The Wyomissing
Opinion of the Court
March 13, 1914, at night, the tug Wyomis-sing started from Port Reading with a tow of seven tiers of loaded boats, four in a tier, and two light boats tailing on, bound to New York. The length of the tow was about 1,000 feet. The helper tug Pencoyd, on the starboard side at the end of the tow, assisted it through the draw of the Baltimore & Ohio bridge across the Arthur Kill on the Staten Island side. The tide was flood and the night dark, but clear. From the bridge to a point at or near Elizabethport the tide runs comparatively true, but a tow rounding the point known as Holland Hook or Dooley’s Point on the Staten Island side on the flood tide is swung toward the New Jersey side. At about 9 p. m. the tow reached this point. The width of water is about 600 feet and of deep channel about 400 feet. The Morris & Cumings Company’s dredge No. 7 was at work day and night under a contract with the government deepening the channel. The government laid out eight cuts lengthwise of the stream about 1,000 feet long and SO feet wide, numbered 1 to 8, be
Libels were filed by the owners of these two barges to recover the damages sustained by them against the tug Wyomissing, whose claimant brought in the Dredging Company under the fifty-ninth rule. Judge Veeder found the Wyomissing solely at fault and we concur with him.
The chief charge against the Dredging Company is that upon the approach of the tow the dredge did not move nearer the Staten Island shore. The company’s contract with the government contains the following clause:
“26. Obstructions — Navigation. The contractor will be required to conduct the work in such a manner as to obstruct navigation as little as possible, and at the completion of the work shall remove his plant, including rangers and buoys, piles, etc., placed by him under the contract, in navigable waters. In case the contractor’s plant so obstructs the channel as to impede the passage of vessels, it shall promptly be so moved as to afford a practicable passage on the approach of any vessel.”
This clause is not to be construed as requiring the dredge to move for every vessel that approaches, but only that she leave enough space for vessels navigating properly to pass. The dredge was rightfully where she was at work, and her necessary equipment was lying rightfully at the Iron dock. The work of deepening the channel of necessity somewhat reduced the width of the waterway. The Wyomissing was bound to take notice of this situation, and if her tow had been shorter, or if with her then tow she had employed an additional helper, or if the one helper had acted more promptly, we are satisfied that it would have passed safely. There is a dispute as to whether the dredge actually did move, about which the District Judge made no finding. If we assume that she did not, there was, as he found, unobstructed water enough for the- tow to have navigated in safety, had she been adequately supplied and handled.
The decree is affirmed.