the Contract Sum; .5 damage to the Owner or another contractor; .6 reasonable evidence that the Work will not be completed within the Contract Time, and that the unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay; er .7 persistent failure to carry out the Work in accordance with the Contract Documents; or .8 without limiting the generality of the above, any other reason for which Owner is entitled to withhold or deduct payment under the express provisions of the Contract Documents.

§ 9.5.2 When the above reasons for withholding eertifieatisH payment are removed, eertifieatisn payment will be made for amounts previously withheld.

AlA Document A2Q1TM -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the 34 maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995 1 which expires on 7/23/2006, and is not for resale. - User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) {986536188) R.P. Appx. 066 § 9.6 PROGRESS PAYMENTS § 9.6.1 After the Architect Owner has issHed a Certificate received an Application for Payment, Payment which complies with the requirements of the Contract Documents, the Owner shall make payment in the manner and within the time provided in the Contract DocHrnents, and shall so Hotify the Architect. Documents.

§ 9.6.2 The Contractor shall promptly pay each Subcontractor, upon receipt of payment from the Owner, out of the amount paid to the Contractor on account of such Subcontractor's portion of the Work, the amount to which said Subcontractor is entitled, reflecting percentages actually retained from payments to the Contractor on account of such Subcontractor's portion of the Work. The Contractor shall, by appropriate agreement with each Subcontractor, require each Subcontractor to make payments to Sub-subcontractors in a similar manner.

§ 9.6.3 The Amhitect Owner will, on request, furnish to a Subcontractor, if practicable, information regarding percentages of completion or amounts applied for by the Contractor and action taken thereon by the Architect aHd Owner on account of portions of the Work done by such Subcontractor.

§ 9.6.4 Neither Contractor shall use the sums advanced to it pursuant to the Contract documents solely for the purpose of the performance of the Work. The Owner HOI Architect shall not have an obligation to pay or to see to the payment of money to a Subcontractor except as may otherwise be required by law.

§ 9.6.5 Payment to material suppliers shall be treated in a manner similar to that provided in Sections 9.6.2, 9.6.3 and 9.6.4.

§ 9.6.6 A Certificate for PayrneHt, a progress payment, or partial or entire use or occupancy of the Project by the Owner shall not constitute acceptance of Work not in accordance with the Contract DocHrnents.Documents and shall not relieve Contractor of its obligations under the Contract Documents with respect thereto.

§ 9.6.7 Unless the Contractor provides the Owner with a payment bond in the full penal sum of the Contract Sum, payments received by the Contractor for Work properly performed by Subcontractors and suppliers shall be held by the Contractor for those Subcontractors or suppliers who performed Work or furnished materials, or both, under contract with the Contractor for which payment was made by the Owner. Nothing contained herein shall require money to be placed in a separate account and not commingled with money of the Contractor, shall create any fiduciary liability or tort liability on the part of the Contractor for breach of trust or shall entitle any person or entity to an award of punitive damages against the Contractor for breach of the requirements of this provision.

§ 9.7 FAILURE OF PAYMENT § 9.7.1 If the Arehitect Owner does not i:sffile--make a Certificate for Payment, through no fault of the Contractor, within Se¥eH-twenty days after receipt of the Contractor's Application for Payment, or if the Owner does not pay the Contractor within seven days after the date established in the Contract Documents the amount certified by due to the Architect Contractor hereunder or awarded by arbitration, then the Contractor may, HpoH se¥eH additioNal days' writteH Hotice to the Ovmer and Architect, may stop the Work until payment of the amount owing has been received.

The Contract Time shall be extended appropriately and the Contract Sum shall be increased by the amount of the Contractor's reasonable costs of shut-down, delay and start-up, plus interest as provided for in the Contract Documents.

§ 9.8 SUBSTANTIAL COMPLETION § 9.8.1 Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use.

§ 9.8.2 When the Contractor considers that the Work, or a portion thereof which the Owner agrees to accept separately, is substantially complete, the Contractor shall prepare and submit to the Architect Owner a comprehensive list of items to be completed or corrected prior to final payment. Failure to include an item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.

§ 9.8.3 Upon receipt of the Contractor's list, the Architect Owner will make an inspection to determine whether the Work or designated portion thereof is substantially complete. If the Architect's Owner's inspection discloses any AlA Document A2Q1TM -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966,1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 067 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) item, whether or not included on the Contractor's list, which is not sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work or designated portion thereof for its intended use, the Contractor shall, before issuance of the Certificate of Substantial Completion, complete or correct such item upon notification by the Architect. Owner. In such case, the Contractor shall then submit a request for another inspection by the Architect Owner to determine Substantial Completion.

§ 9.8.4 When the Work or designated portion thereof is substantially complete, the Architect Owner will prepare a Certificate of Substantial Completion which shall establish the date of Substantial Completion, shall establish responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance, and shall fix the time within which the Contractor shall finish all items on the list accompanying the Certificate. Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion.

Upon the Owner providing such Certificate of Substantial Completion, Contractor shall cause (a) the Architect to sign and deliver to Owner and Prudential a certificate in the form of Exhibit "E" attached hereto, and (b) the civil engineer for the Project to sign and deliver to Owner and Prudential a certificate in the form of Exhibit "F" attached hereto.

§ 9.8.5 The Certificate of Substantial Completion shall be submitted to the Owner and Contractor for their written acceptance of responsibilities assigned to them in such Certificate. Upon such acceptance and consent of surety, if any, the Owner shall make payment of retainage applying to such Work or designated portion thereof. Such payment shall be adjusted for Work that is incomplete or not in accordance with the requirements of the Contract Documents.

§ 9.9 PARTIAL OCCUPANCY OR USE § 9.9.1 The Owner may occupy or use any completed or partially completed portion of the Work at any stage when such portion is designated by separate agreement with the Contractor, provided such occupancy or use is consented to by the insurer as required under Section 11.4.1.5 and authorized by public authorities having jurisdiction over the Work. Such partial occupancy or use may commence whether or not the portion is substantially complete, provided the Owner and Contractor have accepted in writing the responsibilities assigned to each of them for payments, retainage, if any, security, maintenance, heat, utilities, damage to the Work and insurance, and have agreed in writing concerning the period for correction of the Work and commencement of warranties required by the Contract Documents. When the Contractor considers a portion substantially complete, the Contractor shall prepare and submit a list to the Architect Owner as provided under Section 9.8.2. Consent ofthe Contractor to partial occupancy or use shall not be umeasonably withheld. The stage of the progress of the Work shall be determined by written agreement between the Owner and Coetractor or, if RO agreemeRt is reachea, by decisioR of the Architect. Contractor.

§ 9.9.2 Immediately prior to such partial occupancy or use, the Ovmer, Owner and the Contractor aRd Architect shall jointly inspect the area to be occupied or portion of the Work to be used in order to determine and record the condition of the Work.

§ 9.9.3 Unless otherwise agreed upon, partial occupancy or use of a portion or portions of theW ork shall not constitute acceptance of Work not complying with the requirements of the Contract Documents.

§ 9.10 FINAL COMPLETION AND FINAL PAYMENT § 9.10.1 Upon receipt of written notice from Contractor to Owner that all Punch List Items have been completed and that the Work is ready for final inspection and acceptance and upon receipt of a fmal Application for Payment, the Architect Owner will promptly make such inspection and, when the Architect fmds the Work acceptable nnaer has been finally completed in accordance with the Contract Documents and the Contract fully performed, the Architect Owner will promptly issoo--a-make final Certificate for PaymeRt stating that to the best payment of the Architect's knovileage, infoFffiatioR all amounts due and belief, aHa OR the basis of the Architect's oR site visits aHa illspections, the ¥lork has beeR completea ill accordaRce '.vith terms and coRditioRs of the Coetract Documents aRd that the eRtire balaRce fonnd owing to be-aue-the Contractor aRd Rotea ill under the final Certificate is due and payable. The Architect's fiRal Certificate for Payment will coRstitute a further representation that conditions listea in Section 9.10.2 as precedent to the Contractor's beiRg entitled to final payment have beeR fulfilled.Contract Documents.

§ 9.10.2 Neither final payment nor any remaining retained percentage shall become due until the Contractor submits to the Architect Owner (1) an affidavit that payrolls, bills for materials and equipment, and other indebtedness AlA Document A201™ -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 36 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 068 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) connected with the Work for which the Owner or the Owner's property might be responsible or encumbered (less amounts withheld by Owner) have been paid or otherwise satisfied, (2) a certificate evidencing that insurance required by the Contract Documents to remain in force after final payment is currently in effect and will not be canceled or allowed to expire until at least 30 days' prior written notice has been given to the Owner, (3) a written statement that the Contractor knows of no substantial reason that the insurance will not be renewable to cover the period required by the Contract Documents, (4) consent of surety, if any, to final paymeHt payment, (5) a certificate stating that to the best of Contractor's knowledge, the Project is in compliance with all applicable laws, statutes, ordinances, rules and regulations with respect to the Project, and that there is no action or proceeding pending or threatened before any court or administrative agency with respect to the validity of the certificates, permits, licenses, waivers, consents, approvals, authorizations, registrations, qualifications, designations, declarations and filings required or compliance with any laws, statutes, ordinances, rules and regulations and Contractor has not received any notice to the contrary, (6) evidence satisfactory to Owner that all utilities necessary or appropriate for the operation of the Project have been installed and are fully operational and are actually operating to the satisfaction of the governmental authorities or utility companies responsible for the operation thereof and that all costs in connection with such installation and operation (including but not limited to impact fees, development fees, tap-on fees and recapture costs) have been paid in full and ~{11_if required by the Owner, other data establishing payment or satisfaction of obligations, such as receipts, releases and waivers of liens, claims, security interests or encumbrances arising out of the Contract, to the extent and in such form as may be designated by the Owner. If a Subcontractor refuses to furnish a release or waiver required by the Owner, the Contractor may furnish a bond satisfactory to the Owner to indemnify the Owner against such lien. If such lien remains unsatisfied after payments are made, the Contractor shall refund to the Owner all money that the Owner may be compelled to pay in discharging such lien, including all costs and reasonable attorneys' fees.

§ 9.10.31f, after Substantial Completion of the Work, final completion thereof is materially delayed through no fault of the Contractor or by issuance of Change Orders affecting final completion, and the Architect so coniirms, the Owner shall, upon application by the Contractor and certification by the Architect, Contractor, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance for Work not fully completed or corrected is less than retainage stipulated in the Contract Documents, and if bonds have been furnished, the written consent of surety to payment of the balance due for that portion of the Work fully completed and accepted shall be submitted by the Contractor to the A-rchitect prior to certification of sach payment. Owner. Such payment shall be made under terms and conditions governing final payment, except that it shall not constitute a waiver of claims.

§ 9.10.4 The making of final payment shall constitute a waiver of Claims by the Owner except those arising from: .1 liens, Claims, security interests or encumbrances arising out of the Contract and unsettled; .2 failure of the Work to comply with the requirements of the Contract Documents; or .3 terms of special warranties required by the Contract Documents.

§ 9.1 0.5 Acceptance of final payment by the Contractor, a Subcontractor or material supplier shall constitute a waiver of claims by that payee except those previously made in writing and identified by that payee as unsettled at the time of final Application for Payment.

ARTICLE 10 PROTECTION OF PERSONS AND PROPERTY § 10.1 SAFETY PRECAUTIONS AND PROGRAMS § 10.1.1 The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the performance of the Contract.

§ 10.2 SAFETY OF PERSONS AND PROPERTY § 10.2.1 The Contractor shall take reasonable precautions for safety of, and shall provide reasonable protection to prevent damage, injury or loss to: .1 employees on the Work and other persons who may be affected thereby; .2 the Work and materials and equipment to be incorporated therein, whether in storage on or off the site, under care, custody or control of the Contractor or the Contractor's Subcontractors or Sub- subcontractors; and .3 other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction.

AlA Document A201n.o -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 37 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 069 User Notes: Clayco A201 • Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) Contractor shall comply strictly with local, municipal, provincial, state and national laws, orders, and regulations pertaining to health or safety which are applicable to Contractor or to the Proiect, including without limitation the Occupational Safety and Health Act of 1970 (84 U.S. Statutes 1590), as amended and any state plans approved thereunder, and regulations thereunder, to the extent applicable, and Contractor warrants the materials, equipment and facilities, whether temporary or permanent, furnished by Contractor in connection with the performance of the Project shall comply therewith. At all times while any of Contractor's employees, agents or subcontractors are on Project, Contractor shall provide them with a safe place of employment, and Contractor shall inspect the places where its employees, agents or subcontractors are or may be present on the Project and shall promptly take action to correct conditions which are or may become an unsafe place of employment for them.

Contractor shall incomorate necessary safety precautions and programs in a written safety program manual.

Contractor shall provide Owner with a copy of such safetv program manual.

Contractor shall take reasonable steps to erect and maintain safeguards for the protection of workers and the public and eliminate or abate safety hazards created by or otherwise resulting from the performance of the Work. Contractor shall take all precautions reasonably necessary for the safety and health of. and shall provide all reasonable protection to prevent damage, injurv or loss to: (i) persons working at the job site employed by Contractor or its subcontractors in connection with the Work (ii) all materials and equipment to be incorporated into the Project, whether in storage on or off the job site and (iii) other property at the job site.

Written reports of any accidents, injuries and illnesses at the Project requiring medical attention other than first aid, damage to propertv of Owner or Contractor, and fires shall be orally reported to Owner at the time of the incident. Written reports, reasonably satisfactory in form and content to Owner, shall be submitted by Contractor within forty-eight (48) hours after each incident.

Contractor shall maintain in form and content approved by Owner, job site accident, injury and illness statistics that shall be available for inspection by and submitted to Owner upon their written request.

In the event of any emergency endangering life or propertv, Contractor shall take such action as may be reasonable and necessary to prevent, avoid or mitigate injury or damage and shall, as soon as possible, report to Owner's representatives any such incidents, including Contractor's response thereto. If Contractor fails to take sufficient precautions for the safetv of the public or the protection of the Work or of structures or propertv on or adjacent to the job site, creating an emergency requiring immediate action, the Owner may cause such sufficient precautions to be taken or provide such protection.

Construction equipment obtained or furnished by Contractor or its subcontractors that is to be used on the job site shall be in operating condition, safe, fit for the uses for which intended, and suitable for the safe, legal and efficient performance of the Project.

§ 10.2.2 The Contractor shall give notices and comply with applicable laws, ordinances, rules, regulations and lawful orders of public authorities bearing on safety of persons or property or their protection from damage, injury or loss.

§ 10.2.3 The Contractor shall erect and maintain, as required by existing conditions and performance of the Contract, reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent sites and utilities.

§ 10.2.4 The Contractor will not use, store or keep at the Project any hazardous materials, except those customarily and prudently used in construction of projects similar to the Project and in compliance with all environmental laws.

When use or storage of explosives or other hazardous materials or equipment or unusual methods are necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activities under supervision of properly qualified personnel.

§ 10.2.5 The Contractor shall promptly remedy damage and loss (other than damage or loss insured under property insurance required by the Contract Documents) to property referred to in Sections 10.2.1.2 and 10.2.1.3 caused in whole or in part by the Contractor, a Subcontractor, a Sub-subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts they may be liable and for which the Contractor is responsible under AlA Document A20FM- 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the 38 maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 070 User Notes: Clayco A201 · Koll- lntellicenter- Dallas v2 (5-19-06) (986536188) Sections 10.2.1.2 and 10.2.1.3, except damage or loss attributable to acts or omissions of the Owner or A£Chitect or anyone directly or indirectly employed by either of iliem, the Owner, or by anyone for whose acts either of them may be liable, and not attributable to the fault or negligence of the Contractor. The foregoing obligations of the Contractor are in addition to the Contractor's obligations under Section 3.18.

§ 10.2.6 The Contractor shall designate a responsible member of the Contractor's organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor's superintendent unless otherwise designated by the Contractor in writing to the Ovlfl:er and Arcllitect.Owner.

§ 10.2. 7 The Contractor shall not load or permit any part of the construction or site to be loaded so as to endanger its safety.

§ 10.3 HAZARDOUS MATERIALS § 10.3.1 If reasonable precautions will be inadequate to prevent foreseeable bodily injury or death to persons resulting from a material or substance, including but not limited to asbestos or polychlorinated biphenyl (PCB), encountered on the site by the Contractor, the Contractor shall, upon recognizing the condition, immediately stop Work in the affected area and report the condition to the Owner and Architect in writing.

§ 10.3.2 The Owner shall obtain the services of a licensed laboratory to verify the presence or absence of the material or substance reported by the Contractor and, in the event such material or substance is found to be present, to verify that it has been rendered harmless. Unless otherwise required by the Contract Documents, the Owner shall furnish in writing to the Contractor and A-rchitect the names and qualifications of persons or entities who are to perform tests verifying the presence or absence of such material or substance or who are to perform the task of removal or safe containment of such material or substance. The Contractor <md the A-rchitect will promptly reply to the Owner in writing stating whether or not either-the Contractor has reasonable objection to the persons or entities proposed by the Owner. If either-the Contractor or Architect has an objection to a person or entity proposed by the Owner, the Owner shall propose another to whom the Contractor and the A-rchitect have has no reasonable objection. When the material or substance has been rendered harmless, Work in the affected area shall resume upon written agreement of the Owner and Contractor. The Contract Time shall be extended appropriately and the Contract Sum shall be increased in the amount of the Contractor's reasonable additional costs of shut-down, delay and start-up, which adjustments shall be accomplished as provided in Article 7.

§ 10.3.3 To the fullest extent permitted by law, the Owner shall indemnify and hold harmless the Contractor, Subcontractors, Architect, Architect's consultants and agents and employees of any of them from and against claims, damages, losses and expenses, including but not limited to attorneys' fees, arising out of or resulting from performance of the Work in the affected area if in fact the material or substance presents the risk of bodily injury or death as described in Section 10.3.1 and has not been rendered harmless, provided that such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself) and provided that such damage, loss or expense is not due to the sole negligence of a party seeking indemnity.

§ 10.4 The Owner shall not be responsible under Section 10.3 for materials and substances brought to the site by the Contractor unless such materials or substances were required by the Contract Documents.

§ 10.5 If, without negligence on the part of the Contractor, the Contractor is held liable for the cost of remediation of a hazardous material or substance solely by reason of performing Work as required by the Contract Documents, the Owner shall indemnifY the Contractor for all cost and expense thereby incurred.

§ 10.6 EMERGENCIES § 10.6.1 In an emergency affecting safety of persons or property, the Contractor shall act, at the Contractor's discretion, to prevent threatened damage, injury or loss. Additional compensation or extension of time claimed by the Contractor on account of an emergency shall be determined as provided in Section 4.3 and Article 7.

ARTICLE 11 INSURANCE AND BONDS § 11.1 CONTRACTOR'S LIABILITY INSURANCE § 11.1.1 The Contractor shall purchase from and maintain in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located such insurance as will protect the Contractor from claims AlA Document A201 no- 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 071 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) set forth below which may arise out of or result from the Contractor's operations under the Contract and for which the Contractor may be legally liable, whether such operations be by the Contractor or by a Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable: .1 claims under workers' compensation, disability benefit and other similar employee benefit acts which are applicable to the Work to be performed; .2 claims for damages because of bodily injury, occupational sickness or disease, or death of the Contractor's employees; .3 claims for damages because of bodily injury, sickness or disease, or death of any person other than the Contractor's employees; .4 claims for damages insured by usual personal injury liability coverage; .5 claims for damages, other than to the Work itself, because of injury to or destruction of tangible property, including loss of use resulting therefrom; .6 claims for damages because of bodily injury, death of a person or property damage arising out of ownership, maintenance or use of a motor vehicle; .7 claims for bodily injury or property damage arising out of completed operations; and .8 claims involving contractual liability insurance applicable to the Contractor's obligations under Section 3.18.

§ 11.1.2 The insurance required by Section 11.1.1 shall be written for not less than limits of liability specified in the Contract Documents or required by law, whichever coverage is greater. Coverages, whether written on an occurrence or claims-made basis, shall be maintained without interruption from date of commencement of the Work until date of final payment and termination of any coverage required to be maintained after final payment.

§ 11.1.3 Certificates of insurance acceptable to the Owner shall be filed with the Owner prior to commencement of the Work. These certificates and the insurance policies required by this Section 11.1 shall contain a provision that coverages afforded under the policies will not be canceled or allowed to expire until at least 30 days' prior written notice has been given to the Owner. If any of the foregoing insurance coverages are required to remain in force after final payment and are reasonably available, an additional certificate evidencing continuation of such coverage shall be submitted with the final Application for Payment as required by Section 9.10.2. Information concerning reduction of coverage on account of revised limits or claims paid under the General Aggregate, or both, shall be furnished by the Contractor with reasonable promptness in accordance with the Contractor's information and belief.

§ 11.1.4 Contractor shall cause all architects, engineers and other Design Professionals performing design work for the Project to maintain Professional Liability Insurance having minimum limits of One Million Dollars ($1,000,000) per claim and in the aggregate (including excess coverage) (claims made basis). Such Professional Liability Insurance policies shall (i) provide coverage for claims arising out of any act, error or omission with respect to the rendering of or failure to render design, engineering, professional or architectural services by architects, engineers or other Design Professionals (and their respective officers. directors. employees or agents) who may be employed engaged or otherwise utilized by Contractor to perform Contractor's design, engineering, architectural and professional duties, obligations and responsibilities under the Contract Documents. (ii) include Owner. and its partners. members, officers, directors, employees, agents, successors and assigns as "additional insureds," (iii) be written on an occurrence basis and not on a claims-made basis, (iv) waive any rights of subrogation against Owner and its partners. members, officers. directors, employees. agents. successors and assigns, and (v) be written by an insurance company or companies with a current A.M. Best Company rating of A-/IX or better and be admitted to do business in the State where the Land is located.

§ 11.2 OWNER'S LIABILITY INSURANCE § 11.2.1 The Owner shall be responsible for purchasing and maintaining the Owner's usual liability insurance.

§ 11.3 PROJECT MANAGEMENT PROTECTIVE LIABILITY INSURANCE § 11.3.1 Optionally, the Owner may require the Contractor to purchase and maintain Project Management Protective Liability insurance from the Contractor's usual sources as primary coverage for the Owner's, Contractor's and Architect's vicarious liability for construction operations under the Contract. Unless otherwise required by the Contract Documents, the Owner shall reimburse the Contractor by increasing the Contract Sum to pay the cost of purchasing and maintaining such optional insurance coverage, and the Contractor shall not be responsible for purchasing any other liability insurance on behalf of the Owner. The minimum limits of liability purchased with

AlA Document A201Tlll-1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 072 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 {5-19-06) {986536188) such coverage shall be equal to the aggregate of the limits required for Contractor's Liability Insurance under Sections 11.1.1.2 through 11.1.1.5.

§ 11.3.2 To the extent damages are covered by Project Management Protective Liability insurance, the Owner, Contractor and Architect waive all rights against each other for damages, except such rights as they may have to the proceeds of such insurance. The policy shall provide for such waivers of subrogation by endorsement or otherwise.

§ 11.3.3 The Owner shall not require the Contractor to include the Owner, Architect or other persons or entities as additional insureds on the Contractor's Liability Insurance coverage under Section 11.1.

§ 11.4 PROPERTY INSURANCE § 11.4.1 Unless otherwise provided, the Ovmer Contractor shall purchase and maintain, in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located, property insurance written on a builder's risk "all-risk" or equivalent policy form in the amount of the initial Contract Sum, plus value of subsequent Contract modifications and cost of materials supplied or installed by others, comprising total value for the entire Project at the site on a replacement cost basis without optional deductibles. Such property insurance shall be maintained, unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons and entities who are beneficiaries of such insurance, until final payment has been made as provided in Section 9.10 or until no person or entity other than the Owner has an insurable interest in the property required by this Section 11.4 to be covered, whichever is later. This insurance shall include interests of the Owner, the Contractor, Subcontractors and Sub-subcontractors in the Project.

§ 11.4.1.1 Property insurance shall be on an "all-risk" or equivalent policy form and shall include, without limitation, insurance against the perils of fire (with extended coverage) and physical loss or damage including, without duplication of coverage, theft, vandalism, malicious mischief, collapse, earthquake, flood, windstorm, false work, testing and startup, temporary buildings and debris removal including demolition occasioned by enforcement of any applicable legal requirements, and shall cover reasonable compensation for Architect's and Contractor's services and expenses required as a result of such insured loss.

§ 11.4.1.2 If the Owner does not intend to parchase sach property iasarance req-aired by the Contract and with all of the coverages ia the amoant described above, the Ovmer shall so inform the CoJJ:tractor in writing prior to commencement of the Vlork. The Contractor may then effect iasarance \Yhich will protect the interests of the CoJJ:tractor, SabcoJJ:tractors and Sab subcontractors iH the Work, and by appropriate Change Order the cost thereof shall be charged to the Ovmer. If the Contractor is damaged by the failare or neglect of the Owner to parchase or maintain insarance as described above, withoat so notifying the Contractor in writing, then the Ovmer shall bear all reasonable costs properly attributable thereto.[Intentionally Omitted].

§ 11.4.1.3 If the property insurance requires deductibles, the Owner shall pay as a Cost of the Work costs not covered because of such dedaetibles.deductibles; provided, however, that except for claims arising from flood or earthquake damage, the cost of such deductibles shall not exceed $10,000 per occurrence.

§ 11.4.1.4 This property insurance shall cover portions of the Work stored off the site, and also portions of the Work in transit.

§ 11.4.1.5 Partial occupancy or use in accordance with Section 9.9 shall not commence until the insurance company or companies providing property insurance have consented to such partial occupancy or use by endorsement or otherwise. The Owner and the Contractor shall take reasonable steps to obtain consent of the insurance company or companies and shall, without mutual written consent, take no action with respect to partial occupancy or use that would cause cancellation, lapse or reduction of insurance.

§ 11.4.2 Boiler and Machinery Insurance. The Owner Contractor shall purchase and maintain boiler and machinery insurance required by the Contract Documents or by law, which shall specifically cover such insured objects during installation and until final acceptance by the Owner; this insurance shall include interests of the Owner, Contractor, Subcontractors and Sub-subcontractors in the Work, and the Owner and Contractor shall be named insureds.

§ 11.4.3 Loss of Use Insurance. The Owner, at the Owner's option, may Contractor shall purchase and maintain such insurance as will insure the Owner against loss of use of the Owner's property due to fire or other hazards, however AlA Document A201 TM- 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American .

Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 073 User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 (5-19-06} (9865361 BB} caused. The Ovmer Contractor waives all rights of actioR against the CoRtractor Owner for loss of Hse of the Owner's property, inclllding conseqttentiallosses dlle to damages caused by fire or other hazards however GiH!S84-perils to the extent covered by property insurance obtained pursuant to the terms of this Section 11.4.

§ 11.4.4 [Intentionally Omitted].

§ 11 .4.4 If the CoRtractor reqttests in viriting that insHraRce for risks other thaH those described herein or other special caHses of loss be inclllded in the property insHrance policy, the Ovmer shall, if possible, iRclHde sHch in:sHrance, and the cost thereof shall be charged to the CoRtractor by appropriate Change Order.

§ 11.4.5 If during the Project construction period the Owner insures properties, real or personal or both, at or adjacent to the site by property insurance under policies separate from those insuring the Project, or if after final payment property insurance is to be provided on the completed Project through a policy or policies other than those insuring the Project during the construction period, the Owner shall waive all rights in accordance with the terms of Section 11.4.7 for damages caused by fire or other causes of loss covered by this separate property insurance. All separate policies shall provide this waiver of subrogation by endorsement or otherwise.

§ 11 .4.6 Before an exposure to loss may occur, the Gwner-Contractor shall file with the CoRtractor Owner a copy of each policy that includes insurance coverages required by this Section 11.4. Each policy shall contain all generally applicable conditions, definitions, exclusions and endorsements related to this Project. Each policy shall contain a provision that the policy will not be canceled or allowed to expire, and that its limits will not be reduced, until at least 30 days' prior written notice has been given to the Contractor.

§ 11.4.7 Waivers of Subrogation. The Owner and Contractor waive all rights against (1) each other and any of their subcontractors, sub-subcontractors, agents and employees, each of the other, and (2) the Architsct, Architsct' s conSHltants, separate contractors described in Article 6, if any, and any of their subcontractors, sub-subcontractors, agents and employees, for damages caused by fire or other causes of loss to the extent covered by property insurance obtained pursuant to this Section 11.4 or other property insurance applicable to the Work, except such rights as they have to proceeds of such insurance held by the Owner as fiduciary. The Owner or Contractor, as appropriate, shall require of the Architect, Architect's consHltants, separate contractors described in Article 6, if any, and the subcontractors, sub-subcontractors, agents and employees of any of them, by appropriate agreements, written where legally required for validity, similar waivers each in favor of other parties enumerated herein. The policies shall provide such waivers of subrogation by endorsement or otherwise. A waiver of subrogation shall be effective as to a person or entity even though that person or entity would otherwise have a duty of indenmification, contractual or otherwise, did not pay the insurance premium directly or indirectly, and whether or not the person or entity had an insurable interest in the property damaged.

§ 11 .4.8 A loss insured under Owner's property insurance shall be adjusted by the Owner as fiduciary and made payable to the Owner as fiduciary for the insureds, as their interests may appear, subject to requirements of any applicable mortgagee clause and of Section 11.4.10. The Contractor shall pay Subcontractors their just shares of insurance proceeds received by the Contractor, and by appropriate agreements, written where legally required for validity, shall require Subcontractors to make payments to their Sub-subcontractors in similar manner.

§ 11.4.9 If required in writing by a party in interest, the Owner as fiduciary shall, upon occurrence of an insured loss, give bond for proper performance of the Owner's duties. The cost of required bonds shall be charged against proceeds received as fiduciary. The Owner shall deposit in a separate account proceeds so received, which the Owner shall distribute in accordance with such agreement as the parties in interest may reach, or in accordance with an arbitration award in which case the procedure shall be as provided in Section 4.6. If after such loss no other special agreement is made and unless the Owner terminates the Contract for convenience, replacement of damaged property shall be performed by the Contractor after notification of a Change in the Work in accordance with Article 7.

§ 11 .4. 10 The Owner as fiduciary shall have power to adjust and settle a loss with insurers unless one of the parties in interest shall object in writing within five days after occurrence of loss to the Owner's exercise of this power; if such objection is made, the dispute shall be resolved as provided in Sections 4.5 and 4.6. The Owner as fiduciary shall, in the case of arbitration, make settlement with insurers in accordance with directions of the arbitrators. If distribution of insurance proceeds by arbitration is required, the arbitrators will direct such distribution.

AlA Document A201 TM- 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 074 User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 {5-19-06) (986536188) § 11.5 PERFORMANCE BOND AND PAYMENT BOND § 11.5.1 The Owner shall have the right to require the Contractor to furnish bonds covering faithful performance of the Contract and payment of obligations arising thereunder as stipulated in bidding requirements or specifically required in the Contract Documents on the date of execution of the Contract.

§ 11.5.2 Upon the request of any person or entity appearing to be a potential beneficiary of bonds covering payment of obligations arising under the Contract, the Contractor shall promptly furnish a copy of the bonds or shall permit a copy to be made.

ARTICLE 12 UNCOVERING AND CORRECTION OF WORK § 12.1 UNCOVERING OF WORK § 12.1.1 If a portion of the Work is covered contrary to the Architect's reqaest or to requirements specifically expressed in the Contract Documents, any written inspection schedule agreed to by Contractor, or as previously requested in writing by Owner, it must, if required in writing by the Architect, Owner, be uncovered for the Architect's Owner's examination and be replaced at the Contractor's expense without change in the Contract Time.

§ 12.1.2 If a portion of the Work has been covered which the Architect Owner has not specifically requested to examine prior to its being covered, the Architect Owner may request to see such Work and it shall be uncovered by the Contractor. If such Work is in accordance with the Contract Documents, costs of uncovering and replacement shall, by appropriate Change Order, be at the Owner's expense. If such Work is not in accordance with the Contract Documents, correction shall be at the Contractor's expense unless the condition was caused by the Owner or a separate contractor in which event the Owner shall be responsible for payment of such costs.

§ 12.2 CORRECTION OF WORK § 12.2.1 BEFORE OR AFTER SUBSTANTIAL COMPLETION § 12.2.1.1 The Contractor shall promptly correct Work rejected by the Architect or failing to conform to the requirements of the Contract Documents, whether discovered before or after Substantial Completion and whether or not fabricated, installed or completed. Costs of correcting such rejected Work, including additional testing and inspections and compensation for the Architect's services and expenses made necessary thereby, shall be at the Contractor's expense.

§ 12.2.2 AFTER SUBSTANTIAL COMPLETION § 12.2.2.1 In addition to the Contractor's obligations under Section 3.5, if, within one year after the date of Substantial Completion of the Work or designated portion thereof or after the date for commencement of warranties established under Section 9.9.1, or by terms of an applicable special warranty required by the Contract Documents, any of the Work is found to be not in accordance with the requirements of the Contract Documents, the Contractor shall correct it promptly after receipt of written notice from the Owner to do so unless the Owner has previously given the Contractor a written acceptance of such condition. The Owner shall give such notice promptly after discovery of the condition. During the one-year period for correction of Work, if the Owner fails to notify the Contractor and give the Contractor an opportunity to make the correction, the Owner waives the rights to require correction by the Contractor and to make a claim for breach of warranty. If the Contractor fails to correct nonconforming Work within a reasonable time during that period after receipt of notice from the Owner or Architect, Owner, the Owner may correct it in accordance with Section 2.4.

§ 12.2.2.2 The one-year period for correction of Work shall be extended with respect to portions of Work first performed after Substantial Completion by the period of time between Substantial Completion and the actual performance of the Work.

§ 12.2.2.3 The one-year period for correction of Work shall not be extended by corrective Work performed by the Contractor pursuant to this Section 12.2.

§ 12.2.3 The Contractor shall remove from the site portions of the Work which are not in accordance with the requirements of the Contract Documents and are neither corrected by the Contractor nor accepted by the Owner.

§ 12.2.4 The Contractor shall bear the cost of correcting destroyed or damaged construction, whether completed or partially completed, of the Owner or separate contractors caused by the Contractor's correction or removal of Work which is not in accordance with the requirements of the Contract Documents.

AlA Document A201 TM- 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 0001 82995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 075 User Notes: Clayco A201 - Koll- lntellicenter - Dallas v2 {5-19-06) {9865361 88) § 12.2.5 Nothing contained in this Section 12.2 shall be construed to establish a period of limitation with respect to other obligations which the Contractor might have under the Contract Documents. Establishment of the one-year period for correction of Work as described in Section 12.2.2 relates only to the specific obligation of the Contractor to correct the Work, and has no relationship to the time within which the obligation to comply with the Contract Documents may be sought to be enforced, nor to the time within which proceedings may be commenced to establish the Contractor's liability with respect to the Contractor's obligations other than specifically to correct the Work.

§ 12.3 ACCEPTANCE OF NONCONFORMING WORK § 12.3.1 If the Owner prefers to accept Work which is not in accordance with the requirements of the Contract Documents, the Owner may do so instead of requiring its removal and correction, in which case the Contract Sum will be reduced as appropriate and equitable. Such adjustment shall be effected whether or not final payment has been made.

ARTICLE 13 MISCELLANEOUS PROVISIONS § 13.1 GOVERNING LAW § 13.1.1 The Contract shall be governed by the law of the place where the Project is located.

§ 13.2 SUCCESSORS AND ASSIGNS § 13.2.1 The Owner and Contractor respectively bind themselves, their partners, successors, assigns and legal representatives to the other party hereto and to partners, successors, assigns and legal representatives of such other party in respect to covenants, agreements and obligations contained in the Contract Documents. Except as provided in Section 13.2.2, neither party to the Contract shall assign the Contract as a whole without written consent of the other. If either party attempts to make such an assignment without such consent, that party shall nevertheless remain legally responsible for all obligations under the Contract. Notwithstanding the foregoing, Owner may assign the Contract Documents to Prudential or any entity controlled by Prudential.

§ 13.2.2 The Owner may, without consent of the Contractor, assign the Contract to an institutional lender providing construction financing for the Project. In such event, the lender shall assume the Owner's rights and obligations under the Contract Documents. The Contractor shall execute all consents reasonably required to facilitate such assignment. Contractor hereby subordinates any mechanics" and materialmen's liens or other claims or encumbrances that may be brought by Contractor against any or all of the Work, the Land or the Project to any liens granted in favor of Owner's lender(s), whether such lien in favor of Owner's lender(s) is created, attached or perfected prior to or after any such liens, claims or encumbrances, and shall require by subcontract its Subcontractors, and Sub-subcontractors to the extent required by Owner's lender(s), to similarly subordinate their lien, claim and encumbrance rights. Contractor agrees to comply with reasonable request of Owner for supporting documentation required by Owner's lender(s), including any necessary lien subordination agreements, affidavits or other documents that may be required to demonstrate that Owner's property and premises are free from liens, claims and encumbrances arising out of the furnishing of Work under the Contract. This subordination of lien is made in consideration of and as an inducement to the execution and delivery of this agreement, and shall be applicable despite any dispute between the parties hereto or any others, or any default by Owner under the Contract Documents or otherwise. Owner's lenders may require periodic inspections and certifications by an inspector or inspecting architect, and Contractor will make the Project available at all times for such inspections.

§ 13.3 WRITTEN NOTICE § 13.3.1 Written notice shall be deemed to have been duly served if delivered in person to the individual or a member of the firm or entity or to an officer of the corporation for which it was intended, or if delivered at or sent by registered or certified mail to the last business address known to the party giving notice.

§ 13.4 RIGHTS AND REMEDIES § 13.4.1 Duties and obligations imposed by the Contract Documents and rights and remedies available thereunder shall be in addition to and not a limitation of duties, obligations, rights and remedies otherwise imposed or available bylaw.

§ 13.4.2 No action or failure to act by the Owner, Architect or Contractor shall constitute a waiver of a right or duty afforded them under the Contract, nor shall such action or failure to act constitute approval of or acquiescence in a breach thereunder, except as may be specifically agreed in writing.

AlA Document A201 TM- 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and lnter,national Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 076 User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 (5-19-06} (986536188) § 13.4.3 If any mediation or arbitration is commenced by either party hereunder to enforce the obligations of the other party, then (a) the identity of the prevailing party in any such proceeding shall be determined by the mediator or arbitrator (whichever is applicable), (b) such prevailing party shall be reimbursed by the nonprevailing party for all of the prevailing party's reasonable out-of-pocket expenses incurred in connection therewith, including without limitation reasonable attorneys' fees and (c) the mediator or arbitrator (whichever is applicable) shall be authorized to make an award of such expense in any such proceeding.

§ 13.5 TESTS AND INSPECTIONS § 13.5.1 Tests, inspections and approvals of portions of the Work required by the Contract Documents or by laws, ordinances, rules, regulations or orders of public authorities having jurisdiction shall be made at an appropriate time.

Unless otherwise provided, the Contractor shall make arrangements for such tests, inspections and approvals with an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public authority, and shall bear all related costs of tests, inspections and approvals. The Contractor shall give the A£Chitect Owner timely notice of when and where tests and inspections are to be made so that the Architect Owner may be present for such procedures. The Owner shall bear costs of tests, inspections or approvals which do not become requirements until after bids are received or negotiations concluded.

§ 13.5.2 If the Architect, Owner or public authorities having jurisdiction determine that portions of the Work require additional testing, inspection or approval not included under Section 13.5.1, the Architect will, upoR writtefl aalhorizatioR from the Ovmer, Owner will instruct the Contractor to make arrangements for such additional testing, inspection or approval by an entity acceptable to the Owner, and the Contractor shall give timely notice to the Architect Owner of when and where tests and inspections are to be made so that the Architect Owner may be present for such procedures. Such costs, except as provided in Section 13.5.3, shall be at the Owner's expense.

§ 13.5.3 If such procedures for testing, inspection or approval under Sections 13.5.1 and 13.5.2 reveal failure of the portions of the Work to comply with requirements established by the Contract Documents, all costs made necessary by such failure including those of repeated procedures aRd compeRsatioR for the Architect's services aRd expeRses shall be at the Contractor's expense.

§ 13.5.4 Required certificates of testing, inspection or approval shall, unless otherwise required by the Contract Documents, be secured by the Contractor and promptly delivered to the Architect. Owner.

§ 13.5.5 If the Architect Owner is to observe tests, inspections or approvals required by the Contract Documents, the Architect Owner will do so promptly and, where practicable, at the normal place of testing.

§ 13.5.6 Tests or inspections conducted pursuant to the Contract Documents shall be made promptly to avoid unreasonable delay in the Work.

§ 13.6 INTEREST § 13.6.1 Payments due and unpaid under the Contract Documents shall bear interest from the date payment is due at such rate as the parties may agree upon in writing or, in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located.

§ 13.7 COMMENCEMENT OF STATUTORY LIMITATION PERIOD § 13.7.1 As between the Owner and Contractor: .1 Before Substantial Completion. As to acts or failures to act occurring prior to the relevant date of Substantial Completion, any applicable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than such date of Substantial Completion; .2 Between Substantial Completion and Final Certificate for Payment. As to acts or failures to act occurring subsequent to the relevant date of Substantial Completion and prior to issuance of the fmal Certificate for Payment, any applicable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than the date e.f issuaRce of Owner is required to make the fmal Certificate for PaymeRt; payment hereunder; and .3 After Final Certificate for Payment. As to acts or failures to act occurring after the rele¥8flt date e.f issuaRce of the-final Certificate for Paymern, payment, any applicable statute of limitations shall AlA Document A201 TM- 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 45 reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 077 User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 (5-19-06) (986536188) commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than the date of any act or failure to act by the Contractor pursuant to any Warranty provided under Section 3.5, the date of any correction of the Work or failure to correct the Work by the Contractor under Section 12.2, or the date of actual commission of any other act or failure to perform any duty or obligation by the Contractor or Owner, whichever occurs last.

ARTICLE 14 TERMINATION OR SUSPENSION OF THE CONTRACT § 14.1 TERMINATION BY THE CONTRACTOR § 14.1.1 The Contractor may terminate the Contract if theW ork is stopped for a period of 30 consecutive days through no act or fault of the Contractor or a Subcontractor, Sub-subcontractor or their agents or employees or any other persons or entities performing portions of theW ork under direct or indirect contract with the Contractor, for any of the following reasons: .1 issuance of an order of a court or other public authority having jurisdiction which requires all Work to be stopped; .2 an act of government, such as a declaration of national emergency which requires all Work to be stopped; .3 because the Arehiteet Owner has not issued a Certifieate fer Paymefli payment and has not notified the Contractor of the reason for withholding eertifieatisR payment as provided in Section 9.4.1, or because the Owner has not made payment SR a Certifieate fer PaymeRt within the time stated in the Contract Documents; or .4 the Owner has failed to furnish to the Contractor promptly, upon the Contractor's request, reasonable evidence as required by Section 2.2.1.

§ 14.1.2 The Contractor may terminate the Contract if, through no act or fault of the Contractor or a Subcontractor, Sub-subcontractor or their agents or employees or any other persons or entities performing portions of the Work under direct or indirect contract with the Contractor, repeated suspensions, delays or interruptions of the entire Work by the Owner as described in Section 14.3 constitute in the aggregate more than 100 percent of the total number of days scheduled for completion, or 120 days in any 365-day period, whichever is less.

§ 14.1.3 If one of the reasons described in Section 14.1.1 or 14.1.2 exists, the Contractor may, upon se•;eR aays' written notice to the Ovmer aHa Arehiteet, Owner. terminate the Contract and recover from the Owner payment for Work executed and for proven loss with respect to materials, equipment, tools, and construction equipment and machinery, including reassRaele sverheaa, J3rsfit aHa aamages.Contractor's Fee based on the percentage set forth in Section 5. 1.2 of the Agreement on Work completed to date.

§ 14.1.4 If the Work is stopped for a period of 60 consecutive days through no act or fault of the Contractor or a Subcontractor or their agents or employees or any other persons performing portions of the Work under contract with the Contractor because the Owner has persistently failed to fulfill the Owner's obligations under the Contract Documents with respect to matters important to the progress of the Work, the Contractor may, upon seveR aElElitisRal Elays-C-written notice to the Ovmer aHa the A:Fehiteet, Owner, terminate the Contract and recover from the Owner as provided in Section 14.1.3.

§ 14.2 TERMINATION BY THE OWNER FOR CAUSE § 14.2.1 The Owner may terminate the Contract if the CsBtraetsr:: .1 the Contractor persistently or repeatedly refuses or fails to supply enough properly skilled workers or proper materials; .2 the Contractor fails to make payment to Subcontractors for materials or labor in accordance with the respective agreements between the Contractor and the Subcontractors; .3 the Contractor persistently disregards laws, ordinances, or rules, regulations or orders of a public authority having jurisdiction; .4 a mechanic's or materialmen's lien, stop notice or other encumbrance is filed or served by a Subcontractor, Sub-subcontractor or any person or entity claiming by, through or under Contractor against the Land or the Project or any funds due Contractor, or any part thereof, and the lien, stop notice or encumbrance is not discharged, insured over, or bonded off within 45 days after filing or service, or .4 otherwise is guilty of substantial breach of a provision of the Contract Documents.

AlA Document A201™ -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the 46 maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) R.P. Appx. 078 Without limiting the foregoing, Contractor shall be in default (a "Contractor Default") allowing Owner to terminate the Contract if Contractor fails to perform any obligation under the Contract Documents and does not correct such failure within five (5) working days following written notice thereof from Owner; provided, however, no Contractor Default shall occur if the matter is not subject to being cured within such five (5) day period, but Contractor has promptly begun the correction thereof and diligently proceeds to the correction thereof within thirty (30) working days. In the event of Contractor's Default, Owner may, without prejudice to any other rights or remedies Owner may have, hold in abeyance further payments to Contractor to the extent reasonably deemed necessary by Owner to correct any Contractor Default and/or terminate Contractor's right to continue performance of the Contract Documents by written notice to Contractor specifying the date of termination. In the event of such termination, Owner may take possession of the Work at the job site and any or all materials and equipment (whether delivered to the job site or on order therefore by Contractor), tools and construction equipment at the job site and finish theW ork by whatever method Owner may deem expedient.

In the event of termination by Owner, Contractor shall, upon request by Owner, promptly advise it of all outstanding subcontracts, rental agreements and purchase orders which Contractor has with others pertaining to performance of the Project and furnish Owner with complete copies thereof. Upon request by Owner, Contractor shall assign to Owner, in form and content reasonably satisfactory to Owner, Contractor's title to materials and equipment for the Project and those subcontracts designated by Owner.

In the event of termination by Owner, Contractor shall not be entitled to receive any further payment until the Project is completed. Upon completion and final acceptance of the Project, Owner will determine the total cost incurred in completing the Project including, without limitation, additional overhead, legal and other costs incurred by Owner to effect such termination and to complete the Project. If the total costs noted above exceed the balance of the Contract Sum unpaid at the time of the termination, Contractor shall, promptly after receipt of an invoice, pay to Owner the amount of such excess. Owner shall have the right and is authorized to set-off against and deduct from any excess payable to Contractor any other damages suffered by Owner due to said default or event giving rise to the termination or due to other defaults of Contractor in complying with the terms of the Contract Documents. Contractor shall continue to be fully liable for all such other damages to Owner. A waiver by Owner of one default by Contractor shall not be considered to be a waiver of any subsequent default by Contractor, nor be deemed to amend or modify the terms of the Contract Documents. Contractor expressly waives any formal notice by Owner of Contractor's failure to perform, or passive breach of, Contractor's express obligations under the Contract Documents.

Contractor agrees that upon commencement of a case, receivership, civil action or other proceeding by or against Contractor under state, federal or other applicable insolvency law and if such case is not dismissed within thirty (30) days thereafter, or upon any general assignment by Contractor for the benefit of its creditors, Owner may, in its sole discretion, treat Contractor as in default and may exercise any of the remedies of this Section 14.2.1. In the event Owner's remedies are limited by the commencement by or against the Contractor of a case under any chapter of the United States Bankruptcy Code, Contractor stipulates, acknowledges and agrees that time is of the essence in determination of whether the Contract Documents should be "assumed" or "rejected," within the meaning of 11 U.S.C. § 365; and Contractor therefore further stipulates and agrees that subject only to calendaring constraints of the Bankruptcy Court having jurisdiction, it will take all necessary action to cause the assumption or rejection of the Contract Documents on or before the thirtieth day following the filing of the Petition commencing any such case. In such event, if Contractor seeks to "assume" the Contract Documents, Contractor expressly stipulates, acknowledges and agrees that "adequate assurance of future performance" within the meaning of 11 U.S.C. § 365 (b)(l)(C) means a determination that there is no foreseeable likelihood that there will be any further interruption of Contractor's performance under the Contract Documents following its assumption.

In the event Owner determines, in its reasonable discretion, that Contractor has become insolvent or is in danger of becoming insolvent, then Owner is authorized, but not required, to make direct payment to Contractor's subcontractors with respect to any current or past-due invoices then outstanding.

Alternatively, Owner may, in its sole discretion, require that agreements between Contractor and any such subcontractor be assigned to Owner, and Contractor hereby authorizes and consents to any such assignment. Owner shall be entitled to full credit against any obligations to Contractor for any payments made to any subcontractor under this Section, whether made pursuant to assigned subcontracts or AlA Document A201™ -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 079 User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 (5-19-06) (986536188) otherwise. Title to any materials or equipment for which such direct payment is made shall pass directly from such subcontractor to Owner.

§ 14.2.2 When any of the above reasons exist, the Ovmer, upon certification by the Architect that Owner may, if sufficient cause exists to justify such action, may-without prejudice to any other rights or remedies of the Owner and after giving the Contractor and the Contractor's surety, if any, seven days' written notice, terminate employment of the Contractor and may, subject to any prior rights of the surety: .1 take possession of the site and of all materials, equipment, tools, and construction equipment and machinery thereon owned by the Contractor; .2 accept assignment of subcontracts pursuant to Section 5.4; and .3 finish the Work by whatever reasonable method the Owner may deem expedient. Upon request of the Contractor, the Owner shall furnish to the Contractor a detailed accounting of the costs incurred by the Owner in finishing the Work.

§ 14.2.3 When the Owner terminates the Contract for one of the reasons stated in Section 14.2.1, the Contractor shall not be entitled to receive further payment until the Work is fmished.

§ 14.2.4 If the unpaid balance of the Contract Sum exceeds costs of finishing the Work, including compensation for the t\rchitect's services and expenses made necessary thereby, and other damages incurred by the Owner and not expressly waived, such excess shall be paid to the Contractor. If such costs and damages exceed the unpaid balance, the Contractor shall pay the difference to the Owner. The amount to be paid to the Contractor or Ovmer, as the case may be, shall be certified by the Architect, upon application, and this This obligation for payment shall survive termination of the Contract. Contract Documents.

§ 14.3 SUSPENSION BY THE OWNER FOR CONVENIENCE § 14.3.1 The Owner may, without cause, order the Contractor in writing to suspend, delay or interrupt the Work in whole or in part for such period of time as the Owner may determine. Upon receiving any such notice of suspension, Contractor shall promptly suspend further performance of the Project to the extent specified, and during the period of such suspension shall properly care for and protect all Work in progress and materials, supplies, and equipment Contractor has on hand for performance of the Project. Upon the request of Owner, Contractor shall promptly deliver to Owner copies of outstanding subcontracts of Contractor, and shall take such action relative to such subcontracts as may reasonably be directed by Owner. Contractor shall use its best efforts to utilize its material, labor and equipment in such a manner as to mitigate costs associated with suspension. Owner may at any time withdraw the suspension of performance of the Project as to all or part of the suspended Project by written notice to Contractor specifying the effective date and scope of withdrawal, and Contractor shall resume diligent performance of the Project for which the suspension is withdrawn on the specified effective date of withdrawal.

§ 14.3.2 The Contract Sum and Contract Time shall be adjusted for increases in the cost and time caused by suspension, delay or interruption as described in Section 14.3.1. Adjustment of the Contract Sum shall include profit. No adjustment shall be made to the extent: .1 that performance is, was or would have been so suspended, delayed or interrupted by another cause for which the Contractor is responsible; or .2 that an equitable adjustment is made or denied under another provision of the Contract.

§ 14.4 TERMINATION BY THE OWNER FOR CONVENIENCE § 14.4.1 The Owner may, at any time, terminate the Contract for the Owner's convenience and without cause.

§ 14.4.2 Upon receipt of written notice from the Owner of such termination for the Owner's convenience, the Contractor shall: .1 cease operations as directed by the Owner in the notice; .2 take actions necessary, or that the Owner may direct, for the protection and preservation of the Work; and .3 except for Work directed to be performed prior to the effective date of termination stated in the notice, terminate all existing subcontracts and purchase orders and enter into no further subcontracts and purchase orders.

AlA Document A201 TM -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 080 User Notes: Clayco A201 - Koll- lntellicenter- Dallas v2 (5-19-06} {986536188} Upon receipt of said notice, Contractor shall advise Owner of its outstanding subcontracts pertaining to performance of the terminated Work and, upon request, furnish Owner with complete copies. Contractor shall place no further subcontracts except as may be necessary for completion of such portion of the Project as is not terminated. Contractor shall promptly make everv reasonable effort to procure cancellation, upon terms satisfactory to Owner, of all subcontracts to the extent they relate to the performance of Work terminated or, as directed by Owner, shall assign to Owner in form satisfactory to Owner such of its subcontracts as are designated by Owner, or shall take such other action relative to such subcontracts as may be directed by Owner.

§ 14.4.3 In case of such termination for the Owner's convenience, the Contractor shall be entitled to receive payment for Work executed, and costs incurred by reason of such termination, along with reasonable overhead and profit Contractor's Fee based on the percentage set forth in Section 5.1.2 of the Agreement for Work completed to date.

Contractor shall not e*ecuted.be entitled to any prospective profits or any damages from any termination, suspension or otherwise, whether caused by Owner's fault, negligence or otherwise.

AlA Document A201 TM- 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not for resale.

R.P. Appx. 081 User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) Cerlification of Document's Authenticity AJA® Document 0401™- 2003 I, , hereby certify, to the best of my knowledge, information and belief, that I created the attached final document simultaneously with this certification at 14:42:43 on 05/19/2006 under Order No. 1000182995_1 from AlA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AlA® Document A20 1™- 1997 - General Conditions of the Contract for Construction, as published by the AlA in its software, other than changes shown in the attached final document by underscoring added text and striking over deleted text.

(Signed)

(Title)

(Dated)

AlA Document 0401 TM- 2003. Copyright© 1992 and 2003 by The American Institute of Architects. All rights reserved. WARNING: This AlA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the Jaw. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 - Koll - lntellicenter- Dallas v2 (5-19-06) (986536188) R.P. Appx. 082 R.P. Appx. 083 R.P. Appx. 084 R.P. Appx. 085 R.P. Appx. 086 OUTLINE SPECIFICATIONS 211, 637 SQUARE FOOT SPECULATIVE OFFICE BUILDING INTELLICENTER- DALLAS for KOLLDEVELOPMENTCO~ANY February 20, 2006 DIVISION 1 -GENERAL REQUIREMENTS Section IA- Summary of Work The project titled Intellicenter- Dallas for Koll Development is a proposed shell office building development located in Irving, Texas.

The project consists of (1), 4-story, building, totaling 211,637 gross square feet with parking as shown on the Glenn Engineering plans.

The exterior surface of the building is to be load bearing, tilt-up concrete, architectural wall panels, aluminum clad punched windows, with insulated tinted glass system and aluminum curtainwall glass system with insulated tinted glass units.

It is the goal of Koll Development to achieve basic LEED certification for Core & Shell (24 points). Refer to the attached Preliminary Project Checklist dated 8/9/05. The GMP includes the direct design and construction related costs associated with these items. Our GMP does not include the costs for the following LEED credits: Energy & Atmosphere - Credit 3 - Additional Commissioning Energy & Atmosphere - Credit 5 - Measurement & Verification Materials & Resources - Prereq. I - Storage & Collection of Recyclables Innovation in Design & Process - Credit 2 - LEED Accredited Professional Our GMP also excludes any costs associated with the LEED certification and associated Commissioning of the building systems.

Section IB - General Conditions The Developer is Koll Development Company and shall provide the following items for the use of the Design/Builder (Clayco): 1. Phase I environmental report.

2. Soil Investigation and report; on-site materials testing and inspections.

3. Entry road and utilities to the site.

4. Topographical and boundary survey.

The Design/Builder (Clayco) shall include the following items as required for the execution and/or completion of the Work. PLEASE NOTE: This listing is not to be considered all inclusive nor complete, but merely as a guide for the major items to be included under this Division.

R.P. Appx. 087 Section lB - General Conditions- continued 1. Civil engineering will meet the design/build requirements and will be provided by the design/build contractor.

2. Architectural and structural engineering, construction documents and specifications; the engineering documents shall include the plumbing, mechanical, electrical and fire protection work as these items are being completed by engineering consultants.

The design/builder shall cause the preparation and design of all construction drawings and specifications and incorporates the intent of the scope drawings and construction guidelines utilizing a licensed, registered, insured architect and engineer for all design and structural components of the building. The design/builder will cause the design to comply with all applicable local, state and national codes and all design requirements for obtaining the necessary permits. The design/builder will include any specialized design or consulting services needed.

Provide all shop drawings, cut sheets, samples, submittals and other required items for Owner's review. Simultaneously both design/builder and design professionals are to review and approve all shop drawings and submittals.

In addition to all other insurance requirements of design/builder set forth in these general conditions, or the general conditions attached to the AlA Contract Agreement, the design/builder shall require its architect and all other professional subcontractors to obtain and maintain professional errors and omission coverage in connection with such subcontractors work. Professional errors and omissions insurance shall be endorsed to provide contractual liability coverage. Such coverage for the architect and any other professional subcontractor shall be in amounts not less than $2,000,000 each. Certified copies of the policies evidencing such coverage shall be furnished at the same time as the other evidence of insurance required under this agreement.

3. Temporary utilities- water, telephone, power and portable toilet facilities shall be provided by the Design/Builder (Clayco) of sufficient capacity and at the locations required for their work. Pay for all costs to establish service and usage until the issuance of substantial completion notice.

4. Supervision- Any and all Design/Builder (Clayco) project site and office supervision required for The Work shall be included, including a full-time qualified field superintendent.

A part-time Project Manager will be provided to coordinate both design and construction and to serve as liaison between the design team, Owner's representatives, and the field superintendent. The cost of this project manager is included.

5. A progress schedule will be a part of the contract and the schedule will be updated and delivered to the Owner's representatives not less than monthly.

Direct project progress meetings at the jobsite. The Owner's representatives will be invited as well as the Owner project manager, all subcontractors and key equipment and material suppliers.

R.P. Appx. 088 Section 1B- General Conditions- continued There will be written minutes of the meetings and distributed copies to all parties concerned within three days following the meeting.

6. Provide progress photographs. Submit no less than 5 slides of the work in progress with each application for payment to document percent complete.

7. Submit payment requests monthly using AlA G702 format and G703 schedule of values.

Confirm billing procedures with the Owner's representatives.

8. The Design/Builder (Clayco) will submit all claims for changes to the Owner's representative for approval, including the add or credit cost of the change and the affect on contract completion date. No change order work will be started prior to Owner's approval.

9. Security- Provide and maintain job site security, as required to secure the project during construction term.

10. Insurance Coverage - Provide a cei;tificate of insurance issued to the Owner evidencing insurance coverage as follows: Workmen's Compensation $1,000,000 General Liability including Contractual Liability $1,000,000 Comprehensive Auto $1,000,000 Builder's Risk Insurance- Included Provide $25,000,000.00 umbrella coverage.

11. Surveys and Lay-Out - Owner shall provide a monumented boundary survey of the parceL The Design/Builder (Clayco) shall perform all work required for the lay-out of The Work including line and grade surveying.

12. Coordination of testing and inspection reports and recommendations with actual construction methods.

13. Materials and Workmanship- Materials used in The Work will conform to the latest Standard Specification of the American Society for Testing Materials, The American Concrete Institute, The American Institute of Steel Construction, American Welding Society, American Society of Mechanical Engineers, National Electric Code, N.E.M.A., American Institute of Electrical Engineers and the rules and regulations of the National Board ofFire Underwriters.

The workmanship will be consistent with the best practice of the various building trades and will conform to the standards of good construction for this class of work.

Where a product is specified by a trade name, a product of equal performance maybe substituted only with the prior approval of the Owner and Architect or Engineer of record.

R.P. Appx. 089 Section 1B - General Conditions -continued 14. Color Selections- Owner and/or Architect will provide a finish color schedule of the exposed surfaces of The Work in a timely manner for the Design/Builder (Clayco)'s use in coordinating building shell.

15. Temporary Heat, Water and Power- Heat, water and power will be provided as required for construction. The permanent heating, cooling and electrical system will be utilize as required for construction use; thus the warranty for the equipment may start prior to the building substantial completion. The Builder has included the cost of operating the systems until Substantial Completion has been achieved.

16. Guarantees- Upon notice from the Owner, the Design/Builder (Clayco) will remedy any defects due to defective workmanship or materials which will appear within a period of one year from the date of Substantial Completion of The Work.

17. The following items are included in the General Conditions/General Requirements for the Design/Builder (Clayco): a. office supplies, postage, telephone, shop drawing blueprints, reproduction costs, progress photographs, computer and EDP expenses, fust-aid supplies, insurance and other such miscellaneous expenses.

b. Project staff including salaries and benefits for Project Executive, Project Superintendent, Engineers, Accountants, Assistants, Estimators, Purchasing, Secretaries and Clerks.

c. Tools and supplies including hand tools and construction equipment having an individual new value of less than $200 and consumable items which are used in the construction operation such as chalk, kerosene, brooms, brushes, etc ...

d. Job office including rental of trailers, temporary buildings or office space for project staff. Also include interior modification and mechanical/electrical work as required to said job offices.

e. Plant, vehicles and repairs such as purchase of rental charges for plant owned by Design/Builder (Clayco) or outside parties. Items include transits and levels, rental or purchase of job vehicles and repairs and maintenance of plant and vehicles used specifically on this project.

f. Temporary buildings, barricades and installations including labor, lumber, millwork, and other building materials used in the construction of tool sheds and other temporary structures with the exception of the job office which is included above.

g. We have included the cost of the Building Permit.

R.P. Appx. 090 Section lB- General Conditions- continued 18. Project close out requirements will be provided as follows: a. Record drawings plans which will be maintained in the field trailer of all field changes on the contract drawings and at the conclusion of the project a set of reproducible stamped "Record Drawing" including field changes will be turned over to the Owner. All As-built drawings will be provided to owner via CD-ROM.

b. Provide (3) sets of operating and maintenance manuals to the Owner.

c. Provide operating instructions to the Owner's representatives. Walk the Owner's designate through all systems and demonstrate the proper sequence of starting, normal operation and adjustments and shut-down. Include physical verification that all safeties work properly.

d. Provide job clean up during the project and final clean up. Clean and wash windows, remove all debris inside and out and leave the entire building "broom clean".

19. The Design/Build Contractor's site office must include the following: a A furnished conference area with seating for a minimum of 12 persons.

b. One furnished office for use by the architect, engineer or O>.•mer.

c. Telephone and DSL quality Internet services for the offices. One additional S6flarate telephone line in a location of the Owner's ohoioe for sepa!ate faK HSe by the Owner/l\rehitect/ Engineer. (Fax machine furnished by Owner, if available at site).

d. Copier capable of 11xl7 format and onsite drawing plotter capable of 36" paper width format for shared use by Design/Build Contractor, Owner and Owner's consultants.

DIVISION 2 - SITE WORK Section 2A - Subsurface Investigation Subsurface Investigation will be completed by Koll Development.

All on site inspections and monitoring the excavation will be paid for by Koll Development.

Every site location will involve different soil characteristics that will affect the earthwork, paving and foundation design.

Section 2B - Site Preparation Site preparation and clearing shall be provided to remove vegetation, trees and/or shrubs in the new construction areas unless noted to be reused or salvaged.

R.P. Appx. 091 Section 2C - Earthwork All earthwork shall be performed per the recommendations of the geotechnical design report.

Provide mass grading of entire site including all cut and fill required. The existing pile and any excess material from the cut to fill operation will be hauled off by Koll. Excess topsoil and vegetation will be strategically stockpiled for future placement in landscape berms.

Excavation to subgrade elevations for all interior footings and slabs on grade. General and rough grading of the site to achieve the proposed subgrades.

Finish grading of areas around the buildings, paving and sidewalks to achieve proper drainage and uniform surfaces; finish grading for the building area and site to a 0.1 foot (±) tolerance.

Finish planting areas will be finish graded for planting by landscaping contractor as part of the work. All planting and sod areas shall have a minimum of 4" topsoil. Topsoil work will be completed if necessary out of landscape budget.

Design/builder shall protect and maintain any and all existing utilities, drives and parking areas which are to remain in service and are adjacent to the work during the course of construction activities.

Section 2D - Storm Sewers and Utilities Underground storm-sewer system will be installed to collect surface storm water run-off throughout the site and drain to adjacent off site system.

Provide all water service for domestic use and fire protection with new hydrants, as required.

Provide underground service for electric and telephone. TXU fees for electric service will be paid by Koll.

The gas service is by Koll Development.

All utility work will be limited to work on site and as indicated on the civil documents. The sanitary sewer and water utility work are to service building tie roof drains into storm sewer system.

Section 2E - Paving and Surfacing The work includes concrete paving and curbs as shown on the Civil drawings including entry and island work along Regent Boulevard.

Provide curb cuts for entrances as shown.

Pavement markings to be white two coat paint system.

Provide concrete pad at loading dock and dumpster pad. Provide concrete pad for transformer.

Provide $25,000 budget allowance for exterior hardscape; this includes fountains, artwork, brick pavers, signage and furniture at the entrance locations. The base bid includes concrete sidewalks @ the 2 entrances.

R.P. Appx. 092 Section 2F - Irrigation System A landscape irrigation system design and installation will be provided as an allowance of $75,000.

Section 2G - Landscaping An allowance of$225,000 has been provided for landscaping.

DIVISION 3 - CONCRETE Section 3A- Cast-In-Place Concrete Reinforced-concrete at foundations based on 3500psi compressive strength at 28 days.

Provide all concrete work in accordance with the structural drawings.

Concrete sidewalks in locations and width as indicated on the site plan, standard-broom finish on a 60'' square pattern, 4" concrete minimum 4000psi and rebar and granular base if required by code. Reinforced concrete drilled piers with bearing capacities as recommended by the structural engineer.

First, Second, 1bird and Fourth floor concrete structural slabs over 2" metal decking and beams with mesh reinforcing and 4000psi concrete (3" thick). Concrete to be steel troweled to a smooth finish within normal tolerances.

Provide six (3) sets of pan stairs; regular weight concrete at treads and landings.

Provide non-shrink, non-metallic grout as required for all column base plates.

Provide foundation pits and slab at elevator construction. (Three (3) elevators included).

Section 3B- Tilt-Up Concrete Panels All concrete panels will be completed as site cast, reinforced, architectural concrete panels. All Tilt-Up panels will be designed and constructed with the most up-to-date quality assurance programs available through the Tilt-Up Concrete Association, Concrete Specification Institute, Concrete Council, and Clayco Construction Company's own high standards. An alternate will be provided to have 15' wide panels instead of 30' wide. The window configuration at the top level will need to change if the 15' wide panel option is pursued.

The system will be detailed in conjunction with all aluminum window and curtain wall systems to provide wholly integrated exterior building cladding system.

A tilt-up screen wall will be provided for the truck dock area

R.P. Appx. 093 DIVISION 5- METALS Section SA - Structural Metal Framing Structural steel shall comply with ASTM A-36 and A572, GD50 as noted on drawings and structural steel framing shall be provided to include the following: Elevated floor slabs are designed for lOOlb. live load, with Code allowance reductions.

Structural steel column and beam system to support the floor and roof structures. All shapes will be installed.

Steel framing supports for the metal screen wall.

Miscellaneous structural steel as required for new construction.

Steel channel framing as required for floor and roof blockouts.

Section SB -Metal Joist and Metal Decking Structural steel beams for 151, 2nd ,3rd and 4th floors and bar joist at roof deck. All joists shall be designed and installed per SJI specifications.

Steel roof decking to support roofing system per SDI Standard No. 1 with factory primer. 1 W' metal decking to be 22 gauge painted. Roof deck and joist shall be sloped to provide 1/4" per foot slope for positive roof drainage.

2" x 19 gage galvanized steel decking to support concrete slab at the first, second, third and fourth floors.

Section 5C - Metal Support System All interior partitions shall contain standard metal studs on 16" centers, size and gauge as required unless otherwise noted.

Columns, chases and soffits shall be furred with metal studs, furr ceilings where indicated to be drywalled (fired rated where required).

All lintels, 6" pipe bollards (concrete filled), steel tube and hand rails and miscellaneous other steel as shown on architectural and structural drawings.

Mechanical equipment supports, as required.

Include Morins X-12 type horizontal prefinished panel system for mechanical screen and vertical entry element at all entries. Include metal stud framing as required.

Section 5D- Metal Fabrication Steel angle dock nosing (embedded in concrete at the outer edge of dock).

Stair system with steel pan treads and landings with concrete fill.

R.P. Appx. 094 Section SD - Metal Fabrication - continued Include Alucobond metal panel system at vertical features and roof parapet condition per the drawings.

Include sunscreens at 3 levels near both entries and building ends.

Metal access ships ladder to roof hatch at one stair location.

Elevator divider beams and sill support angle.

DIVISION 6 ~WOODS AND PLASTICS Section 6A - Rough and Finish Carpentry Wood blocking, nailers, grounds blocking at parapet walls, furring and framing with standard construction grade #2 yellow pine or Douglas for lumber required to complete all new construction, (fire treated as required by Code).

Each electric closet will have one wall with plywood mounted to it for installation of telephone equipment. Telephone equipment by others.

Solid surface lavatory tops for the restroom lavatories for one core at each floor for a total of eight (8) restrooms.

One full length wood shelf only a janitor's storage closets. Shelf constructed of A WI custom grade plywood and exposed edge receiving a hardwood edge.

Installation of all toilet accessories in restroom lavatories.

Window sills shall be 1116" general purpose plastic laminate on 3/4" APA high density overlay plywood. At curtain wall, provide metal sills.

DIVISION 7- THERMAL AND MOISTURE PROTECTION Section 7A- Insulation and Fireproofing 3-1/2" (R-13) fiberglass with foil faced vapor barrier to above ceilings.

1" rigid insulation board on exterior walls at spandrel glass, otherwise, batt insulation will be used at exterior walls.

2" rigid polystyrene insulation board on foundation perimeter walls below floor slab.

Provide fue rated assembly by use of drywall or spray on ftreproofmg at beams extending from the rated stairwells to the fust adjoining structural member in accordance with applicable codes.

Provide floor to floor fireproofing as required for all penetrations.

Include fireproofing main beam supports as required for all stairwells.

Section 7A- Insulation and Fireproofing (Cont) R.P. Appx. 095 Include vapor barrier type insulation above ceiling areas; seal all joints carefully, especially at perimeter condition at 4th floor attic space.

Section 7B - Roofmg Roofing shall be 45 MIL mechanically attached TPO polymer based roof system with R value of (meet the energy code in each area).

Roof area to be drained by interior roof drains located along the exterior wall.

10 year warranty (material and labor) provided by the manufacturer after his inspection of the roof.

Section 7C - Flashing and Sheet Metal Flashing and sheet metal as required for the roof parapet walls.

Paint-grip, galvanized sheet metal installed at locations requiring flashing, counterflashing and roof drain pockets unless otherwise noted on drawings.

Prefinished and pre-formed aluminum coping at parapets as required, unless otherwise noted on drawings.

Section 7D - Roof Accessories Roof hatch and ships ladder installed for access to roof.

Section 7E - Caulking Caulking at required joints and intersections to two different materials. Exterior joints shall use two component polyurethane based sealing compounds, Tremco Dymeric or equal. Interior joints and under thresholds shall be architectural grade caulking compounds, Sorrebom Kaukit, or equal. Provide closed cell backer rod as required, material shall be round rod.

DIVISION 8 -DOORS AND WINDOWS Section 8A - Metal Doors and Frames Hollow metal doors and frames as shown on drawings will be primed and coated with 2 coats of gloss enamel paint. All hollow metal frames will be welded at seams. All doors shall be 18 gauge, 1-3/4" thick with finish faces, exterior door shall be insulated.

Aluminum frames at passages to restrooms and building maintenance rooms and stairways.

Hollow metal doors at passages to mechanical equipment to be fire-rated as required.

One (1) 8'x9' manual overhead door at loading dock. The compactor opening will be provided by Clayco; the door to the compactor (if necessary) will be provided by the compactor vendor.

Hollow metal frames at pump rooms and building electrical room.

R.P. Appx. 096 Section 8B - Wood Doors Any wood doors used by tenant shall meet or exceed the following specification: Wood doors at all passages throughout interior unless otherwise noted doors to be 1-3/4" thick, solid core, mahogany veneer doors to be fire-rated as required. Doors to be 3 '-0" x 8 '-0" (H) in aluminum metal frames.

Section 8C - Glass and Glazing Furnish and install an insulated store front window system at building off-sets. Clear anodized aluminum finish per the architectural drawings, glazed with insulated glass units per the architectural drawings. Glass to be clear system with low E similar to the Atlanta project.

Aluminum clad insulated punched window system by Vistawall (basis of design) or equal.

Mirror glass in all bathrooms, glass to be 1/4" thick.

Provide glass feature wall at main stairwell (all levels).

Provide two (2) double glass door vestibules at 1 entry.

Provide revolving door and two (2) single glass doors at main entry.

Section 8D - Hardware Hardware shall include the following and will meet all ADA requirements.

EXTERIOR DOOR HARDWARE: 1-1/2 pair hinges door stop exit device hydraulic closure cylinder lock weather strip and gasketing sill sweep strike lock shield threshold Code required panic hardware (where required).

INTERIOR DOOR HARDWARE: 1-1 /2 pair hinges silencers latch set (Mortise) door stop Toilet room doors shall also have push/pull plates, kick plates and closers All hardware will be satin chrome All tenant supplied material must meet this specification.

R.P. Appx. 097 DIVISION 9 - FINISHES Section 9A - Gypsum Drywall All columns to have metal studs installed with drywall installation as part of the TI work.

Partitions and furring shall be fire-rated with 5/8" Type "X" gypsum board where required.

Moisture-resistant gypsum board shall be used in toilet rooms, janitor closets and pump room exterior soffits, unless otherwise noted.

Partitions at toilet rooms, mechanical and electrical rooms shall be full height and sound deadened with sound batt insulation. Bathroom ceilings to be drywall.

Stairwells and elevator shaft enclosures shall consist of gypsum 2 hour construction at all levels.

Exterior wall framing shall receive 3-5/8" stud framing with insulation and vapor barrier to allow for voice, data and electrical work in the future.

Main lobby will include architectural grade drywall, coffered ceiling & metal pan ceiling. The elevator lobby on 2nd, 3rd and 4th floor will also receive a drywall ceiling.

Include exterior framing as required for Alucobond supports at parapet elements and upright locations.

Section 9B - Ceramic and Granite Tile Provide ceramic tile per drawings at the floor and wet walls (full height) in all public toilet areas.

Provide epoxy terrazzo in the entire main lobby area with tile base.

Provide porcelain tile boarder with cove base at 2nd, 3rd and 4th floor elevator lobbies.

Section 9C - Acoustical Ceiling Upgraded 2x2 White aluminum grid for acoustical ceiling furnished and installed at decorative soffit areas. No TI ceiling grid or pads are included.

Section 9D - Carpeting and Flooring Carpet in the tenant finish area shall be furnished and installed under the tenant finish contract.

Provide carpet inset at 2nd, 3rd and 4th floor elevator lobby areas.

Main stairwell to be upgraded with carpet. The 2 secondary stairs will have exposed concrete treads with painted stair stringers and drywall partitions.

Include heavy duty traffic rated sheet vinyl at lower level corridor areas.

Section 9E - Painting R.P. Appx. 098 The exterior of the building will be acid etched and include a one coat MODAC paint system on all surfaces.

Drywall ceilings and walls to receive two coats of paint.

All exterior sheet metal to receive two coats of paint.

All hollow metal doors and frames to receive two coats of paint.

All exposed miscellaneous metal to receive two coats of paint.

Painting will be provided in the stairways. Two secondary stairwells will have exposed concrete treads with exposed stringers and one stairway to be completely finished with drywall and carpet.

DIVISION 10 - SPECIAL TIES Section 1OA - Identifying Devices All interior signage and directories will be provided by Koll Development.

Exterior signage will be provided by Koll Development. Include conduit and junction box for a building mounted sign and one conduit and junction box for an entry monument sign.

Section lOB - Partitions at Restrooms Full height gypsum board with louvered wood doors and wood frames.

Section 10C- Toilet and Bath Accessories (2) grab bars per handicap toilet stall. (1) toilet tissue holder per toilet stall to hold two rolls of paper. (1) paper towel dispenser/disposal per toilet rooms. (1) sanitary napkin dispenser per ladies room. (1) sanitary napkin disposal at each stall (ladies only). lavatory top soap dispensers at each lavatory, per toilet room.

Section 1OD- Dock Equipment Provide dock bumpers and dock edge angle at indicated areas on architectural drawings.

Include one (1) 35,000 pound mechanical dock leveler (6'x7').

Section 1OE - Fire Extinguisher Equipment R.P. Appx. 099 Provide Code required quantity of stainless steel semi-recessed fire extinguisher cabinets for the base building.

Section 1OF - Access Flooring Under the shell budget, the access :flooring will be stockpiled on the floor. The access :flooring locations include all areas in the building besides the following: bathrooms, stairwells, dock areas, elevator lobby at upper levels, and complete 1st :floor lobby areas from both main entries across the building.

Base Area -Provide 14" high raised access :floor system at 15\ 2nd, 3rd and 4th floor levels to receive carpet tiles. Support system to be bolted pedestals. Tiles are concrete filled bare metal type with point load capacity of 1,000 lbs. No grounding is provided. An alternate has been provided to utilize 1,250lb for all access :floors including laminate tile locations.

Electric Rooms - Provide 14" high raised access :floor system with top finish of high-pressure laminate with integral trim. Support System to be pedestals. Tiles are concrete filled metal type with point load capacity of 1250 lbs. No grounding is provided. Material manufacturer is Tate Access Floors or equal.

Four panel lifters are included. Two emergency panel lifter wall plates are included.

DIVISION 12 -FURNISHINGS Section 12A - Horizontal Blinds Blinds will be included at all exterior glass punched window systems. Blinds to be 1" horizontal mini-blinds equal to Bali or Levelor in a manufacturer.

Section 12B - Floor Mats and Frames Provide one piece polypropylene mats with anodized aluminum frames at two (2) entry vestibules.

DIVISION 14- CONVEYING SYSTEMS Section 14A- Hydraulic Elevators Provide one (1) freight elevator with a 4,500# capacity. Interior cab shall be 5' -8" x 7' -1 0" x 9' -0" high.

Provide two (2) passenger elevator with a 3,500# capacity. Interior cab shall be 4' -9" x 6' -8" x 7' -4" high.

Freight elevator will include 1/2" thick damage control pads.

Passenger elevators will be center opening. Freight elevator will be side sliding.

Elevators will operate at 150 f.p.m. and operate on 208V, 3-phase, 60 hertz. Passenger elevator will have a 40hp motor. The freight elevator will have a 60hp motor.

Section 14A- Hydraulic Elevators (cont) R.P. Appx. 100 Provide duplex micro-processor control.

Signals will be standard stainless steel finish, digital car position indicators with illuminated car and hall buttons.

In-car lantern with gong and floor passing signals.

Constant features will be a Lambda II infrared, multi-beam door reversal device with remote elevator monitoring REM ready, fire fighter service Phase I and Phase II and handicap and Braille markings.

DIVISION 15 -MECHANICAL Section 15A- Fire Sprinkler System The contractor shall provide an engineered site five (5) protection layout for installation by others.

This building is classified as a Light Hazard occupancy. The combination sprinkler and standpipe system shall be hydraulically designed to deliver a density of 0.10 gpm. over the most remote 1,500 sq. ft. with hose stream allowance per local requirements. Any Ordinary Hazard Group I areas will be hydraulically designed for a density of 0.15 gpm. over the most remote 1,500 sq. ft. with 250 gpm for hose stream allowance per local requirements. The minimum flow rate for hydraulically most remote standpipe shall be 500 gpm. and 250 gpm. for each additional standpipe, with the total not to exceed 1,250 g. p.m. 100 psi at the top of the standpipe is required. Interconnect each standpipe at the lowest floor level. Provide control valve at the base of each standpipe. Provide roof manifold at required areas per UBC and IFC.

Include pump system if required by code incoming flow/pressure to meet building performance requirements. Contractor shall provide fue flow test on nearest available water supply.

Contractor to provide incoming service back:flow preventer of the type required by local authorities.

Fire protection work starts at the flanged lead-in connection inside of the building.

Provide 1" outlets on branchline piping with 1" sprigs and upright brass sprinkler heads to protect the building shell areas. Upon tenant finish, upright sprinklers will be removed and replaced with pendent sprinklers per tenant requirements. In finished shell and core areas provide concealed heads located to work a pattern in the room.

The Fire Protection Contractor shall provide sprinkler head layout, hydraulic calculations, final fue pump and jockey pump selection based on hydraulic calculations, pipe routing with sizes and elevations as required by N.F.P.A. (latest edition) and insurance carrier.

All work shall comply with the fue protection requirements and codes of the City Building Department, the State and Local Fire Marshal and N.F.P.A. National Fire Codes.

Section 15A- Fire Sprinkler System (cant) R.P. Appx. 101 The Contractor shall submit shop drawings (including device/equipment product data submittals) and hydraulic calculations to the municipality having jurisdiction and the Architect/Engineer prior to commencement of project and purchase of materials. Contractor shall submit as-built drawings and maintenance manuals as directed by the Architect/Engineer.

The Fire Protection Contractor shall coordinate his work with that of all other trades.

The Fire Protection Contractor shall guarantee all labor and materials for the period of one year from the date of completion.

Fire protection sprinkler piping shall be either Schedule 40 black steel pipe with screwed fittings or Schedule 10 black steel pipe with grooved fittings.

Sprinkler heads shall be UL listed and FM approved and shall be quick response rated at 155 deg. F (or temp required for location).

Contractor shall provide and install each of the following devices and pieces of equipment: 1) Fire department connection. (Polished chrome) 2) Fire hose connections and caps at each stair landing.

3) Floor control valves at each floor with drain visor.

4) Inspector's test connection for each zone.

5) Spare sprinkler cabinet with heads and wrench Contractor shall provide sprinklers of the type installed for the use as spares to the building Owner. The number of sprinklers shall be as required by code. Contractor shall provide sprinkler wrench for each type of sprinkler supplied. Spare sprinkler cabinet shall be located next to the fire pump.

The Fire Protection Contractor is responsible for all leak damage due to system, installation and materials.

Contractor shall perform all tests on system as required by N.F.P.A., local code and insurance carrier.

All piping shall be suspended independently from building structure. Vertical pipe risers shall be supported at least once on each story height. Riser clamps at base of riser shall be supported at building structure. All supports and hangers shall be so constructed as to allow for proper pitch and expansion of pipes. Position exposed riser clamps so they do not create a tripping hazard.

Contractor shall remove all debris from job site daily to Clayco provided dumpster and leave all work and equipment in clean working condition.

Contractor shall provide and install all pipe sleeves. Sleeves shall be at least 1-112 times the size of the pipe and shall be similar material to prevent reaction between pipe and sleeve.

Contractor shall provide and install fire stopping as to completely seal all penetrations of fire rated assemblies, walls and ceilings caused by this trade. The system shall be installed Section 15A- Fire Sprinkler System- continued R.P. Appx. 102 according to an Underwriter's Laboratories approved through penetration fire stopping protection system, have been tested in accordance with ASTM #E-814 and UL # 1479 and shall have an "F" rating not less than the required rating of the wall penetrated. The annular space between pipe and the fue rated assembly shall be filled with the approved material so as to maintain the integrity of the fue rating of the assembly penetrated. Insulation shall not pass through fire rated assemblies.

Section 15B- Heating, Ventilating and Air Conditioning Piping, except branch lines feeding heads in rooms, shall not pass through stairwells, five rated exit pathways, electrical rooms/closets, and tele/data rooms.

All heating, ventilating and air conditioning work will be designed and installed in accordance with the local adopted codes (including International Energy Code) and with the ASHRAE standards and guidelines, SMACNA standards and the outline below. All equipment with electrical connections will bear the UL Label and all refrigeration equipment will be labeled in accordance with ARI.

An HVAC system will be provided that utilizes four (4) packaged electric heating and electric cooling, down discharge, roof top package air conditioning units (RTUs). RTUs will provide tons of capacity. The following features are required: 1) Return air bypass with damper, damper actuator and temperature control (supply air temperature must be re-heated to 61-62 degrees F).

2) Multiple stage electric heating coil (4 stages). Step controller required.

3) 100 % power exhaust.

4) 30% filter section with 2 sets of throwaway filters. Also provide one set of construction filters in the units.

5) 0 to 100% economizer with enthalpy control and low ambient lock out control.

6) Freeze stat protection.

7) Supply air temperature control.

8) DDC temperature control panel/module with BACNET & or LON capabilities as well as a human interface unit mounted panel.

9) Factory installed and wired unit electrical disconnect switch for a single point connection.

10) Factory installed and wired GFI convenience outlet.

11) Complete manufacturer's 1 year warranty for parts and labor from the date of start up.

12) Additiona14 year extended parts only compressor warranty.

13) High efficiency motors for supply and exhaust.

14) Complete static pressure control capabilities referencing outside, space, duct and under floor pressures.

15) Variable frequency drives on the supply fan as well as spring isolation.

16) 460 V AC I 60 HZ I 3 phase.

17) Hinged access doors.

18) Flat roof curb.

19) Low leak outside air dampers.

20) Low leak supply air dampers.

21) Independent control of outside and return air dampers.

Section 15B- Heating, Ventilating and Air Conditioning R.P. Appx. 103 The system will be designed meeting the following design conditions: Outdoor Design Conditions: Summer: 100°F DB/74°F WB Winter: l7°F WB Indoor Design Conditions (occupied area): Summer: 75°F DB (+/-2) 50% RH Winter:72°F DB (+/-2) Outdoor Ventilation: Per ASHRAE Standard - 20.0 CFM/person Infiltration: 1.0 CFM!linear foot of exposure Heat Gain: One person per 120 sq. ft. of occupancy 1.5 watts per sq. ft. demand for lighting 3.0 watts per sq. ft. miscellaneous power Occupants: 1 per 120 SF (at 245/155 sensible/latent BTU/Hr each).

The design will be based on the use oftinted, double paned, insulated glass for curtain wall and at all other window areas with the blinds open.

Return air will be provided in perforated white finish. In the core areas only, insulated plenum type linear supply slot supply air diffusers in the ceiling will be provided. Exhaust grilles will be square, louvered faced. Return air grilles in each office and conference room (provided in tenant finish) will include acoustically lined sound boots. All in floor supply air will be delivered through the in floor VAV terminal I diffuser. The in floor air devices will be installed in the future T.I.

Zoning of fan terminals and VAV boxes shall not be less than 1 zone per 250 sq. ft. with a dedicated fan terminal unit in each building comer with two exterior exposures. Each fan powered box will incorporate an electric heating coil. All in floor FTUs and VAV s will be stockpiled to the floors and installed in the future T.I. In floor FTUs will be sized at maximum of 50 linear feet at the exposure.

Shell and core construction of toilets, corridor, etc. will be completed using VAV units with a maximum size of 1600 CFM each.

Cabinet unit heaters will be furnished in the vestibules. Heating and cooling will be provided to main stairways and entry vestibule. Temporary heat will be installed by providing and installing (4) 10 kW electric unit heaters above ceiling height per floor. These will be disabled once the in floor FTUs are installed in the T .I. build out.

Exhaust fans will be provided to ventilate the janitor's closets and main toilet rooms. The system will be sized at a minimum of 2 CFM/SF of exhaust for toilet rooms and janitor's closets. Make- up air for the toilet rooms will be provided from HVAC supply air devices. Toilet rooms will be provided with exhaust grilles.

Exhaust for the elevator machine rooms will be provided.

Stairways will be provided with cabinet unit heaters.

R.P. Appx. 104 Section 15B - Heating, Ventilating and Air Conditioning - continued

Fire pump room will be served by a 5 kW electric unit heater.

The dock area will be served by a 10 kW electric unit heater.

Elevator shafts shall have pressure relief as required by code. All electric rooms will be exhausted. Make up air will be supplied from HVAC supply air devices.

Fire dampers, smoke dampers and combination fire/smoke dampers will be provided as required by code. Materials and Methods Ductwork will be galvanized sheet metal, constructed per latest edition of the SMACNA and ASHRAE. Traverse joints on medium pressure system will be sealed with Hard cast. Insulated, Class 1 flexible air ductwork will be used for the connections from mediwn pressure trunk ductwork to variable air volume units, fan terminal units and slot diffusers. Acoustical duct lining or flexible duct wrap insulation will be provided where required to avoid noise and condensation.

Sound attenuation will be provided as required to achieve an overall maximum NC-40 level in the office spaces.

Vertical mediwn pressure duct risers will be provided from the RTU s to each floor with, and a duct loop on each tenant floor will be provided. Acoustically lined, hard return air duct risers, in shafts, from the lower floors to the RTUs will be provided with a stub out on each floor. On top floor, a minimum of20 LF of acoustically lined return air duct from the RTU serving this floor will be provided.

All medium velocity ductwork risers installed in vertical shafts shall be acoustically lined, with lining extending horizontally 20' from the main riser on each floor.

Return air duct and supply air duct mounted smoke detectors will be provided for all air handling units 2000 CFM and greater.

A complete direct digital temperature control and building management system will be provided. Standard features including local PC workstation, dial in and out modem, and complete color graphics to the VAV level. All wiring, software, hardware, sensors, actuators, and control panels will be included for a complete and functional system. All core and parking lot lighting will be controlled and wired to the BMS. Lighting contactors will be provided by Division 16, low voltage wiring to the contactors will be by Division 15. All low voltage temperature control wiring will be plenum rated.

Section 15C- Plumbing All plumbing work will be designed and installed in accordance with the codes listed in Section 1A of this outline specification. All equipment with electrical connections will bear the UL Label.

R.P. Appx. 105 Section 15C - Plumbing - continued Soil, waste, vent, storm and water piping systems will be designed and installed in accordance with the requirements of the local plumbing code. Soil, waste, and vent piping will be service weight, no-hub cast iron above grade in plenum areas.

Schedule 40 PVC may be used otherwise including underground.

Storm water piping will be Schedule 40 PVC above and below grade. Roof drainage will be provided by the use of 6" inboard roof drains. The piping system will connect to storm sewer below first floor grade and exit building foundation wall.

An overflow roof drain system will be provided and will be sized the same as the primary system and connected to a separate piping system within the building. The secondary system is to terminate near through the wall near grade.

Water distribution piping will be Type "K" copper below grade and "L" copper above grade.

Water closets will be wall mounted white vitreous china, open front seats, and with battery operated flush valves.

Urinals will be wall hung, white vitreous china, floor carrier type, with battery operated flush valves.

Lavatories will be integral with the countertop with chrome plated battery operated sensor type faucet, grid drain, P trap with cleanout plug, flexible risers, and stops. Insulation of exposed piping and hot surfaces for handicapped lavatories will be provided.

Mop basins will be 24" x 24" floor set terrazzo with mop hanger, 24" hose, 4" handles, bucket hook, and elevated vacuum breaker.

Brushed stainless steel, dual-level, semi-recessed, barrier-free self contained electric water coolers located at each floor.

Provide three (3) wet columns (water, waste and vent).

Provide 1-112" water connection with valve at toilet core area.

Electric water heaters for toilet rooms sized per local plumbing code and ASHRAE guidelines will be provided. Relief valves will be piped to floor drain. Include For piped systems longer than 100 lineal feet a hot water recirculation loop with pump and aqua stat will be provided.

General purpose and toilet room floor drains will be cast iron with nickel bronze, heel proof grates.

A dry sump will be provided for each elevator pit - dry sumps to be pumped out with portable sump pump provided by building maintenance.

Mechanical room floor drains will be medium duty, cast iron, and loose set top with sediment bucket.

R.P. Appx. 106 Section 15C -Plumbing - continued Roof drains will be cast iron with sump receiver, under deck clamp, adjustable extension and cast iron mushroom dome (plastic domes not acceptable).

Overflow drains will be cast iron with sump receiver, under deck clamp, adjustable extension, exterior water dam and cast iron mushroom dome.

A minimum of 3 frost-proof wall hydrants will be provided at grade. Also 2 hydrants will be provided at the rooflevel for use for window washing.

4" incoming domestic water service will be provided with a gate valve, a reduced pressure back:flow preventor (type as required by local plumbing code), a pressure gauge and with the drain piped to a floor drain. A valved and capped 1-1/2" line for irrigation system backflow preventor and piping system will be provided. The irrigation system is not included.

Insulation will be provided on all vertical and horizontal domestic water, including inside of wet chases, and on all horizontal downspout piping and roof/overflow drain bodies.

A stubbed out sanitary sewer and vent connection will be provided on each side of each toilet room wet wall opening onto the tenant space or corridor for future connections. Provide at each location, a valved and capped 1" domestic cold water stub out.

Provide the following fixtures: 1. Toilets (wall hung flushometer type) 2. Handicap toilets (wall hung flushometer type) 3. Urinals (wall hung flushometer type) 4. EWC (drinking fountains) 5. Lavatories (custom), each with (3) bowls 6. Janitor mop sinks 7. Hot water heaters General All systems will be designed and installed in accordance with all federal, state and local code enforcement agencies, ADA regulations, the Fire Marshall and the local building department.

Scope of Work Water Service and Distribution, Plumbing Fixtures and Storm Water System Sanitary, Waste and Vent System Water Service and Distribution Underground domestic water piping will extend from water meter with minimum system pressure for core/shell total fixture counts. Backflow preventer will be provided at point of service, separate from fire protection service. Water service will be metered within service pit.

Three (3) hose hibbs around perimeter of building, one (1) hose bibb on roof and (1) 1-1/2" irrigation system connections will be provided.

Include dual level electric water cooler at each bathroom core.

R.P. Appx. 107 Section 15C- Plumbing - continued

Elevator sump and code required discharge will be provided.

Water service is not sized for any special tenant load requirements.

Domestic Water Systems The Core/shell system will include hot and cold water service and insulated distribution piping to all core areas and stub connections/valves for tenant areas.

Fixtures will include commercial grade products in all bathrooms, ADA compliant. Any exposed plumbing lines (supply and waste) will be chrome plated with appropriate wall escutcheons at penetrations. All plumbing fixtures will be installed with shut-off valves.

Drinking fountains with central remote chiller will be provided per code. Domestic hot water will be provided from electric water heaters.

No special water, gas, air or vacuum systems are included for tenant areas.

All water systems will be tested and approved for final use.

Storm Systems Roof drain bodies and horizontal leader runs to be insulated. A properly sized roof drainage system including roof drains, vertical piping and storm piping under the building will be provided. Roof drain collector pipe system will connect into exterior storm system piping.

Include emergency overflow piping from roof drain locations to location above finished grade.

Office ceiling space to be used as a return-air plenum.

Sanitary System The sanitary sewer will be stubbed into the building and extend through core/shell areas and be stubbed into tenant areas for future interconnection. No special waste provisions are included for lab waste.

Materials Domestic water system: Type Land M copper, above floor, Type K below floor.

Sanitary system: PVC above floor, cast iron below floor.

Storm system: PVC above floor, cast iron below floor.

DIVISION 16- ELECTRICAL DESIGN BUILD General All systems will be designed and installed in accordance with all federal, state and local code enforcement agencies, ADA regulations, the Fire Marshall and the local building department.

Temporary and Construction Power Temporary service and distribution will be provided to all project trailers, electric scaffolds and accessories, welding machines and power and lighting loads. Temporary power service and R.P. Appx. 108 Section 16A -Electrical - Continued

distribution will be protected in accordance with OSHA requirements. Lighting levels and distribution will be included in all areas to achieve code-required foot-candle levels.

Electrical Service Service to the building will include (2) 4"C. underground raceway from the property line to electric utility company pad mounted service transformer. The electric utility company will provide underground primary cables, service transformer. Building will be metered at electric utility company secondary voltage rate.

Current transformers, meter compartments, etc. will be included with service switchboards as required by electric utility company.

Secondary underground conduits/cables and terminations from service transformer to interior service switchboard will be provided. A separately metered power service will originate from the electric utility company service transformer to a 75HP fire pump for the building (add alternate, if required by code). Installation and protection of secondary service conductors will be in conformance with NBC.

Telecommunications Systems Service Service to the building will include (6) 4"C. underground raceways from the property line to the demarcation point within the building. Telecom utility company will provide all service conductors and/or fiber to tenant areas.

A 4'x8' plywood backboard, a dedicated isolated ground bar and a 20A duplex receptacle will be provided at the demarcation point and at each Telecom Room. Tenants/Owner will provide all data and voice wiring and equipment for the building including elevator phone service.

Rough-in boxes and conduits will be provided in all core/shell finished office areas. (2) 4"C. conduit sleeves will be provided through floor slab between Telecom Rooms.

Power Distribution Service switchboard will include service connection equipment; space for utility company equipment; feeder overcurrent devices to support connected loads outlined. Service switchboard will be rated 480/277V, 3P, 4W Large equipment loads will be 480V, 3 phase; lighting loads will be 277V, 1 phase or 480V, 1 phase; small receptacle and appliance loads will be 120V, 1 phase. Service switchboard will include digital metering and integral TVSS protection on the incoming main.

480/277V panelboards will be provided on each floor and sized to support 1.5W/SF tenant area lighting. Step down transformers and 120/208V panelboards will be provided on each floor to support 3.5W/SF tenant receptacle and equipment power. 480/277V and 120/208V single and multi-pole breakers will be provided within floor panelboards for tenant areas lighting and power loads. Conduits will be installed from tenant receptacle panelboards stubbed into depressed floor slab areas for floor box wiring by tenants.

Separate 480/277V panelboards will be provided on each floor to support tenant area under floor electric fan terminal units. Conduits will be installed from floor HV AC panelboards stubbed into depressed floor slab areas for underfloor fan terminal units by tenants. A separate R.P. Appx. 109 Section 16A - Electrical- Continued

panelboard will be provided on the 3rd Floor Level to support rooftop HV AC units and equipment.

Elevator equipment, trash compactor, domestic water heaters, entry or room electric heaters, etc. will be served from available 480V distribution within building. Site lighting circuits will be fed from 1st Floor lighting panelboard. Core/shell lighting and power circuits will be shared with tenant area lighting and power panelboards.

New power Distribution and Lighting/Appliance panelboards will be dead front furnished with branch protective devices, main bus, main breakers, with AIC rating for available fault current at installed location. Main buses and connectors will be hard drawn copper or tin plated aluminum. Framed directories with protective plastic facing will be attached to the inside of panelboards and be neatly filled out to identify all circuits and loads. 25% spare breaker and space capacity will be provided.

Circuit breakers will be quick make - quick break, molded case type with the tripping position midway between on and off. Breakers will be the bolt-on type with common trip for multi-pole application. Breakers indicated to be used for lighting circuit control will be switch rated.

Fuses will be UL approved and listed for application, NEMA PB-1 complaint Step down transformers will be factory-assembled and -tested, air-cooled units for 60-hz service.

Grain-oriented cores, non-aging silicon steel. Continuous copper or aluminum coil windings without splices, brazed or pressure type internal coil connections. Comply with NEMA ST 20, and list and label as complying with UL 1561. Enclosures will be ventilated, NEMA 250, Type 2.1nsulation class: 220 degree C., UL-component-recognized insulation system with a maximum of 150 degree C. rise above 40 degree C. ambient temperature. Transformers may be hung from structure where acceptable by local authorities.

Receptacle/Equipment Connections Duplex receptacles will be provided within all core/shell finished corridors 50 feet on center along all routes. Weatherproof duplex receptacles will be provided at all roof-mounted equipment per NEC. Duplex dedicated duplex receptacles will be provided per 200SF within each Electric Room, Mechanical Room, Telecom Room. All wiring devices will be 20A, 125V specification grade. Receptacles will be mounted 18" AFF and will include plastic coverplates.

Tenant will furnish and install all above and below floor lighting and receptacle branch circuit wiring within all tenant areas. No power-data floor boxes are stockpiled on floors. No bay boxes for tenant wiring is included.

Grounding A fully grounded electrical system per NEC requirements will be provided. Feeder and branch circuits will contain safety ground conductors in lieu of raceway serving as grounding means.

No column grounding or building ground loop will be provided except for separately device systems such as transformers, UPS systems, etc. Lighting Systems Core/shell lighting will include recessed 3 lamp, (18) 3" deep cell, 2'x4' parabolic troffer fixtures for one fixture every 80SF all finished corridor routes; fluorescent downlights with R.P. Appx. 110 Section 16A- Electrical- Continued

specular clear alzak reflectors in Entry and Elevator Lobbies and within Restrooms; pendant shop lights in all Elect!Mech Rooms, Janitors Closets, etc. Fluorescent fixtures will utilize electronic ballasts and T-8 lamps.

Tenant Area lighting, branch circuit wiring and control wiring will be provided by tenants during build out and are not included in core/shell. Minimal lighting will be provided within empty tenant areas to support owner and code officials requirements.

Exit signs and emergency egress lighting will be provided along all core/shell egress paths. Life safety lighting will be powered from self-contained battery units.

Exterior metal halide HID site lighting pole mounted fixtures will be provided along all entry and parking areas. Average maintained exterior foot-candle values will be 1.5 for roadway and parking areas. Control of exterior lighting will be from contactors at source panelboards with temperature control system ON/OFF interface.

A material only allowance of $10,000 for decorative Front Office lighting; entry canopy; monument sign lighting, flagpole lighting and exterior entry bollards is included. (This is included as part of the current DFW design.)

Fire Alarm System Building will include a system with devices, control and signaling in compliance with local authority having jurisdiction and specific project requirements. System will include furnishing and installing heat detectors; smoke detectors within each Electrical and Mechanical Room; manual pull stations; fire alarm annunciator panel at main entrance and AutoDial connections to central monitoring agency.

Duct smoke detectors for all ventilation units over 2,000 CFM will be furnished and installed by HV AC contractor, devices will be monitored by building fire alarm system; duct smoke detectors will be provided by electrical contractor on each floor at each return air opening into return air shaft back to each rooftop unit.

Smoke detectors will be provided at each elevator lobby, Elevator Equipment Room, elevator pit and top of elevator shafts. Heat detectors will be provided in each Elevator Equipment Room, elevator pit and top of elevator shafts. Monitoring and control functions will be in conformance with ASME A 17.3-93, Safety Code for Elevators and Escalators.

Signal devices, strobes and horns will be provided within areas in accordance with NFPA, ADA Guidelines and local authority having jurisdiction. Connections to fue sprinkler system water flow switches and tamper switches will be provided.

Fire pump and jockey pump controller monitoring modules will be included (add alternate as I if required by code).

Initiation and signal devices within tenant areas are not included, but main fire alarm panel will be sized to accept initiation and signal devices installed by tenants, based on an open plan finish- out concept.

R.P. Appx. 111 Section 16A- Electrical - Continued

Lightning Protection System A UL Listed, Master labeled lightning protection system complete with rooftop air terminals, roof conductors, down conductors, perimeter counterpoise and driven ground rods.

Materials All feeder circuits will be THHNITHWN copper or aluminum conductors. All branch circuits will be THHN/THWN copper conductors. UL Type MC feeder cables will be acceptable for use. UL Type MC cable will be acceptable for branch circuit use. Modular wiring systems will be used for all Office lighting circuits. Feeders and branch circuits will be routed below floor slabs in all areas.

The following types of conduits will be allowed for specific applications as follows: Site Lighting PVC Feeders- Underground PVC Feeders-Exposed IMC, EMT (above 7' AFF) Branch Circuits- Concealed RGS, IMC, EMT, MC Cables

ADDITIONAL CLARIFICATIONS

Contract Documents The scope of work is based upon Clayco Outline Specification dated December 6, 2005, Architectural drawings through Progress Set# 1 dated 10/07/05, Structural drawings and Tilt- Up Wall drawings through Pricing Set dated 10/14/05, and Civil drawings through Pricing Set dated 10/15/05 and as further clarified in this exhibit to the Agreement ("Outline Specifications").

LEED The estimate is based upon achieving basic LEED certification for Core & Shell (24 points). No allowances are included for achieving a higher rating.

ADDITIONAL CLARIFICATIONS Contract Documents The scope of work is based upon Clayco Outline Specification dated October 20, 2005 and design drawings from Forum dated October 21,2005 and as further clarified above and below.

LEED The estimate is based upon achieving basic LEED certification for Core & Shell (24 points) based upon current design assumptions. No allowances are included for achieving a higher rating.

Exclusions The following work is excluded from the GMP: 1) Payment & Performance Bond 2) Utility use fees 3) Additional Commissioning required for LEED certification R.P. Appx. 112 Exclusions (Con't) 4) On-site materials testing services 5) Design services for tenant area build-out 6) Cleanup for owner or TI work 7) Hazardous materials remediation 8) LEED certification costs (Koll has hired Gensler for this process) 9) Painting of interior steel joist and decking 10) Ceiling grid or pads for Tenant Areas 11) Factory Mutual requirements 12) Tenant improvements 13) Undercutting of existing and new subgrade due to poor or unsuitable soil conditions 14) Excludes rock removal or blasting 15) Site fencing & gates 16) Flag poles 17) Trash enclosure 18) Compactor 19) Foundation drainage system 20) Metallockers 21) Interior or exterior signage 22) Furniture, fixtures and unspecified equipment 23) Installation of raised floor system except at core areas 24) Elevator to the roof 25) Specialty Glass at Decorative Stair or 2nd Level Rail 26) Separate gas or electric meters 27) Gas service to building 28) Building humidification or dehumidification 29) Temporary heating of tenant spaces 30) Tenant area lighting and power branch circuit wiring and light fixtures 31) Tenant area fire alarm devices 32) Tenant Finish Lighting or Power Work 33) Standby power system or Emergency power generation 34) Public Address System 35) Data, Voice, Video Systems 36) Security Systems 7) Excludes accent lighting for metal screen walls @ roof 38) Utility company fee relating to phone, fiber and Gas or Electric 39) Mudslab below crawl spac~ Miscellaneous Clarifications 1) The access flooring will be stockpiled on each floor as required for future installation by the tenants. Installation of the floor is only included in the Core areas.

2) Our estimate is based upon the minimum lighting as required by applicable codes for the tenant spaces.

3) Our estimate assumes that the excess topsoil and vegetation will be stockpiled for use as fill in the sloped areas north and west of the building.

4) Steel and concrete bids are based upon the 11-23-05 documents.

5) About 20,000 cy of excess material will be loaded and hauled off site by HL Merrill.

R.P. Appx. 113 Allowances The GMP includes the following allowances: 1) Entry sidewalks and hardscaping upgrades $25,000 2) Landscaping $225,000 3) Irrigation system $75,000 4) Wood, stone & metal trim at main lobby $25,000 5) Wood & metal trim at level2 & 3 & 4lobbies $7,500 6) Light bollards and building accent lighting @ main building entrances-now part of design 7) Revolving entrance door-now part of design 8) Elevator Cab finishes-now part of design See the Drawing List, attached hereto as Attachment A.

R.P. Appx. 114 R.P. Appx. 115 EXHIBIT A R.P. Appx. 116 EXHIBIT A R.P. Appx. 117 EXHIBIT A R.P. Appx. 118 EXHIBIT A R.P. Appx. 119 EXHIBIT A R.P. Appx. 120 EXHIBIT A R.P. Appx. 121 EXHIBIT A R.P. Appx. 122 EXHIBIT A R.P. Appx. 123 EXHIBIT A R.P. Appx. 124 EXHIBIT A R.P. Appx. 125 EXHIBIT A R.P. Appx. 126 EXHIBIT A R.P. Appx. 127 EXHIBIT A R.P. Appx. 128 EXHIBIT A R.P. Appx. 129 EXHIBIT A R.P. Appx. 130 EXHIBIT A R.P. Appx. 131 EXHIBIT A R.P. Appx. 132 EXHIBIT A R.P. Appx. 133 EXHIBIT A R.P. Appx. 134 EXHIBIT A R.P. Appx. 135 EXHIBIT A R.P. Appx. 136 EXHIBIT A R.P. Appx. 137 EXHIBIT A R.P. Appx. 138 EXHIBIT A R.P. Appx. 139 EXHIBIT A R.P. Appx. 140 EXHIBIT A R.P. Appx. 141 EXHIBIT A R.P. Appx. 142 EXHIBIT A R.P. Appx. 143 EXHIBIT A R.P. Appx. 144 EXHIBIT A R.P. Appx. 145 EXHIBIT A R.P. Appx. 146 EXHIBIT A R.P. Appx. 147 EXHIBIT A R.P. Appx. 148 EXHIBIT A R.P. Appx. 149 EXHIBIT A R.P. Appx. 150 EXHIBIT A R.P. Appx. 151 EXHIBIT A R.P. Appx. 152 EXHIBIT A FORM OF CONSTRUCTION INDEMNITY AND ASSIGNMENT AGREEMENT (General Contractor) THIS CONSTRUCTION INDEMNITY AND ASSIGNMENT AGREEMENT, dated as of the _ _ day of , from ,a - - - - - - - - ( t h e "Contractor") to THE PRUDENTIAL INSURANCE COMPANY OF AMERICA, a New Jersey corporation ("Prudential"), a ("Developer") and a _ _ _ _ _ _ _ _ _ (the "Venture").

RECITALS A. Prudential and Developer shall be partners in the Venture, pursuant to Acquire Joint Venture Interest, dated , _ _ (the 11 Acquisition Agreement") and the Amended and Restated Limited Liability Partnership Agreement of the Venture, dated ------------, (the 11 IVA"). The Venture is the owner of the Project as more particularly described in the Acquisition Agreement. All capitalized terms used, but not defined herein, have the meanings given to such terms in the Acquisition Agreement.

B. The Venture and the Contractor have entered into the , dated (the 11 Construction Contract"), --------------- whereby the Contractor agreed to construct the Improvements.

C. The Contractor desires to enter into this Agreement to induce: (i) Prudential to make Prudential's Initial Contribution (as defined in the Acquisition Agreement) to the Venture; and (ii) acquire an interest in the Venture, in the manner contemplated by the Acquisition Agreement.

NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Contractor hereby agrees as follows: 1. Guarantee. The Contractor hereby guarantees all the work performed in connection with the construction of the Improvements and all materials furnished and installed, or either, under the Construction Contract including all change orders thereto, to be: (i) substantially in accordance with the Plans and Specifications attached to the Acquisition Agreement as Exhibit B and/or modifications thereof permitted pursuant to the Acquisition Agreement (including any and all replacements or corrections of work performed in connection with construction ofthe Improvements and materials that may be required pursuant thereto); (ii) substantially in accordance with all federal, State of , County and City of _______ laws, ordinances, statutes, rules and regulations applicable to the construction of office buildings, including, without limitation, local building, environmental, land use and persons with disabilities requirements, in effect on the date of this Agreement (collectively, the "Legal Requirements"); and (iii) free from faulty, defective workmanship and materials. The Contractor agrees to repair, correct or replace, at their own cost and expense, all of the work performed in connection with construction of the Improvements and materials, or either, covered

R.P. Appx. 153 EXHIBIT A under said Construction Contract, change orders, modifications or corrections pursuant thereto that may prove not to be substantially in accordance with the Plans and Specifications (and/or modifications thereof permitted pursuant to the Acquisition Agreement) or the Legal Requirements or not to be free from faulty, defective workmanship and/or materials, ordinary wear and tear excepted. The Contractor does further agree to pay the cost of repairing all damage to other property resulting from defects in the work, performed in connection with construction of the Improvements, and materials, or either, covered by this Agreement and to pay the cost and expenses of replacing other property which may be damaged or disturbed in making good any defects as provided herein.

This Agreement shall be for a period of 1 year commencing the date of substantial completion of the Project. This Agreement shall be for the entire work performed in connection with construction of the Improvements except as may be extended by other guarantees specified elsewhere in the Construction Contract or as required by applicable law, and materials under the Construction Contract, and is in no way to be construed as invalidating guarantees for longer periods where required by the Construction Contract. This Guarantee shall not broaden the scope of the guarantees specified in the Construction Contract.

All replacements and corrections to defective work performed in connection with construction of the Improvements and materials; or either, are to be done at the convenience of the Venture.

The obligation of Contractor under this Agreement shall survive both final payment for the work performed in connection with the construction of the Improvements or designated portion thereof and termination of the Construction Contract.

2. Indemnification. The Contractor shall indemnifY, defend and hold harmless Prudential and the Venture, their officers, agents and employees for from and against any an~ all claims and demands, just or unjust, of third persons for death, for bodily injury, for personal injury, for property damage, direct or consequential, or for breach of contract arising or alleged to arise out of the construction of the Improvements and for all expenses incurred by them in the defense, settlement or satisfaction thereof except to the extent such claims and demands result from the intentional acts of Prudential or the Venture.

In any and all claims against Prudential or the Venture or any of their agents or employees by any employee of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this Agreement shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any subcontractor under workers' or workmen's. compensation acts, disability benefit acts or other employee benefit acts.

If so directed by Prudential or the Venture, the Contractor shall at its own expense defend any suit based upon any such claim or demand within the scope of the foregoing indemnity with counsel reasonably acceptable to Prudential or the Venture, as applicable (even if such suit, claim or demand is groundless, false or fraudulent).

FINAL Clayco IndemnitvJ.DOC BANK OF AMERICA/PRUDENTIAL LOAN PURCHASE AGREEMENT ~

R.P. Appx. 154 EXHIBIT A 3. Assignment of Guarantees and Warranties. Contractor, as assignor, hereby conditionally assigns, transfers and sets over to the Venture, as assignee, all of its right, title and interest in and to all guarantees and warranties received by Contractor from subcontractors and suppliers in connection with the construction of the Improvements. This assignment shall be effective upon default by the Contractor under this Agreement or upon complete satisfaction of the obligations of Contractor hereunder. Contractor shall not and has not taken any action or done any thing which could limit the enforceability of such guarantees and warranties.

4. Governing Law. This Agreement will be governed by and construed in accordance with the laws of the State of - - - - 5. No Assignment of Benefits Under this Agreement. Neither Prudential nor the Venture may assign this Agreement or its rights under this Agreement. This Agreement shall terminate as to both Prudential and the Venture upon any transfer by Prudential of its interest in the Venture to other than an affiliate of Prudential.

[CONTRACTOR]

By: _ _ _ _ _ __:___ _ _ _ __ Name: Its: ------------------------ -------------------------------

FINAL Cia yeo lndemnity3.DOC BANK OF AMERICA/PRUDENTIAL LOAN PURCHASE AGREEMENT PAGE3 R.P. Appx. 155 EXHIBIT A FORM OF ARCHITECT'S CERTIFICATE [LETTERHEAD OF ARCHITECT FOR THE PROJECT]

[Dated no later than 5 days prior to the Closing date]

The Prudential Insurance Company of America Prudential Real Estate Investors

Re: ____________________________________ Gentlemen: We understand that you intend to acquire an interest in _ _ _ _ __ ---------------------------------(the "Venture"), which Venture acquired the real property in------------·---------------' more particularly described in Exhibit A attached hereto (the "Land"), and constructed an office building consisting of approximately net rentable square feet, plus __ parking spaces (collectively, the "Improvements"), pursuant to an Agreement To Acquire Joint Venture Interest, dated _____________, 200_ (the "Commitment"). (The Land and Improvements shall be referred to herein collectively as the "Project".)

We understand that the receipt by you of certain written certifications from us is a condition precedent to your obligation to make a capital contribution to the Venture and to acquire an interest in the Venture. Accordingly, we hereby certify the following to the best of our lmowledge, information and belief: 1. We prepared the working drawings, a true and complete copy of which is attached hereto as Exhibit B (the "Plans and Specifications"). The working drawings describe the Improvements completely and accurately.

2. The Project lies in a district designated zoning under the applicable zoning ordinances of the~---:----------------------' The Project, if built and used in conformity with the Plans and Specifications, is in full compliance with such zoning ordinances.

3. The Improvements contemplated by the Plans and Specifications are permitted by and in conformance with all applicable building codes and regulations and all other federal, state and local laws, rules and regulations relating to the physical aspects of improvements to land.

R.P. Appx. 156 EXHIBIT A 4. Based on our observation of the Improvements during their constmction and at the time all certificates of occupancy were issued, (a) the Improvements as actually built substantially conform to the Plans and Specifications, and comply with all Federal, state and local laws, mles, and regulations relating to the physical aspects of improvements to land, including, without limitation, those relating to zoning, building and fire codes, of which we have been made aware by the owner, and environmental laws, mles and regulations and (b) no amendment to the building permits were required subsequent to[_ _ _----.~ 5. The Project complies in all respects with the Americans with Disabilities Act and allmles, regulations and guidelines promulgated in connection therewith.

6. The specified materials for the Project do not contain asbestos or polychlorinated biphenyl (PCB) products or any other hazardous or toxic wastes or substances in violation of applicable environmental laws.

7. The Project, if built in conformity with the Plans and Specifications, is in substantial compliance with all conditions and requirements specifically relating to constmction and development of the Project contained in the following documents: [list of Private Development Covenants].

This letter is being delivered to you as a condition precedent to your making a capital contribution to the Venture and acquiring an interest in the Venture.

We understand that you and the Venture are relying on this letter and that you or the Venture may pursue a claim against us in the event that you or the Venture has any loss or damage as a result of facts or circumstances that exist at the Project which make any of our certifications incorrect or inaccurate. This letter does not constitute, however, a guarantee of the work of the builder of the Improvements, and the builder and its subcontractors are solely responsible for all construction means, methods, techniques, sequences and procedures and compliance with the drawings, specifications and contract documents.

Very tmly yours,

By________________________ Its --------------------------- (Attachments)

R.P. Appx. 157 EXHIBIT A FORM OF ENGINEER'S CERTIFICATE [LETTERHEAD OF PROJECT'S ON-SITE ENGINEER]

[Dated no later than 5 days prior to Second Closing date]

The Prudential Insurance Company of America Prudential Real Estate Investors

Re: _________________________________________ Gentlemen: We understand that you intend to acquire an interest in - - - - - - - - - - - - - - - ------------------(the "Venture"), which Venture acquired the real property in_ ----------------------------' more pcuiicularly described in Exhibit A attached hereto (the "Land"), and constructed an office building consisting of approximately __________ net rentable square feet, plus __ parking spaces (collectively, the "Improvements"), pursuant to an Agreement To Acquire Joint Venture Interest, dated - - - - - - - - - - - - - - - · ' 200_ (the "Commitment"). (The Land and Improvements shall be referred to herein collectively as the "Project".)

We understand that the receipt by you of certain written certifications from us is a condition precedent to your obligation to make a capital contribution to the Venture and to acquire an interest in the Venture. Accordingly, we hereby certifY the following: 1. We are civil engineers licensed in the State of . We provided civil engineering design and construction observation services for the Improvements. Our involvement has included preparing civil engineering design plans dated (the "Plans"). In connection with rendering the Plans, we performed such research and made such investigations as we deemed appropriate in our professional judgment with respect to the Plans.

Our firm provided construction observation services during site preparation and grading prior to beginning construction of buildings. In addition, we periodically observed the contractor's progress and procedures during the preparation of the site and full course of construction.

2. We hereby represent to you that, in our professional opinion, based upon our services rendered, the Project has been designed by this office in compliance with applicable Federal, state and local approvals and design standards relating to the site improvements for the land.

R.P. Appx. 158 EXHIBIT A 3. We hereby represent to you that the following utilities are connected to the Improvements and fully operational: . Such utilities comprise all of the utilities which were designed by this office.

4. We have concluded that on the basis of our observations that the contractor has completed the Project in substantial conformity with the "Plans and Specifications", attached hereto as Exhibit B. Further, the work we observed was completed in a manner compatible with the relevant aspects of the Land as we understood them at the time of design and in substantial compliance with our recommendations.

This letter is being delivered to you as a condition precedent to your making a capital contribution to the Venture and acquiring an interest in the Venture. We understand that you and the Venture are relying on this letter and that you or the Venture may pursue a claim against us in the event that you or the Venture has any loss or damage as a result of facts or circumstances that exist at the Project which make any of our certifications inconect or inaccurate. This letter does not constitute, however, a guarantee of the work of the builder of the Improvements.

Very truly yours,

By________________________ Its._ _ _ _ _ _ _ _ _ _ _ _ __ (Attachments)

R.P. Appx. 159 EXHIBIT A CONTRACTOR'S CONSENT AND AGREEMENT

The undersigned ("Contractor") acknowledges the assignment by Intellicenter Atlanta Investments, LLP, a Delaware limited liability partnership ("Owner"), to Bank of America, N.A., a national banking association, as administrative agent ("Administrative Agent") on behalf of the lenders ("Lenders") from time to time parties to the Loan Agreement (as herein defined), as additional security for the obligations of Owner under a Construction Loan Agreement ("Loan Agreement") between Owner (as Borrower), Administrative Agent and Lenders dated September 26, 2005, of Owner's rights (but not Owner's obligations) under the Construction Contract and any future modifications thereof or change orders ("Contract") between Owner and the Contractor pertaining to the pr~ject contemplated by the Loan Agreement, such project to be located upon certain real property described on Exhibit "A" attached hereto and made a part hereof (the "Property"). Contractor hereby consents to and agrees to be bound by such assignment. Contractor further represents and warrants to and agrees with Administrative Agent and Lenders as follows: 1. The copy of the Contract attached hereto as Exhibit "B" is a true, correct and complete copy of the Contract, the Contract has not been changed or modified, and to Contractor's knowledge, the Contract is in full force and effect.

2. If Owner defaults under the Loan Agreement or certain other Loan Documents (as defined in the Loan Agreement), Lenders may elect by a specific request in writing to (i) have Contractor continue performance under the Contract, in which case Contractor shall thereafter perform under the Contract pursuant to the remainder of this Paragraph 2, or (ii) have Contractor stop work on the project and vacate the Property, in which case Contractor shall promptly do so. If Lenders elect by specific request in writing to have Contractor continue or recommence to perform work under the Contract, Contractor shall continue or recommence performance on Lenders' behalf under the Contract in accordance with the terms thereof, and Contractor shall be reimbursed in accordance with the Contract for all work, labor and materials performed or furnished at Lender's request and prior to Lender's request; provided that, (i) with respect to reimbursement for work, labor or materials prior to Lender's request, Contractor has notified Administrative Agent in writing of the amounts owed Contractor and (ii) Lenders shall not be required to pay any amounts for work, labor or materials for which Lenders have already made an advance under the Loan Agreement . Contractor will look solely to the Owner for all sums owing under the Contract which Lenders are not required to advance pursuant to this paragraph.

Contractor's agreement to act under the Contract for Lenders will not depend upon Contractor being paid any sums which Lenders are not required to advance hereunder nor on whether the Owner has otherwise defaulted under the Contract. Nor will Administrative Agent or Lenders be liable for any amounts owing Contractor if Administrative Agent (on behalf of Lenders) requests Contractor to stop work and vacate the Property pursuant to clause (ii) above. Neither Administrative Agent nor Lenders shall be liable for any damages Contractor may be entitled to recover from Owner or for change orders made by Contractor and not approved by Lenders pursuant to the Loan Agreement. In the event the Contract is terminated for any reason, Contractor shall notifY Administrative Agent in writing within seven (7) days of such termination. After such termination, Contractor shall, at Lenders' option, enter into a new contract with Administrative Agent (on behalf of Lenders) upon substantially the same terms as the Contract. "Lenders" as used in this Paragraph includes Lenders' successors or assigns, any receiver in possession of the Property, any purchaser upon foreclosure of Lenders' security, or any corporation or other nominee formed by or on Lenders' behalf (collectively "Lenders' Successors"). This Paragraph 2 shall not affect the rights of Lenders or Lenders' Successors upon or following a foreclosure or transfer of title to the Property.

CONTRACTOR'S CONSENT AND AGREEMENT (Intel/icenter Atlanta Investments, LLP) Page 1 4049692.1

R.P. Appx. 160 EXHIBIT A 3. If Owner defaults in making any payment or in performing any other obligation under the Contract, Contractor shall promptly give Administrative Agent written notice thereof, specifying the default and the steps necessary to cure same; and if Contractor learns of any default in payment due any subcontractor or other person supplying labor or materials for the project, Contractor shall similarly advise the Administrative Agent thereof. Contractor will not exercise any remedy available under the Contract, at law, or in equity arising from such default by Owner until Lenders shall have had the same opportunity to cure such default to which Owner is entitled, but at least thirty (30) days in any event, if Lenders so elect to cure such default, and such longer period of time as may be necessary to obtain possession of, or title to, the Property, provided that Lenders shall have no obligation to cure any Owner default. Any curative act done by Lenders shall be as effective as if done by Owner.

4. Contractor shall not perform work under any change order without first securing Administrative Agent's written consent to such change order unless: (a) the Owner has certified to Contractor that Lenders' consent is not required for such change order; and (b) the cost of or reduction resulting from any single change or modification does not exceed $50,000, and the aggregate amount of all such changes and modifications does not exceed $500,000. In any such case, Contractor shall promptly provide Administrative Agent or its construction consultant with a copy of such change order or other modification. Administrative Agent's consent shall not constitute any assumption by Administrative Agent or Lenders of any obligation under the Contract. In addition, Contractor will not terminate, or in any material respect, modify or amend, the Contract without the prior written consent of Administrative Agent, provided that Contractor may terminate the Contract because of a default by Owner thereunder to the extent Contractor has such right in the Contract, provided Contractor has first complied with Paragraphs 2 and 3 above.

5. Contractor acknowledges that the plans (the "Plans") described in the Schedule attached hereto were prepared by an architect on Contractor's staff or engaged by Contractor to prepare such Plans (the "Architect). Contractor represents and warrants to Administrative Agent and Lenders that such Architect is authorized to practice architecture under the laws of the State in which the Property is located and is familiar with the federal, state, and local laws and ordinances relevant to the construction of the improvements (the "Improvements") described in the Plans. Architect prepared all of the Plans, or such Plans were prepared under its supervision and direction, and Architect is responsible therefor. To the best of Contractor's knowledge, the Plans comply with all applicable laws, including all zoning, building, and other pertinent statutes, ordinances, rules and regulations. The Plans were prepared in accordance with customary professional standards of architectural practice for projects similar to the Improvements. The Plans are complete and adequate for the construction of the Improvements, and there have been no modifications thereof except as described on the attached Schedule. The Plans have been approved by all applicable governmental authorities. To the best of Contractor's knowledge: (a) the Improvements, if constructed in accordance with the Plans, will fully comply with all applicable laws, statutes, ordinances, codes, rules, regulations, decrees and orders (including but not limited to those relating to access and facilities for handicapped persons), applicable restrictive covenants and the site plan approved by Administrative Agent; and (b) the structural design of the Improvements, the proposed method of construction, the foundation plan, and the materials specified by the Plans for the project are adequate and appropriate for the contemplated Improvements and for the soil conditions of the construction site.

6. Contractor hereby expressly subordinates all contractual, constitutional and statutory mechanics' and materialmen's liens to which Contractor may be or become entitled, to all liens and security interests securing the loan contemplated by the Loan Agreement (all indebtedness of Borrower, Administrative Agent and Lenders evidenced by the Loan Agreement and related loan documents are referred to herein as the "Secured Indebtedness") and expressly waives any right to remove any removable improvements from the Property. Contractor hereby expressly waives any equitable lien upon the loan funds to which Contractor might otherwise be entitled. Contractor acknowledges and agrees that, CONTRACTOR'S CONSENT AND AGREEMENT (lnlel/icenter Atlanta Investmenls, LLP) Page2 4049692.1

R.P. Appx. 161 EXHIBIT A foreclosure of the liens and security interests securing the loan contemplated by the Loan Agreement shall be fully and automatically effective to cut off, terminate, and extinguish all of Contractor's liens and claims of any kind against the Property (provided, that, such termination shall not affect any rights that Contractor may have in any proceeds paid at any foreclosure of the Property in excess of the amount necessary to pay the Secured Indebtedness in full). Contractor shall require all material subcontracts and material purchase orders to contain a provision subordinating the subcontractors' and materialmen's liens to the liens and security interests securing the loan contemplated by the Loan Agreement and expressly waiving the right to remove removable improvements from the Property.

7. As of the date hereof, Contractor has no counterclaim, right of set-off, defense or like right against Owner or Lenders, and to the best of Contractor's knowledge and belief, the Owner is not in default under the terms ofthe Contract. Contractor is not in default under the terms of the Contract.

8. Nothing herein shall be construed to confer any present benefits on Contractor or to create any contractual arrangement between Contractor and Administrative Agent or Lenders or to impose upon Administrative Agent or Lenders any duty to see to the application of the proceeds of the loan contemplated by the Loan Agreement or to give any notice of any type to Contractor. Contractor acknowledges that Administrative Agent and Lenders are obligated under the Loan Agreement only to the Owner and to no other person or entity. Contractor is executing this Contractor's Consent and Agreement to induce Lenders to advance funds under the Loan Agreement, and Contractor understands that Lenders would not do so but for Contractor's execution and delivery of this Contractor's Consent and Agreement.

9. Contractor shall provide Administrative Agent promptly in each case with (a) any information Contractor may have regarding defects in workmanship or materials incorporated into or provided for the project which come to Contractor's attention, (b) Contractor's estimate(s) of the stage(s) of completion of the project, (c) any deviations or variations in construction of the prqject from the plans and specifications used by Contractor, (d) any information Contractor may have regarding any defaults by Owner, or any other contractor or subcontractor under any construction contracts, and (e) any claims of non-payment by any person furnishing labor or material in connection with construction of the project.

10. This Contractor's Consent and Agreement shall bind and benefit Contractor, Administrative Agent, Lenders and their respective successors and assigns, including Lenders' Successors, their successors and assigns.

11. Any notice for purposes of this Contractor's Consent and Agreement shall be given in writing and shall be addressed or delivered to the respective addresses set forth below, or to such other address as may have been previously designated by the intended recipient by notice given in accordance with this Section and shall be delivered by personal delivery, by nationally recognized overnight courier service, by prepaid registered or certified United States mail (return receipt requested), or by facsimile.

The notice shall be deemed effective when the receipt is signed or when the attempted initial delivery is refused or cannot be made because of a change of address of which the sending party has not been notified; and if transmitted by facsimile or personal delivery, the notice shall be effective when received.

Until changed by notice given in accordance with this Section, the initial respective addresses for notices are the following: To Administrative Agent and Lender: Bank of America, N.A.

901 Main Street, 21'1 Floor Dallas, Texas 75202-3714 Attention: Real Estate Loan Administration Fax No. 214.209.1832 CONTRACTOR'S CONSENT AND AGREEMENT (Intel/icenter Atlanta Investments, LLP) PageJ 4049692.1

R.P. Appx. 162 EXHIBIT A To Contractor:

Attention: Fax No. --------------------------- ---------------------------- 12. The provisions of this Contractor's Consent and Agreement cannot be waived, modified or amended unless such waiver, modification or amendment is in writing and is executed on behalf of each of Administrative Agent and Contractor.

13. Prior to the date hereof, no work of any kind, including the destruction or removal of any existing improvements, site work, clearing, grubbing, draining or fencing of the Property, has been commenced or performed on the Property and no equipment or materials have been delivered to the Property for any purpose whatsoever.

14. Neither the Contract, nor any memorandum, affidavit or notice thereof, has been recorded by or on behalf of Contractor in the county where the Property is located or in any other county. No affidavit of commencement of construction of any improvements, performance of labor, furnishing of materials, or providing of specially fabricated materials in connection with the construction contemplated by the Contract has been executed or filed by Contractor in the county where the Property is located or in any other county. Contractor will, however, join in the execution of such an affidavit once such work has commenced in form and substance satisfactory to Administrative Agent.

15. Contractor will address to Administrative Agent, naming Administrative Agent as an additional named party or beneficiary, all certificates, statements, or representations regarding the completion of the project or any portion thereof.

16. THIS CONTRACTOR'S CONSENT AND AGREEMENT AND ITS VALIDITY, ENFORCEMENT AND INTERPRETATION, SHALL BE GOVERNED BY TEXAS LAW (W11HOUT REGARD TO ANY CONFLICT OF LAWS PRINCIPLES) AND APPLICABLE UNITED STATES FEDERAL LAW.

CONTRACTOR'S CONSENT AND AGREEMENT (lntellicenter Atlanta Investments, LLP) Page4 4049692.1

R.P. Appx. 163 EXHIBIT A EXECUTED this _ _ day of _ _ _ _ _ _ _ _, 2005.

"CONTRACTOR"

By: ------------------------------------ Name: Title: --------------------------------- --------------------------------

CONTRACTOR'S CONSENT AND AGREEMENT{lntellicenter Atlanta Investments, LLP) Signature Page R.P. Appx. 164 EXHIBIT A EXHIBIT A LAND

CONTRACTOR'S CONSENT AND AGREEMENT(7ntellicenter Atlanta Investments, LLP) EXHIBIT A R.P. Appx. 165 EXHIBIT A EXHIBITB CONTRACT

CONTRACTOR'S CONSENT AND AGREEMENT(lntellicenter Atlanta Investments, LLP) EXHIBJTB R.P. Appx. 166 EXHIBIT A SCHEDULE OF PLANS AND SPECIFICATIONS

Pr~ect: ________________________________________________________________________ Location: _________________________________________________________________________ Drawing No. &Page Nos. Description

4049692v2

CONTRACTOR'S CONSENT AND AGREEMENT(lntellicenter Atlanta Investments, LLP) SCHEDULE R.P. Appx. 167 EXHIBIT A FORM OF ARCHITECT'S CERTIFICATE

The Prudential Insurance Company ofAmerica Prudential Real Estate Investors Two Ravina Drive,- Suite 400 Atlanta, GA 30346 Attn: Mark W. Seedorff

Re: 370 I Regent Blvd., Irving TX Gentlemen: We understand that you intend to acquire an interest in Intellicenter Dallas Investments, LLP, a Delawaie limited liability partnership (the ''Venture"), which Venture acquired the real property in Irving, Texas, more particularly described in Exhibit A attached hereto (lhe "Land"), and constructed an office building consisting of approximately 199,276 net rentable square feet, plus 850 parking spaces (collectively, the "Improvements"), pursuant to an Agreement To Acquire Interest, dated January 5, 2006 (the "Commitment"). (The Land and Improvements shall be referred to herein collectively as the ''Project''.)

We understand that tbe receipt by you of certain written certifications from us is a to condition precedent to your obligation make a capital contribution to the Venture and to acquire an interest in the Venture. Accordingly, we hereby certify the following: ARCHITECTURE 1. We preparedcthe working drawings, a true and complete copy of which is attached hereto as Exhibit B (the "Plans and Specifications"). The working drawings describe the Improvements completely _and accurately.

2. The Project lies in a district designated FWY (Freeway) zoning under the applicable zoning ordinance No. 4681, City of Irving Planning and Development Department. The Project, if built and used in conformity with the Plans and Spe-Cifications, is in full compliance with such zoning ordinances.

3. All Improvements contemplated by the Plans and Specifications are permitted by and in conformance with all applicable building codes and regulations and all other federal, state and local laws, rules and regulations relating to the physical aspects of improvements to !and.

4. Based on our observation of the Improvements during their construction and at the time all certificates of occupancy were issued, (a) the Improvements as actually built substantially conform to the Plans a,nd Specifications, and comply with all Federal, state and local laws, ·rules, and regulations relating to the physical aspects of improvements to land, including. without limitation, those relating to zoning, building and fire codes, of which we have been made aware

!855559.2

R.P. Appx. 168 by the owner, and environmental laws, rules and regulations and (b) no amendment to the building permits were required subsequent to April 26, 2006.

5, The Project complies in all respects with the Americans with Disabilities Act and all rules, regulations and guidelines promulgated in connection therewith.

6. Intention~Hy deleted.

7. The specified materials for the Project do not contain asbestos or polychlorinated biphenyl (PCB) products or any other hazardous or toxic wastes or substances in violation of applicable environmental laws.

8. The Projec~ if built in conformity with the Plans and Specifications, is in substantial compliance with all conditions and requirements specifically relating to construction and development of the Project contained in the following documenls: [None] LANDSCAPE ARCIDTECTIJRE l. The landscape architects are licensed in the State of Texas. They provided landscape architecture design and construction observation services for the site improvements for lhe Project. Their involvement included preparing landscape design plans, as noted on Exhibit B.

In connection with rendering such plans, they perfom1ed such research and made such investigations as they deemed appropriate in their professional judgment with respect to such plans. They provided limited construction observation services pursuant to our contract. In addition, they periodically observed the contractor's progress a.nd procedures during the preparation of the site and full course of construction.

2. In our professional opinion and based upon our services rendered, the Project's landscape improvements (the "Site Improvements") have been designed in compliance with applicable federal, stite and local approvals and design standards relating to the Site Improvements.

3. . Further, the work was completed in a manner compatible with the relevant aspects of the Land as understood by the landscap~ architects at the time of design and in substantial compliance with their recommendations.

ENGINEERJNG I. The civil engineers are licensed in the State of Texas. They provided civil engineering design and construction observation services for the Improvements. Their involvement has included preparing civil engineering design plans noted on Exhibit B. In connection with rendering the Plans, they perfonned such research and made such investigations · as deemed appropriate in their professional judgment with respect to the Plans. They provided construction observation sc;;rvices during site preparation and grading prior to beginning construction of buildings. In addition, they periodically observed the contractor's progress and procedures during the preparation of the site and full course of construction.

2. We hereby represent to you that, in our professional opinion, based upon our services rendered, the Project has been designed with respect to the civil engineering aspects in

1855559.2

R.P. Appx. 169 compliance with applicable Federal. state and local approvals and design standards relating to the site improvements for the lim d.

3. We hereby represent to you tltat the following utilities are connected to the Improvements and fully operational: water, electric, sanitary/sewer e.nd telephone. Such utilities comprise all of the utilities which were designed by the civil engineers.

4. We have concluded that on the basis of our observations that the contractor has completed the Project in substantial conformity with the Plans. Further, the work was completed in a manner compatible with the relevant aspects of the Land as understood by the civil engineers at the time of design and in substantial. compliance with their recommendations.

This letter is being delivered to you as a condition precedent to your making a capital contribution to the Venture and acquiring an interest in the Venture. We understand that you and the Venture are relying on this letter and that you or the Venture may pursue a claim against us in the event that you or the Venture has any loss or damage as a result of facts or circumstances that ex.ist at the Project which make any of our certifications incorrect or inaccurate. This letter does not constitute, however, a guarantee of the work of the builder ofthe Improvements, and the builder and its subcontractors are solely responsible for all construction means, methods, techniques, sequences and procedures and compliance with the drawings, specifications and contract documents.

Very truly yours, fbn,wvt, ~eM Vht/. I

(Attachments)

EXHIBIT A Land

EXHIBITB Plans and Specifications ·

I 8S55S9.2

R.P. Appx. 170 EXHIBIT A i !

LEGAL DESCRIPTION OF THE LAND II" i BEING a 14.84 acre tract of land situated in the Jefferson Tilley Survey, Abstract No. 1474, City ofirving, Dallas County, Texas, and being pan of a tmct of land conveyed to The Travelers Insurance Company by deed as recorded in Volume 9 I244. Page 4044 of the Deed Records, Dallas County, Texas, and being more particularly described by metes 1 j I and bounds as follows: ).

COMMENCING at a 112 inch iron rod found at the new West line of Bcltline Road. said i ·I point being the Northwest comer of a tract of land conveyed to the County of Dallas by I deed recorded in Volume 91189, Page 2171, of the Deed Records of Dallas County, I Texas, said point also being in the southerly line of Interstate Highway No. 635 (LBJ f Freeway, a variable width right-of-way): THENCE North 71 degrees 07 minutes 55 seconds West, along the southerly line of said I Interstate Highway No. 635 (LBJ Freeway), a distance of 518.07 feet to a 1/2 inch iron rod found for comer; I TITENCE North 61 degrees 27 minutes 23 seconds West, continuing along the southerly 1- 1inc of said Interstate Highway No. 635 (LBJ Freeway) , a distance of 26.87 feet to a 1/2 inch iron rod found for comer, said point being the POINT OF BEGINNING, same poinl being the Northwest comer of a tract of land conveyed to SMPD-TEXAS-lRVING-203, LLC by deed as recorded in Volume 2003066, Page 01481, Deed Records, Dallas County, Texas, said point al~o being the Northeast comer of said 14.83 acre tract of land being described; THENCE South 28 degrees 32 minutes 37 seconds West, departing the southerly line of said Interstate Highway No. 635 (LBJ Freeway) and along the common line of srud SMPD-TEXAS-IRVING·203, LLC tract and said 14.83 acre tract of land being described, a distance of 775.69 feet to a 112 inch iron rod set for comer, said point being in the northeasterly line of Regent Boulevard (a variable width right-of-way) according to the plat thereof recorded in Volume 85244, Page 3298, Map Records, Dallas County, Texas, said point being the Southeast comer of said 14.83 acre tract of land being described, said point also being the Southwest corner of a tract of land conveyed lo SECOND CENTURY INVESTMENTS by deed as recorded in Volume 2003066, Page 01466, Deed Records, Dallas County, Texas, same point being the beginning of a curve to the right having a radius of900.00 feet a delta angle of22 degrees 59 minutes 22 seconds, and a chord hearing and distance of North 56 degrees 37 minutes 34 seconds West, 358.70 feet; THENCE in a northwesterly direction continuing along the said curve to the right an arc distance of361.12 feet and 10 a 112 inch iron rod found for corner; THENCE North 45 degrees 07 minutes 53 seconds West, continuing along the northeasterly line of said Regent Boulevard, a distance of I 19.07 feeL to a 112 inch iron Exhibrt A-Legal Description of th_e Land Page1 Dallas 1270791_2 5554.38 •

R.P. Appx. 171 ·I I.

I I I rod found for ~;orner. said point being the beginning of a curve to me right having .a radiu."i l of 607.74 fee[ a delta angle of 40 degree.'> 07 minute~ 46 second.t;, ~nd a chord hearing and 'j• distance of Nolih 25 degrees 04 minutes 00 second::: v,:esl, 417.01 feel; ' 11-JENCE in a northweslerly direction continuing along [he said curve to the righl an arc t. r distance of 425.66 feet and to a 112 inch iron rod found for corner: ! l THENCE North 05 degrees 00 minutes 07 seconds West, continuing along the northea.o.:lerly line of !>aid Regenr Boulevard, a distance of 337.64 feet to a 1/2 inch iron rod found for corner, said point being the beginning of a curve to the left having a radius of70g_50 feet a de1ta angle of34 degrees: 03 minutes 09 seconds, and a chord be3fing and di<il.rut-ee. of North 21 degrees 57 minutes 59 seconds West, 4 I4.91 feet; ·,.

THENCE in a northwesterly direction continuing along me ~id curve to the right an nrc distance of 421.08 feet and to a 112 in~h iron rod found for comer, said point being the I • I

Northwest comer of said 1.4.83 <~ere trnct of land being described and being in the I!. j, southcdy line: of said Intenmue Wghway No. 635 (LBJ Frccwa)'}: THENCE South 45 degrees 07 minutes ?:I se<:ond$ East, along the southerly line of said [nt~rsrate Highway No. 635 (LBJ Frc~wny), n disrance of 286.79 feet to a 112 inch iron I I rod follnd for corner; THF....NCE South 61 degrees 27 ntinutes 23 seconds East, c:ontinuing along the southerly Hn~:- of said 1..1\terstate Highway No. 635 (LBJ Freeway) , a distance or 1038,95 feet to the !

POJN1' or: BEGINNING and containing. 646.585 square feet or 14.84 acres of computed land.

Exhibit A-Legal Description of the Land Page2 Dallas 1270791_2 5554.38

R.P. Appx. 172 EXHIBIT 8- DALLAS Drawing List lntellicenter ~ Dallas 3701 Regent Blvd. Irving, Texas 75063 I Number Drawing Civil C1 Title Cover Sheet Rev Date 3/2612007 I .I C2 Grading Plan 312612007 I C3 Underfloor Gmding Plan 312612007 C4 Drainage Area Map 312612007 C5 Storm Sewer Plan $126.12007 C6 Storm Sewer Profiles 3126.12007 C7 Utility Plan 312612007 C8 Palling Plan 31:2.6/2007 C9 Tum Lane Plan 31:2.612007 C10 Tum Lane Plan and Details 312612007 en Paving Details 312612007 C12 Erosion Control Plan 3126120(JT C13 Erosion Control Details 312612007 ,.

C14 CUy of Irving Storm Water Pollution Prevention Methods 518f2006 !'I C15 City of Irving Storm Water Pollullon PrevenUan Delalls 51812006 I C16 City of Irving Storm Sewer Delalls 3.126.12007 C17 Clty of Irving Inlet Details 312612007 C18 City of Irving Trench Embedment, Sacldlll, and Pavement 312.&12007 Repair Delails C19 City of Irving Details for Trench Sheeting, Shoring, 312612007 Sloplll!J for Trenches over 5' Deep C20 Ctty of Irving Water and Sanil;uy Sewer Delalls . 312612.007 C21 City ollrlllng Sanitary Sewer Derails 312612007

Architectural Cover Cover 312612007 AQ-QO Project Information 312612007 INDEX Drawing Index 312612007 A0-01 Ufe 8alety Plans & Code Data 3126/2007 A{}-()2 Rated Structure Plans 312612007

R.P. Appx. 173 Il -I AD-03 UL Assemblies 312612007 I1 I

AHJ1 A~l'litectural Sire Plan 312612007 j A1-o2 Enlarged Site Plans and Details 312612007 !· i A2-D1 A2-D2 Overall Crawl Space and First Floor Plans Overall Second and Thln:f Floor Plans 312612007 S/2&'2007 ii ~ A2-D3 Overall Fourth Floor and Roof Plans 3126/2007 A2-11 Partial First Floor Plan 312612007 A2·12 Partial First Floor Plan 312612007 A2·21 Partial Second Roor Plan 312612007 A2·22 Partial Secom:l Floor Plan '3/2612007 A2~1 Partial Third Floor Plan 3126/2007 A2~ Partial Third Floor Plan 312612007 A2-41 Partial Fourth Floor Plan 3126/2007 A2-42 Partial Fourth Floor Plan '312612007 A2-51 Partial Roof Plan 312612007 A2-52 Partl!ll Roof Plan 312612007 A2-53 Roof Details 312612007 A2-54 Roof Details 3126/2007 A3-01 Overall Elevations :3126J2007 A3-02 Enlarged Elevations :312Eif2007 A3-03 Enlarged ElevatiOrtS 312612007 I.l I I A3-D4 Enlarged Elevatioi'IS :312612007 A3-05 Enlarged Elevations 312612007 A3-10 Building Secl.lortS 312612007 A3-11 Building Sections 3126/2007 A4-01 Enlarged Plans, Tolle! Rooms & Lobby 3126/2007 A5-00 Interior Elevations, TypicallnformaUon 312612007 A5-D1 Interior Elevations, Lobby 312612007 A5-D2 Interior Elevations, Toilet Rooms '3/26/2007 A5-D3 Interior Elevations Elevator Cabs 312612007 AB-11 Partial First Floor Ceiling Plan 312612007 AB-12 Partial First Floor Celllng Plan 312612007 AB-21 Partial Second Floor Ceiling Plan 312612007 AS-22. Partial SIICOnd Floor Ceiling Plan 312612007 A6-{)1 Partial Third Floor Ceiling Plan 3126/2007 A6-3Z Partial Third Floor Ceiling Plan 312612007 As-41 Partial Fourth Floor Ceiling Plan 312612007

R.P. Appx. 174 j l !

1-I I A6-42 Partial Fourth Floor Ceiling Plan &'2612007 t !

AHJ1 Elevator Plans & Sections 312&'2007 ' A7-(J2 Elevator Secliol'l!! 3126f2007 'j ~ A7-(J3 Elevator Delalrs 312612007 i A7-11 Stair 1 Sections & Plans 3126l2007 I i ~ A7-11A Stair 3 Section & Plane 312612007 A7-12 Stair 2 Sections & Plans 3126/2007 'l A7-13 AS-01 Stair Details Wall Sections 3126/2007 &'2612007 l I AB-02 Wall Sections 312612007 AB-03 Wall Sections 312612007 AB-04 Wall Sections 312612007 A9-111 Partition Types and Details, Door & Frame Types & Oetails 312612007 A9-02 TYP Window Details 312.612007 A9-03 Window frame Types 312612007 A9-10 Plan Details 312612007 A9-11 Plan Delalls - 312612007 A9-20 Exterior Details 312612007 A9-21 Exterior Details 312612007 A9-22 Exterior Details 312612007 I A10-n1 lnterloc Delails, Toilet Rooms lnter1orDetaJis, 1st Level Lobby 312612007 - 312612007 li AHHJ2 I

A1ll-03 Interior Details, 2nd Level Lobby 312612007 I- A11-11 Partial Finish Plans, First Floor 3(26/2007 A11-12 Partial Finish Plans, First Floor 312612007 A11·21 Partial Finish Plan, Seeood Floor 312612007 A11·22 Partial Finish Plan, Secolld Floor 312612007 A11-31 Partial Finish Plan, Third Floor 312612007 A11-32 Partial Rnlsh Plan, Third Floor 312S/2007 A11-41 Partial Rnlsh Pian, Fourth Floor 312612007 A11-42 Partial Finish Plan, Fourth Floor 3121?.12007 Structural 51-01 General Notes 312612007 51-02 Typical Sections & Delails 3/2612007 S1-Q3 Typical Sections & Details 312612007 51.{)4 Typical Sections & Details 312.612007 52..()1 Partial Pier Plan 3126/2007

R.P. Appx. 175 II I l S2.-Q2 Partial Pier Plan 3126120()7 j S2-Q3 Deck Plan 312612007 ,I. . I 52·11 Partial Foundation Plan 312612007 I 52-12 Partial Foundation Plan 312612007 i S2-21 Partial Second Floor Framing Plan j 312612007 j.

52-22 Partial Second Floor Framlfl9 Plan 3/26J2.007 J S2-31 Partial Third Floor Framing Plan 3/26J2007 S2-32 Partial Thlrd Floor FramTng Plan 312612007 92.-41 Partial Fourth Floor Fmmlfl9 Plan 312612007 52-42 Partial Fourth Floor Framing Plan 312612007 52-51 Partial Roof Fr.amlng Plan 312.612007 52-52 Partial Roof Framing Plan 312812007 S3-o1 Foundation Section and Details 312612007 83--02 Foundation Section and Detall9 312612007 S3-Q3 Foundation Section & Details 312612007 S4-01 Framing Section & Oatalls 312612007 S4-Q2 Framing Section & Details 312612007 l 84-03 Framing Section & Oalalls 312612007 -I 54-04 Framing Sectlon & Oelalls 312612007 55-01 Column Schedule & Oetalls 312612007 S6-01 arace ElevaUon & Details 312612007 Tilt Up T1-11 Partial Panel Layout Plan 3126f2007 T1·12 Partial Panelt.ayout Plan 312612007 T2-11 Typical Sections & Details 312612007 T3-11 Tilt-Up Wall Elevations 312612007 T3-12 lilt-Up Wall Elevations 312612007 r3-13 TilHJp Wall Elevations 312612007 13-14 lilt-Up Wall Elevations 312612007 T4-11 Relnfort:ing Details 312612007 T4-12 Relnlort:in g Details 312612007 Fire Prolection

Sheet 1 of 10 Site Plan :111:312007 Sheet 2of 10 Level1 -East Wing 311312007 Sheel3of10 Lavel1 -West Wing 311312007 Sheat4 of10 Leve12 • East Wing a/1312007

R.P. Appx. 176 Sheet5of10 Leve12 -Wesl Wing 311312007 I Sheel6 or1o Level 3 - East Wing I 3/1312007 Sheel7 of 10 Level 3 - Wesl Wing 311312007 I Sheet 8 of 10 Leve14- East Wing 311312007 !.

Sheet 9 of10 Level 4- West Wing 311312007 l 1 I I' Sheet 10 of 10 Details 311312007 Mechanical i M2.11 Partial First Floor Plan· Mechanical 1/2512007 M2.12 Penial First Floor Plan- Mechanical 1/2612007 M2.2.1 Partial Set~Jnd Floor Plan - Mechan!cal 112612007 M2.22 Partial Second Floor Plan - Mechanical 1/2612007 M2.31 Partial Third Floor Plan- Mechanical 1/2612007 M2.32 Partial Third Floor Plan - Mechanical 1{2612007 M2.41 Partial Fourth Floor Plan -Mechanical 1126/2007 I.

M2.42 Partial Fourth Floor Plan- Mechanical 1/26/2007 MEP2.51 Partial Roof Plan· MechanlcaliEiectricallf'lumbing 1/26/2007 MEP2.52 Partial Rocf Plan • Mechan!cal/EiectricalfPiumbing 112M!007 I M3.01 .

Partial Floor Plans • MechaniC<>~ 1/2612007 I I M3.02 Partial Second Floor Plans - Mechanical 1126/2007 M3.03 Partial Third Floor Plans- Mechanical 112&2007 I M3.04 Partlel Fourth Floor Plans - Mechanical 1/2612007 M4.02 Mechanical Details 1/26l2007 Plumbing ·I.

I P2.01 Partial Underfloor Plan- Plumbing 1/26/2007 P2.02 Partial Underfloor Plan· Plumbing 1/26/2007 P2.11 Partlal First Floor Plan • Plumbing 1/2612007 P2.12 Partial FirSt Floor Plan- Plumbing 112612007 P2.21 Partial Second Floor Plan- Plumbing 112612007 P2.22 Partial Second Floor Plan· Plumbing 112612007 P2.31 Partial Third Floor Plan· Plumbing 1/2612007 P2.32 Partial Third Aoor Plan· Plumbing 1!26/2007 P2.41 Partial r=:ourth Floor Plan • Plumbing 112612007 P2.42 Partial Fourth FIOOl' Plan- Plumbing 1/26/2007 P3.01 Partlal Enlarged Plans- Plumbing 1/26/2007 P3.02 Partial Enlarged Plans -'Plumbing 1/2612007 P4.01 Plumbing Riser Dlagmms 112812007

R.P. Appx. 177 Electrical E1.01 SHe PJan EJectrlca:J 319/2007 E2.11 Firs! Floor Plan Elec\rical 3/912.007 1I E2.12 Partial First Roor Plan Electrical 31912007 !

1- E2.21 Partial Second Floor Plan Electrfcal 3/912007 I" I.

E2.22 Partlal Second Floor PI an Electrical . 3/912007 I E2.31 Pe.rtial1111rd Roor Plan Electrlcal 319/2007 E2.32 Partial Third F109r Plan Electrical 31912007 E2.41 Partllll Fourth Floor Plan Eleclrical 3/912007 E2.42 Partial Fourth Roor Plan Electrical 31912007 E4.01 Single Una Electric:al 319/2007 E4.02 Details Electrical 3/9/2007 E4.03 De\ails Electrical 319/2007 ES.01 Electrical Sch&dules 31912007 ES.02 Electrical Schedules 31912007 E5.03 Electrical Schedules 31912007 E5.04 Electrical Schedules 31912007 E5.05 Electrical Schedules 31912007 ES.06 Ugh\ing FIXtUre Schedule 319/2007 EL.2.11 Partial Firs! Floor Plan UghUng 31912007 EL.2.12 Partial Frrst Aoor Plan Ughting 31912007 EL2.21 Partial Second Floor PJan Ughtlng 319/2007 El2.22 Partial Second Floor Plan Ughtlng 3f912007 EL2.31 Partial Third Floor Plan Ughting 31912007 El2.32 Partial Third Floor PlanJ,.Ighting 31Sl2007 EL2.41 Partial Fourth Floor Plan UghUng 3/S/2007 El.2.42 Partial Fourth Floor Plan Ughtlng 31912007 Landscape & Irrigation

LC1.1 General Notes & MataJials Schedule 4116106 LS 1.1 Overall LBndscape Sitewoli< Plan 4118106 LS 1.2 Sitewor1< & Paving Enlargements 4118106 L$2.1 Srtework Datalls 4118f06 LP 1.1 Planting Plan 4118100 LP 1.2 Planting Entry Enlargement 4118106 LP 1.3 Planllng Entry Enlargement 411at06 LP2.1 Planling DelaDs 4118106 ll1.1 Overall Landscape lrrrigation Plan 4/1&06

R.P. Appx. 178 R.P. Appx. 179 052.10 Steel Jolsts 1012112005 6 Pages 05310 Steel Peel< 1012112005 2Pages l I Pages l 05500 Metal Fabi!calions 1012112005 i :j.

05511 Metal Stairs 1012112005 8Pages 10121/2005 8 Pages !·!.

05521 Pipe and Tube Rallfr~g i 05811 ArchiteciUral Joint System 10121/2005 6 PagtJs i I [.

06100 Rough carpentry 10121/2005 5 Pages t 06402 07170 Interior Archlteclural Woodwori<: Bentonite waterproofing 10121/2005 1012112005 S Pages Pages l 07210 BulldlllQ Insulation 1012112005 7 Pages 07412 Metal Wall Panels 1012112005 9 Pages 07540 Thermoplastic Membr.ma Roofing 10121/2005 6 Pages 07620 Sheet Metal Aashing and Trim 10121/2005 5 Pages 07720 Roof Accessories at22/2006 3 Pages 07811 Sprayed Rre- Resistive Materials 1QI2112005 5 Pages 07842 Flre Resistive Joint Systems 10/2112005 4Pages 0792.0 08110 Jolnt Sealants Steel Doors and Frames 2/27/2006 10121/2005 Pages 5Pages II 08125 Interior Aluminum Frames 1012112005 4 Pages I 082.11 Flush Wood Doors 10121/2005 4Pages ·I: 08311 Access Doors 10/2112005 5 Pages 08331 Ovemead Colling Doors 10/21/2005 4 Pages 08410 Aluminum Enhances and Storefronts 10121/2005 10 Pages 08470 Ravolving Entrance Doors 10/2112005 7 Pages 0862.0 Unit Skylights 1012112005 3 Pages 08710 Door Han:lware 6/1:Y2006 18 Pages 08711 Door Schedule 612212006 7 Pages 08800 Glass & Glazing 1012112005 7 Pages 08830 Mirrors 10121/2005 5 Pages 08911 Glazed Aluminum Curtain Wall 10121/2005 9 Pag99 09000 Material Legend 6/22/2006 2 Pages 092.53 Gypsum Sheathing 10/21.12005 3 Pages 09280 Gypsum Board Assemblies 10121/2005 14 Pages

J- R.P. Appx. 180 09265 Gypsum Boartl Shatt-Wall Assemblies 10/21/2.005 5Pages 09310 Ceramic Tile 10/2112.005 7 Pages 09402 EpoxyTerrazo 10121/2005 5 Pages 09514 Acoustlcal Pan Ceilings 1012112005 4 Pages 09653 Resilient Wall Base 10121/2005 4 Pages 09671 Resinous Flooring 10127/2005 6 Pages 09861 Cwpetlile 1012112005 3 Pages 09912 Painting 10/21/2005 9 Pages 09950 Wall Covering 9/112006 2 Pages 09970 Special Wall Surfaces(Flberglass Reinforced Plastic Panels) 1012112005 4 Pages 09980 Special Coatings lor Concrete Surfaces 612212006 6Pages 10155 Toilet Compartments 712812006 2Pages 10270 Access Roofing 10121/2005 6 Pages 10520 Flre Protection Specialties 10/2.1/2005 5 Pages 10801 Toilet and Bath Accessories 612212006 2Pages I.

11160 Loading Dock Equipment 10121/2005 5Pages !

12491 Horizontal Blinds 1012112005 3 Pages 14240 Hydroullc Elevators 2127/2006 SPages 15010 Basic Mechanical Requirements 1/1912006 4 Pages 15071 Mechan[cal\libratlon Controls 1/19/2006 4 Pages 15075 MechanlcalldentiHcatlon 1/19/2006 4 Pages I,.

15081 Ducllnsu~tlon 1/1912006 B Pages 15083 Pipe lnsu~Uon 1/1912006 10 Pages 15100 Valves 1/19r.!006 B Pages 15135 Moten;; and Gages 1/19/2006 4 Pages 15140 Hangers and Supports 1/1912006 4 Pages 15300 Rre Suppression Plping 1/19/2006 14 Pages 15411 Water Distribution Piping 1/19/2006 8 Pages 15420 Drainage and Vent Systems 1/19/2006 7 Pages 15440 Plumbing FIXtUres 1/19/2006 4 Pages 15453 Plumbing Pumps 1{19/2006 4 Pages 15460 Water Heaters 1119/2000 3 Pages

R.P. Appx. 181 15730 Section Packaged Rooftop Air Condltionlng Units 1/1912006 10 Pages 15838 Power Ventilators and Exhaust Fans 1/1912006 7Pagas 15883 Variable Frequency Drives 1/1912006 5Pagas l 15891 Melal DuelS 1/1912006 BPages I - j· I 15910 Duct Accessoiies - 1/19/2006 6Pagas 15932 Air OuUets and Inlets 1/f9/2006 3Pages 15933 Air Terminals 1/1912.000 4Pages 1- 15970 Automatic COntrols 1317/2006 32 Pages 15990 Testing, Adjusting, and Balancing 1/1912006 7 Pages 15995 Commissioning 1/1912006 5 Pages 16010 Basic Electrical Requirements 1/1912006 4 Pages 16110 Raceways 111912006 sPeges 16120 Wires and Cables 1/1912006 3Pages 16135 Cablnels, Boxes, and Flttlngs 1/1912006 5 Pages 16143 Wiring Devices 111912006 4Pages 16170 Circuit and Motor Disconnect Switches 1/19/2006 2Pages 16190 Circuit and Motor DisconnBCI Switches 1119/2006 4 Pages 16195 Electricalldentificallon 1/19/2006 3 Pages 16420 Service Entrance 1/1912006 4Pages 16425 Switchboards 1119/2006 6 Pages 16452 Groundlng 1/1912006 5 Pages 16460 Transformers 1/19/2006 3 Pages 16470 Panelboards 1/19/2006 4 Pages 16471 Tf'!lllslent Voltage Surge Suppressors 1/1912006 4Pages 16475 Overrurrent Protective Devices 1/19/2006 5 Pages 16481 Motor Controllers 1/1912006 4 Pages 16515 Ughtlng 1/19/2006 6 Pages 16670 Ughtnlng Prolaction Systems 1/1912006 3f'ages 16721 Fire Alarm Systems 1/1912006 7 Pages

R.P. Appx. 182 ~ """f MUNSCH HARDT 3$00 Lincoln Pla<:3 N, Akard Street )._ ..... KOPF & HARR PC Dallas, Texas 75201-6659 Main 214.855.7500 ATTORNEYS & COUNSELORS !"ax 214.855.7584 DALLAS I HOUSTON jAUSTtN munsch.com

Oirect Diai214.855.75S9 Direct Fax 214.978. 4378 [email protected]

September 13, 2013 Clayco, Inc. Attn: Tom Sieckhaus 2199 lnnerbelt Business Center Drive St. Louis, MO 63114 RE: Agreement between Owner and Contractor dated May 19, 2006 ("Contracn, by and between lntellicenter Dallas Investments LLP ("Owner''), and Clayco, Inc. {"Contractor"), for the design and construction of a four story office building consisting of approximately 211,637 gross square feet located at 3701 Regent Boulevard, Irving, Texas ("Project").

Dear Mr. Sieckhaus: This law firm serves as litigation counsel to Owner. As Owner previously advised by email and a phone call to Contractor's authorized representative, Owner recently discovered shear cracks in the tilt wall panels at the Project. Owner retained a structural engineer to evaluate the cause of the cracks, and, after investigating the cracks, the engineer concluded that the cracking occurred because of insufficient shear friction reinforcing above the openings. Additfonally, the engineer noted the flextural reinforcing appears to be inadequate below the girders along the east and west ends of the building. Project was not designed pursuant to applicable codes and that the design failed to comply with the requirements of the Contract's construction documents. I am enclosing a copy of the engineer's report for your review.

Pursuant to its rights and remedies under the Contract and applicable law, Owner is hereby demanding Contractor complete, repair and/or replace the recently discovered incomplete and/or defective work immediately. To the extent Contractor requires access to the Project, please contact Mike Rosamond, 8115 Preston Road, Suite 700, Dallas, Texas 75225; Phone: 214 696 7826 (Direct); 957 6075 (Cell); email: [email protected].

Additionally, under the Contract, Contractor was required to secure errors and omissions policies for the design professionals which named Owner as an additional insured. Please provide the Certificates of Insurance to Owner upon receipt of this letter so that proper notification can be made under the terms of those policies.

Please be advised that Owner's investigation rs ongoing and that Owner may discover additional errors and omissions and incomplete failures to comply with the terms of the Contract.

Nothing in this letter is intended to limit or waive or estop Owner from asserting its legal rights or remedies and any and all rights and remedies are herein reserved.

To the extent that you would Hke to discuss this matter in further detail, please don't hesitate to contact me.

MHDocs 4694265_1 5554.38 R.P. Appx. 183 Clayco, Inc. Attn: Tom Sieckhaus September 16, 2013

Sincerely,

Greg Noschese GCN:Id

c: Ron Rolfes (via email) Scott Ozymy (via email) Mike Rosamond (via email) David CoBgado (via email) Amy Altshuler (via email) Ben Ochoa (via email) Justin Chapman (via email)

MHOocs 4$94265_1 5554.38 R.P. Appx. 184 MCHALE ENGINEERING, INC. 2000 AVENUE G SUITE 800 PLANO, TEXAS 75074 (972) 423-$908 FAX {972) 424-8100

September 10,2013

Mr. Mike Rosamond KDC Real Estate Development and Investment 8115 Preston Road, Suite 700 Dallas, TX 75225

Re: lntelllcenter Dallas 3701 Regent Boulevard Irving, TX

Dear Mr. Rosamond: Per the request of James Williams, the exterior tilt*wall panels at the referenced project were reviewed on August 29, 2013. The review was strictly visual and was limited to the exterior tilt-wall panels. The purpose of this review was to provide a general assessment of the reported cracks in the tilt-wall panels. A review of the construction documents for the building was also conducted.

The following documents were made available for review.

1. Geotechnical report prepared by Reed Engineering, Report Number 12567, dated September 9, 2005.

2. Structural drawings prepared by Alper Aud!, Inc., Record Drawings dated 3~26-07.

The project consists of a four story office building. The exterior facade consists of load bearing concrete tilt- wall panels. The roof is framed with steel joists and beams. The first, second, third and fourth floors are framed with composite steel beams with a steel deck and concrete slab. The exterior tilt-wan panels and interior columns are supported on auger excavated reinforced concrete piers bearing in a deeper shale stratum. The project is estimated to be approximately five (5) years old. The building is assumed to face south.

Observations The tilt-walls panels span four stories high. Each of the thirty (30'.. 0) foot wide panels has two ten (10'..0) feet wide openings at each floor. The floor purlins are connected to the panels along the north and south sides of the building. The main ftoor girders connect to the tilt~wall panels along the east and west sides of the building. Most of the beam connections occur just above an opening.

Cracks were found in the tilt-wan panels along the north and south sides of the building. These cracks occur below the windows at the first flo'Or, second, third and fourth floors. The cracks generally appear to align with the location of the floor purlins. Cracks can also be found along the east and wests ides of the building near the location where the girders connect to the tilt wall panels. The cracks vary from hairline to 1/16" in width.

Some evidence of previously repaired cracks was noted.

No evidence of foundation movement was found In the tilt-wall panels. No separation of the panel joints was noted, which is usuaUy an Indication offoundation movement. No significant deflection ofthe tilt~wall panels was noted.

R.P. Appx. 185 September 101 2013 Page 2 Mr. Mike Rosamond KDC Real Estate Investment and Development

tntellicenter Dallas 3701 Regent Boulevard Irving, TX

A review ofthe design ofthe tiltMwall panels was performed based on the 2000 International Building Code, American Concrete Institute· "Building Code Requirements for Structural Concrete 318-02" and ASCE -7 "Minimum Design Loads for Buildings and Other Structures". The International Building Code was referenced on Record Drawing Sheet S1..01 as the code standard. The deslgn floor loads were indicated on the Record Drawings as a total Dead Load of80 pounds per square foot and total Live Load of 100 pounds per square foot The review of the design of the panels was based on these loads.

The record drawings specify the panel reinforcing on Sheets T4-11 and T4-12. The drawings indicate that 1-#5 were to be installed above and below each opening on each face of the panel. This appears to be typical reinforcing for all of the panels. At locations were the floor purlins and girders are connected to the panel above the openings, it does not appear to be adequate to meet the requirements ACI318 Section 11.7 for shear friction reinforcing. This condition is particularly acute below the first floor where the bottom of the beam connection occurs just 1'·7 above the bottom of the panel. At the second, third and fourth floors, the bottom ofthe beam connection occurs 1'-11 above the bottom of the panel. However, at all locations where the purlin or girder are located above the openings there does not appear to be sufficient shear friction reinforcing. In addition, there does not appear to be sufficient flexural reinforcing below the girder connections on the east and west ends of the building at the locations where the girders connect to the panels above the windows.

In my opinion, the cracking that occurs in the tilt-wall panels occurs because of insufficient shear friction reinforcing above the openings. In addition, the flexural reinforcing appears to be inadequate below the girders along the east and west ends ofthe building. Further investigation may reveal other areas of concern after additional information is provided.

This concludes this report, if I can be of any further assistance or if there should be any questions, please do not hesitate to call. This report is based on the observed conditions on this date, which are subject to change.

Sincerely, MCHALE ENGINEERING, INC.

Gary B. McHale, P.E.

Attachments: Photographs

R.P. Appx. 186 Photograph Number 1 ~ Typical Panel Cracking Along North Side

Photograph Number 2 • Typical Panel Cracking Along North Side

R.P. Appx. 187 Photograph Number 3 • Typical Panel Cracking Along North Side

Photograph Number 4 ·Typical Panel Cracking Along North Side

R.P. Appx. 188 Photograph Number 5 w Typical Panel Cracking Along North Side

Photograph Number 6 • Typical Panel Cracking Along North Side

R.P. Appx. 189 Photograph Number 7 - Typical Panel Cracking Along West Side

Photograph Number 8 ~Previously Repaired Crack Along North Side

R.P. Appx. 190 Photograph Number 9 ·Typical Panel Cracking Along South Side

Photograph Number 10 ·Typical Panel Cracking Along North Side

R.P. Appx. 191 AMERICAN ARBITRATION ASSOCIATION Construction Industry Arbitration INTELLICENTER DALLAS ) INVESTMENTS LP, ) ) Case Number: 01-14-0001-0249 Claimant, ) ) v. ) ) CLAYCO, INC., et al. ) ) Respondents. )

RES.PONDENTS' OBJECTION , RESERVATION OF RIGHTS ND, SUBJECT TO AND WITHOUT WAIVER OF THE THEIR ANSWERING STATEMENT Respondents Clayco, Inc. ("Clayco") and FS Architecture ("FS") (Clayco and FS are hereinafter collectively referred to as "Respondents") submit their Objections, Reservation of Rights and, Subject to and without Waiver of the Same, their Answering Statement, and state as follows: RE PONDENTS' OBJECTIONS AND RESERVATION OF RIGHTS Respondents affirmatively asserted their respective rights to seek the dismissal of Claimant Intellicenter Dallas Investments LP's arbitration complaint/demand (the "Demand"), pursuant to§ 150.002(e), TEX. C!v. PRAC. & REM. CODE, in the 160th Judicial District Court of Dallas County, Texas, Cause No. DC-15-02018 (the "Lawsuit"). Section 150.002(d) expressly excuses a defendant (in a judicial or arbitration proceeding) who seeks dismissal pursuant to § 150.002(e) from filing an answer to a complaint against it, and by implication (if not expressly), it further excuses such a defendant from participating in litigation on the merits of such a complaint until the § 150.002 dismissal issue is resolved, and all expressly authorized interlocutory appeals, under§ 150.002(f) have been fully exhausted.

R.P. Appx. 192 Because Respondents affirmatively exercised their statutory rights to seek dismissal of the Demand, which is their response to the Demand, Respondents object to the imposition by the American Arbitration Association of a deadline for filing an answer to the Demand because they are statutorily excused from doing so. Respondents also object to the imposition of any other deadlines that advance the litigation of the Demand, on the merits, prior to a final disposition of the § 150.002 dismissal request, by appeal or otherwise.

Subject to the above-stated objections and without waiver of the same, Respondents' following Answering Statement, including their assertion of denials and affirmative defenses to Claimant's Demand, are expressly subject to a full reservation of rights with respect to Respondent's position ("Reservation of Rights") that the American Arbitration Association ("AAA") may not take any further action in this matter during the pendency of the lawsuit commenced by Respondents in the Lawsuit, in particular prior to the final disposition of their § 150.002(e) dismissal request, via final appeal, unless and until expressly ordered to do so by a court. Specifically, while the Lawsuit is pending, the AAA has no authority to act with respect to this matter in any manner whatsoever, while Respondents affirmatively seek a dismissal order from the Court in the Lawsuit pursuant to§ 150.002(e), while relying on their statutory rights not to file an answer to the Demand, under § 150.002(d). The basis for the relief sought by Respondents in the Lawsuit is Claimant's undisputed failure to comply with the requirements of § 150.002(a) and (b), which is a statutory, substantive condition precedent to Claimant's purported right to arbitrate the claims that are stated in the Demand, or to seek any damages, losses, or other relief associated therewith.

As a result of the Lawsuit and pursuant to§§ 150.002(d) and (e), this matter should be deemed stayed pending: (a) the final resolution of the Lawsuit, including appeals, interlocutory

R.P. Appx. 193 or otherwise; and/or (b) the Court's issuance of any interim orders expressly directing the AAA to take further action in this arbitration.

Subject to the Objections and full Reservation of Rights asserted herein above, and for the sole purpose of preserving their rights and defenses in connection with this arbitration (in the event that this arbitration is ordered to proceed), and to avoid any waiver or default, Respondents submit the following Answering Statement and Affirmative Defenses to Claimant's Demand.

RESPONDENTS' ANSWERING STATEMENT TO CLAIMANT'S DEMAND Subject to the foregoing Objections and Reservations of Rights and their pending Motion to Dismiss under Section 150.002, in the Lawsuit, Respondents, for their Answering Statement to Claimant's Demand, state as follows: 1. Claimant's Demand is so vague and ambiguous that Respondents cannot properly prepare a response or prepare for an arbitration hearing, and thus, Claimant should be required to restate the allegations, claims, damages, losses, and all relief sought in the Demand with more specificity.

2. Respondents generally deny each of the allegations and claims asserted in the Demand. Furthermore, Respondents also generally deny any liability to Claimant for any of the damages, losses, or other items sought in the Demand. Finally, Respondents generally deny that Claimant is entitled to any of the relief sought in the Demand.

WHEREFORE, subject to and without waiver of their Objections and Reservations of Rights and their pending Motion to Dismiss in the Lawsuit, having answered and generally denied Claimant's Demand, Respondents request that Claimant's Demand be denied and/or that the arbitrator(s) enter an award in favor of Respondents and against Claimant; Respondents also request that the arbitrator(s) grant Respondents their costs and expenses, including reasonable

R.P. Appx. 194 attorneys' fees, incurred herein; Respondents further request any other and further relief deemed just and proper.

RESPONDENTS' AFFIRMATIVE DEFENSES TO CLAIMANT'S DEMAND Subject to the foregoing Objections and Reservations of Rights and their pending Motion to Dismiss in the Lawsuit, Respondents, for their Affirmative Defenses to Claimant's Demand, state as follows: 1. Claimant's Demand is so vague and ambiguous that Respondents cannot properly prepare a response or prepare for the arbitration hearing, and thus, Claimant should be required to restate the allegations, claims, damages, losses, and all relief sought in the Demand with more specificity.

2. Claimant's Demand fails to state a cause of action upon which relief can be granted.

3. Claimant's Demand is barred by Claimant's failure to comply with or satisfy conditions precedent to its right to arbitrate the claims in its Demand, where such failure constitutes a waiver of any contractual right to arbitrate, or the legal non-existence of an agreement to arbitrate such claims.

4. In the event it is judicially determined that the § 150.002 dismissal motion now pending in the Lawsuit is an arbitrable question, and only in such event, Claimant's Demand fails to comply with§ 150.002, TEX. C!V. PRAC. & REM. CODE, titled "Certificate of Merit," and, therefore, must be dismissed. Section 150.002 mandates that "in any action or arbitration proceeding in Texas for damages arising out ofthe provision of professional services by a licensed or registered professional, the plaintiff shall be required to file with the complaint an affidavit of a third-party licensed architect, licensed professional engineer ... ," meeting the

R.P. Appx. 195 qualifications set forth in§ 152.002(a)(l)-(3). The mandatory affidavit "shall set forth, specifically for each theory of recovery for which damages are sought, the negligence, if any, or other action, error, or omission of the licensed or registered professional in providing the professional service, including any error or omission in providing advice, judgment, opinion, or a similar professional skill claimed to exist, and the factual basis for each such claim." § 150.002(b), TEX. Crv. PRAC. & REM. CODE. Claimant did not file any certificate of merit, let alone one that complies with the requirements of§ 150.002(a) and (b), with the Arbitration Complaint. Section 150.002(e), TEX. Crv. PRAC. & REM. CODE mandates that a claimant's failure to file the affidavit(s) required under§§ 150.002(a) and (b) (commonly known as a "certificate of merit"), in accordance with § 150.002, shall result in the dismissal of the arbitration complaint against the defendant(s), and the dismissal may be with prejudice.

5. Each of Claimant's claims are time barred under§§ 16.003 and 16.004, TEX. Clv.

PRAC. & REM. CODE (and/or any other applicable limitations periods) in that Claimant's claims were filed more than two or four years (as appropriate) after Claimant's claims arose and/or accrued, including any tolling periods that may apply. Specifically, Claimant discovered, or should have discovered, the physical manifestations of the alleged design and/or construction defects in subject property that caused the alleged losses and/or damages sought in the Demand more than two or four years (as appropriate) before Claimant filed its Demand, including any tolling periods that may apply. Furthermore, regardless of when Claimant may have actually discovered the physical manifestations of the alleged design and/or construction defects in the subject property, Claimant's claims with respect thereto arose and/or accrued upon substantial completion of the subject property, which occurred on or about March 6, 2007, pursuant to Sub- section 13.7.1(.1) ofthe General Conditions to Claimant's written contract with Clayco, which

R.P. Appx. 196 governs the commencement of any applicable statutory limitations periods, and provides as follows with respect to any acts or failures to act occurring prior to substantial completion of the subject property: "[A]ny applicable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than such date of Substantial Completion." Therefore, each of Claimant's claims with respect to any alleged design and/or construction defects are time-barred, where said claims were not filed within two or four years (as appropriate) of substantial completion ofthe subject property, which occurred on or about March 6, 2007.

6. Claimant is estopped to enforce any contracts or agreements with Respondents upon which it may seek damages, losses, or other relief.

7. Claimant has waived its right to enforce any contracts or agreements with Respondents upon which it may seek damages, losses, or other relief.

8. Claimant's alleged damages and/or losses, if any (which Respondents expressly deny), should be barred and/or reduced because Claimant has failed to mitigate its alleged damages and/or losses, including but not limited to Claimant's performance of unnecessary and destructive "repairs" on the building. Said "repairs" caused or contributed to Claimant's alleged damages. In addition, Claimant's failure to perform necessary maintenance and/or other upkeep on the portions of the property that are the subject of Claimant's claims substantially contributed to Claimant's alleged damages and/or losses.

9. To the extent, if any, that Respondents may be found liable to Claimant for any of the damages and/or losses sought in the Demand (which liability Respondents expressly deny), Respondents are entitled to deductions, credits, and/or setoffs for, among other things, the depreciation of the subject property since substantial completion thereof.

R.P. Appx. 197 10. Claimant's breach of implied warranty claim is barred by virtue of Clayco' s express written disclaimer of any and all express or implied warranties in connection with the subject property, which disclaimer is contained in the General Conditions of Claimant's written contract with Clayco.

11. Claimant's losses and/or damages, if any (which Respondents expressly deny), are the result of Claimant's comparative negligence, which is sufficient to bar or proportionately reduce any recovery by Claimant under applicable law.

12. Claimant's losses and/or damages, if any (which Respondents expressly deny), are the result of actions of third parties over whom Respondents had no control or right to control.

13. Claimant's recovery, if any, must be reduced by any amounts received from any collateral sources pursuant to applicable law.

14. Respondents hereby incorporate by reference any other and further affirmative defenses identified or made known through the course of discovery in this matter, and expressly reserve the right to so amend their affirmative defenses.

BLITZ, BARDGETT & DEUTSCH, L.C.

By:.____~~~~~~~-------- , Mi . ouri Bar #45340 Douglas A. tockenberg, Missouri Bar #57865 S. Central Ave., Ste. 1650 St. Louis, MO 63105 (314) 863-1500 (314) 863-1877 (facsimile) rta e1 bdlc.com [email protected] Attorneys for Respondents Clayco, Inc. and FS Architecture, PC

R.P. Appx. 198 CERTIFICATE OF SERVICE I hereby certify that on the /~day of March, 2015, a true and accurate copy of the foregoing document was filed with the American Arbitration Association and served upon the following parties of record as follows: Erika G. Kleinschmidt Director of ADR Services American Arbitration Association Central Case Management Center 13727 Noel Road, Suite 700 Dallas, TX 75240 Via e-mail to: [email protected] Gregory C. Noschese Munsch Hardt Kopf & Harr, PC North Akard Street, Suite 3800 Dallas, TX 75201-6659 Via e-mail to: [email protected] Attorney for Claimant Intellicenter Dallas Investments LP

R.P. Appx. 199 AMERICAN ARBITRATION ASSOCIATION Construction Industry Arbitration INTELLICENTER DALLAS § INVESTMENTS, LP, § § Claimant, § § § v. § Case Number: 01-14-0001-0249 § § CLAYCO, INC., and FS § ARCHITECTURE, P.C., § § Respondents. §

ORDER PARTIALLY GRANTING AND PARTIALLY DENYING RESPONDENTS' MOTION TO DISMISS ON STATUTES OF LIMITATIONS The arbitration panel has reviewed and considered Respondents' August 14, 2015 Motion to Dismiss Arbitration On Statutes of Limitations, filed by both of the above named Respondents in this matter. The panel also considered Claimant's August 24, 2015 Response to same, as well as Respondents' Reply of August 31, 2015. In addition to the above submissions, the panel received and deliberated upon the oral argument of the parties in support of said submissions.

After consideration of all of the above, the panel determines that Respondent Clayco, Inc.'s ("Clayco") Motion to Dismiss is well taken, and should be Granted for the reasons that briefly follow. The panel further determines that Respondent FS Architecture, P.C.'s ("FSA") Motion to Dismiss is not well taken, and should be Denied.

Intellicenter Dallas Investments, L.P. ("Claimant" or "lntellicenter" brought claims against Clayco for breach of contract, as well as for failure to indemnify, negligent misrepresentation, and fraud. The majority of the facts relevant and necessary to the Order on Respondents' Motion to Dismiss Page 1

R.P. Appx. 200 determination of Clayco's Motion against Claimant are not in dispute or are conclusively established. There is no dispute that the contract between the parties in this matter is a modified AlA Document Alll - 1997 Standard Form of Agreement Between Owner and Contractor design-build contract ("Standard Form"), which incorporates a modified AlA Document A201 - 1997 General Conditions of the Contract for Construction ("General Conditions").

There is also no dispute that the date of Substantial Completion of the Project was March 6, 2007. The parties also agree that Section 13.7 of the General Conditions of the Contract ("Commencement of Statutory Limitations Period,") governs the accrual of any and all claims arising from any acts or omissions related to the Contract. Specifically, Section 13.7.1(3) provides, as between the Owner and Contractor, as follows : "[a]s to acts or failures to act occurring after the payment, any applicable statute of limitations shall commence to run and any alleged cause of ·action shall be deemed to have accrued in any and all events not later than the date of any act or failure to act by the Contractor pursuant to any Warranty provided under Section 3.5, the date of any correction of the I

Work or failure to correct the Work by the Contractor under Section 12.2, or the date of actual commission of any other act or failure to perform any duty or obligation by the Contractor or Owner, whichever occurs last.

Section 3.5 of the General Conditions, provides that the warranty period is for one (1) year from the March 6, 2007 date of Substantial Completion. Consequently, any claims, as between Owner and Contractor, relating to any acts or failures to act occurring subsequent to the date of final payment, would begin to accrue no later than March 6,

Order on Respondents' Motion to Dismiss Page2

R.P. Appx. 201 2008 and the applicable statute of limitations would begin to run no later than March 6, 2008.

Intellicenter argued that the "accrual" provision constitutes an unenforceable contractual waiver of the application of the discovery rule, and requests that the panel hold that such a provision is void as against the public policy of the state of Texas.

Although the parties presented cogent arguments both for and against Intellicenter's request, Intellicenter was unable to present any Texas case authority for the proposition that the patties' bargained-for allocation of risk should be disturbed under the circumstances of this case. Virtually a ll sister State courts who have considered the enforceability of Section 13.7 of AlA Document A201 have held that it does not violate public policy . Absent any Texas authority to the contrary, this arbitration panel declines the invitation to interfere with the bargain entered into and memorialized by these parties.

Consequently, Intellicenter's request for relief from the contractual provision waiving application of the discovery rule is denied.

Alternatively, lntellicenter argues that its claims were revived pursuant to the operation of§ 16.069 of the Texas Civil Practice and Remedies Code, which provides that "if a counterclaim or cross claim arises out of the same transaction or occurrence that is the basis of an action, a party to the action may file the counterclaim or cross claim, even though as a separate action it would be barred by limitation on the date the party's answer is required," so long as the counterclaim or cross claim is filed within thirty days after the date ~he party's answer is required.

Clayco filed their action in District Court on February 20, 2015, and amended their petition on March 16, 2015. Clayco's District Court pleading sought to have the

Order on Respondents' Motion to Dismiss Page 3

R.P. Appx. 202 Court determine that Intellicenter's claims were time-barred, and sought to enjoin Intellicenter and the AAA from proceeding with the arbitration. Clayco also sought dismissal of the arbitration matter based on the certificate of merit statute. Clayco also sought attorney's fees as appropriate.

On March 2, 2015, in response to Clayco's District Court filing, Intellicenter filed claims which Intellicenter asserts are counterclaims arising out of the same transaction or occurrence, such that they would no longer be barred, under Texas Civil Practice and Remedies Code § 16.069.

After review and consideration of the parties' submissions on this issue, it is clear that Intellicenter's claims should not be considered to be "automatically revived" by § 16.069, because Intellicenter's claims cannot fairly be characterized as cross-claims or counterclaims to the declaratory relief that Clayco sought in the District Court action.

The relief Clayco sought was both declaratory and defensive in nature. Additionally, Clayco's generic request for attorney's fees, as appropriate, does not serve to convert the declaratory relief sought by Clayco, into the type of affirmative relief that would allow for Intellicenter's otherwise time-barred claims to be revived under§ 16.069.

Finally, Intellicenter asserts that its arbitration claims are timely because they were filed within one year after Clayco allegedly refused Intellicenter's indemnification request. Intellicenter's argument fails because the indemnification provision relied upon by Intellicenter (Section 4.4.1) is an indemnification provision which is not triggered by liability claims between the parties, but instead obligates Clayco to protect Intellicenter against the liability claims of third parties or actors who are not parties to the agreement.

Adoption of Intellicenter's interpretation (that Intellicenter can sue on Intellicenter's own

Order on Respondents' Motion to Dismiss Page4

R.P. Appx. 203 claims, within a certain period of time that only begins to run after the rejection of a request for indemnity) would render meaningless several provisions of the contract (including the accrual provision discussed above). The parties' briefing presented no evidence that the parties intended to allow for such a circular result.

JnteUicente.r's claims against Clayco in this arbitration, were all ftled outside the respective statute of limitations, but for application of the discovery rule. For the reasons described above, the discovery rule does not apply to lntellicenter's claims against Clayco. Consequently, the arbitration panel determines that lntellicenter's claims against Clayco are time-barred and Clayco's Motion to Dismiss should be; and is hereby, GRANTED.

SIGNED THIS 3RDDA Y OP NOVEMBER, 2015.

RON. CARLOS G. LOPEZ C OF ARBITRATION PANEL

Order on Respondents' Motion to Dismiss Page 5

R.P. Appx. 204 FILED DALLAS COUNTY 2/20/2015 4:39:14 PM FELICIA PITRE DISTRICT CLERK CIT/ ESERVE DC-15-02018 CAUSE NO. ________________ Gay Smith FORUM STUDIO, INC. and § IN THE DISTRICT COURT CLAYCO, INC., § § Plaintiffs, § § V. § ________ JUDICIAL DISTRICT § INTELLICENTER DALLAS § INVESTMENTS LLP, § § Defendant. § DALLAS COUNTY, TEXAS

PLAINTIFFS’ ORIGINAL PETITION TO THE HONORABLE JUDGE: Plaintiffs Forum Studio, Inc. and Clayco, Inc. file this Original Petition pursuant to Sections 171.023, 171.096, 150.002 and 37.001 et seq., Tex. Civ. Prac. & Rem. Code, complaining of Defendant Intellicenter Dallas Investments LLP, and for causes of action show as follows: DISCOVERY CONTROL PLAN 1. Plaintiffs intend to conduct discovery under Level 1 of the Texas Rules of Civil Procedure, Rule 190.2.

PARTIES 2. Plaintiff Clayco, Inc. (“Clayco”) is a Missouri corporation with its principal place of business in St. Louis County, Missouri, that transacts business in Texas.

3. Plaintiff Forum Studio, Inc. (“Forum”) is a Missouri corporation with its principal place of business in St. Louis County, Missouri, that transacts business in Texas.

4. Defendant Intellicenter Dallas Investments LLP (“Intellicenter”) is a Delaware limited liability partnership that transacts business in Texas, that may be served with citation by

PLAINTIFFS’ ORIGINAL PETITION Page 1 R.P. Appx. 205 delivery of the same to its registered agent in Texas: National Registered Agents, Inc., 1021 Main Street, Suite 1150, Houston, Texas 77002.

JURISDICTION AND VENUE 5. Jurisdiction is proper pursuant to §§ 171.023, 171.096, 150.002 and 37.001 et seq., Tex. Civ. Prac. & Rem. Code. 6. Mandatory venue in Dallas County exists pursuant to § 15.001(b)(1), Tex. Civ. Prac. & Rem. Code because: (a) § 171.096(a) and (b), Tex. Civ. Prac. & Rem. Code mandates that Dallas County is the proper venue because it is the county in which Defendant resides or has a place of business and/or the parties’ agreements provide that any arbitration that is to be held to resolve arbitrable disputes between them must be heard in Dallas County; and (b) § 15.020, Tex. Civ. Prac. & Rem. Code mandates venue in Dallas County because this case involves an action arising out of a “major transaction” that is evidenced by a written agreement in which the parties selected and agreed upon Dallas County as the mandatory venue of any proceedings between them.

7. Plaintiffs do not seek a monetary recovery other than attorneys’ fees, as may be authorized by law, in an amount not to exceed $100,000.00.

FACTS A. The Contract for the Design and Construction of the Building 8. On or about May 19, 2006, Intellicenter (as owner) and Clayco (as design-build contractor) entered into a modified AIA Document A111 – 1997 Standard Form of Agreement Between Owner and Contractor design-build contract (“Standard Form”) for the design and construction of a four-story office building located in Irving, Texas (the “Building”). The Standard Form incorporates by reference a modified AIA Document A201 – 1997 General Conditions of the Contract for Construction (“General Conditions”). The Standard Form also PLAINTIFFS’ ORIGINAL PETITION Page 2 R.P. Appx. 206 incorporates by reference the Outline Specifications. The Standard Form, General Conditions and Outline Specifications are hereinafter collectively referred to as the “Contract.”

9. Pursuant to Subsection 13.1.1 of the General Conditions, the parties agreed that Texas law governs the Contract.

10. The Standard Form describes the subject project (i.e., the Building) as follows: “The design and construction of a 4-story speculative office building, consisting of approximately 211,637 gross square feet, located at 3701 Regent Blvd., Irving, Texas.”

11. Pursuant to the Contract, Clayco provided architectural and engineering services to Intellicenter. The Standard Form identifies Forum as the architect of the Building, and Forum performed architectural services in connection with the design of the Building pursuant to a separate contract with Clayco. Forum is an architectural firm licensed to provide architectural services in several states, including Texas.

12. Forum separately contracted for certain structural, mechanical, electrical, and civil engineering services with other design professionals.

13. Section 13.7 of the General Conditions is titled “COMMENCEMENT OF STATUTORY LIMITATIONS PERIOD,” and governs the commencement of statutory limitations periods with respect to claims arising from the Contract, and in this regard Subsection 13.7.1 of the General Conditions provides as follows: As between the Owner and Contractor: .1 Before Substantial Completion. As to acts or failures to act occurring prior to the relevant date of Substantial Completion, any applicable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than such date of Substantial Completion. .2 Between Substantial Completion and Final Certificate for Payment. As to acts or failures to act occurring subsequent to the relevant date of Substantial Completion and prior to issuance of the final Certificate for Payment, any applicable statute of limitations PLAINTIFFS’ ORIGINAL PETITION Page 3 R.P. Appx. 207 shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than the date of issuance of Owner is required to make the final Certificate for Payment; payment hereunder; and .3 After Final Certificate for Payment. As to acts or failures to act occurring after the relevant date of issuance of the final Certificate for Payment, payment, any applicable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than the date of any act or failure to act by the Contractor pursuant to any Warranty provided under Section 3.5, the date of any correction of the Work or failure to correct the Work by the Contractor under Section 12.2, or the date of actual commission of any other act or failure to perform any duty or obligation by the Contractor or Owner, whichever occurs last.

14. Construction of the Building was substantially complete on March 6, 2007, as evidenced by an AIA Document G704 – 2000 Certificate of Substantial Completion issued by Forum. Intellicenter never contested Forum’s certification of substantial completion.

B. The Commencement of Arbitration Proceedings with the AAA 15. On or about September 5, 2014, Intellicenter filed a Demand for Arbitration (the “Arbitration Complaint”) with the American Arbitration Association (“AAA”), and commenced Case No. 01-14-0001-0249 against Forum and Clayco (the “Arbitration Case”). A true and accurate copy of the Arbitration Complaint is attached hereto as “Exhibit 1.”1 16. The filing of the Arbitration Complaint commenced an action or arbitration proceeding for damages against Forum and Clayco arising out of the provision of professional services by a licensed or registered professional. To date, no arbitrators have been selected for the arbitration and Forum and Clayco have not filed an answering statement, and they are not required to do so, as detailed below.

In January of 2015, Intellicenter’s foreign entity registration to do business in Texas expired or terminated, as did its right to maintain any suits filed in Texas. See § 9.051(b), Tex. Bus. Org. Code. PLAINTIFFS’ ORIGINAL PETITION Page 4 R.P. Appx. 208 C. Texas’ “Certificate of Merit” Requirement Under § 150.002, Tex. Civ. Prac. & Rem. Code 17. Section 150.002, Tex. Civ. Prac. & Rem. Code, titled “Certificate of Merit,” mandates that “in any action or arbitration proceeding in Texas for damages arising out of the provision of professional services by a licensed or registered professional, the plaintiff shall be required to file with the complaint an affidavit of a third-party licensed architect, licensed professional engineer . . .,” meeting the qualifications set forth in § 152.002(a)(1-3). The mandatory affidavit “shall set forth, specifically for each theory of recovery for which damages are sought, the negligence, if any, or other action, error, or omission of the licensed or registered professional in providing the professional service, including any error or omission in providing advice, judgment, opinion, or a similar professional skill claimed to exist, and the factual basis for each such claim.” § 150.002(b), Tex. Civ. Prac. & Rem. Code. 18. Intellicenter did not file any certificate of merit, let alone one that complies with the requirements of § 150.002(a) and (b), with the Arbitration Complaint.

19. Section 150.002(e), Tex. Civ. Prac. & Rem. Code mandates that a plaintiff’s failure to file the affidavit(s) required under § 150.002(a) and (b) (commonly known as a “certificate of merit”), in accordance with § 150.002, shall result in the dismissal of the complaint against the defendant(s), and the dismissal may be with prejudice.

20. As defendants sued in an arbitration proceeding for damages arising out of the provision for professional services, Defendants are not required to answer the Arbitration Complaint, and instead, they may seek its dismissal. See § 150.002(d) and (e), Tex. Civ. Prac. & Rem. Code.

PLAINTIFFS’ ORIGINAL PETITION Page 5 R.P. Appx. 209 D. Intellicenter’s Arbitration Complaint is also Time-Barred Under Texas Law 21. Independent of the Chapter 150 dismissal requirement described above, Intellicenter’s claims are also time barred.

22. Subsection 13.7 of the General Conditions governs the commencement of statutory limitation periods with respect to claims arising from the Contract, and Subsection 13.7.1(.1) provides as follows with respect to any “acts or failures to act” that occurred prior to the substantial completion of the Building: “[A]ny applicable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than such date of Substantial Completion” (emphasis added).

23. Each of the claims in Intellicenter’s Arbitration Complaint arise from and directly relate to the Contract, and further, each of the claims concerns “acts or failures to act” that occurred, if at all, prior to the date of Substantial Completion of the Building.2 24. As previously alleged, Construction of the Building was substantially complete on March 6, 2007, the contractual accrual date of any claims or causes of action. The Contract expressly waives application of the so-called discovery rule, as a means for achieving equitable tolling of the applicable limitations period.

25. Intellicenter’s claims in the Arbitration Complaint are governed by either a two or four year limitations period. See §§ 16.003(a), 16.004(a)(3) and 16.004(a)(4), Tex. Civ. Prac. & Rem. Code. The Arbitration Complaint was filed with the AAA on September 5, 2014, which is over seven years and five months after accrual of the asserted claims, and commencement of the limitations period(s). The claims are time barred.

Notwithstanding Forum and Clayco’s statute of limitations argument herein, they each continue to deny any liability to Intellicenter in connection with the claims in the Arbitration Complaint.

PLAINTIFFS’ ORIGINAL PETITION Page 6 R.P. Appx. 210 CAUSES OF ACTION Count One: Application to Stay the Arbitration Case 26. Section 171.023, entitled “Proceeding to Stay Arbitration,” authorizes a court to stay an arbitration commenced or threatened, on application and a showing that there is not any agreement to arbitrate.” § 171.023(a), Tex. Civ. Prac. & Rem. Code. 27. Intellicenter’s Arbitration Complaint purports to assert claims and/or causes of action that arise from and relate to the Contract, which adopted Texas law as the governing law in Subsection 13.1.1 of the General Conditions. Because the Arbitration Complaint commenced an arbitration proceeding for damages arising from the provision of professional services, and Intellicenter agreed to the application of Texas law (which includes Chapter 150, Tex. Civ. Prac. & Rem. Code), its failure to comply with the certificate of merit filing requirement in § 150.002(a) and (b) constitutes Intellicenter’s failure to satisfy a statutory condition precedent to any purported right to arbitrate the claims in the Arbitration Complaint. As a matter of law, including but not limited to § 150.002(d), Tex. Civ. Prac. & Rem. Code, until that condition precedent is satisfied (if it can be satisfied), there is no agreement to arbitrate. And, if the condition precedent cannot be satisfied (and in this case, it cannot be satisfied), there is a waiver of any purported right to arbitrate the claims in the Arbitration Complaint, because dismissal of the Complaint is statutorily mandated with prejudice.

28. Pursuant to § 150.002(e), Tex. Civ. Prac. & Rem. Code, the Arbitration Complaint should be dismissed, with prejudice, because of Intellicenter’s failure to comply with § 150.002(a) and (b) and, if necessary, with prejudice due further to the fact that the claims in the Arbitration Complaint are time barred under the applicable statutes of limitations. See below, Count Two.

PLAINTIFFS’ ORIGINAL PETITION Page 7 R.P. Appx. 211 29. Pending the Court’s adjudication of the dismissal motion, a stay of the Arbitration Case is appropriate and necessary for the following reasons: a. There is no agreement to arbitrate under the circumstances presented because of Intellicenter’s failure to comply with § 150.002(a) and (b); b. A motion to dismiss under Chapter 150 is, by statute, a procedural request for relief that must be considered on an interlocutory basis, prior to the occurrence of any proceeding on the merits, if any such proceeding can occur; and, c. Any activity in the Arbitration Case will interfere with the parties’ rights and obligations to adjudicate the occurrence or satisfaction of the mandatory conditions precedent to the mere occurrence of the Arbitration Case.

30. Plaintiffs apply for such a stay.

Count Two: Application/Motion for Dismissal and Request for Declaratory Judgment 31. For the reasons set forth herein above, Intellicenter’s Arbitration Complaint must be dismissed because no certificate of merit was filed with the Arbitration Complaint, where one was required by § 150.002, Tex. Civ. Prac. & Rem. Code. Plaintiffs apply for and/or move for a dismissal with prejudice.

32. A justiciable controversy exists between Forum and Clayco, on the one hand, and Intellicenter, on the other hand. Because Texas law does not permit amendment of the Arbitration Complaint to cure Intellicenter’s failure of compliance with the § 150.002 certificate of merit filing requirement, the Court’s dismissal is a final judgment on the Arbitration Complaint, so the Court should enter a judgment declaring such non-compliance as grounds for dismissal of the Arbitration Complaint, with prejudice.

33. Pleading further or in the alternative, under its equity jurisdiction, the Court should declare that the claims in the Arbitration Complaint are time barred by application of the

PLAINTIFFS’ ORIGINAL PETITION Page 8 R.P. Appx. 212 statute of limitations set forth in Chapter 16, Tex. Civ. Prac. & Rem. Code, as a further basis for its dismissal, with prejudice.

34. The foregoing declarations will resolve the disputes, controversies and insecurities that now exist between the parties, regarding whether the Arbitration Claims are arbitrable, under the prevailing circumstances.

35. The Court should award Plaintiffs reasonable and necessary attorneys’ fees, pursuant to § 37.009, Tex. Civ. Prac. & Rem. Code. CONDITIONS PRECEDENT 36. All conditions precedent to Plaintiffs’ right to file this petition and to recover the relief requested herein have occurred or been performed.

PRAYER WHEREFORE, PREMISES CONSIDERED, Plaintiffs Clayco, Inc. and Forum Studios, Inc. pray that Defendant Intellicenter Dallas Investments, LLP be cited to appear and answer, and that on final trial, Plaintiffs have the interim relief applied for above and a final judgment against Defendant, including the following: a. An interim order, pursuant to § 171.023, Tex. Civ. Prac. & Rem. Code, staying any further proceedings in the Arbitration Case; b. Judgment making the declarations prayed for above and/or dismissing the Arbitration Complaint, with prejudice; c. Judgment awarding Plaintiffs reasonable and necessary attorneys’ fees and costs of court; and, d. Any other and further relief the Court deems just and proper.

PLAINTIFFS’ ORIGINAL PETITION Page 9 R.P. Appx. 213 Respectfully submitted,

/s/ Kenneth B. Chaiken Kenneth B. Chaiken State Bar No. 04057800 [email protected] CHAIKEN & CHAIKEN, P.C.

Legacy Town Center III 5801 Tennyson Pkwy, Suite 440 Plano, Texas 75024 (214) 265-0250 telephone (214) 265-1537 facsimile ATTORNEYS FOR PLAINTIFFS OF COUNSEL: R. Thomas Avery Missouri State Bar No. 45340 [email protected] BLITZ, BARDGETT & DEUTSCH, LC South Central Avenue, Suite 1650 St. Louis, Missouri 63105 (314) 863-1500 telephone (314) 863-1877 facsimile PRO HAC VICE MOTION TO BE FILED

PLAINTIFFS’ ORIGINAL PETITION Page 10 R.P. Appx. 214 EXHIBIT 1 R.P. Appx. 215 AMERICAN ARBITRATION ASSOCIATION ONLINE FILING ACKNOWLEDGEMENT This confirmation serves as the Demand for Arbitration or Request for Mediation for this filing.

To institute proceedings, please send a copy of this form and the parties' dispute resolution agreement to the opposing party.

Case#: 01-14-0001-0249 This will acknowledge receipt of a request for dispute resolution services tor the claim and parties detailed below.

This claim has been filed for Arbitration This matter has been filed in accordance with Construction Industry Arbitration Rules The fee paid at the time of filing was $8,200.00 This request was received by the AAA on 05-Sep-2014

Claim Description On or about May 19, 2006, Intellicenter Dallas Investments, LP ("lntellicenter") contracted with Clayco Inc ("Contractor") under a Design Build contract ("Design Build Contract") tor the design and construction of a 4 story speculative office building consisting of approximately 211,637 square feet located at 3701 Regent Boulevard, Irving Texas ("Project").

The Design Build Contract provided that the Contractor shall be responsible to lntellicenter for acts and omissions of the Contractor's employees, subcontractors and their agents and employees, and other persons, including the Architect, engineers and other Design Professionals, performing any portion of the Contractor's obligations under Article 3 with respect to the design of the Project.

The Design Build Contract Documents included a specification manual which required the elevated tloor slabs to be designed for a I OOlb live load with Code allowance reductions. The Contractor completed construction on March 6, 2007 as indicated in the architect's certification under the Certificate of Substantial Completion. In September 2007, six months aller Substantial Completion, the architect. Forum Studio Inc.(" FS") .• represented to lntellicenter that the Project was built in accordance with the plans and specifications. Further, FS indicated that it understood lntellicenter was relying upon the architect's representation and that lntellicenter may pursue a claim in the event that lntellicenter has any loss or damage as a result of the facts and circumstances that exist at the Project which made any of the FS's certifications incorrect or inaccurate.

Last year, as Intellicenter was preparing the building for sale, a broker noted some cracking in the exterior tilt panels. After evaluating the cracks, the design, and the building, lntelliccntcr learned that the cracks, some of which appeared to have been intentionally concealed by repair at the time of initial construction, were the result

R.P. Appx. 216 of inadequate structural design in portions of the perimeter concrete wall panels and a portion of the steel beam to wall panel connections in such a way that some, if not all, failed to meet applicable building code based upon contract specitied live load on design drawings.

Upon its first discovery of the cracks, lntellicenter wmte Contractor and 1·equested that Contractor co1'1'ect the deticient design and/or construction. lntellicenter even met with Contractor in person and requested more information. Despite the request to repair the deficiency, Contractor has refused to correct the design and construction deficiencies. Because of Contractor's refusal, lntellicenter has sought bids and contracted for the Project to be repaired to correct the defects. Until undertaking these repairs, lntellicenter had not made any repairs to the outside of the Project.

lntellicenter tiles this demand for arbitration to recover the losses it has sustained as a result of Contractor's and/or FS's breach of contract, breach of implied warranty, unjust enrichment, deticient design, fraud and/or negligent misrepresentation. lntellicenter also seeks to recover its attorney's fees, and all reasonable and necessary costs and expenses recoverable under the Design Build Contract and/or applicable law and further seeks all other reliefpermitted by law.

Claim Amount $1.500.000.00 Do you have a Non-monetary aspect to your claim? N Additional Damages Amount Attorney fees Interest Other Fee Schedule Option Standard ADR Agreement Contained in AlA Document.

Parties and Representatives Party 1 Category Owner Name Company Name lntellicenter Dallas Investments LP Address 8115 Preston Road Suite 700 Dallas, TX 75225 Phone Fax Email The Party is the Company Representative 1 Name Gregory C. Noschese Firm Name Munsch Hardt KopfHarr

R.P. Appx. 217 Address 500 North Akard Suite 3800 Dallas, TX 75201 Phone Fax Email [email protected] Party 2 Category Design I Builder Name Company Name Clayco Inc. Address 2199lnnerbelt Business Drive St. Louis, MO 63114 Phone Fax Email The Party is the Company Representative 2 Name Thomas Avery Firm Name Address 120 South Central Avenue Suite 1650 St. Louis , MO 63105 Phone Fax Email Party 3 Category Architect Name Company Name FS Architecture. PC Address c/o Forum Studios, Inc. 2199 Innerbelt Business Ct1·. Dr. St. Louis, MO 63!14 Phone Fax Email The Party is the Company Representative 3 Name Registered Agent Firm Name FS Architecture, PC Address c/o Forum Studios. Inc. 2199 Jnnerbelt Business Ctr. Dr. St. Louis, MO 63114 Phone Fax Email

R.P. Appx. 218 EXHIBIT

= MEP DESIGN DOC'S = SlRUCTURAL DRAWINGS = TOPOICIVIL DOCUMENTS BORING INFO AVAILABLE l1o3o IFOUNOATION DRAWINGS I 12J120CTosl27ocTosl - - .. - - E:::::::. FOUNDATION DRAWINGS - .... - ...... ---.. .. .. - - - =TILTUP PANEL DESIGN STEEL BID PACKAGE READY FINAL SHELL & CORE DRAWINGS AVAILABLE

CLOSE ON LAND/SITE AVAILABLE TO KOLL =GRADING PERMIT REVIEW PROCESS <::::::::1 FOUNDATION PERMIT REVIEW PROCESS GRADING PERMIT ISSUED = BUit.DING PERMIT REVIEW PROCESS .. - -. BUILDING PERMIT ISSUED·- - -· .. - -· - - - - -

KOLL GMP REVIEW AND ACCEPTANCE BEGIN V.ORKIFINAL GMP ACCEPTANCE 9 BEGIN WORK/FINAL GMP ACCEPTANCE GMP FORMULATION PROCESS/BID PROCESS GMP FORMULATION PROCESS/BID PRocESS = ELEVATOR BID PROCESS c:::=======:::l ELEVATOR LEAD TIME .... -·- ·-- ·~ M,E,P,FP BID PROCESS .. - - - .. - -·-- .• - - - - - - - - ...... --- .. -- - - - - - .. - - - - .. - - .. - - - - - .... - - - .... - .. - - - - .. - 1:::1 STEEL BUYOUT =GLASS/CURTAIN WALL PROCUREMENT PROCESS c:::=======:::IGLASS/GLAZING LEAD TIME PROJECT AWARD -- ...... ------- STEELSHOPS/APPROVAL.IDELIVERY·- - - - .. ------ .. - - - - - - - - ...... ·- .. - - - - - ....... ..

9 AWARD STEEL

• MOBILIZE I SITE LAYOUT

R.P. Appx. 219 -SILTATION CONTROL/CLEAR SITE -MASS GRADING

c:::ll Ear1y bar KOLL DEVELOPMENT CO. - Progress bar FEBRUARY 20, 2006 -Crilicalbar DALLAS INTELUCENTER--O'MIIER SCHEDULE 211,637 SF -summary bar ATTACHMENT A • start milestone point • Finish mlfestone - - i::::::::::::::::::fsTORM SE'M:RSISTRUCTURESJtNLETS =====cONCRETE PAVING/IRRGATION SlEEVES

=BACKFILL CURBS/FINE GRADING FOR = SIDEWALKSmiiSC. CONCRETE

-FOUNDATION SYSTEMS Iii UNDERGROUND ELECTRIC/PLUMBING - POUR MUDSLAB ON GRADE (CASTING SLAB) -FORM. REINFORCE & POUR TILTUP PANELS - T I L T PANELS STRUCTURAL STEEL/DECKING/POUR DECKS (1 THRU 4) - .. •. .. .. .. - .. - - .... - .. - .. .... .. - .... - - .. - .. - ...... - .. - - - - - .. - - .... -- - - .... - .. - - - STRUCTURAL STEEL/DECKING/POUR DECKS (1 THRU 4) - - - - ..

=====>PATCH PANELS/ETCH/PAINT = = = = = = PUNCHED WINDOWS/STOREFRONT =MISCELLANEOUS STEEL/STAIRS 1330 !ECHANICAL SYSTEMS/ROOFTOP HVAC UNITS 40d 17AUG08 110CT06 = = = = = : : I MECHANICAL SYSTEMS/ROOFTOP HVAC UNITS 1260 ROOFING WORK 15<1 24AUG06 13SEP06 ... .. .. .. .. .... - ........ - - - - .... - ... -. - -.. -.. .. - -- - - - .. ... .. .. - - - - - - - - <::::::::::5 ROOFING WORK- -- .. - - •. - .. - .. - - .. - .. - .. - .. - 1380 PLUMBING RISERSIBATHROOM ROUGH-INS 350 24AUG06 11 OCT06 =====PLUMBING RISERS/BATHROOM ROUGH-INS = = = = = = = = STUDS/DRYWALL/FINISHES 1!!1 PUBLIC =======::::c DRYWALL SHAFTS 1!!1 STAIRS/ELEVATO t : : = = = = = = = POIIoER DISTRIBUTION/INTERIOR 1450 MECHANICAL UNITS SET-FINAL TERMINATIONS 15<1 14SEP06 040CT06 .... - ..... - - - - - - - .. - - - -- - ---- . -- - .... - - - - - - .. - - - - .. -- - - - - - - -,:;::::;:::fMECHANICAL UNITS SET-FINAL TERMINATIONS - - 1360 PERMANENT PO'M:R AVAILABLE 0 20SEP06 • PERMANENT PO'M:R AVAILABLE 1320 ELEVATOR CONSTRUCTION 55ci 21SEP06 06DEC06 -- ELEVATOR CONSTRUCTION ....... .. ................ __ __ ----· __ ----·-- ---CURTAINWALL 1590 CERAMIC TILE/PLUMBING FIXTURES/PARTITIONS : : 180CT06 24NOV06 _ - - - _ __ _ _ .. _ - _ _ - _ .. ___ ... - __ .. _ ..... _ - - _ ... _ _ _ _ _ ... _ ·- _ - _ - .... - .. __ ... - - - - - - :ERAMIC TILE/PLUMBING FIXTURESIPAij 1470 MAIN ENTRY AND REAR CANOPY WORK 3~ 230CT06 01DEC06 · MAIN ENTRY AND REAR CANOPYWOJ 1440 MAIN BUILDING DRIED IN 0 260CT06 • MAIN BUilDING DRIED IN 1720 MAIN LOBBY/ELEVATOR LOBBY FINISHES 47o 02NOV06 09JAN07

R.P. Appx. 220 c::::::!l Eartybar KOLL DEVELOPMENT CO. - Progress bar FEBRUARY 20,2006 -Crllicalbar DAUAS INTELUCENTER-OWNER SCHEDULE 211,637 SF -summary bar ATTACHMENT A • Start milestone point • Flnlsh mlestone ~~~~;·"~j;.."~~~~";~.;;;'RALDRAWINGs I s5dl06sEPosi21NOV051 ARCHITECTURALDRAWINGS = MEP DESIGN DOC'S =STRUCTURAL DRAWINGS = TOPO/CML DOCUMENTS • BORING INFO AVAILABLE 1030 FOUNDATION DRAWINGS 12< 120CT05 270CT05 - .. -- --- <::::::::i FOUNDATION DRAWINGS - .. - .. - - .. - - - - - .. -- 1560 TILTUP PANEL DESIGN 10< 210CT05 03NOV05 =TILTUP PANEL DESIGN 1300 STEEL BID PACKAGE READY 0 250CT05 • STEEL BID PACKAGE READY 1710 FINAL SHELL & CORE DRAWINGS AVAILABLE 0 22NOV05 • FINAL SHELL & CORE DRAWINGS AVAILABLE

CLOSE ON LAND/SITE AVAilABLE TO KOLL =GRADING PERMIT REVIEW PROCESS <::::::1 FOUNDATION PERMIT REVIEW PROCESS • GRADING PERMIT ISSUED =BUILDING PERMIT REVIEW PROCESS - - .. - - - --- .... - .. - - - - .. - .... --.-BUILDING PERMITISSUED- - - - ...... - - ·- ·- ..... - - - - .. ·- •• - - ·- - - --- .. - - - ..... -- - - - -- --- ·--- ... -

KOLL GMP REVIEW AND ACCEPTANCE • BEGIN \MlRKIFINAL GMP ACCEPTANCE - - - - - - GMP FORMULATION PROCESS/BID PROCESS =ELEVATOR BID PROCESS ========::~ELEVATOR LEAD TIME ---- - - - - - - - - ·- -t::::::::JM,E,P,FPBIDPROCESS---- - - -·--- t::1 STEEL BUYOUT =GLASS/CURTAIN WALL PROCUREMENT PROCESS c:::=======::JGLASS/GLA21NG LEAD TIME • PROJECT AWARD - - - - - - - - - - - - .. - - - .. - -- STEEL SHOPS/APPROVAL/DELIVERY ... - --------------- --------------·--- • AWARD STEEL

• MOBiliZE I SITE LAYOUT

R.P. Appx. 221 -SILTATION CONTROlJCLEAR SITE -MASS GRADING

I:Zi::::l Early bar KOLL DEVELOPMENT CO. - Progress bar FEBRUARY 20, 2DOe -Critical bar DALLAS INTELUCENTER~WNER SCHEDULE 211,637 SF -summary bar AITACHMENTA • Start mHestone point • Finish rnltestone .. - ~STORM SEVERS/STRUCl\JRES/INLETS ====::=JCONCRETE PAVINGIIRRGATION SLEEVES

= BACKFIUL CURBS/FINE GRADING FOR = SIDEWAU<sn.!ISC. CONCRETE

-FOUNDATION SYSTEMS liil UNDERGROUND ELECTRIC/PLUMBING • POUR MUDSLAB ON GRADE (CASTING SLAB) -FORM, REINFORCE & POUR TIL1\JP PANELS - T I L T PANELS .•.• - .• - .. ~ - - .• • • • • • • STRUCTURAL STEEL.IDECKINGIPOUR DECKS (1 THRU 4) = = = = : : : l PATCH PANELS/ETCH/PAINT = = = = = : : = J PUNCHED 'MNDOWSISTOREFRONT = MISCEULANEOUS STEEL/STAIRS = = = = = : : : l MECHANICAL SYSTEMS/ROOFTOP HVAC UNITS ••••••• " • - • • .• • • - • • • • • ••• - • .• • • - - - - : . ·-ROOFING VIORK • • - • • • • • " - - - • - •••.

====::=J PLUMBING RISERSIBATHROOM ROUGH-INS = = = = = = = = STUOSIDRYWAUJFIMSHES@ ========DRYWALL SHAFTS @j STAIRSIELEVATavl 1350 POVER DISTRIBUTION/INTERIOR PANELS 55< 14SEP06 29NOV06 1450 MECHANICAL UNITS SET-FINAL TERMINATIONS 15< 14SEP06 040CT08 --. ----- • - - - - ••.. - -. - - • - - •• -. - • • • • • - - - .. - - • - - - - • - "ci:::::::::iMECHANICALUNITSSET-FINAL TERMINATIONS •. --- 1360 PERMANENT POVER AVAILABLE 0 20SEP06 .PERMANENT POVER AVAILABLE 1320 ELEVATOR CONSTRUCTION 55< 21SEP06 06DEC06 ELEVATOR CONSTRUCTION 1370 CURTAINWALL 25< 21SEP06 2SOCT06 -CURTAINWALL 1590 CERAMIC TILE/PLUMBING FIXTURES/PARTITIONS 30< 160CT06 24NOV06 =CERAMIC TILE/PLUMBING FIXTURESIP~ 1470 MAIN ENTRY AND REAR CANOPY VI.I:JRK 30< 230CT06 01DEC06 - - • - - - - - - - - - • - - • .. .• • • • • - • • • - - • - - - •• - - - - . -·····- ···- · · - - · - - - · - - - MAINENTRYANDREARCANOPY 1440 MAIN BUILDING DRIED IN 0 260CT06 • MAIN BUILDING DRIED IN

• SUBSTANTIAL COMPLel

R.P. Appx. 222 J::El~Eartybar KOU. DEVELOPMENT CO. - Progress bar FEBR.UARY 20,2006 -Critical bar DALLAS INTELUCENTER...QVVNER SCHEDULE -summary bar 211,637 SF ATTACHMENT A ~'(~0 • Start milestone point • Finish nilestone EXHIBITB OUTLINE SPECIFICATIONS 211, 637 SQUARE FOOT SPECULATIVE OFFICE BUILDING INTELLICENTER- DALLAS for KOLLDEVELOPMENTCOMPANY February 20, 2006 DIVISION 1 -GENERAL REQUIREMENTS Section 1A- Summary of Work The project titled Intellicenter- Dallas for Koll Development is a proposed shell office building development located in Irving, Texas.

The project consists of(1), 4-story, building, totaling 211,637 gross square feet with parking as shown on the Glenn Engineering plans.

The exterior surface of the building is to be load bearing, tilt-up concrete, architectural wall panels, aluminum clad punched windows, with insulated tinted glass system and aluminum curtainwall glass system with insulated tinted glass units.

It is the goal of Koll Development to achieve basic LEED certification for Core & Shell (24 points). Refer to the attached Preliminary Project Checklist dated 8/9/05. The GMP includes the direct design and construction related costs associated with these items. Our GMP does not include the costs for the following LEED credits: Energy & Atmosphere - Credit 3 -Additional Commissioning Energy & Atmosphere - Credit 5 - Measurement & Verification Materials & Resources- Prereq. 1- Storage & Collection ofRecyclables Innovation in Design & Process - Credit 2 - LEED Accredited Professional Our GMP also excludes any costs associated with the LEED certification and associated Commissioning of the building systems.

Section 1B - General Conditions The Developer is Koll Development Company and shall provide the following items for the use of the Design/Builder (Clayco): 1. Phase I environmental report.

2. Soil Investigation and report; on-site materials testing and inspections.

3. Entry road and utilities to the site.

4. Topographical and boundary survey.

The Design/Builder (Clayco) shall include the following items as required for the execution and/or completion ofthe Work. PLEASE NOTE: This listing is not to be considered all inclusive nor complete, but merely as a guide for the major items to be included under this Division.

R.P. Appx. 223 Section 1B - General Conditions - continued 1. Civil engineering will meet the design/build requirements and will be provided by the design/build contractor.

2. Architectural and structural engineering, construction documents and specifications; the engineering documents shall include the plumbing, mechanical, electrical and fire protection work as these items are being completed by engineering consultants.

The design/builder shall cause the preparation and design of all construction drawings and specifications and incorporates the intent of the scope drawings and construction guidelines utilizing a licensed, registered, insured architect and engineer for all design and structural components of the building. The design/builder will cause the design to comply with all applicable local, state and national codes and all design requirements for obtaining the necessary permits. The design/builder will include any specialized design or consulting services needed.

Provide all shop drawings, cut sheets, samples, submittals and other required items for Owner's review. Simultaneously both design/builder and design professionals are to review and approve all shop drawings and submittals.

In addition to all other insurance requirements of design/builder set forth in these general conditions, or the general conditions attached to the AlA Contract Agreement, the design/builder shall require its architect and all other professional subcontractors to obtain and maintain professional errors and omission coverage in connection with such subcontractors work. Professional errors and omissions insurance shall be endorsed to provide contractual liability coverage. Such coverage for the architect and any other professional subcontractor shall be in amounts not less than $2,000,000 each. Certified copies of the policies evidencing such coverage shall be furnished at the same time as the other evidence of insurance required under this agreement.

3. Temporary utilities- water, telephone, power and portable toilet facilities shall be provided by the Design/Builder (Clayco) of sufficient capacity and at the locations required for their work. Pay for all costs to establish service and usage until the issuance of substantial completion notice.

4. Supervision- Any and all Design/Builder (Clayco) project site and office supervision required for The Work shall be included, including a full-time qualified field superintendent.

A part-time Project Manager will be provided to coordinate both design and construction and to serve as liaison between the design team, Owner's representatives, and the field superintendent. The cost of this project manager is included.

5. A progress schedule will be a part of the contract and the schedule will be updated and delivered to the Owner's representatives not less than monthly.

Direct project progress meetings at the jobsite. The Owner's representatives will be invited as well as the Owner project manager, all subcontractors and key equipment and material suppliers.

R.P. Appx. 224 2 Section 1B - General Conditions - continued There will be written minutes of the meetings and distributed copies to all parties concerned within three days following the meeting.

6. Provide progress photographs. Submit no less than 5 slides of the work in progress with each application for payment to document percent complete.

7. Submit payment requests monthly using AlA G702 format and G703 schedule of values.

Confirm billing procedures with the Owner's representatives.

8. The Design/Builder (Clayco) will submit all claims for changes to the Owner's representative for approval, including the add or credit cost of the change and the affect on contract completion date. No change order work will be started prior to Owner's approval.

9. Security- Provide and maintain job site security, as required to secure the project during construction term.

10. Insurance Coverage- Provide a certificate of insurance issued to the Owner evidencing insurance coverage as follows: Workmen's Compensation $1,000,000 General Liability including Contractual Liability $1,000,000 Comprehensive Auto $1,000,000 Builder's Risk Insurance- Included Provide $25,000,000.00 umbrella coverage.

11. Surveys and Lay-Out- Owner shall provide a monumented boundary survey of the parcel. The Design/Builder (Clayco) shall perform all work required for the lay-out of The Work including line and grade surveying.

12. Coordination of testing and inspection reports and recommendations with actual construction methods.

13. Materials and Workmanship- Materials used in The Work will conform to the latest Standard Specification of the American Society for Testing Materials, The American Concrete Institute, The American Institute of Steel Construction, American Welding Society, American Society of Mechanical Engineers, National Electric Code, N.E.M.A., American Institute of Electrical Engineers and the rules and regulations of the National Board of Fire Underwriters.

The workmanship will be consistent with the best practice of the various building trades and will conform to the standards of good construction for this class of work.

Where a product is specified by a trade name, a product of equal performance maybe substituted only with the prior approval of the Owner and Architect or Engineer of record.

R.P. Appx. 225 3 Section lB- General Conditions- continued 14. Color Selections- Owner and/or Architect will provide a finish color schedule ofthe exposed surfaces ofThe Work in a timely manner for the Design/Builder (Clayco)'s use in coordinating building shell.

15. Temporary Heat, Water and Power- Heat, water and power will be provided as required for construction. The permanent heating, cooling and electrical system will be utilize as required for construction use; thus the warranty for the equipment may start prior to the building substantial completion. The Builder has included the cost of operating the systems until Substantial Completion has been achieved.

16. Guarantees - Upon notice from the Owner, the Design/Builder (Clayco) will remedy any defects due to defective workmanship or materials which will appear within a period of one year from the date of Substantial Completion of The Work.

17. The following items are included in the General Conditions/General Requirements for the Design/Builder (Clayco ): a. office supplies, postage, telephone, shop drawing blueprints, reproduction costs, progress photographs, computer and EDP expenses, first-aid supplies, insurance and other such miscellaneous expenses.

b. Project staff including salaries and benefits for Project Executive, Project Superintendent, Engineers, Accountants, Assistants, Estimators, Purchasing, Secretaries and Clerks.

c. Tools and supplies including hand tools and construction equipment having an individual new value of less than $200 and consumable items which are used in the construction operation such as chalk, kerosene, brooms, brushes, etc ...

d. Job office including rental of trailers, temporary buildings or office space for project staff. Also include interior modification and mechanical/electrical work as required to said job offices.

e. Plant, vehicles and repairs such as purchase of rental charges for plant owned by Design/Builder (Clayco) or outside parties. Items include transits and levels, rental or purchase of job vehicles and repairs and maintenance of plant and vehicles used specifically on this project.

f. Temporary buildings, barricades and installations including labor, lumber, millwork, and other building materials used in the construction of tool sheds and other temporary structures with the exception of the job office which is included above.

g. We have included the cost of the Building Permit.

R.P. Appx. 226 4 Section 1B- General Conditions- continued 18. Project close out requirements will be provided as follows: a. Record drawings plans which will be maintained in the field trailer of all field changes on the contract drawings and at the conclusion of the project a set of reproducible stamped "Record Drawing" including field changes will be turned over to the Owner. All As-built drawings will be provided to owner via CD-ROM.

b. Provide (3) sets of operating and maintenance manuals to the Owner.

c. Provide operating instructions to the Owner's representatives. Walk the Owner's designate through all systems and demonstrate the proper sequence of starting, normal operation and adjustments and shut-down. Include physical verification that all safeties work properly.

d. Provide job clean up during the project and final clean up. Clean and wash windows, remove all debris inside and out and leave the entire building "broom clean".

19. The Design/Build Contractor's site office must include the following: a. A furnished conference area with seating for a minimum of 12 persons.

b. Oae R:m:Hshed effiee fer liSe by the arehiteet, engineer er Owner.

c. Telephone and DSL quality Internet services for the offices. Oae adelitienal seJJarate tele~Jhene }me ifi a leeatieB efthe Ovmer's eheiee fer SeJJarate fwr liSe by the OWBer/1\rehiteet/ Bngineer. (Fax machine furnished byOwner, if available at site).

d. Copier capable of llxl7 format and onsite drawing plotter capable of 36" paper width format for shared use by Design/Build Contractor, Owner and Owner's consultants.

DIVISION 2 - SITE WORK Section 2A - Subsurface Investigation Subsurface Investigation will be completed by Koll Development.

All on site inspections and monitoring the excavation will be paid for by Koll Development.

Every site location will involve different soil characteristics that will affect the earthwork, paving and foundation design.

Section 2B - Site Preparation Site preparation and clearing shall be provided to remove vegetation, trees and/or shrubs in the new construction areas unless noted to be reused or salvaged.

R.P. Appx. 227 5 Section 2C - Earthwork All earthwork shall be performed per the recommendations of the geotechnical design report.

Provide mass grading of entire site including all cut and fill required. The existing pile and any excess material from the cut to ftll operation will be hauled off by Koll. Excess topsoil and vegetation will be strategically stockpiled for future placement in landscape berms.

Excavation to subgrade elevations for all interior footings and slabs on grade. General and rough grading of the site to achieve the proposed subgrades.

Finish grading of areas around the buildings, paving and sidewalks to achieve proper drainage and uniform surfaces; finish grading for the building area and site to a 0.1 foot(±) tolerance.

Finish planting areas will be finish graded for planting by landscaping contractor as part of the work. All planting and sod areas shall have a minimum of 4" topsoil. Topsoil work will be completed if necessary out of landscape budget.

Design/builder shall protect and maintain any and all existing utilities, drives and parking areas which are to remain in service and are adjacent to the work during the course of construction activities.

Section 2D - Storm Sewers and Utilities Underground storm-sewer system will be installed to collect surface storm water run-off throughout the site and drain to adjacent off site system.

Provide all water service for domestic use and fire protection with new hydrants, as required.

Provide underground service for electric and telephone. TXU fees for electric service will be paid by Koll.

The gas service is by Koll Development.

All utility work will be limited to work on site and as indicated on the civil documents. The sanitary sewer and water utility work are to service building tie roof drains into storm sewer system.

Section 2E- Paving and Surfacing The work includes concrete paving and curbs as shown on the Civil drawings including entry and island work along Regent Boulevard.

Provide curb cuts for entrances as shown.

Pavement markings to be white two coat paint system.

Provide concrete pad at loading dock and dumpster pad. Provide concrete pad for transformer.

Provide $25,000 budget allowance for exterior hardscape; this includes fountains, artwork, brick pavers, signage and furniture at the entrance locations. The base bid includes concrete sidewalks @ the 2 entrances.

R.P. Appx. 228 6 Section 2F - Irrigation System A landscape irrigation system design and installation will be provided as an allowance of $75,000.

Section 2G - Landscaping An allowance of $225,000 has been provided for landscaping.

DIVISION 3 - CONCRETE Section 3A - Cast-In-Place Concrete Reinforced-concrete at foundations based on 3500psi compressive strength at 28 days.

Provide all concrete work in accordance with the structural drawings.

Concrete sidewalks in locations and width as indicated on the site plan, standard-broom finish on a 60" square pattern, 4" concrete minimum 4000psi and rebar and granular base if required by code. Reinforced concrete drilled piers with bearing capacities as recommended by the structural engineer.

First, Second, Third and Fourth floor concrete structural slabs over 2" metal decking and beams with mesh reinforcing and 4000psi concrete (3" thick). Concrete to be steel troweled to a smooth finish within normal tolerances.

Provide six (3) sets of pan stairs; regular weight concrete at treads and landings.

Provide non-shrink, non-metallic grout as required for all column base plates.

Provide foundation pits and slab at elevator construction. (Three (3) elevators included).

Section 3B- Tilt-Up Concrete Panels All concrete panels will be completed as site cast, reinforced, architectural concrete panels. All Tilt-Up panels will be designed and constructed with the most up-to-date quality assurance programs available through the Tilt-Up Concrete Association, Concrete Specification Institute, Concrete Council, and Clayco Construction Company's own high standards. An alternate will be provided to have 15' wide panels instead of30' wide. The window configuration at the top level will need to change if the 15' wide panel option is pursued.

The system will be detailed in conjunction with all aluminum window and curtain wall systems to provide wholly integrated exterior building cladding system.

A tilt-up screen wall will be provided for the truck dock area.

R.P. Appx. 229 7 DIVISION 5- METALS Section 5A- Structural Metal Framing Structural steel shall comply with ASTM A-36 and A572, GD50 as noted on drawings and structural steel framing shall be provided to include the following: Elevated floor slabs are designed for 1OOlb. live load, with Code allowance reductions.

Structural steel column and beam system to support the floor and roof structures. All shapes will be installed.

Steel framing supports for the metal screen wall.

Miscellaneous structural steel as required for new construction.

Steel channel framing as required for floor and roof blockouts.

Section 5B- Metal Joist and Metal Decking Structural steel beams for 15\ 2nd ,3rd and 4th floors and bar joist at roof deck. All joists shall be designed and installed per SJI specifications.

Steel roof decking to support roofing system per SDI Standard No. 1 with factory primer. 1 W' metal decking to be 22 gauge painted. Roof deck and joist shall be sloped to provide 1/4" per foot slope for positive roof drainage.

2" x 19 gage galvanized steel decking to support concrete slab at the first, second, third and fourth floors.

Section 5C- Metal Support System All interior partitions shall contain standard metal studs on 16" centers, size and gauge as required unless otherwise noted.

Columns, chases and soffits shall be furred with metal studs, furr ceilings where indicated to be drywalled (fired rated where required).

All lintels, 6" pipe bollards (concrete filled), steel tube and hand rails and miscellaneous other steel as shown on architectural and structural drawings.

Mechanical equipment supports, as required.

Include Morins X-12 type horizontal prefinished panel system for mechanical screen and vertical entry element at all entries. Include metal stud framing as required.

Section 5D - Metal Fabrication Steel angle dock nosing (embedded in concrete at the outer edge of dock).

Stair system with steel pan treads and landings with concrete fill.

R.P. Appx. 230 8 Section 5D - Metal Fabrication - continued Include Alucobond metal panel system at vertical features and roof parapet condition per the drawings.

Include sunscreens at 3 levels near both entries and building ends.

Metal access ships ladder to roof hatch at one stair location.

Elevator divider beams and sill support angle.

DIVISION 6 -WOODS AND PLASTICS Section 6A - Rough and Finish Carpentry Wood blocking, nailers, grounds blocking at parapet walls, furring and framing with standard construction grade #2 yellow pine or Douglas for lumber required to complete all new construction, (fire treated as required by Code).

Each electric closet will have one wall with plywood mounted to it for installation of telephone equipment. Telephone equipment by others.

Solid surface lavatory tops for the restroom lavatories for one core at each floor for a total of eight (8) restrooms.

One full length wood shelf only a janitor's storage closets. Shelf constructed of A WI custom grade plywood and exposed edge receiving a hardwood edge.

Installation of all toilet accessories in restroom lavatories.

Window sills shall be 1/16" general purpose plastic laminate on 3/4" APA high density overlay plywood. At curtain wall, provide metal sills.

DIVISION 7- THERMAL AND MOISTURE PROTECTION Section 7A- Insulation and Fireproofing 3-1/2" (R-13) fiberglass with foil faced vapor barrier to above ceilings.

1" rigid insulation board on exterior walls at spandrel glass, otherwise, batt insulation will be used at exterior walls.

2" rigid polystyrene insulation board on foundation perimeter walls below floor slab.

Provide fire rated assembly by use of drywall or spray on fireproofing at beams extending from the rated stairwells to the first adjoining structural member in accordance with applicable codes.

Provide floor to floor fireproofing as required for all penetrations.

Include fireproofing main beam supports as required for all stairwells.

Section 7A - Insulation and Fireproofing (Cont) R.P. Appx. 231 9 Include vapor barrier type insulation above ceiling areas; seal all joints carefully, especially at perimeter condition at 4th floor attic space.

Section 7B - Roofmg Roofing shall be 45 MIL mechanically attached TPO polymer based roof system with R value of (meet the energy code in each area).

Roof area to be drained by interior roof drains located along the exterior wall.

10 year warranty (material and labor) provided by the manufacturer after his inspection of the roof.

Section 7C - Flashing and Sheet Metal Flashing and sheet metal as required for the roof parapet walls.

Paint-grip, galvanized sheet metal installed at locations requiring flashing, counterflashing and roof drain pockets unless otherwise noted on drawings.

Prefinished and pre-formed aluminum coping at parapets as required, unless otherwise noted on drawings.

Section 7D - Roof Accessories Roof hatch and ships ladder installed for access to roof.

Section 7E- Caulking Caulking at required joints and intersections to two different materials. Exterior joints shall use two component polyurethane based sealing compounds, Tremco Dymeric or equal. Interior joints and under thresholds shall be architectural grade caulking compounds, Sorreborn Kaukit, or equal. Provide closed cell backer rod as required, material shall be round rod.

DIVISION 8- DOORS AND WINDOWS Section 8A - Metal Doors and Frames Hollow metal doors and frames as shown on drawings will be primed and coated with 2 coats of gloss enamel paint. All hollow metal frames will be welded at seams. All doors shall be 18 gauge, 1-3/4" thick with finish faces, exterior door shall be insulated.

Aluminum frames at passages to restrooms and building maintenance rooms and stairways.

Hollow metal doors at passages to mechanical equipment to be fire-rated as required.

One (1) 8'x9' manual overhead door at loading dock. The compactor opening will be provided by Clayco; the door to the compactor (if necessary) will be provided by the compactor vendor.

Hollow metal frames at pump rooms and building electrical room.

R.P. Appx. 232 10 Section 8B - Wood Doors Any wood doors used by tenant shall meet or exceed the following specification: Wood doors at all passages throughout interior unless otherwise noted doors to be 1-3/4" thick, solid core, mahogany veneer doors to be fire-rated as required. Doors to be 3'-0" x 8'-0" (H) in aluminum metal frames.

Section 8C- Glass and Glazing Furnish and install an insulated store front window system at building off-sets. Clear anodized aluminum finish per the architectural drawings, glazed with insulated glass units per the architectural drawings. Glass to be clear system with low E similar to the Atlanta project.

Aluminum clad insulated punched window system by Vistawall (basis of design) or equal.

Mirror glass in all bathrooms, glass to be 1/4" thick.

Provide glass feature wall at main stairwell (all levels).

Provide two (2) double glass door vestibules at 1 entry.

Provide revolving door and two (2) single glass doors at main entry.

Section 8D - Hardware Hardware shall include the following and will meet all ADA requirements.

EXTERIOR DOOR HARDWARE: 1-1/2 pair hinges door stop exit device hydraulic closure cylinder lock weather strip and gasketing sill sweep strike lock shield threshold Code required panic hardware (where required).

INTERIOR DOOR HARDWARE: 1-112 pair hinges silencers latch set (Mortise) door stop Toilet room doors shall also have push/pull plates, kick plates and closers All hardware will be satin chrome All tenant supplied material must meet this specification.

R.P. Appx. 233 11 DIVISION 9- FINISHES Section 9A- Gypsum Drywall All columns to have metal studs installed with drywall installation as part of the TI work.

Partitions and furring shall be fire-rated with 5/8" Type "X" gypsum board where required.

Moisture-resistant gypsum board shall be used in toilet rooms, janitor closets and pump room exterior soffits, unless otherwise noted.

Partitions at toilet rooms, mechanical and electrical rooms shall be full height and sound deadened with sound batt insulation. Bathroom ceilings to be drywall.

Stairwells and elevator shaft enclosures shall consist of gypsum 2 hour construction at all levels.

Exterior wall framing shall receive 3-5/8" stud framing with insulation and vapor barrier to allow for voice, data and electrical work in the future.

Main lobby will include architectural grade drywall, coffered ceiling & metal pan ceiling. The elevator lobby on 2nd, 3rd and 4th floor will also receive a drywall ceiling.

Include exterior framing as required for Alucobond supports at parapet elements and upright locations.

Section 9B - Ceramic and Granite Tile Provide ceramic tile per drawings at the floor and wet walls (full height) in all public toilet areas.

Provide epoxy terrazzo in the entire main lobby area with tile base.

Provide porcelain tile boarder with cove base at 2nd, 3rd and 4th floor elevator lobbies.

Section 9C - Acoustical Ceiling Upgraded 2x2 White aluminum grid for acoustical ceiling furnished and installed at decorative soffit areas. No TI ceiling grid or pads are included.

Section 9D - Carpeting and Flooring Carpet in the tenant finish area shall be furnished and installed under the tenant finish contract.

Provide carpet inset at 2nd, 3rd and 4th floor elevator lobby areas.

Main stairwell to be upgraded with carpet. The 2 secondary stairs will have exposed concrete treads with painted stair stringers and drywall partitions.

Include heavy duty traffic rated sheet vinyl at lower level corridor areas.

Section 9E - Painting R.P. Appx. 234 12 The exterior of the building will be acid etched and include a one coat MODAC paint system on all surfaces.

Drywall ceilings and walls to receive two coats of paint.

All exterior sheet metal to receive two coats of paint.

All hollow metal doors and frames to receive two coats of paint.

All exposed miscellaneous metal to receive two coats of paint.

Painting will be provided in the stairways. Two secondary stairwells will have exposed concrete treads with exposed stringers and one stairway to be completely finished with drywall and carpet.

DIVISION 10 - SPECIAL TIES Section 1OA - Identifying Devices All interior signage and directories will be provided by Koll Development.

Exterior signage will be provided by Koll Development. Include conduit and junction box for a building mounted sign and one conduit and junction box for an entry monument sign.

Section 1OB - Partitions at Restrooms Full height gypsum board with louvered wood doors and wood frames.

Section 1OC - Toilet and Bath Accessories (2) grab bars per handicap toilet stall. (1) toilet tissue holder per toilet stall to hold two rolls of paper. (1) paper towel dispenser/disposal per toilet rooms. (1) sanitary napkin dispenser per ladies room. (1) sanitary napkin disposal at each stall (ladies only). lavatory top soap dispensers at each lavatory, per toilet room.

Section 1OD - Dock Equipment Provide dock bumpers and dock edge angle at indicated areas on architectural drawings.

Include one (1) 35,000 pound mechanical dock leveler (6'x7').

Section 1OE - Fire Extinguisher Equipment R.P. Appx. 235 13 Provide Code required quantity of stainless steel semi-recessed frre extinguisher cabinets for the base building.

Section 1OF - Access Flooring Under the shell budget, the access flooring will be stockpiled on the floor. The access flooring locations include all areas in the building besides the following: bathrooms, stairwells, dock areas, elevator lobby at upper levels, and complete 1st floor lobby areas from both main entries across the building.

Base Area -Provide 14" high raised access floor system at 15\ 2nd, 3rd and 4th floor levels to receive carpet tiles. Support system to be bolted pedestals. Tiles are concrete filled bare metal type with point load capacity of 1,000 lbs. No grounding is provided. An alternate has been provided to utilize 1,250lb for all access floors including laminate tile locations.

Electric Rooms- Provide 14" high raised access floor system with top finish of high-pressure laminate with integral trim. Support System to be pedestals. Tiles are concrete filled metal type with point load capacity of 1250 lbs. No grounding is provided. Material manufacturer is Tate Access Floors or equal.

Four panel lifters are included. Two emergency panel lifter wall plates are included.

DIVISION 12 -FURNISHINGS Section 12A- Horizontal Blinds Blinds will be included at all exterior glass punched window systems. Blinds to be 1" horizontal mini-blinds equal to Bali or Levelor in a manufacturer.

Section 12B- Floor Mats and Frames Provide one piece polypropylene mats with anodized aluminum frames at two (2) entry vestibules.

DIVISION 14- CONVEYING SYSTEMS Section 14A - Hydraulic Elevators Provide one (1) freight elevator with a 4,500# capacity. Interior cab shall be 5'-8" x 7'-10" x 9' -0" high.

Provide two (2) passenger elevator with a 3,500# capacity. Interior cab shall be 4'-9" x 6'-8" x 7' -4" high.

Freight elevator will include 112" thick damage control pads.

Passenger elevators will be center opening. Freight elevator will be side sliding.

Elevators will operate at 150 f.p.m. and operate on 208V, 3-phase, 60 hertz. Passenger elevator will have a 40hp motor. The freight elevator will have a 60hp motor.

Section 14A- Hydraulic Elevators (cont) R.P. Appx. 236 14 Provide duplex micro-processor control.

Signals will be standard stainless steel finish, digital car position indicators with illuminated car and hall buttons.

In-car lantern with gong and floor passing signals.

Constant features will be a Lambda II infrared, multi-beam door reversal device with remote elevator monitoring REM ready, fire fighter service Phase I and Phase II and handicap and Braille markings.

DIVISION 15 - MECHANICAL Section 15A - Fire Sprinkler System The contractor shall provide an engineered site five (5) protection layout for installation by others.

This building is classified as a Light Hazard occupancy. The combination sprinkler and standpipe system shall be hydraulically designed to deliver a density of 0.10 gpm. over the most remote 1,500 sq. ft. with hose stream allowance per local requirements. Any Ordinary Hazard Group I areas will be hydraulically designed for a density of 0.15 gpm. over the most remote 1,500 sq. ft. with 250 gpm for hose stream allowance per local requirements. The minimum flow rate for hydraulically most remote standpipe shall be 500 gpm. and 250 gpm. for each additional standpipe, with the total not to exceed 1,250 g.p.m. 100 psi at the top of the standpipe is required. Interconnect each standpipe at the lowest floor level. Provide control valve at the base of each standpipe. Provide roof manifold at required areas per UBC and IFC.

Include pump system if required by code incoming flow/pressure to meet building performance requirements. Contractor shall provide fire flow test on nearest available water supply.

Contractor to provide incoming service backflow preventer of the type required by local authorities.

Fire protection work starts at the flanged lead-in connection inside of the building.

Provide 1" outlets on branchline piping with 1" sprigs and upright brass sprinkler heads to protect the building shell areas. Upon tenant finish, upright sprinklers will be removed and replaced with pendent sprinklers per tenant requirements. In finished shell and core areas provide concealed heads located to work a pattern in the room.

The Fire Protection Contractor shall provide sprinkler head layout, hydraulic calculations, final fire pump and jockey pump selection based on hydraulic calculations, pipe routing with sizes and elevations as required by N.F.P.A. (latest edition) and insurance carrier.

All work shall comply with the fire protection requirements and codes of the City Building Department, the State and Local Fire Marshal and N.F.P.A. National Fire Codes.

Section 15A- Fire Sprinkler System (cont) R.P. Appx. 237 15 The Contractor shall submit shop drawings (including device/equipment product data submittals) and hydraulic calculations to the municipality having jurisdiction and the Architect/Engineer prior to commencement of project and purchase of materials. Contractor shall submit as-built drawings and maintenance manuals as directed by the Architect/Engineer.

The Fire Protection Contractor shall coordinate his work with that of all other trades.

The Fire Protection Contractor shall guarantee all labor and materials for the period of one year from the date of completion.

Fire protection sprinkler piping shall be either Schedule 40 black steel pipe with screwed fittings or Schedule 10 black steel pipe with grooved fittings.

Sprinkler heads shall be UL listed and FM approved and shall be quick response rated at 155 deg. F (or temp required for location).

Contractor shall provide and install each of the following devices and pieces of equipment: 1) Fire department connection. (Polished chrome) 2) Fire hose connections and caps at each stair landing.

3) Floor control valves at each floor with drain visor.

4) Inspector's test connection for each zone.

5) Spare sprinkler cabinet with heads and wrench Contractor shall provide sprinklers of the type installed for the use as spares to the building Owner. The number of sprinklers shall be as required by code. Contractor shall provide sprinkler wrench for each type of sprinkler supplied. Spare sprinkler cabinet shall be located next to the fire pump.

The Fire Protection Contractor is responsible for all leak damage due to system, installation and materials.

Contractor shall perform all tests on system as required by N.F.P.A., local code and insurance earner.

All piping shall be suspended independently from building structure. Vertical pipe risers shall be supported at least once on each story height. Riser clamps at base of riser shall be supported at building structure. All supports and hangers shall be so constructed as to allow for proper pitch and expansion of pipes. Position exposed riser clamps so they do not create a tripping hazard.

Contractor shall remove all debris from job site daily to Clayco provided dumpster and leave all work and equipment in clean working condition.

Contractor shall provide and install all pipe sleeves. Sleeves shall be at least 1-1/2 times the size of the pipe and shall be similar material to prevent reaction between pipe and sleeve.

Contractor shall provide and install fire stopping as to completely seal all penetrations of fire rated assemblies, walls and ceilings caused by this trade. The system shall be installed Section 15A- Fire Sprinkler System- continued R.P. Appx. 238 16 according to an Underwriter's Laboratories approved through penetration fire stopping protection system, have been tested in accordance with ASTM #E-814 and UL #1479 and shall have an "F" rating not less than the required rating of the wall penetrated. The annular space between pipe and the fire rated assembly shall be filled with the approved material so as to maintain the integrity of the fire rating ofthe assembly penetrated. Insulation shall not pass through fire rated assemblies.

Section 15B- Heating. Ventilating and Air Conditioning Piping, except branch lines feeding heads in rooms, shall not pass through stairwells, five rated exit pathways, electrical rooms/closets, and tele/data rooms.

All heating, ventilating and air conditioning work will be designed and installed in accordance with the local adopted codes (including International Energy Code) and with the ASHRAE standards and guidelines, SMACNA standards and the outline below. All equipment with electrical connections will bear the UL Label and all refrigeration equipment will be labeled in accordance with ARI.

An HVAC system will be provided that utilizes four (4) packaged electric heating and electric cooling, down discharge, roof top package air conditioning units (RTUs). RTUs will provide tons of capacity. The following features are required: 1) Return air bypass with damper, damper actuator and temperature control (supply air temperature must be re-heated to 61-62 degrees F).

2) Multiple stage electric heating coil (4 stages). Step controller required.

3) 100 % power exhaust.

4) 30% filter section with 2 sets of throwaway filters. Also provide one set of construction filters in the units.

5) 0 to 100 % economizer with enthalpy control and low ambient lock out control.

6) Freeze stat protection.

7) Supply air temperature control.

8) DDC temperature control panel/module with BACNET & or LON capabilities as well as a human interface unit mounted panel.

9) Factory installed and wired unit electrical disconnect switch for a single point connection.

10) Factory installed and wired GFI convenience outlet.

11) Complete manufacturer's 1 year warranty for parts and labor from the date of start up.

12) Additional 4 year extended parts only compressor warranty.

13) High efficiency motors for supply and exhaust.

14) Complete static pressure control capabilities referencing outside, space, duct and under floor pressures.

15) Variable frequency drives on the supply fan as well as spring isolation.

16) 460 VAC I 60HZ I 3 phase.

17) Hinged access doors.

18) Flat roof curb.

19) Low leak outside air dampers.

20) Low leak supply air dampers.

21) Independent control of outside and return air dampers.

Section 15B- Heating. Ventilating and Air Conditioning R.P. Appx. 239 17 The system will be designed meeting the following design conditions: Outdoor Design Conditions: Summer: 100°F DBI74°F WB Winter: Indoor Design Conditions (occupied area): Summer: 75°F DB (+/-2) 50% RH Winter:72°F DB (+/-2) Outdoor Ventilation: Per ASHRAE Standard - 20.0 CFM/person Infiltration: 1.0 CFM/linear foot of exposure Heat Gain: One person per 120 sq. ft. of occupancy 1.5 watts per sq. ft. demand for lighting 3.0 watts per sq. ft. miscellaneous power Occupants: 1 per 120 SF (at 245/155 sensible/latent BTU/Hr each).

The design will be based on the use of tinted, double paned, insulated glass for curtain wall and at all other window areas with the blinds open.

Return air will be provided in perforated white finish. In the core areas only, insulated plenum type linear supply slot supply air diffusers in the ceiling will be provided. Exhaust grilles will be square, louvered faced. Return air grilles in each office and conference room (provided in tenant finish) will include acoustically lined sound boots. All in floor supply air will be delivered through the in floor VAV terminal I diffuser. The in floor air devices will be installed in the future T.I.

Zoning of fan terminals and VAV boxes shall not be less than 1 zone per 250 sq. ft. with a dedicated fan terminal unit in each building comer with two exterior exposures. Each fan powered box will incorporate an electric heating coil. All in floor FTUs and VAVs will be stockpiled to the floors and installed in the future T.I. In floor FTUs will be sized at maximum of 50 linear feet at the exposure.

Shell and core construction of toilets, corridor, etc. will be completed using VAV units with a maximum size of 1600 CFM each.

Cabinet unit heaters will be furnished in the vestibules. Heating and cooling will be provided to main stairways and entry vestibule. Temporary heat will be installed by providing and installing (4) 10 kW electric unit heaters above ceiling height per floor. These will be disabled once the in floor FTUs are installed in the T.I. build out.

Exhaust fans will be provided to ventilate the janitor's closets and main toilet rooms. The system will be sized at a minimum of 2 CFM/SF of exhaust for toilet rooms and janitor's closets. Make- up air for the toilet rooms will be provided from HV AC supply air devices. Toilet rooms will be provided with exhaust grilles.

Exhaust for the elevator machine rooms will be provided.

Stairways will be provided with cabinet unit heaters.

R.P. Appx. 240 18 Section 15B - Heating, Ventilating and Air Conditioning - continued

Fire pwnp room will be served by a 5 kW electric unit heater.

The dock area will be served by a 10 kW electric unit heater.

Elevator shafts shall have pressure relief as required by code. All electric rooms will be exhausted. Make up air will be supplied from HVAC supply air devices.

Fire dampers, smoke dampers and combination fire/smoke dampers will be provided as required by code. Materials and Methods Ductwork will be galvanized sheet metal, constructed per latest edition of the SMACNA and ASHRAE. Traverse joints on mediwn pressure system will be sealed with Hard cast. Insulated, Class 1 flexible air ductwork will be used for the connections from mediwn pressure trunk ductwork to variable air volwne units, fan terminal units and slot diffusers. Acoustical duct lining or flexible duct wrap insulation will be provided where required to avoid noise and condensation.

Sound attenuation will be provided as required to achieve an overall maximwn NC-40 level in the office spaces.

Vertical mediwn pressure duct risers will be provided from the RTUs to each floor with, and a duct loop on each tenant floor will be provided. Acoustically lined, hard return air duct risers, in shafts, from the lower floors to the RTUs will be provided with a stub out on each floor. On top floor, a minimwn of 20 LF of acoustically lined return air duct from the RTU serving this floor will be provided.

All mediwn velocity ductwork risers installed in vertical shafts shall be acoustically lined, with lining extending horizontally 20' from the main riser on each floor.

Return air duct and supply air duct mounted smoke detectors will be provided for all air handling units 2000 CFM and greater.

A complete direct digital temperature control and building management system will be provided. Standard features including local PC workstation, dial in and out modem, and complete color graphics to the VAV level. All wiring, software, hardware, sensors, actuators, and control panels will be included for a complete and functional system. All core and parking lot lighting will be controlled and wired to the BMS. Lighting contactors will be provided by Division 16, low voltage wiring to the contactors will be by Division 15. All low voltage temperature control wiring will be plenwn rated.

Section 15C - Plwnbing All plwnbing work will be designed and installed in accordance with the codes listed in Section 1A of this outline specification. All equipment with electrical connections will bear the UL Label.

R.P. Appx. 241 19 Section 15C - Plumbing - continued Soil, waste, vent, storm and water piping systems will be designed and installed in accordance with the requirements of the local plumbing code. Soil, waste, and vent piping will be service weight, no-hub cast iron above grade in plenum areas.

Schedule 40 PVC may be used otherwise including underground.

Storm water piping will be Schedule 40 PVC above and below grade. Roof drainage will be provided by the use of 6" inboard roof drains. The piping system will connect to storm sewer below first floor grade and exit building foundation wall.

An overflow roof drain system will be provided and will be sized the same as the primary system and connected to a separate piping system within the building. The secondary system is to terminate near through the wall near grade.

Water distribution piping will be Type "K" copper below grade and "L" copper above grade.

Water closets will be wall mounted white vitreous china, open front seats, and with battery operated flush valves.

Urinals will be wall hung, white vitreous china, floor carrier type, with battery operated flush valves.

Lavatories will be integral with the countertop with chrome plated battery operated sensor type faucet, grid drain, P trap with cleanout plug, flexible risers, and stops. Insulation of exposed piping and hot surfaces for handicapped lavatories will be provided.

Mop basins will be 24" x 24" floor set terrazzo with mop hanger, 24" hose, 4" handles, bucket hook, and elevated vacuum breaker.

Brushed stainless steel, dual-level, semi-recessed, barrier-free self contained electric water coolers located at each floor.

Provide three (3) wet columns (water, waste and vent).

Provide 1-1/2" water connection with valve at toilet core area.

Electric water heaters for toilet rooms sized per local plumbing code and ASHRAE guidelines will be provided. Relief valves will be piped to floor drain. Include For piped systems longer than 100 lineal feet a hot water recirculation loop with pump and aqua stat will be provided.

General purpose and toilet room floor drains will be cast iron with nickel bronze, heel proof grates.

A dry sump will be provided for each elevator pit - dry sumps to be pumped out with portable sump pump provided by building maintenance.

Mechanical room floor drains will be medium duty, cast iron, and loose set top with sediment bucket.

R.P. Appx. 242 20 Section 15C -Plumbing - continued Roof drains will be cast iron with sump receiver, under deck clamp, adjustable extension and cast iron mushroom dome (plastic domes not acceptable).

Overflow drains will be cast iron with sump receiver, under deck clamp, adjustable extension, exterior water dam and cast iron mushroom dome.

A minimum of 3 frost-proof wall hydrants will be provided at grade. Also 2 hydrants will be provided at the roof level for use for window washing.

4" incoming domestic water service will be provided with a gate valve, a reduced pressure backflow preventor (type as required by local plumbing code), a pressure gauge and with the drain piped to a floor drain. A valved and capped 1-112" line for irrigation system backflow preventor and piping system will be provided. The irrigation system is not included.

Insulation will be provided on all vertical and horizontal domestic water, including inside of wet chases, and on all horizontal downspout piping and roof/overflow drain bodies.

A stubbed out sanitary sewer and vent connection will be provided on each side of each toilet room wet wall opening onto the tenant space or corridor for future connections. Provide at each location, a valved and capped 1" domestic cold water stub out.

Provide the following fixtures: 1. Toilets (wall hung flushometer type) 2. Handicap toilets (wall hung flushometer type) 3. Urinals (wall hung flushometer type) 4. EWC (drinking fountains) 5. Lavatories (custom), each with (3) bowls 6. Janitor mop sinks 7. Hot water heaters General All systems will be designed and installed in accordance with all federal, state and local code enforcement agencies, ADA regulations, the Fire Marshall and the local building department.

Scope of Work Water Service and Distribution, Plumbing Fixtures and Storm Water System Sanitary, Waste and Vent System Water Service and Distribution Underground domestic water piping will extend from water meter with minimum system pressure for core/shell total fixture counts. Backflow preventer will be provided at point of service, separate from fire protection service. Water service will be metered within service pit.

Three (3) hose hibbs around perimeter ofbuilding, one (1) hose bibb on roof and (1) 1-112" irrigation system connections will be provided.

Include dual level electric water cooler at each bathroom core.

R.P. Appx. 243 21 Section 15C- Plumbing- continued

Elevator sump and code required discharge will be provided.

Water service is not sized for any special tenant load requirements.

Domestic Water Systems The Core/shell system will include hot and cold water service and insulated distribution piping to all core areas and stub connections/valves for tenant areas.

Fixtures will include commercial grade products in all bathrooms, ADA compliant. Any exposed plumbing lines (supply and waste) will be chrome plated with appropriate wall escutcheons at penetrations. All plumbing fixtures will be installed with shut-off valves.

Drinking fountains with central remote chiller will be provided per code. Domestic hot water will be provided from electric water heaters.

No special water, gas, air or vacuum systems are included for tenant areas.

All water systems will be tested and approved for final use.

Storm Systems Roof drain bodies and horizontal leader runs to be insulated. A properly sized roof drainage system including roof drains, vertical piping and storm piping under the building will be provided. Roof drain collector pipe system will connect into exterior storm system piping.

Include emergency overflow piping from roof drain locations to location above finished grade.

Office ceiling space to be used as a return-air plenum.

Sanitary System The sanitary sewer will be stubbed into the building and extend through core/shell areas and be stubbed into tenant areas for future interconnection. No special waste provisions are included for lab waste.

Materials Domestic water system: Type Land M copper, above floor, Type K below floor.

Sanitary system: PVC above floor, cast iron below floor.

Storm system: PVC above floor, cast iron below floor.

DIVISION 16- ELECTRICAL DESIGN BUILD General All systems will be designed and installed in accordance with all federal, state and local code enforcement agencies, ADA regulations, the Fire Marshall and the local building department.

Temporary and Construction Power Temporary service and distribution will be provided to all project trailers, electric scaffolds and accessories, welding machines and power and lighting loads. Temporary power service and R.P. Appx. 244 22 Section 16A - Electrical - Continued

distribution will be protected in accordance with OSHA requirements. Lighting levels and distribution will be included in all areas to achieve code-required foot-candle levels.

Electrical Service Service to the building will include (2) 4"C. underground raceway from the property line to electric utility company pad mounted service transformer. The electric utility company will provide underground primary cables, service transformer. Building will be metered at electric utility company secondary voltage rate.

Current transformers, meter compartments, etc. will be included with service switchboards as required by electric utility company.

Secondary underground conduits/cables and terminations from service transformer to interior service switchboard will be provided. A separately metered power service will originate from the electric utility company service transformer to a 75HP fire pump for the building (add alternate, if required by code). Installation and protection of secondary service conductors will be in conformance with NEC.

Telecommunications Systems Service Service to the building will include (6) 4"C. underground raceways from the property line to the demarcation point within the building. Telecom utility company will provide all service conductors and/or fiber to tenant areas.

A 4'x8' plywood backboard, a dedicated isolated ground bar and a 20A duplex receptacle will be provided at the demarcation point and at each Telecom Room. Tenants/Owner will provide all data and voice wiring and equipment for the building including elevator phone service.

Rough-in boxes and conduits will be provided in all core/shell finished office areas. (2) 4"C. conduit sleeves will be provided through floor slab between Telecom Rooms.

Power Distribution Service switchboard will include service connection equipment; space for utility company equipment; feeder overcurrent devices to support connected loads outlined. Service switchboard will be rated 480/277V, 3P, 4W Large equipment loads will be 480V, 3 phase; lighting loads will be 277V, 1 phase or 480V, 1 phase; small receptacle and appliance loads will be 120V, 1 phase. Service switchboard will include digital metering and integral TVSS protection on the incoming main.

480/277V panelboards will be provided on each floor and sized to support 1.5W/SF tenant area lighting. Step down transformers and 120/208V panelboards will be provided on each floor to support 3.5W/SF tenant receptacle and equipment power. 480/277V and 120/208V single and multi-pole breakers will be provided within floor panelboards for tenant areas lighting and power loads. Conduits will be installed from tenant receptacle panelboards stubbed into depressed floor slab areas for floor box wiring by tenants.

Separate 480/277V panelboards will be provided on each floor to support tenant area under floor electric fan terminal units. Conduits will be installed from floor HV AC panelboards stubbed into depressed floor slab areas for underfloor fan terminal units by tenants. A separate R.P. Appx. 245 23 Section 16A - Electrical - Continued

panelboard will be provided on the 3rd Floor Level to support rooftop HV AC units and equipment.

Elevator equipment, trash compactor, domestic water heaters, entry or room electric heaters, etc. will be served from available 480V distribution within building. Site lighting circuits will be fed from 1st Floor lighting panelboard. Core/shell lighting and power circuits will be shared with tenant area lighting and power panelboards.

New power Distribution and Lighting/Appliance panelboards will be dead front furnished with branch protective devices, main bus, main breakers, with AIC rating for available fault current at installed location. Main buses and connectors will be hard drawn copper or tin plated aluminum. Framed directories with protective plastic facing will be attached to the inside of panelboards and be neatly filled out to identify all circuits and loads. 25% spare breaker and space capacity will be provided.

Circuit breakers will be quick make - quick break, molded case type with the tripping position midway between on and off. Breakers will be the bolt-on type with common trip for multi-pole application. Breakers indicated to be used for lighting circuit control will be switch rated.

Fuses will be UL approved and listed for application, NEMA PB-1 complaint.

Step down transformers will be factory-assembled and -tested, air-cooled units for 60-hz service.

Grain-oriented cores, non-aging silicon steel. Continuous copper or aluminum coil windings without splices, brazed or pressure type internal coil connections. Comply with NEMA ST 20, and list and label as complying with UL 1561. Enclosures will be ventilated, NEMA 250, Type 2. Insulation class: 220 degree C., UL-component-recognized insulation system with a maximum of 150 degree C. rise above 40 degree C. ambient temperature. Transformers may be hung from structure where acceptable by local authorities.

Receptacle/Equipment Connections Duplex receptacles will be provided within all core/shell finished corridors 50 feet on center along all routes. Weatherproof duplex receptacles will be provided at all roof-mounted equipment per NEC. Duplex dedicated duplex receptacles will be provided per 200SF within each Electric Room, Mechanical Room, Telecom Room. All wiring devices will be 20A, 125V specification grade. Receptacles will be mounted 18" AFF and will include plastic coverplates.

Tenant will furnish and install all above and below floor lighting and receptacle branch circuit wiring within all tenant areas. No power-data floor boxes are stockpiled on floors. No bay boxes for tenant wiring is included.

Grounding A fully grounded electrical system per NEC requirements will be provided. Feeder and branch circuits will contain safety ground conductors in lieu of raceway serving as grounding means.

No column grounding or building ground loop will be provided except for separately device systems such as transformers, UPS systems, etc. Lighting Systems Core/shell lighting will include recessed 3 lamp, (18) 3" deep cell, 2'x4' parabolic troffer fixtures for one fixture every 80SF all finished corridor routes; fluorescent downlights with R.P. Appx. 246 24 Section 16A - Electrical - Continued

specular clear alzak reflectors in Entry and Elevator Lobbies and within Restrooms; pendant shop lights in all Elect/Mech Rooms, Janitors Closets, etc. Fluorescent fixtures will utilize electronic ballasts and T -8 lamps.

Tenant Area lighting, branch circuit wiring and control wiring will be provided by tenants during build out and are not included in core/shell. Minimal lighting will be provided within empty tenant areas to support owner and code officials requirements.

Exit signs and emergency egress lighting will be provided along all core/shell egress paths. Life safety lighting will be powered from self-contained battery units.

Exterior metal halide HID site lighting pole mounted fixtures will be provided along all entry and parking areas. Average maintained exterior foot-candle values will be 1.5 for roadway and parking areas. Control of exterior lighting will be from contactors at source panelboards with temperature control system ON/OFF interface.

A material only allowance of $10,000 for decorative Front Office lighting; entry canopy; monument sign lighting, flagpole lighting and exterior entry bollards is included. (This is included as part of the current DFW design.)

Fire Alarm System Building will include a system with devices, control and signaling in compliance with local authority having jurisdiction and specific project requirements. System will include furnishing and installing heat detectors; smoke detectors within each Electrical and Mechanical Room; manual pull stations; fire alarm annunciator panel at main entrance and AutoDial connections to central monitoring agency.

Duct smoke detectors for all ventilation units over 2,000 CFM will be furnished and installed by HV AC contractor, devices will be monitored by building fire alarm system; duct smoke detectors will be provided by electrical contractor on each floor at each return air opening into return air shaft back to each rooftop unit.

Smoke detectors will be provided at each elevator lobby, Elevator Equipment Room, elevator pit and top of elevator shafts. Heat detectors will be provided in each Elevator Equipment Room, elevator pit and top of elevator shafts. Monitoring and control functions will be in conformance with ASME A17.3-93, Safety Code for Elevators and Escalators.

Signal devices, strobes and horns will be provided within areas in accordance with NFPA, ADA Guidelines and local authority having jurisdiction. Connections to fire sprinkler system water flow switches and tamper switches will be provided.

Fire pump and jockey pump controller monitoring modules will be included (add alternate as I if required by code).

Initiation and signal devices within tenant areas are not included, but main fire alarm panel will be sized to accept initiation and signal devices installed by tenants, based on an open plan finish- out concept.

R.P. Appx. 247 25 Section 16A - Electrical - Continued

Lightning Protection System A UL Listed, Master labeled lightning protection system complete with rooftop air terminals, roof conductors, down conductors, perimeter counterpoise and driven ground rods.

Materials All feeder circuits will be THHN/THWN copper or aluminum conductors. All branch circuits will be THHN/THWN copper conductors. UL Type MC feeder cables will be acceptable for use. UL Type MC cable will be acceptable for branch circuit use. Modular wiring systems will be used for all Office lighting circuits. Feeders and branch circuits will be routed below floor slabs in all areas.

The following types of conduits will be allowed for specific applications as follows: Site Lighting PVC Feeders- Underground PVC Feeders- Exposed IMC, EMT (above 7' AFF) Branch Circuits- Concealed RGS, IMC, EMT, MC Cables

ADDITIONAL CLARIFICATIONS

Contract Documents The scope of work is based upon Clayco Outline Specification dated December 6, 2005, Architectural drawings through Progress Set# 1 dated 10/07/05, Structural drawings and Tilt- Up Wall drawings through Pricing Set dated 10/14/05, and Civil drawings through Pricing Set dated 10/15/05 and as further clarified in this exhibit to the Agreement ("Outline Specifications").

LEED The estimate is based upon achieving basic LEED certification for Core & Shell (24 points). No allowances are included for achieving a higher rating.

ADDITIONAL CLARIFICATIONS Contract Documents The scope of work is based upon Clayco Outline Specification dated October 20,2005 and design drawings from Forum dated October 21, 2005 and as further clarified above and below.

LEED The estimate is based upon achieving basic LEED certification for Core & Shell (24 points) based upon current design assumptions. No allowances are included for achieving a higher rating.

Exclusions The following work is excluded from the GMP: 1) Payment & Performance Bond 2) Utility use fees 3) Additional Commissioning required for LEED certification R.P. Appx. 248 26 Exclusions (Con't) 4) On-site materials testing services 5) Design services for tenant area build-out 6) Cleanup for owner or TI work 7) Hazardous materials remediation 8) LEED certification costs (Koll has hired Gensler for this process) 9) Painting of interior steel joist and decking 10) Ceiling grid or pads for Tenant Areas 11) Factory Mutual requirements 12) Tenant improvements 13) Undercutting of existing and new subgrade due to poor or unsuitable soil conditions 14) Excludes rock removal or blasting 15) Site fencing & gates 16) Flag poles 17) Trash enclosure 18) Compactor 19) Foundation drainage system 20) Metallockers 21) Interior or exterior signage 22) Furniture, fixtures and unspecified equipment 23) Installation of raised floor system except at core areas 24) Elevator to the roof 25) Specialty Glass at Decorative Stair or 2nd Level Rail 26) Separate gas or electric meters 27) Gas service to building 28) Building humidification or dehumidification 29) Temporary heating of tenant spaces 30) Tenant area lighting and power branch circuit wiring and light fixtures 31) Tenant area fire alarm devices 32) Tenant Finish Lighting or Power Work 33) Standby power system or Emergency power generation 34) Public Address System 35) Data, Voice, Video Systems 36) Security Systems 37) Excludes accent lighting for metal screen walls@ roof 38) Utility company fee relating to phone, fiber and Gas or Electric 39) Mudslab below crawl space_ Miscellaneous Clarifications 1) The access flooring will be stockpiled on each floor as required for future installation by the tenants. Installation of the floor is only included in the Core areas.

2) Our estimate is based upon the minimum lighting as required by applicable codes for the tenant spaces.

3) Our estimate assumes that the excess topsoil and vegetation will be stockpiled for use as fill in the sloped areas north and west of the building.

4) Steel and concrete bids are based upon the 11-23-05 documents.

5) About 20,000 cy of excess material will be loaded and hauled off site by HL Merrill.

R.P. Appx. 249 27 Allowances The GMP includes the following allowances: 1) Entry sidewalks and hardscaping upgrades $25,000 2) Landscaping $225,000 3) Irrigation system $75,000 4) Wood, stone & metal trim at main lobby $25,000 5) Wood & metal trim at level2 & 3 & 4lobbies $7,500 6) Light bollards and building accent lighting @ main building entrances-now part of design 7) Revolving entrance door-now part of design 8) Elevator Cab finishes-now part of design See the Drawing List, attached hereto as Attachment A.

R.P. Appx. 250 28 CLf\YCO l'Hc AK! &. ~Cll:.'lCL Ul liLt LOlNlo I Drawing List I Attachment A

lntellicenter • Dallas Project# 7·106..005 Clayco, Inc. 3701 Regent Blvd. Tel: Fax: Irving, Texas 75063 Number Rev Title Rev Date Bulletin % Complete Status Category General Notes Ref RFis

INDEX Drawing Index 10/21/2005 0 Progress Print 1 C1 Cover Sheet 10/21/2005 0 Progress Print 1 C2 Grading Plan 10/21/2005 0 Progress Print 1 C3 Underfloor Grading Plan 10/21/2005 0 Progress Print 1 C4 Drainage Area Map 10/21/2005 0 Progress Print 1 C5 Storm Sewer Plan 10/21/2005 0 Progress Print 1 cs Storm Sewer Profiles 10/21/2005 0 Progress Print 1 C7 Utility Plan 10/21/2005 0 Progress Print 1 CB Paving Plan 10/21/2005 0 Progress Print 1 C9 Tum Lane Plan 10/21/2005 0 Progress Print 1 C10 Tum Lane Plan and Details 10/21/2005 0 Progress Print 1 C11 Paving Details 10/21/2005 0 Progress Print 1

R.P. Appx. 251 C12 Erosion Control Plan 10/21/2005 0 Progress Print 1 C13 Erosion Control Details 10/21/2005 0 Progress Print 1 C14 City of Irving Storm Water 10/21/2005 0 Progress Print 1 Pollution Prevention Methods C15 City of Irving Storm Water 10/21/2005 0 Progress Print 1 Pollution Prevention Details Prolog Manager Printed on: 5/19/2006 Clayco_Master Page 1 CLJ\YCO•.J:r .:.· - tr "'-,T ... ~;T :.,lllr'l:l.; Drawing List Attachment A

Number Rev Title Rev Date Bulletin %Complete Status Category General Notes Ref RFis C16 City of Irving Storm Sewer 10/21/2005 0 Progress Print 1 Details C17 City of Irving Inlet Details 10/21/2005 0 Progress Print 1 C18 City of Irving Trench 10/21/2005 0 Progress Print 1 Embedment, Backfill, and Pavement Repair Details C19 City of Irving Details for Trench 10/21/2005 0 Progress Print 1 Sheeting, Shoring, Sloping for Trenches over 5' Deep C20 City of Irving Water and 10/21/2005 0 Progress Print 1 Sanitary Sewer Details C21 City of Irving Sanitary Sewer 10/21/2005 0 Progress Print 1 Details A0-01 Life Safety Plans & Code Data 10/21/2005 0 Progress Print 1 AD-02 Rated Structure Plans 10/21/2005 0 Progress Print 1 A1-01 Architectural Site Plan 10/21/2005 0 Progress Print 1 A2-01 Overall Crawl Space and First 10/21/2005 0 Progress Print 1 Floor Plans A2-02 Overall Second and Third Floor 10/21/2005 0 Progress Print 1 Plans A2-03 Overall Fourth Floor and Roof 10/21/2005 0 Progress Print 1 Plans A2-11 Partial First Floor Plan 10/21/2005 0 Progress Print 1 A2-12 Partial First Floor Plan 10/21/2005 0 Progress Print 1 A2-21 Partial Second Floor Plan 10/21/2005 0 Progress Print 1 A2-22 Partial Second Floor Plan 10/21/2005 0 Progress Print 1 A2-31 Partial Third Floor Plan 10/21/2005 0 Progress Print 1

R.P. Appx. 252 A2-32 Partial Third Floor Plan 10/21/2005 0 Progress Print 1 A2-41 Partial Fourth Floor Plan 10/21/2005 0 Progress Print 1 A2-42 Partial Fourth Floor Plan 10/21/2005 0 Progress Print 1 A2-51 Partial Roof Plan 10/21/2005 0 Progress Print 1 A2-52 Partial Roof Plan 10/21/2005 0 Progress Print 1

Prolog Manager Printed on: 5/19/2006 Clayco_Master Page 2 CLA._YCO-II' .._11,.. 'i:'l' •.f;r ,;.• ~·.Ill f':l-' Drawing List Attachment A

Number Rev Title Rev Date Bulletin % Complete Status Category General Notes Ref RFis A2-53 Roof Details 10/21/2005 0 Progress Print 1 A2-54 Roof Details 10/21/2005 0 Progress Print 1 A3-01 Overall Elevations 10/21/2005 0 Progress Print 1 A3-02 Enlarged Elevations 10/21/2005 0 Progress Print 1 A3-03 Enlarged Elevations 10/21/2005 0 Progress Print 1 A3-04 Enlarged Elevations 10/21/2005 0 Progress Print 1 A3-05 Enlarged Elevations 10/21/2005 0 Progress Print 1 A3-10 Building Sections 10/21/2005 0 Progress Print 1 A3-11 Building Sections 10/21/2005 0 Progress Print 1 A4-01 Enlarged Plans, Toilet Rooms 10/21/2005 0 Progress Print 1 & Lobby A5-00 Interior Elevations, Typical 10/21/2005 0 Progress Print 1 Information A5-01 Interior Elevations, Lobby 10/21/2005 0 Progress Print 1 A5-02 Interior Elevations, Toilet 10/21/2005 0 Progress Print 1 Rooms A6-11 Partial First Floor Ceiling Plan 10/21/2005 0 Progress Print 1 A6-12 Partial First Floor Cefting Plan 10/21/2005 0 Progress Print 1 AS-21 Partial Second Floor Ceiling 10/21/2005 0 Progress Print 1 Plan A6-22 Partial Second Floor Ceiling 10/21/2005 0 Progress Print 1 Plan AS-31 Partial Third Floor Ceiling Plan 10/21/2005 0 Progress Print 1 AS-32 Partial Third Floor Ceiling Plan 10/21/2005 0 Progress Print 1 AS-41 Partial Fourth Floor Ceiling 10/21/2005 0 Progress Print 1 Plan

R.P. Appx. 253 AS-42 Partial Fourth Floor Ceiling 10/21/2005 0 Progress Print 1 Plan A7-01 Elevator Plans & Sections 10/21/2005 0 Progress Print 1 A7-02 Elevator Sections 10/21/2005 0 Progress Print 1 A7-03 Elevator Details 10/21/2005 0 Progress Print 1

Prolog Manager Printed on: 5/19/2006 Clayco_Master Page 3 CL\YCO .:.· :.. - u ... ,t ... '1:'1' ·~:r tul":l ~ Drawing List Attachment A

Number Rev Title Rev Date Bulletin %Complete Status Category General Notes Ref RFis A7-11 Stair 1 Sections & Plans 10/21/2005 0 Progress Print 1 A7-12 Stair 2 Sections & Plans 10/21/2005 0 Progress Print 1 A7-13 Stair Deta~s 10/21/2005 0 Progress Print 1 AB-01 Wall Sections 10/21/2005 0 Progress Print 1 AB-02 Wall Sections 10/21/2005 0 Progress Print 1 AB-03 Wall Sections 10/21/2005 0 Progress Print 1 AB-04 Wall Sections 10/21/2005 0 Progress Print 1 A9-01 Partition Types and Details, 10/21/2005 0 Progress Print 1 Door & Frame Types & DetaHs A9-02 TYP Vapor Barrier & Window 10/21/2005 0 Progress Print 1 Details A9-03 VVindow Frame Types 10/21/2005 0 Progress Print 1 A9-10 Plan Details 10/2112005 0 Progress Print 1 A9-11 Plan Details 10/21/2005 0 Progress Print 1 A9-20 Exterior DetaHs 10121/2005 0 Progress Print 1 A9-21 Exterior Detans 10/21/2005 0 Progress Print 1 A9-22 Exterior Details 10/21/2005 0 Progress Print 1 A10-01 Interior Details, Toilet Rooms 10/21/2005 0 Progress Print 1 A10-02 Interior Details, 1st Level Lobby 10/21/2005 0 Progress Print 1 A10-03 Interior Details, 2nd Level 10/21/2005 0 Progress Print 1 Lobby A11-11 Partial Finish Plans, First Floor 10/21/2005 0 Progress Print 1 A11-12 Partial Finish Plans, First Floor 10/21/2005 0 Progress Print 1 A11-21 Partial Finish Plan, Second 10/21/2005 0 Progress Print 1 Floor

R.P. Appx. 254 A11-22 Partial Finish Plan, Second 10/21/2005 0 Progress Print 1 Floor A11-31 Partial Finish Plan, Third Floor 10/21/2005 0 Progress Print 1 A11-32 Partial Finish Plan, Third Floor 10/21/2005 0 Progress Print 1 A11-41 Partial Finish Plan, Fourth Floor 10/21/2005 0 Progress Print 1

Pro/og Manager Printed on: 5/19/2006 Clayco_Master Page4 CLJ\YCO - u .., 11 ... ~;T ·.J.·r .:.- :-•.111 r.:1 ~ Drawing List Attachment A

Number Rev Title Rev Date Bulletin % Complete Status Category General Notes Ref RFis A11-42 Partial Finish Plan, Fourth Floor 10/21/2005 0 Progress Print 1 51-01 General Notes 10/21/2005 0 Progress Print 1 51-02 Typical Sections & Details 10/21/2005 0 Progress Print 1 51-03 Typical Sections & Details 10/21/2005 0 Progress Print 1 51-04 Typical Sections & Details 10/21/2005 0 Progress Print 1 52-01 Partial Pier Plan 10/21/2005 0 Progress Print 1 52-02 Partial Pier Plan 10/21/2005 0 Progress Print 1 52-11 Partial Foundation Plan 10/21/2005 0 Progress Print 1 52-12 Partial Foundation Plan 10/21/2005 0 Progress Print 1 52-21 Partial Second Floor Framing 10/21/2005 0 Progress Print 1 Plan 52-22 Partial Second Floor Framing 10/21/2005 0 Progress Print 1 Plan 52-31 Partial Third Floor Framing 10/21/2005 0 Progress Print 1 Plan 52-32 Partial Third Floor Framing 10/21/2005 0 Progress Print 1 Plan 52-41 Partial Fourth Floor Framing 10/21/2005 0 Progress Print 1 Plan 52-42 Partial Fourth Floor Framing 10/21/2005 0 Progress Print 1 Plan 52-51 Partial Roof Framing Plan 10/21/2005 0 Progress Print 1 52-52 Partial Roof Framing Plan 10/21/2005 0 Progress Print 1 53-01 Foundation Section and Details 10/21/2005 0 Progress Print 1 53-02 Foundation Section and Details 10/21/2005 0 Progress Print 1 54-01 Framing Section & Details 10/21/2005 0 Progress Print 1

R.P. Appx. 255 54-02 Framing Section & Details 10/21/2005 0 Progress Print 1 54-03 Framing Section & Details 10/21/2005 0 Progress Print 1 54-04 Framing Section & Details 10/21/2005 0 Progress Print 1 55-01 Column Schedule & Details 10/21/2005 0 Progress Print 1 56-01 Brace Elevation & Details 10/21/2005 0 Progress Print 1 Prolog Manager Printed on: 5/19/2006 Clayco_Master PageS CL\_YCO .. If .._1y.., ~:·1··~:t .:.· :.. IUr'l-:1 0: Drawing List Attachment A

Number Rev Title Rev Date Bulletin % Complete Status Category General Notes Ref RFis MEP1.00 Cover Sheet 10/21/2005 0 Progress Print 1 MP1.01 Site Plan, Mechanical/Plumbing 10/21/2005 0 Progress Print 1 M2.11 Partial First Floor Plan - 10/21/2005 0 Progress Print 1 Mechanical M2.12 Partial First Floor Plan - 10/21/2005 0 Progress Print 1 Mechanical M2.21 Partial Second Floor Plan - 10/21/2005 0 Progress Print 1 Mechanical M2.22 Partial Second Floor Plan - 10/21/2005 0 Progress Print 1 Mechanical M2.31 Partial Third Floor Plan - 10/21/2005 0 Progress Print 1 Mechanical M2.32 Partial Third Floor Plan - 10/21/2005 0 Progress Print 1 Mechanical M2.41 Partial Fourth Floor Plan - 10/21/2005 0 Progress Print 1 Mechanical M2.42 Partial Fourth Floor Plan - 10/21/2005 0 Progress Print 1 Mechanical MEP2.51 Partial Roof Plan - 10/21/2005 0 Progress Print 1 MechanicaVEiectricai/Piumbing MEP2.52 Partial Roof Plan - 10/21/2005 0 Progress Print 1 Mechanicai/EiectricaVPiumbing M3.01 Partial Enlarged Plans - 10/21/2005 0 Progress Print 1 Mechanical M3.02 Partial Enlarged Second Floor 10/21/2005 0 Progress Print 1 Plans- Mechanical M3.03 Partial Enlarged Third Floor 10/21/2005 0 Progress Print 1 Plans - Mechanical M3.04 Partial Enlarged Fourth Floor 10/21/2005 0 Progress Print 1

R.P. Appx. 256 Plans - Mechanical M4.01 Mechanical Details 10/21/2005 0 Progress Print 1 M4.02 Mechanical DetaHs 10/21/2005 0 Progress Print 1 M5.01 Mechanical Schedules 10/21/2005 0 Progress Print 1 P2.01 Partial Underfloor Plan - 10/21/2005 0 Progress Print 1 Plumbing Prolog Manager Printed on: 5/19/2006 Clayco_Master PageS CLt\_YCO-lr..,.,T,., 'i:T-.(.'f .:.· : .. llff'a:l ~ Drawing List Attachment A

Number Rev Title Rev Date Bulletin % Complete Status Category General Notes Ref RFis P2.02 Partial Underfloor Plan- 10/21/2005 0 Progress Print 1 Plumbing P2.11 Partial First Floor Plan - 10/21/2005 0 Progress Print 1 Plumbing P2.12 Partial First Floor Plan- 10/21/2005 0 Progress Print 1 Plumbing P2.21 Partial Second Floor Plan - 10/21/2005 0 Progress Print 1 Plumbing P2.22 Partial Second Floor Plan - 10/21/2005 0 Progress Print 1 Plumbing P2.31 Partial Third Floor Plan - 10/21/2005 0 Progress Print 1 Plumbing P2.32 Partial Third Floor Plan - 10/21/2005 0 Progress Print 1 Plumbing P2.41 Partial Fourth Floor Plan - 10/21/2005 0 Progress Print 1 Plumbing P2.42 Partial Fourth Floor Plan - 10/21/2005 0 Progress Print 1 Plumbing P3.01 Partial Enlarged Plans- 10/21/2005 0 Progress Print 1 Plumbing P4.01 Plumbing Riser Diagrams 10/21/2005 0 Progress Print 1 P5.01 Plumbing DetaHs and 10/21/2005 0 Progress Print 1 Schedules P5.02 Plumbing Details 10/21/2005 0 Progress Print 1 E1.01 Site Plan Electrical 10/21/2005 0 Progress Print 1 E2.11 First Floor Plan Electrical 10/21/2005 0 Progress Print 1 E2.12 Partial First Floor Plan 10/21/2005 0 Progress Print 1 Electrical E2.21 Partial Second Floor Plan Progress Print 1

R.P. Appx. 257 10/21/2005 0 Electrical E2.22 Partial Second Floor Plan 10/21/2005 0 Progress Print 1 Electrical E2.31 Partial Third Floor Plan 10/21/2005 0 Progress Print 1 Electrical E2.32 Partial Third Floor Plan 10/21/2005 0 Progress Print 1 Prolog Manager Printed on: 5/19/2006 Clayco_Master Page 7 CLt\YCO -tr ~lTr. "i:T•ol,'f .;.· :.,IJH''t:l ~ Drawing List Attachment A

Number Rev Title Rev Date Bulletin % Complete Status Category General Notes Ref RFis Electrical E2.41 Partial Fourth Floor Plan 10/21/2005 0 Progress Print 1 Electrical E2.42 Partial Fourth Floor Plan 10/21/2005 0 Progress Print 1 Electrical E4.01 Single Line Electrical 10/21/2005 0 Progress Print 1 E4.02 Details Electrical 10/21/2005 0 Progress Print 1 EL2.11 Partial First Floor Plan Lighting 10/21/2005 0 Progress Print 1 EL2.12 Partial First Floor Plan Lighting 10/21/2005 0 Progress Print 1 EL2.21 Partial Second Floor Plan 10/21/2005 0 Progress Print 1 Lighting EL2.22 Partial Second Floor Plan 10/21/2005 0 Progress Print 1 Lighting EL2.31 Partial Third Floor Plan Lighting 10/21/2005 0 Progress Print 1 EL2.32 Partial Third Floor Plan Lighting 10/21/2005 0 Progress Print 1 EL2.41 Partial Fourth Floor Plan 10/21/2005 0 Progress Print 1 Lighting EL2.42 Partial Fourth Floor Plan 10/21/2005 0 Progress Print 1 Lighting 02466 - Drilled Piers 10/21/2005 0 9 Pages 03300 0 Cast-In-Place Concrete 10/21/2005 0 03301 - Under Slab Vapor Barrier/Retarder 10/21/2005 0 2 Pages

03470 - Tilt-Up Concrete Construction 10/21/2005 0 6 Pages 03490 - Glass Fiber Reinforced Precast 10/21/2005 0 5 Pages Concrete 05120 - Structural Steel 10/21/2005 0 6 Pages

R.P. Appx. 258 05210 - Steel Joists 10/21/2005 0 6 Pages 05310 - Steel Deck 10/21/2005 0 2 Pages 05500 - Metal Fabrications 10/21/2005 0 7 Pages 05511 - Metal Stairs 10/21/2005 0 8 Pages 05521 - Pipe and Tube RaNing 10/21/2005 0 8 Pages Prolog Manager Printed on: 5/19/2006 Clayco_Master Page 8 CL\..YCO -,r .. ,t ... 'i:T•f:r.:-·:•. tltr''-:1.- Drawing List Attachment A

Number Rev Title Rev Date Bulletin %Complete Status Category General Notes Ref RFis 05811 - Architectural Joint System 10/21/2005 0 6 Pages 06100 - Rough Carpentry 10/21/2005 0 5 Pages 06402 - Interior ArcMectural Woodwork 10/21/2005 0 5 Pages 07170 - Bentonite waterproofing 10/21/2005 0 5 Pages 07210 - Building Insulation 10/21/2005 0 7 Pages 07412 - Metal Wall Panels 10/21/2005 0 9 Pages 07540 - Thermoplastic Membrane 10/21/2005 0 6 Pages Roofing 07620 - Sheet Metal Flashing and Trim 10/21/2005 0 5 Pages 07720 - Roof Accessories 10/21/2005 0 3 Pages 07811 - Sprayed Fire- Resistive Materials 10/21/2005 0 5 Pages

07842 - Fire Resistive Joint Systems 10/21/2005 0 4 Pages 07920 - Joint Sealants 10/21/2005 0 7 Pages 08110 - Steel Doors and Frames 10/21/2005 0 5 Pages 08125 - Interior Aluminum Frames 10/21/2005 0 4 Pages 08211 - Flush Wood Doors 10/21/2005 0 4 Pages 08311 - Access Doors 10/21/2005 0 5 Pages 08331 - Overhead Coiling Doors 10/21/2005 0 4 Pages 08410 - Aluminum Entrances and 10/21/2005 0 10 Pages Storefronts 08470 - Revolving Entrance Doors 10/21/2005 0 7 Pages 08620 - Unit Skylights 10/21/2005 0 3 Pages 08711 0 Door Schedule 10/21/2005 0 -

R.P. Appx. 259 08800 Glass & Glazing 10/21/2005 0 7 Pages 08830 - Mirrors 10/21/2005 0 5 Pages 08911 - Glazed Aluminum Curtain Wall 10/21/2005 0 9 Pages 09000 0 Material Legend 10/21/2005 0 2 Pages 09253 - Gypsum Sheathing 10/21/2005 0 3 Pages

Prolog Manager Printed on: 5/19/2006 Clayco_Master Page 9 Cli\.YCO -u .o,.'~Tr. 'i:"t"·J:r .:.· ;•• ,uf\:t.; Drawing List Attachment A

Number Rev Title Rev Date Bulletin %Complete Status Category General Notes Ref RFis 09260 - Gypsum Board Assemblies 10/21/2005 0 14 Pages 09265 - Gypsum Board Shaft-Wall 10/21/2005 0 5 Pages Assemblies 09310 - Ceramic Tile 10/21/2005 0 7 Pages 09402 - Epoxy Terrazo 10/21/2005 0 5 Pages 09514 - Acoustical Pan CeYings 10/21/2005 0 4 Pages 09653 - Resilient Wall Base 10/21/2005 0 4 Pages 09861 - Carpet Tile 10/21/2005 0 3 Pages 09912 - Painting 10/21/2005 0 9 Pages 09970 - Special Wall Surfaces 10/21/2005 0 4 Pages (Fiberglass Reinforced Plastic Panels) 09980 0 Special Coatings for Concrete 10/21/2005 0 Surfaces 10270 - Access Flooring 10/21/2005 0 6 Pages 10520 - Fire Protection Specialties 10/21/2005 0 5 Pages 10801 - Toilet Accessories 10/21/2005 0 3 Pages 11160 - Loading Dock Equipment 10/21/2005 0 5 Pages 12491 - Horizontal Blinds 10/21/2005 0 3 Pages 14240 - Hydraulic Elevators 10/21/2005 0 8 Pages 15010 - Basic Mechanical 10/21/2005 0 4 Pages Requirements 15071 - Mechanical Vibration Controls 10/21/2005 0 4 Pages 15081 - Duct Insulation 10/21/2005 0 8 Pages 15083 - Pipe Insulation 10/21/2005 0 10 Pages

R.P. Appx. 260 15100 - Valves 10/21/2005 0 7 Pages 15135 - Meters and Gages 10/21/2005 0 4 Pages 15140 - Hangers and Supports 10/21/2005 0 4 Pages 15300 - Fire Suppression Piping 10/21/2005 0 14 Pages 15411 - Water Distribution Piping 10/21/2005 0 8 Pages

Pro/og Manager Printed on: 5/19/2006 Clayco_Master Page 10 Cli\YCO -~r ~lTr. el'·.t:t .:.- : .. turq ~ Drawing List Attachment A

Number Rev Title Rev Date Bulletin % Complete Status Category General Notes Ref RFis 15420 - Drainage and Vent Systems 10/21/2005 0 7 Pages 15440 - Plumbing Fixtures 10/21/2005 0 4 Pages 15453 - Plumbing Pumps 10/21/2005 0 4 Pages 15460 - Water Heaters 10/21/2005 0 3 Pages 15730 - Section Packaged Rooftop Air Conditioning Units 10/21/2005 0 10 Pages

15838 - Power Ventilators and Exhaust 10/21/2005 0 7 Pages Fans 15883 - Variable Frequency Drives 10/21/2005 0 5 Pages 15891 - Metal Ducts 10/21/2005 0 8 Pages 15910 - Duct Accessories 10/21/2005 0 6 Pages 15932 - Air Outlets and Inlets 10/21/2005 0 3 Pages 15933 - Air Terminals 10121/2005 0 4 Pages 15990 - Testing, Adjusting, and 10121/2005 0 7 Pages Balancing 15995 - Commissioning 10/21/2005 0 4 Pages 16010 - Basic Electrical Requirements 10/21/2005 0 4 Pages 16110 - Raceways 10/21/2005 0 5 Pages 16120 - Wires and Cables 10/21/2005 0 3 Pages 16135 - Cabinets, Boxes, and Fittings 10121/2005 0 5 Pages 16143 - Wiring Devices 10/21/2005 0 4 Pages 16170 - Circuit and Motor Disconnect 10/21/2005 0 2 Pages Switches 16190 - Circuit and Motor Disconnect 10/21/2005 0 4 Pages Switches -

R.P. Appx. 261 16195 Electrical Identification 10/21/2005 0 3 Pages 16420 - Service Entrance 10/21/2005 0 4 Pages 16425 - Switchboards 10/21/2005 0 6 Pages 16452 - Grounding 10121/2005 0 5 Pages 16460 - Transformers 10/21/2005 0 3 Pages

Prolog Manager Printed on: 5/19/2006 Clayco_Master Page 11 CLA_YCO - 1r .,,y.., ~:T..,:r .~· ;:-.,1n~:1.; Drawing List Attachment A

Number Rev Title Rev Date Bulletin %Complete Status Category General Notes Ref RFis 16470 - Panel boards 10/21/2005 0 5 Pages 16471 - Transient Voltage Surge Suppressors 10/21/2005 0 4 Pages

16475 - Overcurrent Protective Devices 10/21/2005 0 5 Pages 16481 - Motor Controllers 10/21/2005 0 3 Pages 16515 - Lighting 10/21/2005 0 6 Pages 16670 - Lightning Protection Systems 10/21/2005 0 3 Pages 16721 - Fire Alarm Systems 10/21/2005 0 7 Pages

R.P. Appx. 262 Prolog Manager Printed on: 5/19/2006 Clayco_Master Page 12 IN TELL/CENTER ~ EXHIBIT Dallas. IX iii i ('~ 211.637 SF - 4 STORY OFFICE BLDG, KQLLDEVfLOPMENTCOMPANY ~ ~ Februarv 20. 2006 EST.t: TOTAL AREA: 211,638 Sf 52,910 1st Fir 5119/2006 DATE: BY: II####### SAMITS 3:52PM PERIMETER: CLEAR HT.: 1,226 Lf 158,728 Upper Firs I 3:52PM I SITE: Dallas, TX SCHEDULE: 9.00 Mos 211,638 Total 0.500%1 INSURANCE I FILE: 39 Wks 4.00%1 O.H. & PROFIT

1. SITE IMPROVEMENTS CODE DESCRIPTION I QTY I U/M I Labor I Material Sub Con I Total I 02050 DomoiHion I SHe Cleorlng Curb Cuts 3 EA 3,000.00 9,000 Site Clearing 14.30 ACR 800.00 11,440 Tree/shrub removal LS Sawcut existing island and entrance pavement see above 3.00 Demo and fill for 2 entrance and island rework LS 7,000.00 7,000 ,---;:-:--;-::-, Tntfftc control/barricades etc. Discount LS LS 7,000.00 7.000 I 34 0~~ I 02200 Eorthwork discount Mob/Layout/surveying/dewatering LS 20,000.00 20,000 Cut/Fill on-site materials 14,000 CY 3.50 49,000 Prep Building Pad 5,555 SY 0.75 4,168 Cement Mix Clay Under Pavement Areas Top 6' of subgrade SEEALT SY 2.85 Lime at city Street Wor1< 1,604 sy 5.00 8,020 Moisture Conditioning of Slab On Grade areas Top 2.5' below slab SY 2.00 Spoils from utility wor1<-Stocl<plled On Site 2,000 CY 2.00 4,000 Strip and stockpile topsoil 4,500 CY 1.50 6,750 Respread topsoil Based on 4" 3,000 CY 4.00 12,000 Topsoii-Stockpited on Site 1,500 CY 2.00 3,000 Fire MarshaN Road (8'lhickness) 3,251 Tons 17.00 55,267 Tempor.uy staging area 8" Stone 10,000 SF 0.70 7,000 Maintain access road w/access road 3 MO 3,500.00 10,500 ,--,..,...,...,...,.,..., Select fill material at City Road 844 Tons 20.00 16.880 I 224 816 Final Grade paved areas 16,683 sy 1.00 16,683 . 1.06 1.

Build Mounds on site for excess utility spoils 1,350 cy 3.00 4,050 Move excess on site 3,000 CY 2.50 7,500 . - - - - - , 02210 Flnt..h Grading I Backfill Footings 1 LS 4,200.00 4.200 I 4:~ I 02201 Grading Contlngincy Undercut allowance Excluded ByKoll Allow : I 02202 Detention Pond wlstorrn system I : I 02300 Surfoce Woler Control

R.P. Appx. 263 Erosion control per plans Allowance 1 LS 1,000.00 1,000 Sill fence 1,800 LF 2.00 3,600 Temporary seed & mulch 2 AC 1,200.00 2,400 .----::--::::-:-, Protect inlets 10 EA 200.00 2.000 I 9 oo: I 02500 AsphoH Poving ond striping 3.5" + 2.0" asphalt paving w/concreta paving 3.0' + 1.5' asphalt paving w/concrete paving Roadway 2+81/2+4 Exterior Dock stairs/fndn wall w/foundations Patch Drive After Construction Paving Fabric- Mirafi 500 Stripe Par1<ing Stalls - cars Need to count spaces 639 EA 5.00 3,195

Page1 8-30-05atlantaupdate CODE DESCRIPTION I QTY I U/M I Labor I Material I Sub Con I Total I Stripe Parl<ing Stalls- Trailers Parl<ing Blocks I 31951 0.02 02510 Concrete Paving & Curbs-TAS • Light duty paving 257,400 sf 2.20 566,280 • Medium duty paving 56,000 sf 2.50 140,000 " Islands and Decellanes 14,450 sf 4.75 68,638 Seal Joints w/ Hot Tar 327,850 SF O.o? 22,950 " Sidewalk i!Jong the building 11,099 SF 3.25 36,072 " Sidewalk atong main road 7,500 SF 4.00 30,000 Transfonner Pad 50 SF 8.00 400 Light Polo Bases Pipe Bollards-lnstall & pour 36EA ea 240.00 135.00 8,640 3,375 I 876 3551 4.14 02511 Concrete Curba • Extruded Curb 10,611 LF 3.00 31,833 • Curb & Gutter @ road Existing discount LF (27,000.00) (27,000)1 48331 0.02 02605 Sanitary Sewar Layout LS 500.00 "Lateral Line 305 LF 22.00 Gravel bedding 75 TON 24.00 Sanitary Manhole (modify existing) EA 750.00 aeanouts 875.00 Grinder Pump I Sewage Ejector Not included Street Bore EXCLUDED Tie-in to Existing Manhole EA 1,500.00

02606 Sanitary Recoupment or capacity Foes EXCLUDED

02660 Water Distribution Meter Fees LS 2,800.00 Motor Vault & Pit EA 12,000.00 Combination Water Tap 8" EA 5,000.00 Combination Water Tap two @2" EA 2,000.00 "Fire Una 60.00 "Fire Line 1,800 LF 20.00 " Domestic Line 820 LF 16.00 Jack& bore Not Required LF 275.00 8" Detector check valve EA 8,000.00 2" Detector check valve EA 2,500.00 Fire Hydrants EA 2,700.00 Detector Check In Pyramid Box for Sprinklers EA 2,500.00

02680 Gas Main to Building EXCLUDED-BY KOLL

02700 Storm Sewers ALLOWANCE Layout LS Pumping LS Curb Inlets 5 EA 1,800.00 Drain Tile at Building Mud Slab 800 LF 16.00 Rip Rap around Flared Ends & Flumes 170 TONS 23.00 Manholes 3 EA 1,800.00 Roof drains W/Storm Piping LS Downspout Connedions 12 EA 250.00

R.P. Appx. 264 " Stonn Pipe 600 LF 24.00 "Storm Pipe 964 LF 25.00 " Storm Pipe 38.00 " Storm Pipe 175 LF 28.00 " Storm Pipe 45.00 " Storm Pipe 400 LF 32.00 " Storm Pipe • Stonn Pipe " Storm Pipe • Storm Pipe " Storm Pipe " Storm Pipe

Page2 6-3()...()5atlantaupdate CODE DESCRIPTION I QTY I U/M I Labor I Material Sub Con I Total I " Stonn Pipe Rock Excavation EXCLUDED ALL I 89310 0.42 I 02760 Landscape lighting conduH See Div 16 LF 9.50 02781 Underground Electric ConduH Allowance See Dlv 17 32.00 02782 Underground ConduH & CircuM to Sign See Div 18 11.00 02783 Underground Telephone ConduH-diacount 800 LF (12.50) 12.50 I 02800 Hardacape Allowonce ALLOWANCE LS 25,000.00 25,000 02602 SHe Sc""'n Walla IN TILT-UP SF 02805 Traoh Encloau"' IN TILT-UP 02806 P•vers SF 02806 Fencing EXCLUDED 11.60 02807 1\n:hHectural Hardsca ALL 266.50 1,200.00 200.00 25000 0.12 225,000.00 225,000 225 000 1.06 75,000.00 75,000 75 000 0.35 SUBTOTAL SITE IMPROVEMENTS COSTS 1,677,179 1,677,179 7.91 DIVISION 17 • MISCELLANEOUS EROSION CONTROL BOND SITE IMPROVEMENT BOND INSURANCE 0.500% % 8,386 OVERHEAD AND PROFIT 4.00% 67,423

TOTAL SITE IMPROVEMENTS COSTS 211,638 SF 8.28 1,752,988

2. BUILDING SHELL CODE DESCRIPTION I QTY I U/M I Labor I Material Sub Con I Total I Division 1-GENERAL CONDITIONS 16010 Project Manager-discount 1.00 Ls Projed exec MO 500.00 Projed Mgr (50% TIME) 9.00 MO 6,800.00 61,200 Project Engineer 1.00 MO 3,800.00 3,800 Mission control 9.00 MO MO 700.00 500.00 6,~00 I 71-300~ 0.34 General Supt 16020 Field Superintendent (local woge only) 41 WK 2,550.28 104,561 Assistant Superintendent 104561 I I 0.49 18025 Travel Expenaas-discount LS JobSite Superintendent- Per Diem Expenses-Bill Beck is Local days Housing Expense PM Lodging (one per week) 30 Trips 725.00 21,750 Projed Manager/Proj. Exec 40 lrips 21 750 I 16030 Corporale Travel (112 TO Overilead) Dnlwlng Reproduction & ProgFliSS Photos EA I 0.10

R.P. Appx. 265 Reproduction Cosls LS 7,500.00 7,500 Progress Photos 9.00 MO 120.00 1,080 FodEx Charges 9.00 MO 125.00 1,~251 9 7051 Web cam BY KOLL 0.05 18040 Field Engineering & Layout Topographic Survey Foundation Survey As-Bum survey Silo Stal<ing LS 13,000.00 13,000 r - - - - - , Leyoul 1 EA 5,000.00 5,000 1 18oo: 1 18060 Construction Clunlng & General labor-discount Ls General Labor 200 HR 12.00 2,400

Page3 6-30-05atlantaupdate CODE DESCRIPTION QTY I U/M I Labor I Material I Sub ~on I Total _j Clean Streets BO HR 34.00 2,720 Building Clean-up 211,638 SF 0.02 0.09 23,280 Final Clean-Up 211,638 SF 0.10 21,184 Trash Hauling 20 LOS 300.00 6,000 Dumpster Box Rental Concrete LOS 500.00 1,500 Dumpster Box Rental Steel 3 LOS 500.00 1,500 Dumpster Box Rental Woo<J 3 LOS 300.00 900 Dumpster Box Rental Glass LOS 300.00 900 Dumpster Box Rental Plastic LOS 300.00 900 Dumpster Box Rental Dlywall LOS 300.00 900 Dumpster Box Rental Insulation LOS 300.00 900 r - - - - - , Dumpster Box Rental Misc. 10 LOS 300.00 3.000 I 660~ I 18100 Equipment Rental & Small Tools Job Trailers 9.00 MO 200.00 325.00 4,725 Tool Trailers 9.00 MO 350.00 3,150 Superintendent Pick-up Truck 9.00 MO 500.00 4,500 Fuel, Oil, & Repairs 9.00 MO 145.00 1,305 Field Office Supp~es 9.00 MO 35.00 315 Small Tools 8.00 MO 600.00 4,800 Hoisting Equipment Barricades & Lights 9.00 MO Scaffolding I Ladders 9.00 MO 200.00 1,800 . - - - - - , Jobsite Communications 9.00 MO 200.00 1.800 I 22 03~~ I 18200 Miscellaneous G. C.'a & Safety MisceHaneous Hauling 5.00 MO 400.00 2,000 Job Signs EA 800.00 1,500.00 2,400 Temporary Protection Is 2,000.00 2,000 Temporary Shoring Ice, Cups & Water 40 WK 40.00 10.00 2,000 Protect Finish Work LS 555.00 500.00 1,055 OSHA Handrails 2,200 LF 2.00 1.00 0.70 8,140 Safety Supplies 9.00 MO 200.00 1,800 First Aid Supplies 9.00 MO 50.00 450 Security Exduded Site Fencing- Security Excluded LF 5.00 Special Insurance EXCLUDED 19 845 0.09 18210 Winter Protection EXCLUDED 18220 Temporary Roads w/earthwork LS 3,500.00 3,500 3500 0.02 18240 Parfonnance Bond EXCLUDED 18250 Building Penni! 211,000 SF 0.18 37,980 37980 0.18 18255 Builder's Risk Insurance $.009/Hundred x Months + Soft Costs MO 1,650.00 14,850 14 850 0.07 18260 Quality Control & Testing BY KOLL Soils Testing Services Concrete Testing Services Asphalt Testing Services Floor Flatness Testing Steel Tests & Inspections : I

R.P. Appx. 266 18270 Temporvy Lltilitles Telephone Setup & Connection LS 1,000.00 1,000 OSLSet Up ALLOW LS 4,000.00 4,000 Telephone 9.00 MO 600.00 5,400 Temporary Electric Hookup LS 2,500.00 2,500 Temporary Electric 7.00 MO 750.00 5,250 Permanent Electric 2.00 MO 4,000.00 8,000 Temporary Water 9.00 MO 100.00 900 Temporary Fire Protection 9.00 MO 75.00 675 Temporary Toilets 9.00 MO 350.00 3,150 1,---,30.,.-,87"'5,..,1 0.15

Page4 6-30-05atlantaupdate CODE DESCRIPTION Material

Division 2-EARTHWORK 02220 Excavation and Backllll Excavate Footings, Grade Beams, & Tie Beams 60 HR 20.00 70.00 5,400 Pumping & Dewatering 20 HR 20.00 10.00 600 Backfill Footings, Grade Beams, & Tie Beams See Div 2 6.25 I 6000 I _____Q,.Q!..

02370 Drilled Piers LS Drilled piers INCLUDED 119 91 EA 2,950 268,450 DriiHng In Earth Drilling In Rock Auger cast Piles Mobilization Charge Temporary casing Layout of Plies 268450 1.27 EARTHWORK TOTAl 274,450 274,450 1.30 Division 3-CONCRETE 03210 Reinforcing Steel Masonry 0.4 ;\!/SF X lllREFI SF Pile caps 65 ;\!ICY X 74.0 CY Exterior Pads 60 ;\!ICY X #REFI CY Cont. Footing 65 ;\!ICY X 0.0 CY Tie Beams 65 ;1!/CYx 0.0 CY Walls 100 ;\!ICY X 3.0 CY Grade Beams 100 ;1!/CYx 1.0 CY Miscellaneous Reinforcing Total 50,000 LBS 0.60 30.000 I 300~ I 03300 cast-In-place Concnsta Elevated beams 304 ~ x 4 x 1.5 74 CY 950,00 70,300 Continuous Perimeter Grade Beam excluded w/plers LS Premium to fonn elevated slab areas wlflatworl< Ls Elevator Pits EA 6,000.00 18,000 Install column isolation boxes LS 3,000.00 3,000 Install cast~over@ diamonds & elevator pits LS 6,000.00 6,000 Ducts below raised slab areas EA 3,500.00 3,500r---- Slab Edge Fonns & Column Blackouts LS 10,000.00 10,000 I 110:.: I 03345 cament Flatwork MUDSLAB Excluded 2.50 Concrete Fill Pan Stairs 2,400 SF 6.00 14,400 Rooftop Unit Sound Absorbing Slabs 4,860 SF 5.00 24,300 IJ:I. "' Composite Office Slab On Mezzanine with mesh 211,638 SF 3.00 634,914 r----~ Vapor Barrier Raised Slabs with Insulation (includes beam at expn joints) 9,648 sf 0.14 3.25 . I 31,356 704970 3.33 I 03350 Caulk Floor joints w/ MMBO Sealer 1.90 03355 Concreto Sealer 0.09 03346 4 " Granular Fill Under Slab 18.00 03347 w.w. Meah. 6x6-10/10 in above I :I

R.P. Appx. 267 03400 Arohitoctural Concrete Wall Panels Tilt-up Panel Design PART OF KOLL SCOPE casting beds for panels 78,000 SF 1.65 128,700 Loading dock area panels 3,000 SF 7.00 21,000 Joint chasing 1 LS 7,500.00 7,500 Perimeter Deadmen with removal 272 CY 120.00 32,840 Add for winter concrete Panel Erection w/ strongbacks H&H STEEL Clayco Panel Supervision for Top Flight Braces for tiH-up panels " Flat Slab TiHUp Panels @ Office 72.000 SF 9.10 655,2oo I 1,048,04o I PageS 6-30-05atlantaupdate CODE DESCRIPTION I QTY I U/M I Labor I Material I Sub Con I Total 3490 GFRC Column Covers 4.95 Exterior Columns 2 EA 6,500.00 13,000 000 0.061

CONCRETE TOTAL 1,906,810 1,906,810 9.00 Division 4-MASONRY 04210 Masonry Pilast1 ...

Beams • or Granite

MASONRY TOTAL Division 5-METALS I 05120 structural Steel Structunol Steel 1,520,000 LBS 0.60 Steel cantilever and column at 2 bui~ w/structural steel 2 EA 5,000.00 Less Galvanizing Roof Screen Steel 1Ls (28,000.00) Roof screen framing w/structural steel LBS 0.85 Mechanicaf Frames w/structural steel 8 EA 1,200.00 Dock Stair & Railing 1 EA 4,000.00 Pipe Botfards 5 EA 75.00 129.00 60.00 Stairs to OffJCe 9 EA 8,900.00 Ships Ladderto Roof 1 EA 3,500.00 Misc. roof penetretion framing w/strudural steel Allow 5,000.00 Misc. brecing & supports 20 Tons 1,800.00 Premium for laNer level railing system at main stair LS Galvanizing Steel @ roof 1 LS 12,000.00

05200 Miscellaneous for Till-Up 1 EA 15,000.00 05210 Steel Joists Roof Joists 4.51/SF 65,000 LB 0.55 Truck canopy Roof Joists 0.55 Floor Joists

05300 Metal Decking Roof Dec:k-1.5' 52,910 SF 0.90 Truck area canopy deck 0.90 Aoor Deek-3" 211,638 SF 1.20

05340 Structural Erection Strudural Steel & Joists 284,548 SF 1.75 Stair erection w/structunol sleet ea Floor and Roof Deck w/structural steel Div 5 Discount w/structural steel 1 LS (30,000.00) Tilt-Up enoction see div 3 SF Braces for Tilt-Up panels 6 per panel 184 LS

05580 Slwet Metal Fabrications

R.P. Appx. 268 Front entry high alucobond w/ framing (CMP-1) See Div 7 SF 22.75 Metal panel dadding- 10' per W(MP-2) See Div 7 12.25 Metal panel dadding- 9.2' per If (MP-1) See Div 7 12.25 Louver 1 LS 4,000.00 Roof gates 2 LS 350.00 Flashings & sheetmetal See Div 7 LS 32,000.00 Vents 10 LS 90.00 Adjustment for altemate manufacturer LS Roof screen Steal 950 Lf 63.00

PageB 6-30-05atlantaupdate CODE DESCRIPTION QTY I U/M I Labor I Material I Sub Con I Total I Division 6-WOOD AND FINISHES 06100 Rough carpentry Treated Wood Blocking 1,226 LF 4.00 1.00 6,130 Expansion Joint Blocking 240 LF 4.00 1.00 1,200 Misc. wood blocking 400 LF 4.00 1.00 2,000 Fire Treated plywood at CW intersection 340 LF 11.00 3,740 Window Sill Blocking 2,470 LF 2.05 1.00 7,534 Plywood At Parapet Soffit Overhang Framing @ Entry Finish carpentry 400 SF 3.00 2.00 2.000 I 22 0~~ I Csbinets @ Kitchen Araa Vanities @ Restrooms MW2 144 LF 105.00 190.00 42,480 WindowSills 2,470 LF 5.00 8.60 33,592 Trim at main lobby/1st fl, bl' ALLOWANCE 1 LS 17.500.00 17.500 ALLOWANCE 3EA 5,000.00 15,000 108 572 0.51 WQQD AND FINISHES TOTAL 131,176 131,176 0.62 Division 7-THERMAL AND MOISTURE PROTECTION 07100 Waterproofing -elevator pits 2 ea 3,500.00 7,000 I 7o0: I 07200 Insulation Foundation Insulation 2,452 SF 0.40 0.50 2,207.---...,....,~ Insulation at CW Glass 630 SF 3.00 ,,890 1 4 0971 0.02 07300 Spray-On Fireproofing at stairwells (91ocations) LS 4,500.00 12,500.00 11,000 1 11 ooo 1 0.08 07500 Roofing TPO Roofing w/R= 20 Insulation 52,910 SF 4.00 211,640 Roofing Memberane W/out Insulation SF 0.80 Year Extended Warranty excluded Walkway pads 2,100 SF 1.00 2,100 BaUast Roofing at Lobby Araa 290 SF 15.00 4,350 ,--,.,..,..,..,,.., Attic Vents Mech Unit Flashings ea 50.00 800.00 2,650 4,800 .

I 225 540 1.07 .

I 07600 Flashing and Sheet Metal Decorative railing at 2 level atrium 32 LF 425.00 13,600 Alucobond eye brow 11,600 sf 17.00 197,200 Alucobond soffit @ entries 860 sf 23.00 19,780 Metal Panel Cladding 10' per LF (MP2) 2,870 sf Roof Screen Marins X-12 13,250 sf 11.00 145,750 cap Flashing I Gravel Stop 1,226 LF 8.00 9,808 g closer plate 510 LF 9.00 4,590 . - - - - - , Counterflashings 716 LF 2.20 8.00 7,303l 4,, 531 I Stainless Steel Railing at entry 30 LF 450.00 13,500. 1.94 .

07700 Skylights & Roof Hatch Skylight Roof Hatch EA EA 4,500.00 1,000.00 5::1 4,500 . - - - - - - , t,oool 07920 Sealants and caulking Mise interior caulking 2,000 LF 2.00 4,000 TiltUo Walls - Ou1side Joints 72.000 SF 0.18 12.960

R.P. Appx. 269 835 0.12 THERMAL & MOISTURE TOTAL 695,503 695,503 3.21 Division 8-DOORS AND WINDOWS 08200 Doora,Frames,and Hardware-discount Ls (8,500.00) (8,500) Hollow Metal Door Frames - Single Hollow Metal Door Frames - Double Aluminum Door FramesOncludes 3 doubles) 100 EA 180.00 75.00 5.00 26,000 Bathroom Louver doors 40 EA 800.00 32,000 Solid Con! Wood Doors 60 EA 280.00 75.00 5.00 21,600

Page7 6-30-05atlantaupdate CODE DESCRIPTION I QTY I U/M I Labor I Material I Sub Con I Total I HM doors EA 200.00 50.00 5.00 765 Exterior Hollow Metal Door with frame & hardware 1 EA 1,200.00 1,200 A.D.A. Hardware 5.00 I 100 EA 150.00 95.00 25,000 Panic Devices I Automatic Closers 12 EA 300.00 3.600 101,~ 0.48 08300 Overhead Doora & Operato111 Dock I Rail Doors 9 ' X 10 EA 4,000.00 4,000 Drive-in & Garagt 12 'X 14 1,400.00 Elec1ric Operator EA 550.00 550 Overhead COiling Doors @ main entry stair/lower levet 4,500.00 I 08800 Glazing (baaed on National Agreement pricing) PALS I 4 550 0.02 Aluminum Curtainwall {Vistawall) 7,580 sf 42.00 318,360 Glass & Glazing (Viracon) 29,300 sf 26.50 776,450 Revolving door EA 28,000.00 28,000 Secondary Sealant Excluded Aluminum Do EA 1.950.00 15,600 1158560 or 5.47 llllii:IIIUI lo:llla~a-lDIII CII:J\I Ulll f;Jri,J

DOORS AND WINDOWS TOTAL IU.\,1\1 '"·'""" 1,264,775 1,264,775 5.98

R.P. Appx. 270 PageS 6-30-05atlantaupdate CODE DESCRIPTION I QTY I U/M I Labor I Material I Sub Con I Total I Ceramic Wall Tile @ Bathrooms 1,950 SF 14.00 27,300 Ceramic Aoor Tile @ Bathrooms 3,408 SF 12.00 40,896 Porcelain tile at 1st floor main lobby areas with base sf Porcelain tile boarder at 2 lower level entry at perimeter of pedimat sf Porcelain tile boarder 2nd and 3rd fl elevator lobby areas Pordelain Tile base at 2nd & 3rd fl elevator lobby areas sf 1,020 LF 11.00 11,;20 I 79 4161 0.38 09660 Corpet & Resilient Flooring IN FINISH ALLOW.

Carpet @ elevator lobbies 200 SY 32.00 6,400 Stair Carpet-main stair onfy VCT 1,900 SF 2.00 3,800 Vlr1Yf Base B1&2 4,536 LF 1.25 5,670 I - 15 870 o.or I Vinyl flooring at 2 perimeter stairs exduded 09900 Painting Exterior TiltUp Concrete Panels 68,000 SF 0.45 30,600 OrywaN-no painting the core areas 50,000 SF 0.35 17,500 Plaster Soffits 600 SF 1.00 600 Epoxy Floor at pump room 320 SF 3.00 960 Stain! @ Loading Dock 1 EA 1,000.00 1,000 Man Doors 45 EA 75.00 3,375 Overhead Doors EA 300.00 300 Stairways Paint Exterior Steel @ Roof Screen FLIGHTS LS 1,200.00 9,500.00 10.600 9,500 I 74 6351 0.35 09950 Wall Covering & Zolotono Allowonca Vmyl Wall Cover@ Restrooms (w-2) 7,200 SF 1.50 10,800 Vinyl Wall Cover Lobby Araas (W-1) 3,932 SF 1.50 5,898

I 166981 0.08 9970 Special Wall Surfoces (FRP) SF 5.00 1,500 1500 0.01 FINISHES TOTAL 923,077 923,077 4.36 Division 10-SPECIALTIES 10150 Toilet Part~ions and Accos.

Ceiling Mounted Painted Stool Partitions Floor Mounted Painted Partitions 600.00 Wall Mounted Painted Metal Urinal Screens 360.00 Wall Mounted Stainless Urinal Saeens Toilet Room Accessories 12 RMS 560.00 985.00 18,540 1 18s: 10550 Metal Lockers FUll Lockers Locker Room Benches I : I 10600 Miscellaneous Specialties Entry Mats 480 SF 25.00 12,000 Fire Extinguisher Cebinets 10 EA 35.00 120.00 1,550 Wall Expansion Joints @ Interior 320 LF 6.00 1,920 Floor Expansion Joints 460 LF 18.00 8,280 Handicap Parl<ing Signs 22 EA 80.00 60.00 3,080~8230 Exterior Expansion Joint (EJ 1) 140 LF 10.00 1,400 0.13 10610 Appliances - - - -

R.P. Appx. 271 10900 Interior Slgnage & Directories Building Directory Exduded ALL Exdudod ALL Exdudod ALL SPECIALTIES TOTAL 46,770 46,no 0.22 Division 11-EaUIPMENT 11161 Dock EqUipment LS Dock Bumpers

Page9 6-30-DSatl•ntaupdate CODE DESCRIPTION QTY I UIM I Labor I Material I Sub Con I Total I 11160 Mechanical Dock Levelers - 35,00Cll Capacity LS 2,045.00 2,045 11161 Dock Levelers- Self Leveling Pans 11162 Dock Levelers- Form Pita 11163 Dock Levelers -Dock Pit Angle 11164 Docklocks 11165 11166 DockSeals Dock Shelte1 .. 1 Ls 650.00 300.00 300 2 345 0.01 EqUIPMENT TOTAL 2,345 2,345 0.01 Diyision 12-FURNISHINGS 12510 Horlzontol Blinds -1" 28,000 SF 2.10 58,800 56800 0.28 FURNISHINGS TOTAL 58,800 58,800 0.28 Dlylslon 13-5PECIAL CONSTRUCTION 13320 Access Flooring 14" Access Flooring-stockpile on floors, tech rooms installed 191.000 SF 3.77 720.070 720,070 3.40 SPECIAL CONSTRUCTION TOTAL 720,070 720,070 3.40 Division 14-CONVEYING SYSTEMS 14200 Elevato<s Hydraulic 3 EA 64,500.00 193,500 Traction Finish cab for flooring/1 wall panel 3 EA 3,500.00 10,500 204000 0.96 CONVEYING SYSTEMS TOTAL 204,000 204,000 0.96 Division 15-MECHANICAL 15300 Fire Protection 211,638 SF 0.82 173,543 Gtass protection at 4 levels 30 heads 465.00 13,950 Standpipe system 3 Ea 4,000.00 12,000 Dry pipe system @ dock soffit area sf 2.00 Compressor for dry pipe system LS 1,500.00 199 493] 15310 Booster Pumps-75 hp 1 EA 35,000.00 35,000 I 0.94 In-Rack Sprinklers 35 000 I 15400 Plumbing-discount 1 LS (6,000.00) (6,000) I 0.17 Water Closet Fixtures (low usage) 34 EA 1,300.00 44,200 Handicapped Water Closet Fixtures (low usage) 6 EA 1,300.00 7,800 Urinals (low usage) 8 EA 800.00 6,400 Drinking Fountains 8 EA 2,200.00 17,600 Domestic Water in Building-includes 2 extra wet stacks 920 LF 25.00 23,000 Sewer Une in Building-fncludes 2 extra wet stacks 920 LF 30.00 27,600 Hose Bibbs 6 EA 270.00 1,620 Interior Downspout Piping 1,800 LF 35.00 56,000

R.P. Appx. 272 Interior Downspout Roof Drains 16 EA 4,500.00 72,000 Sinks or Rough-ins 32 EA 620.00 26,240 Emergency OVerflow Drains 16 EA 3,200.00 51,200 ottminder for elevator 1 EA 4,500.00 4,500 Mop basins 8 EA 2,500.00 20,000 Floor Drains 15 EA 700.00 10,500 Grease I Oil Interceptor for Garage Trench Drains Hot Water Heaters 8 EA 1,600.00 12.~00 I 375 460 1.77 I 15500 HVAC Trane rooftop units Furnish only 211,638 SF 5.96 1,261,362 Nailor- underlloor HVAC Furnish only 1 LS

Page10 6-30-05atlantaupdate CODE DESCRIPTION QTY I U/M I Labor I Material I Sub Con I Total I HVAC core & shell Exdudes restrooms & lobby's LS HVAC ~ restrooms & lobbies LS Prof. Uab. Insurance LS Control svstem •/HVAC I 1261 362 5.96 MECHANICAL TOTAL 1,871,315 1,871,315 8.84 Division 16-ELECTRICAL 16050 Electrical Main BuHding Service 4,000 AMP 61.00 244,000 Service Feeder 150 LF 300.00 45,000 Panel Boards for lighting 8 EA 3,000.00 24,000 Panel boards for heating 3 EA 3,000.00 9,000 Panel boards for receptades 8 EA 3,000.00 24,000 Panel for HVAC RTU (feeds to 4 RTU) 2,000 amp 25.00 50,000 Transformer 8 EA 8,000.00 84,000 Branch Circuits, raceways, supports 1 LS 6,000.00 6,000 can lighting for main lobby and elevator lobby BOEA 225.00 18,000 Fire pump hookup LS 35,000.00 Back of house ligi 2 x 4 Parebolics 116 EA 300.00 35,400 Stairwell light ftxlures 28 EA 300.00 8,400 Stairwell light fixtures-main stair 14 EA 550.00 7,700 Exit Fixtures 60 EA 270.00 16,200 Restroom Oownlights 72 EA 375.00 27,000 Other Downlights eo EA 375.00 30,000 Strip lights 27 EA 530.00 14,310 W Metal HaNda Exterior Flood Ughts 8 EA 980.00 7,840 Wall Sconces 66 EA 800.00 52,800 Ground Fault Receptacle 12 EA 180.00 2,160 Duplex recap for Water Cooler 6 EA 125.00 750 Duplex for telephone 6 EA 200.00 1,200 Four" PVC lhru floors LS 2,000.00 Miscellaneous Outlets 60 EA 250.00 15,000 Elevator Hookup 2 EA 5,000.00 10,000 HVAC Hookup 4 EA 7,000.00 28,000 Power to ERU units EA 2,000.00 Misc. HVAC 6 EA 750.00 4,500 Sprinkler Hookup 1 LS 12,000.00 12,000 Fire Alarm System 1 LS 75,000.00 75,000 Telephone Board 7 EA 91.71 50.00 992 Security I Cord Access System- EXCLUDED ALL Value engineering required to get to budget ALL Temporary Electric 1 EA 10,000.00 10.000 I 843:.: I 16100 SHo Lighting & Building Accent Lighting Bid based upon 10/21 Drawings-this bid does anticipate about $50k VE savings (conductor & I!Bar) with about $40k smoke damper Add Ground mounted flood Nghling EA Ugh! Boliards, building accent well lights, specially exter. Ughl ALLOWANCE LS 15,000.00 15,000 Fountain Lighting I Power Excluded EA Concrete bases for new sidewalk lighting Excluded Fixtures Added lighting along new sidewalk Excluded Fixtures Concrete Bases for Lights Bollards ALLOWANCE 32 EA 360.00 11,520 Pole Liohts @ Par1<ino Lot ALLOWANCE 32 EA 3.200.00 102.400

R.P. Appx. 273 5 EA 450.00 2,250 131184 0.62 ELECTRICAL TOTAL 974,422 974,416 4.60 SUBTOTAL BUILDING SHELL COSTS 11,385,602 11,385,601 53.73 DIVISION 17- MISCEULANEOUS COMMISSIONS CONTINGENCY INSURANCE 0.500".4 % 56,928.01 OVERHEAD AND PROFIT 4.00".4 457,701

Page 11 6-30-05atlantaupdate CODE DESCRIPTION QTY I U/M I Labor I Material I Sub Con I Total I TOTAL BUILDING SHELL COSTS 211,638 SF 56.23 11,900,231

3. TENANT FINISH ALLOWANCE CODE DESCRIPTION I QTY U/M Labor Material Sub Con I Total J 06200 Finish carpentry Allowance LEED REQUIRED ISSUE$-ALLOWANCE 1 LS 20,000.00 20,000 Sliding Closet B~Fold Doors Additional Shelving & Worktops 20 ooo 0.09 I 08200 Hollow Metal Doors & Frames Solid Core Wood Doors Lever Style Hardware Automatic Closers I : I 08800 Glozing Interior Glass Doors Interior Glass Borrowlites in H.M.

Mirrors I : I 09200 Framing and Drywall Furred Columns Taped Taping : I 09300 Ceramic Tile Floors of Kitchen Wet Walls of Office Restrooms

09500 Quarry Tile @ Lobby Install Acoustical Tik!s I :I Std. 2X4 Second Look II System Install Pads Batt Laid Insulation I :I 09650 Resilient Flooring Vinyl Base Vinyl Tile I : I 09680 carpet Allowance Office & Common Areas Stair Treads : I 09900 Painting VWC Aliowance Paint New Doors & Frames : I t0150 Computer Flooring Computer Floor Ramp : I 10990 Mlscellonooua Specialties Lockers

R.P. Appx. 274 ~ Locker Room Benches 12510 Window Blinds or Drapes 15300 Fire Protection Off"oce Sprinklers Recessed Heads Concealed Heads : I 15400 Plumbing Coffee Bar Areas Sinks or Rough~ins

P1ge12 6-30-05•tlantaupdate CODE DESCRIPTION Material Shower Doors 15500 HVAC Added VAV Boxes and Slo1 Diffusers Exhaust Fans @ Rest Room & Braak Room Extended Warranty : I 16050 Electrical Distribution Plumbing Hookup Cable Tray System I : I 16150 Security I Flra Alonn System• Allowonce Security Syst•"HI 'Stem ing &Deolgn SUBTOTAL TENANT FINISH COSTS 20,000 20,000 0.09 DIVISION 17- MISCELLANEOUS INSURANCE 0.50% % 100.00 OVERHEAD AND PROFIT 4.00% 804

TOTAL TENANT FINISH COSTS 211,638 SF 0.10 20,904

4. ARCHITECTURAL & ENGINEERING SERVICES CODE DESCRIPTION I QTY I U/M I Labor I Material I Sub Con I Total I Preliminary Fees 1 LS : I Archrtectural Services 1 LS 340,000 340,000 Interior Services I Space Planning Part of Tl Reimbursables 1 LS 25,950 25,950 365 950 1.73 Building Envelopo 1 LS 3,500 3,500 3500 0.02 Code Review LS 3,000 3,000 3000 0.01 Energy modeling 5,000 LEED certification BY KOLL

structural Services LS 110,000 110,000 110000 0.52 MEP Services LS 102,000 102,000 102 000 0.48 Plumbing Services w/HVAC Lighting Deoign 1LS

R.P. Appx. 275 Sprinkler Services w/HVAC Civil Services LS 33,000 33,000 Topographic Survey BY KOLL Foundation Spot BY KOLL As Built Survey BY KOLL Site Staking w/GC's 33000 0.16 Landscaping LS 25,000 25,000 25 000 0.12 Subourfoce Soil Report BY KOLL

Roofing Inspections LS 3,000 3,000 3 000

Pa91113 6-30-05atlantaupdate CODE DESCRIPTION QTY UIM Labor Material Sub Con Total 0.01 Renderings 2,000 5000 EnOfllYModel 1 LS 5,000 5,000 0.02 Hardware, slgnage, acoustic• & contingency Models SUBTOTAL ARCHITECTURAL COSTS 650,450 650,450 2.91 MISCELLANEOUS INSURANCE 0.500% % 3,252 OVERHEAD AND PROFIT 4.00",{, 26,148

SUBTOTAL ARCHITECTURAL COSTS 211,638 SF 3.21 679,850

PROJECT SUMMARY DESCRIPTION PERIS.F. TOTAL 1. SITE IMPROVEMENTS $7.92 1,677,179 2. BUILDING SHELL $53.60 11,385,602 3. LEED CERTIFICATION ALLOWANCE $0.09 20,000 4. ARCHITECTURAL & ENGINEERING SERVICES $3.07 650,450 MISCELLANEOUS $0.32 68,666 $65.20 13,601,897 Adjustment OVERHEAD & PROFIT $2.61 552,076

!TOTAL ESTIMATE=====~ $67.82 ISqFt 14,353,973 J

Dallas /ntellicenter Exhibit C Dallas. TX 211.637 SF - 4 STORY OFFICE BLDG.

KQLLDEVELOPMENTCOMPANY Februarv 20. 2006 - CONTROL COST 02000 SITE WORK BUDGET PER/SF 02050 Demol~ion I Site Clearing 34,440 0.16 02200 Earthwor1< 224,816 1.06 02210 Finish Grading I Backfin Footings 4,200 0.02

R.P. Appx. 276 02300 Sulface Water Control 9,000 0.04 02500 Asphalt Paving and Striping 3,195 0.02 02510 Concrete Paving & Curbs-TAS 881,188 4.16 02605 Sanitary Sewer 11,510 0.05 02660 Water Distribution 94,520 0.45 02680 Gas Main to Building 0 0.00 02700 Storm Sewers 89,310 0.42 02780 Underground Electric Conduit 0 0.00 02781 Hardscape Allowance 25,000 0.12 02850 Landscaping Allowance 225,000 1.06 02900 Irrigation Allowance 75,000 0.35

Page 14 6-30-05atl•ntaupdate CODE DESCRIPTION Material SITE WORK TOTAL 02000 EARTHWORK 02220 Excavation and Backfill 6,000 0.03 02370 Drilled Piers 268,450 1.27 !EARTHWORK TOTAL 274,450 1.30 I

03000 CONCRETE 03210 Reinforcing Steel 30,000 0.14 03300 Cast-in-place Concrete 110,800 0.52 03345 Cement Flatwork 704,970 3.33 03350 Caulk Floor joints w/ MM80 Seater 0 0.00 03355 Concrete Seater 0 0.00 03400 Architectural Concrete Wall Panels 1,061,040 5.01 JCONCRETE TOTAL 1,906,810 9.01 I

04000 MASONRY 04210 Masonry 0 I 0.00 I !MASONRY TOTAL I 0 I 0.00 I 05000 METALS 05120 Structural Steel 1,040,520 4.92 05200 Miscellaneous for Tilt-Up 15,000 0.07 05210 Steel Joists 35,750 0.17 05300 Metal Decking 301,585 1.43 05340 Structural Erection 432,959 2.05 05580 Sheet Metal Fabrications 65,450 0.31 !METALS TOTAL 1,891,284 8.94 06000 WOOD .. & PLASTICS 06100 Rough Carpentry 22,604 0.11 #REF! #REF I 108,572 0.51 !WOOD & PLASTICS TOTAL 131,176 0.62

R.P. Appx. 277 Page15 6-30-05atlantaupdate CODE DESCRIPTION QTY I U/M I Labor I Material I Sub Con I Total I 07000 THERMAL & MOISTURE PROTECTION 07100 Waterproofmg -elevator pits 7,000 0.03 07200 Insulation 21,097 0.10 07500 Roofing 225,540 1.07 07600 Flashing and Sheet Metal 411,531 1.94 07700 Skylights & Roof Hatch 5,500 0.03 07920 Sealants and Caulking 24,835 0.12 JMOISTURE PROTECTION TOTAL -- 695,503 3.29 08000 DOORS & WINDOWS I

08200 Doors,Frames,and Harcfwarl!-{jiscount 101,665 0.48 08300 Overhead Doors & Operators 4,550 0.02 08800 Glazing (based on National Agreement pricing) 1,158,560 5.47 JDOORS & WINDOWS TOTAL_ __1,~114.775 5.981 09000 FINISHES 09200 Framing and Drywall 668,721 3.16 9402 Epoxy Terrrazzo 38,024 0.18 09500 Ceiling 28,213 0.13 09650 Ceramic Tile 79,416 0.38 09680 Carpet & Resilient Flooring 15,870 0.07 09900 Painting 74,635 0.35 09950 Wall Covering & Zolotone Allowance 16,698 0.08 9970 Special Wall Surfaces (FRP) 1,500 0.01 !FINISHES TOTAL 923,077 4.36!

10000 SPECIALTIES 10150 Toilet Partitions and Acces. 18,540 0.09 10550 Metal Lockers 0 0.00 10600 Miscellaneous Specialties 28,230 0.13 10610 Appliances 0 0.00 10900 Interior Signage & Directories 0 0.00 10950 Exterior Signage Allowance 0 0.00 !SPECIALTIES TOTAL 46,770 0.221 11000 EQUIPMENT 11160 Mechanical Dock Levelers - 35,000# Capacity 2,045 0.01 11162 Dock Levelers - Form Pits 0 0.00 11164 Dock Locks 0 0.00 11165 Dock Seals 0 0.00 11166 Dock Shelters 0 0.00 11167 Dock Lights 300 0.00 JEQUIPMENT TOTAL 2,345 0.01 12000 FURNISHINGS

R.P. Appx. 278 12510 Horizontal Blinds - 1" FURNISHINGS TOTAL 13000 SPECIAL CONSTRUCTION 13320 Access Flooring SPECIAL CONSTRUCTION TOTAL 14000 CONVEYING SYSTEMS 14200 Elevators 204,000 I 0.961 Page 16 8-30-05atlantaupclate CODE DESCRIPTION Material CONVEYING SYSTEMS TOTAL 15000 MECHANICAL SYSTEMS 15300 Fire Protection 199,493 0.94 15310 Booster Pumps-75 hp 35,000 0.17 15400 Plumbing-discount 375,460 1.77 15500 HVAC 1,261,362 5.96 !MECHANICAL SYSTEMS TOTAL 1,871,315 8.84

R.P. Appx. 279 Page 17 6-30-05atlantaupdate CODE DESCRIPTION l QTY l U/M l Labor l Material Sub Con I Total I 16000 ELECTRICAL 16050 Electrical 843,252 3.98 16100 Site Lighting & Building Accent Lighting 131,164 0.62 !ELECTRICAL TOTAL -- 974,416 4.60 17000 CONSULTING SERVICES 17000 Preliminary Fees lncl 0.00 17100 ArchHectural Services lncl 0.00 17150 Code Review lncl 0.00 17200 Structural Services lncl 0.00 17300 Mechanical-Electrical-Plumbing-Sprinklers lncl 0.00 17400 Civil Services lncl 0.00 17470 Subsurface Soil Report lncl 0.00 17600 Roofing Inspections lncl 0.00 17600 Rendering lncl 0.00 17900 Reimbursable& lncl 0.00 !CONSULTING SERVICES TOTAL ~.~o --- _3.~71

18000 TENANT FINISH 06200 Finish Carpentry Allowance 20,000 0.09 08200 HoHow Metal Doors & Frames 0 0.00 08800 Glazing 0 0.00 09200 Framing and Drywall 0 0.00 09300 Ceramic Tile 0 0.00 09500 Install Acoustical Tiles 0 0.00 09650 Resilient Flooring 0 0.00 09680 Carpet Allowance 0 0.00 09900 Painting 0 0.00 10150 Computer Flooring 0 0.00 10990 Miscellaneous Specialties 0 0.00 12510 Window Blinds or Drapes 0 0.00 15300 Fire Protection 0 0.00 15400 Plumbing 0 0.00 15500 HVAC 0 0.00 16050 Electrical 0 0.00 16150 Security I Fire Alarm Systems Allowance 0 0.00 18001 Space Planning & Design 0 0.00 !TENANT FINISH TOTAL 20,000 0.09

R.P. Appx. 280 Page18 8-30-05atlarrtaupdate CODE DESCRIPTION I QTY I U/M I Labor I Material I Sub Con I Total I 01000 GENERAL CONDITIONS 18010 Project Manager-discount 71,300 0.34 18020 Field Superintendent (local wage only) 104,561 0.49 18025 Travel Expenses-discount 21,750 0.10 18030 Drawing Reproduction & Progress Photos 9,705 0.05 18040 Field Engineering & Layout 18,000 0.09 18060 Construction Cleaning & General Labor-discoun 66,064 0.31 18100 Equipment Rental & Small Tools 22,395 0.11 18200 Miscellaneous G. C.'s & Safety 19,845 0.09 18210 Winter Protection 0 0.00 18220 Temporary Roads 3,500 0.02 18240 Performance Bond 0 0.00 18250 Building Permit 37,980 0.18 18255 Builder's Risk Insurance 14,850 0.07 18260 Quality Control & Testing 0 0.00 18270 Temporary Utilities 30,875 0.15 !GENERAL CONDITIONS TOTAL 420,825 1.99 CONTROL COST SUMMARY BUDGET PER/SF 02000 SITE WORK 1,677,179 7.92 02000 EARTHWORK 274,450 1.30 03000 CONCRETE 1,906,810 9.01 04000 MASONRY 0 0.00 05000 METALS 1,891,264 8.94 06000 WOOD & PLASTICS 131,176 0.62 07000 THERMAL & MOISTURE PROTECTION 695,503 3.29 08000 DOORS & WINDOWS 1,264,775 5.98 09000 FINISHES 923,077 4.36 10000 SPECIALTIES 46,770 0.22 11000 EQUIPMENT 2,345 0.01 12000 FURNISHINGS 58,800 0.28 13000 SPECIAL CONSTRUCTION 720,070 3.40 14000 CONVEYING SYSTEMS 204,000 0.96 15000 MECHANICAL SYSTEMS 1,871,315 8.84 16000 ELECTRICAL 974,416 4.60 18000 TENANT FINISH 20,000 0.09 17000 CONSULTING SERVICES 650,450 3.07 01000 GENERAL CONDITIONS 420,825 1.99 MISCELLANEOUS 68,672 0.32 OVERHEAD & PROFIT 552,076 2.61 !TOTAL ESTIMATE=====> 14,353,973 I 67.81 I

R.P. Appx. 281 1/21/06

DESCRIPTION QUANTITY UNIT Labor Material Sub Con Total

AI I #1 - Add Mud slab Slab-4" with Mesh 52000 sf 2.20 114.400

Page 19 6-30-05atlantaupdata CODE DESCRIPTION QTY U/M Labor Material Sub Con Total Mise LS 5,000.00 5,000 119,400 Insurance 0.60% 716 Overhead & Profit 4.00% 4,805 ':,:: ~:': ~: ~ I:Z.4;!la ~~: AI !#2- pBoytpE ?QGAUGE ys 18 GAUGE MEJAI PANE! S Mf-1 & MP-2 Metal panels 1 I LS (10,900.00) (10,900)

(10,900) lnsunmce 0.60% (65) Overhead & Profit 4.00% 1439 :fiQ:~:~:::~::<::

I ALI #3- PROV!QE MEJAI fANE! 5 MP-1 & Mf-2 WJSIANDARD BlJII !OINT CQRNFRS Metal panels ' LS (14,400.00) (14,400)

(14,400) Insurance 0.80% (86) Overhead & Profit 4.00% 1579 VJ;lltj.:c~: ,, ,, ~' ,,

AI !#4 -QEI FIE GEBC PANE! AT I F\{FL S 2-4 AT 2 I OCAIIQNS Delete GFRC LS (8,500.00) (8,500) less Framing Ls (750.00) (750) (9,250) Insurance 0.60% (56) Overhead & Profit 4.00% 1372 ::~: :::::::: :' (Sil!1:8)

At !#5 - QEI Elf ROOF SCREEN WAI I AND §!FE! SlJfPOB!S Metal panels LS (50,000.00) (50,000) Strudural steel LS (100,000.00) (100,000) Rough catpontry LS (1,000.00) (1,000) Roofing & flashings LS 2,000.00 2,000 Drywall Framing 1 I LS (10,000.00) (10,000) ADD FOR NEW SCREEN WALL 675 n 125.00 84,375 (74,625) lnsunmce 0.60% (448) Overhead & Profit 4.00% 13,003 :~11),:~:::::::~:::::

AI !#6- QEI FIE CORNICE CMp-1@ ROQF PFBIMEIEB Metal panels LS (125,000.00) (125,000) Roofing & flashings LS (10,000.00) (10,000) Rough carpentry LS (75,000.00) (75,000)

R.P. Appx. 282 (210,000) Insurance 0.60% (1,280) Overhead & Profit 4.00% 18.450' :VOIQ:':':':~:~:>:

I AI If? _ MECHANICAl 1y FAS!ENEQ ROOF sysTEM IN L lEU OF FUI I Y APHEBEQ Roofing 1 ILS (7,000.00) (7,000)

(7,000) Insurance 0.80% (42) Overhead & Profrt 4.00% 1282

Page2D 6-3Q...05atlantaupdate CODE DESCRIPTION Material

I AI I tfB ~ ELJBNISH 12"X12" pOCF! AIN Ill FIN liEU OF THE SpECIFIEQ 12~X24"

Ceramic tile 1 ILS (12,000.00) (12,000) (12,000) Insurance 0.60% (72) Overhead & Profit 4.00% (483' •Mlif~~~~!liei'¥tem AI I fQ - El OOR JOISTS IN I IE\ J OF BEANS ON I E\(FI S ? THB\ J 4 Concrete LS Stnlclural steel LS

Insurance 0.60% Ovemaad & Profit 4.00% ·V.OitY.· .. ·::::::::

AI Tt10- QEI FIE S!UMRI E I IQHIING IN IfiNAN! AREA§ (INC! CONQtJ!;r & WIRE\ Leave construction temp. lighting in place Electrical LS (15,000.00) (15,000) (15,000) Insurance 0.60% (90) Overhead & Profit 4.00% (604' •A1M~1

81 I!ll - CEI ~I~ ~~ ~BI81t:J ~II 5:t:5~tt1 Q~ ~CI II~E l8t:JP lfi . Replace with tilt wall and storefront Foundations 1 LS (55,000.00) (55,000) Flatwork concrete 1 LS (2,000.00) (2,000) Ti~·wall 1,800 SF 10.00 18,000 Stnlctural stool 1 LS (10,000.00) (10,000) Metal wall panels 1LS (15,000.00) (15,000) Rough carpentry 1 LS (2,000.00) (2,000) Roofing 1 LS (2,000.00) (2,000) Curtainwall & storefront 1 LS (85,000.00) (85,000) Drywa~ 1 LS .

Painting 1 LS (500.00) (500) Access flooring 1 LS (3,000.00) (3,000) (156,500) Insurance 0.60% (939) Ovemaad & Profit 4.00% (6,298 :lt<JI~•••=••••••:<

AI !#12 - DE! ETE STOREFRONT SUNSHADES I EvE! S 1 AND 2

R.P. Appx. 283 Storefront 1 ILS (25,000.00) (25,000) (25,000) Insurance 0.60% (150) Overhead & Profit 4.00% 11,006'

~w•-o•m•u•~oo~MW~'~' ~~ Curtainwall I 1 LS I I I I I (50,000.00) -I (50,000) (50,000)

Page21 6-30-0Satlanteupdate CODE DESCRIPTION I QTY I U/M I Labor I Material I Sub Con Total Insurance Overhead & Profit T 0.60%1 4.00% I T T (300) 12.012 VOID

AI !#14- DE! FIE INTERIOR GLASS@ SJA!R 2 C! EVE! S 1 2 3 & 4\ Also delete terrazzo @ top landings GL7 LS (25,000.00) (25,000) Drywall LS 5,000.00 5,000 Terrazzo LS (3,000.00) (3,000) Fire protection LS (5,000.00) (5,000) (28,000) Insurance 0.60% (168) Overhead & Profit 4.00% (1.127) VOID.

8~ I !l §- BECi ~~~ ~I;CBEBg~I fUr::J"l:UiC QEi;~ltiGS . 8X6 ON LEVELS 1,2&3, 20X8 ON LEVEL 4, LESS MULLIONS Tilt panels 1 LS 5,000.00 5,000 Curtainwall & storefront 1 LS (218,750.00) (218,750) Painting 1 LS 5,000.00 5,000 (208,750) Insurance 0.60% (1,253) Overhead & Profrt 4.00% /8400 VOID

I At !#16- QEI FIE TB\JCKING fXCESS SPOilS QEF St!E ANQ I EA\/E ON §liE

Earthwor1<--l<eep cut & stockpile In number 17,000 ICY (5.00) (85,000) (85,000) Insurance 0.60% (510) Overhead & Profit 4.00% 13.420 . :: : : .: : : : :; :' : ' .. :~ : I I I I AI !#16a- QEI fiE TB\JCKING EXCESS SPOilS CFBOM EXTRA TOPSOil ¢NQ \Jill lTV srO!I Slit E,A\/E ON S!Jf Earthwork-keeps excavating & stockpiling in number 3,500 ICY (5.00) (17,500) (17,500) Insurance 0.80% (105) Overhead & Profit 4.00% (704 :i~~:~~:Sii~>=

AI !#17- DE! FIE I FFQ CFRTIFICAI!QN REQIJ!BFMFNTS Design remains unchanged starr LS (10,000.00) (10,000) Dumpsters LS (15,000.00) (15,000)

R.P. Appx. 284 (25,000) Insurance 0.60% (150) Overhead & Profit 4.00% 11,006 :i(QiQ::;::;:::::~:::;::

43,000.00

Page22 6-3()...05atlantaupdate QTY U/M Labor Insurance

AI !#19- AQQ liME STABiliZE BEl OW pAyiNG ANQ C! OSE BlDG SWS LIME WORK

Insurance Overhead & Profrt

AI T#2D -PRDyiDE WINDOW WAI I CONSIJI JANI CONSULTING & WATER TESTING

Insurance OVerhead & Profit

AI Tt21 MEpEp C! e.ycp CQOBQINAT!QN MEPFP

Insurance

AI 1#22 CHANGE PANEl S TO 15' WIQE MOQIEY TOP GlASS TILTUP PANEL ERECTION CREDIT GLASS CREDIT PIER & PANEL ADIO PER TAS

Insurance Overhead & Profit

AI T#23 BEMQYE SCOPE W PROVIDE FIRE MARSHAll ACCESS WEIR AMOUNT

Insurance

AI 1#24 DEl ETE 2NQ PASSENGER El E\IAIOR ELEVATOR CREDIT DEDUCT DRYWALL LESS ELECTRIC/F.ALARM ':$

R.P. Appx. 285 Insurance 0.60% OVerhead & Profit 4.00%

AI If25 CHANGE H\IAC TO 0/H SYSTEM TO CREDIT Is DEDUCT DRYWALL SF LS

Insurance

PaQe23 6-30-05atlantaupdata CODE DESCRIPTION I QTY I UIM I Labor I Material I Sub Con Total :~iiid:':::::=:::::::::: AI !#26 -liT!! IZE H&H §TEFI CREDIT FROM ENNIS (WITH PANEL ERECTION) 1 Is {2,318,000.00) (2,318,000) Add for H&H 1 LS 2,091,207.00 2,091,207 Contingency 1 LS 40,000.00 40,000 {186,793) Insurance 0.60% {1,121) Overhead & Profit 4.00% (7 ,517i :\!i!&l: :::·.::.:·:,:::· At If27 El FCIB!CAL \IAILJE ENGINEERING FROM QFW p! AN JMEG 1 Is {60,000.00) {60,000) SF LS {60,000) Insurance 0.60% {360) Overhead & Profit 4.00% 12,414 'iiiil!l~~~tl~!iip add AI J#?B AQQ m PEW QR6WINGS FOR MISSING H)(AC I ,;:;::··:·:-,-:-:-: ··:·:· Power & FA Cgnnectjgna m Ejre Smoke pamoers per M3 Q1 currentlY bejpg rftdesjgned JMEG-Will be raduced 1 Is 53,200.00 53,200 SF LS 53,200 Insurance 0.60% 319 Overhead & Profit 4.00% 2,141 'li~~VE;:: AI !#29 AQQ I !QHIING PER NEW 11(1 /05 QOC'S NOT BECSIYED ey C! AYCQ I jghtjnq Schedule gmyjded to JMEG vja CpnsJmGtg[§ JMEG 1 Is 117,000.00 117,000 SF LS 117,000 lnSUfllnCO 0.60% 702 Overhead & Profit 4.00% 4,708 ::::::::::::l~ii4~0.: AI T#3Q -Change roof screen steel to Ga!yanjzed ·.:;:;:::,:·:: .. ' ..-_ :·::

H&H 1 Is 31,000.00 31,000 Painting 1 Ls (5,000.00) {5,000) 1LS 26,000 Insurance 0.60% 156 Overhead & Profit 4.00% 1,046 ::::::::::::::Z:1'l!Ol!: AI !#31 Caulk jntedgr sjde of wjndow frames

Pals 1 Is 11,500.00 11,500 Ls LS

R.P. Appx. 286 11,500 Insurance 0.60% 69 OVerhead & Profit 4.00% 463 ··.:=.'": :J:t=iJ~~: ~;u:;~:~: ,,::;::::::~ ALT IJ1 - A ADD MUD SLAB ADD r-------:1:-::2-:-4,-=92=:1:-i ALT 12- PROVIDE 20GAUGE VS. 18 GAUGE METAL PANELS MP-1 & MP-2 DEDUCT VOID ALT 13- PROVIDE METAL PANELS MP-1 & MP-2 WISTANDARD BUTT JOINT CORNERS DEDUCT r,V:';.O~I:;:D----1 ALTI4 -DELETE GFRC PANEL AT LEVELS 2-4 AT 2 LOCATIONS DEDUCT (9,678) ALTIS - DELETE ROOF SCREEN WALL AND STEEL SUPPORTS DEDUCT rV.;...O"'I:':D=,---; ALT 16 -DELETE CORNICE CMP-1 @ROOF PERIMETER DEDUCT VOID

Page 24 6-30-05atlantaupdllte CODE DESCRIPTION QTY IU/M I Labor I Material Sub Con I Total I ALT t#7- MECHANICALLY FASTENED ROOF SYSTEM IN LIEU OF FULLY ADHERED DEDUCT Either System ALT t#8 - FURNISH 12"X12" POCELAIN TILE IN LIEU OF THE SPECIFIED 12"X24" DEDUCT May use either system ALT t#9 - FLOOR JOISTS IN LIEU OF BEANS ON LEVELS 2 THRU 4 DEDUCT VOID ALTt#10- DELETE STUMBLE LIGHTING IN TENANT AREAS (INCL. CONDUIT & WIRE) DEDUCT (15&~4) ALTt#11- DELETE CURTAIN WALL SYSTEM ON COL LINE 1 AND 16 DEDUCT VOID ALT t#12 - DELETE STOREFRONT SUNSHADES LEVELS 1 AND 2 DEDUCT VOID ALT#13- DELETE SUNSHADES AT CURTAINWALL AREAS DEDUCT VOID ALT t#14- DELETE INTERIOR GLASS 8 STAIR 2 (LEVELS 1, 2,3 & 4) DEDUCT VOID ALT t#15 - REDUCE STEORFRONT PUNCHED OPENINGS DEDUCT VOID ALTt#16- DELETE TRUCKING EXCESS SPOILS OFF SITE AND LEAVE ON SITE DEDUCT BALANCED SITE ALTt#16a- DELETE TRUCKING EXCESS SPOILS (FROM EXTRA TOPSOIL AND UTILITY SPOILS)/LEAVE ON 51' DEDUCT BALANCED SITE ALT #17- DELETE LEED CERTIFICATION REQUIREMENTS DEDUCT void ALTt#18- ADD GL-7 GLAZING AND DELETE 1/4" TEMPERED (Joel Berman Glass was not quoted to other GC'1 ADD 44,988 ALTt#19- ADD LIME STABILIZE BELOW PAVING AND CLOSE BLDG SWS ADD 149,089 AL Tt#20 -PROVIDE WINDOW WALL CONSULTANT ADD 15,694 AL Tt#21 - MEPFP CLAYCO COORDINATION ADD 10,462 ALTt#22 -CHANGE PANELS TO 15' WIDE, MODIFY TOP GLASS DEDUCT void ALTt#23 --REMOVE SCOPE TO PROVIDE FIRE MARSHALL ACCESS DEDUCT void ALTt#24 -DELETE 2ND PASSENGER ELEVATOR DEDUCT void ALTt#25 -CHANGE HVAC TO 0/H SYSTEM DEDUCT void ALTt#26 -UTILIZE H&H STEEL DEDUCT void ALTt#27 -ELECTRICAL VALUE ENGINEERING FROM DFW PLAN DEDUCT ALTt#28 -ADD TO DFW DRAWINGS FOR MISSING HVAC ADD ALTt#29 -ADD LIGHTING PER NEW 11/1/05 DOC'S NOT RECEIVED BY CLAYCO ADD AL Tt#30 -Change roof screen Steel to Galvanized ADD AL Tt#31 -Caulk interior side of window frames ADD 12,o32 I

R.P. Appx. 287 Page 25 6-30-05atlarrtaupdate Design Fee and Expense Summary Updated: 02/24/06 Building G SF A Est Cost per Est Cost "Shell Design ross rea SF & Core' Fee Basis Fee Basis Component Fee /SF % lnlellicenter Dallas (estimate) Basic Design Fee Building 212,000 $70 $14,B40.000 Architectural Forum $1.60 2.3% $340,000 Lump Sum Fee per sqft, before $2.95 Consultants expenses budget Structural Alper $0.52 0.7% $110,000 Lump Sum MEP+FP DFW $0.48 0.7% $102,000 Lump Sum Civil Glenn $0.16 0.2% $33,000 LS Fee, less Topo, ALTA. Storm Water Landscape TBG $0.12 0.2% $25,000 Lump Sum Energy Model Coolshadow $0.02 0.0% $5.000 Hourly NTE Code/Life Safety RJA $0.01 0.0% $3.000 Hourly NTE Roof Consulting Moue $0.01 0.0% $3,000 Hourly NTE Bldg Envelope Heitmann $0.02 0.0% $3.500 Hourly NTE

$2.95 4.2%

"Estimated" Total Expenses Consultant SD DD CD CA Total Trips Cost Forum 1 1 1 15 18 $17,100 Alper Audi 0 0 0 3 3 $2.850 DFW 0 0 0 0 0 $0 Total Travel 1 1 1 18 21 $19,950

ADA Accessology $3,000 Total Printing, Courier, etc. $3.000 Total Expenses $25,950 Budget

"Estimated" Travel Expenses (1 round trip to jobsite per person - 2 days & 1 night) Forum CA Phase Trips Months 12

R.P. Appx. 288 Airfare $500 Punchlist 3 Rental Car $125 Total 15 Hotel $150 Food $100 Parking & Mileage $75 Total Travel Cost/person $950

Forum Studio, Inc. 1 of 1 FORM OF CONSTRUCTION INDEMNITY AND ASSIGNMENT AGREEMENT (General Contractor) THIS CONSTRUCTION INDEMNITY AND ASSIGNMENT AGREEMENT, dated as of the _ _ day of , from ,a _ _ _ _ _ _ _ _ _ (the "Contractor") to THE PRUDENTIAL INSURANCE COMPANY OF AMERICA, a New Jersey corporation ("Prudential"), a ("Developer") and a (the "Venture"). ------------------ RECITALS A. Prudential and Developer shall be partners in the Venture, pursuant to Acquire Joint Venture Interest, dated , _ _ (the "Acquisition Agreement") and the Amended and Restated Limited Liability Partnership Agreement of the Venture, dated ___________, (the "JVA"). The Venture is the owner of the Project as more particularly described in the Acquisition Agreement. All capitalized terms used, but not defined herein, have the meanings given to such terms in the Acquisition Agreement.

B. The Venture and the Contractor have entered into the , dated (the "Construction Contract"), ---------------- whereby the Contractor agreed to construct the Improvements.

C. The Contractor desires to enter into this Agreement to induce: (i) Prudential to make Prudential's Initial Contribution (as defined in the Acquisition Agreement) to the Venture; and (ii) acquire an interest in the Venture, in the manner contemplated by the Acquisition Agreement.

NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Contractor hereby agrees as follows: 1. Guarantee. The Contractor hereby guarantees all the work performed in connection with the construction of the Improvements and all materials furnished and installed, or either, under the Construction Contract including all change orders thereto, to be: (i) substantially in accordance with the Plans and Specifications attached to the Acquisition Agreement as Exhibit B and/or modifications thereof permitted pursuant to the Acquisition Agreement (including any and all replacements or corrections of work performed in connection with construction of the Improvements and materials that may be required pursuant thereto); (ii) substantially in accordance with all federal, State of , County and City of _______ laws, ordinances, statutes, rules and regulations applicable to the construction of office buildings, including, without limitation, local building, environmental, land use and persons with disabilities requirements, in effect on the date of this Agreement (collectively, the "Legal Requirements"); and (iii) free from faulty, defective workmanship and materials. The Contractor agrees to repair, correct or replace, at their own cost and expense, all of the work performed in connection with construction of the Improvements and materials, or either, covered

R.P. Appx. 289 under said Construction Contract, change orders, modifications or corrections pursuant thereto that may prove not to be substantially in accordance with the Plans and Specifications (and/or modifications thereof permitted pursuant to the Acquisition Agreement) or the Legal Requirements or not to be free from faulty, defective workmanship and/or materials, ordinary wear and tear excepted. The Contractor does further agree to pay the cost of repairing all damage to other property resulting from defects in the work, performed in connection with construction of the Improvements, and materials, or either, covered by this Agreement and to pay the cost and expenses of replacing other property which may be damaged or disturbed in making good any defects as provided herein.

This Agreement shall be for a period of 1 year commencing the date of substantial completion of the Project. This Agreement shall be for the entire work performed in connection with construction of the Improvements except as may be extended by other guarantees specified elsewhere in the Construction Contract or as required by applicable law, and materials under the Construction Contract, and is in no way to be construed as invalidating guarantees for longer periods where required by the Construction Contract. This Guarantee shall not broaden the scope of the guarantees specified in the Construction Contract.

All replacements and corrections to defective work performed in connection with construction of the Improvements and materials; or either, are to be done at the convenience of the Venture.

The obligation of Contractor under this Agreement shall survive both final payment for the work performed in connection with the construction of the Improvements or designated portion thereof and termination of the Construction Contract.

2. Indemnification. The Contractor shall indemnify, defend and hold harmless Prudential and the Venture, their officers, agents and employees for from and against any and all claims and demands, just or unjust, of third persons for death, for bodily injury, for personal injury, for property damage, direct or consequential, or for breach of contract arising or alleged to arise out of the construction of the Improvements and for all expenses incurred by them in the defense, settlement or satisfaction thereof except to the extent such claims and demands result from the intentional acts of Prudential or the Venture.

In any and all claims against Prudential or the Venture or any of their agents or employees by any employee of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this Agreement shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any subcontractor under workers' or workmen's compensation acts, disability benefit acts or other employee benefit acts.

If so directed by Prudential or the Venture, the Contractor shall at its own expense defend any suit based upon any such claim or demand within the scope of the foregoing indemnity with counsel reasonably acceptable to Prudential or the Venture, as applicable (even if such suit, claim or demand is groundless, false or fraudulent).

FINAL Clayco lndemnitvJ.DOC BANK OF AMERICA/PRUDENTIAL LOAN PURCHASE AGREEMENT PAGE2 R.P. Appx. 290 3. Assignment of Guarantees and Warranties. Contractor, as assignor, hereby conditionally assigns, transfers and sets over to the Venture, as assignee, all of its right, title and interest in and to all guarantees and warranties received by Contractor from subcontractors and suppliers in connection with the construction of the Improvements. This assignment shall be effective upon default by the Contractor under this Agreement or upon complete satisfaction of the obligations of Contractor hereunder. Contractor shall not and has not taken any action or done any thing which could limit the enforceability of such guarantees and warranties.

4. Governing Law. This Agreement will be governed by and construed in accordance with the laws of the State of - - - - 5. No Assignment of Benefits Under this Agreement. Neither Prudential nor the Venture may assign this Agreement or its rights under this Agreement. This Agreement shall terminate as to both Prudential and the Venture upon any transfer by Prudential of its interest in the Venture to other than an affiliate of Prudential.

[CONTRACTOR]

By:_ _ _ _ _ ___;__ _ _ _ _ __ Name: Its: -----------------------

FINAL Clayco Indemnity3.DOC BANK OF AMERICA/PRUDENTIAL LOAN PURCHASE AGREEMENT PAGEJ R.P. Appx. 291 FORM OF ARCHITECT'S CERTIFICATE [LETTERHEAD OF ARCHITECT FOR THE PROJECT]

[Dated no later than 5 days prior to the Closing date]

The Prudential Insurance Company of America Prudential Real Estate Investors

Re: _____________ Gentlemen: We understand that you intend to acquire an interest in - - - - - - - - - - - - - - - - - - - - - - - - - - ( t h e "Venture"), which Venture acquired the real property in - - - - · more particularly described in Exhibit A attached hereto (the "Land"), and constructed an office building consisting of approximately net rentable square feet, plus __ parking spaces (collectively, the "Improvements"), pursuant to an Agreement To Acquire Joint Venture Interest, dated - - - - - - - - - - - - ' 200_ (the "Commitment"). (The Land and Improvements shall be refened to herein collectively as the "Project".)

We understand that the receipt by you of ce1iain written certifications from us is a condition precedent to your obligation to make a capital contribution to the Venture and to acquire an interest in the Venture. Accordingly, we hereby certify the following to the best of our knowledge, information and belief: 1. We prepared the working drawings, a true and complete copy of which is attached hereto as Exhibit B (the "Plans and Specifications"). The working drawings describe the Improvements completely and accurately.

2. The Project lies in a district designated zoning under the applicable zoning ordinances of t h e - - - - - - - - - - - - - - The Project, ifbuilt and used in conformity with the Plans and Specifications, is in full compliance with such zoning ordinances.

3. The Improvements contemplated by the Plans and Specifications are permitted by and in conformance with all applicable building codes and regulations and all other federal, state and local laws, rules and regulations relating to the physical aspects of improvements to land.

R.P. Appx. 292 4. Based on our observation of the Improvements during their construction and at the time all certificates of occupancy were issued, (a) the Improvements as actually built substantially conform to the Plans and Specifications, and comply with all Federal, state and local laws, rules, and regulations relating to the physical aspects of improvements to land, including, without limitation, those relating to zoning, building and fire codes, of which we have been made aware by the owner, and environmental laws, rules and regulations and (b) no amendment to the building permits were required subsequent to [_ _ ____.

5. The Project complies in all respects with the Americans with Disabilities Act and all rules, regulations and guidelines promulgated in connection therewith.

6. The specified materials for the Project do not contain asbestos or polychlorinated biphenyl (PCB) products or any other hazardous or toxic wastes or substances in violation of applicable environmental laws.

7. The Project, if built in conformity with the Plans and Specifications, is in substantial compliance with all conditions and requirements specifically relating to construction and development of the Project contained in the following documents: [list of Private Development Covenants].

This letter is being delivered to you as a condition precedent to your making a capital contribution to the Venture and acquiring an interest in the Venture.

We understand that you and the Venture are relying on this letter and that you or the Venture may pursue a claim against us in the event that you or the Venture has any loss or damage as a result of facts or circumstances that exist at the Project which make any of our certifications incorrect or inaccurate. This letter does not constitute, however, a guarantee of the work of the builder of the Improvements, and the builder and its subcontractors are solely responsible for all construction means, methods, techniques, sequences and procedures and compliance with the drawings, specifications and contract documents.

Very truly yours,

By__________________________ Its ------------------- (Attachments)

R.P. Appx. 293 FORM OF ENGINEER'S CERTIFICATE [LETTERHEAD OF PROJECT'S ON-SITE ENGINEER]

[Dated no later than 5 days prior to Second Closing date]

The Prudential Insurance Company of America Prudential Real Estate Investors

Re: - - - - - - - Gentlemen: We understand that you intend to acquire an interest i n - - - - - - - - - - - (the "Venture"), which Venture acquired the real property in _ , more pmiicularly described in Exhibit A attached hereto (the "Land"), and constructed an office building consisting of approximately _______ net rentable square feet, plus __ parking spaces (collectively, the "Improvements"), pursuant to an Agreement To Acquire Joint Venture Interest, dated _____________, 200_ (the "Commitment"). (The Land and Improvements shall be referred to herein collectively as the "Project".)

We understand that the receipt by you of certain written certifications from us is a condition precedent to your obligation to make a capital contribution to the Venture and to acquire an interest in the Venture. Accordingly, we hereby certify the following: 1. We are civil engineers licensed in the State of . We provided civil engineering design and construction observation services for the Improvements. Our involvement has included preparing civil engineering design plans dated (the "Plans"). In connection with rendering the Plans, we performed such research and made such investigations as we deemed appropriate in our professional judgment with respect to the Plans.

Our firm provided construction observation services during site preparation and grading prior to beginning construction of buildings. In addition, we periodically observed the contractor's progress and procedures during the preparation of the site and full course of construction.

2. We hereby represent to you that, in our professional opinion, based upon our services rendered, the Project has been designed by this office in compliance with applicable Federal, state and local approvals and design standards relating to the site improvements for the land.

R.P. Appx. 294 3. We hereby represent to you that the following utilities are connected to the Improvements and fully operational: . Such utilities comprise all of the utilities which were designed by this office.

4. We have concluded that on the basis of our observations that the contractor has completed the Project in substantial conformity with the "Plans and Specifications", attached hereto as Exhibit B. Further, the work we observed was completed in a manner compatible with the relevant aspects of the Land as we understood them at the time of design and in substantial compliance with our recommendations.

This letter is being delivered to you as a condition precedent to your making a capital contribution to the Venture and acquiring an interest in the Venture. We understand that you and the Venture are relying on this letter and that you or the Venture may pursue a claim against us in the event that you or the Venture has any loss or damage as a result of facts or circumstances that exist at the Project which make any of our certifications incorrect or inaccurate. This letter does not constitute, however, a guarantee of the work of the builder of the Improvements.

Very truly yours,

By ------------------------- Its _______________ (Attachments)

R.P. Appx. 295 CONTRACTOR'S CONSENT AND AGREEMENT

The undersigned ("Contractor") acknowledges the assignment by Intellicenter Atlanta Investments, LLP, a Delaware limited liability partnership ("Owner"), to Bank of America, N.A., a national banking association, as administrative agent ("Administrative Agent") on behalf of the lenders ("Lenders") from time to time parties to the Loan Agreement (as herein defined), as additional security for the obligations of Owner under a Construction Loan Agreement ("Loan Agreement") between Owner (as Borrower), Administrative Agent and Lenders dated September 26, 2005, of Owner's rights (but not Owner's obligations) under the Construction Contract and any future modifications thereof or change orders ("Contract") between Owner and the Contractor pertaining to the pr~ject contemplated by the Loan Agreement, such project to be located upon certain real property described on Exhibit "A" attached hereto and made a part hereof (the "Property"). Contractor hereby consents to and agrees to be bound by such assignment Contractor further represents and warrants to and agrees with Administrative Agent and Lenders as follows: 1. The copy of the Contract attached hereto as Exhibit "B" is a true, correct and complete copy of the Contract, the Contract has not been changed or modified, and to Contractor's knowledge, the Contract is in full force and effect.

2. If Owner defaults under the Loan Agreement or certain other Loan Documents (as defined in the Loan Agreement), Lenders may elect by a specific request in writing to (i) have Contractor continue performance under the Contract, in which case Contractor shall thereafter perform under the Contract pursuant to the remainder of this Paragraph 2, or (ii) have Contractor stop work on the project and vacate the Property, in which case Contractor shall promptly do so. If Lenders elect by specific request in writing to have Contractor continue or recommence to perform work under the Contract, Contractor shall continue or recommence performance on Lenders' behalf under the Contract in accordance with the terms thereof, and Contractor shall be reimbursed in accordance with the Contract for all work, labor and materials performed or furnished at Lender's request and prior to Lender's request; provided that, (i) with respect to reimbursement for work, labor or materials prior to Lender's request, Contractor has notified Administrative Agent in writing of the amounts owed Contractor and (ii) Lenders shall not be required to pay any amounts for work, labor or materials for which Lenders have already made an advance under the Loan Agreement . Contractor will look solely to the Owner for all sums owing under the Contract which Lenders are not required to advance pursuant to this paragraph.

Contractor's agreement to act under the Contract for Lenders will not depend upon Contractor being paid any sums which Lenders are not required to advance hereunder nor on whether the Owner has otherwise defaulted under the Contract. Nor will Administrative Agent or Lenders be liable for any amounts owing Contractor if Administrative Agent (on behalf of Lenders) requests Contractor to stop work and vacate the Property pursuant to clause (ii) above. Neither Administrative Agent nor Lenders shall be liable for any damages Contractor may be entitled to recover from Owner or for change orders made by Contractor and not approved by Lenders pursuant to the Loan Agreement. In the event the Contract is terminated for any reason, Contractor shall notify Administrative Agent in writing within seven (7) days of such tennination. After such termination, Contractor shall, at Lenders' option, enter into a new contract with Administrative Agent (on behalf of Lenders) upon substantially the same terms as the Contract. "Lenders" as used in this Paragraph includes Lenders' successors or assigns, any receiver in possession of the Property, any purchaser upon foreclosure of Lenders' security, or any corporation or other nominee formed by or on Lenders' behalf (collectively "Lenders' Successors"). This Paragraph 2 shall not affect the rights of Lenders or Lenders' Successors upon or following a foreclosure or transfer of title to the Property.

CONTRACTOR'S CONSENT AND AGREEMENT (lntel/icenter Atlanta Investments, LLP) Pagel 4049692.1 R.P. Appx. 296 3. If Owner defaults in making any payment or in performing any other obligation under the Contract, Contractor shall promptly give Administrative Agent written notice thereof, specifying the default and the steps necessary to cure same; and if Contractor learns of any default in payment due any subcontractor or other person supplying labor or materials for the project, Contractor shall similarly advise the Administrative Agent thereof. Contractor will not exercise any remedy available under the Contract, at law, or in equity arising from such default by Owner until Lenders shall have had the same opportunity to cure such default to which Owner is entitled, but at least thirty (30) days in any event, if Lenders so elect to cure such default, and such longer period of time as may be necessary to obtain possession of, or title to, the Property, provided that Lenders shall have no obligation to cure any Owner default. Any curative act done by Lenders shall be as effective as if done by Owner.

4. Contractor shall not perform work under any change order without first securing Administrative Agent's written consent to such change order unless: (a) the Owner has certified to Contractor that Lenders' consent is not required for such change order; and (b) the cost of or reduction resulting from any single change or modification does not exceed $50,000, and the aggregate amount of all such changes and modifications does not exceed $500,000. In any such case, Contractor shall promptly provide Administrative Agent or its construction consultant with a copy of such change order or other modification. Administrative Agent's consent shall not constitute any assumption by Administrative Agent or Lenders of any obligation under the Contract. In addition, Contractor will not terminate, or in any material respect, modify or amend, the Contract without the prior written consent of Administrative Agent, provided that Contractor may terminate the Contract because of a default by Owner thereunder to the extent Contractor has such right in the Contract, provided Contractor has first complied with Paragraphs 2 and 3 above.

5. Contractor acknowledges that the plans (the "Plans") described in the Schedule attached hereto were prepared by an architect on Contractor's staff or engaged by Contractor to prepare such Plans (the "Architect). Contractor represents and warrants to Administrative Agent and Lenders that such Architect is authorized to practice architecture under the laws of the State in which the Property is located and is familiar with the federal, state, and local laws and ordinances relevant to the construction of the improvements (the "Improvements") described in the Plans. Architect prepared all of the Plans, or such Plans were prepared under its supervision and direction, and Architect is responsible therefor. To the best of Contractor's knowledge, the Plans comply with all applicable laws, including all zoning, building, and other pertinent statutes, ordinances, rules and regulations. The Plans were prepared in accordance with customary professional standards of architectural practice for projects similar to the Improvements. The Plans are complete and adequate for the construction of the Improvements, and there have been no modifications thereof except as described on the attached Schedule. The Plans have been approved by all applicable governmental authorities. To the best of Contractor's knowledge: (a) the Improvements, if constructed in accordance with the Plans, will fully comply with all applicable laws, statutes, ordinances, codes, rules, regulations, decrees and orders (including but not limited to those relating to access and facilities for handicapped persons), applicable restrictive covenants and the site plan approved by Administrative Agent; and (b) the structural design of the Improvements, the proposed method of construction, the foundation plan, and the materials specified by the Plans for the project are adequate and appropriate for the contemplated Improvements and for the soil conditions of the construction site.

6. Contractor hereby expressly subordinates all contractual, constitutional and statutory mechanics' and materialmen's liens to which Contractor may be or become entitled, to all liens and security interests securing the loan contemplated by the Loan Agreement (all indebtedness of Borrower, Administrative Agent and Lenders evidenced by the Loan Agreement and related loan documents are referred to herein as the "Secured Indebtedness") and expressly waives any right to remove any removable improvements from the Property. Contractor hereby expressly waives any equitable lien upon the loan funds to which Contractor might otherwise be entitled. Contractor acknowledges and agrees that, CONTRACTOR'S CONSENT AND AGREEMENT (Intellicenter Atlanta Investments, LLP) Page 2 4049692.1 R.P. Appx. 297 foreclosure of the liens and security interests securing the Joan contemplated by the Loan Agreement shall be fully and automatically effective to cut off, terminate, and extinguish all of Contractor's liens and claims of any kind against the Property (provided, that, such termination shall not affect any rights that Contractor may have in any proceeds paid at any foreclosure of the Property in excess of the amount necessary to pay the Secured Indebtedness in full). Contractor shall require all material subcontracts and material purchase orders to contain a provision subordinating the subcontractors' and materialmen's liens to the liens and security interests securing the Joan contemplated by the Loan Agreement and expressly waiving the right to remove removable improvements from the Property.

7. As of the date hereof, Contractor has no counterclaim, right of set-off, defense or like right against Owner or Lenders, and to the best of Contractor's knowledge and belief, the Owner is not in default under the terms of the Contract. Contractor is not in default under the terms of the Contract.

8. Nothing herein shall be construed to confer any present benefits on Contractor or to create any contractual arrangement between Contractor and Administrative Agent or Lenders or to impose upon Administrative Agent or Lenders any duty to see to the application of the proceeds of the Joan contemplated by the Loan Agreement or to give any notice of any type to Contractor. Contractor acknowledges that Administrative Agent and Lenders are obligated under the Loan Agreement only to the Owner and to no other person or entity. Contractor is executing this Contractor's Consent and Agreement to induce Lenders to advance funds under the Loan Agreement, and Contractor understands that Lenders would not do so but for Contractor's execution and delivery of this Contractor's Consent and Agreement.

9. Contractor shall provide Administrative Agent promptly in each case with (a) any information Contractor may have regarding defects in workmanship or materials incorporated into or provided for the project which come to Contractor's attention, (b) Contractor's estimate(s) of the stage(s) of completion of the project, (c) any deviations or variations in construction of the pr~ject from the plans and specifications used by Contractor, (d) any information Contractor may have regarding any defaults by Owner, or any other contractor or subcontractor under any construction contracts, and (e) any claims of non-payment by any person furnishing labor or material in connection with construction of the project I 0. This Contractor's Consent and Agreement shall bind and benefit Contractor, Administrative Agent, Lenders and their respective successors and assigns, including Lenders' Successors, their successors and assigns.

11. Any notice for purposes of this Contractor's Consent and Agreement shall be given in writing and shall be addressed or delivered to the respective addresses set forth below, or to such other address as may have been previously designated by the intended recipient by notice given in accordance with this Section and shall be delivered by personal delivery, by nationally recognized overnight courier service, by prepaid registered or certified United States mail (retum receipt requested), or by facsimile.

The notice shall be deemed effective when the receipt is signed or when the attempted initial delivery is refused or cannot be made because of a change of address of which the sending party has not been notified; and if transmitted by facsimile or personal delivery, the notice shall be effective when received.

Until changed by notice given in accordance with this Section, the initial respective addresses for notices are the following: To Administrative Agent and Lender: Bank of America, N .A.

901 Main Street, 21st Floor Dallas, Texas 75202-3714 Attention: Real Estate Loan Administration Fax No. 214.209.1832 CONTRACTOR'S CONSENT AND AGREEMENT (lntellicenter Atlanta Investments, LLP) Page3 4049692.1 R.P. Appx. 298 To Contractor:

Attention: Fax No. ----------------------------- ------------------------------ 12. The provisions of this Contractor's Consent and Agreement cannot be waived, modified or amended unless such waiver, modification or amendment is in writing and is executed on behalf of each of Administrative Agent and Contractor.

13. Prior to the date hereof, no work of any kind, including the destruction or removal of any existing improvements, site work, clearing, grubbing, draining or fencing of the Property, has been commenced or performed on the Property and no equipment or materials have been delivered to the Property for any purpose whatsoever.

14. Neither the Contract, nor any memorandum, affidavit or notice thereof, has been recorded by or on behalf of Contractor in the county where the Property is located or in any other county. No affidavit of commencement of construction of any improvements, performance of labor, furnishing of materials, or providing of specially fabricated materials in connection with the construction contemplated by the Contract has been executed or filed by Contractor in the county where the Property is located or in any other county. Contractor will, however, join in the execution of such an affidavit once such work has commenced in form and substance satisfactory to Administrative Agent.

15. Contractor will address to Administrative Agent, naming Administrative Agent as an additional named party or beneficiary, all certificates, statements, or representations regarding the completion of the project or any portion thereof.

16. THIS CONTRACTOR'S CONSENT AND AGREEMENT AND ITS VALIDITY, ENFORCEMENT AND INTERPRETATION, SHALL BE GOVERNED BY TEXAS LAW (WITHOUT REGARD TO ANY CONFLICT OF LAWS PRINCIPLES) AND APPLICABLE UNITED STATES FEDERAL LAW.

CONTRACTOR'S CONSENT AND AGREEMENT (lntellicenter Atlanta Investments, LLP) Page 4 4049692.1 R.P. Appx. 299 EXECUTED this _ _ day of _ _ _ _ _ _ _ _ , 2005.

"CONTRACTOR"

By: _ _ _ _ _ _ _ _ _ _ _ _ _ __ Name: Title: ------------------------ -------------------------------

CONTRACTOR'S CONSENT AND AGREEMENT{lntel/icenter Atlanta Investments, LLP) Signature Page R.P. Appx. 300 EXHIBIT A LAND

CONTRACTOR'S CONSENT AND AGREEMENT(Jntel/icenter Atlanta Investments, LLP) EXHIBIT A R.P. Appx. 301 EXHIBITB CONTRACT

CONTRACTOR'S CONSENT AND AGREEMENT(Jntellicenter Atlanta Investments, LLP) EXHIBITB R.P. Appx. 302 SCHEDULE OF PLANS AND SPECIFICATIONS

Project:--------------------------------------- Location: ______._____________________________________________ Drawing No. &Page Nos. Description

4049692v.2

CONTRACTOR'S CONSENT AND AGREEMENT(lntellicenter Atlanta Investments, LLP) SCHEDULE R.P. Appx. 303 Lfssl-{ 5.9()

DC-15-020 18 FORUM STUDIO, INC. and § IN THE DISTRICT COURT CLAYCO, INC., § § Plaintiffs, § § v. § OF DALLAS COUNTY, TEXAS § INTELLICENTER DALLAS § INVESTMENTS LLP, § § Defendants. § 160TH JUDICIAL DISTRICT

ORDER ON PLAINTIFFS' APPLICATION TO STAY ARBITRATION On this day, the Court considered the Application to Stay Arbitration ("Application") filed by Plaintiffs Forum Studio, Inc. and Clayco, Inc. ("Plaintiffs"). After reviewing the Application, the responses and replies thereto, if any, the Court is of the opinion that the Application should be DENIED. It is, therefore: ORDERED that Plaintiffs' Application to Stay Arbitration is hereby DENIED.

SIGNED this _!_f_ day of ~C ~

R.P. Appx. 304 '-{f;51-/ DC-15-020 18 FORUM STUDIO, INC. and § IN lHE DISTRICT COURT CLAYCO, INC., § § Plaintiffs, § § V. § OF DALLAS COUNTY, TEXAS § INTELLICENTER DALLAS § INVESTMENTS LLP, § § Defendants. § 160m JUDICIAL DISTRICT

ORDER DENYING PLAINTIFFS' APPLICATION FOR TEMPORARY RESTRAINING ORPER On this day, the Court considered the Application for Temporary Restraining Order ("Application") filed by Plaintiffs Forum Studio, Inc. and Clayco, Inc. (''Plaintiffs"). After reviewing the Application, the responses and replies thereto, if any, the Court is of the opinion that the Application for Temporary Restraining Order should be DENIED. It is, therefore: ORDERED that Plaintiffs' Application for Temporary Restraining Order is hereby DENIED.

SIGNED this _!_2. day of_-==----~~ 2015.

OROER O~~N\'ING PI.AIN1WFS' APPLICATION f'ORTEMPORARY RESTRAINING ORDER - l'11gc I

R.P. Appx. 305 FILED DALLAS COUNTY 3/27/2015 5:20:56 PM FELICIA PITRE DISTRICT CLERK

DC-15-02018 FORUM STUDIO, INC. and § IN THE DISTRICT COURT CLAYCO, INC., § § Plaintiffs, § § v. § OF DALLAS COUNTY, TEXAS § INTELLICENTER DALLAS § INVESTMENTS LLP, § § Defendant. § 160TH JUDICIAL DISTRICT DEFENDANT INTELLICENTER DALLAS INVESTMENT LLP’S MOTION TO COMPEL ARBITRATION Defendant Intellicenter Dallas Investments LLP (“Intellicenter”) files this Motion to Compel Arbitration (the “Motion”) and would show the Court as follows: I.

INTRODUCTION AND FACTUAL SUMMARY On or about May 19, 2006, Intellicenter contracted with Plaintiff Clayco, Inc. ("Clayco") under a Design Build contract ("Contract") for the design and construction of a 4 story speculative office building consisting of approximately 211,637 square feet located at 3701 Regent Boulevard, Irving Texas ("Project"). The Contract assigned Clayco as the general contractor and Plaintiff Forum Studio, Inc. (“FS”) as the Project’s architect. The Contract contains an arbitration provision stating that: Any Claim arising out of or related to the Contract . . . shall be subject to binding arbitration. Prior to arbitration, the parties shall endeavor to resolve disputes my mediation . . . Claims not resolved by mediation shall be decided by binding arbitration which, unless the parties mutually agree otherwise, shall be in

See Standard Form Agreement Between Owner and Contract and General Conditions of the Contract for Construction, a true and correct copy of which is attached to Intellicenter’s Amended Counterclaim as Exhibit A.

DEFENDANT INTELLICENTER DALLAS INVESTMENT LLP’S MOTION TO COMPEL ARBITRATION Page 1 of 6 R.P. Appx. 306 accordance with the Construction Industry Arbitration Rules of the American Arbitration Association currently in effect.

On September 5, 2014, Intellicenter filed a demand for arbitration to recover the losses sustained as a result of Plaintiffs’ breach of contract, breach of implied warranty, unjust enrichment, deficient design, fraud and/or negligent misrepresentation. The Parties subsequently submitted the claims to mediation before Judge Glen M. Ashworth. Efforts to resolve the dispute in mediation failed. As required by the terms of the Contract, Intellicenter began preparing for arbitration before the AAA.

On February 20, 2015, Plaintiffs commenced this litigation with the filing of their Original Petition requesting a stay of the arbitration proceedings and seeking affirmative relief under the Declaratory Judgment Act as well as attorneys’ fees. The Court denied Plaintiffs’ request for a stay on March 17, 2015. Intellicenter now moves the Court to formally remove this matter to binding arbitration. The Parties’ claims are indisputably related to the terms and obligations of the Contract and are, therefore, clearly subject to arbitration. Because all issues before the Court are properly subject to arbitration, the Court should grant this Motion and stay the current matter pending those proceedings. This Motion is filed to enforce the Court’s March 17, 2015 Order denying Plaintiffs’ application to stay arbitration.

See Exhibit A, at 4.6.1-2 (emphasis added).

See Intellicenter’s Demand for Arbitration, a true and correct copy of which is attached to Defendant’s Response to Plaintiffs’ Application to Stay Arbitration as Exhibit B.

See Plaintiff’s Original Petition, at ¶¶ 26-35; Plaintiffs sought this same relief as well as a temporary restraining order against the American Arbitration Association in their First Amended Original Petition, ¶¶ 39 - 49.

See March 17, 2015 Order Denying Plaintiffs’ Application to Stay Arbitration.

DEFENDANT INTELLICENTER DALLAS INVESTMENT LLP’S MOTION TO COMPEL ARBITRATION Page 2 of 6 R.P. Appx. 307 II.

MOTION TO COMPEL ARBITRATION Both Texas and federal courts have long shown favor toward the enforcement of arbitration agreements. Because state and federal policies continue to favor arbitration, a presumption exists favoring agreements to arbitrate. In light of these strong state and federal policies, Texas and federal courts agree that any written agreement to submit a dispute to arbitration should be liberally construed, and any doubt as to the arbitrability – whether construction of the contract or any defense to arbitrability – should be resolved in favor of arbitration.

For the court to compel arbitration, the moving party must show the claims at issue: (1) are subject to a valid arbitration agreement; and (2) fall within the scope of the agreement. The court must resolve any doubts about an agreement to arbitrate in favor of arbitration. Once the court determines the claims fall within the arbitration agreement, the trial court must compel arbitration and stay its own proceedings.

See Southland Corp. v. Keating, 465 U.S. 1, 10 (1984); Jack B. Anglin Co., Inc. v. Tipps, 842 S.W.2d 266, 268 (Tex. 1992).

United Offshore Company v. Southern Deepwater Pipeline Co., 899 F.2d 405, 408 (5th Cir. 1990); Colt Unconventional Resources, LLC v. Resolute Energy Corp., CA No. 3:13–CV–1324–K, 2013 WL 3789896, 3 (N.D. Tex. July 19, 2013); In re First Merit Bank, N.A., 52 S.W.3d 749, 753 (Tex. 2001).

See Moses H. Cone Mem’l Hosp. v. Mercury Const. Corp., 460 U.S. 1, 24 (1983); Rojas v. TK Commc’ns, Inc., 87 F.3d 745, 749 (5th Cir. 1996); Austin Mun. Sec., Inc. v. Nat’l. Ass’n of Sec. Dealers, Inc., 757 F.2d 676, 696 (5th Cir. 1985); Mitsubishi Motors Corp. v. Soler Chrysler-Plymouth, Inc., 473 U.S. 614, 626 (1985).

American Heritage v. Lang, 321 F.3d 533, 537 (5th Cir. 2003); Webb v. Investacorp, 89 F.3d 252, 257 (5th Cir. 1996).

Fedmet Corp. v. M/V Buyalyk, 194 F.3d 674 (5th Cir. 1999). Colt Unconventional Resources, LLC v. Resolute Energy Corp., CA No. 3:13–CV–1324–K, 2013 WL 3789896, 3 (N.D. Tex. July 19, 2013).

Alford v. Dean Witter Reynolds, Inc., 975 F.2d 1161, 1164 (5th Cir. 1992).

DEFENDANT INTELLICENTER DALLAS INVESTMENT LLP’S MOTION TO COMPEL ARBITRATION Page 3 of 6 R.P. Appx. 308 In rejecting Plaintiffs’ Application to Stay Arbitration, this Court determined that a valid arbitration agreement exists and that the Parties’ claims fall within its scope. An order compelling arbitration is now required. Under the very statute Plaintiffs invoked, “[i]f the Court finds for the party opposing the stay, the court shall order the parties to arbitrate.” To formally enforce this Court’s prior Order, the Court should grant this Motion and stay the instant matter pending arbitration.

III.

CONCLUSION AND PRAYER WHEREFORE, PREMISES CONSIDERED, Defendant Intellicenter Dallas Investments LLP requests that the Court grant this Motion to Compel Arbitration and award all relief, in law and in equity, to which it may show itself justly entitled.

See March 17, 2015 Order Denying Plaintiffs’ Application to Stay Arbitration. As it did in its Response to Plaintiffs’ Application to Stay Arbitration, Intellicenter notes that FS does not seek to avoid arbitration as a “non- signatory” to the Contract. But even had FS asserted this defense, it would ultimately fail. Non-signatories to a contract containing an arbitration clause may be required to arbitrate under principles of equity. See In re Labatt Food Serv., L.P., 279 S.W.3d 640, 644 (Tex. 2009); see also In re Weekley Homes, L.P., 180 S.W.3d 127, 131 (Tex. 2005). To that end, Texas courts recognize the doctrine of direct benefits estoppel. “Under the doctrine of ‘direct benefits equitable estoppel,’ a person who has not agreed to arbitrate may nevertheless be compelled to do so when the person seeks to derive a direct benefit from the contract containing the arbitration provision.” In re Morgan Stanley & Co., Inc., 293 S.W.3d 182 (Tex. 2009). Direct benefits equitable estoppel also applies to a non-signatory who sues on a contract containing an arbitration clause. Id. Here, there can be no dispute that FS received direct, financial benefits from the Contract—the same agreement on which it has filed suit. As a result, claims arising out of or related to the services FS rendered are properly subject to binding arbitration.

TEX. CIV. PRAC. & REM. CODE ANN. § 171.023(c) (emphasis added).

DEFENDANT INTELLICENTER DALLAS INVESTMENT LLP’S MOTION TO COMPEL ARBITRATION Page 4 of 6 R.P. Appx. 309 Respectfully submitted, MUNSCH HARDT KOPF & HARR, P.C.

/s/ Greg Noschese Greg C. Noschese State Bar No. 00797164 John Devin Wagner State Bar No. 24090451 North Akard Street, Suite 3800 Dallas, Texas 75201-6659 (214)855-7500 (Telephone) (214)855-7584 (Facsimile) [email protected] [email protected] ATTORNEYS FOR DEFENDANT INTELLICENTER DALLAS INVESTMENTS LLP

CERTIFICATE OF CONFERENCE I hereby certify that on March 27, 2015, the undersigned conferred with counsel for Plaintiffs in an attempt to resolve the issues discussed herein. Those efforts failed, necessitating the filing of this Motion.

/s/ Greg C. Noschese Greg C. Noschese

DEFENDANT INTELLICENTER DALLAS INVESTMENT LLP’S MOTION TO COMPEL ARBITRATION Page 5 of 6 R.P. Appx. 310 CERTIFICATE OF SERVICE I hereby certify that on this 27th day of March, 2015, a true and correct copy of the foregoing instrument was served on the following by Eserve: Kenneth B. Chaiken CHAIKEN & CHAIKEN, PC 5801 Tennyson Pkwy, Suite 440 Plano, TX 75024 (214)265-0250 (214)265-1537 (fax) Email: [email protected] R. Thomas Avery BLITZ, BARDGETT & DEUTSCH, LC South Central Avenue, Suite 1650 St. Louis, Missouri 63105 (314)863-1500 (314)863-1877 (Fax) Email: [email protected] /s/ Greg C. Noschese Greg C. Noschese

DEFENDANT INTELLICENTER DALLAS INVESTMENT LLP’S MOTION TO COMPEL ARBITRATION Page 6 of 6 R.P. Appx. 311 6025276v.1 FILED DALLAS COUNTY 3/16/2015 4:37:05 PM FELICIA PITRE DISTRICT CLERK

DC-15-02018 FORUM STUDIO, INC. and § IN THE DISTRICT COURT CLAYCO, INC., § § Plaintiffs, § § v. § OF DALLAS COUNTY, TEXAS § INTELLICENTER DALLAS § INVESTMENTS LLP, § § Defendants. § 160TH JUDICIAL DISTRICT DEFENDANT INTELLICENTER DALLAS INVESTMENTS LLP's RESPONSE TO PLAINTIFF’S APPLICATION TO STAY ARBITRATION Defendant Intellicenter Dallas Investments LLP (“Intellicenter”) files its Response to Plaintiffs’ Application to Stay Arbitration. In support thereof, Intellicenter would respectfully show as follows: I.

FACTUAL BACKGROUND AND INTRODUCTION On or about May 19, 2006, Intellicenter contracted with Plaintiff Clayco, Inc. ("Clayco") under a Design Build contract ("Contract") for the design and construction of a 4 story speculative office building consisting of approximately 211,637 square feet located at 3701 Regent Boulevard, Irving Texas ("Project"). 1 The Contract assigned Clayco as the general contractor and Plaintiff Forum Studio, Inc. (“FS”) as the Project’s architect. Clayco and FS are collectively referred to as “Plaintiffs”. 2

See Standard Form Agreement Between Owner and Contract and General Conditions of the Contract for Construction, a true and correct copy of which is attached hereto as Exhibit A.

See id. at 1.

Defendant's Response to Plaintiffs' Application to Stay Arbitration Page 1 of 12

R.P. Appx. 312 1 Pursuant to Section 4.6.1 of the Contract, the Parties agreed that "[a]ny Claim arising out of related to the Contract . . . shall be subject to binding arbitration.” The clause further provides that “[p]rior to arbitration, the parties shall endeavor to resolve disputes by mediation.” Section 4.6.2 of the Contract instructs that “[c]laims not resolved in mediation shall be decided by binding arbitration which, unless the parties mutually agree otherwise, shall be in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association.”

On or about September 5, 2014, Intellicenter filed a demand for arbitration to recover the losses sustained as a result of Plaintiffs’ breach of contract, breach of implied warranty, unjust enrichment, deficient design, fraud and/or negligent misrepresentation. 3 The Parties subsequently submitted the claims to mediation before Judge Glen M. Ashworth. Efforts to resolve the dispute in mediation failed. As expressly stipulated by the terms of the Contract, Intellicenter began preparing for arbitration before the AAA.

On February 20, 2015, Plaintiffs filed their Original Petition requesting a stay of the arbitration proceedings and related Motion for Dismiss and Request for Declaratory Judgment. 4 Arguing that Intellicenter failed to satisfy “a condition precedent” to its right to arbitrate, Plaintiffs contend the right has been waived. 5 Intellicenter filed its answer and counterclaims on March 2, 2015.

Intellicenter now files this Response to Plaintiffs’ Application to Stay the Arbitration Case (“Response”). The plain terms of the Contract and binding precedent instruct that the arbitrability of this dispute be decided solely by the AAA. And Plaintiffs’ grounds for avoiding

See Intellicenter’s Demand for Arbitration, a true and correct copy of which is attached hereto as Exhibit B.

See Plaintiff’s Original Petition, at ¶¶ 26-35.

Id. at ¶ 27.

Defendant's Response to Plaintiffs' Application to Stay Arbitration Page 2 of 12

R.P. Appx. 313 2 arbitration merely demonstrate why it is required. This Court should refuse to disturb the Parties’ agreement and deny the application to stay arbitration.

II.

ARGUMENT AND AUTHORITIES 1. THE ARBITRABILITY OF THIS DISPUTE IS A MATTER RESERVED FOR THE AAA.

“An arbitrator's jurisdiction is defined by the parties' contract.” 6 The arbitrator has the power to decide what matters are arbitrable where the arbitration clause “clearly and unmistakably” gives that power to the arbitrator. 7 Here, the Parties “clearly and unmistakably” gave that power to the AAA.

The Contract’s arbitration clause is broad, covering “[a]ny claim arising out of or related to the Contract.” 8 Federal and state courts agree that the broader the arbitration clause, the stronger the presumption of arbitrability. 9 In addition, “the express incorporation of rules that empower the arbitrator to determine arbitrability—such as the AAA Commercial Arbitration Rules—has been held to be clear and unmistakable evidence of the parties' intent to allow the arbitrator to decide such issues.” 10 The Parties elected to pursue arbitration “in accordance with

Am. Realty Trust, Inc. v. JDN Real Estate- McKinney, L.P., 74 S.W.3d 527, 531 (Tex. App.—Dallas 2002, pet. denied).

Howsam v. Dean Witter Reynolds, 537 U.S. 79, 83 (2002).

See Exhibit A, at 4.6.1; see also Ascendant Anesthesia PLLC v. Abazi, 348 S.W.3d 454, 461 (Tex. App.—Dallas 2011, no pet.) (noting arbitration provision that assigns “any controvery, dispute, or claim” to arbitration is construed broadly and in favor of arbitration); 950 Corbindale, L.P. v. Kotts Capital Holdings Ltd. P'ship, 316 S.W.3d 191, 195–96 (Tex.App.—Houston [14th Dist.] 2010, no pet.) (“presumption of arbitrability is particularly applicable when the clause is broad; that is, it provides for arbitration of ‘any dispute arising between the parties'”).

See, e.g., AT&T Technologies, Inc. v. Communications Workers of America, 475 U.S. 643, 650 (1986).

Schlumberger Tech. Corp. v. Baker Hughes Inc., 355 S.W.3d 791, 802 (Tex. App.—Houston [1st Dist.] 2011, no pet.); see also Qualcomm Inc. v. Nokia Corp., 466 F.3d 1366, 1372–73 (Fed. Cir. 2006) (concluding that agreement's incorporation of AAA rules clearly and unmistakably showed parties' intent to delegate issue of determining arbitrability to arbitrator); Terminix Int'l Co., LP v. Palmer Ranch Ltd. P'ship, 432 F.3d 1327, 1332–33 (11th Cir. 2005) (holding that by incorporating AAA Rules into arbitration agreement, parties clearly and Defendant's Response to Plaintiffs' Application to Stay Arbitration Page 3 of 12

R.P. Appx. 314 3 the Construction Industry Arbitration Rules of the American Arbitration Association.” (“CIARAAA”). 11 The CIARAAA recognize the arbitrator’s authority “to rule on his or her own jurisdiction, including any objections with respect to the existence, scope or validity of the arbitration agreement.” 12 Thus, the breadth of the arbitration clause and specific language of the applicable rules mandate that issues of arbitrability remain with the AAA. Plaintiffs’ application to stay the proceedings should thus be denied.

2. THE ARBITRATION CLAUSE COVERS THE PARTIES’ DISPUTE.

Alternatively, if the Court finds it may properly decide arbitrability, the arbitration clause subsumes the Parties’ dispute. Both Texas and federal courts have long shown favor toward the enforcement of arbitration agreements. Because state and federal policies continue to favor arbitration, a presumption exists favoring agreements to arbitrate. In light of these strong state and federal policies, Texas and federal courts agree that any written agreement to submit a dispute to arbitration should be liberally construed, and any doubt as to the arbitrability –

unmistakably agreed that arbitrator should decide whether arbitration clause was valid); Contec Corp. v. Remote Solution, Co., 398 F.3d 205, 208 (2d Cir. 2005) (“[W]hen ... parties explicitly incorporate rules that empower an arbitrator to decide issues of arbitrability, the incorporation serves as clear and unmistakable evidence of the parties' intent to delegate such issues to an arbitrator.”); Citifinancial, Inc. v. Newton, 359 F.Supp.2d 545, 549–52 (S.D. Miss. 2005) (holding that by agreeing to be bound by procedural rules of AAA, including rule giving arbitrator power to rule on his or her own jurisdiction, defendant agreed to arbitrate questions of jurisdiction before arbitrator); Sleeper Farms v. Agway, Inc., 211 F.Supp.2d 197, 200 (D. Me. 2002) (holding arbitration clause stating that arbitration shall proceed according to rules of AAA provides clear and unmistakable delegation of scope- determining authority to arbitrator).

Exhibit A, at 4.6.2.

CIARAAA R-9(a).

See Southland Corp. v. Keating, 465 U.S. 1, 10 (1984); see also Jack B. Anglin Co., Inc. v. Tipps, 842 S.W.2d 266, 268 (Tex. 1992).

United Offshore Company v. Southern Deepwater Pipeline Co., 899 F.2d 405, 408 (5th Cir. 1990); Colt Unconventional Resources, LLC v. Resolute Energy Corp., CA No. 3:13–CV–1324–K, 2013 WL 3789896, 3 (N.D. Tex. July 19, 2013); In re First Merit Bank, N.A., 52 S.W.3d 749, 753 (Tex. 2001).

Defendant's Response to Plaintiffs' Application to Stay Arbitration Page 4 of 12

R.P. Appx. 315 4 whether construction of the contract or any defense to arbitrability – should be resolved in favor of arbitration.

Generally, if the facts alleged “touch matters,” have a “significant relationship” to, are “inextricably enmeshed” with, or are “factually intertwined” with the contract that is subject to the arbitration agreement, the matter is arbitrable. 16 However, if the facts alleged are completely independent of the contract, and the claim could be maintained without reference to the contract, the claim is not subject to arbitration. 17 The Federal Arbitration Act strongly favors arbitration and, as discussed above, any doubts as to whether a claim falls within the scope of an arbitration agreement must be resolved in favor of arbitration. 18 Thus, Plaintiffs’ application to stay arbitration should be denied “unless it can be said with positive assurance that the arbitration clause is not susceptible to an interpretation which would cover the dispute at issue.” 19 The live pleadings clearly demonstrate the inextricably enmeshed nature of the terms of the Contract and the allegations at play. Plaintiffs’ Original Petition concerns conditions to invoking the arbitration clause and the “contractual accrual date” of Intellicenter’s claims and causes of action. 20 Similarly, Intellicenter’s allegations turn on whether Plaintiffs designed and constructed the Project in accordance with their contractual obligations. It is self-evident that an adjudicator cannot resolve these disputes “without reference to the contract,” as each are

See Moses H. Cone Mem’l Hosp. v. Mercury Const. Corp., 460 U.S. 1, 24 (1983); Rojas v. TK Commc’ns, Inc., 87 F.3d 745, 749 (5th Cir. 1996); Austin Mun. Sec., Inc. v. Nat’l. Ass’n of Sec. Dealers, Inc., 757 F.2d 676, 696 (5th Cir. 1985); Mitsubishi Motors Corp. v. Soler Chrysler-Plymouth, Inc., 473 U.S. 614, 626 (1985).

Pennzoil Co. v. Arnold Oil Co., Inc., 30 S.W.3d 494, 498 (Tex. App.—San Antonio 2000, no pet.). Id. (citing Fridl v. Cook, 908 S.W.2d 507, 511 (Tex. App.—El Paso 1995, writ dism'd w.o.j.) (emphasis added). Id. Id. (internal quotation and citations omitted); see also, AT & T Technologies, Inc. v. Communications Workers of Am., 475 U.S. 643, 650 (1986).

See Plaintiffs’ Original Petition, at ¶¶ 24, 27.

Defendant's Response to Plaintiffs' Application to Stay Arbitration Page 5 of 12

R.P. Appx. 316 5 factually intertwined with the very terms to which the Parties agreed. Because the allegations and Contract cannot be divorced, this Court cannot “with positive assurance” determine that arbitration should be stayed. Accordingly, Plaintiffs’ application to stay the proceedings should be denied. 21 3. PLAINTIFFS’ POSITION MERELY PROVES WHY ARBITRATION IS REQUIRED.

Plaintiffs aver that Intellicenter’s compliance with Section 150.002 of the Texas Civil Practices & Remedies Code represents a “condition precedent” to Intellicenter’s right to arbitration. 22 Plaintiffs argue Intellicenter “waive[d]” that right because the “condition precedent cannot be satisfied.” 23 The argument is unavailing, misguided and simply self-defeating.

Unlike issues of substantive arbitrability, “[p]rocedural arbitrability is the province of the arbitrator.” 24 Procedural arbitrability entails “[i]ssues of notice, time limits, laches, and estoppel,” or “generally any issue requiring the adjudicator to decide if a party has satisfied the prerequisites” of a right to arbitration. 25 “[W]hether the issue is described as being a failure to

Intellicenter notes that FS does not seek to avoid arbitration as a “non-signatory” to the Contract. That issue is thus not properly before the Court. But even if FS had asserted this defense, it would ultimately fail. Non- signatories to a contract containing an arbitration clause may be required to arbitrate under principles of equity. See In re Labatt Food Serv., L.P., 279 S.W.3d 640, 644 (Tex. 2009); see also In re Weekley Homes, L.P., 180 S.W.3d 127, 131 (Tex. 2005). To that end, Texas courts recognize the doctrine of direct benefits estoppel. “Under the doctrine of ‘direct benefits equitable estoppel,’ a person who has not agreed to arbitrate may nevertheless be compelled to do so when the person seeks to derive a direct benefit from the contract containing the arbitration provision.” In re Morgan Stanley & Co., Inc., 293 S.W.3d 182 (Tex. 2009). Direct benefits equitable estoppel also applies to a nonsignatory who sues on a contract containing an arbitration clause. Id. Here, there can be no dispute that FS received direct, financial benefits from the Contract—the same agreement on which it has filed suit. As a result, claims arising out of related to the services FS rendered are properly subject to binding arbitration.

Plaintiff’s Original Petition, at ¶ 27. Id. In re Global Const. Co., L.L.C., 166 S.W.3d 795, 798 (Tex. App.—Houston [14th Dist.] 2005, no pet.) (citing Howsam, 537 U.S. at 84-85). Id. Defendant's Response to Plaintiffs' Application to Stay Arbitration Page 6 of 12

R.P. Appx. 317 6 meet a condition precedent or is described as waiver . . . each one presents an issue of procedural arbitrability.” 26 Here, Plaintiffs seek to quash arbitration with defenses that are decidedly procedural. 27 But Plaintiffs’ position only demonstrates why arbitration is required. Plaintiffs simply cannot avoid the well-established precept that “[t]rial court[s] [are] not authorized to address questions of procedural arbitrability such as the satisfaction of conditions precedent to a right of arbitration.” 28 Intellicenter is unaware of any authority removing the “condition precedent” claimed here from the gamut of the rule. And given that “any doubts concerning the scope of arbitrable issues should be resolved in favor of arbitration[,]” a strained analysis is not required. 29 Because Plaintiffs’ challenges to arbitration are admittedly procedural, their request to stay the proceedings should be denied.

4. INTELLICENTER SATISFIED THE MUTUALLY AGREED CONDITIONS TO ARBITRATION.

Even if the Court could decide issues of procedural arbitrability—which it cannot— Intellicenter has satisfied all conditions for arbitrating this dispute. Section 4.6.1 of the Contract

Id. (emphasis added); see also Grand Homes 96, L.P. v. Loudermilk, 208 S.W.3d 696, 703 (Tex. App.—Fort Worth 2006, pet. denied) (noting Texas courts hold that “matters of waiver and delay in requesting arbitration should be presented to the arbitrator for resolution”); In re Weekley Homes, 985 S.W.2d 111, 114 (Tex. App.—San Antonio 1998, no pet.) (holding plaintiffs’ “contention that [defendant’s] failure to perform a condition precedent released them from the arbitration provision is a procedural question the arbitrator should address”); City of Lubbock v. Hancock, 940 S.W.2d 123, 127 (Tex. App.—Amarillo 1996, no writ) (noting Section 171 of the Texas Civil Practices & Remedies Code “does not require or authorize a court to address questions of procedural arbitrability such as the satisfaction of conditions precedent to a right of arbitration”).

See Howsam, 537 U.S. at 84-85.

In re Gardner Zemke Co., 978 S.W.2d 624, 627 (Tex. App.—El Paso 1998, no pet.); see also John Wiley & Sons, Inc. v. Livingston, 376 U.S. 543, 557 (1964) (holding that an arbitrator should decide whether the first two steps of a grievance procedure were completed, where these steps are prerequisites to arbitration).

Moses H. Cone Mem. Hosp. v. Mercury Const. Corp., 460 U.S. 1, 24-25 (1983); In re FirstMerit Bank, N.A., 52 S.W.3d 749, 753 (Tex. 2001) (“courts must resolve any doubts about an arbitration agreement's scope in favor of arbitration”).

Defendant's Response to Plaintiffs' Application to Stay Arbitration Page 7 of 12

R.P. Appx. 318 7 provides that “[p]rior to arbitration, the parties shall endeavor to resolve disputes by mediation . . .” The Parties completed that endeavor but resolution failed. As for any remaining prerequisites, the Parties expressly agreed that: Claims not resolved by mediation shall be decided by binding arbitration which, unless the parties mutually agree otherwise, shall be in accordance with the Construction Industry Rules of the American Arbitration Association currently in effect. The demand for arbitration shall be filed in writing with the other party to the Contract and with American Arbitration Association.“ 30 The CIARAAA set forth the requirements to initiate a demand for arbitration. 31 Plaintiffs do not contest Intellicenter’s compliance with these rules, and the Parties have not agreed to any further or additional conditions to arbitration. 32 Thus, Plaintiffs’ procedural arbitrability arguments—had they been properly raised—still ultimately fail.

5. SECTION 150.002 HAS NO BEARING ON THIS CASE.

A. Section 150.002 Does Not Apply to the Pending Arbitration.

While Intellicenter maintains that only the AAA may adjudicate this dispute, it offers a glimpse of why Plaintiffs’ reliance on section 150.002 is misplaced. The plain language of the statute reveals it does not apply to the Parties’ pending arbitration. The statute’s certificate of Exhibit A, at 4.6.2 (emphasis added).

Those prerequisites are found in CIAAA R-4: (i) The initiating party (“the claimant”) shall, within the time period, if any, specified in the contract(s), file with the AAA a demand for arbitration, the administrative filing fee, and a copy of the applicable arbitration agreement from the parties’ contract which provides for arbitration. Filing may be accomplished through use of AAA WebFile, located at www.adr.org, or by filing the demand with any AAA office. (ii) The claimant shall simultaneously provide a copy of the demand and the applicable arbitration agreement to the opposing party (“the respondent”). (iii) The demand shall include: (a) The name of each party; (b) The address for each party, including, if known, telephone and fax numbers and email addresses; (c) If applicable, the names, addresses, telephone and fax numbers and, if known, email address of the known representative for each party; (d) A statement setting forth the nature of the claim including the relief sought and the amount involved; (e) The locale requested, if the arbitration agreement does not specify one.

Defendant's Response to Plaintiffs' Application to Stay Arbitration Page 8 of 12

R.P. Appx. 319 8 merit requirements apply only to a “plaintiff.” 33 But Intellicenter is not a “plaintiff” by definition; Intellicenter is a “claimant” in an arbitration proceeding. 34 Likewise, the statute only applies to “complaints.” 35 Intellicenter did not file a “complaint,” but rather a “demand for arbitration.” 36 If “plaintiff” was intended to include “claimant,” as Plaintiffs may ultimately contend, the Texas Legislature would not consider amending the statute to change “plaintiff” to “claimant.” But that is exactly what the Texas Legislature is currently considering. 37 Simply put, Intellicenter is not a “plaintiff,” it did not file a “complaint” and the statute’s procedural requirements do not apply. To hold otherwise ignores that courts are bound to interpret a statute in accordance with “the plain meaning of the provision's words and terms.” 38 B. Section 150.002 Does Not Apply to Plaintiffs.

Nor do Plaintiffs qualify for the shelter they seek. The statute’s certificate of merit requirements apply only in actions “arising out of the provision of professional services by a licensed or registered professional.” 39 Because neither FS nor Clayco satisfy the statutory definition of “licensed or registered professional,” section 150.002 has no bearing on this case.

Tex. Civ. Prac. & Rem. Code Ann. § 150.002(a).

See Exhibit B.

Tex. Civ. Prac. & Rem. Code Ann § 150.002(a).

See Exhibit B.

2015 Tex. H.B. 1353, 84th Leg., R.S. (2015).

Fitzgerald v. Advanced Spine Fixation Sys., Inc., 996 S.W.2d 864, 865 (Tex. 1999). Tex. Civ. Prac. & Rem. Code Ann. § 150.002(a) (emphasis added).

Defendant's Response to Plaintiffs' Application to Stay Arbitration Page 9 of 12

R.P. Appx. 320 9 Texas Civil Practices & Remedies Code 150.001(1-a) defines “licensed or registered professional as a licensed architect, licensed professional engineer …or any firm in which such licensed or registered professional practices . . . .” The express terms of the Contract recognize that “[Clayco] is not a licensed architect or engineer[,]” 40 and Hans Hecker, FS’s principal and the individual who signed the Architect’s Certificate, 41 is not licensed by the Texas Board of Architectural Examiners. 42 The statute plainly provides that a firm qualifies as a “licensed or registered professional” only if its practicing architect does. 43 Because Hecker does not satisfy the statutory definition of licensed or registered professional, neither does FS. Plaintiffs’ procedural posturing is fatally flawed, and their application to stay arbitration should be denied.

III.

CONCLUSION AND PRAYER For these reasons, Defendant Intellicenter Dallas Investments LLP respectfully requests that the Court deny Plaintiffs’ Application to Stay the Arbitration Case and further requests any such additional or other relief to which it may show itself justly entitled, whether in law or in equity.

See Exhibit A, at Article 3.

See Architect’s Certificate executed by Hans Hecker as principal of Forum Studio, Inc., a true and correct copy of which is attached hereto as Exhibit C.

Intellicenter requests the Court take judicial notice of Hecker’s status by visiting: http://www.tbae.state.tx.us/publicinformation/finddesignprofessional.

See id. § 150.001(1-a).

Defendant's Response to Plaintiffs' Application to Stay Arbitration Page 10 of 12

R.P. Appx. 321 10 Respectfully submitted, MUNSCH HARDT KOPF & HARR, P.C.

/s/ Greg Noschese Greg C. Noschese State Bar No. 00797164 John Devin Wagner State Bar No. 24090451 North Akard Street, Suite 3800 Dallas, Texas 75201-6659 (214)855-7500 (Telephone) (214)855-7584 (Facsimile) [email protected] [email protected] ATTORNEYS FOR DEFENDANT INTELLICENTER DALLAS INVESTMENTS LLP

Defendant's Response to Plaintiffs' Application to Stay Arbitration Page 11 of 12

R.P. Appx. 322 11 CERTIFICATE OF SERVICE I hereby certify that on this 16th day of March, 2015, a true and correct copy of the foregoing instrument was served on the following by Eserve: Kenneth B. Chaiken CHAIKEN & CHAIKEN, PC 5801 Tennyson Pkwy, Suite 440 Plano, TX 75024 (214)265-0250 (214)265-1537 (fax) Email: [email protected] R. Thomas Avery BLITZ, BARDGETT & DEUTSCH, LC South Central Avenue, Suite 1650 St. Louis, Missouri 63105 (314)863-1500 (314)863-1877 (Fax) Email: [email protected] /s/ Greg C. Noschese Greg C. Noschese

Defendant's Response to Plaintiffs' Application to Stay Arbitration Page 12 of 12

R.P. Appx. 323 MHDocs 6013443_1 5554.38 Exhibit A

R.P. Appx. 324 13 AlA DocumentA111'" -1997 Standard Fonn of Agreement Between Owner and Contractor where the basis for payment is the COST OF THE WORK PLUS A FEE with a negotiated Guaranteed Maximum Price AGREEMENT made as of the nineteenth day of Mu_in the year two thousand six (In words, indicate day, month and year) BETWEEN lhe Owner. (Name, address and other infomUJtion) This document has important legal consequences.

COnsultation wlth an attorney Is encouraged with respect to its completion or modlfrcatlon.

Intellicenter Dallas Investments. LLP This document is not intended for 8115 Preston Rd .. Suite #700 use In competitive bidding.

Dallas, IX 75225 AlA Document A201-1997, and the Contractor. General Conditions of the (Name, address and other informOJion) Contract for Construction, Is adopted in this document by ref8fenoe. Do not use with oth81' general conditions unless this document Is modified.

CJaypo. Inc. This document has been 2199 Innerbelt Business Center Qrive approved and endorsed by the St. Louis. Missouri 63114 Associated Gen8fal Contractors of America.

Tbe Project is: (Name and location) The design and construction of a 4-storv speculative office building. consistine of aooroximately 211.637 gross square feet. located at 3701 Regent Blvd.. Irvim:. Texas.

The Architect is: (Name, address and other information) FS Ar<:hitecture. PC c/o Forum Studios. Inc. 2199 Innerbelt Business Cemer Drive St. Louis. Missouri 63114

Structural. mechanical. electrical and civil engineering services and the consulting services of other Design Professionals for the Project will be proyided contractually Jbrough the Architect except as follows: Topographic and boundary survey to be provided by Owner.

The Owner and Contractor agree as follows.

AlA Document At11TII-1897. Copyright Cl1920, 1925, 1951, 1958,1961, 1983, 1967, 1974, 1978,1987 and 1997 by The American Institute of Arclliteels.

All rigllb nt..ved. WARNING: Thla AlA• Document Is protected by U.S. Copyright Lew and lnt.ernatlooal Treaties. UniUthortred reproduction or 1 distribution ot this AlA• Document, or 1ny po1!11on ot it, may result In severe civil and criminal ~nallles, and wHI be prosecuted to the maximum elCien1 possible under the law. This document was pwauced by AlA software at 15:11:31 on 05/19/2006 under Order No.1000182995~1 which expires on 712312006, and Ia not lor resale. u..r NotH: Clayco A111- Koll - lntelllcenter · Dallas v3 (5-19•08) (2347931739)

R.P. Appx. 325 14 ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of Ibis specifically modified Agreement, the specifically modified AlA Document A201-l997. General Conditions ef lfte Centfeet (G&fleftll, Supplemenwy enEI ether Cenditiens), C"A201"), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement; these fonn the Cenlfaet; "Contract." and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 15. If anything in the other Contract Documents is inconsistent with this Agreement, this Agreement shall govern.

ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others.

ARTICLE 3 RELATIONSHIP OF THE PARTIES The Contractor accepts the relationship of trust and confidence established by this Agreement and covenants with the Owner to cooperate with the Architect and exercise the Contractor's skill and judgment in furthering the interests of the Owner; to furnish efficient business administration and supervision; to furnish at all times an adequate supply of workers and materials; and to perfonn the Worlc in an expeditious and economical manner consistent with the Owner's interests. Tbe Owner agrees to furnish and approve, in a timely manner, infonnation required by the Contractor and to malce payments to the Contractor fn accordance with the requirements of the Contract Documents.

The Contractor will enter into a direct contractual relationship with the Architect. engineers. design/build subcontractors and other design professionals (collectively. the "Desi&n Prof~ionals") to provide the design of the Project The Owner acknowledges and agrees that the Contractor is not a licensed architect or engineer and is not agreeing to pedorm serrjces which require such a license in the State in which the Project is located. Such services will be oerfonned by ljcensed architects, engineers and design/build subcontractors under separate agreements. The fees and expenses of all such design wofessjonals shall be included as part of the Cost of the Work. The Contractor shall cause the Architect to prepare and submit as part of the Cost of the Worlc. the Construction Documents necessary for the construction of the Project. The contractual obligations of such the Architect. engineers and other deSign oorsons or entities are undertaken and performed in the interests of the Contractor, The agreements between the Contractor and the Architect, engineers and other design professionals shall be in writing and lhese IIIJl!ngements. including financial amngements with respect to the Project. shall be promptly and fully disclosed to the Owner upon request. The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's employees. subcontractors and their agents and employees. and other persons. including the Architect. engineers and otber Design ProCessionals. oerformjng any ponion of the Contractor's obligations under thjs Anicle 3 wjth resoect to the design of the Projecb The "Construction Documents" may include drawings. specifications. and other documents and elec(!Qnlc data setting forth the reQuirements for construction of the Work. and shall (i) be consistel]t with the intent of the Proiect as a whole. Cii) provide infonnation for the use of those in the building trades: and (iii) include documents customarily required for re&ulatozy agency approvals. The fees and expenses of all such Design Professionals shall be included as Part of the Contract Sum.

ARTICLE 4 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 4.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (lnsen the date ofcommencement, ifir differs from the date ofthis Agreement ar, if applicable, state that the date will be fixed in a notice to proceed.)

February 21. 200§.

If, prior to commencement of the Work, the Owner requires time to file mortgages, mechanic's liens and other security interests, the Owner's time requirement shan be as follows:

AlA Document A111™ -1997. Copyright @ 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Architects.

All rights rtl8rved. WARNING: Thl• AJA• Doo1.1ment Is proltellld by U.S. Copynghl lAw and International Treaties. Unauthorized reproduction or 2 distribution of this AlA* Dowment, or any portion ollt, m.y result In severe civil and criminal pe1111tles, and will be prosecuted to the maximum extent possible under the law. This docoolent was proc:l.uced by AlA sottware at 15:11:31 oo 05/1912006 under Ordef No. 1000182995_1 which expires oo 712312006, and Is not for resale.

UHI' NotH: Clayco A111 - Koll . lntelicenter • Dallas v3 (5·19·06) (2347931739)

R.P. Appx. 326 15 § 4.2 The Contract Time shall be measured from the date of commencement § 4.3 The Contractor shall achieve Substantial Completion of the entire Work not later than EI&¥S ffem December 26.

20()6. subject to extensions for any delays contemplated jn Paragraph 4.1 of this As.reement or Paragraph 8.3.1 of the form the Genera} Conditions (AlA Document No. A201) attached he.reto. such completion date 9f eemmeneeM&IIq er being l'eferred to herein as fellewe:the "Substantia) Completion Date." (Insert number ofcalendar days. Alternatively, a calerukJr tklte 171(ly be used when coordinated with the date of commencement. Unless staled elsewhere in the Contract Documents, insert an:y requirements for earlier Substantial Completion ofcertain portions of the Work.)

I ~Ftien ef WeFk

, subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidtlted damages relating to failure to complete on time, or for bonus payments for early completion ofthe ~Work.!The initial consttuction schedule (the "Proiect Schedule" I for the Project is attached hereto as Exhlbh "A

ARTICLE 5 BASIS FOR PAYMENT § 5.1 CONTRACT SUM § 5.1.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract Tbe Contract Sum is the Cost of the Work as defined in Article 7 plus the Contractor's Fee.

§ 5.1.2 The Contractor's Fee is: (State a lump sum. percentage of Cost ofthe Work or other provision for tktermining the Contractor's Fee, and describe the method ofadjustment of the Contractor's Fee for changes in the Work. )

The "Contractor's Fee" shall be fow percent <4%) ofd!e Cost of the Work subject to an increase in the fee of four oercent (4%) on all Change Orders. as defined in Paragraph 6.3 herein below. increasing the Cost of the Work. and subject to a decrease in the fee of four oercent (4%>on all Change Orders decreasing the Cost of the Work.

§ 5.2 GUARANTEED MAXIMUM PRICE § 5.2.1 The sum of the Cost of theWorl< and the Contractor's Fee is guaranteed by the Contractor not to exceed ~Fourteen Mmion Three Hundred Fiftv-Three Thousand Nine Hundred Seventv-Tbree and 00/100 Dollars ($14.353.973.00). subject to additions and deductions by Change Order as provided in the Comract Documents.

Such maximum sum is referred to in the Contract Documents as the Guaranteed Maximum Price Cas the same may be adjusted from time to time by Change Order or otherwjse. the "Guaranteed Maximum Pt:i6&:-I!i£!Ll...Costs which would cause the Guaranteed Maximum Price to be exceeded shall be paid by the Contractor without reimbursement by the Owner If. upon Final Completion. the OMP exceeds Cost of the Work plus the Contractor's Fee. then the amount of such excess shall be referred to herein as the "savin~": and the savings shall be shared by the Owner and the Conqactor as follows: sixty percent <60%l of the savings shall be retained by the Owner: and forsv oercent (40%) of the savings sha11 be paid to the Contractor as a fee in addition to the QwaenContractor's Fee described in Paragraph 5.1.2 above. (Insert specific provisions if the Contractor is to participate in any savings.)

AlA Document A111 "' -1997. Copyright C 1920. 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by Tile Ame~can Institute ot ArcMects.

All rights rtHI'Yed. WARNING: This AtA• Document It prottcted by U.S. Copyright law and International Treatlu. Unauthorized reproduction or 3 distribution ol thls AlA,. Document. or any portlon of it, may result In severe clvJI and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was proc:luoed by AlA sollware at15:11:31 on0511912006 under Order f\10.1000182995_1 which elq)lres on 712312006, and is not for resale.

U~er Notes: Clayco A111 • Koll • lntelllceoter . Da~as v3 (5·19-QS) (2347931739)

R.P. Appx. 327 16 § 5.2.2 The Guaranteed Maximum Price is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification ofaccepted alternates. If decisions on other alternates are to be made by the Owner subsequent to the execution of this Agreement, attach a schedule ofsuch other alternates showing the amount/or each and the date when the amount expires.)

See Outline Soecificatioo & Drawings (the "Outline Specs") attached to thjs Contract as Exhibit "B" <consisting of pages).

§ 5.2.3 Unit prices, if any, are as follows:

See Outline Specs.

§ 5.2.4 Allowances, if any, are as follows (Identify and state the amounts ofany allowances, and state whether they include labor, materials, or both.)

~.llewaAee IA$1Uded iteM& See Outline Specs. H the Contract Documents provide for any allowances. then the parties agree that (j) the GMP shall be reduced by the amount. if any. by whjch the allowance exceeds the actyal cost of the item for which such allowance was made. and (ii) !be GMP shall be increased by the amount if any. by which the actual cost of the item for which such allowance was made exceeds the allowance.

§ 5.2.5 Assumptions, if any, on which the Guaranteed Maximum Price is based are as follows:

Contractor's ~neral conditions as set forth in the Division I costs shall not exceed 125% of the amount set fortb on the Clayco Control Budget attached as Exhibit "C".

See Outline Soecs.

§ 5.2.6 To the extent that the Drawings and Specifications are anticipated to require further development by the Architect, the Contractor has provided in the Guaranteed Maximum Price for such further development consistent with the Contract Documents and reasonably inferable therefrom. Such further development does not include such things as changes in scope, systems, kinds and quality of materials, finishes or equipment, all of which, if required, shall be incorporated by Change Order.

ARTICLE 6 CHANGES IN THE WORK § 6.1 Adjustments to the Guaranteed Maximum Price on account of changes in the WorkfR&)"'sha!l be determined&)" aRy ef Ole medied51isted in Seetian 7.3.3 af.'\IA Dee1119ent A2Ql 1997.accordance with Paragraph 6.5 below.

!!:.:..§ fi,3JR GQ)GulatiBg a6jU!IaBeRl& ta 8U\IG9RlfaGt6 (ellG8pt tJiese awQAied widl tile 0>A'R8f'6 pfier 69R&eRt an the easis ef east plus a fee~, the teRm "east" and "fee" as used In Seelien 7.3.:U ef AJA Dee11H1ent ,o\2Ql 1997 ami the teRM "sesl6" ans "a reasenallle allawaaee fer a'ler4tead all(l JIFefit" as used iR Seeaen 7.le ef,r\IA DesYR'IeRt J\2Q} 11}9:7 &hall have the Jlle8AiRg6 889igMd te lh8AI iA ,\lA l)eeyment J\201 199;7 QflQ shall net \le 199dified ey ,\nieles ~. 7 Md 8 ef lhis :\gfeeH!ent i\EijllsHHeal6 te s118eentFaet& awardeEI wilh the Owner's prier eeasent eR the easis ef east pl11s a fee shall ee ealeulateEI in aeeef6aftee with the tefRls ef these sul:Jeena:aets.

~In calculating adjustments to the Guaranteed Maximum Pfi6&;-Price or the impact of any Change Order. the terms "cost" and "costs" as used in the above-referenced provisions of AlA Document A20I-Im shall mean the Cost of the Work as defined in Article 7 of this Agreement and the terms "fee" and "a reasonable allowance for overhead and profit" shall mean the percentage for the Contractor's Fee as ElefiAed indicated in Section 5. I .2 of this Agreement.

AlA Document A111"'- 1997. COpyright (11920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American lnstltuto or Architects.

All rtghts re~ WARNING: Thla AlA• Document Is protected by U.S. Copyright l aw and lnlarnatlonal Trutles. Unauthorized reproduction or 4 dl8trlbutlon of this AlA• Oowmem, or any portion of It, may ntaultln severe civil and criminal penahles, and wBI be prosecuted to the maximum extent po$$ible under the law. This doc~nt was produced by AlA sollwara at 15:11:31 on 0511912006 under Order No.1000182995_1 which expires on 712312006. and Is not !of resale.

UNr Notes: Clayco A111 • Koll · lntelicenter • Dallas v3 (5-19·06) (2347931739)

R.P. Appx. 328 17 § &.4 If 88 speeifie Jlfe'ASieR is II'Hid& iR SeetieA S.l fer adjwstmeRt ef£Re Ceamteler's Jiee iR me ease efehaflges iR £fte WerlE, er if me eJiteat ef s~teh ehaRges is s11eh, ill the aggregate, that applieatieA ef the adjii51HieAI pre•tisieA& ef SeeaeaS.l will eaYSe Slle&taAtial iRe~tvity te die CW.·Rer er CeREFeeter, the Centraeter's Fee shall ee 8EIIIita91y IIEijY&teEI 9A die llasis ef tM rea estalllishee fer IRe eFigiR&l Werk, &RQ the Gwar&RIIIQ Maxi IIIII III PFiee shall ee IIEijws~ aeeeftlingly.

§ 6.3 If Cal the Owner requests a change in the Work or Cbl the Contractor otherwise is entitled to a Change Order as provided in the Contract Documents. then the Contractor Shall have the right to submit to the Owner a written change order request (a ''CO Request"). which shall set forth such change to the Contract as shall be appropriate.

Such CO &guest shall be in writing and shall set forth the appr9j!riate changes. jf any. to the (i) Cost of the Work, Cii> the Contractor's Fee. (iii) the Guaranteed Maximum Price. Civl the Contract Sum. Cvl the schedule of values. (vjl the Substantial Completion Date. or Cviil any other provisions of the Contract. Each CO Request shall constitute an offer by tbe Contractor to amend the Contract. If the Owner accepts such offer in writing and without revision. then such offer and acceptance. together. shall constitute a "Change Orcler" which shall ooerate to amend the Contract. If the Owoer ~Pts such offer subject to revisions not previously agreed to by the Contractor in writing. then such "acceptance" shall constitute a counteroffer by the Owner to the Contractor which the Contractor may ejther accept in writing or reject. If the Contractor accepts such counteroffer in writing. the same shall constitute a written Change Order. The Contractor shall have no obligation or right to perform any changes in the Work except Pursuant to a Change Order made as provided herein.

ARTICLE 7 COSTS TO BE REIMBURSED § 7.1 COST OF THE WORK The tenn Cost of the Work shall mean costs necessarily incurred by tbe Contractor in the proper performance of the Work. Such costs shall be at rates not higher than the standard paid at the place of the Project except with prior ~consent of the Owner. The Cost of theWork shall include only the items set forth in this Article 7.

§ 7.2LABOR COSTS § 7.2.1 Wages of construction workers directly employed by the Contractor to perform the construction of the Work at the site or, with the Owner's app.roval, at off-site workshops.

§ 7.2.2 Wages or salaries of the Contractor's supervisory and administrative peFSeMel oersonnel, based upon the time expended oo the Project when stationed at the site with the Owner's appFe"al.written aoproval. Time expended on the Proiect by the Contractor's Project Manager for the Project shall be included as a Cost of the Work. regardless of w)lere the Proiect Manager js located. (If it is intended that the wages or salaries ofcertain personnel stationed at the Coruractor's principal or other offices shall be included in the Cost ofthe Work, identify in Anicle 14 the personnel to be included and whether for all or only pan oftheir time, and the rates at which their time will be charged to the Work. ) § 7.2.3 Wages and salaries of the Contractor's supervisory or administrative personnel engaged, at factories, workshops or on the road, in expediting the production or transportation of materials or equipment required for the Work, but only for that portion of their time required for the Work.

S7.2.4 Costs paid or incurred by the Contractor for taxes, insurance, contributions, assessments and benefits required by law or collective bargaining agreements and, for personnel not covered by such agreements, customary benefits such as sick leave, medical and health benefits, holidays, vacations and pensions, provided such costs are based on wages and salaries included in the Cost of the Work under Sections 7.2.1 through 7.2.3.

§ 7.3 SUBCONTRACT COSTS § 7.3.1 Payments made by the Contractor to Subcontractors (including. without limitation. the Contractor jf the Contractor or a division of the Contractor is also a subcontractor but only if approved in writing in advance by Owner) in accordance with the requirements of the subcontracts.

§ 7.4 COSTS OF MATERIALS AND EQUIPMENT INCORPORATED IN THE COMPLETED CONSTRUCTION § 7.4.1 Costs, including transportation and storage, of materials and equipment incorporated or to be incorporated in the completed construction.

AlA Document A111 111 -1887. Copyrlgl)t C 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Archhects.

All rlghq reMMid. WAANING: This AlA• Doalment Is protected by U.S. Copyright Law and International Troatiee. Unauthorlled reproduction or 5 distribution of this AlA• Document, or any portion of It, may result In sewre civil and criminal penalties, and wMI be prosecuted to the maximum mctent possible undet' the IIW. This document was produoed by AlA sottware at 15:11:31 on 05f1912006 under Order No.1000182995_1 which expires on 7/2312006, and iS not for resale.

Uter Noles: Clayoo A1 11 • Koll · lntelllcenter • DaPas v3 (5·19·06) (2347931739)

R.P. Appx. 329 18 § 7.4.2 Costs of materials described in the preceding Section 7.4.1 in excess of those actually installed to allow for reasonable waste and spoilage. Unused excess materials. if any, shall become the Owner's property at the completion of the Work or, at the Owner's option, shall be sold by the Conttactor. Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work.

§ 7.5 COSTS Of OTHER MATERIALS AND EQUIPMENT, TEMPORARY FACIUTIES AND RELATED ITEMS § 7.5.1 Costs, including transportation and storage, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment, and hand tools not customariJy owned by construction workers, that are provided by the Contractor at the site and fully consumed in the performance of the Work; and cost (less salvage value) of such items if not fully consumed, whether sold to others or retained by the Contractor. Cost for items previously used by the Contractor shall mean fair market value.

§ 7.5.2 Rental charges for temporary facilities, machinery, equipment, and hand tools not customarily owned by construction workers that are provided by the Contractor at the site, whether rented from the Contractor or others, and costs of lransportation, installation, minor repairs and replacements, dismantling and removal thereof. Rates and quantities of equipment rented from the Contractor shall &e sttejeet te not exceed the OwAer's jJI'ier appreYal.fair market value thereof.

§ 7.5.3 Costs of removal of debris from the site.

§ 7.5.4 Costs of document reproductions, facsimile transmissions and long-distance telephone calls, postage and parcel delivery charges, telephone service at the site and reasonable petty cash expenses of the site office.

§ 7.5.5 That portion of the reasonable expenses of the Contractor's personnel incurred while traveling in discharge of duties connected with the Work.

§ 7.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location, if approved in advance by the Owner.

§ 7.6 MISCElLANEOUS COSTS § 7.6.1 That portion of insurance aRd beBEitnemiYRl5 that can be directly attributed to this Contract. The parties stipulate and agree that Conttactor's cost for providing such insurance is six tenths of one oercent (0.75%) of the Cost of the Work. excluding such cost of insurance. Ceatfasll § 7.6.2 Sales, consumer. use or similar taxes imposed by a governmental authority that are related to the Work.

§ 7.6.3 Fees and assessments for the building permit and for other permits, licenses and inspections for which the Contractor is required by the Contract Documents to pay.

§ 7.6.4 Fees of laboratories for tests required by the Contract Documents, except those related to defective or nonconforming Work for which reimbursement is excluded by Section 13.5.3 of AlA Document A201-l997 or other provisions of the Contract Documents, and which do not fall within the scope of Section 7.7.3.

§ 7.&.5 Reyal~es aadlieease fees paid fer me \l&e af a p&Ftielllar design, flF968S9 er predttet AIEJIIif~ ey the Cana=ast DesttHients; the sast ef aefenEiiRg &llil5 er elaiHI& fer iftft:iRgemeAt ef paleat figkss arisiag ~HI s11eh ~ttireRl8Rt ef me Cea~Het Qe611ffl8Rl&; 8ll4 payHieA~:& IR&Eie in aeeer4anse with legal j11Eigmea111 agaiA6t tile CeA~Heter Feslll\ing frefR stteli sttil!l er slaiHis and payt~~ents ef settlemeBtB Hlade with me OwRer's seASeAt. Hewe~·er. ~N~sh eests af legal Elefeases, j11EigRl8RIS BAEI sealemeal!lsllall Ael be inelttEied ia the ea.lelllatieB ef tile Caalfaeter's Pee er &Y!Jjeet te lbe ~llfaRteee MallimttHI Priee.lfs116h reyalties, fees aREI eeStB are e*elwded by lbe last seAteaee ofSeeaeR 3.17.1 ef AlA DeellH!eAt t'U91 1997 eF etiler previsieRs ef IRe Cealfeet Deellmefls, lheA tlley shall aet be iReludeEi in IAe Cest ef the W8fk: § 7.6.5 Royalties and license fees paid for the use of a particular design. process or product required by the Conttact Documents if such royalty and license fees are disclosed to Owner prior to Contractor commencing construction of the Project and Owner approves same in writing.

§ 7.6.6 Data processing costs related to the Work.

AlA Document A111"' - 1097. Copyright @ 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American tnslitute ot Architects.

All rlghtereterved. WARNING: Thla AlA• Document 11 prottcttd by U.S. Copyright law 1nd International Treaties. Unauthorized reproduction or 6 dl• tributfon of this AlA"' Document, or any portion of It, may result In se,.re civil and criminal penalties, and will be pr0$eculed to the miJCimum extent possible under the lew. ThiS document was produced by AlA SOftwale at 15:11:31 oo 05119/2006 IJ'Ider Order No.1000182995_1 which expires on 712312006, and is not lor resale.

UMr Notes: Clayoo A111 • Koll · \otelllcenter- Dallas vs (5·1 9-06) (2347931739)

R.P. Appx. 330 19 § 7.6.7 Deposits lost for causes other than the Contractor's negligence or failure to fulfill a specific responsibility to the Owner as set fonh in the Contract Documents.

§ 7.6.8 Legal, mediation and arbitration costs, including attorneys' fees, other than those arising from disputes between the Owner and Contractor, reasonably incurred by the Contractor in the performance of the Work and with the Owner's prior wrinen approval; which approval shall not be unreasonably withheld.

§ 7.6.9 Expenses incurred in accordance with the Contractor's standard personnel policy for relocation and temporary living allowances of personnel required for the Work, if approved by the Owner.

§ 7.6.10 Payments by the Contractor Into reserves established unde! the CCIP for tbe Project for providing Subcontractor insurance. The Contractor represents that the amount of such reserve payments shall not excHd the Insurance premiums that reasonably would be Incurred for the Proiect In the absence of the CCIP.

§ 7.6.11 Other direct reasonable exoenses incurred by the Contractor in connection wjth the Project to !he extent not described in this Section 7.6.

§ 7.6.12 Design service feel pavab!e to the Architect and any other design professionals engaged by Architect or the Contractor to provide the detlan for the Proiect.

§ 7.7 OTHER COSTS AND EMERGENCIES § 7.7.1 Other costs incurred in the perfonnance of the Work if and to the extent approved in advance in writing by the Owner.

§ 7.7.2 Costs due to emergencies incurred in taking action to prevent threatened damage, injury or Joss in case of an emergency affecting the safety of persons and property, as provided in Section 10.6 of AlA Document A201-1997.

§ 7.7.3 Costs of repairing or correcring damaged er neHeeRfemtiRg Work executed by the ContraCtor, Subcontractors or suppliers, provided that such damaged er HeneenfeRtliRg Work was not caused by aegligeRee NEGLIGENCE. intentional misconduct or failure to fulfill a specific responsibility of the COntractor and only to the extent that the cost of repairer eeffeetiell is not Eeeetterallle recovered by the Contractor from insurance, sureties, Subcontractors or suppliers.

ARTICLE 8 COSTS NOT TO BE RBMBURSED § 8.1 The Cost of the Work shall not include: § 8.1.1 Salaries and other compensation of the Conttactor's personnel stationed at the COntractor's principal office or offices other than the site office, except as specifically provided in Sections 7.2.2 and 7.2.3 or as may be provided in Article 14.

§ 8.1.2 Blipeases Except to the extent provided in Article 7, expenses of the Contractor's principal office and offices other than the site office.

§ 8.1.3 Overhead and general expenses, except as may be expressly included in Article 7.

§ 8.U The Contractor's capital expenses, including interest on the COnttactor's capital employed for the Work.

§ 8.1.5 Rental costs of machinery and equipment, except as specifically provided in Section 7.5.2.

§ 8.U Except as provided in Section 7.7.3 of this Agreement, costs due to the negligence orfailure to fulfill a specific responsibility of the Contractor, Subcontractors and suppliers or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable.

§ 8.1.7 Any cost not specifically and expressly described in Article 7.

AlA Document A111"' -1m. Copyright c 1920, 1925, 1951,1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American lnSiltute ol AtcMeC1s.

All rlghte reserved. WARNING: This AlA• Oocumenl is protected by U.S. Copyright Law and International Treaties. Unauthorlztd reproduction or 7 di$tributlon of this AlA• Doc;ument, or any portion of it, may result in severe civil and criminal penallles, and wll be prosecuted to the mulmum extent po$Sible under the law. This document was produced by AlA $011Ware 11115:11:31 on 0511912006 under Order No.1000182995_1 which expires on 7123/2006, and Is not lor resale.

Ueer NotH: ClaycoA111. Koll ·lnlelllcenter . Oallasv3 (5-19·06) (2347931739)

R.P. Appx. 331 20 § 8.1.8 Costs, other than costs included in Change Orders approved by the Owner. that would cause the Guaranteed Maximum Price to be exceeded.

§ 8.1.9 The m!ease. or waiyer or bondjng. of any liens or claims which may be claimed. threatened or tecorded so long as Owner paid Contractor all undisputed amounts under this Contract

Costs recpvered by Contractor through insurance or otherwise.

ARTICLE 9 DISCOUNTS, REBATES AND REFUNDS § 9.1 Cash discounts obtained on payments made by the Contractor shall accrue to the Owner if ( 1) before making the payment, the Contractor included them in an Application for Payment and received payment therefor from tbe Owner, or (2) the Owner has deposited funds with the Contractor with which to make payments; otherwise, cash discounts shall accrue to the Contractor. Trade discounts, rebates, refunds and amounts received from sales of surplus materials and equipment shaD accrue to the Owner, and the Contractor shall make provisions so that they can be secured.

§ 9.2 Amounts !hat accrue to the Owner in accordance with the provisions of Section 9.1 shall be credited to the Owner as a deduction from the Cost of the Work.

ARTICLE 10 SUBCONTRACTS AND OTHER AGREEMENTS § 10.1The Owner hereby agrees that portions of the Work may be subcontracted to the Contractor or any division of the Contractor if agreed to in writing jn advance by Qwner. Those portions of the Work that the Contractor does not eYstemarily perform with the Contractor's own personnel (or which are not subcontracted to the Contractor or a division thereof as aforesaid) shall be performed under subcontracts or by other appropriate agreements with the Contractor. The Owner may designate specific persons or entities from whom lhe Contractor shall obtain bids. The Contractor shall obtain bids from Subcontractors and from suppliers of materials or equipment fabricated especially for the Work and shall deliver such bids to the ~The Owner shall then determine, with the advice of the Cea~reeter aRdlhe Afeh:ileel, Contractor. which bids will be accepted. The Contractor shall not be required to contract with anyone to whom the Contractor has reasonable objection. For each oortion of the Work having an estimated cost in excess of $SO,QQ(), Contractor shall endeavor In good faith, usjng significant efforts. to obtain. and orovide to Owner uoon reouest bids for said oortion of the Work {rom at least 3 qualified subcontractors. If Contractor cannot obtain bids from 3 qualified bidders. Contractor shall jofonn Owner of this before entering into the relevant Subcontract. Contractor shall not subcontract performance of all or any oortion of the Project under the Contract Documents pursuant to any subcontract in excess of $50.000 without first notifying Owner of the intended subcontracting and obtaining Owner's acceptance in writing of the subcontracting and the subcontractot which acceptance or rejection shall be promptly given. If reouested by Owner. Contractor shall furnish Owner a copy of the prooosest subc9ntract for Owner's review of the teonS and conditions thereof and shall oot execute such subc9ntract until Owner has accepted such terms. Failure of Contractor to comply wi!h this Section may be deemed to be a material breach of the Contract Documents, Contractor shall not remove any of the following major subcontractors and replace any of such rnaior subcontractors with any other subcontractor without Owner's prior written llJ>.P!"'VaJ. which shall not be unreasonably withheld or delayed. provided the proposed replacement subcontractor has the experience, financial backing and history of quality cons!rUction for projects of the nature and timing of the Projecl Thc: major subcontr.tctpn: that can only be replaced in accordance with the tc1regoing procedures ure as follows; <my CSI Division I5 or 16 subcontractor and any subconmtctor performing roofing or exterior glass or glazing work. Contractor sball not be relieve<! of obligations under the Contract Documents by vinue of Owner's approval of any subcontractors.

§ 10.2 If a specific bidder among those whose bids are delivered by the Contractor to the~(1) is recommended to the Owner by the Contractor; (2) is qualified to perform that portion of the Work; and (3) has submitted a bid that conforms to the requirements of the Contract Documents without reservations or exceptions, but the Owner requires that another bid be accepted, then the Contractor may require that a Change Order be issued to adjust the Guaranteed Maximum Price by the difference between the bid of the person or entity recommended to the AlA Document A111"'-181117. Copyright C 1920. 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The AmeriCan Institute ot Architects.

All rlghta reMI'Wd. WARNING: Thla AtA• Document fa protecled by U.S. Copyright Law and International Treaties. Unauthorfxed reproduction or 8 distribution of t.h ls AtA• Document, or any pottton ollt, may 1'11SUit in severe clvil and criminal penaltie.s, and will be prosecuted to the maximum extent possible under the l;rw. This document was pnxluced by AlA software at 15:11:31 on 05.'1!1.'2006 under Order No.1000182995_1 wllk:h expires on 7/2312006, and is not lor renle.

Ustr Notes: Clayco All 1 • Koll · fntelllcenter · CaRas v3 (5·19.00) (2347931739)

R.P. Appx. 332 21 Owner by the Contractor and the amount of the subcontract or other agreement actually signed with the person or entity designated by the Owner.

§ 10.3 Subcontracts or other agreements shall conform to the applicable payment provisions of this Agreement, and shall be lump sum contracts and shall not be awarded on the basis of a fixed fee or cost plus a fee without the prior consent of the Owner.

§ 10.4 The Owner shall be invited to all subcontract bid and design review meetings.

§ 10.5 Contractor will. and will cause its subcontractors to. comply with the terms of the Contract Documents applicable to the ponjon of the Project performed by tbem. If anY portion of the Project that bas been subcontracted by Contractor js not prosecuted in accordance with !be Contract Documents. on reguest of Owner the subcontractor shall be replaced and shall not be employed again on the Project.

§ 10.6 Contractor shall include a provision in the contract with each subcontractor authorizing assignment of such coruract to Owner in the event of a tenninatjon by Owner of the Contract Documents with Contractor.

§ 10.7 As used in the Contract Docuroepts. the term "subcontract" shall also include purchase orders and rental agreements for materials or egujprnent. and the term "subcontractor" shall also jnclude vendors or suppliers of such material or eauipment.

ARTICLE 11 ACCOUNTING RECORDS The Contractor shall keep full and detailed accounts and exercise such controls as may be necessary for proper financial management under this Contract, and the accounting and control systems shall be satisfactory to the Owner. The Owner and the Owner's accountants shall be afforded access to, and shall be pennitted to audit and copy, the Contractor's (eC()rds, books, correspondence, instructions, drawings, receipts, subcontracts, purchase orders, vouchers, memoranda and other data relating to thls Contract, and the Contractor shall preserve these for a period of three years after final payment, or for such longer period as may be required by Jaw.

ARTICLE 12 PAYMENTS § 12.1 PROGRESS PAYMENTS § 12.1.1 Based upon Applications for Payment submitted to the~by the G:lRifaeler Q9EI Ceftifisates fer PayR!e.Rl ise~~ed hy IJ:Ie ,".oolliteet, ContractOr, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents.

§ 12.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows:

§ 12.1.3 Provided that an Application for Payment is received by the ~not later than the first Cl'1l day of a month, the Owner shall make payment to the Contractor not later than the twentieth (20th) day of the same month. If an Application for Payment is received by the ~after tbe application date fixed above, payment shall be made by the Owner not later than f--+twemy (20) days after lhe Arehiteel ~receives the Application for Payment § 12.1.4 With each Application for Payment, the Contractor shall submit !&Payrolls, petty cash accounts, receipted invoices or invoices with check vouchers attached, and any other evidence required by the Owner er .'\i"ell-ileet to demonstrate that cash disbursements already made by the Contractor on account of the Cost of the Work equal or exceed (1) progress payments already received by the Contractor; less (2) that portion of those payments attributable to the Contractor's Fee; plus (3) payrolls for the period covered by the present Application for Payment (b) unconditional lien waivers jn such form as Owner may reasonably reguire for the p.rior month's payment by Owner to Contractor. execu(Cd by Contractor and all first tier subcontractors. mechanics and materialmen on the Project (c) conditional Hen waivers in such form as Owner may reasonably rnguire for PeymeRbthe current month's payment by Owner to Contractor. executed by Contractor and all f!l'St tier subcontractors. mechanics and materialmen on the Project. the only condition thereof bejng the receipt of oavment from Owner Cor Contractor. jn !he case of the subcontrnctors, mechanics and materialmen>. (d) an affidavit executed by Owner .indicating the names of all AlA Document AIH'M -11187. CopyTigtlt C 1920. 1925, 1951, 1953, 1961, 1963, 1967. 1974, 1978. 1987 and 1997 by The American Institute of AA:hltects.

All rtghn ,.....,.d.

WARNING: This AlA• Doeumen111 protected by U.S. Copyright Law a nd lnleroallonal Treaties. Unauthorized reproduction or g dlstribullon of lhls AlA• Document, or any portion of 11, may result In severe civil and criminal penalties, and will be prosecuted to tile maximum emn1 possible under the law. This documenl was prodU<:ed by AlA software at 15:11 :31 on O!i/1912006 under Order No.I 000182995_1 wtliell expires on 712312006, and Is no1 for resale.

U•r Notes: Clay<:o A111 • Koll - 1n1etacenter . oanas v3 (5·19-06) (2347931739)

R.P. Appx. 333 22 subconrracrs and materialmen that have worked on the Project since the date qf the last Application for Payment and (e) within 45 days after the foundation for the Project has been ooured. a foundation survey showing lhe location of the foundation for the Project. along with the boundaries of tbe Land. the location of any flood plain and all easements and other title exceptions affecting the Land and any set back or other building restrictions as set fonb on the most recent Survey.

§ 12.1.5 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor and aPProved in writing by Qwner in accordance with the Contract Documen!S. The schedule of values shall allocate the entire Guaranteed Maximum Price and the Contractor's current estimate of the Cost of the Work among the various portions of the Work, except that the Contractor's Fee shaU be shown as a single separate item.

The schedule of values shall be prepared in such form and supponed by such data to substantiate irs accuracy as the ~may require. This schedule, unless objected to by the A:rehit.eet Owner. shall be used as a basis for reviewing the Contractor's Applications for Payment.

§ 12.1.6 Applications for Payment shall show the percentage of completion of each ponion of the Work as of the end of the period covered by the Application for Payment The percentage of completion shall be the lesser of (1) the percentage of that portion of the Work which has actually been completed; or (2) the percentage obtained by dividing (a) the expense that has actually been incurred by the Contractor on account of that portion of the Work for which the Contractor has made or intends to make actual payment prior to the next Application for Payment by (b) the share of the Guaranteed Maximum Price allocated to that portion of the Work in the schedule of values.

§ 12.1.7 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 take that ponion of the Guaranteed Maximum Price properly anocable to completed Work as determined by multiplying the percentage of completion of each ponion of the Work by the share of the Guaranteed Maximum Price allocated to that portion of the Work in the schedule of values.

Pending final detennination of cost to the Owner of changes in the Work, amounts not in dispute shall be included as provided in Section 7.3.8 of AJ.A Qee11meRt 1\2~1 199+;the A201: .2 add that portion of the Guaranteed Maximum Price properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the Work, or if approved in advance by the Owner; suitably stored off the site at a location agreed upon in writing; .3 add the Contractor's Fee, less retainage of ( ).The ten percent (1 0%) of the first 50% of the Cost pf the Work (ysjng the Guaranteed Maximum Price as the Cost of the Work for this QUipOSe) and zero percent (Q%) retainage tbereafter. The Contractor's Fee shall be computed upon the Cost of the Work described in the two preceding Clauses at the rate stared in Section 5.1.2 or, if the Contractor's Fee is stated as a fixed sum in that Subparagraph, shall be an amount that bears the same ratio to that fixed- sum fee as the Cost of the Work in the two preceding Clauses bears to a reasonable estimate of the probable Cost of the Work upon its completion; .4 subtract the aggregate of previous paymenrs made by the Owner; .5 subtract the shonfall, if any, indicated by the Contractor in the documentation required by Section 12.1.4 to substantiate prior Applications for Payment, or resulting from errors subsequently discovered by the Owner's accountants in such documentation;&Jl6 .6 subtract amounts, if any, for which the ~has withheld er a1111ifieEI not aporoved a CeRiHeat.e fer Payment as provided in Section 9.5 of AlA Document A2~l 199+.A201-1997: and.

.7 Thiny <30) days after Substantial Completion of the Work. any retainage then held by the Owner shall be due and payable to the Contractor provided that such payroent may be refluced by the cost of completing any incomplete Work or the disputed amount ot any unsettled claims.

§ 12.1.8 Except with the Owner's prior approval, payments to Subcontractors shan be subject to retainage ef net less lhaa ( ). as set forth jn Section 12. 1.7.3 3bove. The Owner and the Contractor shall agree upon a mutually AlA OocUIMnt A111"" -18117. Copyright \01920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Arctlitects.

All rlghll re~~ervt<f. WARNING: Thlc AlA• Document le protectld by U.S. Copyright Law and lntet"natlonal Treaties. Unauthorized reproduction or 10 distribution of this AlA• Dooument. or any portion ollt, may r8$Uit ln savvre ~hiM and criminal penalties, a.n d will be prosecuted to the maximum extent potslble under lhe law. This document was prodUced by AlA software at 15:11:31 on 0511912006 underOroer No.t000182995_1 which explros on 712312006, and Is not lOr resale.

User Hot": Clayco A 111 • Kol • lntellicenter - Dallas v3 (5· 1g..os) (2347931739)

R.P. Appx. 334 23 acceptable procedure for review and approval of payments and retention for Subcontractors. Thjrty days after any Subcontractor fully oerfonns all of its obligations under its Subcontract and the Contractor has approved and the Owner has accepted such WQrlc.. upon request of the Conttactor. the Owner shaD release the full amount of the retajnage for such Subconvacwr to the Contractor for payment to the Subcontractor. provided that such Subconttactor has provided a final lien release applicable to such payment Cas described in Section 12.1.4 above. conditional until payment clears. with an unconditional lion release to follow within LO days after such payment ~ S1~.1.81A tak:iag aetieA en the Cea~J:aeler's Applieatieas fer Paymeat,l:lle Afehileet shall be eaatled le rely en~ aeeltl'lley aeEI eempletetle56 ef die infeRBat:iea furnished by the Centraeter &REI shaD aet be EleemeEl te represeet that tfie Afehiteet ltee fft8Eie a deteiletl eli&Rlinatien, HEiit er a:AtOO!elie 11erifieatieA ef die deetimentatien StibmitteEI ia aeeerdaaee with Seett9ft 12.1.4 er ether Stippertiag Elate; mat me t\rehileet 11:&5 made elihatisti·1e er senlintietis en site inspeeliens er mat the Arehiteet has made eliaminaliens te eeeertaiB hew er fer whal ptifPB&eS me GenEfaeter h85 tised IIRietiniS pre¥iell61y paid en 8669\tBl ef me Cenft'e61e: Stieh l!ll8Hiinatieft5, atidits aAEI t,II!AReatieas, if RIIJtiireEI by !he Owner, wiiJI!e perfefflleEI by lite Owaer' s aseetinlants ~ring in lite sale iR!eJe&l ef dte Owner.

§ 12.1.9 As the Project reaches Substantial Completion, Contractor and Owner shall schedule and conduct a joint inspection of the Proiect and identify in writing all punch list items (''Punch List Items"). Contractor must complete all such Punch List Items prior to Owner making final payment to the ContractQI. Owner may continue to retain one hundred ten oercoot (110%) of tho estimated cost of completing tho Punch List items until the completion of same.

All Punch List Items shall be completed on or before the 45lh day after Substantial Completion.

§ 12.1.10 Uoon completiQn of25%. 50% and 75% of the Worls. Contractor shall provjde to Owner a project cost reoon that includes an estimated cost to complete the Project, a listing of modifications and pending Change Orders. and Otbef items reasonably requested by Owper. Uoon completion of 25%. 50%. 75% and 100% of the Work.

Contractor shall submit to Owner a written reconciliation moon cvjdencin& the difference. if any. between (a) the amounts Owner has paid to Contractor under the Schedule of Values plus the portion of the Contractor's Fee paid by Owner and (b) the actual Cost of the Worlc incurred to the applicable date plus the poaion of the Contractor's Fee owed to the applicable date wtder this Agreement. If such written reconciliation repon shows that Owner's payments pursuant to the Schedule of Values plus the Contractor's Fee has resulted in a oayment to Contractor jn excess of the actual Cost of the Work plus the Contractor's Fee then owed. the ovetpayment shall be credited to Owner. with the credit being spread over the remaining draws until the excess payments haye been fully accounted for by Owner or. if no funher draws are to be made. then promptly refunded to Owner.

§ 12.2 FINAL PAYM.ENT § 12.2.1 Final payment, constituting the entire unpaid balance of the Conttact Sum, shall be made by the Owner to the Conttactor when: .1 the Conttactor has fully perfonned the Contract except for the Conttactor's responsibility to correct Work as provided in Section 12.2.2 of AlA Document A201-1997, and to satisfy other requirements, if any, which extend beyond final ,ayme11l1 anEipayment.

.2 a final Certifieale fer Payment has eeen i:sstied l!y me .~ehiteet. .2 the other reguiremems of this Section 12.2 have been fully met.

§ 12.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the isstianee ef Conttactor has delivered the followjne to the Owner (but in no event earlier than the M~ileel's Rnal Certifieefe fer Paymenl, eras feHews:date set forth in Section 12.2.3 bereoO:

(i) executed final lien waivers (rom all first tier Subcontractors and the Contractor <which may be conditioned only uoon receiot of Owner's final payment>. and (ii) a copy of as-built plans and an as-built survey for the Projecl (jii) evj<lence that all Punch List Items prepared at Substantial Completion of the Work have been completed. The Contractor agrees to obtain final and unconditional lien waivers from all first 8Jild second tier Subcontractors Cor post an appropriate bond over such lien) and to provjde a final unconditional lien waiver from the Contractor within thinv days after receipt of final payment.

§ 12.2.3 The Owner's accountants will review and report in writing on the Contractor's final accounting within 30 days after delivery of the final accounting to the ~by the Contractor. Based upon such Cost of the AlA Document A111 11' -1997. Copyright C 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Arctlltects.

All rlghle ruerved. W~RNING: This AlA• Document Is protected by U.S. Copyr'lght Lew end International Treaties. Unanhorlad reproduction or 11 dlstrlbutlon of this AlA Doc:um.nt, or any portion ollt, may result in severe civN and ~lmlnal penalties, and wHI be prosecuted to the mexlmum extent possibkl under the law. This document was produced by AlA 60ftware at 16:11:31 on 05119/l!OOO under Ofder No.1000182996_1 whict1 expires on 712312006, and is nDI for resate.

User Notes: Clayeo At 11 • Koll • lntetncenter · Dallas v3 (!H9·06) (2347931739)

R.P. Appx. 335 24 Work as the Owner's accountants report to be substantiated by the Contractor's final accounting, and provided the other conditions of ~ections 12.2.1 and 12.2.2 have been met, the ~will, within ~enty .aQLdays after reeeipt ef thereafter. either make the Wfiltefl repert ef !he OwRM'& aeeellflt&RIS, either iss11e final payment. or deliver to the ~a fiflal Certiifeate fer PayM&fll with a copy t&Qf.the CenH'aeter, er Owner's accountant's reoort and notify the Contractor aAS 0Wfler in writing of the .~aiteet's Owne.r's reasons for withholding a eeAifieate payment as provided in Section 9.5.1 of the AlA Document A201-I997. The time periods stated in this Section 12.2.3 supersede those stated in Section 9.4.1 of the AlA Document A201-1997.

§ 12.2.4 If the Owner's accountants report the Cost of the Work as substantiated by the Contractor's final accounting to be Jess than claimed by the Contractor, the Contractor shall be entitled to deRl&Ad ari!i&alieR ef Ehe Elisp11ted ilfli911Rt withe11t submit such matter as a fllrther deeisiefl Claim unc!er Section 4.3 of the so\:Fehiteel. ~Such deF118RS fer aFbiffatieR Claim shall be made by the Contractor within 30 days after the Contractor's receipt ef 11 eepy of the Afehiteet's fi11al Ceffifieate fer PayJMRt; Owner's accountants' reoort failure to Ele1B8REI arlliffEitieR submit such Claim within this 30-day period shall result in the substantiated amount reported by the Owner's accountants becoming binding on the Contractor. Pending a final resolution.13y &reilfatie&, of the Claim. the Owner shall pay the Contractor the amount eenified in the Afehiteet's fiRal Certifteate fer PayMeRt,Owner's accountants' reoort.

§ 1:U.5lf, s&I399Efllellt te fiRel payFIIeRt &Be at llte C>waer's Felflles£; !he Geatra:eter ifteefS eests Elesel'$ed iR A.rtiele 7 BR~ Ret e~~elllded lly Artiele 8 te ea~et Elefeslive ar eeReeRfeFRiiag Werk, llte OwAer sllan reilllbll£6e tile CeRtraetar sueh east& aRS the GaRtfa.eter's Fee applieallle lherete 9R the same llasis as if s11eh east& haEI bee& iBeliMEI f.'fier te fiMl peyme&~ l111t aet ill &JHie86 ef !he Gu816Aieed MaMiiiiiiAI Pfiee. If tbe GeRtRieter has paraeipated iB &a¥iBg& ae !!f9Yided in Seefies j.~. 1M ameiHit ef swah saviRgs shaU 13e ~eeale11late8 a~~EI &flfJFefJriate eresit git;en te lbe OwRer in determining 1M Ret 8JR911Rt te l3e paid lly the 0vfRef te the GaRtraGter.

ARTICLE 13 TERMINATION OR SUSPENSION § 13.1 The Contract may be terminated by the Contractor, or by the Owner for convenience, as provided in Article of AlA Document A201-1997. However, the amount to be paid to the Contractor under Section 14.1.3 of AlA Document A201-1997 shall not ~the BHI911Rt !he Centraeter we11IEi 13e e&~i£1eEi Guaranteed Max.irnum ~to reeei¥e 11RE1er 8ee8ea 13.a llelew, e~teept that the CeRtraeter's Jlee shall be saleulateEi as if !he Wefk had •B fltHy ea111pletedey dte Ceslfaeter, inelwEliRg a reaseaaele estimate ef the Cast ef !he Wefk fer WeI'll Ret aet11ally ee111pletes.excee4cd., § 13.2 The Contract may be terminated by the Owner for cause as provided in Article 14 of AlA Document A201- J997. The amount. if any, to be paid to the Contractor under Section 14.2.4 of AlA Document A201-1997 shall not cause the Guaranteed Max.imum Price to be exceeded, nor shall it exceed an amount calculated as follows: § 13.2.1 Take the Cost of the Work incurred by the Contractor to the date of tennination; § 13.2.2 Add the Contractor's Fee computed upon the Cost of the Work to the date of termination at the rate stated in Section 5.1.2 or, if the Contractor's Fee is stated as a fixed sum in that Section. an amount that bears the same ratio to that fixed-sum Fee as the Cost of the Work at the time of termination bears to a reasonable estimate of the probable Cost of the Work upon its completion; and § 13.2.3 Subtract the aggregate of previous payments made by the Owner.

§ 13.3 The Owner shall also pay the Contractor fair compensation, either by purchase or rental at the election of the Owner, for any equipment owned by the Contractor that the Owner elects to retain and that is not otherwise included in the Cost of the Work under Section 13.2.1. To the extent that the Owner elects to take legal assignment of subcontracts and purchase orders (including rental agreements), the Contractor shall, as a condition of receiving the payments referred to in this Article I 3, execute and deliver all such papers and take all such steps, including the legal assignment of such subcontracts and other contractual rights of the Contractor, as the Owner may require for the purpose of fully vesting in the Owner the rights and benefits of the Contractor under such subcontracts or purchase orders.

§ 13.4 The Work may be suspended by the Owner as provided in Article 14 of AlA Document A201-l997; in such case, the Guaranteed Maximum Price and Contract Time shall be increased as provided in Section 14.3.2 of AlA AlA Document A111l"M - 1997. Copyright ~ 19-20, 1925, 1951, 1958, 1961, 1963, 1967. 1974, 1978, 1987 and 1997 by The American lns«tute ot Archh&cts.

All rlghte reeerwd. WARNING: Thla AlA• Oocumemls protected by u.s. Copyright law and International Treatlea. Unauthorlltd reproduction o. 12 distribution of this AlA• Document. or any portion of It, may result In severe clvU and criminal penalties, and will be prosccu1ed to the meximum extent possible under the law. This document was produced by AlA sottwan1 8115:11:31 on 0511912006 under Order No.1000182995_ t wNch expires on 712312006, and Is not tor resllle.

U•r Notes: Clayco At 11 • Koll · lnleNioenter · Dallas v3 (5·19.06) (2347931739)

R.P. Appx. 336 25 Document A201-1997 except that the tenn "profit" shall be understood to mean the Contractor's Fee as described in SeGlieAS Section 5.1.2 &Ad SeetieA 6.4 of this Agreement ARTICLE 14 MISCB.LANEOUS PROVISIONS § 14.1 Where reference is made in this Agreement to a provision of AlA Document A201-1997 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents.

§ 14.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate ofinterest agreed upon, if any.)

One oercent (1%) over the "prime rate" as reoorted in The Wall Street Journal.

(Usury laws and requirements under the Federal Truth in Lending Act, simiwr state and local consumer credit laws and other regulations at the Owner's and Contractor's principal places ofbusiness, the location of the Project and elsewhere may affect the validity ofthis provision. U!gal advice should be obtained with respect to deletions or modifications, and also regarding requirements such as written disclosures or waivers.)

§ 14.3 The Owner's representative is: (Name, address and other infonnation.)

Mike Rosamond 8411 Preston Road, Suite 700 Dallas. Texas 75225 With copy of all notices to: Wayne Angel 8411 Preston Road. Suite 700 Dallas. Texas 75225 § 14.4 Tbe Contractor's representative is: (Name, address and other infonnation..)

Attn:Tom Sieckhaus Clayco. Jnc.

2199 lnneffielt Business Center Drive StLouis. Missouri 63114 At all times during the course of the Project Contractor shall orovide at the job site a qualified. competent and res,ponsible suoervisor who shall be satisfactorv to Owner. The supervisor shall be Doug Gellner. Any cmoloyee of Contractor reasonably deemed by Owner to be objectionable shall be removed from the job site promptly uoon Owner request and shall be promptly replaced by Contractor at no extra exoense to Owner. Contractor shall nevertheless retain all authoritv and control oyer its emo!oyees. including resoonsibilitv for all costs arising from providing reasonable accommodations for its emp1oyees.

§ 14.5 Neither the Owner's nor the Contractor's representative nor the supervisor shall be changed without ten days' written notice to the other p&fty:party and only wjth the other partv's approval. which approval may not be unreasonably wjthbeld or delayed.

AlA Document A111'"" - 1997. Copyright @ 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Arcllltects.

AU rfghta re•rved. WARNING: Thla AlA" Document Is proleeted by U.S. Copyright Law and fnternlltlonal Treatlea. Unauthorized reproduction or 13 distribution ot thla AlA" Document, or any portion ot It, may nlliiUitln severe clvU and criminal penelliM, and will be prosecuted to the maximum extent possible under the taw. This document was produced by AlA soltwat& at 15:11:31 on05119/2006 under Order No.t000182995_1 which expires on 712312006, and is not tor resale. u - Not": Clayco A111 • Koll • lnteHioenter · Dallas V3 (5-19·06) (2347931739)

R.P. Appx. 337 26 § 14.6 Other provisions:

.I If there is any conflict among the Contract Documents. then the following priority shall be given to the same: firsl. the provisjons of any Change Orders, Change Directives or other modifications shall govern. with later modifications contrnmng over earlier modifications. second. this Agreement <Allll shall govern. third. the proyjsjons of the General Conditions (A2Ql ). shall govern. fourth. the most recent version of the Drawings §pproved by Owner and Contractor in writing shall govern. and fifth. !he Outline Specs shall govern (provided that as to design matters. the Outline Specs shall govern over Alll or A201 ).

.2 ·The Owner represents that it is the owner of fee sjropJe title to the land on which the Project wit I be constructed (the "Land") .3 The Owner is committed to providing a safe working environment on the jobsite. In endeavoring to achieve a safe workplace. the Owner regujres that the Contractor implement a substance abuse policy covering all Contractor. Subcontractor. and Sub-subcontractor employees of any tier throughout the duration of this Project. Contractor agrees that such oolicy shall be in accordance with the Contractor' s corporate substance abuse oolicy: provided that such po}icy shall meet or exceed the standards set forth by the St. Louis Construction lndusny Substance Abuse Consortium.

ARTICLE 15 ENUMERATION Pf CONTRACT DOCUMENTS § 15.1 The Contract Documents, except for Modifications issued after execution of this Agreement. are enumerated as follows: § 15.1.1 The Agreement is this executed 1997 edition of the Standard Form of Agreement Between Owner and Contractor, AlA Document All I 1997.Aill-1997. as modified herein.

§ 15.1.2 The General Conditions are the 1997 edition of the General Conditions of the Contract for Construction, AlA Document .MQl l997.A20l-1997. as modified in the fonn attached to this AiJeement.

§ 15.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated , and are as foUows: DeGYII8Rt

§ 15.1.4 The Specifications are those contained in the Project Manual dated as in Section 15.1.3, and are as follows: (Either list the Specifications here or refer to a" exhibit attached to this Agreement.)

See Outline Specs. $eGtiM

§ 15.1.5 The Drawings are as fellews, &Rd are dated uR.les& a differeRt dale is 9hewR eelew;follows: (Either list the Drawings here or refer to an e;chibit attached to this Agreement.)

See Outline Specs.

N4MMeF

§ 15.1.6 The Addenda, if any, are as follows: AlA Document A111 111 - 18e7. Copyright @ 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The Ame(ICan lnstitule of Arctlltects.

All rlg!Q reseMCL WARNING: This /IJA• Document Is protected by U.S. Copyright lew and lnternaUonal Treaties. Unauthorized reproduction or 14 dl8trlbutlon of this AlA,. Document, or any portion of It, may rvsult In sewr. civil~ criminal penalties, and w" l be prosecU1ed to the max.lmum extent possible under the law. TNs doclment was produced by AlA soltw8t8 at 15:11 :31 on 0511912006 under Order No. 1000182995_1 which e~plres on 7/2Jt2006, and IS not for resale.

U•r Notes: Clayto A11 1 • Koll • lntelllcenter · Dallas v3 (5-19·08) (2347931739)

R.P. Appx. 338 27 I~ Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 15.

§ 15.1.7 Other Documents, if any, forming part of the Contract Documents are as foUows: (Ust here any additional documents, such as a list ofalternates that are intended to form part ofthe Contract Documents. AlA Document A20J-1997 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor's bid are not part ofthe Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.)

The C!ayco Control Budget attacbed flereto as Exhibit "C". The Clayco Control Budget is not attache4 for the puroose of Ca) establishini a maximum cost of each such item. it being agreed that the Contractor's sole obligation with respect to the Cost of the Work is set forth in Paragraph 5.2.1 herein. or (b) defining the scope of the Work that the Contractor is obligated to provide under this Contract it bejng agreed that the Outline Specs and the other Contract Documents Cexcludjng such Control Budget) shall define the Contractor's scope of Work.

ARTICLE 16 INSURANCE AND BONDS (List required limits ofliability for insurance and bonds. AlA Document A201· 1997 gives other specific requirements for insurance and bonds.) lype ef IRIWRIAee biRII& ef Uallllhy ($ 0.110) The Contractor will obtain and majntain at all times Builder's Risk insurance for the Proiect and such insurance shall name the Owner. Owner's eguitv Partner and Owner's construction lender as additional insureds, Current evi<Jence of such insurance shall be furnished to Owner upon reguess. Contractor will maintain the following inswance coverue: fi) a policy of commercial gencralljabllity insurance (occurrence form) as described in oaragraph 11.1 of the Genera] Conditions CA201l wjth coyerage limits of not less than $1.()()().QQO per occurrence and $2.Q()Q.()()() in the aggregate. (ji) employer's liability coverage with limits of not less than $l.OOO,QQO, Ciii) worker's compensation with limits of not less than $1 .OOO,QQO covering all persons employed bv Contractor in the conduct of its operations at the Project (including the all states endorsement and, if aPPlicable. the volunteers endorsement>. (iv) automobile liability coverage of not less than $1.000,()()(). (y) umbrella policy of commercial general liabjlity insurance wjth limits of not less than $10.000,()()(). Such insurance policies sball be issuec! by insurance companies with a rating of not less than A-Class ym in the latest edition of Best's Insurance Guide.

Owner and Prudential Insurance Company of America ("Prudential") shall be a named additional insured partv on all such insurance poljcjes. and Contrac!Qr shall deliver to Owner certified copies of such insurance oolicies, together with certificates evidencing the coverage of Owner and Prudential under all such insurance policies and a certified copy of the declarations page to each of the insurance policies. promptly uoon issuance or ~newal thereof.

Simultaneously with the execution hereof, Contractor shall enter into the Construction Indemnity and Assignment in the form ·attached hereto as Exhibit "D".

AlA Document A1HTM -1997. COpyright tC 1920, 1925, 1951, 1958. 1961, 1963, 1967, 1974, 1978, 1987 and 1997 by The American Institute of Arcl'!nects.

All right• reservtd. WARNING: This AlA• Oooomentlt protected by U.S. Copyright Law and 1nterna11onll Trea1les. Un.,thor1%ed reproduction or 15 dislrllxltlon olthls AlA• Document, or any portion of It, may result in severe civil and criminal penahles, and wMI be proteeuted to the maximum exten1 possible under 1he law. This docU'Il90t was produced by AlA software a115:11:31 on 05/1912006 under Order No.1000182995_ 1 which expiM on 712312006, ancl Is n01 for resale. u- Note1: Clayco A111 • KOII · lntelicenter • Dallas v3 (S·19·06) (2347931739)

R.P. Appx. 339 28 This Agreement is entered into as of the day and year first written above and is executed in at least three original copies, of which one is to be delivered to the Contractor, one to the Architect for use in the administration of the Contract, and the remainder to the Owner.

Exhibit "A"- Project Schedule Exhibit "B"- Ou!line Specifications & Drawings Exhibit "C" - Clayoo Control Budget Exhibit ''D"- Construction ln<lemnjty and Assignment Exhibit "E"- Architect's Cenificate Exhibit "F'- Cjvjl Engineer's Certificate Exhibit "0"- Contractor's Consent and Agreement THIS AGREEMENT CONTAINS A BINDING ARBITRATION PROVISION WHICH MAY BE ENFORCED BY THE PARTIES.

INTP.!..L!CBNTF.R. DA1LAS INYRS'TMFNJ'S U.P C!.A)'CO. INC. By: KDC-HPB !nyesnneots Dallas. IJ>. l!s paanC( By: KPC-HPB Inyesupeots Pallas GP. u.c. jts genqaJ partner Bv: Koll Development Company I. !.,P.. Member By; swy, U.C. Mana&jpg Oencnl Partner

OWNER (Signature)

(Printed name and title) (Printed name and title) VIN" /It~!...,- ~~ OAPtffl4

AlA Document A111""'-1997. COpyright C 1920, 1925, 1951, 1958, 1961, 1963, 1987, 1974, 1978, 1987 an:! 1997 by The American lnstitule of Architects.

All rigllll ,...rved. WARNING: This AlA• Document is PfOiecled by U.S. Copyright Law and lnterollllonal Treatlte. Unauthorized reproduction or 16 distribution of this AlA• Document, or any portion ot It, may reeult in severe civil and criminal penalties, and will be proseculed to the maximum extent possible under the law. This document was produced by AlA sollWIIre at 15:11:31 on 0511912006 under Order No.1000182995_t which expires on 712312006, and Is no1 for resale.

User Notte: Clayco A111 - Koll • lntelllcenter. Dallas v3 (5·19·06) (2347931739)

R.P. Appx. 340 29 AlA Document A201™- 1997 General Conditions of the Contract for Construction for the following PROJECT: (Name and location or address):

The design and construction of a 4-story speculative office building. consisting of approximately 211.637 gross square feet. located at 3701 Regent Blvd., Irving, Texas. T~is document has Important legal consequences.

THE OWNER: Consultation with an attorney (Name and address): Is encouraged with respect to its completion or modification. lntellicenter Dallas Investments. LLP This document has been approved and endorsed by The 15 Preston Rd., Suite #700 Associated General Contractors Dallas. TX 75225 of America THE ARCHITECT: (Name and address): FS Architecture. PC c/o Forum Studios. Inc. 2199 Innerbelt Business Center Drive St. Louis, Missouri 63114

TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 OWNER 3 CONTRACTOR 4 ADMINISTRATION OF THE CONTRACT 5 SUBCONTRACTORS 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 7 CHANGES IN THE WORK 8 TIME 9 PAYMENTS AND COMPLETION 10 PROTECTION OF PERSONS AND PROPERTY 11 INSURANCE AND BONDS AlA Document A201"' -1997. Copyright © 1911 . 1915, 1918, 1925, 1937, 1951, 1956, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA• Document Ia protected by U.S. Copyright Law and International Treatlea. Unauthorized 1 reproduction or distribution of this AlA• Document, or any portion ollt, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the lew. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_ 1 which expires on 7/23/2006, and is not for resale.

User Notes: Ciayeo A201 - Koll · lntelllcenter - Dallas v2 (5-19•06) (986536188) R.P. Appx. 341 30 12 UNCOVERING AND CORRECTION OF WORK 13 MISCELLANEOUS PROVISIONS 14 TERMINATION OR SUSPENSION OF THE CONTRACT

AlA Document A201 111 -1997. Copyright Clil1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserv~ WARNING: This AlA• Document Ia protected by U.S. Copyright Law and lntema1lonal TreaUes. Unauthorized 2 reproduction or distribution of this AlA Document, or any portion of It, may reault In severe c:lvll and criminal penellles, and will be prosecuted to the maximum eJCtent poulble under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_ 1 which expires on 7/2312006, and is not for resale.

User Notes: Clayco A201 • Koll -lntalliconter · Dallas v2 (5· 19·06) (986536188) R.P. Appx. 342 31 INDEX 3.1.3, 4.2, 4.3.4, 4.4, 9.4, 9.5 (Numbers and Topics in Bold are Section Headings) Architect's Appmvals 2.4, 3.1.3, 3.5.1' 3.10.2, 4.2.7 Acceptance of Nonconforming Work Architect's Authority to Reject Work 9.6.6, 9.9.3, 12.3 3.5.1, 4.2.6, 12.1.2, 12.2.1 Acceptance of Work Architect's Copyright 9.6.6,9.8.2, 9.9.3, 9.10.1, 9. 10.3, 12.3 1.6 Access to Work Architect' s Decisions 3.16, 6.2. 1, 12.1 4.2.6, 4.2.7, 4.2. 11 , 4.2.12, 4.2.13, 4.3.4, 4.4. 1' 4 .4.5, Accident Prevention 4.4.6, 4.5, 6.3, 7.3.6, 7.3.8, 8.1.3, 8.3.1 , 9.2, 9.4, 4.2.3, 10 9.5.1,9.8.4, 9.9. 1, 13.5.2, 14.2.2,14.2.4 Acts and Omissions Architect's Inspections 3.2, 3.3.2, 3. 12.8, 3.18, 4.2.3, 4.3.8, 4.4.1, 8.3.1, 4.2.2, 4.2.9, 4 .3.4, 9 .4.2, 9.8.3, 9.9.2, 9. 10.1, 13.5 9.5.1, 10.2.5, 13.4.2, 13.7, 14.1 Architect's lnstructions Addenda 3.2.3, 3.3.1, 4.2.6, 4.2.7, 4.2.8, 7.4.1' 12.1 , 13.5.2 1.1.1,3.11 Architect' s Interpretations Additienal Costs, Claims for 4.2.11, 4.2. 12, 4.3.6 4.3.4, 4.3.5, 4.3.6, 6.1. I, 10.3 Architect's Project Representative Additional Im;pections and Testing 4.2. 10 9.8.3, U.2.1, 13 .5 Architect's Relationship with Contractor Additional Time, Claims for 1.1.2, 1.6, 3.1.3, 3.2.1, 3.2.2, 3.2.3, 3.3. 1, 3.4.2, 3.5.1 , 4.3.4, 4.3.7, 8.3.2 3.7.3, 3.10, 3. 11, 3.12, 3. 16, 3.18, 4.1.2, 4.1 .3, 4.2, ADMINISTRATION OF THE CONTRACT 4.3.4, 4.4.1, 4.4.7, 5.2, 6.2.2, 7, 8.3.1 , 9.2, 9.3, 9.4, :u .3, 4, 9.4, 9.5 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 11.4.7, 12, Advertisemeot or Invitation to Bid 13.4.2, I 3.5 l. L.l Architect' s Relationship with Subcontractors Aesthetic Effect ] .1.2, 4.2.3, 4.2.4, 4.2.6, 9.6.3, 9.6.4, 11.4.7 4.2.13,4.5.1 Architect's Representations Allowances 9.4.2, 9.5.1, 9 .10.1 3.8 Architect' s Site Visits All-fisk lnsurance 4.2.2, 4.2.5, 4.2.9, 4.3.4, 9.4.2, 9.5.1, 9.9.2, 9. J0.1 , .4. 1.1 13.5 Applications for Payment Asbestos 4.2.5, 7.3.8, 9.2, 9.3, 9.4, 9.5. 1, 9c6.3, 9.7.1 , 9.8.5, 10.3.1 9.1 0, 11.1.3, 14.2.4, 14.4.3 Attorneys' Fees Approvals 3. 18.1 , 9.10.2, 10.3.3 2.4, 3.1.3, 3.5, 3.10.2, 3. 12, 4.2.7, 9.3.2, 13.4.2, 13.5 Award of Separate Contracts Arbitration 6.1.1, 6.1.2 4.3.3, 4.4, 4.5.1' 4.5.2, 4.6, 8.3.1, 9.7.1' 11.4.9, A ward of Suibcontracts and Other Contracts for 11.4.10 Portions of the Work Architect 5.2 4.1 Basic Definitions Architect, Definition of 1.1 4.1.1 Bidding Requirements Architect, Extent of Authority l.l.l, 1.1.7, 5·.2. 1, JJ.5. J 2.4, 3.12.7, 4.2, 4.3.6, 4.4, 5.2, 6.3, 7.1.2, 7.3.6, 7.4, Boiler and Machinery Insurance 9.2, 9.3.1 , 9.4, 9.5, 9.8.3, 9.10. 1, 9.10.3, 12.1 , 12.2.1 , 11.4.2 13.5.1, 13.5.2, 14.2.2, 14.2.4 Bonds, Lien Architect, Limitations of Authority and 9 . 10.2 Responsibility Bonds, Performance, and Payment 2. 1.1, 3.3.3, 3.12;4, 3.12.8, 3. I 2.1 0, 4. 1.2, 4.2.1, 7.3.6.4, 9.6.7. 9.10.3, 11.4.9, 11.5 4.2.2, 4.2.3, 4.2.6, 4.2.7, 4.2.10, 4.2.12, 4.2.13, 4.4, Building Permit 5.2.1 ' 7.4, 9.4.2, 9.6.4, 9.6.6 3.7.1 Architect's Additional Services and Expenses Capitalization 2.4, 11.4. 1.1, 12.2.1, 13.5.2, 13.5.3, 14.2.4 1.3 Architect's Adminis~ratioo of the Contract Certificate of Subst.antial Completion AlA Document A201m -1997. Copyright © 1911. 19t 5, 19t8, 1925. 1937, 1951, 1958. 1961. 1963, 1966, t 970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA• Document Is protected by U.S. Copyright Law and International Treaties. Unauthorb:ed 3 reproduction or dfatrlbullon of this AlA• Document, or any portion of It, may result In severe c:tvlland c:rlmlnal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14.:42:43 on 05119/2006 under Order No.1000t 82995_ t which expires on 7/23/2006, and is not tor resale.

User Notes: Clayco A201 • Koll · lntelllcenter · Dallas v2 (5· 19·06) (986536188) R.P. Appx. 343 32 9.8.3, 9.8.4, 9.8.5 1.6.1, 3.2.2, 3.6, 3.7, 3.12.10, 3.13, 4.1.1, 4.4.8, 4.6.4, Certificates for Payment 4.6.6, 9.6.4, 10.2.2, 11.1, 11.4, 13.1, 13.4, 13.5.1, 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6. I, 9.6.6, 9.7.1 , 9.10. 1, 13.5.2, 13.6, 14.1.) , 14.2.1.3 9.10.3, 13.7, 14.1.1.3, 14.2.4 Concealed or Unknown Conditions Certificates of Inspection, Testing or Approval 4.3.4, 8.3.1 , 10.3 13.5.4 Conditions of the Contract Certificates of Insurance 1.1.1 , 1.1.7, 6.l.l, 6.1.4 9.1 0.2, 11.1.3 Consent, Written Change Orders 1.6. 3.4.2, 3.12.8. 3.14.2, 4.1 .2, 4.3.4, 4 ..6.4, 9.3.2, 1.1.1 , 2.4.1' 3:4.2, 3.8.2.3, 3. 11.1 , 3.12.8, 4.2.8, 4.3.4, 9.8.5, 9.9.1, 9.1 0.2, 9.1 0.3, 11.4.1 , 13.2, I 3.4.2 4.3.9, 5.2.3, 7.1, 7.2, 7.3, 8.3.1, 9.3.U, 9.10.3, CONSTRUCTION BY OWNER OR BY I I .4.1.2, I 1.4.4, 11.4.9, 12.1.2 SEPARATE CONTRACTORS Cbange Orders, Definition of 1.1.4, 6 7.2.1 Construction Change Directive, Definition of CHANGES IN THE WORK 7.3.1 3.ll, 4.2.8, 7, 8.3. 1, 9.3.1.1, 11.4.9 Construction Change Directives Claim, Definition of 1.1.1, 3.12.8, 4.2.8, 4.3.9, 7.1, 7.3, 9.3.).1 4.3.1 Construction Schedules, Contractor's Claims and Disputes 1.4. 1.2, 3.1 0, 3.12. I ' 3.12.2, 4.3.7 .2, 6.1.3 3.2.3, 4.3, 4.4, 4.5, 4.6, 6.l.l, 6.3, 7.3.8, 9.3.3, 9.10.4, Contingent Assignment of Subcontracts 10.3.3 5.4, 14.2.2.2 Claims and Timely Assertion of Claims Continuing Contract Performance 4.6,5 4.3.3 Claims for Additional Cost Contract, Definition of 3.2.3, 4.3.4, 4.3.5, 4.3.6, 6. I .I , 7 .3.8, 10.3.2 1.1.2 Claims for Additional Time CONTRACT, TERMINATION OR 3.2.3, 4.3.4, 4.3.7, 6.1. I , 8.3.2, 10.3.2 SUSPENSION OF THE Claims for Concealed or Unknown Conditions 5.4.1.1, 11.4.9, 14 4.3.4 Contract Administration Claims for Damages 3.1.3, 4. 9.4, 9.5 3.2.3, 3.18, 4.3. 10, 6.1.1, 8.3.3, 9.5.1 , 9.6.7, 10.3.3, Contract Award and Execution, Conditions Relating J.l.l, 11.4.5, 11.4.7, 14.1.3, 14.2.4 to Claims Subject to Arbitration 3.7.1,3.10,5.2,6. 1, 11.1.3, 11.4.6, 11.5.1 4.4.1 , 4.5.1, 4.6.1 Contract Documents, The Cleaning Up 1.1, 1.2 3.15,6.3 Contract Docu ments, Copies Furnished and Use of Commencement of Statutory Limitation Period 1.6, 2.2.5, 5.3 13.7 Contract Documents, Definition of Commencement of the Work, C6nditions Relating to 1.1.1 2.2.1, 3.2.1 ' 3.4.1' 3.7. 1' 3.10.1, 3.12.6, 4.3.5, 5.2.1' Contract Sum 5.2.3, 6.2.2, 8.1 .2, 8.2.2, 8.3.1' 11.1, 11.4.1' 11.4.6, 3.8, 4.3.4, 4.3.5, 4.4.5, 5.2.3, 7.2, 7.3, 7.4, 9.1, 9.4.2, 11.5.1 9.5. 1.4, 9.6.7, 9.7, 10.3.2, ll.4.1, 14.2.4, 14.3.2 Commencement of the Work, Definition of Contract Sum, Definition of 8.1.2 9.1 Communications Facilitating Contract Contract Time Administration 4.3.4, 4.3.7, 4.4.5, 5.2.3, 7.2.1.3, 7.3, 7.4, 8. 1.1 , 8.2, 3.9.1,4.2.4 8.3.1 , 9.5.1, 9.7, 10.3.2, 12.1.1, 14.3.2 Completion, Conditions Relating to Contract Time, Definition of 1.6.1 ' 3.4.1, 3.11, 3.15, 4 .2.2, 4.2.9, 8.2, 9.4.2, 9.8, 8.1.1 9.9.1, 9.10, 12.2, 13.7, 14.1.2 CONTRACTOR COMPLETION, PAYMENTS AND 3 9 Contractor, Definition of Completion, Substantial 3.1, 6.1.2 4.2.9, 8.1.1 , 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9. 10.3, Contractor's. Construction Schedules 9.10.4.2, 12.2, 13.7 1.4.1.2, 3.10, 3.12.1, 3.12.2, 4.3.7.2, 6.1.3 Compliance with Laws Contractor's Employees

AlA Document A20f'"' -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA• Document 11 protected by U.S. Copyright Law and International Treaties. Uneulhor~ed 4 reproduction or distribution of thll AlA• Document, or any portion ollt, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent poaslble under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_ 1 which expires on 712312006, and is not lor resale.

User Notes: Clayco A201 • Koll • lntellicenter • Dallas v2 (5·19.06) (986536188) R.P. Appx. 344 33 3.3.2, 3.4.3, 3.8. 1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3, 6.2.5, 3.14 I 1.1.1 , 11.4.7, 14.1, 14.2. 1.1 , Damage to Construction or Owner or Separate Contractor 's Liability Insurance Contractors 11.1 3. 14.2, 6.2.4, 9.2.1.5, I 0.2. 1.2, 10.2.5, 10.6, 11.1 , Contractor's Relationship with Separate Contractors I I .4, 12.2.4 and Owner's Forces Damage to the Work 3.12.5, 3.14.2, 4.2.4, 6, 11.4.7, 12.1.2, 12.2.4 3.14.2, 9.9.1.10.2.1.2, 10.2.5, 10.6, 11.4, 12.2.4 Contractor's Relationship with Subcontractors Damages, Claims for 1.2.2, 3.3.2, 3.18.1 , 3.18.2, 5, 9.6.2, 9.6.7, 9.10.2, 3.2.3, 3. 18, 4.3.10, 6.1 . 1. 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.4. 1.2, 11.4.7, 11.4.8 II. I. I. 11.4.5, 11.4.7, 14. 1.3, 14.2.4 Contractor's Relationship with the Architect Damages for Delay I. I .2, 1.6, 3.1.3, 3.2. 1, 3.2.2, 3.2.3, 3.3.1, 3.4.2, 3.5.1, 6. 1.1 , 8.3.3, 9 .5. 1.6, 9.7, 10.3.2 3.7.3, 3.10, 3.11, 3.12, 3.16, 3.18, 4 .1.2, 4.1.3. 4.2, Date or Commencement of the Work, Definition of 4.3.4, 4.4. 1, 4.4.7, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 8.1.2 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 11.4.7, 12. Date of Substantial Completion, Definition of 13.4.2, 13.5 8. 1.3 Contractor's Representations Day, Definition of 1.5.2, 3.5.1, 3. 12.6, 6.2.2, 8.2.1 , 9.3.3, 9.8.2 8.1.4 Contractor's Responsibility for Those Performing the Decisions of the Architect Work 4.2.6, 4.2.7, 4.2.11' 4.2. 12. 4.2. 13, 4.3.4, 4.4. 1' 4.4.5, 3.3.2, 3.18, 4.2.3, 4.3.8, 5.3.1 ' 6.1.3, 6.2, 6.3, 9.5. 1, 4.4.6, 4.5, 6.3, 7.3.6, 7.3.8, 8.1.3, 8.3. 1, 9.2, 9.4, 10 9.5.1. 9.8.4, 9.9. 1, 13.5.2, 14.2.2, 14.2.4 Contractor's Review of Contract Documents Decisions to Withhold Certification 1.5.2, 3.2, 3.7.3 9.4 . 1, 9.5, 9.7, 14. 1.1.3 Contractor' s Right to Stop the Work Defective or Nonconforming Work, Acceptance, 9.7 Rejection and Correction of Contractor's Right to Terminate the Contract 2.3, 2.4, 3.5.1, 4.2.6. 6.2.5, 9.5. 1, 9.5.2, 9.6.6, 9.8.2, 4.3.10, 14. 1 9.9.3, 9.10.4, 12.2.1. 13.7. 1.3 Contractor's Submittals Defective Work, Definition of 3.10, 3. 11 , 3.12, 4.2.7, 5.2.1, 5.2.3, 7.3.6, 9.2, 9.3, 3.5.1 9.8.2, 9.8.3, 9.9.1, 9.10.2, 9. 10.3, 11.1.3, 11.5.2 Definitions Contractor's Superintendent 1.1 , 2.1.1, 3.1, 3.5.1, 3.12. 1, 3.12.2, 3.12.3, 4.1.1, 3.9, 10.2.6 4 .3.1, 5. 1, 6.1.2, 7 .2. 1, 7.3. 1, 7.3.6, 8.1, 9.1 , 9.8. 1 Contractor's Supervision and Construction Delays and Extensions of T ime Procedures 3.2.3, 4.3.1 4.3.4, 4.3.7, 4.4.5, 5.2.3, 7.2.1 , 7.3.1 , I

1.2.2, 3.3, 3.4, 3.12.1 0, 4.2.2, 4.2.7' 4.3.3, 6.1 .3, 7.4.1, 8.3, 9.5. 1, 9.7. 1, 10.3.2, 10.6.1, 14.3.2 6.2.4, 7.1.3, 7.3.4, 7.3.6, 8.2, 10, 12, 14 Disputes Contractual Liability Insurance 4.1.4, 4.3, 4.4 , 4.5, 4.6, 6.3, 7.3.8 ll.J . 1.8, 11.2, I 1.3 Documents and Samples at the Site Coordination and Correlation 3.11 1.2, 1.5.2, 3.3.1 , 3. 10, 3.12.6, 6.1.3, 6.2.1 Drawings. Defmition or Copies Furnished of Drawings and Specifications 1. 1.5 1.6, 2.2.5, 3.11 Drawings and Specifications, Use and Ownership of Copyrights 1.1.1 , 1.3, 2.2.5, 3.1 I, 5.3 1.6,3. 17 Effective Date of Insurance Correction of Work 8.2.2, 11.1.2 2.3, 2.4, 3.7.4, 4.2.1, 9.4.2, 9.8.2, 9.8.3, 9.9.1 ' 12.1 .2, Emergencies 12.2, 13.7.1.3 4.3.5, 10.6, 14.1.1.2 Correlation and Intent of the Contract Documents Employees, Contractor's 1.2 3.3.2, 3.4.3, 3.8.1 , 3.9, 3.18.2. 4.2.3, 4.2.6, 10.2, 10.3, Cost, Definition of 11.1.1 , 11.4.7. 14.1 ' 14.2.1.1 7.3.6 Equipment, Labor, Materials and Costs I. 1.3, 1.1.6, 3.4, 3.5. 1, 3.8.2, 3.8.3, 3.12, 3.13, 3. 15.1 , 2.4, 3.2.3, 3.7.4, 3.8.2, 3. 15.2, 4.3, 5.4.2, 6.1.1 ' 6.2.3, 4.2.6, 4.2.7, 5.2.1 ' 6.2.1 , 7 .3.6, 9.3.2, 9.3.3, 9.5. 1.3.

7.3.3.3, 7.3.6, 7.3.7, 7.3.8, 9. 10.2, 10.3.2, 10.5, 11.3, 9. 10.2, 10.2. 1, 10.2.4, 14.2.1.2 11.4, 12.1, 12.2.1.12.2.4, 13.5, 14 Execution and Progress o f the Work Cutting and Patching AlA Document A201.,. - 1997. Copyright <l:l 1911, 1915. 1918. 1925. 1937, 1951, 1958, 1961, 1963, 1966. 1970. 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: Thla AlA• Document Is protec:ted by u.s. Copyright Law ancllntornatlonal Treatlea. Unauthorized 5 raproductlon or dlatrlbutlon of thle AlA• Document, or any portion of It, may raeult In aevere civil and criminal panaltlea, and will be proaecutad to tha mulmum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_1 which expires on 7/23/2006, and Is not for resale.

User Notes: Clayco A201 • Koll - lntelllcenter · Dallas v2 (5·19·06) (986536188) R.P. Appx. 345 34 1. 1.3, 1.2.1 , 1.2.2, 2.2.3, 2.2.5, 3.1 , 3.3, 3.4, 3.5, 3.7, Insurance, Project Management Protective 3.10, 3.12, 3.14, 4.2.2, 4.2.3, 4.3.3, 6.2.2. 7.1.3, 7.3.4, Liability 8.2, 9.5, 9.9.1, 10.2, 10.3, 12.2, 14.2, 14.3 11.3 Extensions of Time Insurance, Property 3.2.3. 4.3.1, 4.3.4, 4.3.7, 4.4.5, 5.2.3, 7.2.1 ' 7.3, 7.4.1 , 10.2.5, 11.4 9.5. 1, 9.7.1 , 10.3.2, 10.6.1 , 14.3.2 Insurance, Stored Materials Failure of Payment 9.3.2, 11.4. 1.4 4.3.6, 9.5.1.3, 9.7, 9. 10.2, 14.1.1.3, J4.2. 1.2, 13.6 INSURANCE AND BONDS Faulty Work 11 (See Defective or Nonconforming Work) Insurance Companies, Consent to Partial Occupancy Final Completion and Final P~yment 9.9.1, 11.4.1.5 4.2.1 , 4.2.9, 4.3.2, 9.8.2, 9.10, I I. I .2, 11.1.3, I 1.4. I, Insurance Companies, Settlement with 11.4.5, 12.3.1, 13.7, 14.2.4, 14.4.3 L1.4. LO Financial Arrangements, Owner's Intent of the Contract Documents 2.2. J' J3 .2.2, '14.1.1.5 1.2.1' 4.2.7, 4.2.12, 4.2.13, 7.4 Fire and Extended Coverage Insurance Interest 11.4 13.6 GENERAL PROVISIONS Interpretation 1 1.2.3, 1.4, 4.1.1' 4.3. 1' 5.1' 6.1.2, 8.1.4 Governing Law Interpretations, Written 13.1 4.2.11 4.2.12, 4.3.6 I

Guarantees (See Warranty) Joinder and Consolidation of Claims Required Hazardous Materials 4.6.4 10.2.4, 10.3, 10.5 Judgment on Final Award Identification of Contract Documents 4.6.6 1.5.1 Labor and Materials, F..quipment Identification of Subcontractors and Suppliers 1.1.3, 1.1.6, 3.4, 3.5.1, 3.8.2, 3.8.3, 3.12, 3.13, 3. 15. 1, 5.2.1 42.6, 4.2.7, 5.2.1 , 6.2.1 , 7.3.6, 9.3.2, 9.3.3, 9.5.1.3, Indemnification 9.10.2, 10.2.1, 10.2.4, 14.2.1.2 3.J7, 3.18, 9.10.2, 10.3.3, 10.5, I 1.4.1.2, 11.4.7 Labor Disputes Information and Services Required of the Owner 8.3.)

2.1.2, 2.2, 3.2.1, 3,12.4, 3.12.1 0, 4.2.7, 4.3.3, 6.1.3, Laws and Regulations 6.1 .4, 6.2.5, 9.3.2, 9.6.1, 9.6.4, 9.9.2, 9.10.3, I0.3.3, 1.6, 3.2.2, 3.6, 3.7, 3.12.10. 3.13, 4.1.1, 4.4.8, 4.6, 11.2, 11.4, 13.5. 1, 13.5.2, 14.1.1.4, 14.1.4 9.6.4, 9.9.1, 10.2.2, 11.1 , 11.4, 13.1, 13.4, 13.5.1, Injury or Damage to Person or Proper ty 13.5.2, 13.6, 14 4.3.8, 10.2, 10.6 Liens Inspections 2.1.2 , 4.4.8, 8.2.2, 9.3.3, 9. 10 3.1.3, 3.3.3, 3.7.1, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.2, Limitation on Consolidation or Joinder 9.8.3, 9.9.2, 9.10.1, 12.2.1, 13.5 4.6.4 Instructions tol3idders l-imitations, Statutes of J. 1.1 4.6.3, 12.2.6, 13.7 Instructions to the Contr~ctor Limitations of Liability 3.2.3, 3.3.1, 3.8.1. 4.2.8, 5.2.1, 7, 12, 8.2.2, .1 3.5.2 2.3, 3.2.1, 3.5.1, 3.7.3, 3. 12.8, 3. 12. 10, 3. 17, 3. 18, Insurance 4.2.6, 4.2.7, 4.2.12, 6.2.2, 9.4.2, 9.6.4, 9.6.7, 9.10.4, 3. 18.1,6.1.1 , 7.3.6, 8.2.1 , 9.3.2, 9.8.4. 9.9.1, 9 .10.2. I 0.3.3, I 0.2.5, 11.1.2, 11.2.1 , 11.4.7, 12.2.5, 13.4.2 9.10.5, II Limitations of Time Insurance, Boiler and Machinery 2.1.2, 2.2, 2.4 , 3.2.1, 3.7.3, 3.10, 3.11' 3.12.5, 3. 15.1, J 1.4.2 4.2.7, 4.3, 4.4 , 4.5, 4.6, 5.2, 5.3, 5.4, 6 .2.4, 7.3, 7.4, Insurance, Contractor's Liability 8.2, 9.2, 9.3.1, 9.3.3, 9.4.1 , 9.5, 9.6, 9.7, 9.8, 9.9, 11.1 9.1 o. 11.1.3, 11.4.1.5, 11.4.6, 11.4.10, 12.2, 13.5, Insurance, Effective Date of 13.7, 14 8.2.2, 11. 1.2 Loss of Usc Insurance Insurance, Loss of Use 11.4.3 11.4.3 Material Suppliers Insurance, Owner's Liability 1.6, 3.12.1, 4.2.4, 4.2.6, 5.2.1, 9.3, 9.4.2, 9.6, 9.10.5 11.2 Materials, Hazardous 10.2.4, 10.3, 10.5 AlA Document A201TM -1997. Copyright © 1.911, 1915, 1918, 1925, 1937, 1951 , 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA• Document Ia protected by U.S. Copyright Law and International Treaties. Unauthorized 6 reproduction or dlatr1butlon of thla AlA• OOCIIIment, or any portion ollt, may result In severe ctvn and criminal panaiUas, and will be prosecuted to the maximum extent poal!lble under the law. This document was produced by AlA soltware at 14:42:43 on 05/1912006 under Order No.1000182995_ 1 which expires on 712312006, and is not tor resale.

User Notes: Clayco A201 • Koil · lntelllcenter ·Dallas v2 (5-19-06) (986536188) R.P. Appx. 346 35 Materials, Labor, Equipment and 1.6, 2.1.1 , 2.3, 2.4, 3.4.2, 3.8.1 , 3. 12.10. 3.14.2, 4.1.2, I. 1.3, 1.1.6. 1.6.1 , 3.4, 3.5.1, 3.8.2, 3.8.23, 3.12, 3.13, 4.1.3, 4.2.4, 4.2.9, 4.3.6, 4.4.7, 5.2.1, 5.2.4, 5 .4.1' 3.15.1, 4.2.6, 4.2.7, 5.2.1' 6.2.1' 7.3.6, 9.3.2, 9.3.3, 6.1 ' 6.3, 7.2.1 ' 7 .3.1' 8.2.2, 8.3.1 ' 9.3.1' 9.3.2, 9.5.1 ' 9.5.1.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.2 9.9.1,9. 10.2,. 10.3.2, 11.1.3, 11.3.1, 11.4.3, 1J.4.10, Means, Methods, Techniques, Sequences and 12.2.2, 12.3.1,13.2.2, 14.3, 14.4 Procedures of Construction Owner's Financial Capability 3.3.1, 3.12.10, 4.2.2, 4.2.7, 9.4.2 2.2.1' 13 .2.2, 14.1.1.5 Mechanic' s Lien Owner's Liability Insurance 4.4-.8 11.2 Mediation Owner's Loss of Use Insurance 4.4.1' 4.4.5, 4.4.6, 4.4.8;4.5, 4.6.1' 4.6.2, 8.3.1' 10.5 11.4.3 Minor Changes in the Work Owner's Rel<:~tionship with Subcontractors 1.1.1' 3.12.8, 4.2.8, 4.3.6, 7.1' 7.4 J .l.2, 5.2. 5.3, 5.4, 9.6.4, 9.10.2, 14.2.2 MISCELLANEOUS PROVISIONS Owner's Right to Carry Out the Work 13 2.4, 12.2.4. 14.2.2.2 Modifications, Definition of Owner's Right to Clean Up 1.1. I 6.3 Modifications,to the Contract Owner's Right to Perform Construction and to l.J.l, 1.1.2, 3.7.3, 3.11, 4.1.2, 4.2..1 , 5.2.3, 7, 8.3. 1, Award Separate Contracts 9.7, 10.3.2, 11.4.1 6.1 Mutual Responsibility Owner's Right to Stop the Work 6.2 2.3 Nonconforming Work, Acceptance of Owner's Right to Suspend the Work 9.6.6, 9.9.3, 12.3 14.3 Nonconforming Work, Rejection and Correction of Owner's Right to Terminate the Contract 2.3, 2.4, 3.5.1' 4.2.6, 6.2.5, 9.5. 1' 9.8.2, 9.9.3, 9.1 0.4, 14.2 12.2.1, 13.7.1.3 Ownership and Use of Drawings, Specifications Notice and Other Instruments of Service 2.2. t, 2.3, 2.4, 3.2.3, 3.3.1, 3.7.2, 3.7 .4, 3. 12.9, 4.3, 1. 1.1 , 1.6, 2.2.5, 3.2.1 , 3. I I. I, 3.17.1 , 4.2.12, 5.3 4.4.8, 4.6.5, 5.2. I, 8.2.2, 9.7, 9.10, 10.2.2, 1 1.1 .3, Partial Occupancy or Use 11.4.6, 12.2.2, 12.2.4, 13.3, 13.5. 1' 13.5.2, 14.1' 14.2 9.6.6, 9.9, 11.4.1.5 Notice, Written Patching, Cutting and 2.3, 2.4, 3.3.1' 3.9~ 3.12.9, 3.12.10, 4.3, 4.4.8, 4.6.5, 3.14, 6.2.5 5.2.1, 8.2.2, 9.7, 9.10, 10.2.2, 10.3, 11.1.3, 11.4.6, Patents 12.2.2, 12.2.4, 13.3, 14 3.17 Notice of Testing and Inspections Payment, Applications for 13.5.1, I 3.5.2 4.2.5. 7.3.8, 9.2, 9.3, 9.4, 9.5. 1, 9.6.3, 9.7.1 , 9.8.5, Notice to Proceed 9.10.1 , 9. 10.3, 9.10.5,11.1.3, 14.2.4, 14.4.3 8.2.2 Payment, Certificates for Notices, Permits, Fees and 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6. 1, 9.6.6 , 9.7.1 , 9.10.1, 2.2.2, 3.7, 3.13, 7.3.6.4, 10.2.2 9.10.3, 13.7, 14.1.1.3, 14.2.4 Observations, Contractor's Payment, Failure of 1.5.2, 3.2, 3.7.3, 4.3.4 4.3.6, 9.5. 1.3, 9.7, 9.1 0.2, 14.1.1.3, 14.2.1.2, 13.6 Occupancy Payment, Final 2.2.2, 9.6.6, 9.8, 11.4.1.5 4.2.1 , 4.2.9, 4.3.2, 9.8.2, 9.10, I J.l.2, 11.1.3, 11.4.1 , Orders, Written 11.4.5, 12.3.1' 13.7' 14.2.4, 14.4.3 1.1.1, 2.3, 3.9, 4.3.6, 7, 8.2.2, 11.4.9, 12.1 ' 12.2, Payment Bond, Performance Bond and 13.5.2, 14.3.1 7.3.6.4, 9.6.7, 9.10.3, 11.4.9, 11.5 OWNER Payments, Progress 2 4.3.3, 9.3, 9 .6, 9.8.5, 9. 10.3, 13.6, 14.2.3 Owner, Definition of PAYMENTS AND COMPLETION 2.1 9 Owner, Information and Services Required of the Payments to Subcontractors 2.1.2, 2.2, 3.2.1. 3.12.4, 3.12. 10, 4.2.7, 4.3.3, 6.1.3, 5.4.2, 9.5. I .3, 9.6.2, 9.6.3, 9.6.4, 9.6.7, 11.4.8, 6.1.4, 6.2.5, 9.3.2, 9.6. I, 9.6.4, 9.9.2, 9.1 0.3, I 0.3.3, 14.2.1 .2 11.2, 11.4, 13.5.1, 13.5.2, 14.1.1.4, 14.1.4 PCB Owner's Authority 10.3.1 AlA Document A201 111 -1997. Copyright @ 1911, 1915, 1918, 1925. 1937, 1951 , 1958. 1961, 1963, 1966, 1970, 1976. 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA• Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 7 reproduction or distribution of this AlA• Document, or any portion ollt. may result In severe civil and criminal penalties, ll!'ld will be prosecuted to the maximum extent possible under the law. This document was produced by AlA soltware at 14:42:43 on 05/1912006 under Order No.1 000182995_1 which expires on 7/2312006, and is not lor resale.

User Notes: Clayco A201 - Koll- lntellicenter - Dallas v2 (5-19·06) (986536188) R.P. Appx. 347 36 Performance Bond and Payment Bond Review of Contractor' s Submittals by Owner and 7.3.6.4, 9.6.7, 9.10.3, 11.4.9, 11.5 Architect Permits, Fees and Notices 3.10.1 , 3.10.2, 3.1 I , 3.12, 4.2, 5.2, 6.1.3, 9.2, 9.8.2 2.2.2, 3.7, 3.13, 7.3.6.4, 10.2.2 Review of Shop Drawings, Product Data and PERSONS AND PROPERTY, PROTECTION Samples by Contractor OF 3.12 10 Rights and Remedies I .1.2, 2.3, 2.4 , 3.5.1, 3 .15.2, 4.2.6, 4.3.4, 4.5, 4.6, 5.3, Polychlorinated Biphenyl 5.4, 6.1 , 6.3, 7 .3.1, 8.3, 9.5.1, 9.7, 10.2.5, 10.3, 10.3.1 12.2.2, 12.2.4 , 13.4, 14 Product Data, Definition of Royalties, Patents and Copyrights 3.12.2 3.17 Product Data and Samples, Shop Drawings Rules and Notices for Arbitration 3.11 ' 3.12, 4.2.7 4.6.2 Progress and Completion Safety of Persons and Property .2.2, 4.3.3., 8.2, 9.8, 9.9.1, 14.1.4 10.2, 10.6 Progress Payments. Safety Precautions and Programs 4.3.3, 9.3, 9.6, 9.8.5, 9 .10.3, 13.6, 14.2.3 3.3. 1, 4.2.2, 4.2.7, 5.3. 1, 10.1, 10.2, 10.6 Project, Definition of the Samples, Definition of 1.1.4 3.12.3 Project Management :Protective Liability Samples, Shop Drawings, Product Data and Insurance 3.11 , 3.12, 4.2.7 11.3 Samples at the Site, Documents and Project Manual, Definition of the 3.11 1.1.7 Schedule of Values Project·Manuals 9.2, 9.3.1 2.2.5 Schedules, Project Representatives 1.4.1.2, 3. 10, 3.Construction 12. 1, 3.12.2, 4.3.7.2, 4.2.10 6.1.3 Property Insurance Separate Contract'> and Contractors 10.2.5, 11.4 1.1.4, 3.12.5, 3.14.2, 4.2.4, 4.2.7, 4.6.4, 6, 8.3.1 ' PROTECTION OF .fERSONS AND PROPERTY 11.4.7, 12. 1.2, 12.2.5 10 Shop Drawings, Definition of Regulations and Laws 3.12.1 1.6, 3.2.2, 3.6, 3.7, 3. 12.10, 3. 13, 4.1.1, 4.4.8, 4.6, Shop Drawings, Product Data and Samples 9.6.4, 9.9.1, 10.2.2, lJ.l , 11.4, 13.1, 13.4, 13.5. 1. 3.11 , 3.12. 4.2.7 13.5.2, 13.6, 14 Site, Use of Rejection of Work 3.13, 6.1.1, 6.2.1 3.5.1 , 4.2.6, 12.2.1 Site Inspections Releases and Waivers of Liens 1.2.2, 3.2.1 , 3.3.3, 3 .7. J, 4.2, 4.3.4, 9.4.2, 9.10.1 ' 13.5 9. 10.2 Site Vi.sits, Architect's Representations 4.2.2, 4.2.9, 4 .3.4, 9.4.2, 9.5.1 , 9.9.2, 9.10.1 , .1 3.5 1.5.2, 3.5.1 , 3.12.6, 6.2.2, 8.2.1 t 9.3.3, 9.4.2, 9.5. I I Special Inspections and Testing 9.8.2, 9.10.1 4.2.6, 12.2.1 , 13.5 Represe ntatives Specifications, Definition of the 2.1.1 ' 3. 1.1' 3.9, 4.1.1, 4.2. 1, 4.2.10, 5 . I. I, 5.1.2, 1.1 .6 13.2.1 Specifications, The Resolution of Claims and Disputes 1.1.1 , 1.1.6, 1.1.7, 1.2.2, 1.6, 3. 11, 3.1 2. I 0, 3.17 4.4, 4.5, 4.6 Statute of Limitations Responsibility for Those Petforming toe Work 4.6.3, 12.2.6, 13.7 3.3.2, 3.18, 4.2.3, 4.3.8, 5.3. 1, 6. 1.3, 6.2, 6.3, 9.5. I , Stopping the Work 10 2.3, 4.3.6, 9.7, 10.3, 14.1 Retainage Stored Materials 9.3.1 , 9.6.2, 9.8.5, 9.9.1 , 9.10.2, 9. 10.3 6.2.1 , 9.3.2, 10.2.1.2, 10.2.4, I 1.4.1.4 Review of Contract Documents and Field Subcontractor, Definition of Conditions by Contractor 5.1.1 1.5.2, 3.2, 3.7.3, 3.12.7. 6.1.3 SUBCONTRACTORS AlA Document A201.,.,. -1997. Copyright © 1911 , 1915, 1918, 1925. 1937. 1951 , 1958. 1961. 1963, 1'966, 1970, 1976, 1987 and 1997 by The Ameriean Institute of Architects. All rights reserved. WAR NING: Thia At A• Document Ia protected by U.S. Copyright L.w and International Treatlea. Unauthorized 8 reproduction or distribution of this AIA8 Document, or any portion ollt, may result In aevere civil and criminal penalties, and will be prosecuted to the maJCimum edent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_ 1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 · Koll • lntellicenter · Dallas v2 (5·19·06) (986536188) R.P. Appx. 348 37 5 TERMINATION OR SUSPENSION OF THE Subcontractors, Work by CONTRACT 1.2.2, 3.3.2, 3.12.1 I 4.2.3, 5.2.3, 5.3, 5.4, 9.3. 1.2, 14 9.6.7 Tests and Inspections Subcontractual Relations 3.1.3, 3.3.3, 4.2.2, 4.2.6, 4.2.9. 9.4.2, 9.8.3, 9.9.2, 5.3, 5.4, 9.3.1.2, 9.6, 9.10 10.2.1, 11.4 .7, 11.4.8, 14.1, 9.10.1 , 10.3.2, 11.4.1.1 , 12.2. 1,13.5 14.2,1, 14.3.2 TIME Submittals 8 1.6, 3. JO, 3. 11 , 3.12, 4.2.7, 5.2. 1, 5.2.3, 7.3.6, 9.2, Time, Delays and Extensions of 9.3. 9.8, 9.9.1, 9. 10.2, 9.10.3, 11.1.3 3.2.3, 4.3. 1I 4.3.4, 4.3.7, 4.4.5, 5.2.3, 7.2.1 I 7.3. 1) Subrogation, Waivers of 7.4. 1, 8.3. 9.5.1, 9 .7. 1, 10.3.2, 10.6.1, 14.3.2 6. 1.1 , 11.4.5, 11.4.7 Time Limits Substantial Completion 2.1.2, 2.2, 2.4, 3.2.1, 3.7.3. 3.10, 3. J I , 3 .12.5, 3.15.1.

4.2.9, 8.1.1, 8.1.3. 8.2.3, 9.4.2, 9.8, 9.9.1' 9.10.3, 4.2, 4.3, 4.4, 4.5, 4.6, 5.2, 5.3, 5.4, 6.2.4, 7.3, 7.4, 9.10.4.2, 12.2, 13.7 8.2, 9.2, 9.3.1' 9.3.3, 9.4.1' 9.5, 9.6, 9.7, 9.8, 9.9, Substantial Completion, Defi,ni~on of 9.10, 11.1.3, ]1.4.1.5, 11.4.6, 11.4.10, 12.2, l3.5, 9.8.1 13.7, 14 Substitution of Subcontractors Time Limits on Claims 5.2.3, 5.2.4 4.3.2, 4.3.4, 4.3.8, 4.4, 4.5, 4.6 Substitution of Architect Title to Work 4.1.3 9.3.2, 9.3.3 Substitutions of Materials UNCOVERING AND CORRECTION OF 3.4.2, 3.5.1, 7,3.7 WORK Sub-subcontractor, Definition of 12 5.1.2 Uncovering of Work Subsurface Conditions 12.1 4.3.4 Unforeseen Conditions SuccessOrs and Assigns 4.3.4, 8.3.1, I 0.3 13.2 Unit Prices Superintendent 4.3.9, 7 .3.3.2 3.9, 10.2.6 Use of Documents Supervision and Construction Procedures 1.1.1 , 1.6, 2.2.5, 3.12.6, 5.3 1.2.2, 3..3, 3.4, 3.1 2.1 0, 4.2.2, 4.2.7, 4.3.3, 6. 1.3, Usc of Site 6.2.4, 7.1.3, 7.3.6, 8.2, 8.3. 1, 9.4.2, 10, 12, 14 3.13, 6.1.1, 6.2.1 Surety Values, Schedule of 4.4.7, 5.4.1.2, 9.8.5, 9.10.2, 9.10.3, 14.2.2 9.2, 9.3.1 Surety, Consent of Waiver of Claims by the Architect 9.10.2, 9.10.3 13.4.2 Surveys Waiver of Claims by the Contractor 2.2.3 4.3. 10, 9.10.5, 11.4.7, 13.4.2 Suspension by the Owner for Convenience Waiver of Claims by the Owner 14.4 4.3.10, 9.9.3, 9.10.3, 9 . 10.4, 11.4.3, 11.4.5, 11 .4.7' Suspension of the Work 12.2.2. 1, 13.4.2, 14.2.4 5.4.2, 14.3 Waiver of Consequential Damages Suspension or Termination of the Contract 4.3.10, 14.2.4 4.3.6, 5.4.1.1, 11.4.9, 14 Waiver of Liens Taxes 9.10.2, 9.10.4 3.6, 3.8.2.1, 7.3.6.4 Waivers of Subrogation Termination by the Contractor 6.1.1, 11.4.5, 11.4.7 4.3.10, 14.1 Warranty Termination by the Owner for Cause 3.5, 4.2.9, 4.3.5.3, 9.3.3, 9.8.4, 9.9.1, 9.10.4, 12.2.2.

4.3. 10, 5.4.1.1, 14.2 13.7.1.3 Termination of the Architect Weather Delays 4.1.3 4.3.7.2 Termination of the Contractor Work, Definition of 14.2.2 1.1.3 Written Consent AlA Document A201lM-1997. Copyright <11>19 11 , 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976. 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document Is protected by U:S. Copyright Law and lntornetlonal Treatlea. U'nauthoi'Ued 9 reproduction or distribution of this AlA' Document. or any portion of It, may result In seva1'81 civil end criminal penalties, snd will be prosecuted to tho maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_ 1 which expir'es on 7/2312006, and is not for resale.

User Notes: Ciayeo A201 • Kolf · lntelflcenter · Dallas v2 (5·19·06) (986536188) R.P. Appx. 349 38 1.6. 3.4.2, 3.12.8, 3.14.2, 4.1.2, 4.3.4, 4.6.4, 9.3.2. 2.3, 2.4, 3.3.1. 3.9, 3.1 2.9, 3.12.10, 4.3, 4.4.8, 4.6.5, 9.8.5, 9.9.1, 9.10.2, 9.10.3, 11.4.), 13.2. 13.4.2 5.2.1 , 8.2.2. 9.7, 9.10, 10.2.2. 10.3. 11.1.3, 11.4.6, Written Interpretations 12.2.2, 12.2.4, 13.3, 14 4.2.11, 4.2.12, 4.3.6 Written Orders Written Notice 1.1.1, 2.3, 3.9, 4.3.6, 7. 8.2.2, 11.4.9, 12.1 ' 12.2, 13.5.2, 14.3.1

AlA Document A201T10 -1997. Copyright © 191 1, 1915, 1918, 1925, 1937, 1951. 1958, 1961 , 1963. 1966, 1970, 1976. '1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA• Document Ia protected by U.S. Copyright Law and International Treatl&a. Unauthorized 10 reproduction or dlatrlbullon of this AlA• Document, or any portion ollt, may reault In severe civil and criminal penalties, and will be prolle'cuted to the mliXImum extent possible under the taw. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_ 1 which expires on 7123/2006, and is not for resale.

User Notes: Clayco A201 • Kol! • lntelllcenter • Dallas v2 (5·19·06) (986536188) R.P. Appx. 350 39 ARTICLE 1 GENERAL PROVISIONS § 1.1 BASIC DEFINITIONS § 1.1.1 THE CONTRACT DOCUMENTS The Contract Documents consist of the Agree meat betweea O•.vtlef an£1 Coatraetar (hereiaafter l!!e Agreemeal), Agreement. this specifically modified AlA Document A20 1.-1997. General Conditions of the Ceatreet (Geaerel, S\iflfllemeatary Qflti ol!!er Coatiitioas), (" A20 I"), Ora wings, Specl1ications, Addenda issued prior to execution of the Contract, other documents listed in the Agreement and Modifications issued after execution of the Contract. A Modification is (1) a written amendment to the Contract signed by both parties, QL(2) a Change Oreer, (31 a Cea:Jtffictiea Cl:lQflge Direea·'e or (4) a wFiUea omer ~r a miaor eaaage ia tl:le Work isseed by the Arehitect. Order.

Unless specifically enumerated in the Agreement, the Contract Documents do not include other documents such as bidding requirements (advertisement or invitation to bid, Instructions to Bidders, sample forms, the Contractor' s bjd or portions of Addenda relating to bidding requirements). References herein to the "Agreement'' shall mean and refer to the specifically modified Standard Form of Agreement Between Owner and Contractor. or Owner and Construction Manager, which may be an AlA Document AIOI. Alii or Al2l. whichever is applicable.

§ 1.1.2 THE CONTRACT The Contract Documents fom1 the Co.ntract for Construction. The Contract represents the entire and integrated agreement between the parties hereto .and supersedes prior negotiations, representations or agreements, either written or oral. The Contract may be amended or modified only by a Modification. The Contract Documents shall not be construed to create a contractual relationship of any kind (I) between the Architect and Contractor, (2) between the Owner and a Subconti:actor or Sub-subcontractor, (3) between the Owner and Architect or (4) between any persons or entities other than the Owner and Contractor.Tile A:ehiteet shall, however, be eatitlea to f!er4'erataaee aae eefel'eemeat of ol:lligaaoas Haser the Coatraet i:Rteaded to facilitate performance of the Al:chitect's duties.

§ 1.1.3 THE WORK The term "Work" means ·the construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor's obligations. The Work may constitute tbe whole or a part of the Project.

§ 1.1.4 THE PROJECT The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part and which may include construction by the Owner or by separate contractors.

§ 1.1.5 THE DRAWINGS The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams.

§ 1.1.6 THE SPECIFICAliONS The Specifications are that portion ofthc Contract Documents consisting of the written requirements for materials. equipment, systems, standards and workmanship for the Work, and performance of related services.

§ 1.1.7 THE PROJECT MANUAL The Project Manual is a volume assembled for the Work which may include the bidding requirements, sampJe forms, Conditions of the Contract and Specifications.

§ 1.2 CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS § 1.2.1 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indica.ted results.

§ 1.2.2 Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings sh,all not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade.

AlA Document A201"' -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute or Architects. All rights reserve~. WARNING: This AJA8 Document Is protected by U.S. Copyright Law 1nd International Treaties. Unauthorized 11 reproduction or distribution of thht AlA Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent poulble under tile law. This document was produced by AlA software at 14:42:43 on 05119/2006 under Order No.1 000182995_ 1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 - Koll - lntellicenter · Dallas v2 (5·19·06) (986536188) R.P. Appx. 351 40 § 1.2.3 Unless otherwise stated in the Contract Documents, words which have well-known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings.

§ 1.3 GAPITALIZATION § 1.3.1 Tenns capitali7.ed in these General Conditions include those which are (I) specifically defined, (2) the titles. of numbered ruticles or (3) tbe titles of other documents published by the American Institute of Architects.

§ 1.41NTERPRETATION § 1.4.1ln the interest of brevity the Contract Documents frequently omit modifying words such as "all" and "any" and articles such as "the" and "an," but the fact that a modifier or an article is absent from one statement and appears in another is not intende.d to affect the interpretation of either statement.

§ 1.5 EXECUTION OF CONTRACT DOCUMENTS § 1.5.1 The Contract Documents shall be signed by the Owner and Contractor.If either the Qv,'f!er ar CaHtraetar or aath da Ret sigA ttl! W!e Cealfaet Doeameots, the ,'\n;hiteel shall ideotify ~I:IEll'll:lnsiga.etl Doel:lments l:lpon r:eqaest.

§ 1.5.2 Execution of the Contract by the Contractor is a representation that the Contractor has visited the site, become generaUy familiar with local conditions under which the Work is to ibe performed and correlated personal observations with requirements of the Contract Documents.

§ 1.6·OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS AND OTHER INSTRUMENTS OF SERVICE § 1,&,1 Tile Drawing:;, Sfleeifieat:iens II:Rti etlier Elee1:1ments, iRei1:1Eiing l:l~ese iA: eleeEFeffie farm, f!reparee ey the Arelliteet aad the Arehiteet' 5 eea:sl:lltaats are lnSlfl:lfReRtS ef Service threl:lgA which the Werk ta ee e){eCI:IleG ey lhe CeRlfaeter is Eleserieea. The Ceatraet~lF FHay retain one reeorEI set. ~leitller tJ:te Ceatraeter ner any 8-aaeeatraeter, S1:1b saaeonlfas«~r or ERaterial or equipa1eat s~;~pplier seal! own or elaifR a copyright ifl the Drawi:Hgs, Speeifieatieat; ana eY!er aeeu~Rts flFeparea by the Arelliteet er the Arekite.et' s eeftRUitaal!>, ana I:IAiess et:Aerwise iaaieatea lhe Arel!iteet aftd the A:fehitect'S 601lSI:IItantS SRaiJ ae SeeFHed the autREIFS ef tReffl ll:Rd will retttiR ail 69ffiRI8ft law, statutery aM other reser¥ed rights, in additieR to lR:e eepyrights. AIJ eepies of lHstruFHents ef Serviee, e*eept the Centraeter's reee£6 :;et, sllall ee retafAetl er sl:litaaly aeeo1:1nted fer te tile Arehiteet, eA req1:1est, 1:1pen ce!Bplet:ien et the Werk. The Drawiags, SpeeifieatieBs and e!:her deel:lfRBftt!i pr:etJareEI ey tke Arelliteel ttHS t:Ae Architect's eansultaats. asa eepies tl!ereef faFRisaed te the Centraetar, are fer use salely with re~eet te tlli:; Prejeet. Tiley are net te be 'I:!sea by the Ceattaeter er QFIY S~:~eeentraeter, S1:1e s~:~eeoatractor or ERaterial or eq~:~ipFHent Sl:lflfllier en ather prejeets er fer edelitieas ta this Prejeet eat:1iae the seeJ!e ef !:he WerlE witheut !:he specifie written eonsent of tile Owner, t\rehiteet ll:Ra the Ar:ehiteet's eeasl:lltants. The Ceatreetar, S~:~aeenli'aeters, .S1:1a 9ueeen~raetars aaa material er eEJH:ipFAeat sapf!liers are autherizea te use aaEI reprea~:~ee apf!lieable pertiaas ef the Drawisgs, Sj3eeifieatiaas aad ether aeeumentG j3Fepai'eEI ey tile Arehiteet aaa Hie t\:elliteet' s eensl:lltanl(; apJ3F8'j:lriate to aaa i"er ase in the 8l(B.el:ltiea af their '\lla.rk !lASer tile Ceel:Faet DeeumeHt:l. All 60fliBfl FHaae under !:his au!:horizatioR shall eear the Statl:ltary 69J3)oflgRt aoaee, if any, shows 9R tile Drawings, Speeifieatians aHd ather ElaetlmeR~ flFefli:H'ea ey the Arelliteet aHd tl!e Arehiteet's eoHsll:itants. Submittal or aistria-aties te FReet affieial reg1:1latory reEJatre!BeRtt; ar for .ether fll:lrpeses iHeeooeetiea witll this Projeet is not to be eoRstruea at; flUelieation in aerogation oftl=le Arellitect's er .\re!Hteet' s eeasaltants' eepyrightG ar etl!er rese£'1eEI rights.

§ 1.6.1 The Drawings, Specifications and other documents prepared by the Architect or by any engineer or other design consultant working under the Architect or the Contractor (the "Other Design Consultants") for this Project (the "Design Documents") are instruments of the Architect's and Other Design Consultants' service through which the Wotk to be executed by the Contractor is described and, unless otherwise provided. the Architect and Other Design Consultants shall be deemed the author of these documents and shall retain all common law. statutory and other reserved rights, including the copyright until such time as the Owner has provided full and final payment to the Contractor for all services provided by the Architect and Other Design Consultants under this Agreement. Until final payment has been made by Owner. the Contractor shall cause the Architect .and Other Design Consultants to grant in writing. upon execution of this Agreement. to the Owner a fu ll and exclusive lkense for all copyright rights and privileges held by the Architect and Other Design Consultants with respect to the Design Documents. Such written agreement by the Architect and Other Design Consultants shall also provide that, upon full and final payment for Architect's and the Other Design Consultants' services. all rights reserved for the Architect and the Other Design Consultants with respect to the Design Documents shall pass to the Owner. The Architect and Other Design Consultants shall he permitted t() retain copies. including reproducible and electronic copies. of the Design Documents for information and for use in the marketing of the Architect's and Other Design Consultants' services.

AlA Document A201TM -1997. Copyright © 1911, 1915, 1918. 1925, 1937, 1951, 1958. 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: Thla AlA"' Document II protected by U.S. Copyright Law eod lnternellonel Treaties. U neuthorlz;ed 12 reproduction or distribution of this AtA• DoeUl'l'lent, or tny portion of It, may result In severe- civil and criminal penaltltt, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05119/2006 under Order No.1000182995_ 1 which expires on 7/2312006, and is not for resale.

User Notes: Clayco A201 • Koll • lntellicenter • Dallas v2 (5·19·06) (986536188) R.P. Appx. 352 41 Architect and the Other Design Consultants shalJ also be permitted to use any standard details from the Design Documents for other projects by the Architect o.r Other Design Consultants.

Any use of the copyright license or use or distribution of the Design Documents by the Owner. other than for this specific project. shall be at the Owner's sole risk. The Owner waives any right to make claims and waives. to the fullest extent permitted by law. any claim or cause of action against the Architect. the Other Design Consultants. their employees, agents or subconsultants. which may arise out of the Owner's use of this copyright license or its use or distribution of the Design Documents for other than this specific project without the concurrent and associated use of the Architect's or Other Design Consultants' services. The Owner hereby agrees to defend. indemnify and hold harmless the Contractor. Architect and Architect's consultants from any and all claims. damages. liabilities. losses and expenses. including reasonable attorney's fees. arising out of or resulting from the use of the "instruments of service." This docs not relieve the Architect or Other Design Consultants from their responsibility to properly design this project for future renovations or expansions to the extent the criteria for such are specifically identified by the Owner and documented in the programming of this project.

The Architeet and Other Design Consultants shall deliver to the Owner a complete set of the Design Documents prepared by the Architect. Other Design Consultants or their subconsultants in the form of electronic files within thirty (3{)) days·of the Substantial Completion date or the date of the last Owner-initiated revision, whichever is latest. Architect and the bther Design Consultants shall also maintain an electronic copy of the Design Documents for a period of three (3) years from the date of Substantial Completion of the Project.

ARTICLE 2 OWNER § 2.1 GENERAL § 2.1.1 The Owner is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as.if singular in number. The Owner shaJI designate in writing a representative who shall have express authority to bind the Owner with respect to all matters requiring the Owner's approval or authorb.ation.

Except as otherwi$e provided in Section 4.2. 1, the Architect does not have such authority. The term "Owner" means the Owner or the.Owner's authorized representative.

§ 2.1.2 The Owner shall furnish to the Contractor within fifteen days after receipt of a written request, information necessary and relevant for the Contractor to evaluate, give notice of or enforce mechanic' s lien rights. Such information shaH include a correct statement of the record legal title to the property on which the Project is located, usuafly referred to as the site, and the Owner's interest therein.

§ 2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER § 2.2.1 The Owner shall, at the written request of the Contractor, prior to commencement of the Work and thereafter, furnish to the Contractor reasonable evidence that financial arrangements have been made to fulfill the Owner's obligations under the Contract. Furnishing of such evidence shall be a condition precedent to commencement or continuati.o n of the Work. After such evidence has been furnished, the Owner shaJJ not materially vary such financial arrangements without prior notice to the Contractor.

§ 2~2 Except for permits and fees, including those required under Section 3.7.1, which are the responsibility of the Contractor under the Contract Documents, the Owner shall secure and pay for necessary approvals, easements, assessments and charges .required for construction, use or occupancy of permanent structures or for permanent changes in exjsting facilities.

§ 2.2.3 The Owner shall f11mish surveys describing physical characteristics, legal limitations and utility locations for the site of the Pn~ect, Project (the "Surveys"), and a legal description of the site. The Contractor shall be entitled to rely on the accur!!-CY of information furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work. The Owner shall disclose. to the extent known to the Owner. the results and reports of studies. prior tests. inspections \)r investigations conducted for the Project (collectively, the "Project Information") involving: structural or mechanical system.~;. chemical. air and water pollution; hazardous materials; geotechnical conditions; Surveys; studies and plans or other environmental, subsurface or concealed conditions. The Owner shall disclose all information known to the Owner regarding the presence of hazardous materials. pollutants or contaminants at the Project's site. The Contractor shall review all such Project Information and shall cause the Architect, the structural engineer and other Design Professionals hired by Contractor and/or Architect to design, and

AlA Document A201.,.. -1997. Copyright © 191 1, 1915, 1918, i925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by TheAmelican Institute of Architects. All rights reserved. WARNING: Thla AlA• Document Ia protected by U.S. Copyright Lew and International Treaties. Unauthorized 13 reproduction or distribution of thla AlA• Doc11ment, or any portion of II, may re.ult In severe civil and criminal penal tiel, and will be prosecuted to the maximum extent possible under the IIIW. This document was produced by AlA software at 14:42:4J on 05/ 19/2006 under Order No.1 000182995~1 which expires on 7123/2006, and is not for resale.

User Notes: Clayco A201 • Koll • lntelllcenter · Dallas v2 {5-19·06) (986536188) R.P. Appx. 353 42 Contractor shall construct. the Project in accordance with the recommendations and findings set forth in such Project Information.

§ 2.2.4 Information or services required of the Owner by the Contract Documents shall be furnished by the Owner with reasonable promptness. Any other information or services relevant to me Contractor' s performance of the Work under the Owner's control shaJJ be furnished by the Owner after receipt from the Contractor of a written request for such information or services.

§ 2.2.5 Unless otherwise provided in the Contract Documents, the ContractOI will be furnished, free of charge, such copies of Drawings and Project Manuals as are reasonably necessary for execution of the Work.

§ 2.3 OWNER'S RIGHT TO STOP THE WORK § 2.3.1 If the Contractor fails to correct Work which is not in accordance with the requirements of the Contract Documents as required by Section 12.2 or persistently fails to carry out Work in accordance with the Contract Documents, the Owner muy issue a written order to the Contractor to stop the Work, or uny portion thereof, until the cause for such.order has been eliminated; however, the right of the Owner to stop the Work shall not give rise to a duty on the part Gf the Owner to exercise this right for the benefit of the Contractor or any other person or entity, except to the extent required by Section 6.1.3. No part of the time lost due to any such stop work orders shall be made the subject of a claim for extension of time or for increased costs or damages by Contractor.

§ 2.4 OWNER'S RIGHT TO CARRY OUT THE WORK § 2.4.1lf the Contractor defaults or neglects to carry out the Wo rk in accordance with the Contract Document<; and fails within a seven-day period after receipt of written notice from the Owner to commence and continue correction of such default or neglect with diligence and promptness, the Owner may after such seven-day period give the Contractor a second written notice to correct such deficiencies within a three-day period. If the Contractor within such three-day period after receipt of such second notice fails to commence and continue to correct any deficiencies, the Owner may, without prejudice to other remedies the Owner may have, correct such deficiencies. ln such case an appropriate Change Order shall be issued deducting from payments then or thereafter due the Contractor the reasonable cost of correcting such deficiencies, including Owner' s expenses ttfld eeftl~f:Utllat:ion fer the A:reJ:titeet's aeEiil:ieseJ serviees made necessary by such default, neglect or failure. SYea ae!:iea ey tl:te Owner and amom1ts ehaFged te the Cont:Fae~er aFe eet:A SYejeet te ~fier a~~re·,oal ef the ,\fel:titeet. If payment<; then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the difference to the Owner. lf the Contractor defaults in the Contractor's obligations to the Owner. the Architect shall grant a license to the Owner to use the drawings. specifications. and other document'! and electronic data furnished by the Architect to the Contractor for the completion of the Project.

ARTJCLE 3 CONTRACTOR § 3.1 GENERAL § 3.1.1 The Contractor is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term "Contractor" means the Contractor or the Contractor's authorized representative.

§ 3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents.

§ 3.1.3 The Contractor shall not be relieved of obligations to perform the Work in accordance with the Contract Documents either by activities or duties of the Architect in the Architect's administration of the Contract, or by tests, inspections or approvals required or performed by persons other than the Contractor.

§ 3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR § 3.2.1 Since the Contract Documents arc complementary, before starting each portion of the Work, the Contractor shall carefully study and compare the various Drawings and other Contract Documents relative to that portion of the Work, as well as the information furnished hy the Owner pursuant to Section 2.2.3, shall take field measurements of any existing conditions related to that portion of the Work and shalJ observe any conditions at the site affecting it.

These obligations are for the purpose of faciljtating construction by the Contractor and are not for the purpose of djscovcring errors, omissions, or inconsistencies in the Contract Documents; however, any errors, inconsistencies or omissions djscovered by the Contractor shall be reported promptly to the Arehiteet Owner as a request for information in such form a,<; the Arehiteet Owner may reasonably require.

AlA Document A201TM - 1997. Copyright © 1911 . 1915, 1918, 1925. 1937, 1951 , 1958, 1961. 1963, 1966, 1970, 1976. 1987 and 1997 by The American Institute of Architects. All rlghta reserved. WARNING: This AIA1 Document 11 protected by U.S. Copyright Llw 1nd lntern1t1onal Treaties. Unauthorized 14 reproduction or dlatrlbuUon ol this AIA1 Document, or any portion ol It, may result In severe civil and criminal pan•IU. ., and will be proa~t<~uted to the maximum extent possible under the law. This document was produced by AlA software at t 4:42:43 on 05119/2006 under Order No.1000182995_ 1 which expires on 712312006, and Is not for resale.

User Notes: Clayco A201 • Koll • lntelllcenter • D<!llas v2 (5-19·06) (986536 188) R.P. Appx. 354 43 § 3.2.2 Any design errors or omissions. noted by the Contractor during this review shall be reported promptly to the AreRi~et, Owner. but it is recognized that the Contractor's review is made in the Contractor's capacity as a contractor and not as a licensed design J:Jrefessioaal ttEHess otherwise SJ:Jeeifieally ~re'liaea iR t:Re Ceattaet Deel:nfleRts. professional. The Contractor is Ret req~:~irea shall cause the Architect and other design professionals to ascertain that the Contract Documents are in accordane<: with applicable laws, statutes, ordinances, building codes, and rules and regulations, including. without limitation. the Americans with Disabilities Act, but any nonconformity discovered by or ffii:IEie-make known to the Contractor shall be promptly reponed promptly to the Arehiteet.Owner.

§ .3.2.3lf the Contractor believes that additional cost or time is involved because of clarifications or instructions issued by the ,'\rehitl*lt Owner in response to the Contractor's notices or requests for information pursuant to Sections 3.2.1 and 3.2.2, the Contractor shall make Claims as provided in Sections 4.3.6 and 4.3.7. If the Contractor fails to perform the obl,igations of Sections 3.2.1 and 3.2.2, the Contractor shall pay such cost:; and damages to the Owner as would have been avoided if the Contractor had performed such obligations.TI"le Ceatraetar !>hall Ret ee liable te !be Owaer er A:rehiteet fer aamages res1:1ltiag free errors, ~soesisleaGies or emissioAS ifl me CoAtFaet Deet~meats er fer aiffereaees eetweea iiela measaremeats er eeRaitioas at'la. me Ceatraet DoeYmeRts YAless !be CeR~meter reeegnizea s1:1ea effer. iAeof'lsisteRey, emissiaR or EliffereFtee aRe lEI:lO\ViAgly t'ailea te rep eFt it te the Areliit.eet.

§ 3.3 SUPERVISION AND CO~STRUCTION PROCEDURES § 3.3.1 The Contractor shall supervise and direct the Work, using the Contractor's best skill and attention. The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures and for coordinating alJ portions of the Work under the Contract, unJess the Contract Document'> give other specific instructions concerning these matters. If the Contract Documents give specific .instructions concerning construction means, methods, techniques, sequences or procedures, the Contractor shall evaluate the jobsite safety thereof and, except as stated below, shall be fully and solely responsible for the jobsite safety of such means, methods, techniques, sequences or procedures. If the Contractor determines that such means, methods, techniques, sequences or procedures may not be safe, the Contractor shall give timely written notice to the Owner and ,<\feffiteet liRa shall not proceed with that portion of the Work without further written instructions from the :z'\rehiteet Owner. If the Contractor is then instructed to proceed with the required means, methods, techniques, sequences or procedures..without acceptance of changes proposed by the Contractor, the Owner shall be solely responsible for any resulting loss or damage.

§ 3.3.2 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's employees, Subcontractors and their agents and employees, and other persons or entities performing portions of the Work for or on behalf of the Contractor or any of its Subcontractors.

§ 3.3.3 The Contractor shall be responsible for inspection of portions of Work already performed to determine that such portions are in proper condition to receive subsequent Work.

§ 3.4 LABOR AND MATERIALS § 3.4.1 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work. whether temporary or permanent and whether or not incorporated or to be incorporated in the Work.

§ 3.4.2 The Contract0r may make substitutions only with the consent of the Owner, after evaluation by the Architect and in accordance with a Change Order.

§ 3.4.3 The Contractor soall enforce strict discipline and good order among the Contractor' s employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them.

§ 3.4.4 The Contractor shall inspect all materials. supplies and equipment that are to be incorporated into the Project.

In addition. Contractor shall be responsible for construction quality control f{>r all Work. Contractor's quality control program and inspection procedures for the foregoing shall be submitted in writing to Owner for review and approval. in sufficient detail to delineate those items to be inspected and the manner in which they are to be AlA Document A201,. -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961 , 1963. 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA• Document Ia protected by U.S. Copyright Law and International Treatla.. Unauthorized 15 reproduction or distribution ot this AlA• Document, or 1ny portion of It, m•y result In 1evera c.l vll and crl!llfnal pen11tles, 1nd will be prosecuted to tha maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_ 1 which expires on 7123/2006. and is not for resale.

User Notes: Ciayeo A201 • Kotl - lntellicemer - Dallas v2 (5-1 9-06) (986536188) R.P. Appx. 355 44 inspected, and shall adequately describe all construction quality control activities contemplated. including provision for adequate documentation of Contractor's performance of such quality control and inspection.

§ 3.4.5 Contractor shall, during the course of performance of the Project hereunder. without additional compensation. make or cause to be made all inspections required by the Contract Documents. Owner may require at Owner's expense additional inspections. Contractor shall furnish Owner with satisfactory documentation of the results of all inspections. Owner shall be given not less than three (3) working days notice of any inspections to be made by Contractor or Contractor' s subcontractors in order that Owner may witness any such inspections.

§ 3.4.6 Owner and its representatives. and others as may be required by applicable laws. ordinances and regulations. shall have the right at all reasonable times to inspect the Project and all material and equipment for the Project at the job site and at Contractor's and its subcontractors' shops for conformance w]th the Contract Documents. Contractor shall provide. or cause to be provided access and sufficient, safe and proper facilities for such inspections.

§ 3.4.7 Neither the failure by Owner to make any insoection under the Contract Documents nor to discover defective workmanship, ,materials oreauipment nor approval of any Work or payment to Contractor for such Work shall constitute Contractor's satisfaction of its obligations under the Contract Documents. nor shall any such inspections or approvals prejudice the right<> of Owner.

§ 3.5 WARRANTY § 3.5.1 The Contractor warrants to the Owner a:aa Arekiteet that materials and equipment furnished under the Contract will be of good quality and new unless otherwise required or permitted by the Contract Documents, that the Work will be free from defects not inherent in the quality required or permitted, and that the Work will conform to the requirements of the Contract Documents. Work not conforming to these requirements, including substitutions not properly approved and authorized~ may be considered defective. The Contractor's warranty e,l(cludes remedy for damage or defect caused by abuse, modifications not executed by the Contractor, improper or insufficient maintenance, improper operation, or normal wear and tear and normal usage. If required by the AreJ:Jiteet, Owner. the Contt;actor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. All warranties under this Paragraph shall commence as of the date of Substantial Completion of the Work. and shall continue for a oeriod of one ( l) year. except as otherwise noted in the Outline Specs (as such term js defined in the Agreement). THE CONTRACTOR .H EREBY DISCLAIMS ANY AND ALL EXPRESS OR IMPLIED WARRANTIES. INCLUDING WITHOUT LIMITATION. ANY WARRANTIES OF FITNESS FOR ANY PARTICULAR PURPOSE, EXCEPT AS EXPRESSLY WARRANTED HEREIN. THERE ARE NO WARRANTIES BEYOND THE DESCRIPTION ON THE FACE HEREOF. All subcontractor's and manufacturer' s warranties shall be deemed furnished and assigned to the Owner pursuant to this Contract without further action by the Contractor upon Final Payment by the Owner as required under this Contract.

§ 3.6 TAXES § 3.6.1 The Contractor shall pay sales, consumer, use and similar taxes for the Work provided by the Contractor which are legally enacted when bids arc received or negotiations concluded, whether or not yet effective or merely scheduled to go into effect.

§ 3.7 PERMITS, FEES AND NOTICES § 3.7.1 Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building permit and other permits and governmental fees, licenses . waivers, consents. approvals and authorizations and make all material registrations. qualifications , designations and filings required and shall secure and pay for all inspections necessary for proper execution and completion of the Work which are customarily secured after execution of the Contract and which are legally required when bids arc received or negotiations concluded.

§ 3.7.2 The Contractor shall comply with and give notices required by laws, ordinances, rules, regulations and lawful orders of public authorities applicable to performance of the Work.

§ 3.7.3It is Aet Contractor shall cause the CeRtfaetor's resf.!eRsiaility Architect and other design professionals to ascertain that the Contract Documents are i.n accordance with applicable laws, statutes, ordinances, building codes, and rules and regulations. However, if the Contractor observes that portions of the Contract Documents are at variance therewith, the Contractor shall promptly notify the ,'\Eelti~eet aaa Owner in writing, and necessary changes shaiJ be accomplished by appropriate Modilication.

AlA Document A201TM -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963. 1966. 1970, 1976, 1987 and 1997 by The American Institute ol Architects. All rights reservei· WARNING: This AJA1 Document Ia protected by U.S. Copyright Law and International Treaties. Unauthorlted reproduction or distribution of this AlA Document, or any portion ollt, may result In Mvera, civil and criminal panallles, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.10001 82995_ 1 which expires on 712312006, and Is not tor resale.

User Notes: Clayco A201 • Koll · lntellicenter · Dallas v2 (5· 19·06) (986536188) R.P. Appx. 356 45 § 3.7.4lf the Contractor performs Work knowing it to be contrary to laws, statutes, ordinances, building codes, and rules and regulations without such notice to the ~wner, lhe Contractor shall assume appropriate responsibility for such Work and shall bear the costs attributable to correction.

§ 3.8 ALLOWANCES § 3.8.1 The Contractor shall include in the Contract Sum all allowances stated in the Contract Documents. Items covered by allowances shall be supplied for such amounts and by such persons or entities as the Owner may direct, but the Contractor shall not be required to employ persons or entities to whom the Contractor has reasonable objection.

§ 3.8.2 Unless otherwise provided in the Contract Documents: .1 allowances shall cover the cost to the Contractor of materials and equipment delivered at the site and all required taxes, less applicable trade discounts; .2 Contractor' s costs for unloading and handling at the site, labor, installation costs, overkeael, ~refit Contractor's Fee based on the percentage set forth in Section 5.1.2 of the Agreement and other expenses contemplated for stated allowance amounts shall be included in the Contract Sum but not in the allowances; .3 whenever costs are more than or less than allowances, the Contract Sum shall be adjusted accordingly by Change Order. The amount of the Change Order shal1 reflect (1) the difterence between actuaJ costs and the allowances under Section 3.8.2.1 and (2) changes in Contractor's ~osts.

Contractor's Fee based! on the percentage set forth in Section 5. 1.2 of the Agreement and other expenses under Section 3.8.2.2.

§ 3.8.3 Materials and equipment under an allowance shall be selected by the Owner in sufficient time to avoid delay in the Work.

§ 3.9 SUPERINTENDENT § 3.9.1 The Contract.o r $hall employ a competent superintendent and necessary assistants who shall be in attendance at the Project site durin,g performance of the Work. The superintendent shall represent the Contractor, and communications given to the superintendent shall be as binding as if given to the Contractor. Important communications (including but not limited to any communication that may affect the items in subparagraphs (i) through (vii) of Section 6.5 of the Agreement) shall be confirmed in writing. Other communications shall he similarly confirmed on written request in each case.

§ 3.10 CONTRACTOR'S CONSTRUCTION SCHEDULES § 3.10.1 The Contractor, promptly after being awarded the Contract, shall prepare and submit for the Owner' s 600 ,'\reftiteet's information a Contractor's construction schedule for the Work. The schedule shall not exceed time limits current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the Work and Project, shall be related to the entire Project to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the Work.

§ 3.10.2 The Contractor shall prepare and keep current, for the Arckiteel's Owner' s approval, a schedule of submittals which is coordinated with the Contractor's construction schedule and allows the ~ reasonable time to review submittals.

§ 3.10.3 The Contractor shall perform the Work in general accordance with the most recent schedules submitted to the OWfier ll:llE! Arehi~eetOwner.

§ 3.11 DOCUMENTS AND SAMPLES AT THE SITE § 3.11.1 The Contractor shall maintain at the site for the Owner one record copy of the Drawings, Specifications, Addenda, Change Orders and other Modifications, in good order and marked currently to record field changes and selections made during construction, and one record copy of approved Shop Drawings, Product Data, Samples and similar required submittals. These sbaU be available to the Afeltiteet Owner and shall be delivered te the ,'\Fskiteet fer submittal to the Owner upon completion of the Work.

AlA Document A201"' - 1997. Copyright © 191 1, 1915, 1918, 1925, 1937, 1951 , 1958, 1961, 1963, 1966. 1970. 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA• Document Ia protected by U.S. Copyright law end International Treatlea. Unauthorized 17 reproduction or distribution of this AlA• Document, or any portion of It, may result In severe civil and criminal penalties, and will be proa"cuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_1 which expires on 7/2312006, and is not for resale.

User Notes: Clayco A201 • Koll - lntellicenter · Dallas v2 (5·19-06) (986536t 88) R.P. Appx. 357 46 § 3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES § 3.12.1 Shop Drawings are drawings, diagrams, schedules and other data specially prepared for the Work by the Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

§ 3.12.2,Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate materials or equipment for some portion of the Work.

§ 3.12.3 Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged.

§ 3.12.4 Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents. The purpose of their submittal 'is to demonstrate for those portions of the Work for which submittals are required by the Contract Documents the way by which the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documenrs. Review by the Architeot Owner is subject to the limitations of Seotiea section 4.2.7. Informational submittals upon which the Ai'cb:iteet Owner is not expected to take responsive action may be so identified in the Contract Documents. Submittals ~that are not required by the Contract Documents may be returned by the Areffiteet Owner without action.

§ 3.12.5 The Contractor shall review for compliance with the Contract Documents, 8fJfJFOve and submikiirect the Owner to review the A:-el!itect Shop Drawings, Product Data, Samples and similar submittals required by the Contract Documents with reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of the Owner or of separate contractors.SaeeliuaJ.s wfti.ch are Ret IBaEkeel a:s revieweel for COHI:J:lHEIHee with tile Coetraet DeeiUAeRI:S aRe! approved ay t:Ae CeRkaeter may ae retYFReel ey t:Ae ,'\reffiteet witAOii:t aetieH.

§ 3.12.6 By approving and submitting Shop Drawings, Product Data, Samples and similar submittals, the Contract(lr represents that the Contractor has determined and verified materials, field measurements and field construction criteria related thereto;or will do so, and has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents.

§ 3.12.7 The Contractor shall perform no portion of the Work for which the Contract Documents require submittal and review by the Owner of Shop Drawings, Product Data, Samples or similar submittals until the respective submittal has been approved by tli,e At:eh~teet.Owner.

§ 3.12;8 l'he Work shall be in accordance with approved submittals exceptthat the Contractor shall not be relieved of responsibility for deviations from requireme nts of the Contract Documents by the Arehitect's Owner's approval of Shop Drawings, Product Data, Samples -or similar submittals unless the Contractor has specifically informed the AFehiteet Owner in writing of such deviation at the time of submittal and (J) the A::cll:iteet Owner has given written approval to the specific deviation as a minor change in the Work, or (2) a Change Order or CoRstrnetiea Cl!aege Direeti•re has been issued authorizing the deviation. The Contractor shall not be relieved of responsibility for errors or omissions in Shop Drawings, Product Data, Samples or similar submittals by the t\:eJ:titect'!; Owner's approval thereof.

§ 3.12.9 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data, Samples or similar submittals, to revisions other than those reque.~tcd by the AFeRitect Owner on previous submittals. In the absence of such wrinen notice the Arelliteet's Owner's approval of a resubmission shall not apply to such revisionS.

§ 3.12.10 The Contractor shall not be required to provide professional services which constitute the practice of architecture or engineering unless such services are spec-ifically required by the Contract Documents for a portion of the Work or unless the Contractor needs to provide such services in order to carry out the Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. The Contractor shall not be required to provide professional services in violation of applicable law. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of the Contractor by the Contract Documents, the Owner aAEI ~he Arelliteet will specify all performance and design criteria that such services must satisfy. The Contractor shall cause such services or certifications to be provided by a properly licensed design professional, whose signature and seal shall appear on all drawings, calculations, AlA Document A201TM -1997. Copyright © 191 1, 1915, 1918, 1925, 1937, 1951 , 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AtA• Document Ia protected by U.S. Copyright Law and lnternatlonel Treatloa. Unauthorized reproducti on or distribution of lhla AlA• Document, or any portion ol It, may result In severe. elvlland criminal penalties, and will be prosecuted to the 18 maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 0511912006 under Order No.1000182995_1 which expires on 7123/2006, and is not for resale.

User Notes: Ciayeo A201 • Koll · lntellicenter · Dallas v2 (5·19·06) (986536188) R.P. Appx. 358 47 specifications, certifications, Shop Drawings and other submittals prepared by such professional. Shop Drawings and other submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to the l\reJ:Uteet. Owner. The Owner aaEI tae Areaiteel shall be entitle'd to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided the Owner aRE! AreJ:Iiteet have has specified to the Contractor aJI performance and design criteria that such services must satisfy. Pursuant to this Section 3.12.10, the ,'\i'el:liteet Owner will review, approve or take other appropriate action on submittals only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. The Contractor shall not be responsible for the adequacy of the performance or design criteria required by the Contract Documents.

§ 3.13 USE OF SITE § 3.13.1 The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits and the Contract Documents and shaH not unreasonably encumber the site with materials or equipment.

§ 3.14 CUTTING AND PATCHING .§ ~.14.1 The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

§ 3.14.2 The Contractor shall not damage or endanger a portion of the Work or fully or partially completed construction of the Owner or separate contractors by cutting, patching or otherwise altering such construction, or by excavation. The· Contractor shall not cut or otherwise alter such construction by the Owner or a separate contractor except with written consent of the Owner and of such separate contractor; such consent shall not be unreasonably withheld. The Contractor .shall not unreasonably withhold from the Owner or a separate contractor the Contractor's consent to cutting or otherwise altering the Work.

§ 3.15 CLEANING UP § 3.15.1 The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or rubbish caused by operations. under the Contract. At completion of the Work, the Contractor shall remove from and about the Project waste materials, rubbish, the Contractor's tools, construction equipment, machinery and surplus materials.

§ 3.15.2 If the Contract{)r fails to clean up as provided in the Contract I)ocuments, the Owner may do so and the cost thereof shall be charged to the Contractor.

§ 3.16 ACCES.S TO WORK § 3.16.1 The Contractor shall provide the Owner and Architect access to the Work in preparation and progress whe~;ever located.

§ 3.17 ROYALTIES, PATENTS AND COPYRIGHTS § 3.17.1 The Contractor shall pay all royalties and license fees. The Contractor shall defend suits or claims for infringement of copyrights and patent rights and shall hold the Owner aaEI AFebiteet harmless from loss on account thereof, but shall not be responsible for such defense or loss when a particular design; process or product of a particular manufacturer or manufacturers is required by the Contract Documents or where the copyright violations are contained in Drawings, Specifications or other documents prepared by the Owaer er ArcJ:Iiteet. Owner. However, if the Contractor has reason to believe that the required design, process or product is an infringement of a copyright or a patent, the Contractor shall be responsible for such loss unless such information is promptly furnished to the AreJ:Iiteet.Owner.

§ 3.181NDEMNIFICATION § 3.18.1 To the fullest extent permitted by law and to the extent claims, damages, losses or expenses are not covered by U!l:Proje<;t Management Protective Liability insurance purchased by the Contractor in accordance with Section ~I L3 or (b) builder' s risk or property insurance maintained with respect to the Project. the Contractor shall indemnify and hold harmless the Owner, 1\re&i~eet, ATe&iteet' s eaam:l!tan~. aeEI ageets aaEI 8HI:f3leyees af aay ef lfiem.from and against claims, damages, losses and expenses, including but not limited to reasonable attorneys' fees, arising out of or resulting from performance of the Work, provided that such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself), but only to the extent caused by the aegligent acts or omissions of the Contractor, a Subcontractor, AIADocumentA201TN-1997.Copyrlght ©1911 , 1915,1918, 1925,1937,1951,1958. 1961, 1963, 1966, 1970,1976,1987and 1997byTheAmerican Institute of Architects. All rights reserved. WARNING: Thla AlA• Document Is protected by U.S. Copyright Law and International Treetlea. Unauthorized 19 reproduction or dlatrlbutlon of thl1 AlA• Document, or any portlon oil!, may result In severe civil and criminal penalties, and will be proseauted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_1 which expires on 7/23/2006, and is not lor resale.

User Notes: Ciayeo A201 • Koll · lntellicenter ·Dallas v2 (5· 19·06) (986536188) R.P. Appx. 359 48 anyone directly or indirectly employed by them or anyone for whose acts they may be liable, regaraless but only to the extent that such claim. damage. loss or expense is not caused by breach. or acts of omissions of the Owner. To the fullest extent permitted by Jaw, the Owner shall indemnify and hold harmless the Contractor, its Subcontractors. and the agents and employees of any of whether er them from and against claims, damages. losses and expenses. including but not limited to reasonable attorneys' fees. arising out of the Project. provided that such claim, damage, loss or expense is attributable to bodily injury. sickness. disease or death, or tO injury to or destruction of tangible prOperty, but only to the extent caused by the Owner's breach of this Contract. or the acts or omissions of the 0'Wller. the Owner' s separate contract<lrs (as provided in ~subparagraph 6.1.4). anyone directly or indirectly employed by them or anyone for whose acts they may be liable (other than the Contractor and its Subcontractors), and only to the extent that such claim.. damage. loss or expense is not caused by tt-breach. or acts or omissions of the party indemnified hereunder. Such obligation shall not be construed to negate, abcidge, or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Section 3 .18. The obligations of the Contractor and the Owner herein are subject to the provisions of Subparagraphs 4.3 . I0 and 11.4.7.

§ 3.18.2 In claim.<> against any person or entity indemnified under this Section 3.18 by an employee of the Contractor, a Subcantractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, the indemnification obligation under Section 3.18.1 shall not be limited by a limitation. on amount or type of damages, compensation or benetits payable by or for the Contractor or a Subcontractor under workers' compensation acts, disability benefit acts or other employee benefit acts.

ARTICLE 4 AD.MINISTRAliON OF THE CONTRACT § 4.1 ARCHITECT § 4.1.1 The Architect is the persen lawfully licensed to practice architecture or an entity lawfully practicing architecture identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The .term "Architect" means the Architect or the Architecl's authorized representative.

§ 4.1.2 Duties, responsibilities and limitations of authority of the Architect as set forth in the Contract Documents shall not be restricted, modified or extended without written consent of the Owaer, Caaa=ae~er Owner and Arehi~eet. the Contractor. Consent shall not be unreasonably withheld.

§ 4.1.3 If the employment ofthe Architect is terminated, the ~ontractor shall employ a new Architect against whom the Ceaa=aeter 0'Wller has no reasonable objection aatl-whose status under the Contract Documents shall be that of the fonner Architect.

§ 4.2 ARCHITECT'S ADMINISTRATION OF THE CONTRACT § 4.2.1 The Arehiteet will pre.,.iae aElmiAistratiea ef the CaAa=aet as aeserieed ia the Ceaa=aet DeeYFBeats, aaEi will ee QA ov..aer' s rej3reseAtati·~e (1) SliriBg ea~klietiee, (2) liAlil .fiaal J38Ytl}eAt is E:iae QtlS (3) with~ Owaer' s eeAei:HTeeee, frem ~:mete ~e E:ilifiAg the aAe year periea l'er eerreetiaa afWerlc E:ieserieea i:A Seetiee 12.2. The ,'\rehi~ee~ will ha•le al:ltherity ta aet eft behalf af the Owner a ely te the eKtent J3FOvided in the Centraet DoeHmeats, HBles$ otherwi!;e FBodifiea ia writing iAaeeardaaee •Nith ether J3Fe''isiens af ·the Cana=aet.

§ 4.2.1 The Contractor shall keep the Owner infonned of the progress and quality of the Work. Within thirty (30) calendar days after full execution and delivery of the Contract Documents and before submittal of the first progress payment invoice, and at each construction progress meeting on site. Contractor shall submit to Owner for Owner' s reasonable approval (i) a revised Project Schedule (the most recent schedule so approved in writing by Owner becoming the revised Project Schedule for all purposes of the Contract Documents) showing changes from the prior Project Schedule, the sequence in which Contractor proposes to perform the Project. the start and completion dates of all separable portions of the Project in sufficient detail. manpower forecasts (incremental and cumulative percent complete), materials procurement and delivery plans. the anticipated Substantial Completion Date and the anticipated date that Contractor will tender possession of the Project and any other information reasonably specified by 0'Wller pertaining to the construction schedule, along wi:th (ii) a proforma Project Schedule that "looks ahead" two weeks containing the same details as set forth in subpart (i) above. Contractor agrees to adhere to the Project Schedule and attend and participate in scheduled progress and coordination meetings called by Owner. Within thirty (30) calendar days after full execution and delivery of the Contract Documents and before submittal of the first progress payment invoice. and at each construction progress meeting on site, Contractor shall also submit to Owner a revised budget for the Project, in form and content reasonably approved by Owner. including all hard and soft construction costs {the "Bud2et"l. along with a construction cost report in fom1 and content reasonably acceptable to Owner. Contractor shall use commercially reasonable efforts to keep the Budget as accurate as possible.

AlA Document A2011M - 1997. Copyright © 191 1, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute ol Architects. All rights reserved. WARNING: This AJA• Document Ia protected by U.S. Copyright Law and International Treatlu. Unauthorized 20 reproduction or dlatrlbuUon o1lhis AIA8 Document, or a.ny portion ol It, may result In severe olvila.nd criminal penaJUea, end will be pros&euted to the maximum extent possible under the law. This document was prOduced by AlA software at 14:42:43 on 05!19/2006 under Order No.1000182995_ 1 which expires on 7!2312006, and is not for resale.

User Notes: Clayco A201 • Koll • lntellicenter - D.allas v2 (5-1 9·06) (986536188) R.P. Appx. 360 49 Contractor shall provide Owner with monthly reports no later than the tenth (lOth} day of each month, which shall. at the minimum, include the most current Project Schedule and a Project Change Order log update (with pricing information).

§ 4.2.2ln the event Contractor's perfonnance of the Project is not in compliance with the Project Schedule, Owner may, in writing, reguire the Contractor to submit its plan for schedule recovery, or specify in writing the steps to be taken to achieve compliance with such Project Schedule, and/or exercise any other remedies under the Contract Documents. Contractor shall thereupon take such commercially reasonable steps as may be directed by Owner or otherwise necessary to improve its progress.

§ 4.2.2 The Arel:iiteet, as a Tef!Feseatali \'e ef !he O•...•aer, will visit the site at ieterva-ls Bflf!ref!riate ta the stage ef the Ceatraeter's 9f1eratieas (1) te eeeeA'Ie geRerally fa&~iliar 'i'o<i.tli aBEl te keefl the Owaer iafermeEI aeel:lt the j:JFE>gress aREI ~u~ity ef the pe:Ft:ieH ef the W~:~rk eemf!leted, (2) te eadeaver te gliara the Qv,r-ser agaiast Elefeets aREI EleeeieReies i.e the Wefl(, aaEI (3) te Eleterffiiae ia geaeral if the Werle is eeiag tJerfermea ia a meaaer iaEiiealiag that the 'Nark, 'lihea f~:~Uy semf!leted, •.vill ee ia ascordaAse with the Coatraet Deeumeats. gewever, the Arehiteet will aet be re~EI te A'!alce exhaa;sti¥e er eeatiaue~;~s ea site iasf!eetieas te e~ek the E}l:la!ity er EJuantity ef the Werle The Arehiteet will aeiti:ler h&><'e eeatral ever er ei:large ef, Aor ae respaasiele fEJr, the eeastruetiea meeRs, metheEis, tecllaiEjHes, seq~;~eaees er fJFeceEiures, or fur the safety f!FeCautieas aRd f!Fegram.s ia eeaaeetiea with the \lledc, siRe e thet;e are solely tRe Coatractor's right~• aAd resf!oasieilities uader the CeRtraot Documeats, eKeept as provided ia SeetioA J .3 .I.

§ 4.2.3 Contractor acknowledges and agrees Prudential Insurance Company of America (''Prudential") shall employ one or more. construction consultants or engineers (collectively. the "Prudential Construction Consultant") to advise Prudential with respect to the progress of construction and compliance of construction with the construction plans and specifieations for the Project. applicable legal requirements and good construction practices. Contractor shall inform the Prudential Construction Consultant of the usual location. date and time of periodic construction meetings for the Project. The Prudential Construction Consultant shall be permitted to attend all such construction meetings. Contractor shall provide the Owner and Prudential Construction Consultant with at least three (3) business days' pri0r notice of any change in the date, time or location of a periodic construction meeting. Contractor shaH permit Owner and the Prudential Construction Consultant to have access to the Project during the period of construction to enable the Owner and Prudential Construction Consultant to examine all aspects of such construction and all matters related thereto. Contractor shall provide Owner and the Prudential Construction Consultant wjth at least three (3) business days' prior written notice of each of the following trades commencing construction at the Project: mechanical. -electrical, plumbing. framing, paving, curtain wall installation and foundations. Contractor shall provide to Owner and the Prudential Construction Consultant reasonable access during normal business hours to all books. records: shop drawings. and engineering and other reports and tests related to the Project as may be reguested by Owner or the Prudential Construction Consultant. The Owner and the Prudential Construction Consultant shall have the right to make copies of all such materials. Contractor shall provide to Owner and the Prudential Construction Consultant a _reasonable working space and access to telephone and other such facilities as may be reasonably requested by Owner or the Prudential. Construction Consultant. Upon execution of this Agreement, Contractor shall deliver to Owner and the Prudential Construction Consultant a list of all current and potential bidders who may perform work at or supply materials to the Project together with a list of al.l bid packages which were 'sent to any of such bidders and all bids which were received from such bidders. Such bidding information shall be updated by Contractor on a monthly basis by delivering revised lists to Owner and the Prudential Construction Consultant. The Owner and the Prudential Construction Consultant shall have the right to review any bid packages or any bids received upon request.

§ 4.2.3 T~ Arelliteet v•iH aot ee reSflOASiele for the Cootraetor's failure te f!erferm the WerlE iR aeeerdaflee witA me ~iremeAlA ef the Cem:raet Deenuaeflts. The Ai'e&iteet wil:l aet J:ia¥e ooatreJ o¥er or ettarge of aaEI will sot ee resf!easiele Fer aets er emi:ssieas ef the Ceetraeter, Suaeeatreetors, or their ageats er employees, er any other perseAs er eat:it:ies f!erfermiRg f!OrtieRs ef t.Ae Werk.

§ 4.2.4 If requested by Owner. Contractor shall furnish it with the names of the subcontractors who have performed or are -performing the Work hereunder. ~Communications Facilitating Contract Admi_nistration. ell6ef!t as et.Aerwise flFEH<iEieEI iR tAe Coatraet Dee~:~mefltS or wlleA direct GOJfiffil:IRieatieas have eeea Sf!eeiaJiy at~theri:l!etl, Ute Owaar ttAQ ContF<teter !lhall eadeB'Ior te cemmuaicate wilh eaeh ether threugh the Arefiiteet al:lout matters arisiag e1:1t ef er relatiag te the Coatr.aet. CemmuaieatieR!i l:ly aaEI witR the Arettiteet's eeRs'l:lltants shall ee U~re1:1gh the Arehiteet. . Communications AlA Document A201 1 M - 1997. Copyright© 1911, 1915, 1918, 1925, 1937, 1951 , 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA• Document Is protected by U.S. Copyright Lllw and International Treatlaa. Unauthorized reproduction or dlatrlbutlon of thla AlA• Document, or any portion of It, may reault In severe civil and criminal penalties, and will be prosecuted to the 21 maximum extent possible under the lew. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182-995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 • Koll · lntellicenter · Dallas v2 (5·19·06) (986536188) R.P. Appx. 361 50 by and with Subcontractors and material suppliers shall be through the Contractor. Communications by and with separate ·c ontractors shall be through the Owner.

§ 4.3.5 Bft!led OR the Are8iEeet' s evall:latiORS ef me Ceatraeter's Aflfllieatieas fer Paymettt, the ArehiEeet will Ie'lievl aad eertify the amo1:1ats d1:1e the Coatraeter aad will iss1:1e Certifieates fer Paymeat ia n1:1eR arao1:1at.s.

§ 4.2.6 Upon request of Owner, Contractor will furnish it with a certificate satisfactory in form to Owner that goods ·furnished by Contractor in performance of the Contract Documents were produced in full compliance with the requirements of Sections 6, 7, and 12 of the Fair Labor Standards Act of 1938, as amended, and the regulations and orders of the U.S. Department of Labor issued under Section 14 thereof. ~The Arehiteet Owner will have authority to reject Wor.k that does not co.nform to the Contract Documents. Whenever the Architeet Owner considers it necessary or advisable, the Arei:liteet Owner will have authority to require inspection or testing of the Work in accordance with Sections 13.5.2 and 13.5.3, whether or not such Work is fabricated, installed or completed. However, neither this authority of the Ac:-e8iteet Owner nor a decision made in good faith either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the Are8iteet Owner to the Contractor, Subcontractors, material and equipment suppliers, their agent~ or employees, or other persons or entities performing portions of the Work.

§-4.3J..§ 4.2.8 As set forth in paragraph 3.12 above, the Owner will review submittals such as Shop Drawings.

Product Data and Samples. The Architeet Owner will'l'eview and approve or take other appropriate action upon the Contractor's submittals such a<> Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents. The Aremteet's Owner's action will be taken with such reasonable promptness as to cause no delay in the Work or in the activities of the ~Contractor or separate contractors, while allowing s~1ffieieat time ia ti:le Arel:liteet's fiF&iessieaal jl:llilgmeat to permit adequate review. Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities, or for substantiating instructions for installation or performance of equipment or systems, all of which remain the responsibility of the Contractor as required by the Contract Documents. Tile AxcbiEeet's Owner's review of the Contractor's submittals shall not relieve the Contractor of the obligations under Sections 3.3, 3.5 and 3.12. The J\:'eftiteet's Owner's review shall not constitute approval of safety precautions er, 1:1aless stherwise SfJeeii'teally stated by the Arehitee~. or of any construction means, methods, techniques, sequences or procedures. The Arehiteet's Owner's approval of a specific item shall not indicate approval of an assembly of which the item is a component.

§ 4,3,8 The AFebiteet will pref1are Cba:Age Orders aeEI CaaGtr~etiea C8aage Direetives, aaEI may &l:ltheril!e mf.nor ehruiges ia the Work as fJFOViEieEi ill Seetiea 7.4.

§ 4.2.9 The Owner will submit CO Requests as provided in Section 6.5 of the Agreement. ~The Arehiteet Owner wilt conduct inspections to determine the date or dates of Substantial Completion and the date of final ee~letiea, will reeeive aaEI ferwarEI te ti:le Owaer, for the 0'JiAer's reviev,. ll:fle reeo~s, writtea warraaaes aaEI related Eleeameats req1:1ired by the Coatract aad assemble<:! by the Caatraetor, ll:fiEI w+ll iss1:1e a fiaal Certifieate fer Pay mea~ l:lfiOR sempliaaee with t8e req~ireraeats ef the Ceatraet Dec1:1meats.completion.

§ 4.3.10 If the Owner aaEI,'\:Fci:litoeet agFee, ti:le Aichitect •Nill J3revide eae or IIISFEI J3rejeet represeatati'les to assist ia eaR"yiag e~t the Ai=eaiteet's respoasieilities at ti:le site. The d1:1ties, reHfJeRsiailities aaEi liraitatioas of i~t:ltberity ef Sl:l€R fiTejeet FEifJFesea~tiYe!'l shallee as set ferth ia Qft exhteit ta be iACOffJOFaEeEi ia tile Cealfaet Dasl:lmeats.

§ 4.2.11 Contractor represents and warrants it is an independent contractor and an employer subject to all applicable unemployment compensation, occupational safety and health. workers' compensation, or similar statutes so as to .relieve Owner of _any responsibility or liability for treating Contractor's employees as employees of Owner for the purpose of their safety or of keeping records. making reports or paying of any payroll taXes or contribution.

Contractor agrees to defend, indemnify and hold Owner harmless and reimburse them for any expense or liability incurred under said statutes in connection with employees of Contractor. including a sum equal to any unemployment benefits paid to those who were Contractor's employees. where such benefit payments are charged to Owner under any merit plan or to Owner reserve accounts pursuant to any statute. Nothing contained in the Contract Documents or any subcontract awarded by Contractor shall create any contractual relationship between any subcontractor and Owner.

AIADocument A201 ~ - 1997.Copyright @19"11, 1915,1918,1925, 1937,1951. 1958, 1961, 1963, 1966, 1970,1976.1987and 1997byTheAmerican Institute ot Architects. All rights reserved. WARNING: Thla AlA• Document Ia protected by U.S. Copyright law and International Treatlea.llnauthorlzed 22 reproducUon or dlatrlbullon of this AIA8 Document, or any portion of It, may result In aevere civil and criminal penalties, and will be proaecuted to tho mnlmum extent possible under the law. This document was pr.oduced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_1 which expires on 7/2312006, and is not for resale.

User Notes: Clayco A201 • Koll · lntellicenter · Dallas v2 (5· 19·06) (986536188) R.P. Appx. 362 51 § 4.2,11 The t\rehheet will iatsrpret aeEi EieeiEie matters eooeemiag 13erfermaaee aaaer oaEI reEJllll=emeat~ af, the Contract DocHRleRffi oR writtea reetHe.st of eil:Rer H'te OvfHer or Coaa-eeter. The ,'\rehiteet's FeSfJORse te SHch reEJHests will be maEie ie writiag wit Ria aay time limits agreeE11:1~ea or etherwise with reaseaaele prem)!ltaess. If ao agFeeme~ is RlaEie ceacemiag H'te time withia which iaterpretatieas reEjHireEI ef me Arc:!Htec.t shall ee fl:lmisheEI iR eomtJ~ianee vlith a=tis Seetiea 4.2, tkea EieJay shall aet ee reeegRir:eEi ea aeeeaRt ef faihu=e ey the Arehiteet te farnish s1:1ch iaterpFetatieas Yatil 15 Eiays after 'NAtteR ref:}Yest is IRilEie fer them.

§ 4.2.12 Contractor represents and warrant~ that it will keep and have available all necessary records and make all payments. reports. collections and deductions and otherwise do any and all things so as to fully comply with all federal. state and local laws. ordinances and regulations as they affect performance of the Contract Documents, so as to fully relieve and protect Owner from any and all responsibility or liability therefore or in regard thereto: (I) the production. purchase and sale. furnishing and delivering. pricing, and use or consumotion of materials. supplies and equipment (2) the hire, tenure or conditions of employment of employees and their hours of work and rates of the payment of their Work. and (3) the keeping of record~. making of reports. and the payment. collection and/or deduction of rederal. state. commonwealth and local taxes. contributions. pension funds. welfare funds. or similar assessments.

§ 4.2.12 bi!ElFJ!lretatieas &REI Eieeisieas ef the Areliiteet will ee eeasiHteAt witk: tile iRteAt of aRt:! reaseAaely iRferaele frem me Ceaka~t DeeYmefl~ aaa wiU ae iR writieg er ia the farm af drawiags. Wliea maiEiRg SHell iaterpFetatiBRS ana iajlial Eiesisioas, the. :1\J:ehitest will eREieaYer te seeYre faia=tful ~erformS:Rce by eeth OwReF ant:! Ceaa=aeter, will Ret shew JJartiality te either anEI wiJI aet ee liaele fer resylts of iaterpretatiens or Eieeisioar; se reAEiereEi ia geeEI f11ith.

§ 4.2.13 T!!e Are:!Hteet's Eleei:sieas ea matters relatiag te aestlietie effect •n•iJI ee flfl&l if eonsisteat with the iRteRt e*f!Fe:;seEi ia the CoH:tTact DecYmeats.

§ 4.2.13 Nothjng in the Contract Documents shall be deemed to represent that Contractor. or any of Contractor's ·employees or agents. are the agents. representatives or employees of Owner. Contractor shall be an independent contractor and shall have resoonsibility for and control over the details and means for performing the Proiect.

Anything in the Contract Documents that may appear to give Owner the right to direct Contractor as to the details of the perf0rmance of the Project or to exercise a measure of control over Contractor shall mean that Contractor shall follow tbe desires of Owner onJy as to the intended results of the Project.

§ 4.3 CLAIMS AND DISPUTES § 4.3.1 Definition. A Claim is a demand or assertion by one of the parties seeking, as a matter of right, adjustment or interpretation of Contract terms, payment of money, extension of time or other relief with respect to the terms of the Contract. The term "Claim" also includes other di~putes and matters in question between the Owner and Contractor arising out of or relating to the Contract. Claims must be initiated by written notice. The responsibility to substantiate Claims shaU rest with the party making the Claim.

§ 4.3.2 Time Limits on Claims. Claims by either party must be initiated within 2 1 days after occurrence of the event giving rise to such Claim or within 21 days after the claimant first recognizes the condition giving rise to the Claim, whichever is later. Claims must be initiated by written notice to the Architect aad the other party.

§ 4.3.3 Continuing Contraat Performance. Pending final resolution of a Claim except as otherwise agreed in writing or as provided in Section 9.7 .I and Article 14, the Contractor shall proceed diligently with performance of the Contract and the Owner shall continue to make payments in accordance with the Contract Documents.

§ 4.3.4 Claims for Concealed or Unknown Conditions. If conditions are encountered at the site which are (I) subsurface or otherwise concealed physical conditions which differ materially from those indicated in the Contract Documents or (2) unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exi.<;t and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, then notice by the observing party shall be given to the other party promptly before conditions are disturbed and in no event later than 21 days after first observance of the conditions. Tlie Areliitect willf3F9fl'!~tly iRvest:igate sl:lcl:! cenEiiheRs aad, if ~Re~· Eiiffer materially aRE! ea1:1se Qfl inerease er Eieerease ia tke CeRa=aeter' ~ east ef, er t:ime re€:j:HireEI fer, perfern:taaee ef any f'art ef tae \Veri<, •.viii reeeRl!BeAEi aa ef:}eitable aEljYstmeat ia the Ceaa-aet St~fl'! er Ceaa-eet Tia1e, or eats. If the :1\J:ehitect determiaes that tile eoaditieas at the site are. Ret materially EiiffereRt from tkese inEiisateEi iR lhe CeAlraet Deeymeats aREI that ae ehaRge ia tae terms of tae CeRtraet is jYstifieEI, H'te ,'\reJ:iiteel saall se ROt:ify a=te o·. . aer aRE! Ceaa-aeter iR writing, stat:iag the reaseas. Claifl'lfi ey eia=ter flertj ill ElfJJ!lEISit:iea te SYeh EletermiRatieR mYSt ee maae \ Athia 21 Elays after a=te Architeet has gi'leA Rotiee afthe EieeisieR. If

AlA Document A201lN-1997. Copyright © 1911, 1915, 1918, 1925, 1937. 1951 , 1958, 1961, 1963., '1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA• Document Is protected by U.S. Copyright Lew and lntem•tlonal Treatlea. Unau1horlzed 23 reproduction or dletrlbutlon of thll AlA• Document, or any portion ot It, may result In severe ~;:lvlland criminal penaltlea, and will be prosecuted to the maximum extent posaible under the law. This document was produced by AlA software at 14:42:43 on 05119/2006 under Order No.1 000182995_ 1 which expires on 7/2312006, and is not for resale.

User Notes: Clayco A201 · Kall· lntellicenter · Dallas v2 (5·19·06) (986536188) R.P. Appx. 363 52 the conditions encountered arc materially different, the Contract Sum and Contract Time shall be equitably adjusted, but if the Owner and Contractor cannot agree on an adjustment in the Contract Sum or Contract Time, the aajllstm~t ~shall be referred te the Areh:i.teet fer ie:ilial dete!'ffii:flatieR, Sl:lejeet te Fl:lrtl:!er praeeeaiRgs Pl:lfSI:IaBt t9 Seetiea 4.4.considered a Claim and be resolved in accordance with Sections 4.4-4.6 below.

§ 4.3.5 Claims for Additional Cost. If the Contractor wishes to make Claim for an increase in the Contract Sum, written notice as provided herein shall be given before proceeding to execute the Work. Prior notice is not required for Claims relating to an emergency endangering life or property arising under Section 10.6.

§ 4.3.6 If the Contractor believes additional cost is involved for reasons including but not limited to (I) a written interpretation from the Ai'ehitect, Owner, (2) an order by the Owner to stop the Work where the Contractor was not at fault, (3) a written order for a minor change in the Work issued by the Areaiteet, Owner. (4) failure of payment by the Owner, (5) terminati.o n of the Contract by the Owner, (6) Owner's suspension or (7) other reasonable grounds, Claim shall be filed in accordance with this Section 4.3.

§ 4.3.7 Claims for Additional Time § 4.3.7.1 If the Contractor wishes to make Claim for an increase in the Contract Time, written notice as provided herein shaH be given. The Contractor's Claim shall include an estimate of cost and ofprobable effect of delay on progress of the Work. In the case of a continuing delay only one Claim is necessary.

§ 4:3.7.2 If eaverse weather eoaairioas are the easis fer a Claiftl fer aelairieRal tiftle, SHch Claim shall ee elecl:IFAeRtea ey aala Sl:IBStEllltiat4ng that Vf'eather eena.itioes were aeserm!H fer the periea ef time, eo1:1la eot !:lave eeea reaseaaely I!:Baeit>atea ena.haEla:B ea¥erse effect OR the sched1:1lea cOBSa.=l:letioa § 4.3.7.2 Adverse weather conditions or adverse site conditions caused by adverse weather may be the basis for a Claim for additional time to the extent that the days lost during a particular calendar month due to such inclement weather exceeds three (3) days of lost time (in work days) for the calendar month. If adverse weather conditions or adverse site conditions caused by adverse weather are the basis for a Claim for additional time, such Claim shall be documented by·data substantiating that either (i) weather conditions had an adverse effect on the scheduled construction. or (ii) weather conditions prevented the type of Work then scheduled, or (iii) adverse site conditions caused by adverse weather prevented the type of Work then scheduled.

§ 4.3.8 Injury or Damage to Person or Property. If either party to the Contract suffers injury or damage to person or property because of an act or omission of the other party, or of others for whose acts such party is legally responsible, written notice of such injury or damage, whether or not insured. shall be given to the other party within a reasonable time not exceeding 21 days after discovery. The notice shall provide sufficient detail to enable the other party to investigate the matter.

§ 4.3.9 If unit prices are stated in the Contract Documents or subsequently agreed upon, and if quantities originally contemplated are materially changed in a proposed Change Order er Cossl:f~:~el:ioR Clumge Directive so that application of such unit prices to quantities of Work proposed will cause substantial inequity to the Owner or Contractor, the applicable unit prices shall be equitably adjusted.

§ 4.3.10 Claims for Consequential Damages. The Contractor and Owner waive Claims against each other for consequential damages arising out of or relating to this Contract. This mutual waiver includes: .1 dan1ages incurred by the Owner for rental expenses, for losses of use, income, profit, financing, business and reputation, and for loss of management or employee productivity or of the services of such persons; and .2 damages incurred by the Contractor for principal office expenses including the compensation of personnel stationed there, for losses of financing, business and reputation, and for loss of profit except anticipated profit arising directly from the Work.

This mutual waiver is applicable, without limitation, to all consequential damages due to either party's termination in accordance with Article 14. Nothing contained in this Section 4.3.10 shall be deemed to preclude an award of liquidated direct damages, when applicable, in accordance with the requirements of the Contract Documents.

AlA Document A201"' - 1997. Copyright © 1911, 19l5, 1918, 1925, 1937, 1951 , 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The ATflerican Institute of Architect$. All rights reserv~ WARNING: This AIA8 Document Ia protected by U.S. Copyright Law end lnternstlonsl Trestles. Unauthorl:ted 24 reproduction or dlstrlbuUon of thlt AlA Docum ent, or any portion of lt1 may result In severe civil and criminal penaiUea, and will be prose<:utad to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_1 which expires on 7/23.12006, and is not for resale.

User Notes: Clayco A201 • Koll • lntellicenter - Dallas v2 {5-19·06) (986536188) R.P. Appx. 364 53 § 4.4lNDEMNITY & RESOLUTION OF CLAIMS AND DISPUTES § 4.4.1 Deeiniaa ef Arekiteet. ClaiFRs, iaelaeiag tk9se allegiag aR err9r 9F 9R'Mssi9R l:)y tke kekiteet aut elEelal:iiag mefie arisiag aaeer SeetieR!i 10.3 tA.rewgl:l lQ.5, shall ee refen-ee initially £9 tile i\:rek:it.eet fer eeeisioa. Aa iaitial eeeisi9B By tRe t\reftiteet shftlJ Be f8Ej!:IH8Q aS a eeftE!itiea f!F8eeEleat te IBeEf.iatiOB, areiB"-atiOB OF litigatioB of alJ ·Claims eetweeR tke Ceatraeter aae Owaer arisiRg f'AOF to tke eate fiaal!lllYFfi8At is eue, URiess 3Q eayl; kave fltl!iSee after the ClaiFR kas eeea referree to Hie AreA:iteet with ae eeeisiea l:laviag eeea reaaeree ey tA:e Arekiteet. Tke Arehiteet will aot eeeiee dispwtes betweeR the Ceatraeter aaa perseRs or eAtities otker thQR tke Owaer.

§ 4.4.1 Contractor agrees to defend. indemnify and hold Owner. the affiliated companies of Owner. and all of their directors, officers, employees. agent~ and representatives. harmless from and against any claim, demand, cause of action. liability. loss or expense arising: .1 By reason of Contractor's actual or asserted failure to comply with any law, ordinance. regulation. rule or order. or with the Contract Documents. This Section 4.4. 1.1 includes, but is not limited to, fines or penalties by government authorities and claims arising from Contractor' s actual or asserted failure to pay taxes .

.2 From actual or asserted violation or infringement of rights in any patent. copyright, proprietary information. trade secret or other property right caused or alleged to be caused by the use or sale of goods. materials, methods, processes. designs or information. including construction methods. construction equipment and temporary wnstruction facilities. furnished by Contractor or its subcontractors in performance of the Project. Should any goods or services provided by Contractor become, or appear likely to become. the subject of a claim of infringement of a patent. copyright or other property right Contractor shall. at Owner's option, either procure for Owner the right to continue using such gOOds or services. replace same with equivalent. non-infringing goods or services. or modify the goods ()r services so that the use thereof becomes non-infringing. provided that any such modification or replacement is ofequal quality and provides equal perfonnance to the infringing goods or services.

.3 From actual ,or alleged contamination. pollution. or public or private nuisance. directly caused by any negligence or intentional misconduct of the Contractor or its subcontractors.

§ 4.4.2 The Arehiteet v.411 :eeviev; Claims aRa w~tl:liR tea aays af the reeeifjt ef the ClaiFR tal~ aee er FRere af the feJia?l'ia:g ae~aes: (I) FeEJ:~test aEieitieeal SYppertiag eata freFR the elaimaet era respoase witk SI:IJ3pertieg data A-am me ether f!'!l:llJ', (2) rejeet t:l!e ClaifR mwkele aria flart, (3) aj3preve the Claim, (4) sHggest a e9FRfl£9FRifle, er (5) advise the flaFties taat tke Arebiteet is l::IAable to resolve the ClaiFR if tke Arehiteetlaeks saffieieat ieferFRatiea te e"alaate tke FBerit§ 9f the Qaiffl er if the i\:rehiteet e9A€Il::lees_that, ia the Anzhitest' s sale eiseretiea, il weala ee ifl:appropriate fer the 1\i:ehiteet to resolve the ClaiFR.

§ 4.4.2 Contractor's indemnity obligations in this Subparagraph 4.4 arc subiect to the provisions of Subparagraphs 4,3.10 and 11.4.7 and ArtiCle 10. and shall apply to the extent that the amount to be indemnified was not caused by the negligence or willful misconduct of. or by defects in design furnished by, the party to be indemnified. Contractor's defense and indemnity obligations shaD include the duty to reimburse any attorneys' fees and expenses reasonably incurred by Owner for legal action to enforce Contractor's indemnity obligations.

§ 4.4.3 Ia tWall::lat-iag Claiffl5. the Arsltiteel FRay, aut skall Bet ee eeligatee te, seasalt witk flf Reek ffiforFRalieR freffi eitlte.r f!arty 9F froFR f'e£S9as vlith Sf!eeial lffiowleage er eJEf!ertise who FRay assist tlte Arehiteet iR reaeeriRg a eeetsiae. The Arekiteet may reEJaest the Owner te authorize reteaaea of sael:l l"ersoRs at tke Owaer' s eM:pease.

§ 4.4.3In the event that the indemnity provL~ions in the Contract Documents are contrary to the law governing the Contract Documents, then the indemnity obligations applicable hereunder shall be construed to be to the fullest extent allowed by applicable law.

§ 4.4.4 If tke Arehiteet reEJaests a party to (:lFOVide a reS(:lOR:68 te a Clai-m er te ~mish aeaitioaal Sl::lj3j39rti-ag eal:a, s.aeh flarly shall resfleRe, withia tee eays after reeeipt ofsush re~1:1est, aHa shall either fl£9\'ide a resf!oese oe tke FeEJ:l:lestee SllflflOI'tiRg eata, QQ~'iSe the Arekiteet \'/ReA tlte FeSfiORSe er Sllfl!"9rtiR:g eata wiH ee famiskee or aEivise tbe :Arehi*eet that BO SYflfl9rURg eata will ee fl::lmishee. Upea reeeiflt of the respease 9f sappertiag eata, if aey, me Arehiteet will eit-Rer rejeet er apf!reve tlte ClaiFR ia whole or ia f!art. § 4.4.4 With respect to claims by employees of Contractor or its subcontractors. the indemnity obligations created under this Section 4.4 shall not be limited by the fact of. amount or type of benefits or compensation payable by or for Contractor. its subcontractors or suppliers under any workers' compensation, disability benefits. or other employee benefits acts or regulations. and Contractor waives any limitation of liability or immunity arising from workers' compensation or such other acts or regulations.

AlA Document A201TM - 1997. Copyright @ 1911 , 1915. 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: Thla AlA• Document Ia protected by U.S. Copyright Law and lntematlonel Treaties. Unauthorized 25 reproduction or distribution of this AlA" Document, or any portion of It, may result In sevel'8 civil and criminal penaltlea. and will be prose-cuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 • Koll · lntellloenter • Dallas v2 (5· 19·06) (986536188) R.P. Appx. 365 54 § 4.4.5 The ;\rekiteet vt'ill &flflFO're or Fejeet ClaciHis ey writteR deeisioa, wR:ich shall state tke reauoa~ tkerefer ltfld wJ:tiee shall aeti:fy tee flarties af aay eJ.laage ia tke Caatraet S1:1H1 oF CoRtraet TiHie or eatk. The a'f'lj:l£0\'al er rejeetioa ef a Cla'i:£6 ey the AreR:iteet shll'll be fiaal aHEi eiad:iag OR the j'larties bl:lt Sl:lbj eet te med:iatiea aRel arbitratiOR.

§ 4.4.5 Unless Contractor has provided Owner with a bond or other form of security in form and amount reasonably acceptable to Owner. amounts may be retained from payments otherwise du·e Contractor as shall reasonably be considered necessary to satisfy any mechanics' or materialmen's lien.~ for damages that fall within Contractor's indemnity obligations under this Section 4.4 until such claims suits or liens have been settled and satisfactory evidence to that effect .has been furnished to Owner. Notwithstanding anything to the contrary in the foregoing. if the Contractor provides the Owner with a lien bond or other form of security sufficient to cover mechanics' liens filed by the Contractor or any Subcontractor. the Owner shall not withhold payment as set forth in this Section or in Section 9.5. I herein. The Contractor will diligently pursue the removal of any lien filed by a Subcontractor. and. regardless of whether a lien bond is provided as set forth above. during such time the Owner shall not satisfy or pay off the lien or otherwise settle or compromise the Contractor's claim; provided, however. that promptly after a final. non-appealable judgment is rendered directing that the property be sold to satisfy the lien. and in any event prior to tbedate ofsuch sale. the Contractor will satisfy the lien and pay the Contractor all amounts owing.

§ 4.4.& Vlkea a writteH Eleeisiea ef the ,'\i:ekiteet states tJ.lat (l) tke aeeisieR is fiaal al:lt Sl:lajee.t te H!ed:iaaea aaa areitratieR aad (2,) a aemaREI fer arbitratieR af a ClaiR! severed by SliGh eeei&ieR HII:ISt ae HIaGe witJ.liR 30 days afte:r tBe Sate OR wfl:iea the 'flart)' Hl.aking tl:!.e S8FHa.Rel reseives the flRal WFJ\'teH EleeisieH, thea faiiYf@ te demaREI areitrati9R witkia said 39 d:ays' fleried skaJI resYit ia the Archlteet'!> deeision becoHiing final aad biaaiag l:lflOR tke Owaer afld CeRtraeter. If tl:le ,'\:rekiteet Eeaeers a deeisiea a.fEe£ arbitratiea preeeeeiag!l J:lave eeea iaitiated, s1:1eJ:i deeisien may be eHtered as e\"'.:Eleeee, e1:1t saa!I Ret Sl:lfleFsede arbitratieR J3FOeeediegs l:lftiess tke deeifd8R is aeeeptaele tO all parties eeeeemea.

§ 4.4.6 Notwithstanding any provision in the Contract Documents to the contrary, Owner and Contractor mutually waive any and all claims against the other for special, consequential or punitive damages arising out of or relating to the Contract Documents. This waiver includes but is not limited to damages incurred for rental expenses, for losses of use, income, profit, financing, business and reputation, and for loss of management or employee productivity or of the services of such persons; § 4.4.7 Upon receipt of a Claim against the Contractor or at any time thereafter, the Arel:!iteet er tJ.le Owner may, but is not obligated to, notify the surety, if any, of the nature and amount of the C laim. lf the Claim relates to a possibility of a Contractor's default, the ,'\i:el:!iteet OF the Owner may, but is not obligated to, notify the surety and request the surety's assistance in resolving the controversy.

§ 4.4.8 If a Claim relates to or is the subject of a mechanic' s lien, the party asserting such Claim may proceed in accordance with applicable law to comply with the lien notice or filing deadlines prior to resolution of the ClaiR! B)' ~by mediation or by arbitration.

§ 4.5 MEDIATION § 4.5.1 Any Claim arisin,g out of or related to the Contract, except Claim6 relaliag to aes~hetie effeet !IRa e*eept tbose waived as provided for in Sectioll$ 4.3 .J 0, 9.I 0.4 and 9 . I0.5 shall, after iniaal Eleeisiea by tke A.reJ.liteet er 30 days after s~:~emissiea ef ~l:!e ClaiR! te tJ.le A:eJ.liteet, be subject to mediation as a condition precedent to arbitratieR er binding arbitration.~Except with the Owner's prior written consent, neither the assertion of a Claim nor the iastitl:ltiea prosecution of ~mediation or eEjl:litable pFeeeediags by either party.arbitration hereunder shall cause any Work to be haJted pending resolution of same.

§ 4.5.2 The parties shall endeavor to resolve their Claims hy mediation which, unless the parties mutually agree otherwise, .shall be in accordance with the Construction Industry Mediation Rules of the American Arbitration Association C\llTently in effect. Request for mediation shall be filed in writing with the other party to the Contract and with the American Arbitration Association. The request may be made concurrently with tbe filing of a demand for arbitration but, in such event, mediation shall proceed in advance of arbitration or legal or equitable proceedings, which shaJl be stayed pending mediation for a period of 60 days from the date of filing, unless stayed for a longer period by agreement of the parties or court order.

AlA Document A201 110 -1997. Copyright @ 1911 , 1915. 1918, ~925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, t 976, 1987 and 1997 by The American Institute of Architects. All rights reserve~. WARNING: This AJA Document Is p rotected by U.S. Copyright Law and lntematlon11l Treaties. Unauthorized reproducUon or distribution of t hla AJA Document, or any portion of It, may result In eevere civil and criminal penalties, and will be prollelcuted to the 26 maximum extent poss.lble under the law. This document was produced by AlA software al t4:42:43 on 05119/2006 under Order No.1 000182995_1 which expires on 7/2312006, and is 11otlor resale.

User Notes: Clayco A201 • Koll · lntellicenter · Dallas v2 (5·19·06) (986536188) R.P. Appx. 366 55 § 4.5.3 The parties shall share the mcd!iator's fee and any filing fees equally. The mediation shaU be held in the place where the Project is located, unless another location is mutually agreed upon. Agreements reached in mediation shall be enforceable as settlement agreements in any court having jurisdiction thereof.

§ 4.6 ARBITRATION § 4.6.1 Any Claim arising out of or related to the Contract, except Claims relatiag te aesthetie effeetanEI e:Kee13t those waived as provided for in Sections 4.3.10, 9.1 0.4 and 9.1 0.5, shaH, after Elee3sioa ey t.he Arehi~eet or 30 Elays after s~JemissieR ef tae Claim te tae Afeftiteet, shall be s ubject to binding arbitration. Prior to arbitration, the parties shall endeavor to resolve disputes by mediation in accordance with the provisions of Section 4.5.

§ 4.6.2 Claims not resolved by mediation shall be decided by binding arbitration which, unless the parties mutually agree otherwise, shall be in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association currently in effect. The demand for arbitration shall be filed in writing with the other party to the Contract and with the American Arbitration Assoeiatiea, aaEI a eej3y 5hall ee f:iJeEI wim me AJ.:GAiteot.Association. BY lNITIALING IN THE SPACE BELOW YOU ARE AGREEING TO HAVE ANY DISPUTE DECIDED BY NEUTRAL ARBITRATION AND YOU ARE GIVING UP ANY RIGHTS YOU MIGHT POSSESS TO HAVE THE DISPUTE LITIGATED IN A COURT OR JURY TRIAL.

Owner Initials Contractor Initials

§ 4.6.3 A demand for arbitration shall be made within tke time limits specified i-s Seetieas 4.4 .e eBfi 4.€i.l as &j3j31ieaele, anEI iR ether eases \'lithia a reasonable time after the Claim has arisen, and in no event shall it be made after thedate when institution of legal or equitable proceedings based on such Claim would be barred by the applicable statute of limitations as det·ermined pursuant to Section I ~.7.

§ 4.6.4 Limitation on Consolidation or Joinder. No arei~atiea arisiRg o11t of or relatiag te the Cena=aet shall iacl11de, ey eefl:'leliEiatiee erjei-BEier or iR aay aEher mQfiRer, the Arekiteet, the i\::effiteet's empleyees er eefltlai~Rts, e:Keej3t ey v,rriuea eeaseat.eeataiaiag specifie refereaee to me Agreemeat aaEI sigRee by the Arehiteet, OwRer, Cea~aeter EI8Eiany ether persea er eat:ity tiollght to ee jeiAed. ~le arei~atieR shall iRelllele, ey eoaseliEiatieR erjeieEier or ia any etd:ler maRBer, fJal'ties ether man td:le 0'1;ser, CeRa-actor, a se13arate eena=aetor as EieserieeEI i-s: A"'tiele 9 aad ather persons sllestaijliia:lly iJwelYeEI iRa eemmea c.'jHesaea offact or law whe5e preseRce is re€JilireEI if eeH!plete relief is te ee aeeen:EieEI ia areitra~ieR. No 13ersoR er eatity ether than tile Owaer, CeRtraerer er a fiej3arate eentraeter as Eleserieed ia Acr-ae!e 6 shall ae iBciYdeEI as ae erigiaal th-ir4 fJartY er aEIEiitietHtl third fJaFtY te aR a;reia=atien whese iaterest er respeAsieility is i-as11bs~anti a.J. Ceeseet te areia=atioR iR\'eh•iRg aa aEiditieRal 13erseR er eatity tihall ROt eeastit11te eeaseat to areitratie:a ef a Claim Ret eleserieed thereia or with a j3ersee or effiity aet B:IHHee er described thereiR. The foregoing agreement to arbitrate and other agreements to arbitrate with an additional person or entity duly consented to by parties to the Agreement shall be specifically enforceable under applicable law in any court havjng jurisdiction thereof.

§ 4.6.5 Clailtl$ and Timely Assertion of Claims. The party filing a notice of demand for arbitration must assert in the demand all Claims then known to that party on which arbitration is permitted to be demanded.

§ 4.6.6 Judgment on Final Award. The award rendered by the arbitrator or arbitrators shall be final, and judgment may be entered upon it in accordance with applicable law in any court having jurisdiction thereof.

ARTICLE 5 SUBCONTRACTORS § 5.1 DEFINITIONS § 5.1.1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the Work at the site. The term "Subcontractor" is referred to throughout the Con1ract Documents as if singular in number and mearis a Subcontractor or an authorized representative of the Subcontractor. The term "Subcontractor" does not include a separate contractor or subcontractors of a separate contractor.

§ 5.1.2 A Sub-subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to perform a portion of the Work at the site. The term "Sub-subcontractor" is referred to throughout the Contract

AlA Document A201'M -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961 , 1963, 1966. 1970, 1976, 1987 and 1997 by The· American Institute ol Architects. All rights reserved. WARNING: This AtA• Document Is protected by U.S. Copyright Lew and International Treallea. U'nauthorlzed 27 reproduction or dlatrlbutlon of this AlA" Document, or any portion ollt, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_ 1 which expires on 7/2312006, and is not for resale.

User Notes: Clayco A201 • Koll - lntellicenter - Dallas v2 (5-19-06) (98.6536188) R.P. Appx. 367 56 Documents as if singular in number and means a Sub-subcontractor or an authoriz.ed representative of the Sub- subcontractor.

§ 5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE WORK § 5.2.1 Unless otherwise stated in the Contract Documents or the bidding requirements, the Contractor, as soon as practicable after award of the Contract, shall furnish in writing to the Owner tbro~:~gli ~e Arekiteet the names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for each principal portion of the ~Work and will, upon request therefor by Owner. update such list during construction of the Project. The A rchitect Owner will promptly reply to the Contractor in writing stating whether or not the Owner er lke Afebiteet, Owner, after due investigation, has reasonable objection to any such proposed person or entity. Failure of the Owner or Architect to reply promptly shall constitute notice of no reasonable objection. Notwithstanding anything herein to the contrary, the Contractor may subcontract portions of the Work to the Contractor or divisions of the Contractor pursuant to a subcontract agreement. and the subcontract sum thereof shall constitute a Cost of the Work. but only if such subcontract agreement is approved in writing in advance by Owner.

§ 5.2.2 The Contractor shall not contract with a proposed person or entity to whom the Owner er Arekheet has made reasonable and timely oojection. The Contractor shaJJ not be required to contract with anyone to whom the Contractor has made reasonable objection.

§c5.2.3 lf the Owner er Arekiteet has reasonable objection to a person or enti"ty proposed by the Contractor, the Contractor shaJJ propose another to whom the Owner ar A::ebiteet has no reasonable objection. If the proposed but rejected Subcontractor was reasonably capable of performing the Work, the Contract Sum and Contract Time shall be increased or decreased by the difference, if any, occasioned by such change, and an appropriate Change Order shall be issued before commencement of the substitute Subcontractor's Work. However, no increase in the Contract Sum or Contract Time shall be ano wed for such change unless the Contractor has acted promptly and responsively in submitting na.mes as required.

§ 5.2.4 The Contractor shall not change a Subcontractor, person or entity previously selected if the Owner er Arehiteet makes reasonable objection to such substitute.

§ 5.3 SUBCONTRACTUAL RELATIONS § 5.3.1 By appn~priate agreement, written where legally required for validity, the Contractor shall require each Subcontractor, to the extent of the Work to be performed by the Subcontractor, to be bound to the Contractor by terms of the Contract Documents, and! to assume toward the Contractor all the obligations and responsibilities, including the responsibility for safety of the Subcontractor's Work, which the Contractor, by these Documents, assumes toward the Owaer aae :t\Feliiteet. Owner. Each subcontract agreement shall preserve and protect the rights of the Owner aRe Arel:titeet under the Contract Documenlc; with respect to the Work to be performed by the Subcontractor so that subcontracting thereof will not prejudice such rights, and shall allow to the Subcontractor, unless specifically provided otherwise in the subcontract agreement, the benefit of all rights, remedies and redress against the Contractor that the Contractor, by the Contract Documents, has against the Owner. Where appropriate, the Contractor shall require each Subcontractor to enter into similar agreements with Sub-subcontractors. The Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract agreement, copies of the Contract Documen~ to which the Subcontractor will be bound, and, upon written request of the Subcontractor, identify to the Subcontractor terms and conditions of the proposed subcontract agreement which may be at variance with the Contract Documents. Subcontractors will similarly make copies of applicable portions of such documents available to their respective proposed Sub-subcontractors.

§ 5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS § 5.4.1 Each subcontract agreement for a portion of the Work is assigned by the Contractor to the Owner provided that: .1 assignment is effective only after termination of the Contract by the Owner for cause pursuant to Section 14.2 and only for those subcontract agreements which the Owner accepts by notifying the Subcontractor and Contractor in writing; and .2 assignment is subject to the prior rights of the s urety, if any, obligated under bond relating to the Contract.

AlA Document A201 TIII-1997. Copyright © 1911 , 1915, 1918, 1925, 1937, 1951 , 1958, 1961 , 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA" Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized 28 reproduction or dletrlbutlon of this AlA• Document, or any portion of it. may result In eevere civil and criminal penalties, and will be prosecuted to the maximum extent poSJJible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_ 1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 • Koll · lntellicenter · Dallas v2 (5·19.06) (986536188) R.P. Appx. 368 57 § 5.4.2 Upon such assignment, if the Work has been suspended for more than 30 days, the Subcontractor's compensation shall be equitably adjusted for increases in cost resulting from the suspension.

ARTICJ.:E 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS § 6.1 OWNER'S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS § 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insura.n ce and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Section 4.3.

§ 6.1.2 When separate contracts arc awarded for different portions of the Project or other construction or operations 0n the site, the term "Contractor" in the Contract Documents in each case shall mean the Contractor who executes each separate Owner-Contractor Agreement.

§ 6.1.3 The Owner shall provide for coordination of the activities of the Owner's own forces and of each separate contractor with the Work of the Contractor, who shall cooperate with them. The Contractor shall participate with other separate contractors and the Owner in reviewing their construction schedules when directed to do so. The Contractor shaH make any revisions to the construction schedule deemed necessary after a joint review and mutual agreement. The construction schedules shall then constitute the schedules to be used by the Contractor, separate contr;,tctors a,nd the Owner until subsequently revised.

§ 6.1.4 Unless otherwise provided in the Contract Documents, when the Owner performs construction or operations related to the Project with the Owner's own ~forces or pursuant to separate contracts with other contractors. the Owner shall be deemed to be subject to the same obligations and to have the same rights which apply to the Contractor under the Conditions of the Contract, including, without excluding others, those stated in Article 3, this Article 6 and Articles 10, 11 and 12. Without limiting the generality of the foregoing. if the Owner awards separate contracts with any other contractors for any work at the Project site during the performance of the Work. then the Owner shall cause each and every such other contractor (and their subcontractors of any tier) to name the Contractor as an additional insured on all liability insurance policies maintained by such other contractor (and their subcontractors of any tier) to the extent such policies cover liabiJities relating to the Project or other work being performed at the Project site. The Owner shall furnish to the Contractor written evidence that such insurance is in effect and that the Contractor has been named an additional insured as aforesaid upon the first to occur of the award or execution of any such separate contract.

§ 6.2 MUTUAL RESPONSIBILITY § 6.2.1. The Contractor shall afford the Owner and separate contractors reasonable opportunity for introduction and storage of their materials and equipment and performance of their activities, and shall connect and coordinate the Contractor's construction and operations with theirs as required by the Contract Documents.

§ 6.2.2 If part of the Contractor's Work depends fo( proper execution or resu Its upon construction or operations by the Owner or a separate contractor, the Contractor shall, prior to proceeding with that portion of the Work, promptly report to the ~apparent discrepancies or defects in such other construction that would render it unsuitable for such proper execution and results. Failure of the Contractor so to report shall constitute an acknowledgment that the Owner's or separate contractor's completed or partially completed construction is fit and proper to receive the Contractor's Work, except as to defects not then rea-;onably discoverable.

§ 6.2.3 The Owner shall be reimbursed by the Contractor for costs incurred by the Owner which are payable to a separate contractor because of delays, improperly timed activities or defective construction of the Contractor. The Owner shall be responsible to the Contractor for costs incurred by the Contractor because of delays, improperly timed activities, damage to the Work or defective construction of a separate contractor.

§ 6.2.4 The Contractor shall promptly remedy damage wrongfully caused by the Contractor to completed or partially completed construction or to property of the Owner or separate contractors as provided in Section 10.2.5.

§ 6.2.5 The Owner and each separate contractor shall have the same responsibilities for cutting and patching as are described for the Contractor in Section 3.14.

AlA Document A201TM - 1997. Copyright© 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The Americatl lns1itute of Architects. All rights reserved. WARNING: This AlA• Document Ia p rotected by U.S. Copyright Law and International Treatlea. Unauthorized 29 reproduction or d~trlbutlon of thla AlA• Docwnent, or en~ portion of It, may reaullln severe clvlllnd criminal ponlltlu, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05119/2006 under Order No.1 000182995_ 1 which expires on 7123/2006, and is not for resale.

User Notes: Clayco A201 • Koll · lntellicenter · Dallas v2 (5·19·06) (986536188) R.P. Appx. 369 58 § 6.3 OWNER'S RIGHT TO CLEAN UP § 6.3.1 If a dispute arises among the Contractor, separate contractors and the Owner as to the responsibility under their respective contracts for maintaining the premises and surrounding area free from waste materials and rubbish, the Owner may clean up and the Ar-eiliteet will alloeate the cost among those FeSf'Oiliitble.responsible shall be equitably allocated.

ARTICLE 7 CHANGES IN THE WORK § 7.1 GENERAL § 7.1.1 Changes in the Work may be accomplished after execution of the Contract, and without invalidating the Contract, by Change Order, Coastr~etioa Cllange Di£eet1ve or oraer fer a miaor ehange in the Work, subject to the limitations stated in this Article 7 and elsewhere in the Contract Documents.

§ 7.1.2 A Chaage OrEier sllall ae aaseEf lipOR agreeffieRt affiORg the Owner, Contraetor ana Arehlteet; a CeHstruetiofl Change Difeetive Fe~ ~:!ires agreeffient ay tlle Owner ana Ai:Gaiteet aA:d RiQy or ll'l&Y AOt ae agreed to ay !:he Contraetor;· aa oFde£ for a £Bitter e!lange ia the Work may ee iss1:1ea ey the t\rehiteet a:loae.

§ 7.1.2 A Change Order shall be based upon agreement between the Owner and the Contractor as provided in Sectj()n 6.5 of the Agreement.

§ 7.1.3 Cha~:~ges in the Work shall be performed under applicable provisions of the Contract Documents, and the Contractor shall proceed promptl'y, unless otherwise provided in the Change OFaer, CeHstRtetion Change Direetive er erEier fer a ~Hiaer ehange iB the Work.Order.

§ 7.2 CHANGE ORDERS § 1.2.1 A Chaege OrEier is a written instrHtHent prepared ey the ,'\ftlJ:Iiteet aaa sigaea ay the 0VIflef, Coatraeter l:lHEI Areaiteet, statiag tkeif agreetHMlli~e:n all ef the fellewiRg: ,1 eaaage in tke Werk; .2 the amooot ofthe adjust~Hent, if aay, ia the Conwaet 8~ffi; and ,3 the e)(teRt ef tlle aeljast~Heet, if aRy, in the Ceatrast Time.

§ 7.2.1 If the other provisions of the Contract require that a Change Order be issued and the Owner and the Contractor are unable to agree upon the terms thereof as provided in Section 6.5 of the Agreement within ten days of a written demand given by either party to the other party to so agree. then the dispute shall be resolved ·as provided in Article 4 herein. Tn any such dispute resolution proceedings the parties agree that the terms of the Change Order set forth in subparagraphs (i)-(vii) of Section 6.5 ofthe Agreement shall be determined.

§ 7.2.2 Methoa!i In any dispute..resolution proceeding over a Change Order, the methods used in determining adjustments to the Contract Sum may include those Jjsted in Section ~7.33.

§ 7.2.3 Contractor shall not suspend performance of the Contract Documents during the review and negotiation of any Change Order.

§ 7.3 CONSTRUCTION CHANGE DIRECTIVES § 1.3.1 A Ceastruetiea Oiaage Difeeti..,·e is a written oraer !*E!PaFea ay t:l:te Arehiteet afl£1 sigaed ay the Owner aad ,<\fehiteet, Elireetiag a ehaage iR tlle Werk prier to ag:ree~HeRt on aEijlist!fleet1 'if any, in the CoRa:&et Sl:llfl or Contrast TIH!e, Of 9oth. The Owner ~Hay ay COf!Strl:letioa Ckaage Direetive. witROI:Il iflvaliaatiag tke Coatraet, orEler ehange s in the \Veri< within tlle general seope of the CoBtraet eonsi!itiAg ef aEiditieRS, aeletiens Of other re,·isioas, the Ceatraet S1:1ffi ana Contraet Time 9etag aelj1:1s*eEi eeeerEI:iRgly.

§ 7.3.1 !Intentionally Omitted].

§ 1.3.2 ;>'\ Ceast:rlietien ChaBge Difeeti'<'e saall ae l:lsea ia tlle aasenee of le~al agreement OH the terms of a Chaage OFEier.

§ 7.3.211ntentionally Omitted).

§ 7.3.3 If the Coastn1etien Change Direeti·;e Order provides for an adjustment *&-ill...the Contract Sum, the adjustment shall-may be based on one of the following methods: AlA Document A2011M -1997. Copyright© 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: Thle AlA• Document Ia protected by U.S. Copyright Law 811d International Treatlea. Unauthorized 30 reproduction or dlatrlbutlon of this AlA• Document, or any portion ollt, may result In eevere civil 811d criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_1 wiJich expires on 7/2312006, and is not for resale.

User Notes: Clayco A201 • Koll - lntellicenter • Dallas v2 (5· 19·06) (986536188) R.P. Appx. 370 59 .1 mutual acceptance of a lump sum properly itemized and supp<>rted by sufficient substantiating data to permit evaluation; .2 unit prices stated in the Contract Documents or subsequently agreed upon; .3 cost to be determined in a manner agreed upon by the parties and a Rll:ltl:laJly aeeeptaele fix eEl er Contractor Fee based on the percentage feet-set forth in Section 5.1.2 of the Agreement: or .4 as provided in Section 7.3.6.

§ 7.3.4 UflOA Feeeipt of a CoRstFl:letioR ClulAge DiFecti·;e, ilie CeAtraeter shall premf!t.IY preeeeEI witfl the ellaage iA the Werle iAWll¥eEI. aREI aEI¥ise t:Re Arelliteet ef t!ie Ceatr-aeter' s agTeemeRt er ElisagreemeRt with tf:le JaetheEI, if aRy, pro•,riaea iA tile Con!ltRietieR Change Directive for aetermiaiag the proposed aEiji:IStmeat iR tl:!e Ceatraet Sl:lm er Ceatract Time.

§ 7.3.4 [Intentionally Omitted!.

§ 7.3.5 IJnteritionally Omitted).

§ 7.3.5 A CefiStrl:letieA Cl:!aage Directive sigaee ay tile Ceatraeter iRaieates the agreemeat ehJ:te Cealfaeter there•.vith; iaoluaiag aEij~:~stmeRt iR Ce;ntrast S1:1m. aRG Ceetrast Tim.e er t:Re Rltiltf:led fur Eletenaiaiag tl:!em. .. SYeh agFeeffteRt shall be eft:eel:ive immeEiiMely aAEi shall ee reeoraea as a CI:!Mlge Order.

§ 7.3.6 lf-In any dispute between the Contractor does Ret reSfHlRa j:lrflFRpltly ar disagrees witf:l and the Owner over the method for adjustment in the Contract ~Sum in connection with any Change Order or in connection with. any other adjustment in the Contract Sum to which the Contractor is entitled under the Contract Documents. then the method and the adjustment shaH be determined by tile J\.Fekiteet on the basis of reasonable expenditures and savings of those performing the Work attributable to the change, including, in case of an increase in the Contract Sum, a reasoaaele allewaRse fer eYerlleaa aR9 ~refit. Contractor' s Fee based on the percentage set forth in Sectjon 5.1.2 of the Agreement. In such case, aae alse 1:1aEier Sectiea 7.3.3.3, the Contractor shall keep and present, in such form as the Arehiteet Owner may reasonably prescribe, aa-a reasonably itemized accounting together with appropriate supporting data. Unless otherwise provided in the Contract Documents, costs for the purposes of this Section 7.3.6 shall be limited to the following: .1 costs of labor, including social security, old age and unemployment insurance, fringe benefits required by agreement or custom, and workers' compensation insurance; .2 costs of materials, supplies and equipment, including cost of transportation, whether incorporated or consumed; .3 rental costs of machinery and equipment, exclusive of hand tools, whether rented from the Contractor or others; .4 costs of premiums for all bonds and insurance, permit fees, and sales, use or similar taxes related to the Work;aaa .5 additional costs of supervision and field office personnel directly attributable to the eaaage.change; and .6 if the Agreement is an AlA Document A Ill or A 121. all other costs which would be considered to be Costs of the Work under the Agreement.

§ 7.3.7 The amount of credit to be .allowed by the Contractor to the Owner for a deletion or change which results in a net decrease in the Contract Sum sha!J be actual net east as eell41rmea B)' the Architect. cost. When both additions and credits covering related Work or substitutions are involved in a change, the allowance for overhead and profit shall be figured on the basis of net increase, if any, with respect to that change.

§ 7~3.8 Pending final determination of the total cost of a CeRstrHetiea Change Direetive te t:Re Q·,..'fler, Order, amounts not in dispute for such changes in the Work shall be included in Applications for Payment accompanied by a Change Order indicating the parties' agreement with part or all of such cos.ts. For aay portiea ef costs and the Owner shall be obligated to pay such east that FemaiAs costs together with a Contractor's Fee based on the percentage set forth in aiSfl\:lte, the Areaiteel will malce aa iAteriFR aeteFFRiaatioR for pl:lrpeses efmeately eeft:iijeatiea fur payFReAt fer these eests. That aeterFRinatioa Section 5.1.2 of eost shan adjust the Coatract 81:1m ea tee same basis as a Cfiaage OrEier, sY&jeet Agreement to the right of either ~arty to disagree &fla assert a elaim ia aeeora&flee with Article 4.Contractor.

§ 7.3.9 When the Owner and Contractor agree with tf:le aeteFFRiaatiea ftl&Ele by the Architect concerning ~.ill!Y adjustments in any one or more of the Work. the Contract Sum aM-or the Contract Time, or otherwise reach AlA Document A201"' -1997. Copyright © 1911 , 1915, 1918, 1925, 1937, 1951 , 1958, 1961 ,1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: Tllla AJA Document II protected by U.S. Copyright Law and International Treaties. Unauthorized 31 reproduction or distribution of lhla AlA• Document, or any portion of It, may result In eevare civil and criminal penaiUaa, and will bl proMCuted to the maximum extent possible under the law. This document was produced·by AlA software at 14:42:43 on 05/1912006 under Order No.1000182995_ 1 which expires on 7123/2006. and Is not for resale: User Notes: Clayco A201 - Koll • lntellicenter - Dallas v2 (5· 19·06) (986536188) R.P. Appx. 371 60 agreement upon the aEij1:1stmeets. adjustments in the items set forth in subparagraphs (i)-(vii) of Section 6.5 of the Agreement. such agreement shall be effective immediately and shall be recorded by preparation and execution of an appropriate Change Order.

§ 7.4 MINOR CHANGES IN THE WORK § 7.4.1 The Architect Owner will have authority to eR:Ief-make minor changes in the Work not involving adjustment in the Contract Sum or extension of the Contract Time and not inconsistent with the intent of the Contract Documents. Such changes shall be effected by written order and shall be binding on the OwAer ana Contractor. The Contractor shall carry out such written orders promptly.

ARTICLE 8 TIME § 8.1 DEFINITIONS § 8.1.1 Unless otherwise provided, Contract Time is the period of time, including authorized adjustments, allotted in the·Contract Documents for Substantial Completion of the Work.

§ 8.1.2 The date of commencement of the Work is the date established in the Agreement.

§ 8.1.3 The.date of Substantial Completion is the date certifies B)' the Arehiteet when Substantial Completion is actually achieved in accordance with Section 9.8.

§ 8.1.4 The term "day" as used in the Contract Documents shall mean calendar day unless otherwise specifically defined.

§ 8.2 PROGRESS AND COMPLETION § 8.2.1 Time limits stated in the Contract Documents are of the essence of the Contract. By executing the Agreement the Contractor confirms that the Contract Time is a reasonable period for performing the Work.

§ 8.2.2 The Contractor shall not knowingly, except by agreement or instruction of the Owner in writing, prematurely commence 0peratioos on the site or elsewhere prior to the cffccti vc date of insurance required by Article 11 to be furnished by the Contractor and Owner. The date of commencement of the Work shall not be changed by the effective date of such insurance. Unless the date of commencement is established by the Contract Documents or a notice to proceed given by the Owner,.the Contractor shall notify the Owner in writing not less than five days or other agreed period before commencing the Work to permit the timely filing of mortgages, mechanic's liens and other security interests.

§ 8.2.3 The Contractor shall proceed expeditiously with adequate forces and shall achieve Substantia] Completion within the Contract Time.

§ 8.3 DELAYS AND EXTENSIONS OF TIME § 8,3,1 If the CeAa:aeter is clelayea at ilAY time ie the commencement or progress ef th:e Werk BY ae act er eegleet of the Owaer er Afehitect, er ef Bfl eff!ployee ef either, or ef a sepllfate eeea-aet:or emJ:lloyea l:ly !fle OwRer, or ey changes eFE!ereE! iA the Wor-k, or ey la~er EHSfH:Ites, t'ire, I:IBI:ISHal aelay in deliveries, HAaveiaaele eas1:1ahies or ether caYses eeyeea t:Re Cent:raetor's eeea-el, er BY aelay al:ltheri:tea By the Owfler peAEiiRg meaiatieA aRe areil:fatioA, er B~' ether ea~:~ses which the Ai'eliitect aetefftliaes nlay ji:IStify aelay, thea the CeRtract Time shall Be ex:teaaea B)' QaRge OFEler fer s1:1eh reaseAaele tiate as the ArcJ:Iitect may cletermiee.

§ 8.3.1 If the Contractor js delayed at any time in the commencement or progress of the Work that adversely affect the sequencing of the Work resulting 1n a delay in Substantial Completion by (i) an act or neglect of the Owner. or of an employee of Owner. or of a separate contractor emplgyed by the Owner. or (ii) changes ordered in the Work. or (iii) labor disputes, or (iv) fire. or (v) unusual delay in deliveries. or (vi) the imposition after the date of the Agreement of guotas or other restrictions on the ability of the Contractor to obtain material or eguipment. or (vii) unavoidable casualties or (viii) other causes not reasonably foreseeable on the date the Work commenced or which are beyond the Contractor's control, or (ix) adverse weather conditions or adverse site conditions as set forth in Section 4.3.7.2, or Cx) delays caused by governmental authorities (not caused as a result of fault on the part of the Contractor) or (xi) delay authorized by the Owner pending mediation and arbitration (provided that no such event has been caused by the delay or negligent or other wrongful act or omission of the Contractor or any of its employees.or agents). and provided that Contractor has delivered to Owner wdtten notice of the occurrence of such event within ten (I 0) business days after the occurrence thereof. then the Contract Time shall be extended by ,AIADocumentA20tTM -1 997. Copyrlght ©191 1,1915, 1918.1925, 1937, 1951,1958. 1961. 1963.1966, 1970.1976, 1987and 1997by TheAmerlcan Institute of Architects. All rights reserved. WARNING: This AIA8 Document Is protected by U.S. Copyright Lew and International Treaties. Unauthorized 32 reproduction or distribution of I his AIA8 Ooc~m~ent, or any portion of it, may result In .evere civil and criminal penalties, and will be proaecutad to the maximum ex1ent possible under the Jaw. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_1 which expires on 7/2312006, and is not for resale.

User Notes: Clayco A201 • Koll - lntelllcenter - Dallas v2 (5-19·06) (986536188) R.P. Appx. 372 61 Change Order for a reasonable time and the Contract Sum shall be adjusted to the extent reasonably necessary to compensate the Contractor for any increases in the Cost of the Work caused by such delay.

§ 8.3.2 Claims relating to time shall be made in accordance with applicable provisions of Section 4.3.

§ 8.3.3 This Section 8.3 does not preclude recovery of damages for delay by either party under other provisions of the Contract Documents.

ARTICLE 9 PAYMENTS AND COMPLETION § 9.1 CONTRACT SUM § 9.1.1 The Contract Sum is stated in the Agreement and, including authorized' adjustments, js the total amount payable by the Owner to the Contractor for performance of the Work under the Contract Documents.

§ 9.2 SCHEDUlE OF VALUES § 9.2.1 Before the first Application for Payment, the Contractor shall submit to the Afe~Owner a schedule of values allocated to various portions of the Work, prepared in such form and supported by such data to substantiate its accuracy as the Afehiteet Owner may require. This schedule, unless objected to by the Arehtteet, Owner. shall be used as a basis for reviewing the Contractor' s Applications for Payment.

§ 9.3 APPLICATIONS FOR PAYMENT § 9~3:1 At least tett-twenty days before the date established for each progress payment, the Contractor shall submit to the Afehiteet Owner an itemized Application for Payment for operations completed in accordance with the schedule of values. Such application shall be notarized, if required, and supported by s uch data substantiating the Contractor's right to payment as the Owner er Areaiteet may reasonably require, such as 'c opies of requisitions from Subcontractors and material suppliers, and reflecting rctainage if provided for in the Contract Documents. See the Agreement for additional provisions relating to Applications for Payment.

§ 9.3.1.1 As tJrevieeEI i:a Seetiea 7.3.8, sae8 <lfltJlieatteas !Bay i:ne!aee re~¥:~eSEs fer paymeRt oa accm:mt of ceaages h~ tee \llerJE wftieh ha-ve eeea preperly a~:~therii!ee ey CeatJ!fl:l6tieR ChaAge Di:reeti'leS, er ey iaterim eetermiaat:iea s ef Hie ,'\fehiteet, el:!t aet ~t iaell:leee ia Chaage Onlers.[lntentionaJly Omitted].

§ 9.3.1.2 Such applications may not include requests for payment for portions of theW ork for which the Contractor does not intend to pay to a Subcontractor or material supplier, unless such Work has been performed by others whom the Contractor intends to pay.

§ 9.3.2 Unless otherwise provided in the Contract Documents, payments shall be made on account of materials and equipment delivered and suitably stored at the site for subsequent incorporation in the Work. Jf approved in advance by the Owner, payment may similarly be made for materials and equipment s uitably stored off the site at a location agreed upon in writing. Payment for materials and equipment stored on or off the site shall be conditioned upon compliance by the Contractor with procedures satisfactory to the Owner to e stablish the Owner's title to such materials and equipment or otherwise protect the Owner's interest, and sball include the costs of applicable insurance, storage and transportation to the site for such materials and equipment stored off the site.

§ 9.3.3 The Contractor warrants that title to all Work covered by an Application for Payment will pass to the Owner no later than the time of payment. The Contractor further warrants that upon submittal of an Application for Payment all Work for which Certilieales fer Pe.~·meat payments have been fJte•,ie asly iss!ieEI aae f>Bymeats received from the Owner sl:ta:ll, ta the eest ef Hie CeAtraeter' s kRewleEige, iafefRlQtiea &REI eelief, shall be free and clear of liens, claims, security interests or encumbrances in favor of the Contractor, S ubcontractors, material suppliers, or other persons or entities making a claim by rea~on of havjng provided labor, materials and equipment relating to the Work. To the extent permitted by applicable law. good and clear title to all materials furnished by Contractor under the Contract Documents for the Project shall pass to Owner upon incorporation into the Pro ject. Contractor shall ensure that subcontractors from whom Contractor obtains materials do not retain or reserve title to such items. and Contmctor shall defend, indemnify and hold Owner harmless from any such claims by Contractor's subcontractors.

Notwithstanding the foregoing, the care. custody and control of Contractor's Work incorporated into the Project shall remain with Contractor until such Work has been accepted jn writing by Owner and shall thereon pa~s to Owner unless Owner notifies Contractor in writing that such care. custody and controJ is assumed by Owner at a earlier date.

AlA Document A201lltl -1997. Copyright © 191 1. 1915. 1918, ~925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976. 1987 and 1997 by The American Institute of Architects. All rights reserve<J,. WARNING: This AlA Document Is protected by U.S. Copyright Law and International Treatlas. Unauthorized reproduction or dlatrlbutlon of lhla AlA Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the 33 mBJCimum extent possible under the law. This document was prod~Jced by AlA so1tware at 14:42:43 on 05/19/2006 under Order No.1000182995_ 1 which expires on 7/2312006, and is not for resale.

User Notes: CJayco A201 · Koll · lntellicenter ·Dallas v2 (5·19·06) (986536188) R.P. Appx. 373 62 § 9.4 CERTIFICATES FOR PAYMENT § 9.4.1 The A::ebi~eet Owner will, within ~twenty days after receipt of tbe Contractor' s Application for ,Payment, either isstte to ru!Y...the Owfler a Certifieate amount of such Application for Paymeat, with a eOfJ:Y Payment to the Contractor, fur sae8 ameaat as the Areaiteet Eietermiaes is flFefJerl:y Eil:le, or notify the Contractor aaEI Ovmer in writing of the Arehiteet' s Owner's reasons for withholding eertifieatiea payment in wbole or in part as provided in Section 9.5.1.

§ 9.4.2 The issttaaee of a Certifieate far Paymeat will eeastitate a refJreseataaoa ey the Afehiteet to the Ovmer, easeEI OR the AreJ:iiteet's e·lalttatioa of the Work liftS the euta eomfJrisiAg the AfJfJiieatioa fur Pa:ymeat, that the Work BaS progresS~d tO the f)OiAt iadieated and that; to ffie aest of the Arebiteet' S knowledge, information aad eelief, the qttalit~· of the ~.J.'ork is ia aeeoffla.a ee ·...·ith the Coaaoaet DoettmeaM. The foregeiag refJreseatatieHs are s~:~bjeet to aH. e'•aklatiea of me Wor-k fur eeaforJBaaee wim the Ceatraet Dee~:~meats l:lfJOft S~:~estaal:ial ComfJletiea, te resttlts of s~:~aseq~:~eat tests aea iAsfJeetioas. te eerreetiea ef raiaor Ele•viatioa:; kom the Ceatraet Doeameats 13rior to eomfJletiea aAd to speeit=is EJttalifisatioas exfJres:;ee ey the Areliiteet. The iss1:1aeee of a Certifieate fur PayCAeAl will Atrther eoasti~te a refJrese.RtatioB; that the CoRtractor is eRtitlee to fJaymeRt ia the ameliA\ eettifiea. However, the issl!aaee ef a Certifieate fer Paylfleftt v.~ll A.ot !Je a represeAtatioa tkat the A:ehiteet haR (1) maae exka11stive er eeatia11e11s as s:ite iaspeetiORS to elieek the Ejl:la!ity OF qttaatity of the Work, (2) reviewea 60ftSlr11StieA me&r.s, memoas, teCAAiEjl:le s, seqttenees or fJFeeer:ltires, (J) re·1iewed eopies of req1:1isitioas receiwe fro£A 8~:~9eoAtraetors aBEl material Sl:lfJfJliers aBEi ether Elata reql:lested ey IRe OwRer to s~:~astaatiate the Ceatraeter's rigAl to J')aymeRt, or (4) maae eK&ffiiRatioR to a!)eeftB:iH how er for what J3t.lfPOS8 the Contractor has 1:1see lfloRey l"revie1:1&1y l"aid ea aeeeaat ef tl:le Ceatraet Slim:flntentionally Omitted).

§ 9.5 DECISIONS TO WITHHOLD CERTIFICATION § 9.5.1 The Arehiteet m~y withJ:iold a Certifieate i'or Paymef!t is whale er :ia part, to If the extea.t reaseaaely aeeessary to fJfOteet the 0\\'fier, if ia the Arekiteet' !l E>flinioR the refJreseatatioRs to the Owner reql:lired ay SeetieR 9.4 .2 eaf'Jiot ae made. If the Afehiteel iAt~aaele te eertify withholds a payment ia the ame~:~al of all or any portion of an Application for Payment. then tbe a\fJfJJieatioa, !:lie ,<\i:ehiteet Owner will notify the Contractor aHa OwHer as provided in Section 9.4. I. If the Contractor and Arehiteet the Owner cannot agree on a revised amount, the A:-ehiteet Owner will promptly iss1:1e a Certifieate for PaymeRt for lli!Y_the amount fer-which the Arehltect is aale te malce s~:~ca R!lfJreSea~oas to the Owaer. not in dispute. The ,'\Fehiteet Owner may a:lse-withhold a Certitieate fur Paylfleat payment or, because of subsequently discovered evidence, may ~request a refund of the whole or a part of a Certifieate fur Paymeflf payment previously tssue&,-made to such extent as may be reasonably necessary i:fl-the A£e8iteet's BfJinioa to protect the Owner from loss for which the Contractor is responsible, iaelaEiia:g less resulting from acts and on1issions described in Section 3.3.2, because of: .1 defective Work not remedied; .2 third party claims filed or reasonable evidence indicating probable filing of such claims against Owner, the Land or the Project or reasonable evidence indicating the probable filing of such claims. unless security acceptable to the Owner is provided by the Contractor to protect Owner against such claims (such security may include, without limitation. Contractor's compliance with its indemnification or bonding obligations under the Ceatraerer;Contract); .3 failure of the Contractor to make payments properly to Subcontractors or for labor, materials or equipment; .4 reasonable evidence that the Work cannot be completed for the unpaid balance of the Contract Sum; .5 damage to the Owner or another contractor; .6 reasonable evidence that the Work wiU not be completed within the Contract Time, and that the unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay; er .7 persistent failure lo carry out the Work in accordance with the Contract bocuments; or .8 without limiting the generality of the above, any other reason for which Owner is entitled to withhold or deduct payment under the express provisions of the Contract Documents.

§ 9.5.2 Wben the above reasons for withholding eertifiaatiea payment are removed, eertit=ieatiea payment will be made for amounts previously withheld.

AlA Document A201TM -1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The A.nnerican Institute of Architects. All rights reserved. WARNING: This AlA• Document Is protected by U.S, Copyright Law and International Treaties. Unauthorized 34 reproduc~on or dletrlbutlon of lhll AlA• Document, or any portion of It, may result In severe civil end criminal penaiUes, end will be pro~eeuted to the maximum extent poulble under the law. This document was produced by AlA so1tware at 14:42:43 on 05/19/2006 under Order No. 1000182995_ 1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 · Koll - lntelllcenter • Dallas v2 (5-1 9·06) (986536188) R.P. Appx. 374 63 § 9.6 PROGRESS PAYMENTS § 9.6.1 After the Arehiteet Owner has issaeE:I a CeFtif;ieate received an Application for PayFAeRt, Payment which complies with the requirements of the Contract Documents, the Owner shall make payment in the manner and within the time provided in the Contract DeeaRle.R£5, aeEI shall se eetify the Arehiteet.Documents.

§ 9.6.2 The Contractor shall promptly pay each Subcontractor, upon receipt of payment from the Owner, out of the amount paid to the Contractor on account of such Subcontractor's portion of the Work, the amount to which said Subcontractor is entitled, retlecling percentages actually retained from payments to the Contractor on account of sucb Subcontractor's portion of the Work. The Contractor shaH, by appropriate agreement with each Subcontractor, require each Subcontractor to make payments to Sub-subcontractors in a similar manner.

§ 9.6.3 The Arshi~es~ Owner will, on request, furnish to a Subcontractor, if practicable, information regarding percentages of completion or amounts applied for by the Contractor and acti.on taken thereon by the Arehiteet aREI 0wner on account of portions of the Work done by such Subcontractor.

§ 9.6.4 Neither Contractor shall use the sums advanced to it pursuant to the Contract documents solely for the pumose of the performance of the Work. The Owner ear A:ehi~ee~ shall not have an obligation to pay or to see to the payment of money to a Subcontntctor except as may otherwise be required by law.

§ 9.6.5 Payment to material suppliers shall be treated in a manner similar to that provided in Sections 9.6.2, 9.6.3 and 9.6.4.

§ 9.6.6 A CeFtiflea~ fer PayRleet, a progress payment, o.r partial or entire use or occupancy of the Project by the Owner shall not constitute acceptance of Work not in accordance with the Contract DoeaRleRts.Documents and shall not relieve Contractor of its obligations under the Contract Documents with respect thereto.

§ 9.6.7 Unless the Contractor provides the Owner with a payment bond in the full penal sum of the Contract Sum. paym~.:uts received by the Contractor for Work properly performed by Subcontractors and suppliers shall be held by the Contractor for those Subcontractors or suppliers who performed Work or furnished materials, or both, under contract with the Co_ntractor for which payment was made by the Owner. Nothing contained herein shall require money to be placed in a separate account and not commingled with money of the Contractor, shall create any fiduciary liability or tort liability on the part of the Contractor for breach of urust or shall entitle any person or entity to an award of punitive damages against the Contractor for breach of the requirements of this provision.

§ 9.7 FAILURE OF PAYMENT § 9.7.1 If the ,'\feh;i~et Owner does not ts&ae-make a CeFtif;ieate fur Payment, through no fault of the Contractor, within~twenty days after receipt of the Contractor's Application for Payment, or if the Owner does not pay the Contractor within seven days after the date established in the Contract Documents the amount eertifieEI ey due to the A:reffi:teet Contractor hereunder or awarded by arbitration, then the Contractor Rlay, I:IJ:lOR seveR aEIEI:itioRal Elays' wri~R eetiee te the Oweer aes At=ekiteel, may stop the Work until payment of the amount owing has been received.

The Contract Time shall be extended appropriately and the Contract Sum shall be increased by the amount of the Contractor's reasonable costs of shut-down, delay and start-up, plus interest as provided for in the Contract Documents.

§ 9.8 SUBSTANTIAL COMPLETION § 9.8.1 Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended usc.

§ 9.8.2 When the Contractor considers that the Work, or a portion thereof which the Owner a~:.,.ees to accept separately, is substantially complete, the Contractor shall prepare and submit to the Arel:!iteet Owner a comprehensive list of items to be completed or corrected prior to final payment. Failure to include an item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.

§ 9.8.3 Upon receipt of the Contractor•s list, the l\rehiteet Owner will make an inspection to determine whether the Work or designated portion thereof is substantially complete. If the Arel:!iteet's Owner's inspection discloses any AlA Document A201"' - 1997. Copyright © 1911 , 1915, 1918, 1925, 1937, 1951 , 1958. 1961, 1963, 1966, 1970, 1976. 1987 and 1997 by The American Institute of Architects. All rights relierved. WARNING: This AIA8 Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized 35 reproduction or distribution of thl1 AIA8 Document, or any portion otlt, may re1ullln severe civil and criminal penaltle1, and will be prosecuted to the maximum extent possible under the law. Thi.s document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_ 1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 • Koll · lntellicenter · Dallas v2 (5· 19..06) (986536188) R.P. Appx. 375 64 item, whether or not included on the Contractor's list, which is not sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work or designated portion thereof for its intended use, the Contractor shall, before issuance of the Certificate of Substantial Completion, complete or correct such item upon nptification by the Arehit.eet Owner. In such case, the Contractor shall then submit a request for another inspection by the /'.fehiEeet Owner to determine Substantial Completion.

§ 9.8.4 When the Work or designated portion thereof is substantially complete, the At=ehi~ee~ Owner will prepare a Certificate of Substantial Completion which shall estabUsh the date of Substantial Completion, shall estabHsh responsibilities of the Owner and Contractor for security, maintenance, beat, utilities, damage to the Work and insurance, and shall fix the time within which the Contractor shall finish all items on the list accompanying the Certificate. Warranties required by the Contract Documents shaiJ commence on the date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion.

Upon the Owner providing such Certificate of Substantial Completion. Contractor shall cause (a) the Architect to sign and deliver to Owner and Prudential a certificate in the form of Exhibit "E" attached hereto. and (b) the civil engineer for the Project to sign and deliver to Owner and Prudential a certificate in the form of Exhibit "F" attached hereto.

§ 9.8.5 The Certific.~te of Subst.antial Completion shall be submitted to the Owner and Contractor for their written acceptance of responsibilities assigned to them in such Certificate. Upon such acceptance and consent of surety, if any, the Owner shall make payment of retainage applying to such Work or designated portion thereof. Such payment shall be adjusted for Work that is incomplete or not in accordance with the requirements of the Contract Documents.

§. 9.9 PARTIAL OCCUPANCY OR USE § 9.9.1 The Owner may occupy or use any completed or partially completed portion of the Work at any stage whe01 soch portion is designated by separate agreement with the Contractor, provided such occupancy or use is consented to by the insurer as required under Section 11.4.1.5 and authorized by public authorities having jurisdiction over the Work. Such partial occupancy or usc may commence whether or nm the portion is substantially complete, provided the Owner and Contractor have accepted in writing the responsibilities assigned to each of them for payments, retrunage, if any, security, maintenance, heat, utilities, damage to the Work and insurance, and have agreed in writing concerning the period for correction of the Work and commencement of warranties required by the Contract Documents. When the Contractor considers a portion substantially complete, the Contractor shaU prepare and submit a list to the Arshitest Owner as provided under Section 9.8.2. Consent of the Contractor to partial occupancy or use shalf not be.unreasonably withheld. The stage of the progress of the Work shall be determined by written agreement between the Owner and Ce~aeter er, if ae agt:eemet'lt i:~ reaeheEl, by deeisioa of the A:ehiteet.Contractor.

§ 9.9.2 Immediately prior to such partial occupancy r>r use, the O·Naer, Owner and the Contractor aoa Arsi:Nteet shall jointly inspect the area to be occupied or portion of the Work to be used in order to determine and record the condition of the Work.

§ 9.9.3 Unless otherwise agreed upon, partial occupancy or use of a portion or portions of the Work shall not constitute acceptance of Work not complying with the requirements of the Contract Documents.

§ 9.10 FINAL COMPLETION AND FINAL PAYMENT § 9.10.1 Upori receipt of written notice from Contractor to Owner that all Punch List Items have been completed and that the Work is ready for final inspection and acceptance and upon receipt of a fmaJ Application for Payment, the A,rel!Jteet Owner will promptly make such inspection and, when tke Arehiteet .Raas the Work aeeeptable Hnder has been finally completed in accordance with the Contract Documents and the Contract fully performed, the kehitest Owner will promptly isslla-a-make final Certifieate fer Paymeat stat=.iag that t:e the best payment of the Arekiteet's lmowleage, iaformatioR all amounts due and eeliel', aad OR the easifl ef' ~Ae ,'\i'ehiteet' 5 ea Site visits aoEI iaspeetieAti, !:he Werk BB5 beea esHtf!letea in aceeraaoee with terms ami eeadilieftS of the Ceatras~ Dee~:~mea~s aed that the eatire ealaaee feaRS owing to 9&4:1e-the Contractor aad ROttld iR under the final Certi.Reate is d~;~e and Jlayable. The Arelijteet' s fiaal Certificate fer Paylfleat will eeastit~:~te a fNrtJter represeatatiea tJtat ceaaitieos listed iB Sec tieR 9.1 0.2 as !3Fe6edeRt te the Ceatraster's eeif!g eatitled to tiaal fltl·}'meat ba\'e eeee fHlfilled.Contract Documents.

§ 9.10.2 Neither final payment nor any remaining retained percentage shall become due until the Contractor submits to the Ai'ehiteet Owner (I) an affidavit that payrolls, bills for materials and equipment, and other indebtedness AlA Document A201TM -1997. Copyright © 191 1, 1915. 1918, 1925, 1937, 1951 , 1958, 1961, 1963, 1966,-1970, 1976, 1987 and 1997 by The American tnstitu1e of Archi1ects. All rights reserved. WARNING: This AlA• Document Ia protcc;ted by U.S. Copyright Law and International Treaties. Unauthorized 36 reproduction or dlatrlbutlon of t hla AfA8 Document, or any portion of It, may result In aevere clvlf and criminal peneitlea, end will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_ 1 which expires on 7/23/2006. and is not lor resale.

User Notes: Clayco A201 · Koll · lntelllcenter • Daffas v2 (5·19·06) (986536188) R.P. Appx. 376 65 connected with the Work for which the Owner or the Owner's property might be responsible or encumbered (Jess amounts withheld by Owner) have been paid or otherwise satistied, (2) a certificate evidencing that insurance required by the Contract Documents to remain in force after tina! payment is currently in effect and will not be canceled or allowed to expire until at least 30 days' prior written notice has been given to the Owner, (3) a written statement that the Contractor knows of no substantial reason that the insurance will not be renewable to cover the period required by the Contract Documents, (4) consent of surety, if any, to final paymeRt payment, (5) a certificate stating that to the best of Contractor's knowledge, the Project is in compliance with all applicable laws, statutes, ordinances, rules and regulations with respect to the Project. and that there is no action or proceeding pending or threatened before any court or administrative agency with respect to the validity of the certificates. permits, licenses, waivers. consents. approvals, authori7.ations. registrations. qualifications, designations. declarations and filings required or compliance with any laws, statutes. ordinances. rules and regulations and Contractor has not received any notice to the contn.lry. (6) evidence satisfactory to Owner that all utilities necessary or appropriate for the operation of the Project have been installed and are fully operational and are actually operating to the satisfaction of the governmental authorities or utility companies responsible for the operation thereof and that all costs in connection with such installation and operation (including but not limited to impact fees. development fees. tap·on fees and recapture costs) have been paid in full and ~if required by the Owner, other data establishing payment or satisfaction of obligations, such as receipts, releases and waivers of liens, claims, security interests or encumbrances arising out of the Contract, to the extent and in such form as may be designated by the Owner. If a Subcontractor refuses to furnish a release or waiver required by the Owner, rhe Contractor may furnish a bond satisfactory to the Owner to indemnify the Owner against such lien. If such lien remains unsatisfied after payments are made, the Contractor shall refund to the Owner all money that the Owner may be compelled to pay in discharging such lien, including all costs and reasonable attorneys' fees.

§ 9.10.3lf, after Substantial Completion of the Work, final completion thereof is mater.ially delayed through no fault of the Contractor or by issuance of Change Orders atl'ecting final completion, ana tbe A:£e9i.teelse eeRfirms, the Owner shall, upon application by the CeRtraster aHa eertifieatieR by the Arehiteet, Contractor, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and -accepted. lf the remaining balance for Work not fully completed or corrected is less than retainage stipulated in the Contract Documents, and if bonds have been furnished, the written consent of surety to payment of the balance due for tha(,portion of the Work fully completed and accepted shall be submitted by the Contractor to the ,'\i'effiteet flA er te eeftifieatiea ef st~ek p&ymeRt. Owner. Such payment shall be made under terms and conditions governing final payment, except that it shall not constitute a waiver of claims.

§ 9.10.4 The making of final payment shall constitute a waiver of Claims by the Owner except those arising from: ,1 liens, Claims, security interests or encumbrances arising oul of the Contract and unsettled; .2 failure of the Work to comply with the requirements of the Contract Documents; or .3 terms of special warranties required by the Contract Documents.

§ 9.10.5 Acceptance of final payment by the Contractor, a Subcontractor or material supplier shall constitute a waiver of claims by that payee except those previously made in writing and identified by that payee as unsettled at the time of final Application for Payment.

ARTICLE 10 PROTECTION OF PERSONS AND PROPERTY § 10.1 SAFETY PRECAUTIONS AND PROGRAMS § 10.1.1 The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the performance of the Contract.

§ 10.2 SAFETY OF PERSONS AND PROPERTY § 10.2.1 The Contractor shall take reasonable precautions for safety of, and shall provide reasonable protection to prevent damage, injury or loss to: .1 employees on the Work and other persons who may be affected thereby; .2 the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site, under care, custody or control of the Contractor or the Contractor's Subcontractors or Sub- subcontractors; and .3 other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction.

AlA Document A201"' - 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA• Document Is protected by U.S. Copyright L1w and International Treaties. Unauthorized 37 reproduellon or distribution ol thla AlA• Docu ment. or any portion al it, may result In !Ievere civil and erimlnal penalties, and will be proSGCuted to the maximum extent possible und.er the law. This document was produced by AlA software at 14:42:43 on 05119/2006 under Order No.1000182995_1 which expires on 7/23/2006, and is not for resale.

U1er Notes: Clayco A201 • Koll· lntellicenter · Dallas v2 (5·19·06) (986536188) R.P. Appx. 377 66 Contractor shall comply strictly with local. municipal. provincial. stare and national laws. orders, and regulations pertaining to health or safety which are applicable to Contractor or to the Project, including without limitation the Occupational Safety and Health Act of 1970 (84 U.S. Statutes 1590), as amended and any state plans approved thereunder. and regulations thereunder. to the extent applicable. and Contractor warrants the materials. equipment and facilities. whether temporary or permanent. furnished by Contractor in connection with the performance of the Project shall comply therewith. At all times while any of Contractor's employees. agents or subcontractors are on Project. Contractor shall provide them with a safe place of employment, and Contractor shall inspect the places where its employees. agents or subcontractors are or may be present on the Project and shall promptly take action to correct conditions which are or may become an unsafe place of employment for them.

Contractor shall incorporate necessary safety precautions and programs in a written safety program manual.

Contractor shall provide Owner with a copy of such safety program manual.

Contractor shall take reasonable steps to erect and maintain safeguards for the protection of workers and the public and eliminate orabate safety hazard~ created by or otherwise resulting from the performance of the Work. Contractor shall take ail precautions r<l<lsonably necessary for the safety and health of. and shall provjde all reasonable protection to prevent damage. injury or Joss to: (i) persons working at the job site employed by Contractor or its subcontractors in connection with the Work. (ii) all materials and equipment to be incorporated into the Project, whether in storage on or off the job site and (iii) other property at the job site.

Written reports of any accidents, injuries and illnesses at the Project requiring medical attention other than first aid. damage to property of Owner or Contractor. and fires shall be orally reported to Owner at the time of the mcident. Written reports, reasonably satisfactory in form and content to Owner. shall be submitted by Contractor within forty-eight (48) hours after each incident.

Contractor shall maintain in form and content approved by Owner, job site accident, injury and illness statistics ·that shall be available for inspection by and submitted to Owner upon their written request.

In the event of any emergency endangering life or property. Contractor shall take such action as may be rea~onablc and necessary to prevent, avoid or mitigate injury or damage and shall. as soon as possible. report to Owner's repre.o;entatives any such incidents. including Contractor's response thereto. [f Contractor fails to take sufficient precautions for the safety of the public or the protection of the Work or of structures or property on or adjacent to the job site, creating an emergency requiring immediate action. the Owner may cause such sufficient precautions to be taken or provide such protection.

Construction equipment obtained or furnished by Contractor or it.<> subcontractors that is to be used on the job site shall be in operating. condition. safe. fit for the uses for which intended. and suitable for the safe. legal and efficient performance of the Project.

§ 10.2.2 The Contractor shall g·ive notices and comply with applicable laws, ordinances, rules, regulations and lawful orders of public authorities bearing on safety of persons or property or their protection from damage, injury or loss.

§ 10.2.3 The Contractor shall erect and maintain, as required by existing conditions and performance of the Contract, reasonable safeguards for safety and protection, including posting danger sig ns and other warnings against hazards, promu.lgating safety regulations and notifying owners and users of adjacent sites and utilities.

§ 10.2.4 The Contractor will not use. store or keep at the Project any har.ardous materials. except those customarily andpruclently used in construction of projects similar to the Project and in compliance with all environmental laws.

When use or ,storage of explosives or o ther hazardous materials or equipment or unusual methods arc necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activities under supervision of properly qualified personnel.

§ 10.2.5 The Contractor shall promptly remedy damage and loss (other than damage or loss insured under property insurance required by the Contracr Documents) to property referred to in Sections I 0.2. 1.2 and 10.2. 1.3 caused in whole ox: in part by the Contractor, a Subcontractor, a Sub-subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose act~ they may be liable and for which the Contractor is responsible under AlA Document A2011M -1 997. Copyright @ 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966. 1970, 1976, 1987 and 1997 by The American Institute ot Architects. All rights reserved. WARNING: This AlA• Document Is protected by U.S. Copyright Law and International Treatlea. Unauthorized 38 reproducUon or distribution of this AIA111 Document, or any portion of It, may reault In M vere civil and criminal peneiUee, end will be prosecuted to the maximum extent possible under the lew. This document was produced by AlA soltware at 14:42:43 on 05/19/2006 under Order No.1 000182995_ 1 which expires on 7/23/2006, and is not tor resale.

User Notes: Clayoo A201 • Koll • lntellicenter · Dallas v2 (5·19·06) (986536188) R.P. Appx. 378 67 Sections I0.2.1.2 and I0.2. J.3, except damage or loss attributable to acts or 0 1nissions. of the Owner or Arehiteet er anyone directly or indirectly employed by eiH:ier ef theiH, the Owner. or by anyone for whose acts either of them may be liable, and not attributable to the fault or negligence of the Contractor. The foregoing obligations of the Contra<;:tQr are in addition to the Contractor's obligations under Section 3.1&.

§ 10.2.6 T he Contractor shall designate a responsible member of the Contractor' s organi7.ation at the site whose duty shall be the prevention of accidents. This person shall be the Contractor's superintendent unless otherwise designated by the Contractor in writing to the Owaer aaEl A-rebiteet.Owner.

§ 10.2.7 The Contractor shall not load or permit any part of the construction or site to be loaded so as to endanger its safety.

§ 10.3 HAZARDOUS MATERIALS § 10.3.1 If reasonable precautions will be inadequate to prevent foreseeable bodily injury or death to persons resulting from a material or substance, including but not limited to asbestos or polychlorinated biphenyl (PCB), encountered on the site. by ~e Contractor, the Contractor shall, upon recogni:ting the condition, immediately stop Work in the affected area and report the condition to the Owner aaEl Arrebiteet in writing.

§ 10.3.2 The Owner shall obtain the services of a licensed laboratory to verify the presence or absence of the material or substance reported by the Contractor and, in the event such material or substance is found to be present, to verifY that it has been rendered harmless. UnJess otherwise required by the Contract Documents, the Owner shall furnish in writing to the Contractor aAEl Areb:iteet the names and qualifications of persons or entities who are to perform tests. ·verifying the presence or absence of such material or substance or who are to perform the task of removal or safe C<lntainment of such material or substance. The Contractor aREI tJ:Ie AreR-iteet will promptly reply to the Owner in writing stating whether or not etl:bef-the Contractor has reasonable objection to the persons or entities proposed by the Owner. If ettbef-the Contractor or A-reR-iteet has an objection to a person or entity proposed by the Owner, the Owner shall propose another to whom the Contractor I!:BEl the Arebiteet ha·1e has no reasonable objection. When the material or substance has tk:en rendered harmless, Work in the affected area shall resume upon written agreement of the Owner and Contractor. The Contract Time shall be extended appropriately and the Contract Sum shall be increased in the'amount of the Contractor' s reasonable additional costs of shut-down, delay and start-up, which adjustments shall be acwmplished a~ provided in Article 7.

§ 10.3.3 To the fullest extent permitted by law, the Owner shall indemnify and hold harmless the Contractor, Subcontractors, Architect, Architect' s consuJtants and agents and employees of any of them f.rom and against claims, damage,s, losses and expenses, including but not limited to attorneys• fees, arising out of or resulting from performance qfthe Work in the affected area if in fact the material or substance presents the risk of bodily injury or death as described in Section 10.3.1 and has not been rendered harmless, provided that such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itc;elf) and provided that such damage, loss or expense is not due to the sole negligence of a party seeking indemnity.

§ 10.4 The Owner shaH notbe responsible under Section 10.3 for materials and substances broughtto the site by the Contractor unless such materials or substances were required by the Contract Documents.

§ 10.5 If, without negligence on the part of the Contractor, the Contractor is held liable for the cost of remediation of a hazardous material or substance solely by reason Qf performing Work as required by the Contract Documents, the Owner·shall indemnify the Contractor for all cost and expense thereby incurred.

§ 10.6 EMERGENCIES § 10:6.1 In an emergency affecting safety of persons or property, the Contractor shall act, at the Contractor's discretion, to prevent threatened damage, injury or loss. Additional compensation or extension of time claimed by the Con.tractor on account of an emergency shall be determined as provided in Secti.o n 4 .3 and Article 7.

ARTICLE 11 INSURANCE AND BONDS § 11.1 CONTRACTOR'S LIABILITY INSURANCE § 11.1.1 The Contractor shall purchase from and maintain in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located such insurance as will protect the Contractor from claims AlA Document A201'" -1 997. Copyright @ 1911, 1915.1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966. 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA"' Document Is protected by U.S. Copyright Lew and lntornat1on11l Treatlcs. llnauthorlzed 39 roproductlon or dlatrlbutlon of this AJA' Document, or any portion of II, may result In ~evere clvlland criminal penalties, and will be prosecuted to tha maximum extent posalble under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_ 1 which expires on 712312006, and is noi for resale.

User Notes: Clayco A201 - Koll · lntelllcenter · Dallas v2 (5- 19·06) (98.6536188) R.P. Appx. 379 68 set forth below which may arise out of or result from the Contractor's operations under the Contract and for which the Contractor may be legally liable, whether such operations be by the Contractor or by a Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable: .1 claims under workers' compensation, disability benefit and other similar employee benefit acts which are applicable to the Work to be performed; .2 claims for damages because of bodily injury, occupational sickness or disea~e. or death of the Contractor's employees; .3 claims for damages because of bodily injury, sickness or disease, or death of any person other than the Contractor's empJo,yees; .4 claims for damages insured by usual personal injury liability coverage; .5 claims for damages, other than to the Work itself, because of injury to or destruction of tangible property, including loss of use resulting therefrom; .6 claims for damages because of bodily injury, death of a person or property damage arising out of ownership, maintenance or usc of a motor vehicle; .7 claims for bodily injury or property damage arising out of completed operations; and .8 claims involving contractual liability insurance applicable to the Contractor's obligations under Section 3. 18.

§ 11.1.2 The insurance required by Section 11 .1.1 shall be written for not less than limits of liability specified in the Contract DQCuments or required by law, whichever coverage is greater. Coverages, whether written on an occurrence or claims-made basis, shall be maintained without interruption from date of commencement of the Work until date of final payment and termination of any coverage required to be maintained after final payment.

§ 11.1.3 Certificates of insurance acceptable to the Owner shall be filed with the Owner prior to commencement of the Work. These certificates and the insurance policies required by this Section J 1.1 shall contain a provision that coverages afforded under the policies will not be canceled or allowed to expire until at least 30 days' prior written notice has been given to the Owner. lf any of the foregoing insurance coverages are required to remain in force after final payment and are reasenably available, an additional certificate evidencing continuation of such coverage shall be submitted with the final Application for Payment as required by Section 9.10.2. Information concerning reduction of coverage on account of revised limits or claims paid under the General Aggregate, or both, shall be furnished by the Contractor with reasonable promptness in accordance with the Contractor' s information and belief.

§ 11.1.4 Contractor shall cause all architect~. engineers and other Design Professionals performing design work for the Project to maintain Professional Liability Insurance having minimum limits of One Million Dollars C$1 .000.000) per claim and in the aggregate (including excess coverage) (claims made basis). Such Professional Liability Insurance policies shall (i) provide coverage for claims arising out of any act. error or omission with respect to the rendering of or failure to render design. engineering. professional or architectural services by architects, engineers or other Design Professionals (and their respective officers. directors. employees or agents) who may be employed. engaged or otherwise utilized by Contractor to perform Contractor's design. engineering, architectural and professional duties. obligations and responsibilities under the Contract Documents. (ii) include Owner, and its partners. members. officers. directors, employees. agents. successors and assigns as "additional insureds," (iii) be written on an occurrence basis and not on a claims-made basis, (iv) waive any rights of subrogation against Owner and it~ partners. memberS. officers. directors, employees. agents, successors and assigns. and (v) be written by an insurance company or companies with a current A.M. Best Company rating of A-/IX or better and be admitted to do business in the State where the Land is located.

§ 11.2 OWNER'S LIABILITY INSURANCE § 11.2.1 The Owner shall be responsible for purchasing and maintaining the Owner's usual liability insurance.

§ 11.3 PROJECT MANAGEMENT PROTECTIVE LIABILITY INSURANCE § 11.3.1 Optionally, the Owner may require the Contractor to purchase and maintain Project Management Protective Liability insurance from the Contractor's usual sources as primary coverage for the Owner's, Contractor's and Architect's vicarious Hability for construction operations under the Contract. Unless otherwise required by the Contract DocumentS, the Owner shall reimburse the Contractor by increasing the Contract Sum to pay the cost of purchasing and maintaining such optional insurance coverage, and the Contractor shaJJ not be responsible for purchasing any other liability insurance on behalf of the Owner. The minimum limits of liability purchased with

AlA Document A201TU -1997. Copyright © 1911 , 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by Tile American lnslitule of Architecls. All rights reserved. WARNING: This AlA• Document is protected bV U.S. Copyright Law and International Treaties. Unauthorized 40 reproducUon or dlstrlbuUon of this AlA• Document, or snv portion of II, may result In severe clvU and criminal penaiUes, and will be prosecuted to the maximum extent possible under the IIIW. This document was ptoduced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_ 1 which expires on 7123/2006. and Is not for resale.

User Notes: Clayco A201 - Koll • lntellicenter - Dallas v2 (5-19·06) (986536188) R.P. Appx. 380 69 such coverage shall be equal to the aggregate of the limits required for Contractor's Liability Insurance under Sections 11.1.1.2 through 11.1.1.5.

§ 11.3.2 To the extent damages are covered by Project Management Protective Liability insurance, the Owner, Contractor and Architect waive all rights against each other for damages, except such rights as they may have to the proceeds of such insurance. The policy shall provide for such waivers of subrogation by endorsement or otherwise.

§ 11.3.3 The Owner shall not require the Contractor to include the Owner, Architect or other persons or entities as additional insureds on the Contractor's Liability Insurance coverage under Section 1 J.I.

§ 11.4 PROPE~TY INSURA~CE § 11.4.1 URJe·ss etherwise poolfielea, the OwRer Contractor shall purchase and maintain, in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located, property insurance written on a builder's risk "all-risk" or equivalent policy form 1n the amount of the initial Contract Sum, plus value of subsequent Contract modifications and cost of materials supplied or installed by others, comprising total value for the entire Project at the site on .a replacement cost basis without optional deductibles. Such property insurance shall be maintained, unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons and entities who are beneficiari._es of such insurance, until t1nal payment has been made as provided in Section 9.10 or until no p,ersoll or entity other than the Owner has an insurable interest in the property required by this Section I 1.4 to be covered, whichever is later. This insurance shall include interests of the Owner, the Contractor, Subcontractors and Sub-subcontractors in the Project.

§ 11.4.1.1 Property insurance shall be on an "all-risk" or equivalent policy form and shall include, without limitation, insurance against the perils of fire (with extended coverage) and physical loss or damage including, without duplication of coverage, theft, vandalism, malicious mischief, collapse, earthquake, flood, windstorm, falsework, testing and startup, temporary buildings and debris removal including demolition occasioned by enforcement of any applicable legal requirements, and shall cover reasonable compensation for Architect's and Contractor's services and expenses required as a result of such insured loss.

§ 11.4.1.2lfthe Owser elees set iRteR!i te fHi£6Base SO!e.e ~reperty i:nsl:lraeee £eEII:IH=eel ey tee Ceal:faet aHa wit:b aH ef the ee¥eF&ges iR the ame<~Rt tlescribec:l aee'>'e, the O·Nfler shall se iRf'enfl the Cestraeter iR writisg prier te eemmeaeemeat ef the Werk. The Ce~eter may t8ea effeet iRstmmee which will fHeteet the iRt8fests ef the Ceatraeter, S~:~eeefltfaeters afla S<~e sueee·a traeters iR the Werk, a.Rd by SJ)f:JFOpriate ChaRge Oreler the SllSt thereef shall ee eaargeel te !:be OwRer. l:f the Cefta=aetor is elamageel ey l:he faihlre er Regleet ~:~f the OwRer te pl:lrehase er maietaia iRsaraaee as eleseribee aee'>'e, withe at se ROtifyiag the Ceal:faeter ift writiag, thea the OwRer shall eear ai1J reaseRable ees~s properly att:rie~:~table therete.fintentionally Omitted].

§ 11.4.1.3 If the property insurance requires deductibles, the Owner shall pay as a Cost of the Wor.k costs not covered because of such elea~:~etibles.deductibles; provided, however. that except for claims arising from tlood or earthquake damage, the cost of such deductible.~ shall not exceed $10,000 per occurrence.

§ 11 .4.1 .4 This property insurance shall cover portions of the Work stored off the site, and also portions of the Work in transit § 11.4.1.5 Partial occupancy or use in accordance with Section 9.9 shall not commence until the insurance company or companies providing property insurance have consented to such partial occupancy or use by endorsement or otherwise. The Owner and the Contractor shall tak,e reasonable steps to obtain consent of the insurance company or companies and shall, without mutual written consent, take no action with respect to partial occupancy or use that would cause cancellation, lapse or reduction of insurance.

§ 11.4.2 Boiler and Machinery Insurance. Tae Oweer Contractor shall purchase and maintain boiler and machinery insurance required by the Contract Documents or by law, which shall specifically cover such insured objects during installati.o n and until final acceptance by the Owner; this insurance shall include interests of the Owner, Contractor, Subcontractors and Sub-subcontractors in the Work, and the Owner and Contractor shaH be named insureds.

§ 11.4.3 Loss of Usc Insurance. The OwRer, at the OwRer's ef!aea, may Contractor shall purchase and maintain such insurance as will insure the Owner against loss of use of the Owner's property due to fire or other hazards, however AlA Document A201 1 M -1997. Copyright <&> 1911, 1915. 1918. 1925, 1937, 1951, 1958, 1961 , 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA• Document Is protected by U.S. Copyright Law and International Treaties. U'nauthorized 41 reproduction or distribution of this AlA• Document, or any portion of It, may result In severe civil 1nd criminal penalties, and will be proncuted to the mulmum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05119[2006 under Order No.1000182995_1 which expires on 712312006, and is not for resale.

User Notes: Clayco A201 • Koll - lntellicenter ·Dallas v2 (5·19·06) (986536188) R.P. Appx. 381 70 caused. The OwReF Contractor waives all rights ef aetiee against tl:le CoRa:aeter Owner for less ef 1:1se af the OwRer's flF9flert-y, iRehHliRg ceesequeRtial losses a~:~e te damages caused by fire or other ha;r,aras hewe:Yer ~perils to the extent covered bv property insurance obtained pursuant to the terms of this Section 11.4.

§ 11,4.4 [Intentionally Omitted!.

§ 11.4,4 If the Ceatraeter reEl1:1ests ia writiRg that iRs~:~raaee fer risks ether than thene ae!;erieea hereiR er ether Sfleeial ea~:~ses ef less ee iRel~:~aea iR the J3F9f!erty ia!ll:lraRee peliey, the OwRer shall, if J3ossiele, iRel~:~Eie s1:1eh iRSSraRee, QRQ l:ke east the.reef shall ee ehargeEI ta the Caea:aetar ey &J3flF9tJJ'iate Chaflge Order.

§ 11.4.5 If during the Project construction period the Owner insures properties, real or personal or both, at or adjacent to the site by property insurance under policies separate from those insuring the Project, or if after finaJ payment property insurance is to be provided on the completed Project through a po.licy or policies other than those insuring the Project during the construction period, the Owner shall waive aJI rights in accordance with the terms of Section 11.4:7 for damages caused by fire or other causes of loss covered by this separate property insurance. AJI separate policies shall provide this waiver of subrogation by endorsement or otherwise.

§ 11.4.6 Before an exposure to loss may occur, the ~ontractor shall file with the Ce11kaeter Owner a copy of each policy that includes insurance coverages required by this Section 11.4. Each policy shall contain all generally applicaole conditions, definitions, exclusions and endorsements related to this Project. Each policy shall contain a provision that the policy will not be canceled or aHowed to expire, and that it!> limits will not be reduced, until at least 30 ·d ays' prior written notice has been given to the Contractor.

§ 11.4.7 W~vers of Subrogation. The Owner and Contractor waive aH rights against ( l ) each other and any of their subcontractors, sub-subcontractors, agents and employees, each of the other. and (2) the Arehiteet, l\r-ekitect' s ceRsliltaets, separate contractors described in Article 6, if any, and any of their subcontractors, sub-subcontractors, agents and employees, for damages caused by ftre or other causes of loss to the extent covered by property insurance obtained pursuant to this Section 11.4 or other property insurance applicable to the Work, except such rights as they have to proceeds of such ins.urance held by the Owner as fiduciary. The Owner or Contractor, as appropriate, shall require of the Arehiteet, Arehiteet' s eoRsl:lltaRts, separate contractors described in Article 6, if any, and the subcontractors, sub-subcontmctors, agents and employees of any of them, by appropriate agreements, written where legally required for va.Jidity, similar waivers each in favor of other parties enumerated herein. The policies shall provide such waivers of subrogation by endorsement or otherwise. A waiver of subrogation shaH be effective as to a person or eritity even though that person or entity would otherwise have a duty of indemnification, contractual or otherwise, did not pay the insurance premium directly or indirectly, and whether or not the person or entity had an insurdble interest in the property damaged.

§ 11.4.8 A loss insured under Owner's property insurance shall be adjusted by the Owner as fiduciary and made payable to the Owner as fiduciary for the insureds, as their interests may appear, subject to requirements of any applicable mortgagee clause and of Section 11 .4.10. The Contractor shalJ pay Subcontractors their just shares of insurance proceeds received by the ContractOr, and by appropriate agreements, written where legally required for validity, shalJ require Subcontractors to make payments to their Sub-subcontractors in similar manner.

§ 11.4.9 If required in writing by a party in interest, the Owner as fiduciary shall, upon occurrence of an insured loss, give bond fo,r proper performance of the Owner's duties. The cost of required bonds shaH be charged against proceeds received as fiduciary. The Owner shall deposit in a separate account proceeds so received, which the Owner shall distribute in accordance with such agreement as the parties in interest may reach, or in accordance with an arbitration award in which case the procedure shall be as provided in Section 4.6. If after such loss no other special agreement is made and unless the Owner terminates the Contract for convenience, replacement of damaged property shall be performed by the Contractor after notification of a Change in the Work in accordance with Article 7.

§ 11.4.10 The 0wner as fiduciary shaH have power to adjust and settle a loss with insurers unless one of the parties in interest shaH object in writing within five days after occurrence of Joss to the Owner's exercise of this power; if suc h objection is made, the dispute shall be resolved as provided in Sections 4.5 and 4.6. The Owner as fiduciary shall, in the case of arbitration, make settlement with insurers in accordance with directions of the arbitrators. If distribution of insurance proceeds by arbitration is required, the arbitrators will direct such distribution.

AlA Document A201'M - 1997. Copyright © 1911 , 1915, 1918, 1925, 1937. 1951, 1958. 1961 , 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA• Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized 42 reproduction or distribution ol this AlA• Document, or any portion of It, may result In Jevere olvllsnd criminal penalties, and will be prose-cuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_1 which expires on 7/2312006, and is not for resale.

User Notes: Clayco A201 • Koll · lnlellicenter · Dallas v2 (5·19-06) (986536188) R.P. Appx. 382 71 § 11.5 PERFORMANCE BOND AND PAYMENT BOND § 11.5.1 The Owner shall have the right to require the Contractor to furnish bonds covering faithful performance of the Contract and payment of obligations arising thereunder as stipulated in bidding requirements or specifically Iequired in the Contract Documents on the date of execution of the Contract.

§ 11.5.2 Upon the request of any person or entity appearing to be a potential beneficiary of bonds covering payment of obligations arising under the Contract, the Contractor shall promptly furnish a copy of the bonds or shall permit a copy to be made.

ARTICLE 12 UNCOVERING AND CORRECTION OF WORK § 12.1 UNCOVERING OF WORK § 12.1.11f a portion of the Work is covered contrary to the Arel:liteet's F8EjY8Sl er te requirements specifically expressed in the Contract Documents, any written inspection schedule agreed to by Contractor, or as previously requested in writing by Owner, it must, if required in writing by the Areffiteoet, Owner, be uncovered for the Areffiteet's Owner's examination and be replaced at the Contractor's expense without change in the Contract Time.

§ 12.1.2 If a portion of the Work has been covered which the ~has not specifically requested to examine prior to its being rovered, the Arel:liteet Owner may request to see such Work and it shall be uncovered by the Contractor. -If such Work is in accordance with the Contract Documents, costs of uncovering and replacement shall, by appropriate Change Order, be at the Owner's expense. (f such Work is not in accordance with the Contract Documents, correction shall be at the Contractor's expense unless the condition was caused by the Owner or a separate contractor in which event the Owner shall be responsible for payment of such costs.

§ 12.2 CORRECTION OF WORK § 12.2.1 BEFORE OR AFTER SUBSTANTIAL COMPLETION § 12.2.1.1 The Contractor shal) promptly correct Work rejeeted by the Arel:liteet er failing to conform to the requirements of the Contract Documents, whether discovered before or after Substantial Completion and whether or not fabricated, mstalled or completed. Cost~ of correcting such rejected Work, including additional testing and inspections and compensation for the A:reffi\eet's serYiees &Ad expenses made necessary thereby, shall be at the Contractor's expense.

§ 12.2.2 AFTER SUBSTANTIAL COMPLETION § 12.2.2.'1 In addition to the Contractor's obligations under Section 3.5, if, within one year after the date of Substantial Completion of the Work or designated portion thereof or after the date for commencement of warranties established under Sectien 9.9.1, or by terms of an applicable speciaJ warranty required by the Contract Documents, any of the Work is found to be not in accordance with the requirements of the Contract Documents, the Contractor shalLcorrect it promptly after receipt of written notice from the Owner to do so unless the Owner has previously given the Contractor a written acceptance of such condition. The Owner sham! give such notice promptly after discover)' of the condition. During the one-year period for correction of Work, if the Owner fails to notify the Contractor and give the Contractor an opportunity to make the correction, the Owner waives the rights t0 require correction by the Contractor and to make a claim for breach of warranty. If the Contractor fails to correct nonconforming Work within a re.asonable time during that period after receipt of notice from the OwRer er /'&emteet, Owner. the Owner may correct it in accordance with Section 2.4.

§ 12.2.2.2 The one-year period for correction of Work shall be extended with respect to portions of Work first performed after Substantial Completion by the period of time between Substantial Completion and the actual performance of the Work.

§ 12..2.2.3 The o.ne-year period for correction of Work shall not be extended by corrective Work performed by the Contractor pursuant to this Section 12.2.

§ 12.2.3 The Contractor shall remove from the site portions of the Work which arc not in accordance with the requirements of the Contract Documents and are neither corrected by the Contractor nor accepted by the Owner.

§ 12.2.4 The Contractor shall bear the cost of correcting destroyed or damaged construction, whether completed or partially completed, of the Owner or separate contractors caused by the Contractor's correction or removal of Work which is not in accordance with the requirements of the Contract Documents.

AlA Document A201TM -1997. Copyright © 1911, 1915, 1918, 1925. 1937, 1951 , 1958, 1961 . 1963, 1966. 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This A1A8 Document Ia protected by U.S. Copyright Law and International Treaties. Unauthorized 43 reproduction or distribution of thla AtA• Document, or any portion of It, may result In severe civil and criminal penaltlea, and will be proleeluted to the maximum extent possible under the law. This document was produced by AlA soltware at 14:42:43 on 05/19/2006 under Order No.1000182995_'1 which expires on 7/23/2006, and is not lor resale.

User Notes: Clayco A201 • Koll · lnlelllcenter · Dallas v2 (5· 19·06) (986536188) R.P. Appx. 383 72 § 12.2.5 Nothing contained in this Section 12.2 shall be construed to establish a period of limitation with respect to other obligations which the Contractor might have under the Contract Document.<;. Establishment of the one-year period for correction of Work as described in Sec~ion 12.2.2 relates only to the specific obligation of the Contractor to correct the Work, and has no relationship to the time within which the obligation to comply with the Contract Documents may be sought to be enforced, nor to the time within which proceedings may be commenced to establish the Contractor's liability with respect to the Contractor's obligations other than specifically to correct the Work.

§ 12.3 ACCEPTANCE OF NONCONFORMING WORK § 12.3.1 If the Owner prefers to accept Work whic)l is not in accordance with the requirements of the Contract Documents, the Owner may do so instead of requiring hs removal and correction, in which case the Contract Sum will be reduced as appropriate and equitable. Such adjustment shall be effected whether or not final payment has been made.

ARTICLE 13 MISCELLANEOUS PROVISIONS § 1:3.1 GOVERNING LAW § 13.1.1 The Contract shall be governed by the law of the place where the Project is located.

§ 13.2 SUCCESSORS AND ASSIGNS § 13.2.1 The Owner and Contractor respectively bind themselves, their partners, successors, assigns and legal Fepresentatives to the other party hereto and to partners, successors, assigns and legal representatives of such other party in respect to covenants, agreements and obligations contained in the Contract Documents. Except as provided in Section 13.2.2, neither party to the Contract shall assign the Contract as a whole without written consent of the other. 1f either party attempts to make such an assignment without such consent, that party shall nevertheless remain legally responsil;>le for -all obligations under the Contract. Notwithstanding the foregoing. Owner may assign the Contract Documents to Prudential or any entity controlled by Prudential.

§ 13.2.2 The Owner may, without consent of the Contractor, assign the Contract to an institutional lender providing construction financing for the Project. In such event, the lender shall assume the Owner' s rights and obligations under the Contract Documents. The Contractor shall execute all consents reasonably required to facilitate such assignment. Contractor hereby subordinates any mechanics" and materialmen's liens or other claims or encumbrances that may be brought by Contractor against any or all of the Work, the Land or the Project to any liens granted in favor of Owner's lender(s). whether such lien in favor of Owner's lender(s) is created. attached or perfected prior to or after any such liens, claims or encumbrances. and shall require by subcontract its Subcontractors, and Sub"subcontractors to the extent required by Owner's lender(s), to similarly subordinate their lien. claim and encumbrance rights. Contractor agrees to comply with reasonable request of Owner for supporting documentation required by Owner's lender(s). including any necessary lien subordination agreements. affidavits or other documents that may be required to demonstrate that Owner's property and premises are free from liens. claims and encumbrances arising out of the furnishing of Work under the Contract. This subordin ation of lien is made in consideration of and a~ an inducement to the execution and delivery of this agreement. and shall be applicable despite any dispute between the parties hereto or any others. or any default by Owner under the Contract Documents or otherwise. Owner's lenders may require periodic inspections and certifications by an inspector or inspecting architect. and Contractor will make the Project available at all times for such. inspections.

§ 13.3 WRITTEN NOTICE § 13.3.1 Written notice shall be deemed to have been du~y served if delivered in person to the individual or a member of the firm or entity or to an officer of the corporation for which it was intended, or if delivered at or sent by registered or certified mail to the last business address known to the party giving notice.

§ 13.4 RIGHTS AND REMEDIES § 13.4.1 Duties and obligations imposed by the Contract Documents and rights and remedies available thereunder shall be in addition to and not a limitation of duties, obligations, rights and remedies otherwise imposed or available by law.

§ 13.4.2 No action or failure to act by the Owner, Architect or Contractor shaJI constitute a waiver of a right or duty afforded them under the Contract, nor shall such action or failure to act constitute approval of or acquiescence in a breach thereunder, except as may be specifically agreed in writing.

AlA Document A201''"' - 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951. 1958, 1961, 1963. 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA• Document Is protected by U.S. Copyright Law and lrrtarnallonal Treaties. Unauthorized reproduction or distribution of this AIA8 Document, or any portion of It, msy result In severe civil and c:r1mlnel penalties, and will be prosecuted to the 44 maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_ 1 which expires on 7/2312006, and is not for resale.

User Notes: Ciayeo A201 • Koll · lntellicenter - Dallas v2 {5--19·06) (986536188) R.P. Appx. 384 73 § 13.4.3 If any mediation or arbitration is commenced by either party hereunder to enforce the obligations of the other party. then (a) the identity of the prevailing party in any such proceeding shall be determined by the mediator or arbitrator (whichever is applicable). (b) such prevailing party shall be reimbursed by the nonprevailing party for all of the prevailing party's reasonable out-of-pocket expenses incurred in connection therewith. including without limitation reasonable attorneys' fees and (c) the mediator or arbitrator (whichever is applicable) shall be authori7.ed to make an award of such expense in any such proceeding.

§ 13.5 TESTS AND INSPECTIONS § 13.5.1 Tests, inspections and approvals of portions of the Work required by the Contract Documents or by laws, ordinances, rules, regulatjons or orders of public authorities having jurisdiction shall be made at an appropriate time.

Unless otherwise provided, the Contractor shall make arrangements for such test~. in~pections and approvals with .an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public authority, and shall bear all related costs of tests, inspections and approvals. The Contractor shall give the A:-crutect Owner timely notice of when and where tests and inspections arc to be made so that the Arel:liteel Owner may be present for such procedures. The Owner shall bear costs of tests, inspections or approvals which do not be.c ome requirements until after bids are received or negotiations concluded.

§ 13.5.2 If the ,'\J:ehiteot, Owner or public authorities having judsdiction determine that portions of the Work require additional testing.• inspection or approval not included under Section 13.5.1, the A:el:iiteet will, l:ltJ9R writteR atttherizati~;JR fram t:Re OwRer, Owner will instmct the Contractor to make arrangements for such additional testing, inspection or approval by an entity acceptable to the Owner, and the Contractor shall give timely notice to the t\Fel:li~eet Owner of when.and where tests and inspections are to be made so that the Archi~ect Owner may be present for such procedures. Such costs, except as provided in Scct)on J 3.5.3, shall be at the Owner's expense.

§ 13.5.3Jf such procedures for testing, inspection or approval under Sections 13.5.1 and 13.5.2 reveal failure of the portions of the Work to comply with requirements established by the Contrac t Documents, all cos~s made necessary by such failure including those of repeated procedures and cempeRsatioR fur the Architect's serYice!'i ana expeases shall be at the Contractor's expense.

§ 13.5.4 Required certificates of testing, inspection or approval shall, unless otherwise required by the Contract Documents, be secured by the Contractot and promptly delivered tb the Areftiteet.Owner.

§ 13.5.5 If the i\Fei:Hteet Owner is to observe tests, inspections or approvals required by the Contract DocumenLc;, the Arcrutect OwneF,will do so promptly and, where practicable, at the normal place of testing.

§ 13.5.6 Tests or inspections conducted pursuant to the Contract Documents shall be made promptly to avoid unreasonable delay in the Work.

§ 13.6 INTEREST § 13.6.1 Payments due and unpaid under the Contract Documents shall bear interest from the date payment is due at such rate as the parties may agr;ee upon in writing or, in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located.

§ 13.7 COMMENCEMENT OF STATUTORY LIMITATION PERIOD § 13.7.1 As between the Owner and Contractor: .1 Before Substantial Completion. As to act'> or failures to act occurring prior to the relevant date of Substantial Completion , any applicable statute of limitations shall commence to run and any alleged cause of action shall be-deemed to have accrued in any and all events not later than such date of Substantial Completion; .2 Between Substantial Completion and Final Certificate for Payment. As to acts or failures to act occurring subsequent to the relevant date of Substantial Completion and prior to issuance of the final Certificate for Payment, any applicable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and alJ events not later than the date e.f insaaeee ef Owner is required to make the ftnal Certifieate fur Paymeet; payment hereunder; and .3 After Final Certificate for Payment. As to acts or failures to act occurring after the reieY8flt date e.f issaaaee of tl:le-final Certifisate fur Paymeat, payment, any applicable statute of limitations shall AlA Document A2DtTM-t997. Copyright © 1911, 1915, 1918, 1925. 1937. 1951 , 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: Tills AlA• Document Is protected by U.S. Copyright Law and International Treatlea. Unauthorized 45 reproduction or dlatrlbuUon of thla AtA• Document, or any portion of It, may result In aevere c:lvll and c:rlmlnal penaltlea, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1 000182995_ 1 whicl) expires on 7123/2006, and is not for resale.

User Notes: Clayco A201 • Koll • lntellicenter · Dallas v2 (5·19.06) (986536188) R.P. Appx. 385 74 commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than the date of any act or failure to act by the Contractor pursuant to any Warranty provided under Section 3.5, the date of any correction of the Work or failure to correct the Work by the Contractor under Section 12.2, or the date of actual commission of any other act or failure to perform any duty or obligation by the Contractor or Owner, whichever occurs last.

ARTICLE 14 TERMINATION OR SUSPENSION OF THE CONTRACT § 14.1 TERMINATION BY THE CONTRACTOR § 14.1.1 The Contractor may terminate the Contract if the Work .is stopped for a period of 30 consecutive days through no act or fault of the Contractor or a Subcontractor, Sub-subcontractor or their agents or employees or any other persons or entities _performing portions of the Work under direct or indirect contract with th_ e Contractor, for any of the following reasons: .1 issuance of an order of a court or other public authority having jurisdiction which requires all Work to be stopped; .2 an act of government, s uch as a declaration of national emergency which requires all W<)rk to be stopped; .3 because the ~has not issued a Certitieale fer PaymeHl payment and has not notified the Contractor of the reason for withholding eertifieatieH payment as provided in Section 9.4.1, or because the Owner has not made payment eRa Certifieate fer Pa-ymeRt within the time stated in the Contract Documents; or .4 the Owner has failed to furnish to the Contractor promptly, upon the Contractor's request, reasonable evidence as required by Section 2.2. 1.

§ 14.1.2 The Contractor may terminate the Contract if, through no act or fault of the Contractor or a Subcontractor, Sub-subcontractor or their agents or employees or any other persons or entities performing portions of the Work under direct or indir~t contract with the Contractor, repeated suspensions, delays or interruptions of the entire Work by the Owner as described in Section 14.3 constitute in the aggregate more than l 00 percent of the total number of days scheduled for completion, or 120 days in any 365-day period, whichever is less.

§ 14.1.3 If one of the reasons described in Section 14.l.l or 14.1.2 exist~, the Contractor may, upon seven da-ys' written notice to the Ow.Rer and Arehiteet, Owner. terminate the Contract and recover from the Owner payment for Work executed and for proven loss with respect to materials, equipment, tools, and construction equipment and machinery, including Feasonable o~·erhead, prefit aad eamages.Contractor's Fee based on the percentage set forth in Section 5.1.2 of the Agreement on Work completed to date.

§ 14.1.4 If the Work is stopped for a period of 60 consecutive days through no act or fault of the Contractor or a Subcontractor or their agents or empJoyees or any other persons performing portions of the Work under contract .with the Contractor because the Owner has persistently failed to fulfill the Owner's obligations under the Contract Documents with respect to matters important to the progress of the Work, the Contractor may, upon Aevea additieAal ~written notice tb the Owaer aRd tRe Arehifeet; Owner. term.inate the Contract and recover from the Owner as provided in Section 14.1.3.

§ 14.2 TERMINATION BY THE OWNER FOR CAUSE § 14.2.1 The Owner may terminate the Contract if tile Coatraetor:: .1 the Contractor persistently or repeatedly refuses or fails to supply enough properly skilled workers or proper materials; .2 the Contractor fai ls to make payment to Subcontractors for materials or labor in accordance with the respective agreements between the Contractor and the Subcontractors; .3 the Contractor persistently disregards laws, ordinances, or rules, regulations or arders of a public authority having jurisdiction; .4 a mechanic's or materialmen's lien, stop notice or other encumbrance is filed or served by a Subcontractor. Sub-subcontractor or any person or entity claiming by. through or under Contractor against the Land or the Project or any funds due Contractor, or any part thereof. and the lien, stop notice or encumbrance is not discharged. insured over. or bonded off within 45 days after filing or service. or .4 otherwise is guilty of substantial bre_ach of a provision of the Contract Documents.

AlA Document A201 111 - 1997. Copyright © 1911 . 1915, 1918. 1925, 1937, 1951, 1958, 1961, 1963, 1'966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AIA1 Document Is protected by U.S. Copyright Law and International TrtaUea. Unauthorized 46 reproduction or distribution of this AtA• Document, or any portion of It, may reault In eevere civ il and criminal penalties, and will be prosecuted to the mu imum extent possible under the IIIW. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_ 1 whi,ch expires on 7/2312006. and Is not tor resale.

User Notes: Clayoo A201 - Koll - lntellicenter - Dallas v2 (5·19·06) (986536188) R.P. Appx. 386 75 Without limiting the foregoing. Contractor shall be in default (a "Contractor Default") allowing Owner to terminate the-Contract if Contractor fails to perform any obligation under the Contract Documents and does not correct such failure within five (5) working days following written notice thereof.from Owner; provided. however. no Contractor Default shall occur if the matter is not subject to being cured within such five (5) day period. but Contractor ha~ promptly begun the correction thereof and diligently proceeds to the correction thereof within thirty (30) working days. In the event of Contractor's Default, Owner may. without prejudice to any other rights or remedies Owner may have. hold in abeyance further payments to Contractor to the extent reac;onably deemed necessary by Owner to correct any Contractor Default and/or terminate Contractor's right to continue performance of the Contract Documents by written notice to Contractor specifying the date of termination. In the event of such termination. Owner may take possession of the Work at the job site and any or all materials and equipment (whether delivered to the job site or on order therefore by Contractor). tools and construction equipment at the job site and finish the Work by whatever method Owner may deem expedient.

In the event of termination by Owner, Contractor shall, upon request by Owner. promptly advise it of all outstanding subcontracts, rental agreements and purchase orders which Contractor has with others pertaining to performance of the Project and furnish Owner with complete copies thereof. Upon .request by Owner. Contractor shall assign to Owner. in form and content reasonably satisfactory to Owner.

Contractor's title to materials and equipment for the Project and those subcontraqs designated by Owner.

In the event of termination by Owner, Contractor shall not be entitled to receive any further payment until the Project is completed. Upon completion and final acceptance of the Project, Owner will determine the total cost incurred .in comp.leting the Project including, without limitation, additional overhead. legal and other costs incurred by Owner to effect such termination and to complete the Project. If the total costs noted above exceed the balance of the Contract Sum unpaid at the time of the termination. Contractor shall. promptly after receipt of an invoice. pay to Owner the amount of such excess. Owner shall have the right and is authorized to set-off against and deduct from any excess payable to Contractor any other damages sufferetl. by Owner due to said default or event giving rise to the termination or due to othe'r defaults of Contractor in complying with the terms of the Contract Documents. Contractor shall continue to be fully liable for all such other damages to Owner. A waiver by Owner of one default by Contractor shall not be considered to be a waiver of any subsequent default by Contractor. nor be deemed to amend or modify the terms of the Contract Documents. Contractor expressly waives any formal notice by Owner of Contractor's failure to perform, or passive breach of, Contractor's express obligations under the Contract Documents.

Contractor agrees that upon ·commencement of a case, receivership, civil action or other proceeding hy or against Contractor under state. federal or other applicable insolvency Jaw and if such case is not dismissed within thirty (30) days thereafter, or upon any general assignment by Contractor for the benefit of its creditors. Owner may, in its sole discretion. treat Contractor as in default and may exercise any of the remedies of this Section 14.2.1. In the event Owner's remedies are Jimited by the commencement by or against the Contractor of a case under any chapter of the United States Bankruptcy Code, Contractor stipulates. acknowledges and agrees that time is of the essence in determination of whether the Contract Documents should be "assumed" or "rejected." within the meaning of ll U.S.C. § 365; and Contractor therefore further stipulates and agrees that subject only to calendaring constraints of the Bankruptcy Court having jurisdiction. it will take all necessary action to cause the assumption or rejection of the Contract Documents on or before the thirtieth day following the filing of the Petition commencing any such case. In such event if Contractor seeks to "assume" the Contract Documents, Contractor expressly stipulates, acknowledges and agrees that "adequate assurance of future performance" within the meaning of 11 U.S.C. § 365 (b)(l )(C) means a determination that there is no foreseeable ljkelihood that there will be any further interruption of Contractor's performance under the Contract Documents following its assumption.

In the event Owner dctcnnines, in its rea~onable discretion; that Contractor has become insolvent or is in danger of becoming insolvent, then Owner is authorized, but not required. to make direct payment to Contractor's subcontractors with resoect to any current or pa~t-due invoices then outstanding.

Alternatively, Owner may. in its sole discretion. require that agreements between Contractor and any such subcontractor be assigned to Owner. and Contractor hereby authorizes and consents to any such assignment. Owner shall be entitled to full credit against any obligations to Contractor for any payments made to any subcontractor under this Section. whether made pursuant to assigned subcontracts or AlA Document A20tTM -1997. Copyright @ 1911 , 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: Thla AlA• Document It protected by U.S. Copyright law and International Treatlea. Unauttiorlzctd 47 reproduction or dlttrlbutlon of thla AlA"' Document, or any portion ollt, may result In severe civil and criminal penaiUu, and will be prosecuted to the maximum extent possible under the 1- . This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_1 which expires on 7/23/2006, and Is not for resale.

User Notes: Clayco A201 - Koll - lntelllcenter · Dallas v2 (5· 19·06) (986536188) R.P. Appx. 387 76 otherwise. Title to any materials or equipment for which such direct payment is made shall pass directly from such subcontractor to Owner.

§ 14.2.2 When any of the above reasons exist, the Ov<aer, Mpoa certificatiO;A by me Afekiteet ~eat Owner may, if sufficient cause exists to justify such action, fa&y-without prejudice to any other rights or remedies of the Owner and after giving the Contractor and the Contractor's sure.ty, if any, seven days' written notice, terminate employment of the Contractor and may, subject to any prior rights of the surety: .1 take possession of the site and of all materials, equipment, tools, and construction equipment and machinery thereon owned by the Contractor; .2 accept as$ignment of subcontracts pursuant to Section 5.4; and .3 finish the Work by whatever reas(mable method the Owner may deem expedient. Upon request of the Contractor, the Owner shall furnish to the Contractor a detailed accounting of the costs incurred by the Owner in finishing the Work.

§ 14.2.3 When the Owner terminates the Contract for one of the reasons stated in Section 14.2. l , the Contractor shall not be entitled to receive further payment until the Work is finished.

§ 14.2.4 If the unpaid balance of the Contract Sum exceeds costs of finishing the Work, iaeh:IEiiag eelftpeasatioa fer tke ,'\rehltect's services aaEI eKpeases maEie aeeessary thereby, and other damages incurred by the Owner and not expressly waived, such excess shall be paid to the Contractor. If such costs and damages exceed the unpaid balance, the Contractor shall pay the difference to the Owner. The aHtflMRt to be paid to IJ:Ie Ceewacter er Oweer, as tee case lftay be, sbaU be eeftiJ.ieEII:ly the Afeeiteet, t~pea appHeatiea, aed t81s This obligation for payment shaJI survive termi11ation of the Cea!:raet.Contract Documents.

§ 14.3 SUSPENSION BY THE OWNER FOR CONVENIENCE § 14:3.1 The Owner may, without cause, order the Contractor in writing to suspend, delay or interrupt the Work in whole or in part for such period of time as the O~ner may determine. Upon receiving any such notice of suspension, Contractor shall promptly suspend further performance of the Project to the extent specified, and during the period of such suspension shall properly care for and protect all Work in progress and materials, supplies. and equipment Contractor has on hand for performance of the Project Upon. the request of Owner. Contractor shall promptly deliver to Owner copies of outstanding subcontracts of Contractor, and shall take such action relative to such subcontracts as may reasonably be directed by Owner. Contractor shall use it.s best efforts to utili7.e its material. labor and equipment in such a manner as to mitigate costs associated with suspension. Owner may at any time withdraw the suspension of performance of the Project a<: to all or part of the suspended Project by written notice to Contractor soeeifving the effective date and scope of withdrawal. and Contractor shall r:esume diligent performance of the Project for which the suspension is withdrawn on the specified effective date of withdrawal.

§ 14.3.2 The Contract Sum and Contract Time shall be adjusted for increases in the cost and time caused by suspension, delay or interruption as described in Section 14.3.1. Adjustment of the Contract Sum shall include profit. No adjustment shall be made to the extent: .1 that performance is, was or would have been so suspended, delayed or interrupted by another cause for which the Contractor is responsible; or .2 that an equitable adjustment is made or denied under another provision of the Contract.

§ 14.4 TERMINATION BY THE OWNER FOR CONVENIENCE § 14.4.1 The OWQer may, at any time, terminate the Contract for the Owner's convenience and without cause.

§ 14.4.2 Upon receipt of written notice from the Owner of such termination for the Owner' s convenience, the Contractor shall: .1 cease operations as directed by the Owner in the notice; .2 take actions necessary, or that the Owner may direct, for the protection and preservation of the Work; and .3 except for Work directed to be performed prior to the effective date of termination stated in the notice, terminate all existing subcontracts and purchase orders and enter into no further subcontracts and purchase orders.

AIADocurnentA201"'-1997.Copyright @191 1, 1915,1918, 1925, 1937, 1951,1958,1961,1963.1966.1970, 1976,1987and 1997byTheAmerican Institute of Architects. All rights reserved. WARNING: Thla AlA• Document Ia protected by U.S. Copyright Law and International Treallea. U nauthorlzed 48 reproduction or distribution of thla AlA• DoctJ menI, or any portion of It, may result In severe clvlland criminal penalties, and will be prosecuted to the maximum extent possible under the taw. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No.1000182995_ 1 which expires on 7/23/2006, and is not for resale.

User Notes: Clayco A201 • Koll · lntellicenter · Dallas v2 (5-19-06) (986536188) R.P. Appx. 388 77 Upon receipt of said notice, Contractor shall advise Owner of its outstanding subcontracts pertaining to performance of the terminated Work and, upon request, furnish Owner with complete copies. Contractor shall place no further subcontracts except as may be necessary for completion of such portion of the Project as is not terminated. Contractor shall promptly make every reasonable effort to procure cancellation, upon terms satisfactory to Owner, of all subcontracts to the extent they relate to the performance of Work terminated or, as directed by Owner, shall assign to Owner in form satisfactory to Owner such of its subcontracts as are designated by Owner. or shall take such other action relative to such subcontracts as may be directed by Owner.

§ 14.4.3 In case of such termination for the Owner's convenience, the Contractor shall be entitled to receive payment for Work executed, and costs incurred by reason of such termination, along witb reaseea8Je everheael aeel prefit Contractor's Fee based on the percentage set forth in Section 5 .1. 2 of the Agreement for Work completed to date.

Contractor shall not exee~Heel.be entitled to any prospective profits or any damages from any termination, suspension or otherwise, wllether caused by Owner's fault, negligence or otherwise.

AlA Document A201'M -1997. Copyright © 1~11. 1915. 1918, ~925. 1937, 1951 . 1958, 1961, 1963, 1966, 1970, 1976. 1987 and 1997 by The American Institute of Architects. All rights reserved. WARNING: This AlA Document Ia protected by U.S. Copyright Law and International Treaties. Unauthorized 49 reproduction or distribution of thla AlA• Document, or tny portion of It, may result In ~evere civil and criminal pen1ltles, tnd will be pro10cuted to the maximum extent possible under the law. This document was produced by AlA software at 14:42:43 on 05/19/2006 under Order No. 1000182.995_1 which expires on 7123/2006, and is not for resale.

User Notes: Clayco A201 - Koll - lntelllcenter - Dallas v2 (5-19.06) (986536188) R.P. Appx. 389 78 Certification of Document's Authenticity AfA® Document D401TM - 2003 f, , hereby certify, to the best of my knowledge, information and belief, that I created the attached final document simultaneously with this certification at 14:42:43 on 05/19/2006 under Order No. I 000 182995_ 1 from AlA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AlA®Document A20 I rM - 1997 - General Conditions of the Contract for Construction, as published by the· AlA in its software, other than changes shown in the attached final document by underscoring added text and striking over de1etcd text.

(Signed)

(Title)

(Dated)

AlA Document D401TM -2003. Copyright@ 1992 and 2003 by The American Institute of Architects. All rights reserved. WARNING: This AlA" Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA• Document, or any po rtlon of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent poulble under the lew. This document was produced by AlA softwareat14:42:43 on 05/19/2006 under Order No.10001 82995_1 which expires on 7123/2006 , and is not for resale.

User Notes: Clayco A201 - l<oll· lntellicenter · Dallas v2 (5-19·06) (98·6536188)

R.P. Appx. 390 79 Exhibit B

R.P. Appx. 391 80 AMERICAN ARBITRATION ASSOCIATION ONLINE FILING ACKNOWLEDGEMENT This confirmation serves as the Demand for Arbitration or Request for Mediation for this filing.

To institute proceedings, please send a copy of this form and the parties' dispute resolution agreement to the opposing party.

Case # : 01-14-0001-0249 This will acknowledge receipt of a request for dispute resolution services for the claim and parties detailed below.

This claim has been filed for Arbitration This matter has been filed in accordance with Construction Industry Arbitration Rules The fee paid at the time of filing was $8,200.00 This request was received by the AAA on 05-Sep-2014

Claim Description On or about May 19, 2006, Intellicenter Dallas Investments, LP ("Intellicenter") contracted with Clayco Inc ("Contractor") under a Design Build contract ("Design Build Contract") for the design and construction of a 4 story speculative office building consisting of approximately 211,637 square feet located at 3701 Regent Boulevard, Irving Texas ("Project").

The Design Build Contract provided that the Contractor shall be responsible to Intellicenter for acts and omissions of the Contractor's employees, subcontractors and their agents and employees, and other persons, including the Architect, engineers and other Design Professionals, performing any portion of the Contractor's obligations under Article 3 with respect to the design of the Project.

The Design Build Contract Documents included a specification manual which required the elevated floor slabs to be designed for a 100lb live load with Code allowance reductions. The Contractor completed construction on March 6, 2007 as indicated in the architect's certification under the Certificate of Substantial Completion. In September 2007, six months after Substantial Completion, the architect, Forum Studio Inc. ("FS")., represented to Intellicenter that the Project was built in accordance with the plans and specifications. Further, FS indicated that it understood Intellicenter was relying upon the architect's representation and that Intellicenter may pursue a claim in the event that Intellicenter has any loss or damage as a result of the facts and circumstances that exist at the Project which made any of the FS's certifications incorrect or inaccurate.

Last year, as Intellicenter was preparing the building for sale, a broker noted some cracking in the exterior tilt panels. After evaluating the cracks, the design, and the building, Intellicenter learned that the cracks, some of which appeared to have been intentionally concealed by repair at the time of initial construction, were the result

R.P. Appx. 392 81 of inadequate structural design in portions of the perimeter concrete wall panels and a portion of the steel beam to wall panel connections in such a way that some, if not all, failed to meet applicable building code based upon contract specified live load on design drawings.

Upon its first discovery of the cracks, Intellicenter wrote Contractor and requested that Contractor correct the deficient design and/or construction. Intellicenter even met with Contractor in person and requested more information. Despite the request to repair the deficiency, Contractor has refused to correct the design and construction deficiencies. Because of Contractor's refusal, Intellicenter has sought bids and contracted for the Project to be repaired to correct the defects. Until undertaking these repairs, Intellicenter had not made any repairs to the outside of the Project.

Intellicenter files this demand for arbitration to recover the losses it has sustained as a result of Contractor's and/or FS's breach of contract, breach of implied warranty, unjust enrichment, deficient design, fraud and/or negligent misrepresentation. Intellicenter also seeks to recover its attorney's fees, and all reasonable and necessary costs and expenses recoverable under the Design Build Contract and/or applicable law and further seeks all other relief permitted by law.

Claim Amount $1,500,000.00 Do you have a Non-monetary aspect to your claim? N Additional Damages Amount Attorney fees Interest Other Fee Schedule Option Standard ADR Agreement Contained in AIA Document.

Parties and Representatives Party 1 Category Owner Name Company Name Intellicenter Dallas Investments LP Address 8115 Preston Road Suite 700 Dallas, TX 75225 Phone Fax Email The Party is the Company Representative 1 Name Gregory C. Noschese Firm Name Munsch Hardt Kopf Harr

R.P. Appx. 393 82 Address 500 North Akard Suite 3800 Dallas, TX 75201 Phone Fax Email [email protected] Party 2 Category Design / Builder Name Company Name Clayco Inc. Address 2199 Innerbelt Business Drive St. Louis, MO 63114 Phone Fax Email The Party is the Company Representative 2 Name Thomas Avery Firm Name Address 120 South Central Avenue Suite 1650 St. Louis , MO 63105 Phone Fax Email Party 3 Category Architect Name Company Name FS Architecture, PC Address c/o Forum Studios, Inc. 2199 Innerbelt Business Ctr. Dr. St. Louis, MO 63114 Phone Fax Email The Party is the Company Representative 3 Name Registered Agent Firm Name FS Architecture, PC Address c/o Forum Studios, Inc. 2199 Innerbelt Business Ctr. Dr. St. Louis, MO 63114 Phone Fax Email

R.P. Appx. 394 83 EXHIBIT C

R.P. Appx. 395 84 FORM OF ARCHITECT'S CERTIFICATE

The Prudential Insurance Company of America Prudential Real Estate Investors Two Ravina Drive, Suite 400 Atlanta, GA 30346 Attn: Mark W. Seedorf!

Re: 3701 Regent Blvd., Irving TX Gentlemen: We understand that you intend to acquire an interest in Intellicenter Dallas Investments, LLP, a Delaware limited liability partnership (the ''Venture"), which Venture acquired the real property in Irving, Texas, more particularly described in Exhibit A attached hereto (the "Land"), and constructed an office building consisting of approximately 199,276 net rentable square feet, plus 850 parking spaces (collectively, the "Improvements"), pursuant to an Agreement To Acquire Interest, dated January 5, 2006 (the "Commitment"). (The Land and Improvements shall be referred to herein collectively as the "Project".)

We understand that the receipt by you of certain written certifications from us is a condition precedent to your obligation tO make a capital contribution to the Venture and to acquire an interest in the Venture. Accordingly, we hereby certify the following: ARCHITECTURE I. We prepared the working drawings, a true and complete copy of which is attached hereto as Exhibit B (the "Plans and Specifications"). The working drawings describe the Improvements completely _and accurately.

2. The Project lies in a district designated FWY (Freeway) zoning under the applicable zoning ordinance No. 4681, City of Irving Planning and Development Department. The Project, if built and used in conformity with the Plans and Specifications, is in full compliance with such zoning ordinances.

3. All Improvements contemplated by the Plans and Specifications are permitted by and in conformance with all applicable building codes and regulations and all other federal, state and local laws, rules and regulations relating to the physical aspects of improvements to land.

4. Based on our observation of the Improvements during their construction and at the time all certificates of occupancy were issued, (a) the Improvements as actually built substantially conform to the Plans and Specifications, and comply with all Federal, state and locallaws,·rules, and regulations relating to the physical aspects of improvements to land, including. without limitation, those relating to zoning, building and fire codes, of which we have been made aware

1855559.2

R.P. Appx. 396 85 by the owner, and environmental laws, rules and regulatiOns and (b) no amendment to the building permits were required subsequent to April26, 2006.

5. The Project complies in all respects with the Americans with Disabilities Act and all rules, regulations and guidelines promulgated in connection therewith.

6. Intentionally deleted.

7. The specified materials for the Project do not contain asbestos or polychlorinated biphenyl (PCB) products or any other hazardous or toxic wastes or substances in violation of applicable environmental laws.

8. Tlte Project, if built in conformity with the Plans and Specifications, is in substantial compliance with all conditions and requirements specifically relating to construction and development of the Project contained in the following documents: [None] LANDSCAPE ARCIDTECTIJRE l. The landscape architects are licensed in the State of Texas. They provided landscape architecture design and construction observation services for the site improvements for the Project. Their involvement included preparing landscape design plans, as noted on Exhibit B.

In connection with rendering such plans, they performed such research and made such investigations as tltey deemed appropriate in their professional judgment with respect to such plans. They provided limited construction observation services pursuant to our contract. In addition, they periodically observed the contractor's progress and procedures during the preparation of the site and full course of construction.

2. In our professional opinion and based upon our services rendered, the Project's landscape improvements (the "Site Improvements") have been designed in compliance with applicable federal, state and local approvals and design standards relating to the Site Improvements.

3. Further, the work was completed in a manner compatible with the relevant aspects of the Land as understood by the landscap~ architects at the time of design and in substantial compliance with their recommendations.

ENGINEERJNG I. The civil engineers are licensed in the State of Texas. They provided civil engineering design and construction observation services for the Improvements. Their involvement has included preparing civil engineering design plans noted on Exhibit B. In connection with rendering the Plans, they performed such research and made such investigations as deemed appropriate in their professional judgment with respect to the Plans. Tltey provided construction observation services during site preparation and grading prior to beginning construction of buildings. In addition, they periodically observed the contractor's progress and procedures during the preparation of the site and full course of construction.

2. We hereby represent to you that, in our professional opinion, based upon our services rendered, the Project has been designed with respect to the civil engineering aspects in

18555592

R.P. Appx. 397 86 compliance with applicable Federal, state and local approvals and design standards relating to the site improvements for the land.

3. We hereby represent to you that the following utilities are connected to the Improvements and fully operational: water, electric, sanitary/sewer and telephone. Such utilities comprise all of the utilities which were designed by the civil engineers.

4. We have concluded that on the basis of our observations that the contractor has completed the Project in substantial confonnity with the Plans. Further, the work was completed in a manner compatible with the relevant aspects of the Land as understood by the civil engineers at the time of design and in substantial_compliance with their recommendations.

This letter is being delivered to you as a condition precedent to your making a capital contribution to the Venture and acquiring an interest in the Venture. We understand that you and the Venture are relying on this letter and that you or the Venture may pursue a claim against us in the event that you or the Venture has any loss or damage as a result of facts or circumstances that exist at the Project which make any of our certifications incorrect or inaccurate. This letter does not constitute, however, a guarantee of the work of the builder of the Improvements, and the builder and its subcontractors are solely responsible for all construction means, methods, techniques, sequences and procedures and compliance with the drawings, specifications and contract documents.

Very truly yours, fbrytM.-t. ~t\M, Vhv.

(Attachments)

EXHIBIT A Land

EXHIBITB Plans and Specifications

1855559.2

R.P. Appx. 398 87 Pcdl c.- s EXHIBIT A i LEGAL DESCRIPTION OF THE LAND i' i.

BEING a 14.84 acre tract of land situated in the Jefferson Tilley Survey, Abstract No. 1474, City oflrving, Dallas County, Texas, and being part of a tract of land conveyed to The Travelers Insurance Company by deed as recorded in Volume 91244, Page 4044 of the Deed Records, Dallas County, Texas, and being more particularly described by metes I I ' and bounds as follows: ).' CO:M:MENCIN"G at a 1/2 inch iron rod found at the new West line of Bcltline Road. said i .I point being the Northwest comer of a tract of land conveyed to the County of Dallas by I deed recorded in Volume 91189, Page 2171, of the Deed Records of Dallas County, i Texas, said point also being in the ~oll(hcrly line of Interstate Highway No. 635 (LBJ Freeway, a variable width right-of-way); I TIIENCE North 71 degrees 07 minutes 55 seconds West, along the southerly line of said I Interstate Highway No. 635 (LBJ Freeway), a distance of518.07 feet to a 1/2 inch iron rod found for comer; I TIIENCE North 61 degrees 27 minutes 23 seconds West, continuing along the southerly line of said Interstate Highway No. 635 (LBJ Freeway) , a distance of 26.87 feet to a 112 I inch iron rod found for comer, said point being the POINT OF BEGINNING, same point being the Northwest comer of a tract of land conveyed to SMPD-TEXAS-lRVING-203, LLC by deed as recorded in Volume 2003066, Page 01481, Deed Records, Dallas County, Texas, said point also being the Northeast coiner of said 14.83 acre tract ofland being described; THENCE South 28 degrees 32 minutes 37 seconds West, departing the southerly line of said Interstate Highway No. 635 (LBJ Freeway) and along the common line of said SMPD-TEXAS-IRVING-203, LLC tract and said 14.83 acre tract of land being described, a distance of 775.69 feet to a 1/2 inch iron rod set for comer, said point being in the northeac:;terly line of Regent Boulevard (a variable width right-of-way) according to the plat thereof recorded in Volume 85244, Page 3298, Map Records, Dallas County, Texas, said point being the Southeast comer of said 14.83 acre tract of land being described, said point also being the Southwest corner of a tract of land conveyed to SECOND CENTURY INVESTMENTS by deed as recorded in Volume 2003066, Page 01466, Deed Records, Dallas County, Texas, same point being the beginning of a curve to the right having a radius of900.00 feet a delta angle of22 degrees 59 minutes 22 seconds, and a chord hearing and distance of North 56 degrees 37 minutes 34 seconds Wes~ 358.70 feet;

THENCE in a northwesterly direction continuing along the said curve to the right an arc distance of 361.12 feet and to a 1/2 inch iron rod found for comer; THENCE North 45 degrees 07 minutes 53 seconds West, continuing along the northeasterly line of said Regent Boulevard, a distance of 119.07 feet to a 112 inch iron Exhibtl A-Legal Description of the Land Page 1 Dallas 1270791_2 5554.38

R.P. Appx. 399 88 i I I rod found for corner. said point being the beginning of a curve LO the righL ha\'ing a radim; ' i' of 607_74 feet a delta angle of 40 degree< 07 minmes 46 second.<, and a chord hearing and I distance of North 25 degrees 04 minutes 00 seconds w_est, 417.01 fcc[; TIJENCE in a northwesterly direction continuing along lhc saic.l curve to the righl an arc distance of 425.66 feeL and 10 a 10. inch iron rod found for comer: THENCE North 05 degrees 00 minutes 07 seconds West, continuing alor1g the northea.~terlyline of said Regent Boulevard, a distance of 337.64 feet to a 1/2 inch iron rod found for corner. said point being the beginning of a curve to the left having a radius of708.50 feet a delta angle of34 degrees: 03 minutes 09 seconds, and a chord bearing and di'itance of North 21 degrees 57 minutes 59 seconds West, 414.91 feet; THENCE in a northwesterly direction continuing along !he said curve to the right an nrc distance of 421.08 feet and to a 112 inch imn rod found for comer, said point being the Northwest comer of said l4.83 ncre trnct ofland being- described and being in the southerly line of said Interstate Highway No. 635 (LllJ Frccwa)'): I,' THENCE South 45 degrees 07 minutes?' seconds East, along the southerly line of said I [ntcrstate Highway No. 635 (LBJ Freeway). a distance of 285.79 feet to a 112 inch iron rod futmd for corner; THENCE Soutb 61 degrees 27 minutes 23 seconds East, continuing along the southerly f lino of said btterstate Highway No. 635 (LBJ Freeway) , a distance of 1038,95 feet to the POINT 01' BEGINNING and containing 646.585 square feet or 14.84 acres of computed land,

Exhibit A-Legal Description of the Land Page2 Dallas 1270791_2 5554.38

R.P. Appx. 400 89 EXHIBIT B- DALLAS Drawing List lntellicenter ~ Dallas 3701 Regent Blvd. Irving, Texas 75063 i Number Drawing Civil Trtle Rev Date C1 C2 Cover Sheet Grading Plan 3/2612007 312612007 I C3 Underfloor Grading Plan 312612007 C4 Drainage Area Map 312612007 cs Storm Sewer Plan 312612007 C6 Storm Sewer Profiles 312612007 C7 Utility Plan 312612007 CB Paving Plan 312612007 C9 Tum Lane Plan 312612007 C10 Tum Lane Plan and Details 312612007 C11 Paving Details 312612007 C12 Erosion Control Plan 312612007 C13 Erosion Control Details 312612007 C14 City of Irving Storm Water Pollution Prevention Methods 51812006 C15 City of liVIng Storm Water Pollution Prevenllon Details 51812006 C16 City of Irving Storm Sewer Details 312612007 C17 City of Irving Inlet Details 312612007 C18 City of Irving Trench Embedment, Backfill, and Pavement 3/W2007 Repair Detru1s C19 City of Irving Details lor Trench ShesUng, Shoring, 312612007 Sloping for Trenches over 5' Deep C20 City of Irving Water and Sanftruy Sewer Delalls 312612007 C21 City ollrvlng Sanitary Sewer Details 312612007

Architectural Cover 312612007 AD-<JO Project Information 312612007 INDEX Drawing Index 312612007 AD-<J1 Ufe Safety Plans & Code Dala 312612007 AD-<J2 Raled S\ruc\ure Plans 3126.12007

I R.P. Appx. 401 90 AO<l3 UL Assemblies 312612007 AHJ1 An::hilectural Slle Plan 312612007 A1-o2 Enlarged Site Plans and Details 312612007 !• A2-<l1 OVerall Crawl Space and Fir9t Floor Plans 312612007 i A2-<l2 OVerall Second and Third Floor Plans 312612007 l A2-<J3 OVerall Fourth Roor and Roof Plans 312612007 A2-11 Partial First Floor Plan 312612007 A2·12 Partial First Floor Plan 312612007 A2·21 Partial Second Floor Plan 312612007 A2-22 Partial Second Floor Plan 3/2612007 A2-31 Partial Third Floor Plan 312612007 A2-32 Partial Third Floor Plan :J/2612007 A2-41 Partial Foorth Floor Plan 312612007 A2-42 Partial Foorth Floor Plan :J/2612001 A2-51 Partial Roof Plan :J/2612001 A2-52 Partial Roof Plan S/2612001 A2-53 Roof Details :J/2612007 A2-54 Roo\' Details :J/2612IJ07 A3-01 Overall Elevations :J/2612001 A3-02 Enlarged Elevations 312612007 A3-{)3 Enlarged Elevations 312612007 I. ' I' A3-04 Enlarged Elevations :J/2612007 A3-<l5 Enlarged Elevations 312612007 A3-10 Building Sections SI2612IJ07 A3-11 Building Sections 312612007 A4-01 Enlarged Plans, Toilet Rooms & Lobby 312612007 AS-00 Interior ElevaUons, Typical Information 312612007 A5-01 Interior Elevations, Lobby 312612007 A5-02 Interior BevaUons, Toilet Rooms 3/2612007 AS-<l3 Interior Elevations Elevator Gabs 312612007 AB-11 Partial First Roar Ceiling Plan 312612007 AB-12 Partial First Aoor Ceiling Plan S/2612007 AB-21 Partial Second Roor Ceiling Plan 312612007 AB-22 Partial Second Roor Ceiling Plan 312612007 A'""1 Partial Third Roar Ceiling Plan 312612007 AB-32 Partial Third Roar Ceiling Plan 3126/2007 AB-41 Partial Fourth Floor Ceiling Plan 312612007

R.P. Appx. 402 91 A6-<2 Partial Fourth Floor CeiUng Plan 312612007 A7-Q1 Elevator PlallS & Sections 312612007 AHJ2 Elevator Sections 312612007 A7-Q3 Elevator Delalls 3/2612007 A7-11 Stair 1 Seclions & Plans 3/2612007 A7-11A Stair 3 Section & Plans 3/2612007 A7-12 Stair 2 Sections & Plans 3/2612007 A7·13 Stair Details 312&'2oo7 AB-01 Wall Sections 312612007 AB-02 Wall Sections 312612007 AB-<>3 Wall Sections 312612007 AB-<>4 Wall Sections :l/2612007 A9-<!1 Partition Types and Details, Door & Frame Types & Details 312612007 ...., TYP Window Details :l/2612007 A9-<l3 Window Frame Types 3126/2007 A9-10 Plan Details 3/2612007 A9-11 Plan Details 312612007 AB-20 Exterior Details 312612007 AS-21 Exterior Delails :l/2612007 AS-22 Exterior Delails :l/2612007 Al()-{)1 lnteriorDelails, Toilet Rooms :l/2612007 A1()-{)2 lnlerlor Delalls, 1st Level Lobby 312612007 i ' A1D-03 Interior Details, 2nd l..Bvel Lobby :l/2612007 I A11-11 Partial Finish Plans, First Floor 3126/2007 A11·12 Partial Finish Plans, First Floor :l/2612007 A11-21 Partial Finish Plan, Second Floor :l/2612007 A1H2 Partial Rnlsh Plan, Second Floor :l/2612007 A11-31 Partial Finish Plan, Third Floor :l/2612007 A11-32 Partial Finish Plan, Third Floor 312612007 A11-41 Partial Finish Plan, Fourth Floor 312612007 A11-42 Partial Rnlsh Plan, Fourth Roor 312612007 Slructural S1.01 General Noles 312612007 81-02 Typical SectiollS & Delails 312612007 S1.Q3 Typical Sections & Delails 312612007 81.()4 Typical Sections & Details 312612007 52.01 Partial Pier Plan 312612007

R.P. Appx. 403 92 I ' II I I S2-o2 S2-o3 Partial Pier Plan Dock Plan 312612007 312812007 I ,.

52-11 Partial Foundation Plan 312612007 I' I !

52-12 Partial Foundation Plan 312612007 i 52-21 Partial Second Floor Framing Plan 3/2£12007 I j.

52-22 Partial Second Floor Fmmlng Plan 312612007 ! ' 52-31 Partial Third Floor Framing Plan 312612007 S2-32 Partial Third Floor Framing Plan 312612007 52-41 Partial Fourth Floor Framing Plan 312612007 52-42 Partial Fourth Floor Framing Plan 312612007 52-51 Partial Roof Fmmlng Plan 312612007 52-52 Partial Roof Framing Plan 312812007 S3-01 Foundation Section and Details 312612007 S3-02 Foundation Section and Details 312612007 S3-03 Foundation Section & Details 312612007 54-01 Fremlng Section & Details 312612007 S4-02 Framing Section & Details 312612007 S4-03 Fi8mlng Section & Details 312612007 54-04 Framing Section & Details 312612007 S5-<l1 Column Schedule & Details 3126/2007 SB<l1 Brace Elevation & Details 312612007 Tilt Up T1-11 Partial Panel Layout Plan 312612007 T1-12 Partial Panel layout Plan 312612007 T2-11 Typical Sections & Details 312612007 T3-11 Tilt-Up Wall Elevations 312612007 T3-12 Tilt-Up Wall Elevations 312612007 T3-13 Tilt..Up Wall Elevations 312612007 T3-14 Tilt-Up Wall Elevations 312612007 T4-11 Reinforcing De!ails 312612007 T-4--12 Reinforcing Details 3/2612007 Fire Protection Sheet 1 of 10 Site Plan 311312007 Sheet 2of 10 Leve11 -East Wing 311312007 Sheet 3 ol10 Lsve11 -West Wing 311312007 Sheet 4 ol10 Leva12 • East Wing 311312007

R.P. Appx. 404 93 R.P. Appx. 405 94 Electrical E1.01 Site Plan Bectrlcal 319/2007 E2.11 Flrsf Floor Plan Electrical 31912.007 I' E2.12 Partial First Floor Plan Electrical 31912007 : E2.21 Partial Second Floor Plan Electrical 31912.007 !I E2.22 Partial Second Floor Plan Electrical 31912007 I E2.31 Partial Third Floor Plan Electrical 3/912007 E2.32 Partial Third Floor Plan Bectrical 3/912007 E2.41 Partial Fourth Floor Plan Eleclrical 31912007 E2.42 Partial Fourth Floor Plan Electrical 31912.007 E4.01 Single Una Electrical 31912007 E4.02 Details Electrical 3/912007 E4.03 Details Electrical S/9/2007 ES.01 Electrical Schedules 31912007 E5.02 Eleclrical Schedules 31912007 E5.03 Electrical Schedules 319/2007 E5.04 Electrical Schedules 31912007 E5.05 Electrical Schedules 3/912007 ES.06 Ughling FIXtUre Schedule 31912007 El.2.11 Partial Firs! Floor Plan UghUng 3/912007 El.2.12 Partial First Floor Plan Ughling 3/912007 El2.21 ParUal Second Floor Plan UghUng 3/S/2007 El2.22 Partial Second Floor Plan UghUng 31912007 EL2.31 Partial Third Floor Plan Ughting 31912007 El.2.32 Partial Third Floor Plan Lighting 31912.007 El.2.41 Partial Fourth Floor Plan Ughling 31912007 EL2.42 Partial Fourth Floor Plan Ughtlng 31912007 Landscape & Irrigation

LC 1.1 General Notes & Materials Schedule 4118106 LS 1.1 Olera11landscape Sitewol1< Plan 4118106 LS 1.2 Sitewol1< & Pavtng Enla~gemenls 4118106 LS2.1 Sitework Delalls 4118106 LP 1.1 Planting Plan 4118106 LP 1.2 Planting Entry Enlargement 4118106 LP 1.3 Planllng Entry Enlargement 4/IB/06 LP2.1 Planting DetaUs 41\B/06 uu OVerall Landscape lrrrigation Plan 4/IB/06

R.P. Appx. 406 95 u 1.3 Landscape Irrigation Building Enlargement 4/18106 u 1.2 Landscape Irrigation Building Enlargement 4/18106 Ll2.1 Landscape Irrigation Detlals 4/1&'06 Specification 00010 Table of Contents 9/1/2006 4 Pages 02110 Site Clearing 1/1912006 2 Pages 02122 Tree Protection and Trimming 1/1912006 3 Pages 02200 Site Earthwork 1/1912006 8 Pages 02201 Trenching, Embedment and Backfilling 1/1912006 2 Pages 02244 Ume Soil Stabilization 1/1912006 4 Pages 02400 Trench Safety Sheeting and Shoring 1/19/2006 8 Pages 02466 Drilled Piers 10121/200:5 9 Pages 02520 Portland Cement Concrete Paving 1/1912006 4 Pages 02624 Concrela Curb and Gutter 1/1912006 2 Pages 02660 Water and Pipe Frtlings 1/1912006 5 Pages I 02661 Gale Valves and Butlerily Valves 1/1912006 6 Pages iI 02662 Fire Hydrants 1/1912006 1 Pages II 02663 Wei Conneclion 1/1912006 1 Pages 02665 Water Pipe Test 1/19/2006 3 Pages 02666 Water Dechlorination 1/19/2006 1 Pages 02667 Cutting, Plugging and Blocking off Existing Water Mains 111912006 1 Pages 02720 Reinforced Concrete Pipe Culverts 1/1912006 1 Pages 02721 Drainage Structures 1/1912006 1 Pages 02722 Corrugated Polyalhylene Pipe 1/1912006 3 Pages 02730 Sanitary Sewer Mains 1/1912006 2 Pages 02731 Sanitary Sewer Manholes 1/1912006 2 Pages 02732 Sanitary Sewer Testing 1(1912006 1 Pages 03300 Gasl-ln-Place Collcrete 1012.512006 13 Pages 03301 Under Slab Vapor Barr1er/Retan:ler 1012112005 2 Pages 03306 Concrete Curing, Sealing and Hardening 11{712005 3 Pages 03470 Tltt-Up Concrete Construction 10/2112005 6 Pages 03490 Glass Fiber Reinforced Precast Concrete 1012112005 5 Pages 05120 Structural Steel 10121t2005 6 Pages

R.P. Appx. 407 96 05210 Steel Joists 1012112005 6 Pages 05310 Steel Deck 10121/2005 2 Pages 05500 Metal Fabilcations 10121/2005 7 Pages 05511 Metal Stairs 10121/2005 8 Pages ;

05521 Pipe and Tube Railing 10121/2005 8 Pages 05811 Architectural Joint System 10121/2005 6 Pages 06100 Rough Garpentry 10121/2005 5 Pages 06402 Interior Architectural Woodwork 10121/2005 5 Pages 07170 Bentonite waterproofing 1012112005 5 Pages 07210 Building lnsulaUon 1012112005 7 Pages 07412 Metal Wall Panels 1012112005 9 Pages 07540 Thermoplastic Membrane Roofing 1012112005 6 Pages 07620 Sheet Metal Aashing and Trim 10121/2005 5 Pages 07720 Roof Accessories 612212006 3 Pages 07811 Sprayed Rre- Resistive Materials 10121/200:5 5 Pages 07842 Fire Resistive Joint Systems 10121/2005 4 Pages 07920 Joint Sealants 212712006 7 Pages 08110 Steel Doors and Frames 10121/2005 5 Pages I 08125 Interior Aluminum Frames 10121/2005 4 Pages I 08211 Flush Wocxt Doom 10121/2005 4 Pages I 08311 Access Doom 10121/2005 5 Pages 08331 Overhead Colling Doom 10121/2005 4 Pages 08410 Aluminum Entrances and Storefronts 10121/2005 10 Pages 08470 Revolving Entrance Doom 10/21/2005 7 Pages 08620 Unit Skylights 1012112005 3 Pages 08710 Door Hardware 6/1212006 18 Pages 08711 Door Schedule M!212006 7 Pages 081100 Glass & Glazing 10121/2005 7 Pages 08830 Mirrors 10121/2005 5 Pages 08911 Glazed Aluminum Curtain Wall 10121/2005 9 Pages 09000 Material legend 6/22/2006 2 Pages 09253 Gypsum Sheathing 1012112005 3 Pages 09260 Gypsum Board Assemblies 10121/2005 14 Pages

R.P. Appx. 408 97 ' 09265 Gypsum Board Shaft-Wall Assemblies 10/2112005 5 Pages 09310 Ceramic Tile 10/2112005 7 Pages 09402 EpoxyTerrazo 1012112005 5 Pages 09514 ACO!Jstlcal Pan Callings 1012112005 4 Pages 09653 Resilient Wall Base 1012112005 4 Pages 09671 Resinous Flooring 10/27/2005 6 Pages 09861 Carpet Tile 10121/2005 3 Pages 09912 Painting 1012112005 9 Pages 09950 Wall Covering 9/112006 2 Pages 09970 Special Wall Surfaces(Flberglass Reinforced Plastic Panels) 1012112005 4Pages 09980 Special Coatings lor Concrete Surfaces 612212006 6 Pages ' 10155 Tof let Compartments 712812006 2 Pages I 10270 Access Flooring 1012112005 6 Pages I 10520 Flre Protection Specialties 10/2112005 5 Pages 10801 11160 Toilet and Bath Accessories Loading Dock Equlpmerrt: 612212006 1012112005 Pages Pages I I I I' 12491 Horizontal Blinds 10121/2005 3 Pages 14240 Hydraulic Elevators 2127/2006 8 Pages 15010 Basic Mechanical Requirements 1/1912006 4 Pages 15071 Mechanical Vibration Controls 1/1912006 4 Pages 15075 Mechanlcalldentillcatlon 1/19/2006 4 Pages 15081 Duel Insulation 1/1012006 B Pages 15083 Pipe Insulation 1/1912006 10 Pages 15100 Valves 1/1912006 B Pages 15135 Meters and Gages 1/19/2006 4 Pages 15140 Hangers and Supports 1/19/2006 4 Pages 15300 Rre Suppression Piping 1/1912006 14 Pages 15411 Water Distribution Piping 1/1912006 B Pages 15420 Drainage and Vent Systems 1/1912006 7 Pages 15440 Plumbing FIXtUres 1/1912006 4 Pages 15453 Plumbing Pumps 111912006 4 Pages 15460 Water Healers 1/19/2006 3 Pages

R.P. Appx. 409 98 15730 Section Packaged Rooftop Air Conditioning Units 111912006 10 Pages 15838 Power Ventilators and Exhaust Fans 111912006 7 Pages 15883 Variable Frequency Drives 111912006 5 Pages I 15891 Melal Duels 111912006 8 Pages I I 15910 Duct Accessories 1119/2006 6 Pages ' I 15g32 Air Outlets and Inlets 111912006 3 Pages I 15933 Air Terminals 111912006 4 Pages I 15970 Automatic COntrols Bl712006 32 Pages 15990 Testing, Adjusting, and Balancing 111912006 7 Pages 15995 Commissioning 1119/2006 5 Pages 16010 Basic Electrk:al Requirements 1/1912006 4 Pages 16110 Raceways 1/1912006 5 Pages 16120 Wires and Cables 1/1912006 3 Pages 16135 Cablnels, Boxes, and Fittings 1/19/2006 5 Pages 16143 Wiring Devices 1119/2006 4 Pages 16170 Circuit and Motor Disconnect Swilches 1119/2006 2 Pages 16190 Circuit and Motor Disconnect Swilches 1119/2006 4 Pages 16195 Electricalldenlificatlon 1/19/2006 3 Pages 16420 Service Entrance 1/1912006 4 Pages 16425 Switchboards 1/1912006 6 Pages 16452 Grounding 111912006 5 Pages 16460 Transformers 1119/2006 3 Pages 16470 Panelboan:ls 1/1912006 4 Pages 16471 Transient Voltage Surge Suppressors 1/1912006 4 Pages 16475 Qvercurrent Protective Devices 1/1912006 5 Pages 16481 Motor Controllers 1/1912006 4 Pages 16515 Ughtlng 1/1912006 6 Pages 16670 Ughtnlng Protection Systems 1/19/2006 3 Pages 16721 Fire Alarm Systems 1/1912006 7 Pages

R.P. Appx. 410 99 SearchIndividual

Individual Login | Business Login | Site Map | Contact Us | Home

HOW TO APPLY TBAE PUBLIC INFORMATION REGISTRANTS LAWS AND ENFORCEMENT ENFORCEME ENNT T

Find A Design Professional click here for business search

Registered interior designers, architects and landscape architects must be registered by the Texas Board of Architectural Examiners and adhere to specific standards and criteria set forth in law, including the completion of continuing professional education every year. It is against the law for any individual to claim to be an architect, landscape architect or registered interior designer unless he or she is registered by this Board.

Note: "Revoked" status does not necessarily mean the registrant was disciplined. In most cases, a license is revoked for nonpayment (voluntary or otherwise) of the annual registration fee. Please contact the board for more information. A registrant may voluntarily surrender his or her registration if he or she no longer wishes to be registered.

Note: It appears that some browsers, including Microsoft Internet Explorer Version 11, may display information improperly. TBAE staff are working on a solution to this problem, and meanwhile encourage users to view this page using Firefox, Chrome, Safari, or an earlier version of Internet Explorer if necessary while we work on the solution. Instructions to view results in Microsoft Internet Explorer 11.

Registration First Name Last Name Profession Firm Name City State Zip # 63114 Hans Hecker All All St. Louis MO Search

Not all fields are required. The search becomes narrower each time a field is populated.

No Results Found

Hobby Building : 333 Guadalupe, Suite 2-350, Austin Texas 78701 : Telephone (512) 305-9000 : Fax (512) 305-8900 Copyright © 2005-2015, Texas Board of Architectural Examiners

Web Policies | Trail | Texas Homeland Security | Texas.Gov | Texas Veterans Portal | Where the Money Goes | Report Fraud Online | Agency Contracts (SB 353)

R.P. Appx. 411 http://www.tbae.state.tx.us/PublicInformation/SearchIndividual[11/9/2015 4:27:46 PM] Business Search Note: H appears that some bfO\,sers, including Microsoft Internet Explorer Version l I. may display inlormation impruperly. TBAE staff are working on a sQiution to this problem, and meanwhile enco11r3ge usen; to vie\\ this page using rirefox, Chrome. Safari. or an earlier version of lnlcrrtct Explorer if necessary while we work on the solution. Instructions to vie\'\ results m Microsoft Internet Explorer I I Enter your scarcll criteria Re1! II: BR Finn Nome: Cluyco C:ity: Saint Loui$ Sate: '"' Z ip: 63114 Scltc:t Profc:iSion I _, I There Is No Resu lt Based On Your Search Criteria.

R.P. Appx. 412 hllps:l/birn:g.tboc.ll1ltte.L<.wlllomc/llwin<:Sll.';carchJ I II'I/2015 4:20:12 I'M 1 Business Search Nate. ll appears that some browsen.. including Microsoft lmcrnct Explorer Version 11, may display information improperly TBAE staffarc working on a solution to this problem. and meanwhile encourage users lt> view this page U!ling Firefox, Chrome. Safari, or an earlier version of Internet Explorer if rltli.'I.'SSary while we worl. on the solution. lm;tructions lo view result:. in Mit:rosoll Internet Explor<:r 11 Enter your search criteria lUg II: BR Firm Name: Cluyco City: SL Louis Stwte: "u Zip: 63114 Sclcc.ot Prof~:-11:;ion ~

There Is No Re.'l\111 Based On Your Search Crhet!a.

R.P. Appx. 413 hitps-Jibizreg.tbae.!rulle.ll<.IJ$/Homc/llu_<ints.•~reh(II/91201S 4:20:58 PM I

Case-law data current through December 31, 2025. Source: CourtListener bulk data.