Madison & P. R. v. Wisconsin
Opinion of the Court
By the first section of the act of congress, approved June 3, 1856, granting public lands to aid in the construction of railroads in the state of Wisconsin, there was granted to that state, “for the purpose of aiding in the construction of a railroad from Madison or Columbus, by way of Portage City, to the St. Croix river or lake, between townships 25 and 31, and from thence to the west end of Lake Superior and to Bayfield, and also from Fond du Lac, on Lake Winnebago, northerly to the state line, every alternate section of land, designated by odd numbers, for six sections in width, on each side of said roads respectively.” “But,” the act declares, “in case it shall appear that the United States have, when the lines or routes of said roads are definitely fixed, sold any sections or parts thereof granted as aforesaid, or that the right of pre-emption has attached to the same, then it shall be lawful for any agent or agents, to be appointed by the governor of said state, to select, subject to the approval of the secretary of the interior, from the lands of the United States nearest to the tier of sections above specified, as much land in alternate sections or parts of sections as shall be equal to such lands as the United States have sold or otherwise appropriated, or to which the right of pre-emption has attached as aforesaid, which lands (thus selected in lieu of those sold and to .which pre-emption has attached as aforesaid, together with the sections or parts of sections designated by odd numbers as aforesaid and appropriated as aforesaid) shall be held by the state of Wisconsin for the use and purpose aforesaid; provided, that the lands to be so located shall in no case be further than fifteen miles from the line of the roads in each case, and selected for and on account of said roads; pro
On 11th October, 1856, the state, by an act on that day approved [Gen. Acts Wis, p. 217], authorized the La Crosse & Milwaukee Railroad Company, a corporation created by the laws of Wisconsin, to construct and operate the roads described in the act of congress from Madison and Columbus, via Portage City, to St. Croix river and lake, and from thence, to the west end of Lake Superior and to Bayfield; and for the purpose of aiding such construction the state granted to that company all its interest and estate, present and prospective, in or to the lands granted by the act of June 3, 1856, for the construction of the railroad between the points and along the routes just named, together with all the rights, privileges, and immunities conferred or intended to be conferred by the act of congress. Prior to May 5, 1864, no portion of the entire route from Madison, via Portage City and St. Croix river or lake, to the west end of Lake Superior and to Bayfield, had been completed, except the line between Portage and Tomak, a distance of 61 miles; that part of the line was constructed in the years 1857 and 185S, and ever since April, 1858, has been in use for freight and passenger trains.
On May 5, 1864 [13 Stat. 66], congress passed an act “granting lands to aid in the construction of certain railroads in the state of Wisconsin.” Since the rights of parties to this litigation depend chiefly, if not altogether, upon the construction and effect which may be given to that act, it is necessary to refer at some length to its provisions. By the first section it is declared “that there be and is hereby granted to the state of Wisconsin, for the purpose of aiding in the construction of a railroad from a point on the St. Croix river or lake, between townships 25 and 31 to the west end of Lake Superior, and from some point on the line of said road, to be selected by said state, to Bayfield, every alternate section of public land designated by odd numbers, for ten sections in width on each side of said road, deducting any and all lands that may have been granted to the state of Wisconsin for the same purpose by the act of congress of June 3d, 1556, upon the same terms and conditions as are contained in the act granting lands to the state of Wisconsin to aid in the construction of railroads in said state, approved June 3d, 1856.” “But,” the act provides, “in case it shall appear that the United States have, when the line or route of said road is definitely fixed, sold, reserved, or otherwise disposed of any sections or parts thereof, granted as aforesaid, or that the right of pre-emption or homestead has attached to the same, then it shall be lawful for any agent or agents, to be appointed by said company to select, subject to the approval of the secretary of the interior, from the public lands of the United States nearest to the tier of sections above specified, as much land in alternate sections or parts of sections as shall be equal to such lands as the United States have sold or otherwise appropriated, or to which the right of pre-emption or homestead has attached as aforesaid, which lands (thus selected in lieu of those sold, and to which pre-emption or homestead right has attached as aforesaid, together with sections and parts of sections designated by odd numbers as aforesaid, and appropriated as aforesaid) shall be held by said state for the use and purpose aforesaid; provided that the lands to be so located shall in no case be further than 20 miles from the line of the said roads, nor shall such selection or location be made in lieu of lands received under the said grant of June 3d, 185G, but such selection and location may be made for the benefit of said state, and for the purpose aforesaid, to supply any deficiency under the said grant of June 3d, 1806.” By the second section of the act, a grant in similar terms, and upon like condi
On the 20th March, 1865, the lands granted by the act of May 5, 1864, were accepted by the state, “subject however, to all the conditions of said act of congress,” and the state consented “to execute the said trust, created by the aforesaid act of congress, pursuant in all tilings, to the terms, limitations, and conditions of said act.” The secretary of state of Wisconsin was required to-transmit a certified copy of the resolution, showing such acceptance, to the secretary of the interior.
Recurring to the provisions of the act of June 3, 1856, it seems to be reasonably clear, that that act contemplated, or at any rate rendered possible, the construction, by one company, of a single continuous railroad from Madison or Columbus, via Portage City and St. Croix river or lake, to the west end of Lake Superior and to Bayfield. But the continuity of such line was destroyed, and in my opinion was intended to be destroyed, by the act of May 5, 1804. Instead of making an additional or increased grant for one entire line, as described in the act of June 3, 1856, from Madison or Columbus to Lake Superior, congress, in one section of the act of 1864, made a distinct grant for a railroad from a point on the St. Croix river or lake, between townships 25 and 31, to the west end of Lake Superior and to Bay-field; in another section, a. distinct grant to aid in the construction of another railroad from Tomah to St Croix river or lake, between townships 25 and 31; and, in a third section, a distinct grant for another and distinct railroad from Portage City, Berlin, Doty’s Island or Pond du Lac, to Bayfield, thence to Superior. If congress had intended to give additional lands for the benefit of the same or a single and continuous line from Madison or Columbus, via St. Croix river or lake, to the west end of Lake Superior and to Bayfield, as described in the act of June 3, 1856, that result could have been effected
An important question arising upon the construction of the acts of 1S56 and 1SG4 is, whether the act of 1804 provides for the disposal of the granted lands upon a principle or by a rule different from that prescribed in the act of 1S56, and, further, whether that of 1864 has not practically, and without violating any of the rights of the parties to this cause, superseded the essential portions of the act of 1850. Touching the act of June 3, 1S50, some of the counsel insist that the lands, which by that act weve allowed to be selected in lieu of lands appearing to have been previously sold or otherwise appropriated by the government, or the lands earned by the construction of each 20 continuous miles, could have been located anywhere along the entire line from Madison, via Portage and St. Oroix river or lake, to the west end of Lake Superior and to Bay-field, and that the selection of such lands was not by that act limited to the public lands coterminous withany completed section of 20 miles and within 15 miles of the line of road. Without stopping now to inquire how far that construction of the act of June 3, 1850, is maintained by some of the adjudged cases, or by the action of any department of the government, it is quite certain that the act of May 5, 1864, admits of the disposal of the lands therein granted only upon the coterminous principle. Upon the completion of 20 consecutive miles in the manner required for a first class railroad, and upon the fact of such completion being certified by the governor, and sustained by affidavits, presented to the secretary of the interior, patents could issue for the lands earned in the construction of such twenty continuous miles. But the statute, in language too explicit to admit of doubt, or to require construction, declares that the patents shall convey tlie right and title to such earned lands to the companies entitled thereto, “on each side of the road, as far as the same is completed, and coterminous with said completed section, not exceeding the amount” prescribed in the act. According to the act of 1S64, patents for lands earned in pursuance of its provisions could issue only to the companies con-strueting the roads described in the act, or to the companies to whom the benefit of the grant might be transferred.
It is, however, contended with much earnestness that the act of 1864, so far from repealing or modifying the act of 1856, recognizes and requires the enforcement of its provisions as to all lands covered by the grant therein contained. But, in my opinion, this position is unauthorized by anything contained in the act of May 5, 1864, and is inconsistent with the evident intention of congress in making distinct grants for the several roads designated in that act. The grant is of “every alternate section of pub-lie land designated by odd numbers for ten sections in width on each side of said road, deducting any and all lands that may have been granted to the state of Wisconsin for the same purpose by the act of congress of June 3, 1856, upon the same terms and conditions as are contained in the act granting lands to the state of Wisconsin to aid in the construction of railroads in said state, approved June 3, 1856.” It certainly was not the intention of congress, by the act of May 5, 1864, to grant to the state every alternate odd section “for ten sections in width on each side of said road,” in addition to the alternate odd sections “for six sections in width on each side” of the roads, granted by the act of June 3, 1806. The purpose of the act of May 5, 1864, was, as to the several roads therein described, to grant the alternate odd sections for 10 sections in width in place of odd alternate sections for six sections in width granted by the act of June 3, 1856; and instead of indemnity limits for 15 miles, as provided in the last named act, to allow selections of lands within 20 miles of the located line. If, within the place limits, as established and rendered certain under the act of 1864, either by the location of a new route or by the partial adoption of the route located under the act . of 1S56, there should be found lands within the place limits, as established under the act of 1856, the title to which had not been earned or become vested, it was intended that such lands be taken as a part of the place limits under the act of 1864, and not in addition to the alternate sections for 10 sections in width granted by the act of 1864. That is manifestly what was meant by the requirement that the
If we are correct in our construction of The act of May 5, 1804, it follows that the lands coterminous with each completed section of 20 consecutive miles of the respective roads, described in and granted by that act, were exclusively for the benefit of the respective companies who should, under the provisions of that act, construct each completed section of 20 miles, and that no one of the companies constructing a road under that act could, for any deficiency of lands coterminous with its own line, supply such deficiency out of lands coterminous with other lines constructed by other companies under the same act. In other words, congress intended that all the lands granted Dy and earned under the act of May 5. 1864, by means of constructed road, should be disposed of according to-the coterminous principle.
It results, also, from what has been said, that its acceptance of the grant of May 5, 1804, subject to all the conditions prescribed in the act of congress, and its agreement to execute the trust therein created by congress, “pursuant in all things to the terms, limitations, and conditions in said act,” binds the state to an administration of the grant upon the coterminous theory, unless rights had previously accrued under and by virtue of the act of June 3, 1S5G, which congress could not, even with the consent of the state, ignore or violate, or unless, subsequent to the passage and acceptance of the act of 1S04, the state, with the consent of congress or in harmony with its legislation, recognized in some binding form the rights growing out of the act of June 3, 1856. Whether any of the parties to this litigation have any such rights, or whether any of them can object to the administration of the grant upon the principles enumerated in the act of May 5, 1804, we now proceed to inquire.
Before considering the exact status at the time of the passage of the act of May 5, 1864, of the several parties to this litigation, it is necessary to state somewhat in detail all that had been accomplished between the date of the passage of the act of June 3, 1850, and prior to the passage of the act of May 5, 1804. We have already referred to the act of October 11, 1850, whereby the state conferred the grant of June 3, 1856, upon the La Crosse & Milwaukee Bailroad Company. Prom the act of October 11, 1850, it appears that the title to the lands granted by the act of June 3, 1850, was not to vest or be subject to disposal except upon the completion of each section of 20 consecutive miles, and that the company was prohibited from making sales exceeding six sections of land for every mile of road completed; that the La Crosse & Milwaukee Bailroad Company agreed to complete the entire road from Madison and from Columbus, via Portage City, to the St. Croix river or lake, between townships 25 and 31, and from thence to the west end of Lake Superior and to Bayfield, within 10 years from June 3, 1850, and to complete those portions between Madison and Portage City, and between Columbus and Portage City, simultaneously, as nearly as practicable, and by December 31, 1858; that in ease the company should violate the provisions of the act of October 11, 1850, the legislature of Wisconsin might repeal that act, and might revoke the rights and franchises therein conferred, so far as the same had not been performed and fulfilled, and so far as the rights and privileges thereby granted had not become complete and absolute. The La Crosse & Milwaukee Bailroad Company promptly accepted the grant, lands, rights, and privileges conferred by the act of October 11, 1850, upon the terms, conditions, and restrictions therein contained. On 31st December, 1856, the company executed to Bronson and others, as trustees, a deed of trust or mortgage, containing the usual provisions, covering all the property which then constituted, or might thereafter constitute or be a part of the road of the grantor from Madison, by way of Portage, to St. Croix river or lake, between townships 25 and 31, and from Portage to La Crosse, to secure bonds amounting to $10,000.000 proposed to be issued for the construction of said roads, including all lands granted or intended to be granted to that company, so far as the same pertained or were applicable to the construction of the road from Madison, by way of Portage, to the St Croix river or lake, and also all the property which the company might thereafter acquire, as fully and amply
Following chronologically as far as possible, the history of the events as they transpired and were connected with the proposed lines of road, we find that on 2d August, 1856, there was certified to the governor of Wisconsin the completion, by the La Crosse & Milwaukee Railroad Company, of 20 additional miles westward from Portage City, making 61 continuous miles from that city westwardly to Tomah. in the direction of St. Croix river or lake, so as to admit of the running of regular trains, both freight and passenger. But on 23d July, 1858, the governor refused to certify the same to the secretary of the interior, placing his refusal upon the ground that the conditions upon which the grant was made by the state to the company had not been complied with, in that the company had not built any road from Madison and from Columbus to Portage, simultaneously or at all, while both of such roads — from Madison to Portage, and from Columbus to Portage — were to have been completed by December 31, 1858. After the location of the line from Madison to Portage in June, 1857, and prior to 1801, the La Crosse & Milwaukee Railroad Company partially graded portions thereof, expending from $50,000 to $75,000.
By an act of the legislature of Wisconsin approved April 12, 1861 [Priv. & Loc. Laws Wis. 1861, p. 333], the Sugar River Valley Railroad Company.was authorized to build and operate a railroad from Madison and the village of Columbus, on the most direct and feasible routes, to Portage, — both roads to be completed simultaneously, as near as practicable, and to be completed by December 31. 1863. For the purpose of aiding in the construction of such roads, there was granted to that company all the interest and estate, then present and prospective, of the state, in and to so much of the lands granted by the United States to Wisconsin by the act of June 3, 1SD6, as was or could be made applicable to the construction of that part of the railroad described in said last-named act, lying between Madison and Portage, together with all the rights, privileges, and immunities conferred or intended to be conferred by the act of congress, as to so much of said grant of land. The act provided for the acquisition of title to the land by the company, in the same mode and upon the same conditions substantially as prescribed in the act of October 11, 1856, in relation to the La Crosse & Milwaukee Railroad Company. That act provides also that, in case the Sugar Valley Railroad Company should construct their road, or any part of it, upon or over any route upon or over which any other railroad company was authorized to construct a railroad-, or upon or over which it had, prior to that date, actually surveyed or located its line of railroad, then it should be the duty of the Sugar Valley Railroad Company to settle with such railroad company, upon principles of justice and equity, for all the property and rights of property which it should take, injure, or destroy, and pay therefor whatever it should be reasonably worth; that in case the company should fail to expend at least $50,(X)0 in the construction of said road within one year, or should fail to complete the road from Madison to I’ortage.' so as to admit of the running of regular trains upon the same by December 31, 1863, or should otherwise violate the provisions of said act of April 12, 1861, the legis-
By an act approved 1st April, 1863 [Supp. Loc. & Priv. Laws Wis. 1863, p. 47], the Tomah & Lake St. Croix Railroad Company was incorporated, with authority to build and operate, on such route or from such point as the directors should determine in Tomah, on the track of the Milwaukee & La Crosse Railroad, or any other railroad running out of Tomah (that being the point westward of Portage City to which the 61 miles of road from Portage City, constructed in 1857 and 1S5S by the La Crosse & Milwaukee Railroad Company extended), by way of Black River Palls, thence by the most feasible route to such point on Lake St. Croix, between townships 25 and .31, as the directors should determine. For the purpose of aiding in the construction of said railroad there was granted to that company all the interest ana estate, then present and prospective, of Wisconsin in and to so much of the lands granted by the United States by the act of June 3, 1856, as was or could be made applicable to the construction of that part of said railroad lying between the village of Tomah and Lake St. Croix, together with the rights, privileges, and immunities conferred or intended to be conferred by said act of June 3, 1856, as to so much of said grant, the title to the lands thus granted to vest in the same mode and upon the same conditions, substantially, as those prescribed in reference to the La Crosse & Milwaukee Railroad Company by the act of October 11, 1856. The act further provided that so much of the act of October 11, 1856, and so much of the grant thereby of lands to the La Crosse & Milwaukee Railroad Company as was or could be made applicable to the construction of a railroad from Tomah to Lake St. Croix, and all the rights, privileges, and franchises thereby conferred, granted, and conveyed to the said La Crosse & Milwaukee Railroad Company, so far as the road from Tomah to St. Croix, and the lands therein granted to aid in the construction of the same, were concerned, were thereby repealed, revoked, annulled, and declared void. On the 5th May, 1863, Wallace and White received a deed from the marshal, and upon the same day organized a corporation under the name of Milwaukee & St. Paul Railway Company, to which was conveyed, by the decretal purchasers, among other things, the lands granted or intended to be granted to the La Crosse & Milwaukee Railroad Company by virtue of the acts of June 3, 1856, and October 11, 1856, so far as lands pertained or were applicable to the construction of the roads from Madison, by way of Portage, to the St. Croix river or lake. By an act approved March 31, 1864 [Gen. Laws Wis. 1864, p. 349], the St. Croix & Lake Superior Railroad Company was authorized and empowered to preserve and protect the timber growing or being upon any of the lands theretofore granted by congress to the state of Wisconsin by the act of June 3, 1S56, and “which are situated within fifteen miles of the located line of such company's railroad.”
We have now stated, so far as we have been able to collect them from the immense mass of papers before us, the important facts in connection with the lines of railroad between Madison, via Portage and St. Croix river, to the west end of Lake Superior and to Bayfield, which transpired between the passage of the act of June 3, 1856, and the acceptance by the state of the act of 5th May, 1864. At the date last named, as we have shown, no part of the line between Madison and Portage had been constructed. Nothing had been done, except to locate and partially grade the lines between those points. The company charged with the duty of completing the road from Madison to Portage by December 31, 1863, had, prior to May 5, 1864, failed and suspended operations, and was in suspension at the last-named date. Between Tomah and St. Croix lake, and between St. Croix lake and the west end of Lake Superior and Bayfield, nothing whatever had been done in the way of construction prior to May 5, 1864. The respective companies seeking or claiming the benefit of, or operating under, the grant of June 3, 1856, had done substantially nothing between To-mah and Lake Superior beyond locating their lines on the designated routes.
Returning to the inquiry whether the acceptance by the state of the provisions of the
The West Wisconsin Railroad Company,
Formerly the Tomah & Lake St. Croix Railway Company. It seems to be clear that that company, at least, is not in any position to object to the administration of the congressional grant upon the coterminous principle. It would seem to be estopped, upon every principle'of equity, from asserting any claim to supply its deficiency of land, if any such exists, out of lands beyond its line and along the road constructed and to be constructed by other companies north of its line and between St. Croix river or lake and Lake Superior. The state, by an act approved March 29, 1865, conferred upon that company the benefit of the increased grant, and, among other things, all and singular the rights, privileges, and interests conferred and bestowed upon the state by the act of May 5, 1864. including the privilege given by that act as to the extension of time for building the road from Tomah to St. Croix river or lake between townships 25 and 31. The company accepted the grant upon the same conditions and restrictions as were imposed by congress upon the state in the act of 1864. Besides, it accepted from congress, by joint resolution approved July 13, 1868, a further extension of three years for tiie completion of its road beyond the time limited by the act of 1S64. It accepted and caused to be filed with the secretary of the interior a certificate from the governor of the state, dated September 10, 1870, showing that the first SO miles constructed by it had been built and completed in the manner required by the act of May 5, 1864. It accepted and caused to be filed a similar certificate as to another section of 20 continuous miles. After these repeated recognitions of the act of May 5, 1804, after accepting the benefits, the extension of time, and all the privileges given by that act and by the act of 1S6S, it should not be heard to claim lands beyond its terminal points and within the limits granted to other companies who have entered upon the work of construction under the authority and upon the faith of the act of May 5, 1864. If. as claimed, the North Wisconsin Railroad Company, which is engaged in constructing the road from St. Croix lake or river to Bay-field, has received grants of land in violation of the coterminous principle prescribed in the act of May 5. 1804, that is a matter between the state or the United States and that company, of which the W’est Wisconsin Railroad Company may not complain. And so if the West Wisconsin Railroad Company has, as urged, received lands along or opposite to its line which it had no lawful right to receive under the act of 1864, that is not a matter to be corrected in this litigation, or of which other companies can complain under the present issues, provided such other companies were not themselves entitled to the lands thus alleged to have been illegally appropriated and received by the West Wisconsin Railroad Company. As to whether it has, in fact, received patents for lands to which it was not entitled, the court expresses no opinion. Its decision upon the claim of the West Wisconsin Railway Company is restricted to the single point that it cannot supply its alleged deficiency out of the lands north of St. Croix river or lake, and beyond its own terminal points, whether such lands are claimed by the North Wisconsin Railway Company, the Chicago, Portage & Superior Railway Company, or the Wisconsin Central Railway Company.
Madison & Portage Railway Company.
Our next inquiry relates to the claim of the Madison & Pottage Railway Company to supply its alleged deficiency from lands north of St. Croix river or lake. We have already seen that the rights, privileges, and franchises conferred in 1856 upon the La Crosse & Milwaukee Railroad Company, so far as the roads from Madison to Portage, and from Columbus to Portage, and the lands granted to aid in the construction of the same, were concerned, were, in the year 1801, revoked, annulled, and declared void by the state. The right of the state to make such revocation cannot well be disputed in view of the reservations in the act of October 11, 1856, and the failure of. the La Crosse & Milwaukee Railroad Company to complete such roads by the time stipulated in that* act, viz. December 31, 1858. What the La Crosse & Milwaukee Railroad Company may have previously done upon the line between Madison and Portage, in the way merely of grading. did not create any rights in its favor against the state or against the United States, certainly no rights that were complete or absolute, or which prevented the state, in 1861, from recalling its grant to that company. We have also seen that, in the statute of 1SG1, declaring such revocation. the right to construct the road from Madison to Portage was conferred upon the Sugar Valley Railroad Company, together with the lands, privileges, and immunities, as to that part of the original line, which had been previously conferred upon and granted to the La Crosse & Milwaukee Railroad Company. But the Sugar Valley Railroad Company (the predecessor of the Madison & Portage Railroad Company) did not comply with the terms of the said act of 1861. It did not, as it expressly agreed to do, expend upon its road, within one year from the passage of the act, the sum of $50.000; nor did it, by December 31, 1803, complete the road from Madison to Portage so as to admit of the running of regular trains upon the same, or at all. On the contrary, as early as January 26, 1SG3, it failed, suspend
Wisconsin Railroad Farm Mortgage Land Company.
We will now consider the case of the Wisconsin Railroad Farm Mortgage Land Company, which claims to be the successor of the La Crosse & Milwaukee Railroad Company as to all rights accruing upon the construction of the 61 miles of road between Portage and Tomah in the years 1857 and 1858. It will be remembered that the La Crosse & Milwaukee Railroad Company, on the 10th March, 1857, under authority conferred by the state, transferred to the St. Croix & Lake Superior Railroad Company the right to construct the original line north of St. Croix lake or river, and such benefits and privileges as tvere connected with the grant contained in the act of June 3, 1856. The indenture between the parties contained, as has been seen, an acknowledgment that the La Crosse & Milwaukee Railroad Company then possessed and did not surrender or release the right to select lands within 15 miles of, and more than six miles from, the route of the roads north of St. Croix river or lake to supply any deficiency which then existed or might thereafter exist in the quantity of lands to which the La Crosse & Milwaukee Railroad Company was or might be entitled upon that part of its line extending from Madison to the St. Croix river or lake. It does not appear that the state previously assented to or contemplated such an arrangement between the parties. But, waiving any consideration of its validity because of the absence of such assent, it is clear that the state, after its acceptance of the act of 1864, and before the date of its grants to the North Wisconsin Railroad Company, the Chicago & Northern Pacific Air Line Railway Company, and Wisconsin Central Railway Company, conferred upon the Wisconsin Railroad Warm Mortgage Land Company the benefit of the reservation contained in the contract and indenture of March 10, 1857. The purchasers at the decretal sale of the rights and interests conveyed by the mortgage to Bronson and others, by apt and sufficient words, conveyed and transferred to the Milwaukee & St. Paul Railroad Company before the passage of the act of May 5, 1864. Although that company' necessarily took subject to the right of appeal and revocation reserved to the state in the charter of the La Crosse & Milwaukee Railroad Company, and was, therefore, for the reasons already stated, in no position to object to the state’s accepting and agreeing to execute the provisions of the act of May 5,
Some question has been made as to the precise extent of the grant under the two acts of congress. We understand that it covers G sections in width on each side of the line in the one case, and 10 sections in the other, of lands in place as they existed on the ground, so that if any of these sections were fractional, or from any cause were not full sections, the state could not make up the deficiency from lands in the indemnity limits, because as to the lands in place the act operates directly by specific description, but, when there was not land in place to meet the call of the grants, whether the deficiency was more or less, it was competent to supply it by sections from the indemnity limits; or if. as might happen, there were parts of sections of the lands in place excluded from the grants by the terms of the acts, it was competent to supply the deficiency from the indemnity limits by a similar legal subdivision of the land. It would seem to be impracticable to administer the trust on any other basis. In supplying deficiencies it must be by sections, whether full or fractional, and by legal subdivisions. Deficiencies in place limits, caused by sales or pre-emptions previous to the location of routes, whether before or after the passage of the acts, may be .supplied from the indemnity limits.
Although the Wisconsin Central Railroad Company has filed no cross bill, and has only presented its claims by answer, it may not be improper for us to express an opinion upon the effect of the grant by the act of 1864, when there is a conflict or overlapping of lands granted to the different railroads as they approach Lake Superior, large quantities of land being thus granted by the act to different roads. These grants are made by the same law operating on the lands granted at the same time. The Wisconsin Central Railroad has completed its road to Ashland, on Lake Superior, a point not named in the act, but up to the present time no road has been finished to Bayfield or to the west end of Lake Superior, and, without foreclosing the parties upon this question, we should be inclined to think that the different companies, as to all lands overlapping in the respective grants, must be considered tenants in common, without regard to priority of construction.
I am not sure that I have touched upon every point in this complicated cause which is essential to the determination of the lights of parties, nor am I quite sure that the recital of facts contained in this opinion is in all respects full and accurate. It would have-been gratifying to me to have had more time-than has transpired since the conclusion of the oral argument for the examination of the record and the consideration of the mauy difiicult questions suggested by counsel. But the interests of parties seem to require an early disposition of the cause, and I have not felt at liberty to postpone an announcement of my conclusions to such a time as would give me all the opportunity for careful deliberation jyhicli the large interests involved seemed to'^emand. I have been the more willing to pursue this course since counsel concurred in stating that the cause, however decided in this court, would be taken to-the supreme court of the United States for final determination. Upon the filing of this opinion in court,' counsel will prepare an order dismissing the bill of complainant and' the cross bill of the West Wisconsin Railroad Company, and referring the cause to-the special master with such directions as are consistent with this opinion, and as will facilitate the final determination of all the-remaining issues.
[An appeal was taken, in this case to the supreme court of the United States, but was dismissed by stipulation of counsel on April 8. 1SG4.]