Sandusky Portland Cement Co. v. Dixon Pure Ice Co.
Opinion of the Court
Such widely differing rules of damages arc urged by the parties to this litigation that a statement of details is necessary. Appellee secured control of the ice fields and the icehouses a short distance below Dixon in 1903, and operated its business since that date to the day of the trial. Its location is advantageous, but it appears that ice seasons in this vicinity are uncertain and variable. Uncertainty attends the business, both as to the quantity and quality of the ice, and the length of the season during which the merchantable ice may be harvested. Appellant’s manufacturing plant, located just above the ice fields, required the use of heated water, which was secured from and emptied into the Rock river, and which heated water followed the channel of the river and entered the ice fields before entirely cooling. The channel thus affected was near the center of the stream, and the cut-off portion of the pond, it was con-i'ended, contained the best ice. This channel, varying somewhat in width, was at times entirely open, while at other times the ice forming ihereon was so thin as to render travel across the stream dangerous or impossible.
Many interesting statistics are presented, tending to establish the amount of damages on various theories, and nearly every possible, theory for computing such damages has been advanced. No warm water was turned into the stream or affected the ice business during any of the seasons of 1905-06, 1906-07, 1907-08, 1911-12, 1913-14, and 1915-16. Appellant turned its hot water into the river during each of the other five years, to appellee's damage. No allowance for damages is made for the season of 1913-14, because no damages traceable to appellant's conduct is shown. Appellant turned no warm water into the river in this year after February 11th. No ice had been put up prior to this date. None had formed in or outside the channel of sufficient thickness to justify its harvest. In a few hours, at most, the iulluence of the heated water previously poured into the river wottld nave disappeared. The cold and ice-forming weather occurred shortly thereafter, and on February 16th appellee began cutting its ice, and continued until February 28th, without interference from appellant. These 12 days completed its season. Appellee’s superintendent frankly admits: “No trouble with hot water was experienced this season.”
It was claimed that in normal years the field held about 125,000 tons of ice. A careful study of all the figures justifies the conclusion that the average per day capacity of appellee’s plant was 470 tons. These figures are reached by taking appellee’s statistics, showing total harvest and the number of days actually devoted to harvesting the crop, covering a period of six years.
The rule which requires the aggrieved party to keep its loss to the lowest possible figure, while enforced by the courts wherever practicable, should not be enforced in a case like the present. In order to reduce its loss, appellee was not required to so increase the hazards of its business as to endanger the life of any of its employes. The uncertainty surrounding its business, as well as the uncertainty connected with the appellant’s trespassing, furnishes added reason why this rule of damages should not be applied. Chicago Bonding & Surety Co. v. Augusta-Savannah Navigation Co., 250 Fed. 616, —— C. C. A. ——, decided by this court at this term.
Assuming the average daily capacity of the plant to be 470 tons and the average value of a ton of ice to be 18 cents, and limiting the total capacity for any season to 16,981 tons, the result becomes a mere mat
This total tonnage, figured at 18 cents per ton, produces a total damage of $3,870.18. We see no reason why interest should not be allowed from March 1, 1915, at 5 per cent. The use of the average in determining quantities, price, etc., as the basis for the computation, makes it impossible for the court to allow interest prior to this date.
The decree, which was for a sum considerably larger, is modified, so that appellee is awarded the sum of $3,870.18, together with interest at 5 per cent, from March 1, 1915, besides the costs and disbursements of this action in the lower court. So modified, the decree is affirmed. Appellant is to recover its costs in this court.