Indianapolis Power & Light Co. v. Environmental Protection Agency

U.S. Court of Appeals for the D.C. Circuit
Indianapolis Power & Light Co. v. Environmental Protection Agency, 38 F. App'x 613 (D.C. Cir. 2002)

Indianapolis Power & Light Co. v. Environmental Protection Agency

Opinion of the Court

JUDGMENT

PER CURIAM.

These consolidated petitions were considered on the record from the Environmental Protection Agency and on the briefs of the parties. The court has determined that the issues presented occasion no need for a published opinion. It is

ORDERED AND ADJUDGED that the petitions for review in Nos. 01-1039 and 01-1494 are dismissed for the reasons given in the attached memorandum.

Pursuant to D.C. Circuit Rule 36, this disposition will not be published. The Clerk is directed to withhold issuance of the mandate herein until seven days after resolution of any timely petition for rehearing or petition for rehearing en banc. See Fed. R.App. P. 41(b); D.C.Cir. Rule 41.

MEMORANDUM

Indianapolis Power & Light (IPL) petitions for review of two final rules promulgated by the Environmental Protection Agency (EPA): “Final Rule Making Findings of Failure to Submit Required State Implementation Plans for the NOx SIP Call,” 65 Fed.Reg. 81,366 (Dec. 26, 2000), and “Approval and Promulgation of Air Quality Implementation Plans; Indiana; Oxides of Nitrogen Regulations,” 66 Fed.Reg. 56,465 (Nov. 8, 2001). In its briefs, however, IPL does not challenge these rules. Instead, it challenges EPA’s determination in another rule that Indiana must reduce its NOx emissions. See “Finding of Significant Contribution and Rulemaking for Certain States in the Ozone Transport Assessment Group Region for Purposes of Reducing Regional Transport of Ozone,” *61463 Fed.Reg. 57,356 (Oct. 27, 1998) (“NOx SIP Call”). Because IPL brings this challenge long after the expiration of the 60-day review period for the NOx SIP Call, 42 U.S.C. § 7607(b)(1), we must dismiss its petitions.

IPL contends that we should hear its challenge to EPA’s determination because it has not previously had an opportunity to seek review of the NOx SIP Call. In fact, IPL was a petitioner in Michigan v. EPA, 213 F.3d 663 (D.C.Cir. 2000), in which we rejected the claim that the NOx SIP Call is unlawful as applied to Indiana and therefore denied IPL’s petition. As a result, in addition to being untimely, IPL’s challenge is barred by the doctrine of res judicata. See Natural Resources Defense Council v. Thomas, 838 F.2d 1224, 1252 (D.C.Cir. 1988). IPL suggests that its participation in the Michigan litigation should not prevent it from bringing this challenge because this court did not allow it to file a separate brief, and because, despite its best efforts, its specific argument against the NOx SIP Call was not included in the industry petitioners’ joint brief. But if IPL encountered any difficulty presenting its position in the Michigan litigation, it should have sought relief from the court prior to the deadline for the submission of the petitioners’ opening brief in that case. Its failure to do so does not permit it to bring a challenge outside the 60-day jurisdictional window—and certainly not a challenge to a rule that has already been reviewed and upheld by this court.

Reference

Full Case Name
INDIANAPOLIS POWER & LIGHT COMPANY v. ENVIRONMENTAL PROTECTION AGENCY
Status
Published