Washington Gas Light Co. v. Federal Energy Regulatory Commission

U.S. Court of Appeals for the D.C. Circuit
Washington Gas Light Co. v. Federal Energy Regulatory Commission, 603 F.3d 55 (D.C. Cir. 2010)
390 U.S. App. D.C. 249; 40 Envtl. L. Rep. (Envtl. Law Inst.) 20129; 2010 U.S. App. LEXIS 8652; 2010 WL 1655965

Washington Gas Light Co. v. Federal Energy Regulatory Commission

Opinion

Opinion for the Court filed by Circuit Judge KAVANAUGH.

KAVANAUGH, Circuit Judge:

Dominion Cove Point operates a large facility adjacent to the Chesapeake Bay in Maryland, where it receives imported liquefied natural gas by ship from foreign countries. Dominion Transmission is an interstate gas transmission and storage company that transmits natural gas from facilities such as Dominion Cove Point to local distributors. Washington Gas Light Company is a local natural gas distributor that provides service to residential and commercial customers in and around Washington, D.C.

In 2005, Dominion Cove Point and Dominion Transmission sought to launch a construction project (known as “the Expansion”) that would allow them to import greater quantities of liquefied natural gas and distribute it in gaseous form. Under § 3 and § 7 of the Natural Gas Act, the proposed Expansion required approval from the Federal Energy Regulatory Commission. See 15 U.S.C. §§ 717b(a), 717f(c)(1)(A). Section 3 provides that FERC “shall” approve an application to import natural gas “unless, after opportunity for hearing, it finds that the proposed ... importation will not be consistent with the public interest.” Id. § 717b(a). Section 7 states that FERC “shall” approve a natural gas construction project like the Expansion so long as it “is or will be required by the present or future public convenience and necessity.” Id. § 717f(e).

In 2006, FERC approved the proposed project. Washington Gas then sued in this Court, arguing that FERC’s approval was not in the public interest and thus unlawful. Washington Gas claimed that higher volumes of regasified liquefied natural gas would pass through its piping system as a result of the Expansion, which in turn would pose an increased risk of unsafe natural gas leakage. (Regasified liquefied natural gas is natural gas that is liquefied to facilitate transportation and storage and then returned to gaseous form for distribution.)

This Court concluded that FERC had not adequately explained its analysis of the safety concerns associated with the Expansion. See Washington Gas Light Co. v. FERC, 532 F.3d 928 (D.C.Cir. 2008). After reviewing FERC’s approval of the Expansion under the § 3 and § 7 criteria, we stated that “FERC failed to carry out its obligation of ensuring the Expansion can go forward consistent with the public interest.” Id. at 933. In reaching that conclusion, we recognized that allowing more regasified liquefied natural gas to flow through Washington Gas’s piping system could result in an increased risk of unsafe natural gas leakage. Id. at 931. Our remand order left FERC with a narrow task: to “more fully address whether the Expansion can go forward without causing unsafe leakage.” Id. at 933.

*57 On remand, FERC explained that the Expansion could not be said to cause any unsafe leakage if the amount of regasified liquefied natural gas that could be delivered posi-Expansion was identical to the amount that could be delivered pre-Expansion. FERC found that the relevant preExpansion contracts authorized the delivery of 530,000 Dekatherms per day of regasified liquefied natural gas. And FERC then limited the relevant post-Expansion regasified liquefied natural gas delivery levels to that same amount of 530,000 Dekatherms per day. By doing so, FERC ensured that the Expansion could not be said to increase the risk of unsafe natural gas leakage; after all, the same amount of regasified liquefied natural gas could have been delivered even if the Expansion had never occurred.

By imposing a post-Expansion limit that matches the pre-Expansion limit, FERC has satisfactorily ensured that the Expansion will not result in an increased risk of unsafe natural gas leakage. We have considered Washington Gas’s other arguments and find them without merit. FERC has satisfied our remand order, and we deny Washington Gas Light Company’s petition for review.

So ordered.

Reference

Full Case Name
WASHINGTON GAS LIGHT COMPANY, Petitioner v. FEDERAL ENERGY REGULATORY COMMISSION, Respondent. Dominion Transmission, Inc., Dominion Cove Point Lng, LP, Statoil Natural Gas, LLC, Shell Na Lng LLC, BP Energy Company, and Columbia Gas Transmission, LLC, Intervenors
Cited By
3 cases
Status
Published