Oak Grove Technologies, LLC v. United States

U.S. Court of Appeals for the Federal Circuit

Oak Grove Technologies, LLC v. United States

Opinion

Case: 22-1556     Document: 117   Page: 1   Filed: 09/16/2024




    United States Court of Appeals
        for the Federal Circuit
                   ______________________

         OAK GROVE TECHNOLOGIES, LLC,
                Plaintiff-Appellee

                             v.

                UNITED STATES, F3EA, INC.,
                    Defendants-Appellants
                   ______________________

                    2022-1556, 2022-1557
                   ______________________

     Appeals from the United States Court of Federal
 Claims in No. 1:21-cv-00775-MHS, Judge Matthew H. Sol-
 omson.
                  ______________________

           OPINION ISSUED: September 11, 2024
          OPINION MODIFIED: September 16, 2024 ∗
                 ______________________

     CRAIG HOLMAN, Arnold & Porter Kaye Scholer LLP,
 Washington, DC, argued for plaintiff-appellee. Also repre-
 sented by THOMAS PETTIT.

     WILLIAM JAMES GRIMALDI, Commercial Litigation
 Branch, Civil Division, United States Department of Jus-
 tice, Washington, DC, argued for defendant-appellant


     ∗ This opinion has been modified and reissued to cor-
 rect typographical errors on page 2.
Case: 22-1556   Document: 117     Page: 2    Filed: 09/16/2024




 2                       OAK GROVE TECHNOLOGIES, LLC v. US




 United States. Also represented by BRIAN M. BOYNTON,
 PATRICIA M. MCCARTHY, DOUGLAS K. MICKLE, JOSEPH ALAN
 PIXLEY; MICHAEL RAY TREGLE, JR., Contract Litigation &
 Intellectual Property Division, United States Army Legal
 Services Agency, Fort Belvoir, VA.

     JOSHUA ALLAN MULLEN, Womble Bond Dickinson (US)
 LLP, Nashville, TN, argued for defendant-appellant F3EA,
 Inc. Also represented by RAYMOND BENNETT, Raleigh, NC.
                  ______________________

      Before PROST, STOLL, and STARK, Circuit Judges.
 STARK, Circuit Judge.
     This bid protest action originated with the United
 States Department of the Army (“Army” or “agency”)
 awarding a contract to F3EA, Inc. (“F3EA”). Another bid-
 der, Oak Grove Technologies, LLC (“Oak Grove”), protested
 the award, including by filing suit in the Court of Federal
 Claims. The Court of Federal Claims agreed with Oak
 Grove that the bidding process had gone awry and, there-
 fore, enjoined the Army from proceeding with its award to
 F3EA. It further ordered the Army either to begin the pro-
 curement process anew or reopen it to conduct discussions
 with, and accept revised final proposals from, multiple of-
 ferors, including Oak Grove. The trial court also sanc-
 tioned the government for repeatedly failing to include
 material evidence in the administrative record. Both F3EA
 and the government appeal the trial court’s judgment and
 the injunction. The government additionally appeals the
 trial court’s sanctions order. We vacate the judgment and
 the injunction, affirm the sanctions order, and remand for
 further proceedings.
Case: 22-1556    Document: 117      Page: 3    Filed: 09/16/2024




 OAK GROVE TECHNOLOGIES, LLC v. US                           3



                               I
                               A
      The contract at issue here is called “Special Operations
 Forces Requirements, Analysis, Prototyping, Training, Op-
 erations and Rehearsal,” or “SOF RAPTOR.” J.A. 2650. As
 the name implies, SOF RAPTOR is a contract vehicle that
 the Army uses for procuring training services for its special
 forces. When the predecessor contract to the one at issue
 here was set to expire, the Army issued a solicitation (“So-
 licitation,” “Request for Proposals,” or “RFP”) for SOF
 RAPTOR IV, a small business set-aside, single-award, in-
 definite delivery indefinite quantity (“IDIQ”) contract with
 an order ceiling of $245 million. In the Solicitation, the
 Army required offerors to include in their proposals four
 volumes addressing the following factors: (1) capability, (2)
 past performance, (3) cost/price, and (4) administrative.
 See J.A. 2764-65. The Solicitation provided that the capa-
 bility, past performance, and cost/price volumes would be
 evaluated in that order of importance. See J.A. 2778. The
 Solicitation did not include any criteria for evaluating the
 “administrative” volume. The government indicated that,
 in evaluating proposals, it “may use information other than
 that provided by Offeror in its evaluation . . . includ[ing]
 DCAA [Defense Contract Audit Agency], DCMA [Defense
 Contract Management Agency], Government Databases
 and past performance questionnaires.” J.A. 2777.
      The Solicitation explained that the capability factor in-
 cluded three technical subfactors, and that a rating of “un-
 acceptable” or “marginal” in any of the three subfactors
 would result in an “unacceptable” or “marginal” rating for
 the overall capability factor, rendering a proposal “una-
 wardable.” J.A. 3547-48. The “program management sub-
 factor” required the offeror to demonstrate the ability to
 address, among other things, “[m]anagement [s]tructure,”
 J.A. 2766, 2778.      In connection with “[m]anagement
 [s]tructure,” an offeror was required to “identify all
Case: 22-1556    Document: 117     Page: 4   Filed: 09/16/2024




 4                        OAK GROVE TECHNOLOGIES, LLC v. US




 teaming arrangements, partnerships, joint venture owner-
 ship and contingencies, as applicable, within this descrip-
 tion.” Id.
      Relatedly, the Solicitation required offerors to submit
 “all executed teaming arrangements” and provided that
 “any previous teaming arrangements . . . that [are] refer-
 enced within the proposal shall be included as attachments
 in the admin volume as supporting documentation.”
 J.A. 2775. The Solicitation also stated that “any modifica-
 tions to a teaming arrangement must be reviewed by the
 Contracting Officer before the effective date of such modi-
 fication in order to ensure that there [are] no negative im-
 pacts on contract performance, in accordance with FAR
 [Federal Acquisition Regulation] 9.603.” J.A. 2771. As rel-
 evant here, FAR § 9.603 provides that “[t]he Government
 will recognize the integrity and validity of contractor team
 arrangements; provided, the arrangements are identified
 and company relationships are fully disclosed in an offer
 or, for arrangements entered into after submission of an
 offer, before the arrangement becomes effective.”
      Past performance was evaluated for relevancy (i.e.,
 “Very Relevant,” “Relevant,” “Somewhat Relevant,” or “Not
 Relevant”) and confidence (i.e., “Substantial Confidence,”
 “Satisfactory Confidence,” “Neutral Confidence,” “Limited
 Confidence,” or “No Confidence”). J.A. 2784-85. For
 Cost/Price factor, the Solicitation specified that the “DCAA
 will be requested to perform a Financial Capability Risk
 Assessment for the Prime offeror” and that “[t]he Prime of-
 feror must be deemed financially responsible by the Con-
 tracting Officer based on the Financial Capability Risk
 Assessment.” J.A. 2783. As relevant here, FAR § 9.103(a)
 provides that “[p]urchases shall be made from, and con-
 tracts shall be awarded to, responsible prospective contrac-
 tors only.” Because SOF RAPTOR IV is a small business
 set-aside contract, FAR § 9.105-2(a)(2) also requires that
 “[i]f the contracting officer determines that a responsive
 small business lacks certain elements of responsibility,”
Case: 22-1556    Document: 117     Page: 5    Filed: 09/16/2024




 OAK GROVE TECHNOLOGIES, LLC v. US                          5



 the contracting officer shall “[r]efer the matter to the cog-
 nizant SBA [Small Business Administration],” FAR
 § 19.602-1(a)(2). Once the SBA assesses the financial re-
 sponsibility of the small business, FAR § 9.105-2(a)(2) re-
 quires “the contracting officer [to] accept the Small
 Business Administration’s decision to issue a Certificate of
 Competency and award the contract to the concern.”
                              B
     Oak Grove, F3EA, and Lukos-VATC III, LLC (“Lukos”)
 were among the ten offerors that timely submitted pro-
 posals to be awarded the SOF RAPTOR IV contract. Oak
 Grove and F3EA were both members of Raptor Training
 Services, LLC, a joint venture that had been awarded the
 predecessor contract, SOF RAPTOR III.
      The Army initially screened proposals to ensure that
 all necessary information was submitted. Later, source se-
 lection evaluation board (“SSEB”) teams were assigned to
 evaluate and rate proposals. A person identified as “RM”
 was the chairperson of the overall SSEB and, in that ca-
 pacity, RM received all reports from various teams within
 the SSEB. See J.A. 2700 (showing source selection team
 structure); J.A. 2690-91 (outlining roles and responsibili-
 ties of SSEB). RM, as chairperson, was responsible for pre-
 paring a comprehensive and accurate proposal evaluation
 report (“PER”), containing “the adjectival assessments for
 each factor and subfactor as well as a Cost/Price report and
 the supporting rationale.” J.A. 6 (citation omitted). The
 PER was provided to the source selection advisory council
 (“SSAC”), which, in turn, provided the source selection au-
 thority (“SSA”) with a source selection decision recommen-
 dation. The SSA was an individual designated to make the
 best-value source selection decision.
     Ultimately, the Army awarded the SOF RAPTOR IV
 contract to F3EA after rating F3EA’s proposal as having
 the highest technical rating and the lowest price among the
 three proposals that received an acceptable (or better)
Case: 22-1556    Document: 117     Page: 6    Filed: 09/16/2024




 6                        OAK GROVE TECHNOLOGIES, LLC v. US




 capability rating. Specifically, the Army rated F3EA’s pro-
 posal, which had a price of $4.35 million, as “Outstanding”
 in each capability subfactor and assigned it a “Very Rele-
 vant” and “Substantial Confidence” rating for past perfor-
 mance. J.A. 3587. By comparison, Lukos’ proposal, which
 had a higher price of $4.78 million, was rated only “Good”
 for the capability factor and “Somewhat Relevant” and
 “Neutral Confidence” for past performance. J.A. 3588.
 Oak Grove’s proposal was deemed unawardable because
 the agency rated it “Unacceptable” for the capability factor.
 J.A. 3587.
                              C
     Shortly after the SOF RAPTOR IV contract was
 awarded to F3EA, Oak Grove filed a protest with the Gov-
 ernment Accountability Office (“GAO”), raising numerous
 challenges to the Army’s evaluation of Oak Grove’s own
 proposal and to the Army’s decision to award the contract
 to F3EA. Among Oak Grove’s allegations was that F3EA
 improperly benefited from unequal access to information,
 resulting in a prohibited organizational conflict of interest
 (“OCI”). As support for its accusation, Oak Grove submit-
 ted two emails it had received from former F3EA employ-
 ees. In those emails, the employees alleged that they had
 overheard conversations between an employee of F3EA
 and RM, the chairperson of the SSEB, regarding “the in-
 tent for F3EA to get the work,” J.A. 1546 (internal quota-
 tion marks omitted), and that RM had steered the contract
 award to F3EA by deliberately selecting the sample task
 orders (“STO”) that F3EA had performed under the prede-
 cessor SOF RAPTOR III contract, J.A. 1620-21. Oak Grove
 also alleged that F3EA had a role in drafting the STOs.
 Shortly after filing its protest at the GAO, Oak Grove sent
 a notice of possible Procurement Integrity Act (“PIA”) vio-
 lations to the contracting officer.
     Soon thereafter, the Army issued a notice of corrective
 action, stating:
Case: 22-1556    Document: 117     Page: 7    Filed: 09/16/2024




 OAK GROVE TECHNOLOGIES, LLC v. US                          7



       The Army will reevaluate proposals con-
       sistent with the solicitation, determine the
       impact of the reevaluations on the source se-
       lection decision, and document its reevalua-
       tions and new best value determination. . . .
       Additionally, the Army has initiated an inves-
       tigation in accordance with FAR 9.505 to de-
       termine the validity of the organizational
       conflict of interest (OCI) allegations in Oak
       Grove’s protest. The Army will also investi-
       gate the allegations set forth in Oak Grove’s
       January 29, 2020 Notice of Possible Procure-
       ment Integrity Act Violations in accordance
       with FAR 3.104. The Army will take appro-
       priate action as necessary based on the re-
       sults of the information gathered during the
       investigation.
 J.A. 1623. The GAO then dismissed Oak Grove’s protest,
 finding that “[t]he agency’s corrective action render[ed] the
 protest academic.” J.A. 1625.
     On February 18, 2020, the contracting officer issued a
 memorandum summarizing the findings from the investi-
 gation he had undertaken of Oak Grove’s OCI and PIA al-
 legations. As part of that investigation, members of the
 SSEB provided written statements and were interviewed,
 uniformly denying that they had ever heard RM discussing
 influencing the procurement for the benefit of F3EA. The
 contracting officer also obtained a written statement from
 RM, also denying Oak Grove’s allegations. Neither RM nor
 the former F3EA employees who had sent the emails on
 which Oak Grove’s allegations rested were interviewed.
 On May 1, 2020, the contracting officer issued another
 memorandum, noting that the emails from the former
 F3EA employees “did not provide a timeline of when the
 statements and discussions [involving RM] occurred, the
 topics of discussion and who were other parties that were
 present.”    J.A. 3441.    Based on the findings of the
Case: 22-1556    Document: 117     Page: 8    Filed: 09/16/2024




 8                        OAK GROVE TECHNOLOGIES, LLC v. US




 investigation, the contracting officer ultimately concluded
 that Oak Grove’s allegations were not credible and that the
 alleged OCI and PIA violations could not be substantiated.
      On August 28, 2020, after reevaluating the proposals,
 the Army once again awarded the SOF RAPTOR IV con-
 tract to F3EA, having concluded once more that F3EA was
 the offeror having the highest technical rating and the low-
 est price at $4.35 million. Lukos’ proposal, which had a
 price of $4.73 million, was rated “Good” for the capability
 factor and “Relevant” and “Satisfactory Confidence” for
 past performance. Id. Proposals from the remaining offe-
 rors, including Oak Grove, were deemed unawardable be-
 cause the agency rated them “Marginal” or “Unacceptable”
 for the capability factor.
     On September 9, 2020, Oak Grove filed a second pro-
 test with the GAO, raising the same issues it had presented
 in the first protest. On December 18, 2020, the GAO denied
 the protest, concluding that the agency was reasonable in
 assessing Oak Grove’s proposal as unawardable. See
 J.A. 3677.
                              D
     On January 21, 2021, Oak Grove filed its complaint
 against the United States in the Court of Federal Claims.
 The complaint alleged that the agency: (1) inadequately in-
 vestigated whether the chairperson, RM, steered the pro-
 curement award to F3EA (Count I); (2) awarded the
 contract to F3EA despite the existence of biased ground
 rule or unequal information OCIs (Count II); (3) violated
 FAR § 1.602-2 and FAR § 3.101-1 (Count III), which re-
 quire the government and its contracting officers to avoid
 any conflict of interest in Government-contractor relation-
 ships and to treat contractors impartially, fairly, and equi-
 tably; (4) abused its discretion in failing to engage in
 discussions or clarifications with Oak Grove (Count IV); (5)
 arbitrarily assessed weaknesses to various sections of Oak
 Grove’s proposal (Counts V-VIII); (6) misevaluated Lukos’
Case: 22-1556    Document: 117      Page: 9     Filed: 09/16/2024




 OAK GROVE TECHNOLOGIES, LLC v. US                            9



 proposal (Count IX); and (7) awarded F3EA the contract
 despite various critical deficiencies with its proposal
 (Counts X-XII). J.A. 9. F3EA intervened.
     The Court of Federal Claims granted Oak Grove’s mo-
 tion for judgment on the administrative record and en-
 joined the Army from proceeding with its contract award to
 F3EA. It wrote:
       Given the defects in F3EA’s and Lukos’ re-
       spective proposals . . . , the Agency’s failure to
       conduct discussions, as well as the Agency’s
       inadequate investigation into alleged wrong-
       doing by the [chairperson, RM], the [c]ourt
       concludes that it has no choice but to order the
       Agency either: (1) to resolicit this procure-
       ment from its inception; or (2) to reopen the
       procurement to conduct discussions and ac-
       cept new final proposal revisions from offe-
       rors.
 J.A. 51. The trial court also denied the government’s mo-
 tion to dismiss Oak Grove’s complaint for lack of standing.
                               E
     In a separate order, the Court of Federal Claims sanc-
 tioned the government under Rule 11 of the Rules of the
 United States Court of Federal Claims (“RCFC”) for failing
 to compile a complete administrative record. Over the
 course of the litigation, the trial court had directed the gov-
 ernment, on numerous occasions, to file certain documents
 that had been omitted from the administrative record orig-
 inally filed by the government. See J.A. 735-36, 1017-18,
 1114-15. Among them were a letter from the SSA termi-
 nating RM’s appointment as SSEB Chairperson, J.A. 3950,
 and a report from the DCMA recommending “No Award”
 for Lukos based on its financial capability, which the court
 found to be highly relevant to the issues in the litigation.
 J.A. 3937-39; see also J.A. 67, 70, 80. As sanctions for its
Case: 22-1556    Document: 117       Page: 10    Filed: 09/16/2024




  10                        OAK GROVE TECHNOLOGIES, LLC v. US




  failings, the government was ordered “to pay the legal costs
  and expenses [Oak Grove] incurred in dealing with the ad-
  ministrative record issues for which the government was
  responsible throughout this litigation.” J.A. 81.
                                F
      The government and F3EA timely appealed. We have
  jurisdiction under 
28 U.S.C. § 1295
(a)(3).
                                II
       We review the Court of Federal Claims’ “determination
  on the legal issue of the government’s conduct, in a grant
  of judgment upon the administrative record, without defer-
  ence.” Per Aarsleff A/S v. United States, 
829 F.3d 1303, 1309
 (Fed. Cir. 2016) (internal quotation marks and cita-
  tion omitted). “This means that we apply the arbitrary and
  capricious standard . . . anew.” Centech Grp., Inc. v. United
  States, 
554 F.3d 1029, 1037
 (Fed. Cir. 2009) (internal quo-
  tation marks omitted). We review determinations of stand-
  ing under the Tucker Act de novo. See SEKRI, Inc. v.
  United States, 
34 F.4th 1063, 1070
 (Fed. Cir. 2022). How-
  ever, underlying factual findings, including prejudice, are
  reviewed for clear error. See CliniComp Int’l, Inc. v. United
  States, 
904 F.3d 1353, 1357-59
 (Fed. Cir. 2018); see also
  Bannum, Inc. v. United States, 
404 F.3d 1376
, 1357 (Fed.
  Cir. 2005) (“[T]he trial court’s factual determination on
  prejudice . . . is entitled to review for clear error like any
  finding in a bench trial, and the special concerns applicable
  to bid protest actions do not alter that review here.”).
      The Administrative Procedure Act (“APA”) supplies the
  standard of review in bid protests.         See 
28 U.S.C. § 1491
(b)(4); Axiom Res. Mgmt., Inc. v. United States, 
564 F.3d 1374, 1381
 (Fed. Cir. 2009). The APA standard asks
  whether the agency’s actions were “arbitrary, capricious,
  an abuse of discretion, or otherwise not in accordance with
  law.” 
5 U.S.C. § 706
(2)(A); see also Banknote Corp. of Am.,
  Inc. v. United States, 
365 F.3d 1345
, 1350 (Fed. Cir. 2004).
Case: 22-1556     Document: 117       Page: 11    Filed: 09/16/2024




  OAK GROVE TECHNOLOGIES, LLC v. US                            11



  Hence, the court may overturn the challenged agency deci-
  sion if it “lacked a rational basis” or “involved a violation of
  regulation or procedure.” Axiom, 
564 F.3d at 1381
 (inter-
  nal quotation marks and citation omitted).
       In handling a bid protest case, the Court of Federal
  Claims “may award any relief that the court considers
  proper, including declaratory and injunctive relief.” 
28 U.S.C. § 1491
(b)(2). Before granting injunctive relief, the
  trial court “must consider whether (1) the plaintiff has suc-
  ceeded on the merits, (2) the plaintiff will suffer irreparable
  harm if the court withholds injunctive relief, (3) the bal-
  ance of hardships to the respective parties favors the grant
  of injunctive relief, and (4) the public interest is served by
  a grant of injunctive relief.” Centech Grp., 
554 F.3d at 1037
. “We give deference to the Court of Federal Claims’
  decision to grant or deny injunctive relief, only disturbing
  the court’s decision if it abused its discretion.” PGBA, LLC
  v. United States, 
389 F.3d 1219, 1223
 (Fed. Cir. 2004). An
  abuse of discretion exists where the court has “made a clear
  error of judgment in weighing the relevant factors or exer-
  cised its discretion based on an error of law or clearly erro-
  neous fact finding.” 
Id.
 (internal quotation marks and
  citation omitted).
      Accordingly, here, we review without deference the
  Court of Federal Claims’ analysis of whether the Army’s
  evaluations of the offers were arbitrary and capricious.
  However, we review the court’s holding that Oak Grove
  was prejudiced by these evaluations for clear error. We re-
  view the imposition of sanctions for abuse of discretion.
                                III
      The parties raise numerous procedural and substan-
  tive arguments. With respect to procedure, Oak Grove ar-
  gues that the government’s corrective action renders this
  appeal moot, while F3EA and the government contend that
  Oak Grove lacks standing because it has not been preju-
  diced. We reject each of these positions. After doing so, we
Case: 22-1556    Document: 117     Page: 12    Filed: 09/16/2024




  12                       OAK GROVE TECHNOLOGIES, LLC v. US




  turn to the substantive issues. We agree with F3EA and
  the government that the Army’s award to F3EA was not
  arbitrary and capricious, rejecting Oak Grove’s contentions
  that (1) the agency was required to hold discussions, an is-
  sue we do not resolve on the merits because Oak Grove
  waived its argument, (2) F3EA was required to include
  teaming agreements in its proposal, and (3) the agency’s
  investigation into RM’s alleged misconduct was inade-
  quate. We further agree with F3EA and the government
  that the trial court erred in finding that Lukos’ proposal
  was ineligible for award. Finally, we disagree with the gov-
  ernment’s contention that the Court of Federal Claims
  abused its discretion by imposing Rule 11 sanctions.
                               A
                               1
       We begin by explaining our rejection of Oak Grove’s
  suggestion that this appeal is moot. Oak Grove’s mootness
  contention is grounded in the fact that after the Court of
  Federal Claims entered judgment, the government reo-
  pened the procurement, engaged in discussions with cer-
  tain offerors, requested and evaluated revised proposals,
  and reopened its investigation into the SSEB’s chairper-
  son’s alleged misconduct. However, as the government
  points out – without dispute from Oak Grove – the Army
  “has no[t] issued any new contract nor has the agency reso-
  licited its requirements.” Gov’t Reply Br. at 2. Thus, if
  F3EA and the government prevail on appeal, the Army
  may be “in a position to reinstate[] the original award [to
  F3EA], which would obviate any need to continue its con-
  tingent corrective action.” Id. at 3. Additionally, absent
  this appeal, the government would have no mechanism to
  attempt to overturn the sanctions order. Because both
  F3EA and the government could be in better positions if
  they press and prevail on appeal than if there could be no
  appeal, their appeals are not moot, notwithstanding the
  government’s corrective actions. See Acceleration Bay LLC
Case: 22-1556    Document: 117      Page: 13     Filed: 09/16/2024




  OAK GROVE TECHNOLOGIES, LLC v. US                          13



  v. 2K Sports, Inc., 
15 F.4th 1069, 1076
 (Fed. Cir. 2021)
  (“The test for mootness is whether the relief sought, if
  granted, would make a difference to the legal interests of
  the parties . . . .”) (internal quotation marks and citation
  omitted).
                                2
      A second preliminary procedural issue is whether Oak
  Grove has standing to press its bid protest claims. Because
  we find no clear error in the Court of Federal Claims’ fac-
  tual finding that Oak Grove was prejudiced by the agency’s
  procedure, we do not agree with F3EA and the government
  that Oak Grove lacks standing.
       Under the Tucker Act, the Court of Federal Claims has
  jurisdiction over cases brought “by an interested party ob-
  jecting to . . . the award of a contract” by a federal agency.
  
28 U.S.C. § 1491
(b)(1). “To satisfy § 1491(b)(1)’s standing
  requirements,” the plaintiff “must make two showings.”
  CliniComp, 
904 F.3d at 1358
. First, the plaintiff “must
  show that it is an ‘interested party.’” 
Id.
 An “interested
  party” objecting to a contract award is an “actual or pro-
  spective bidder[] or offeror[] whose direct economic interest
  would be affected by the award of the contract or by failure
  to award the contract.” Rex Serv. Corp. v. United States,
  
448 F.3d 1305, 1307
 (Fed. Cir. 2006) (internal quotation
  marks and emphasis omitted). “[T]o prove a direct eco-
  nomic interest,” such a plaintiff “must show that it had a
  substantial chance of winning the contract.” CliniComp,
  
904 F.3d at 1358
. In this way, the “interested party” re-
  quirement – which is statutory, not jurisdictional – “im-
  poses more stringent standing requirements than Article
  III.” Weeks Marine, Inc. v. United States, 
575 F.3d 1352, 1359
 (Fed. Cir. 2009); see also CACI, Inc.-Fed. v. United
  States, 
67 F.4th 1145, 1151
 (Fed. Cir. 2023).
      “Second, the plaintiff must show that it was prejudiced
  by a significant error in the procurement process.” Clini-
  Comp, 
904 F.3d at 1358
. The requirement to show
Case: 22-1556     Document: 117      Page: 14     Filed: 09/16/2024




  14                        OAK GROVE TECHNOLOGIES, LLC v. US




  prejudice, like the “interested party” requirement, is stat-
  utory and not jurisdictional. See CACI, 
67 F.4th at 1153
  (“[T]he issue of prejudice is no longer jurisdictional unless
  it implicates Article III considerations.”). “To establish
  prejudice,” a plaintiff objecting to a contract award “must
  show that there was a ‘substantial chance’ it would have
  received the contract award but for the alleged error in the
  procurement process.” Info. Tech. & Applications Corp. v.
  United States, 
316 F.3d 1312, 1319
 (Fed. Cir. 2003).
       For purposes of evaluating standing, “[i]n assessing
  whether a party was prejudiced by purported errors in a
  procurement process, we must assume that the party will,
  if permitted to proceed with its claim, prevail on the mer-
  its.” REV, LLC v. United States, 
91 F.4th 1156, 1164
 (Fed.
  Cir. 2024). Hence, in undertaking the standing analysis
  here, we must presume that Oak Grove will prevail on its
  challenges to the Army’s evaluation of F3EA’s and Lukos’
  proposals. Thus, we must evaluate whether Oak Grove
  would have had a substantial chance of receiving the con-
  tract in a scenario in which Oak Grove has succeeded in
  proving that neither F3EA nor Lukos submitted compliant,
  awardable proposals.
      From this perspective, we find no clear error in the
  Court of Federal Claims’ finding that, in that eventuality,
  Oak Grove is an interested party and would have had a
  substantial chance of being awarded the SOF RAPTOR IV
  contract. If F3EA and Lukos were eliminated, as Oak
  Grove alleges they should have been, the Army would have
  been obligated to seek and consider revised proposals from
  other offerors that were initially deemed unawardable, in-
  cluding Oak Grove. See Tinton Falls Lodging Realty, LLC
  v. United States, 
800 F.3d 1353, 1359
 (Fed. Cir. 2015) (“[A]
  bid protester had a ‘substantial chance’ of receiving a con-
  tract – and therefore standing to challenge the award of
  that contract – if, as a result of a successful bid protest, the
  government would be obligated to rebid the contract and
  the protester could compete for the contract during the
Case: 22-1556     Document: 117      Page: 15     Filed: 09/16/2024




  OAK GROVE TECHNOLOGIES, LLC v. US                            15



  reopened bid.”). Assuming, as we must, that its challenges
  to F3EA and Lukos would be successful, Oak Grove would
  be provided an opportunity to submit a revised proposal,
  giving it a chance to cure the deficiencies in its original “un-
  awardable” proposal and, hence, would have a “substantial
  chance” of being awarded the contract.
      Accordingly, the trial court’s finding that Oak Grove
  demonstrated a substantial chance of being awarded the
  contract – and, for purposes of the standing analysis, was
  an interested party and prejudiced – is not clearly errone-
  ous. See J.A. 13. Thus, Oak Grove had standing to chal-
  lenge the awardability of F3EA and Lukos. We affirm the
  Court of Federal Claims’ denial of the government’s motion
  to dismiss for lack of standing.
                                 B
      Having disposed of the procedural issues raised by the
  parties, we now turn to their substantive arguments.
  F3EA and the government contend that the Army did not
  act arbitrarily and capriciously in finding F3EA’s proposal
  acceptable. Specifically, F3EA and the government argue
  that (1) Oak Grove waived its argument that the agency
  was required to hold discussions and, in any case, discus-
  sions were not required, (2) F3EA was not required to in-
  clude a teaming agreement in its proposal, and (3) the
  agency’s investigation into RM’s alleged misconduct was
  adequate. F3EA and the government additionally argue
  that the trial court erred by finding Lukos’ proposal unac-
  ceptable. We agree with F3EA and the government on each
  of these points.
                                 1
      First, we address F3EA’s and the government’s argu-
  ment that the Army did not act arbitrarily and capriciously
  in awarding the contract to F3EA without first engaging in
  discussions with offerors. On de novo review, we conclude
  Oak Grove waived this issue, consistent with our holding
Case: 22-1556     Document: 117      Page: 16     Filed: 09/16/2024




  16                        OAK GROVE TECHNOLOGIES, LLC v. US




  in Blue & Gold, L.P. v. United States, 
492 F.3d 1308, 1313
  (Fed. Cir. 2007).
       In Blue & Gold, 
492 F.3d at 1313
, we held that “a party
  who has the opportunity to object to the terms of a govern-
  ment solicitation containing a patent error and fails to do
  so prior to the close of the bidding process waives its ability
  to raise the same objection subsequently in a bid protest
  action in the Court of Federal Claims.” The applicability of
  the “Blue & Gold rule” turns on the existence of a patent
  error. “A defect in a solicitation is patent if it is an obvious
  omission, inconsistency, or discrepancy of significance. Ad-
  ditionally, a defect is patent if it could have been discovered
  by reasonable and customary care.” Inserso Corp. v.
  United States, 
961 F.3d 1343, 1349
 (Fed. Cir. 2020) (inter-
  nal citation omitted). Thus, the issue we confront is
  whether the error alleged by Oak Grove is obvious or could
  at least have been discovered by reasonable and customary
  care.
       Oak Grove asserts that the Army violated Defense Fed-
  eral Acquisition Regulation Supplement (“DFARS”)
  § 215.306(c), which provides that “[f]or acquisitions with an
  estimated value of $100 million or more, contracting offic-
  ers should conduct discussions” (emphasis added). Regard-
  less of the merits of this argument, the Army’s intent not
  to conduct discussions – and, thus, the alleged violation of
  the DFARS provision – is obvious from the Solicitation and
  certainly could have been discovered by Oak Grove through
  the exercise of reasonable and customary care. Indeed,
  multiple portions of the Solicitation informed the bidders
  that discussions would not be held, including the Solicita-
  tion’s incorporation of FAR § 52.215-1 without its Alternate
  I. J.A. 2777. Compare FAR § 52.215-1(f)(4) (“The Govern-
  ment intends to evaluate proposals and award a contract
  without discussions . . . .”), with FAR § 52.215-1, Alternate
  I (f)(4) (“The Government intends to evaluate proposals
  and award a contract after conducting discussions . . . .”)
  (emphasis added). The Solicitation also expressly states
Case: 22-1556    Document: 117      Page: 17     Filed: 09/16/2024




  OAK GROVE TECHNOLOGIES, LLC v. US                          17



  that “[t]he Government does not intend to hold discussions,
  but reserves the right to do so, at the sole discretion of the
  PCO [Procuring Contracting Officer].” J.A. 2777. Further,
  “[o]fferors are cautioned that the award may not neces-
  sarily be made to the lowest priced offeror and that award
  may be made without discussions.” Id. Thus, Oak Grove’s
  contention – that the Army’s decision not to hold discus-
  sions violated DFARS § 215.306(c) – was obvious from the
  Solicitation itself and had to have been raised before the
  close of the bid process. As Oak Grove did not do so, this
  issue is waived under the Blue & Gold rule.
      In finding that the Blue & Gold waiver rule did not ap-
  ply, the Court of Federal Claims relied on our decision in
  Dell Federal Systems, L.P. v. United States, 
906 F.3d 982
  (Fed. Cir. 2018). J.A. 35-36. Dell, however, considered the
  distinguishable circumstances in which the Army’s con-
  tracting officer conceded that the agency had “likely vio-
  lat[ed] . . . DFARS 215.306(c)(1)” and voluntarily took
  corrective action based on that determination. 
906 F.3d at 994
 (internal quotation marks omitted). We were not
  asked to, and did not, resolve the issue of whether a solici-
  tation’s use of FAR 52.215-1 without Alternate I could trig-
  ger a Blue & Gold waiver. In Dell, we did not decide
  whether the contracting officer’s statement was the correct
  interpretation of the regulation, and nothing about the gov-
  ernment’s concession in that case binds us here. We disa-
  gree with the trial court that Dell applies here.
      Accordingly, by application of the Blue & Gold rule,
  Oak Grove waived its argument relating to the Army’s fail-
  ure to hold discussions.
                                2
       We next address F3EA’s and the government’s argu-
  ment that the Army did not act arbitrarily and capriciously
  in finding F3EA’s proposal acceptable despite F3EA’s fail-
  ure to include teaming agreements. The Court of Federal
Case: 22-1556    Document: 117      Page: 18     Filed: 09/16/2024




  18                        OAK GROVE TECHNOLOGIES, LLC v. US




  Claims agreed with Oak Grove that the Army acted arbi-
  trarily and capriciously. We do not.
      The Solicitation provides that the “[o]fferor shall in-
  clude in full all executed teaming arrangements, partner-
  ships, joint venture ownership documentation, associate
  contractor agreement contingencies, as applicable.”
  J.A. 2775. The Solicitation further states that “any previ-
  ous teaming arrangements . . . that [are] referenced within
  the proposal shall be included as attachments in the admin
  volume as supporting documentation.” 
Id.
 (emphasis
  added). It also warned that failure to submit a complete
  proposal including all required information could render an
  offeror unacceptable and ineligible for award. J.A. 2762-
  64. It is undisputed that F3EA’s proposal did not include
  any written teaming arrangement, even though F3EA’s
  proposal referenced a third party and discussed that
  party’s capabilities and past performance. J.A. 24-26.
      A proposal’s failure to conform to a term or condition of
  a solicitation renders the proposal unawardable only if the
  violation relates to a term or condition that is material. See
  E.W. Bliss Co. v. United States, 
77 F.3d 445, 448
 (Fed. Cir.
  1996) (“[A] proposal that fails to conform to the material
  terms and conditions of the solicitation should be consid-
  ered unacceptable and a contract award based on such an
  unacceptable proposal violates the procurement statutes
  and regulations.”). A “defect or variation is immaterial
  when the effect on price, quantity, quality, or delivery is
  negligible when contrasted with the total cost or scope of
  the supplies or services being acquired.” 
48 C.F.R. § 14.405
. Whether a term or condition of a solicitation is a
  material requirement presents a question of law we review
  de novo. See Safeguard Base Operations, LLC v. United
  States, 
989 F.3d 1326, 1343-44
 (Fed. Cir. 2021) (“We apply
  de novo review to the Claims Court’s interpretation of the
  Solicitation.”).
Case: 22-1556     Document: 117      Page: 19     Filed: 09/16/2024




  OAK GROVE TECHNOLOGIES, LLC v. US                            19



       We conclude that the Solicitation’s teaming agreement
  provisions are not material requirements. The non-mate-
  riality of these provisions is reflected in Section L.7.7 of the
  Solicitation, which provides that the “[o]fferor shall include
  in full all executed teaming arrangements . . . as applica-
  ble,” adding that “companies are not locked into any team-
  ing arrangements or subcontractors.” J.A. 2775 (emphasis
  added). It follows that teaming agreements are not always
  required to be included, as they may be, for example, unex-
  ecuted, inapplicable, or changing over time. Moreover, the
  Solicitation directs the offerors to include teaming agree-
  ments in the administrative volume, which is a portion of
  the proposal that is not evaluated as part of the bid evalu-
  ation process. See J.A. 2891 (agency confirming “[t]here is
  no Section M [evaluation criteria] or evaluation for admin
  volume.”). This seems to reflect the Army’s anticipation
  that failing to show the agency any current teaming agree-
  ments the offeror is party to would have a negligible impact
  or effect on price, quantity, quality, or delivery.
       By contrast, the Court of Federal Claims found the
  teaming agreement requirement “serve[d] a substantive
  and material purpose – ensuring that prime contractors
  cannot simply claim the capability and experience of an-
  other contractor for the purpose of making the offeror’s pro-
  posal more competitive, absent some concrete evidence
  that the described team will actually perform an awarded
  contract.” J.A. 22 (emphasis added). We disagree. The So-
  licitation was for an IDIQ contract and, as such, sought
  proposals for a sample task, not an actual task that a win-
  ning offeror was expected to perform. The then-current
  teaming agreements, therefore, may not have any impact
  on any task the successful offeror will be required to per-
  form.
       The Court of Federal Claims further faulted the Army
  for failing to provide “any supporting rationale” regarding
  its decision not to find F3EA’s bid non-compliant for the
  lack of teaming agreements. J.A. 25. Given that the
Case: 22-1556     Document: 117      Page: 20    Filed: 09/16/2024




  20                        OAK GROVE TECHNOLOGIES, LLC v. US




  Solicitation does not mandate exclusion from the bid pro-
  cess of an offeror who fails to include teaming agreements,
  the contracting officer was under no obligation to provide
  written reasons for why he was not troubled by the lack of
  inclusion of such agreements in F3EA’s proposal. See Dyn-
  Corp Int’l, LLC v. United States, 
10 F.4th 1300, 1313
 (Fed.
  Cir. 2021) (“Generally, contracting officers are not obli-
  gated by the APA to provide written explanations for their
  actions.”) (cleaned up).
      Thus, we conclude that the Solicitation’s teaming
  agreement provisions are not material requirements.
  Therefore, F3EA’s offer did not become unawardable due
  to F3EA’s failure to submit teaming agreements.
                                3
      The Court of Federal Claims’ finding that the Army’s
  internal investigation into RM’s conduct was inadequate is
  clearly erroneous. It also appears to be the result of appli-
  cation of an incorrect non-deferential standard of review.
       “FAR provides a contracting officer with considerable
  discretion to conduct fact-specific inquiries of acquisition
  proposals to identify potential conflicts.” PAI Corp. v.
  United States, 
614 F.3d 1347, 1352-53
 (Fed. Cir. 2010).
  Moreover, we engage in a “strong presumption” that gov-
  ernment officials – including, here, RM, the chairperson of
  the SSEB – act consistent with their duties. Sanders v.
  U.S. Postal Serv., 
801 F.2d 1328, 1331
 (Fed. Cir. 1986).
  The trial court failed to acknowledge these twin layers of
  deference, and there is no indication that the court ac-
  corded any deference to the agency’s investigative process.
  Rather, the court appears to have substituted its own judg-
  ment as to what constitutes an adequate investigation.
  See, e.g., J.A. 40 (“[T]he Agency did not adequately investi-
  gate possible violations . . . , including serious questions of
  bias or improper conduct impacting the fairness and integ-
  rity of this procurement.”). Instead of applying what
Case: 22-1556    Document: 117      Page: 21     Filed: 09/16/2024




  OAK GROVE TECHNOLOGIES, LLC v. US                          21



  amounts to de novo review, deference should be given to
  the decision making and discretion of the Army.
      In particular, the Court of Federal Claims found that
  the agency’s “failure to do more” – and especially its failure
  to interview F3EA’s CEO and the two former-employee
  whistleblowers – “was insufficient under the facts of this
  case.” J.A. 43. Given the deference we accord to the
  agency, we disagree. The Army’s contracting officer con-
  ducted numerous interviews and examined written state-
  ments from individuals involved in the STOs. All of them
  confirmed that F3EA played no role in preparing the STOs,
  directly contradicting the misconduct claims made in the
  F3EA former employees’ emails. J.A. 2911-16. RM also
  provided a sworn declaration denying Oak Grove’s allega-
  tions. J.A. 2914-16. In light of these investigative steps,
  and the evidence amassed, it was not unreasonable for the
  Army’s contracting officer to choose not also to interview
  RM and the former employees who sent the emails. We do
  not say that these additional steps would have been in any
  way inappropriate; we merely hold that it was a proper ex-
  ercise of the agency’s discretion to decide they were unnec-
  essary.
      The trial court faulted RM for “play[ing] multiple roles
  in the procurement.” J.A. 44. It focused on what it charac-
  terized as RM “review[ing] his own work,” in that as the
  contracting officer representative (“COR”) for the award of
  the RAPTOR III contract he had been the author of some
  of the past performance references, which in his later ca-
  pacity as SSEB chairperson for the RAPTOR IV contract
  he participated in evaluating as “outstanding,” J.A. 44.
  The Court of Federal Claims viewed these as creating “cir-
  cumstances [which] certainly warranted a more detailed
  and thorough investigation” than the agency undertook.
  J.A. 45. While we acknowledge that RM’s multiple roles
  raise concerns, it remained within the agency’s discretion
  to conduct the investigation – which, again, included
Case: 22-1556    Document: 117      Page: 22    Filed: 09/16/2024




  22                       OAK GROVE TECHNOLOGIES, LLC v. US




  multiple interviews, sworn statements, and review and
  generation of numerous documents – in the manner it did.
       The Court of Federal Claims was further troubled by
  “the Agency’s total obfuscation of [RM’s] role in this pro-
  curement,” including the omission from the investigation
  memoranda of the “critical detail” of RM’s role as the chair-
  person of SSEB. J.A. 45-49. This finding is clearly errone-
  ous. RM’s status as SSEB chairperson was noted in
  documents that were produced to Oak Grove early in the
  litigation. See, e.g., J.A. 2651 (showing RM signature with
  title “SSEB Chairperson” in source selection plan docu-
  ment), 2700 (showing source selection team structure).
      Investigations are dynamic. A decision as to what ac-
  tions to take next is often influenced by what has been
  learned so far. Here, the contracting officer was permitted
  to be informed by the fact that all direct witnesses to RM’s
  actions denied any wrongdoing and to factor that evidence
  into a decision not to pursue additional investigative steps.
  The investigation undertaken was extensive, involving six
  interviews, obtaining a sworn statement from RM, and pro-
  ducing and gathering a voluminous record. While no doubt
  a more thorough investigation would also have been justi-
  fiable, the specific investigative steps to be taken are gen-
  erally left to the discretion of the agency and not a
  reviewing court.
      Thus, nothing about the Army’s investigation into the
  allegations relating to RM’s role render the agency’s deci-
  sion to award the contract to F3EA arbitrary and capri-
  cious.
Case: 22-1556    Document: 117      Page: 23    Filed: 09/16/2024




  OAK GROVE TECHNOLOGIES, LLC v. US                         23



                               4
      We turn now to Oak Grove’s attacks on Lukos. 1 In or-
  der to prevail on its bid-protest claims, Oak Grove must
  demonstrate that it was actually prejudiced by the Army’s
  actions, which here requires a showing that Lukos, as well
  as F3EA, was not an awardable offeror. See generally Ban-
  num, 404 F.3d at 1351 (explaining that, when considering
  merits of protester’s claim, court must “determine, as a fac-
  tual matter, if the bid protester was prejudiced by” the gov-
  ernment’s conduct). Otherwise, Oak Grove cannot show it
  had a substantial chance of being awarded the contract be-
  cause Lukos, like F3EA, was more highly rated than Oak
  Grove. 2



      1   We disagree with F3EA’s contention that the Court
  of Federal Claims violated the party presentation principle
  by even considering whether Lukos was financially respon-
  sible. The government made this issue relevant by point-
  ing to Lukos as a highly-rated bidder that would have
  blocked Oak Grove from receiving the SOF RAPTOR IV
  contract even if F3EA were knocked out of the competition
  by Oak Grove’s attacks. See J.A. 340-42 (Government’s ar-
  guing in response to Oak Grove’s motion for judgment that
  “Oak Grove was not ‘next in line’ for award”) (capitalization
  altered).

      2    Prejudice is an issue in connection with both
  standing and the merits of a claim. In considering preju-
  dice as part of evaluating whether a party has standing, we
  must presume that “the party will, if permitted to proceed
  with its claim, prevail on the merits.” REV, LLC, 
91 F.4th at 1164
. The party is no longer accorded this presumption
  at the merits stage, at which point a court must “review[]
  evidence of prejudice on the merits.” Bannum, 404 F.3d at
  1357. This distinction gives rise to the possibility that a
Case: 22-1556    Document: 117      Page: 24     Filed: 09/16/2024




  24                        OAK GROVE TECHNOLOGIES, LLC v. US




       As with its challenges to the Army’s actual award of
  the contract to F3EA, Oak Grove’s attempt to demonstrate
  that Lukos was not a qualified offeror also fails. The Court
  of Federal Claims found that Lukos could not have been
  awarded the contract because it was not a financially re-
  sponsible bidder. Specifically, the trial court found that
  “the administrative record conclusively demonstrates that
  Lukos, in fact, was ineligible for a contract award.” J.A. 27.
  The court erred by making this factual determination in
  the first instance. 3 Thus, the trial court’s conclusion that
  the existence of the higher-rated Lukos offer could not have
  defeated Oak Grove’s effort to prove prejudice on the merits
  is clearly erroneous.
       The administrative record does not “conclusively
  demonstrate[]” anything about Lukos’ financial responsi-
  bility or lack thereof. To the contrary, the administrative
  record is, for valid reasons, incomplete. Because the con-
  tract was awarded to F3EA, and not to Lukos, the contract-
  ing officer never had any occasion to decide whether Lukos
  was a financially responsible offeror. If it had ever become
  necessary for the contracting officer to do so, and if the of-
  ficer were to have found deficiencies in this regard, the of-
  ficer would have been required to refer the matter to the
  SBA, which would have worked with Lukos on potential



  party will demonstrate prejudice for purposes of standing
  but fail to do so on the merits.

       3  In so holding, we do not deny that the record con-
  tains indications that Lukos may not have been financially
  responsible. See, e.g., J.A. 28 (noting DCAA report stating
  Lukos was “found to be NOT financially capable of perform-
  ing the contract”) (internal emphasis omitted); J.A. 29
  (pointing to DCMA report stating Lukos is not found “to be
  financially capable of supporting” the Solicitation) (inter-
  nal emphasis omitted).
Case: 22-1556      Document: 117       Page: 25     Filed: 09/16/2024




  OAK GROVE TECHNOLOGIES, LLC v. US                               25



  fixes to the issues. See FAR § 9.105-2(a)(2) (“If the con-
  tracting officer determines that a responsive small busi-
  ness lacks certain elements of responsibility, the
  contracting officer shall comply with the procedures [re-
  quiring referral to SBA].”); FAR § 19.602-1(a) (“Upon de-
  termining and documenting that an apparent successful
  small business offeror lacks certain elements of responsi-
  bility . . . , the contracting officer shall . . . [r]efer the mat-
  ter to the cognizant SBA [barring other conditions].”). For
  these reasons, had an assessment of Lukos’ financial re-
  sponsibility been necessary to the Court of Federal Claims’
  decision, it should have remanded the issue for further
  agency review rather than attempt to resolve the issue it-
  self on an incomplete record. See CACI, 
67 F.4th at 1154
  (“Typically, . . . if the issue has not been addressed in the
  first instance by the contracting officer, a remand is neces-
  sary for the contracting officer to address the issue of prej-
  udice.”).
      Accordingly, the Court of Federal Claims erred in find-
  ing that Lukos was ineligible to win the contract due to its
  lack of financial responsibility and in concluding that Lu-
  kos’ bid did not defeat Oak Grove’s effort to satisfy the prej-
  udice component of the merits of its claims.
                                  5
      In sum, we hold that (1) Oak Grove waived its argu-
  ment that the Army was required to hold discussions, (2)
  F3EA was not required to include teaming agreements in
  its proposal, and (3) the quality of the agency’s investiga-
  tion into RM did not render its contract award decision ar-
  bitrary and capricious. We further hold that the Court of
  Federal Claims’ finding that Lukos’ offer could not defeat
  Oak Grove’s showing of prejudice was clearly erroneous.
  Because the trial court’s now-vacated findings on each of
  these points were the bases of its conclusion that the
  Army’s award of the SOF RAPTOR IV contract to F3EA
  was arbitrary and capricious, and that Oak Grove was
Case: 22-1556    Document: 117      Page: 26     Filed: 09/16/2024




  26                        OAK GROVE TECHNOLOGIES, LLC v. US




  prejudiced, its entry of an injunction was an abuse of dis-
  cretion. Hence, we vacate the order enjoining the Army
  from proceeding with its award to F3EA. See PGBA, 
389 F.3d at 1223
 (“We give deference to the Court of Federal
  Claims’ decision to grant or deny injunctive relief, only dis-
  turbing the court’s decision if it abused its discretion.”).
       Oak Grove raised additional challenges to the accepta-
  bility of F3EA’s and Lukos’ bids, relating generally to al-
  leged failures to submit certain documents or to meet
  budget requirements, that the Court of Federal Claims did
  not need to reach. See e.g., J.A. 222-23, 246-47, 262-66,
  533-34, 591, 608. On remand, the trial court will need to
  determine if it must resolve these (and any other) issues. 4
                                C
       Finally, we address the government’s appeal of the
  Court of Federal Claims’ imposition of sanctions for discov-
  ery violations. Our review is for abuse of discretion. See
  1-10 Indus. Assocs. v. United States, 
528 F.3d 859, 867
  (Fed. Cir. 2008). “A court abuses its discretion if the order
  imposing sanctions is based on an erroneous view of the
  law or on a clearly erroneous assessment of the evidence.”
  
Id.
 (internal quotation marks and citation omitted). There
  was no such abuse here.
     The Court of Federal Claims sanctioned the govern-
  ment for failing to compile an adequate administrative


       4  The parties advised us at oral argument of a second
  action pending before the Court of Federal Claims, involv-
  ing events occurring in the bidding process after the period
  at issue in this appeal. See Oral Arg. at 52:8-18, 52:30-
  53:06         (available         at        https://oralargu-
  ments.cafc.uscourts.gov/default.aspx?fl=22-1556_0306202
  4.mp3). The impact, if any, of our decision today on the
  second action is a matter left to the Court of Federal
  Claims.
Case: 22-1556    Document: 117      Page: 27     Filed: 09/16/2024




  OAK GROVE TECHNOLOGIES, LLC v. US                          27



  record and, thus, wasting judicial resources. Specifically,
  the trial court faulted the government for omitting two doc-
  uments from the administrative record: a DCMA report re-
  garding Lukos’ financial responsibility and a letter
  documenting the agency’s removal of SSEB chairperson
  RM from his role in the procurement process. The court
  explained:
        The Agency’s failure to include the omitted
        documents was neither reasonable nor excus-
        able – it was, rather, an improper compila-
        tion, submission, and certification of the
        administrative record. The omissions delayed
        resolving this case, wasted the Court’s judi-
        cial resources by forcing the Court to engage
        in fact finding on an incomplete record, and
        imposed substantial costs on Oak Grove.

  J.A. 80. These findings, including that the two omitted
  documents should have been included in the administra-
  tive record, are not clearly erroneous.
      Appendix C, ¶ 21 of the Rules of the Court of Federal
  Claims requires the government to “identify and provide
  (or make available for inspection) the administrative rec-
  ord in a protest case.” This rule arises from the fact that
  “to perform an effective review,” the Court of Federal
  Claims relies on the government to compile “a record con-
  taining the information upon which the agency relied when
  it made its decision as well as any documentation revealing
  the agency’s decision-making process.” Vanguard Recovery
  Assistance v. United States, 
99 Fed. Cl. 81, 92
 (2011). “The
  court’s review function is undermined when an agency as-
  sembles a record that consists solely of materials that in-
  sulate portions of its decision from scrutiny or that it deems
  relevant to specific allegations raised by a protester.” Joint
  Venture Comint Sys. Corp. v. United States, 
100 Fed. Cl. 159, 168
 (2011).
Case: 22-1556    Document: 117     Page: 28    Filed: 09/16/2024




  28                       OAK GROVE TECHNOLOGIES, LLC v. US




       As discussed above, the government injected into the
  litigation the issue of whether Lukos’ offer was awardable,
  and therefore a barrier to Oak Grove winning the contract.
  Lukos’ financial responsibility, therefore, became pertinent
  to whether Lukos could be awarded the contract. Even
  though we have ultimately decided that the Court of Fed-
  eral Claims should not have attempted to determine finan-
  cial responsibility itself, rather than remand to the Army
  for SBA to make such a determination, documents related
  to the issue were relevant to the court’s review of the bid
  protest, due to the government’s introduction of the Lukos
  issue. Thus, it was entirely appropriate for the Court of
  Federal Claims to find that the DCMA report should have
  been included by the government in the administrative rec-
  ord.
      Likewise, the government knew at the time it prepared
  the administrative record that Oak Grove was contending
  that F3EA should not have received the contract due to a
  conflict grounded in the allegedly improper conduct of the
  SSEB chairperson, RM. RM’s termination from the role of
  SSEB chairperson occurred in April 2020, see J.A. 3950-51,
  within the period of activity under attack by Oak Grove,
  which was January through May 2020. See, e.g., J.A. 1623
  (government’s Notice of Corrective Action dated January
  31, 2020); J.A. 2907 (contracting officer’s memorandum re-
  garding PIA and OCI allegations dated February 18, 2020);
  J.A. 3439 (contracting officer’s summary memorandum re-
  garding PIA and OCI allegations dated May 1, 2020).
  Given the centrality of Oak Grove’s allegations against RM
  to the awardability of F3EA’s offer, the RM termination let-
  ter – even if, as the government contends, it provides rea-
  sons unrelated to those raised by Oak Grove – should have
  been included in the administrative record.
      The government failed, however, to produce the DCMA
  report on Lukos’ financial responsibility and the RM termi-
  nation letter until after merits briefing was completed and
  oral argument had been heard. J.A. 48 (“[RM termination]
Case: 22-1556    Document: 117      Page: 29    Filed: 09/16/2024




  OAK GROVE TECHNOLOGIES, LLC v. US                         29



  letter was not included in the administrative record until
  after all of the briefing, oral argument, and status confer-
  ences were concluded.”); J.A. 64 (“Agency failed to include
  the DCMA report in the record until after both the comple-
  tion of the merits briefing and oral argument.”) (internal
  emphasis omitted). The government’s “omissions delayed
  resolving this case, wasted the Court’s judicial resources by
  forcing the Court to engage in fact finding on an incomplete
  record, and imposed substantial costs on Oak Grove.”
  J.A. 80. The Court of Federal Claims did not abuse its dis-
  cretion in determining that the government’s conduct was
  not “objectively reasonable” and, therefore, violated Court
  of Federal Claims Rule 11. 5
       Nor are we persuaded by the government’s suggestion
  that Rule 11 prohibits a trial court from acting on its own
  initiative to order payment of a monetary penalty to an op-
  posing party. See Gov’t Br. at 63 n.19. The government
  cites no binding authority to support this proposition,
  pointing only to a single opinion of the Court of Appeals for
  the Tenth Circuit. See Hutchinson v. Pfeil, 
208 F.3d 1180, 1184
 (10th Cir. 2000). While we respect the view of our
  sister circuit, we have not adopted this limitation on trial
  courts’ discretion ourselves. Moreover, the Rules of the
  Court of Federal Claims expressly contemplate that “[t]he
  court must not impose a monetary sanction[] on its own,
  unless it issued the show cause order . . . .” RCFC 11(c)(5)
  (emphasis added). The trial court in this case issued such
  an order before imposing the monetary sanction. See
  J.A. 52 (“[P]ursuant to RCFC 11 and this Court’s inherent



      5   Although the parties had, in the trial court, dis-
  puted the applicable legal standard for imposition of sanc-
  tions, on appeal they are in agreement that the
  government’s conduct should be assessed for “objective rea-
  sonableness.” See, e.g., Oak Grove Br. at 59; Gov. Reply Br.
  at 27-28.
Case: 22-1556     Document: 117      Page: 30    Filed: 09/16/2024




  30                        OAK GROVE TECHNOLOGIES, LLC v. US




  authority, the Court orders the government to show cause
  why monetary sanctions should not be imposed against De-
  fendant for its piecemeal and improper handling of the ad-
  ministrative record in this matter.”). We see no basis to
  deem this rule, which was indisputably followed, invalid.
     Accordingly, we affirm the trial court’s imposition of
  sanctions.
                                IV
       Because we find that (1) Oak Grove waived its argu-
  ment that the Army was required to hold discussions, (2)
  F3EA was not required to include a teaming agreement in
  its proposal, and (3) the Army’s investigation into RM’s al-
  leged misconduct did not render its contract award arbi-
  trary and capricious, Oak Grove has failed to prove that the
  award of the SOF RAPTOR IV contract to F3EA was arbi-
  trary and capricious. The Court of Federal Claims’ finding
  that another bidder, Lukos, was financially irresponsible
  and, hence, ineligible to win the contract, is also clearly er-
  roneous. Therefore, the judgment and the injunction or-
  dered by the Court of Federal Claims are vacated. The
  imposition of discovery sanctions on the government is af-
  firmed. The case is remanded to the Court of Federal
  Claims for further proceedings not inconsistent with this
  Opinion.
       AFFIRMED IN PART, VACATED IN PART, AND
                     REMANDED
                             COSTS
  No costs.


Reference

Status
Published