Summers v. Chicago, S. F. & C. Ry. Co.
Opinion of the Court
What has been said in deciding the Lewis Case, 49 Fed. Rep. 708, is applicable in a measure to this case. The contracts involved in the two cases are practically the same, but the work done by Summers was done 65 miles west of the Lewis, Wood & Penny work, and, as a whole, appears to have been of a less difficult and expensive character. The total amount of material taken from all the cuts on the six sections of the road constructed by Summer's was only about 22 per cent, of the gross amount taken from the cuts on the five sections constructed by Lewis, Wood & Penny in Missouri. A very considerable portion of Summers’ -work was in the valley of the Chariton river, and the court is satisfied that the bulk of the material handled was much easier to move than on the Lewis, Wood & Penny sections. The. court had the advantage of hearing all of the oral testimony in. ¿his case, and it will suffice to say that it created a very strong impression that Mr. Summers’ work was liberally estimated under any construction of " the dó'ntráet. That impression has been confirmed by a careful perusal of the testimony since the case was argued. It is true that the division engineer in charge of this portion of the work construed the “plowing test” as applicable to hardpan, cemented gravel, etc.; but that is not an adequate reason for disturbing the final estimate, unless the plaintiff sustained some injury. If the test actually applied gave him all the loose-rock classification that he was fairly entitled to, the estimate should not be disturbed. At the conclusion of the work, and evidently with a full knowledge'Of all the facts, Mr. Summers
Case-law data current through December 31, 2025. Source: CourtListener bulk data.