Eaton v. Neumark
Opinion of the Court
The master at Dantzig signed two bills of lading for iron rails shipped there by the same shipper, all deliverable at Philadelphia, to order,—the one for 1,825 pieces of iron flange rails; the other for 192 pieces of flange rails, and 814 pieces of tram rails. The bills of lading were transferred to different consignees, both of whom provided for the delivery of the iron on their behalf at Philadelphia to the Reading Railway Company at its wharf. The iron was not allowed to bo put on the wharf, but was required to be put into the Reading Railroad cars direct from the ship, and was weighed by a United States weigher in the cars, after it had boon thus loaded. The master of the vessel and a United States inspector supervised the handling of the iron as it went from the ship to the cars, and counted the pieces. The weighers’ returns specified the amount forwarded by cars on account of each consignee, and made the respondents’ iron fall short about 28 tons in weight, and 245 in number of pieces; a shortage which is set up as an offset to the libel-ant’s claim for freight.
' The testimony, taken on commission at Dantzig, goes to show that the exact number of pieces and the weight given in the bill of lading were put on hoard the vessel there. The weigher’s returns at Philadelphia of the whole consignment of rails under both bills of lading shows an excess of 243 pieces in the number of rails, and about 20 tons less of aggregate weight. The circumstances of the case, the excess of the
Upon the testimony, as I have already said, I have no doubt that the vessel did deliver to the railroad company all that was shipped at Dantzig. It is impossible to say how the large difference of 20 tons in the two weights arose. Both weights were proved by the respondents. There is nothing to show that the one is correct rather than the other. The burden of proof is upon the respondents. To hold the ship for the larger weight, they must show a preponderance of proof in its favor; which is not shown. If the Philadelphia weight is correct, certainly the ship is not answerable for the Dantzig weight; if it was erroneous, then the consignees, one or both, have actually received more weight than is acknowledged. For, as regards the amount actually received, they adopt the Philadelphia weight. No subsequent test of that weight was made, or, if made, it was not put in evidence. In view of the large apparent shortage, it seems but natural that some further- inquiry about the weight, or -number of cars, should have been made of the persons to whom the iron was delivered by the railroad company; as well as a demand of the eight-tons excess forwarded by the company on Walbaum & Co.’s account. As the evidence stands, I must assume the Philadelphia weight to be the correct weight of all that was shipped.
The only question that remains is whether the ship discharged her legal duty as to the manner of delivering what she had on board. It was the master’s duty to see that the cargo, for which he had given separate bills of lading, though received from one shipper, should be delivered in separate lots according to the bills of lading. Bradley v. Dunipace, 1 Hurl. & C. 521. The separate bills of lading, deliverable to order, were notice that the goods might be dealt with separately; and before delivery the master knew that they had been transferred to different holders, and that their rights were quite distinct. The master was therefore bound to deliver to each separate holder, either his own goods, or, if they were all alike in value and mixed up, as he says they were, then the proper
The ship was required to deliver at a dock directed by the consignees, and they directed the Reading Railroad dock for delivery into the cars of that company on their account. The company did not permit any discharges upon the wharf, but only into its cars for transportation. That was, therefore, the mode of delivery required by both consignees; and, in the absence of the consignees themselves, or any other person to represent them, the company would be the common agent and representative of both consignees to receive delivery from the ship. The United States inspector, however, is proved to have been specially engaged by the respondents to act in their behalf, and to see that they got their proper amount of rails, and he undertook to do so. No one specially represented Walbaum & Co., the other consignees. The inspector testifies that the master and himself did endeavor to appropriate to each the proper amount. The master testifies that he separated all the tram rails and loaded them in the cars for the respondents, and designated the rails for them as they went into the cars; and in one of these cars, nearly filled with the tram rails, he was also particular to put 192 pieces of flange rails, the number called for by the respondents’ bill .of lading. The inspector confirms this. The respondents could not tell whether the deficiency in what they received was in the flange rails or in the train rails; the prices of both being the same, no attention was given to that pioint, and no complaint is made as to the identity of any particular rails. A tally of the number of pieces was kept by the master and the inspector as the iron was discharged from the ship into the cars. When a car was loaded it ivas sent down to the weigher, who weighed it and marked the weight of the rails under the car number; and the inspector gave the weigher the address of the car, either verbally or on a slip of paper, and the cars were supposed to be marked and forwarded accordingly. Corresponding entries were made in the weigher’s books, and the the cars wore forwarded as addressed. The original books ivero not produced in evidence; only a transcript, showing the aggregate number of ears, the weight of iron, and the number of pieces forwarded on account of each consignee.
In this work it was manifestly no part of the master’s duty to act as forwarder; nor to see lo the marking of the cars, either with the proper address, or the proper weight; nor to see that all the cars loaded were properly dispatched. He was required only to discharge the iron from the ship into the cars, and to designate what iron was for each consignee. Considering that there was an apparent shortage or difference of 20 tons in aggregate weight, and that notwithstanding that fact an actual excess of 8 tons was sent to Walbaum & Co., it is clear that a gross mistake was committed by somebody in sending at least one car-load (about 15 tons) to Walbaum & Co. that ought to have been sent to the respondents. Rut no sufficient proof appears that this mistake was the master’s, or by the master’s fault. The master did not direct the weigher how to mark the cars, and he was not bound to do so; nor was he bound to examine the ears to see that they were rightly marked. That was the duty of the
In my judgment the case stands the same as if one of the respondents, while receiving delivery by loading the iron into the cars, had himself designated to the weigher the person for whom each car should be marked. If they did not get what belonged to them, was it not clearly by their agent’s own fault? How could he throw the responsibility of a clear mistake made by some one in the address, of say one car-load, upon the master, except on clear proof that the error was the master’s, and did not arise from any mistake of his own or of the weigher’s? There is no such proof. The very fact that Walbaum & Co. were receiving- 488 pieces and 8 tons in excess of the weight specified in their bill of lading, while the respondents were receiving 245 pieces and 28 tons short of what their bill of lading specified, convicts the inspector, who was acting for the respondents, and who knew the weights called for by each bill of lading, either of the grossest inattention to the duties he had assumed, or else of a mere verbal mistake in communicating to the weigher the name of the consignee designed; unless, indeed, the mistake was on the -weigher’s part in understanding and writing down what had been told him, which is equally possible. The excess of pieces and weight in the cars marked for Walbaum & Co.’s account convinces me that this is not a case of an intentional appropriation of that whole weight to Walbaum & Co., but of accidental error in the communication of the master’s direction, or in the execution of the direction, of one car-load, contrary to the intent. The inspector swears that he was not inattentive, but trying to get the proper weight for the respondents. If this is true, the necessary conclusion is that the mistake as to the direction of one car-load was an accidental misdirection by the inspector to the weigher, or that the weigher misunderstood and assigned one car to the wrong person. In neither case would the fault be the master’s. The fact that the number of pieces sent to the respondents by the railroad company is even 53 pieces short of the number of tram rails, all of which belonged to the respondents, which were, as the master says, easily distinguishable and separated, and were designated by him for the respondents, besides the additional 192 pieces of flange rails put with them, confirm my conviction that this mistake was not the master’s. The proof establishes a certain mistake on the part of the weigher or the inspector. It goes no further, except inferentiafly, as to the author of the error. The fact that one of these two persons made a mistake in directing one car seems to me not to afford any legal inference that the master made a similar mistake. The error cannot be traced back of the inspector. The inspector’s act was not the master’s act, for he was not the master’s agent, but the respondents’ agent. Upon the evidence, moreover, if any mistake could be inferred on the part of the master, or could be legally charged to him, in assigning or directing one car-load to Walbaum & Co. that should have gone to the respondents,
Case-law data current through December 31, 2025. Source: CourtListener bulk data.