Now, the strong contention of the defendant, or plaintiff in error, is that the proposal and its acceptance do not constitute a valid contract between the parties, because the drawings alluded to in the proposal were never made, nor were the specifications ever completed, and therefore there was no means of knowing or determining the character and quantity of steel to be furnished. This question is adequately raised by objections to the admission of the proposal and specifications in evidence.
The questions to be determined are whether the alleged contract is sufficiently definite and certain in its description of the materials to be manufactured and furnished, and, as it relates to quantity, whether it was susceptible of being executed in accordance with the intention of the parties. If it was, any breach in either direction would afford cause for damages.
By reference to the proposal, it will be seen that the material to be furnished is specifically described as the structural steel and iron and reinforcing steel (excepting certain items) for the Richelieu Syndicate Theater and Office Building, known as the Columbia Theater, designating its location. The specifications are even more specific in this respect. The steel construction described in these specifications is that for a new office building and theater, southeast corner Van Ness avenue and Geary street, San Francisco, Cal. The building is in plan 149x120 feet, and is 8 stories high above the sidewalk, with basement extending 20 feet 3 inches below ground. The general plan of construction is then delineated, and the kind of material required, and the character and finish thereof are specified in minute detail. So that there can be no mistake, in construing these two instruments together, touching the material to be manufactured by the plaintiff and furnished to the defendant for the construction of the theater building.
If it were not for the fact that the proposal recites that the structural material shall be in accordance with drawings furnished by Jos. D. Smedberg, and specifications also furnished by Jos. D. Smedberg, identified with certain marks, there could be no question that the general descriptions contained in these two instruments would sufficiently identify the materials to be manufactured’ to make the contract valid in all respects. Do these recitals render the contract -indefinite ?
The specifications were identified and introduced in evidence. There can be no doubt that they are the specifications alluded to in the proposal. The entire drawings for the completed building were never furnished by Smedberg. It seems to have been contemplated that Smedberg should work up the drawings for the iron and steel frame from the general plans drafted by Shea, the architect. This is apparent from the preamble of the specifications. From these general drawings the evidence shows that detail drawings for the work
• From a construction of the proposal and the specifications as a whole, we are satisfied that it was never contemplated that the drawings to be furnished by Smedberg should have been made and completed prior to the making and acceptance of the proposal, but that such drawings should be made by Smedberg and the detail working drawings approved by him in the way of furthering the work of fabrication of the steel and iron to be furnished under the proposal. This is borne out by the stipulations contained in the proposal touching the time in which the fabricated steel and iron is required to be shipped; that is to say, from 30 to 90 days from receipt of “approved working detail drawings, signed by Mr, Smedberg.”
We are of the opinion, therefore, that the drawings referred to, which were work to be furnished by Smedberg, were to state additional details touching the material to be furnished which was otherwise more comprehensively described in the contract, and we think sufficiently described so that its identification was easily and unmistakably ascertainable. It must be remembered that the proposal was to furnish steel and iron by its weight, and not to furnish any specific and predetermined pieces of given sizes and dimensions, and we believe, as previously indicated, by contemplation of the parties it was designed that the detail drawings should be taken care of in the future, and the plaintiff was to furnish the steel and iron in quantity in accordance with those details.
We are aware that the minds of contracting parties must draw together and become as one touching the subject-matter and "the terms and conditions before a contract can be consummated. But in the present case that is what was done, and the purpose of the parties was defined with sufficient definiteness that there can be no mistake as to their intention touching the steel and iron to be fabricated and delivered.
“In case any difference of opinion shall arise between the parties to this contract in relation to the contract, the work to be or that has been performed under it, such difference shall be settled by arbitration by two competent persons, one employed by each party to the contract, and these two shall have the power to name an uninterested umpire whose decision shall be binding on all parties to the contract.”
This stipulation falls within the general rule laid down in Holmes v. Richet, 56 Cal. 307, 38 Am. Rep. 54, and not the exception. The general rule is, using the language of that case, that:
“An agreement to refer a case to arbitration will not be regarded by the courts, and they will take jurisdiction and determine a dispute between parties, notwithstanding such agreement.”
This answers the four objections presented and insisted upon by counsel in their revised and supplemental brief, and, finding them not well taken, the judgment below will be affirmed.