Forum Construction Co.
Opinion of the Court
Plaintiff submitted bids on two invitations for bids (IFB) for the construction of Marine Corps barracks at Camp Pendleton, California, the contracts requiring, inter alia, installation in each room of “built-in casework,” i.e. wardrobe and desk units. The IFB’s indicated that prospective bidders could obtain the plans and specifications package from defendant’s Plan Issue Office. The basic set of plans did not include, but incorporated by reference, the specification for the wardrobe — a NAYFAC Purchase Description. The basic plans and specifications informed bidders that NAVFAC documents could be obtained upon request from the Naval Supply Depot in Philadelphia, that all inquiries relating to plans and specifications should be directed to Boom 117 of the local Construction Branch Office and that all relevant documents, could be examined at Boom 206 of the local Specification Section Office. Plaintiff did not obtain a copy of the Purchase Description prior to bidding, but based its bids on the assumption that the wardrobes were to be constructed of wood as in prior similar contracts awarded to other contractors. Actually, the wardrobes were to be of metal. Plaintiff was low bidder on both contracts, and confirmed its considerably lower bids when requested by defendant to verify them. Plaintiff seeks a price adjustment to recover the additional cost of furnishing metal wardrobes, its claim having been denied by the Navy and General Accounting Office. In an opinion filed September 21, 1972, Commissioner James F. Davis found that the IFB’s and the basic plans and specifications clearly informed bidders where inquiries were to be addressed and where relevant documents could be obtained and/or examined ; that plaintiff did not act in a reasonable manner under the circumstances in attempting to acquire a copy of the
Case-law data current through December 31, 2025. Source: CourtListener bulk data.