Jordan v. Helix Energy Solutions Grp., Inc.
Jordan v. Helix Energy Solutions Grp., Inc.
Opinion of the Court
Plaintiff Ralph Jordan ("Jordan" or "Plaintiff") brought this action against defendant Helix Energy Solutions Group, Inc., ("Helix" or "Defendant") asserting claims for violation of the overtime provisions of the Fair Labor Standards Act ("FLSA"),
I. Factual and Procedural Background
A. Factual Background
Helix provides, inter alia, rigless offshore well intervention services using specialized well intervention vessels. Jordan and the only other individual to opt-in to this action, Christopher Gordon ("Gordon"), worked as drillers on Helix's Q4000 and Q5000 vessels, respectively. Both the Q4000 and the Q5000 are semisubmersible rigless vessels used to conduct well intervention in water depths of up to 10,000 feet. Kenric McNeal, Helix's Director of Human Resources, states in his declaration that because these vessels are rigless no actual drilling occurs.
A driller spends the majority of his time sitting in a control room, monitoring a series of computer screens to ensure that the well intervention operations are running smoothly.
Helix hired Jordan as an assistant driller in February of 2008, and Jordan worked in that position until October of 2013 when he was promoted to the position of driller.
Helix hired Gordon as a driller in November of 2013, and Gordon worked in that position until June of 2015 when he was discharged.
B. Procedural History
On June 23, 2016, Jordan filed an Original Complaint, individually and on behalf of all others similarly situated, seeking damages for unpaid overtime wages pursuant to the FLSA based on allegations that Helix misclassified him as exempt and improperly *895paid him on a day rate basis with no overtime compensation.
On July 18, 2016, Helix filed its Original Answer denying plaintiff's allegations, and asserting several affirmative defenses, including that Jordan was exempt from the FLSA's overtime requirements under the executive, highly compensated, administrative, and combination exemptions.
The parties stipulated to conditional certification,
On April 27, 2018, Helix filed Defendant's MSJ, asserting that no genuine issues of material fact exist that Jordan and Gordon are exempt under two FLSA exemptions: the executive and highly compensated exemptions, that it is entitled to summary judgment on the issue of willfulness, and that fact issues exist on the administrative and combination exemptions.
On April 30, 2018, Jordan filed his MPSJ, arguing that Helix waived its right to assert FLSA exemptions as affirmative defenses, and that even if it did not waive its affirmative defenses, Helix cannot meet its burden on the executive, highly compensated, administrative, combination, professional, and foreign exemptions, and that Helix cannot prove that it acted in good faith.
Both parties have filed responses in opposition to the other party's summary judgment motion,
II. Standard of Review
Summary judgment is warranted if the movant establishes that there is no genuine dispute as to any material fact and that it is entitled to judgment as a matter of law. Fed. R. Civ. P. 56(a). An examination of substantive law determines which facts are material. Anderson v. Liberty Lobby, Inc.,
If the dispositive issue is one on which the moving party will bear the burden of proof at trial, the moving party "must produce evidence that 'would entitle it to a directed verdict if the evidence went uncontroverted at trial.' " Dallas/Fort Worth International Airport Board v. INet Airport Systems, Inc.,
If the movant satisfies its initial burden, the burden shifts to the nonmoving party to show by affidavits, depositions, answers to interrogatories, admissions on file, or other evidence that summary judgment is not warranted because genuine fact issues exist. Celotex, 106 S.Ct. at 2553. The nonmovant may not rest upon the pleadings, but must identify specific facts that establish a genuine issue for trial. Id. In reviewing the evidence "the court must draw all reasonable inferences in favor of the nonmoving party, and it may not make credibility determinations or weigh the evidence." Reeves v. Sanderson Plumbing Products, Inc.,
III. Cross-Motions for Summary Judgment
Jordan has alleged that he and Gordon were non-exempt employees under the FLSA and that Helix violated the FLSA by failing to pay them overtime.
A. Applicable Law
The FLSA provides that "[n]o employer shall employ any of his employees ... for a workweek longer than forty hours ... unless such employee receives compensation for his employment in excess of the hours above specified at a rate not less than one and one-half times the regular rate at which he is employed."
"[T]he general rule [is] that the application of an exemption under the [FLSA] is a matter of affirmative defense on which the employer has the burden of proof." Corning Glass Works v. Brennan,
Jordan asserts that the FLSA exemptions must be narrowly construed against the employer.
The [circuit court] also invoked the principle that exemptions to the FLSA should be construed narrowly.... We reject this principle as a useful guidepost for interpreting the FLSA. Because the FLSA gives no "textual indication" that is exemptions should be construed narrowly, "there is no reason to give [them] anything other than a fair (rather than a 'narrow') interpretation." The narrow-construction principle relies on the flawed premise that the FLSA "pursues" its remedial purpose "at all costs." But the FLSA has over two dozen exemptions in § 213(b) alone, including the one at issue here. Those exemptions are as much a part of the FLSA's purpose as the overtime-pay requirement. We thus have no license to give the exemption anything but a fair reading.
B. Helix Has Not Waived Its Affirmative Defenses
Asserting that "Helix has done nothing in the way of identifying "the factual basis for the applicability of any [FLSA] exemption,"
Helix responds that its affirmative defenses are specifically pleaded in its Original Answer,
Plaintiffs reply that "Helix claims that the requisite factual detail is contained in its discovery response,"
*899Rule 8(c)(1) of the Federal Rules of Civil Procedure requires a litigant to "affirmatively state any avoidance or affirmative defense." Fed. R. Civ. P. 8(c)(1). "Failure to timely plead an affirmative defense may result in waiver and the exclusion of the defense from the case." LSREF2 Baron, L.L.C. v. Tauch,
The Fifth Circuit has not decided whether the pleading standard announced in Twombly and Iqbal extends to affirmative defenses, and district courts in this circuit are split on the issue. See Parikh,
Helix included in its answer the following statements regarding affirmative defenses:
3. Based upon information and belief, with the exception of assistant drillers, Plaintiff, other drillers, and other day-rate workers are exempt from the overtime provisions of29 U.S.C. § 207 pursuant to the provisions of29 U.S.C. § 213 , including the administrative, executive, professional exemptions, some combination thereof, and/or the highly compensated employee exemption. Assistant drillers are paid on an hourly basis with overtime compensation for hours worked over forty in a workweek.
4. Any acts or omissions by Helix with respect to the payment of wages to its assistant drillers, drillers, and day-rate workers, like Plaintiff, were undertaken in good faith reliance on the regulations and interpretations of the Wage Hour Administration of the United States Department of labor and/or legal advice or opinions from outside counsel and were based on long-standing industry standards and practices.43
*900An exemption must be asserted as an affirmative defense to a claim under the FLSA. See Brennan,
Even a technical failure to comply precisely with the pleading requirements of Rule 8(c) may be excused as long as "the affirmative defense is raised in the trial court in a manner that does not result in unfair surprise." Rogers v. McDorman,
Plaintiffs do not and cannot contend that they were surprised by the motion for summary judgment based on the executive and highly compensated employee exemptions to the FLSA's overtime requirements because in addition to naming these specific affirmative defenses in its Original Answer, Helix provided the factual basis for them in response to plaintiff's Tenth Interrogatory:
Helix submits that Driller position, held by Plaintiff, is exempt under the seaman, highly compensated, administrative and/or executive exemptions, and/or some combination thereof. Drillers work offshore. They are exempt because they make well in excess of $100,000. Drillers do not "drill" per se but rather supervise the activities of the drill crew, including al drilling documentation, logs, and International Association of Drilling Contract paperwork. Drillers customarily and regularly direct the work of two or *901more subordinate members of the drill crew. Drillers also work with the Superintendent and the oil and gas client to review and revise various aspects of the well program. Drillers also ensure that the dimensions of the bottom hole assembly components are measured and logged. Drillers generally perform non-manual work directly related to Helix's business and that of its customers. They exercise discretion and independent judgment regarding matters of significance, and they provide suggestions and recommendations on the advancement of other drill crew members.44
Although plaintiffs argue that Rule 12(d) prohibits the court from considering Helix's response to plaintiff's Tenth Interrogatory in ruling on their Rule 12(c) motion for judgment on the pleadings, plaintiff's reliance on Rule 12(d) is misplaced. Rule 12(c) of the Federal Rules of Civil Procedure provides: "After the pleadings are closed - but early enough not to delay trial - a party may move for judgment on the pleadings." Rule 12(d) provides:
If, on a motion under Rule ... 12(c), matters outside the pleadings are presented to and not excluded by the court, the motion must be treated as one for summary judgment under Rule 56. All parties must be given a reasonable opportunity to present all material that is pertinent to the motion.
Fed. R. Civ. P. 12 (d).
The parties to this action have both filed a motion for summary judgment that cite matters outside the pleadings. Both parties have also filed a response to the opposing party's motion, and a reply in support of their own summary judgment motion. Each of these filings reference matters outside of the pleadings that have not been excluded by the court. Accordingly, the court concludes that both parties have received a reasonable opportunity to present all material that is pertinent to the pending motions. Under these circumstances Rule 12(d) does not prohibit the court from considering evidence submitted by Helix in response to Jordan's motion for judgment on the pleadings under Rule 12(c) but, instead, requires the court to treat that motion as one for summary judgment under Rule 56 pursuant to which matters outside the pleadings may be considered.
Because Helix not only identified in its Original Answer the specific affirmative defenses on which it intended to rely, including those on which it seeks summary judgment, i.e., the executive and highly compensated employee exemptions, but also provided plaintiffs the factual basis for those defenses in response to interrogatories provided to plaintiffs well before the pending motions for summary judgment were filed, the court concludes that Helix has not waived those affirmative defenses, and that plaintiffs are not entitled to summary judgment on that basis.
C. Fact Issues Regarding Whether Plaintiffs Were Paid on a Salary Basis Preclude Granting Either Party's Summary Judgment Motion
Because Helix has withdrawn its assertion of the professional exemption, and stated that it never pleaded the foreign exemption, the issue before the court is the applicability of the executive, administrative, combination, and highly compensated employee exemptions. Helix argues that it is entitled to summary judgment that Jordan and Gordon were exempt from the FLSA's overtime provisions as a matter of law under the executive and highly-compensated exemptions,
Common to each of the exemptions at issue is the requirement that the employee be paid on a salary basis of at least $455 per week.
(a) General rule. An employee will be considered to be paid on a "salary basis" within the meaning of these regulations if the employee regularly receives each pay period on a weekly, or less frequent basis, a predetermined amount constituting all or part of the employee's compensation, which amount is not subject to reduction because of variations in the quality or quantity of the work performed. Subject to the exceptions provided in paragraph (b) of this section, an exempt employee must receive the full salary for any week in which the employee performs any work without regard to the number of days or hours worked. Exempt employees need not be paid for any workweek in which they perform no work. An employee is not paid on a salary basis if deductions from the employee's predetermined compensation are made for absences occasioned by the employer or by the operating requirements of the business. If the employee is ready, willing and able to work, deductions may not be made for time when work is not available.
1. Defendant Fails to Establish as a Matter of Law that Plaintiffs Were Paid on a Salary Basis
As evidence that the plaintiffs were paid on a salary basis, Helix cites Jordan's pay statements showing that he was paid on a bi-weekly basis and received no less than $923.00 per week,
Helix also cites the declaration of Kenric McNeal, Helix's Director of Human Resources, that "Helix pays its Drillers a day rate, which is a predetermined sum that remains constant regardless of the hours worked in a day and the quality of the work performed."
Citing Faludi v. U.S. Shale Solutions, LLC, No. H-16-3467,
*904In Faludi the plaintiff had a written agreement with the defendant stating, "Company shall pay Consultant the following amounts ...," the least of which was $1,000.00 for each day he performed services.
Faludi is distinguishable and does not control the outcome of this case for two reasons. First, in Faludi the parties had a written agreement that guaranteed the plaintiff pay that exceeded $455.00 for any week in which he worked. Here, there was no written agreement governing the plaintiffs' employment. Even though the letters offering the plaintiffs employment referenced day rates that exceeded $455.00, and the plaintiffs received pay that exceeded that amount for every week they worked, the evidence also shows that the day rate plaintiffs were paid changed from time to time and therefore was not as Helix contends, an amount that was both predetermined and guaranteed not to drop below $455.00 per day.
[t]he precise question raised by the parties' arguments [there was] whether the language of29 C.F.R. § 541.602 (a) allowing the exemption as long as the employee's predetermined pay 'is not subject to reduction because of variations in the ... quantity of the work performed' includes a voluntary reduction by the employee as opposed to a reduction by the employer.
Helix has presented undisputed evidence that plaintiffs were paid at a rate that satisfied the pay rate required for them to be qualified for one of the exemptions at issue, i.e., a rate that exceeded $455.00 for each week worked. See
2. Plaintiffs Fail to Establish as a Matter of Law that They Were Not Paid on a Salary Basis
Plaintiffs argue that because undisputed evidence shows that Helix paid them on a day-rate basis as opposed to a salary basis, they are entitled to summary judgment because the salary basis test is not satisfied.
This letter only serves to communicate a contingent offer of employment and is not intended to create, nor is it to be construed to constitute, an employment contract between you and Helix. Your employment with Helix will be "at-will," that is the employment relationship can be terminated at any time by either you or Helix.65
Citing Dufrene v. Browning-Ferris, Inc.,
Dufrene involved a dispute over the method used by the defendant employer to calculate overtime pay for non-exempt employee plaintiffs. At issue was whether the employee's overtime pay was to be calculated under
The distinction between the two regulations is explicit: Section 778.112 applies to workers who are "paid a flat sum for a day's work or for doing a particular job" and, in contrast, § 778.114 applies to employees who are "employed on a salary basis." Department of Labor Regulations provide that an employee is considered to be paid "on a salary basis" within the meaning of the regulations "if under his employment agreement he regularly receives each pay period on a weekly or less frequent basis, a predetermined amount constituting all or part of his compensation, which amount is not subject to reduction because of variations in the quality or quantity of the work performed. Subject to the exceptions provided below, the employee must receive his full salary for any week in which he performs any work without regard to the number of days or hours worked."29 C.F.R. § 541.118 (a)68 (emphasis added). Plaintiffs fail to meet this definition because they generally do not receive compensation for the days they do not work. The workers do not receive a flat salary per week regardless of how many days of the week they have worked. Instead, they are paid a daily rate, and their weekly salary is computed by multiplying the number of days worked by their daily wage. Accordingly, it is clear that they are covered by § 778.112, not § 778.114.
994 F.Supp. at 754. On appeal the Fifth Circuit affirmed the district court's determination that § 778.112 applied to the employees, stating that "employees here are not paid a salary for a workweek. Instead, they are paid for the number of days they work in a week: a day-rate."
Hughes involved a dispute over whether employees paid a day rate of $337.00 were exempt from the FLSA's overtime requirements because they qualified as highly compensated employees. The employees conceded that they were paid in a manner and at a rate consistent with being exempt, but they argued that it mattered whether their salaries were guaranteed, and whether a rational trier of fact could have concluded that there was no such guarantee. The district court granted summary judgment to the defendant employer, but the Sixth Circuit reversed explaining that the plaintiffs had introduced evidence that their salary was calculated at the rate of $337.00 per day worked, that there was thus "reason to conclude that their pay was calculated more frequently than weekly[, a]nd it is very much disputed whether what they received weekly was in fact guaranteed."
Helix argues that Dufrene and Hughes are legally and/or factually distinguishable from this case.
Helix argues that Dufrene is legally distinguishable because at issue there was which of two methodologies for calculating overtime pay applied to undisputedly non-exempt employees. Helix argues that " Dufrene does not establish that a salary based on a day rate fails the salary basis requirement for exemptions under the FLSA, because it does not consider this issue."
The deposition excerpts and other evidence presented by plaintiffs are not sufficient to carry their burden of showing that they were not paid on a salary basis. Defendants have presented competent summary judgment evidence, consisting of the declaration testimony of Kenric McNeal, Helix's Director of Human Resources, excerpts from plaintiffs' deposition testimony, plaintiffs' pay statements, and plaintiffs' offers of employment, showing that material fact issues are in dispute concerning whether plaintiffs were paid on a salary basis, including but not limited to, whether plaintiffs were guaranteed a minimum of at least $455 per week for the weeks that they worked, and whether plaintiffs were paid their full rate and did not have their wages reduced based on the quantity of work when they did not work full weeks. Because the question of whether plaintiffs were paid on a salary basis remains in dispute, they cannot prevail on their motion for partial summary judgment on their contentions that they were not exempt executive, administrative, combination, or highly compensated employees. Accordingly, plaintiffs' motion for partial summary judgment will be denied.
D. Genuine Issues of Material Fact Preclude Granting Either Party's Summary Judgment Motion on Willfulness
Helix moves for summary judgment on the issue of willfulness arguing that plaintiffs cannot present any evidence that Helix knew its pay practices violated the FLSA.
IV. Conclusions and Order
For the reasons stated in § III.C.1, above, plaintiffs' objection to ¶¶ 8-9 of the McNeal Declaration are OVERRULED , and for the reasons stated in §§ III.C.1 and III.D, above, Helix Energy Solutions Group, Inc.'s Motion for Summary Judgment (Docket Entry No. 27) is DENIED.
For the reasons stated in §§ III.B, III.C.2, and III.D, above, Plaintiff Ralph Jordan's Motion for Partial Summary Judgment (Docket Entry No. 29) is DENIED.
The Joint Pretrial Order must be filed by November 2, 2018.
Docket Call will be held on November 9, 2018, at 3:00 p.m. in Courtroom 9-B, 9th Floor, United States Courthouse, 515 Rusk Avenue, Houston, Texas 77002.
See Plaintiff's Original Complaint ("Complaint"), Docket Entry No. 1, p. 2 ¶¶ 3-4.
Declaration of Kenric McNeal ("McNeal Declaration"), Exhibit A to Defendant's MSJ, Docket Entry No. 27-1, p. 2 ¶¶ 3-5. Although plaintiffs object to ¶¶ 8-9 of the McNeal Declaration as inadmissible parole evidence, see Plaintiff Ralph Jordan's Response in Opposition to Defendant's Motion for Summary Judgment ("Plaintiff's Response"), Docket Entry No. 35, pp. 23-24, plaintiffs have not objected to other paragraphs the declaration. All page numbers for docket entries in the record refer to the pagination inserted at the top of the page by the court's electronic filing system, CM/ECF.
McNeal Declaration, Exhibit A to Defendant's MSJ, Docket Entry No. 27-1, p. 2 ¶ 6.
Driller Job Description, Exhibit D-l to Defendant's MSJ, Docket Entry No. 27-9, p. 1. See also Oral and Videotaped Deposition Ralph C. Jordan ("Jordan Deposition"), pp. 54:19-57:20, Exhibit D to Defendant's MSJ, Docket Entry No. 27-8, pp. 5-6.
See Oral Videotaped Deposition Mr. Christopher L. Gordon ("Gordon Deposition"), p. 56:5-12, Exhibit C to Defendant's MSJ, Docket Entry No. 27-3, p. 6.
See Jordan Deposition, pp. 50:23-51:16, 66:10-20, 92:3-93:5, Exhibit D to Defendant's MSJ, Docket Entry No. 27-8, pp. 4, 7, 13-14; Gordon Deposition, pp. 57:21-59:16, 112:15-113:12, Exhibit C to Defendant's MSJ, Docket Entry No. 27-3, pp. 7, 18-19.
Jordan Deposition, pp. 66:21-69:11, Exhibit D to Defendant's MSJ, Docket Entry No. 27-8, pp. 7-8; Gordon Deposition, pp. 122:1-131:9; Exhibit C to Defendant's MSJ, Docket Entry No. 27-3, pp. 21-23.
Jordan Deposition, pp. 54:19-553, Exhibit D to Defendant's MSJ, Docket Entry No. 27-8, p. 5. See also Oral Deposition of Helix Rig Supervisor Chad Crenshaw ("Crensahw Deposition"), pp. 5:1-3 (stating his position as Rig Supervisor), 9:24-10:4, 45:3-16, Exhibit E to Defendant's MSJ, Docket Entry No. 27-15, pp.3, 4 and 8.
Jordan Deposition, pp. 72:22-77:16, Exhibit D to Defendant's MSJ, Docket Entry No. 27-8, pp. 8-10; Gordon Deposition, pp. 63:19-25, 90:9-91:21, Exhibit C to Defendant's MSJ, Docket Entry No. 27-3, pp. 8 and 14; Crensahw Deposition, pp. 16:3-17:4, 45:11-13, Exhibit E to Defendant's MSJ, Docket Entry No. 27-15, pp. 5-6, 8.
Jordan Deposition, p. 46:10-19, Exhibit D to Defendant's MSJ, Docket Entry No. 27-8, p. 3; McNeal Declaration, Exhibit A to Defendant's MSJ, Docket Entry No. 27-1, p. 3 ¶ 11.
McNeal Declaration, Exhibit A to Defendant's MSJ, Docket Entry No. 27-1, p. 3 ¶ 12.
Jordan Deposition, pp. 83:22-84:7, Exhibit D to Defendant's MSJ, Docket Entry No. 27-8, p. 11.
Gordon Deposition, pp. 55:9-11, 75:2-14, Exhibit C to Defendant's MSJ, Docket Entry No. 27-3, pp. 6 and 10. See also Gordon's Offer of Employment, Exhibit C-2 to Defendant's MSJ, Docket Entry No. 27-5.
Gordon Deposition, pp. 75:15-18, 78:14-21, 118:20-25, Exhibit C to Defendant's MSJ, Docket Entry No. 27-3, pp. 10, 11, and 20. See also Gordon's Rehire Letter, Exhibit C-3 to Defendant's MSJ, Docket Entry No. 27-6.
Gordon Deposition, pp. 55:12-15, Exhibit C to Defendant's MSJ, Docket Entry No. 27-3, p. 6; See also Gordon's Offer of Employment, Exhibit C-2 to Defendant's MSJ, Docket Entry No. 27-5; and Gordon's Rehire Letter, Exhibit C-3 to Defendant's MSJ, Docket Entry No. 27-6.
Gordon Deposition, pp. 54:7-55:18 Exhibit C to Defendant's MSJ, Docket Entry No. 27-3, p. 6. See also Gordon's 2014-2016 W2s, Exhibit C-4 to Defendant's MSJ, Docket Entry No. 27-7.
See Complaint, Docket Entry No. 1, pp. 1, 4-5.
See Defendant Helix Energy Solutions Group, Inc.'s Original Answer and Affirmative Defenses to Plaintiff's Original Complaint ("Original Answer"), Docket Entry No. 7, p. 2 ¶ 3. See also Defendant's Response, Docket Entry No. 36, p. 10 n.1 ("Helix withdraws its affirmative defense on the professional exemption.").
See Stipulation and Order Signed by Judge Lake Re: Conditional Certification and Notice, Docket Entry No. 15.
See Notice of Consent, Docket Entry No. 18.
Defendant's MSJ, Docket Entry No. 27.
Plaintiff's MPSJ, Docket Entry No. 29.
See Plaintiff's Response, Docket Entry No. 35; Defendant Helix Energy Solutions Group, Inc.'s Response to Plaintiffs' Partial Motion for Summary Judgment ("Defendant's Response"), Docket Entry No. 36.
See Defendant Helix Energy Solutions Group, Inc.'s Reply in Support of Defendant's Motion for Summary Judgment ("Defendant's Reply"), Docket Entry No. 37; Plaintiff Ralph Jordan's Reply in Support of His Motion for Partial Summary Judgment ("Plaintiff's Reply"), Docket Entry No. 38.
See Complaint, Docket Entry No. 1.
See Original Answer, Docket Entry No. 7, p. 2 ¶ 3. See also Defendant's Response, Docket Entry No. 36, p. 10 n.1 ("Helix withdraws its affirmative defense on the professional exemption."), p.10 n.6 (same).
Defendant's MSJ, Docket Entry No. 27, pp. 6, 11-20; Defendant's Response, Docket Entry No. 36, pp. 16-17 and 19-26.
Plaintiff's MPSJ, Docket Entry No. 29, pp. 17, 23-36; Plaintiff's Response, Docket Entry No. 35, pp. 23-41.
Plaintiff's MPSJ, Docket Entry No. 29, pp. 17, 19, 21-23 (exemption defenses), and 34-35 (good faith defenses).
Defendant's Response, Docket Entry No. 36, p. 10 n.1, p. 26 n.6, and pp. 27-32.
Plaintiff's MPSJ, Docket Entry No. 29, pp. 19-21.
Defendant's Response, Docket Entry No. 36, p. 17.
Plaintiff's Reply, Docket Entry No. 38, p. 5.
Original Answer, Docket Entry No. 7, p. 2 ¶¶ 3-4.
Defendant's Response, Docket Entry No. 36, pp. 17-18 (quoting Interrogatory 10, Exhibit F to Defendant's Response, Docket Entry No. 36-17, pp. 3-4).
Defendant's MSJ, Docket Entry No. 27, pp. 6, 11-20; Defendant's Response, Docket Entry No. 36, pp. 16-17 and 19-26.
Defendant's Response, Docket Entry No. 36, p. 26 n.6, and pp. 27-32.
Plaintiff's MPSJ, Docket Entry No. 29, pp. 17, 23-36; Plaintiff's Response, Docket Entry No. 35, pp. 23-41.
Defendants' MSJ, Docket Entry No. 27, p. 12 (citing Jordan pay statements, Exhibit D-5 to Defendant's MSJ, Docket Entry No. 28).
Defendants' MSJ, Docket Entry No. 27, p. 12 (citing Jordan Deposition, p. 46:20-23, Exhibit D to Defendant's MSJ, Docket Entry No. 27-8, p. 3; Gordon Deposition, p. 55:12-15, Exhibit C to Defendant's MSJ, Docket Entry No. 27-3, p. 6).
Plaintiff's Response, Docket Entry No. 35, pp. 23-24 (citing Exhibit C-3 to Defendant's MSJ, Docket Entry No. 27-6).
See July 27, 2015 Offer Letter to Gordon, Exhibit C-3 to Defendant's MSJ, Docket Entry No. 27-6; and February 27, 2008 Offer Letter to Jordan, Exhibit D-4 to Defendant's MSJ, Docket Entry No. 28-1.
See Jordan Deposition, pp. 83:20-84:7, 86:6-87:15, Exhibit D to Defendant's MSJ, Docket Entry No. 27-8, pp. 11-12; Gordon Deposition, pp. 54:7-55:3, 80:10-12, Exhibit C to Defendant's MSJ, Docket Entry No. 27-3, pp. 6, 11.
See Jordan Pay Statements, Exhibit D-5 to Defendant's MSJ, Docket Entry No. 28.
Defendant's MSJ, Docket Entry No. 27, pp. 12-13. See also Defendant's Response, Docket Entry No. 36, pp. 19-20; Defendant's Reply, Docket Entry No. 37, p. 5.
See Jordan Deposition, pp. 83:20-84:7, Exhibit D to Defendant's MSJ, Docket Entry No. 28-8, p. 11 (testifying that his day rate changed from $985.00, to $1,014.00, to $923.00).
Plaintiff's MPSJ, Docket Entry No. 29, pp. 24-26. See also Plaintiff's Response, Docket Entry No. 35, pp. 16-17 and 25-33.
Plaintiff's Response, Docket Entry No. 35, p. 29. See also Plaintiff's Reply, Docket Entry No. 38, p. 6 (asserting "No Evidence of a Guarantee Means That the Drillers Were Not Paid on a Salary Basis").
Plaintiff's Response, Docket Entry No. 35, p. 32 (citing Exhibit C-3 to Defendant's MSJ, Docket Entry No. 27-6).
Gordon's offer of employment, Exhibit C-3 to Defendant's MSJ, Docket Entry No. 27-6, p. 3.
Plaintiff's MPSJ, Docket Entry No. 29, p. 26 (quoting DuFrene v. Browning-Ferris, Inc.,
Plaintiff's Response, Docket Entry No. 35, pp. 28-29.
This regulation has since been revised and renumbered to
Defendant's Response, Docket Entry No. 36, pp. 19-20; Defendant's Reply, Docket Entry No. 37, pp. 2-5.
Defendant's Response, Docket Entry No. 36, pp. 19-20.
Defendant's MSJ, Docket Entry No. 27, pp. 19-20.
Plaintiff's MPSJ, Docket Entry No. 29, p. 35.
Reference
- Full Case Name
- Ralph JORDAN, Individually and on Behalf of All Others Similarly Situated v. HELIX ENERGY SOLUTIONS GROUP, INC.
- Cited By
- 4 cases
- Status
- Published